Furnace heat prediction device and method, and furnace heat control guide device and method

The furnace heat prediction device enhances accuracy by using time delay and constant gain parameters to model past performance data, effectively predicting and controlling blast furnace heat despite unobserved factors, ensuring stable hot metal temperature.

JP7575555B2Active Publication Date: 2024-10-29KOBE STEEL LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023172936
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-10-04
Publication Date
2024-10-29
Estimated Expiration
2040-02-21

AI Technical Summary

Technical Problem

Existing blast furnace heat prediction systems struggle with accuracy due to unobserved factors that are not accounted for, particularly during abnormal conditions, leading to inaccuracies in predicting hot metal temperature changes.

Method used

A furnace heat prediction device that generates a furnace heat model based on past performance data, using time delay and constant multiplication gain parameters to predict furnace heat with higher accuracy by considering unobserved factors as approximately constant over a short period, and adjusting weights based on proximity to the prediction time.

Benefits of technology

The system accurately predicts furnace heat by minimizing the influence of unobserved factors, allowing for precise control of operating conditions to stabilize hot metal temperature.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007575555000014
    Figure 0007575555000014
  • Figure 0007575555000015
    Figure 0007575555000015
  • Figure 0007575555000016
    Figure 0007575555000016
Patent Text Reader

Abstract

To provide a furnace heat prediction device and a furnace heat prediction method capable of predicting the furnace heat of a blast furnace more accurately, and to provide a furnace heat control guide device and a furnace heat control guide method for guiding operation for furnace heat control using the furnace heat prediction device and the furnace heat prediction method, respectively.SOLUTION: A furnace heat control guide device D equipped with a furnace heat prediction device includes a furnace heat model generation section 23 for sequentially generating a furnace heat model for determining a change of furnace heat based on past actual data from a predetermined time point to a predetermined past time, and a furnace heat change processing section 24 for determining a change of furnace heat after a predetermined time point using a furnace heat model generated by the furnace heat model generation section 23. The furnace heat model is represented by two predetermined equations.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a furnace heat prediction device and a furnace heat prediction method for predicting the furnace heat of a blast furnace, and a furnace heat control guidance device and a furnace heat control guidance method for guiding operation conditions for furnace heat control. [Background technology]

[0002] The molten iron temperature of a blast furnace, which is represented by the furnace heat of the blast furnace, is important for maintaining the quality of the molten iron, and is generally controlled to be within a predetermined specified range by manipulating (changing, adjusting, controlling) the operating conditions such as the blast temperature, blast humidity, blast volume, pulverized coal injection volume, and coke ratio. However, in the blast furnace of a large plant, even if the operating conditions are manipulated, the molten iron temperature does not change immediately, and the change in the molten iron temperature appears after several hours (e.g., 2 hours) or more have passed. For this reason, so-called feedback control is difficult, and in order to stabilize the molten iron temperature, there is a demand for prediction of the molten iron temperature several hours in advance, which is proposed, for example, in Patent Document 1.

[0003] The blast furnace heat prediction device disclosed in Patent Document 1 is a device that predicts the furnace heat of a blast furnace as a molten iron temperature, and includes a data expansion unit that extracts data up to a first predetermined time prior to each actual value of actual process data including information on actual values ​​of blast furnace operating conditions and actual values ​​of molten iron temperatures when the blast furnace is operated under those operating conditions to create an actual data set, a data difference value calculation unit that uses the actual data set to calculate the amount of change over time of each actual value, a data difference value expansion unit that extracts data on the amount of change over time of each actual value for a second predetermined time to create a time change amount data set, and a data expansion unit that extracts data on the amount of change over time of each actual value for a second predetermined time to create a time change amount data set. the furnace heat prediction formula creation unit creates a prediction formula for the time change of the blast furnace operating conditions, which expresses the relationship between the time change of the blast furnace operating conditions and the time change of the molten iron temperature, using the time change of the actual values ​​of the operating conditions in the time change data set and the similarity calculated by the similarity calculation unit; and the furnace heat prediction unit predicts the time change of the molten iron temperature at the prediction time by substituting the time change of the blast furnace operating conditions at the prediction time into the prediction formula created by the furnace heat prediction formula creation unit. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2018-145520 A Summary of the Invention [Problem to be solved by the invention]

[0005] The blast furnace heat prediction device disclosed in the above-mentioned Patent Document 1 obtains a prediction formula based on a time change amount data set similar in time change amount, and predicts the time change amount of the molten iron temperature at the prediction time. However, when a prediction formula is obtained based on a physical relationship, the prediction formula should be the same regardless of which time change amount data set is used. In reality, there are unobserved factors that are not included in the physical relationship, and the blast furnace heat prediction device disclosed in the above-mentioned Patent Document 1 absorbs the unobserved factors into the prediction formula by obtaining a prediction formula based on a time change amount data set similar in time change amount. However, since a blast furnace is a complex and very large system, the furnace conditions (conditions of the blast furnace) of the blast furnace are not necessarily similar just because the time change amount is similar, that is, the unobserved factors are not necessarily the same. In particular, in an abnormal state where the furnace heat is reduced, this tendency is considered to be remarkable. Therefore, there is a risk that a prediction formula is obtained based on data from a period in which unobserved factors are different from the prediction time, and the change amount of the molten iron temperature at the prediction time is predicted.

[0006] The present invention has been made in consideration of the above-mentioned circumstances, and its purpose is to provide a furnace heat prediction device and a furnace heat prediction method that can predict the furnace heat of a blast furnace with greater accuracy, as well as a furnace heat control guidance device and a furnace heat control guidance method that use the furnace heat prediction device and the furnace heat prediction method, respectively, to guide operational operations for furnace heat control. [Means for solving the problem]

[0007] As a result of various studies, the inventor of the present invention found that the above object can be achieved by the present invention described below. That is, a furnace heat prediction device according to one aspect of the present invention is a device for predicting furnace heat, and includes a furnace heat model generation unit that sequentially generates a furnace heat model for determining a change amount of furnace heat based on past performance data from a predetermined time point to a predetermined past time, and a furnace heat change amount processing unit that uses the furnace heat model generated by the furnace heat model generation unit to determine a change amount of furnace heat after a predetermined time has elapsed from the predetermined time point, and the furnace heat model is expressed by Equation 2 and Equation 3 described below. Preferably, in the above-mentioned furnace heat prediction device, the predetermined past time is a time during which a predetermined unobserved factor that affects the furnace heat and is set in advance is assumed to be substantially constant. Preferably, the predetermined past time is any one of 24 hours, 48 ​​hours, and 72 hours. Preferably, in the above-mentioned furnace heat prediction device, the predetermined time is a time during which the two parameters determined based on the past performance data from the predetermined time point to the predetermined past time are assumed to be substantially valid (substantially unchanged). Preferably, the predetermined time is any one of 3 hours, 5 hours, and 6 hours. Preferably, the above-mentioned furnace heat prediction device further includes a furnace heat prediction processing unit that calculates the furnace heat after a predetermined time has elapsed from the predetermined time point based on the change in furnace heat calculated by the furnace heat change amount processing unit and the furnace heat at the predetermined time point.

[0008] Since a blast furnace is a very large system, it is considered that the unobserved factors that affect the furnace heat of a blast furnace do not change suddenly but are approximately constant for a relatively short period of time, such as a dozen hours or several tens of hours, relative to continuous operation. The above-mentioned furnace heat prediction device predicts the effect of the unobserved factors on the furnace heat with a time lag θ i、2 , θ i、3 and constant multiplication gain θ i、1 The above two parameters are used to absorb the unobserved factors, and a furnace heat model is generated based on past performance data from a specified point in time to a specified past time to determine the amount of change in furnace heat after a specified time has elapsed from the specified point in time.Since the furnace heat model and the amount of change in furnace heat after the specified time have elapsed can be determined within a period during which unobserved factors are considered to be approximately constant, the furnace heat of the blast furnace can be predicted with greater accuracy.

[0009] In another aspect, in the furnace heat prediction device, the furnace heat model generation unit uses the past performance data by weighting the data with a larger value the closer it is to the predetermined time point.

[0010] As described above, it is considered that the unobserved factors are approximately constant over a predetermined period, but it is difficult to consider that the unobserved factors do not change at all without slight changes. The furnace heat prediction device uses past performance data with a larger weighting value the closer it is to the predetermined time point, so that the influence of the unobserved factors closer to the predetermined time point can be largely reflected in the furnace heat model, and therefore the furnace heat of the blast furnace can be predicted with higher accuracy.

[0011] In another aspect, in the above-mentioned furnace heat prediction device, the furnace heat model generation unit generates the furnace heat model by calculating the parameters so that an objective function expressed using the difference between the amount of change in furnace heat based on the past actual data and the amount of change in furnace heat calculated by the furnace heat model based on the past actual data is minimized.

[0012] Such a furnace heat prediction device can appropriately determine parameters.

[0013] In another aspect, in the above-mentioned furnace heat prediction device, the furnace heat model generation unit calculates a time-delay parameter at a predetermined time interval, and adds a second difference between a constant multiplication gain parameter calculated in the past and a constant multiplication gain parameter predicted at the present time to the objective function.

[0014] Such a furnace heat prediction device takes into account the second difference between the parameter of the constant multiplication gain calculated in the past and the parameter of the constant multiplication gain predicted at the present time, thereby making it possible to avoid cases in which the parameter is accidentally calculated to be larger (or smaller), and to generate a more appropriate furnace heat model.

[0015] In another aspect, in the above-mentioned furnace heat prediction device, the furnace heat model generation unit calculates a time delay parameter at a predetermined time interval, and calculates the time delay parameter so as to reduce a third difference between a time delay parameter calculated in the past and a time delay parameter predicted at the present time.

[0016] Such a furnace heat prediction device calculates the time lag parameter by reducing the third difference between the time lag parameter calculated in the past and the time lag parameter predicted at the present time. This makes it possible to avoid cases where the parameter is accidentally calculated to be too large (or too small), and to generate a more appropriate furnace heat model.

[0017] In another aspect, in the furnace heat prediction device described above, the furnace heat model is further represented by a function related to a plurality of predetermined set causal factors that affect the furnace heat, and further includes a factor model generation unit that generates a factor model for determining at least one of the plurality of set causal factors based on past performance data from the predetermined time point to a second predetermined past time, and the furnace heat change amount processing unit further uses the factor model generated by the factor model generation unit to determine the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point. Preferably, in the furnace heat prediction device described above, the set causal factors include a furnace wall heat loss amount, which is the amount of heat radiated from the furnace wall, and a solution loss heat amount, which is the amount of heat due to a solution loss reaction, and the factor model generation unit generates a heat loss amount factor model for determining the furnace wall heat loss amount and a solution loss factor model for determining the solution loss heat amount. Preferably, in the furnace heat prediction device described above, the factor model is a time series model using autocorrelation.

[0018] Such a furnace heat prediction device uses the furnace heat model generated by the furnace heat model generation unit and the factor model generated by the factor model generation unit to determine the amount of change in furnace heat after a specified time has elapsed from the specified point in time, so that it can take into account changes in the set causal factors and more accurately predict the furnace heat of a blast furnace.

[0019] A furnace heat prediction method according to another embodiment of the present invention is a method for predicting furnace heat, and includes a furnace heat model generation process for sequentially generating a furnace heat model for determining an amount of change in furnace heat based on past actual data from a predetermined point in time to a predetermined past time, and a furnace heat change amount processing process for determining an amount of change in furnace heat after a predetermined time has elapsed from the predetermined point in time using the furnace heat model generated in the furnace heat model generation process, and the furnace heat model is expressed by Equations 2 and 3 described below.

[0020] This furnace heat prediction method estimates the effect of unobserved factors on furnace heat with a time lag of θ i、2 , θ i、3 and constant multiplication gain θ i、1 The above two parameters are used to absorb the unobserved factors, and a furnace heat model is generated based on past performance data from a specified point in time to a specified past time to determine the amount of change in furnace heat after a specified time has elapsed from the specified point in time.Since the furnace heat model and the amount of change in furnace heat after the specified time have elapsed can be determined within a period during which unobserved factors are considered to be approximately constant, the furnace heat of the blast furnace can be predicted with greater accuracy.

[0021] A furnace heat control guidance device according to another aspect of the present invention comprises any one of the above furnace heat prediction devices, and a guidance unit that uses the furnace heat model generated by the furnace heat model generation unit to calculate the amount of change in furnace heat at the time of prediction, and provides guidance on operating conditions for changing the furnace heat based on the calculated amount of change in furnace heat at the time of prediction and the current furnace heat. A furnace heat control guidance method according to another aspect of the present invention comprises the above furnace heat prediction method, and a guidance step of calculating the amount of change in furnace heat at the time of prediction using the furnace heat model generated in the furnace heat model generation step, and providing guidance on operating conditions for changing the furnace heat based on the calculated amount of change in furnace heat at the time of prediction and the current furnace heat.

[0022] According to these, a furnace heat control guidance device and a furnace heat control guidance method using the above-mentioned furnace heat prediction device and furnace heat prediction method, respectively, can be provided. In this way, the furnace heat control guidance device and the furnace heat control guidance method are equipped with the above-mentioned furnace heat prediction device and furnace heat prediction method, respectively, so that the furnace heat at the time of prediction can be predicted more accurately based on the change in the furnace heat at the time of prediction and the current furnace heat. Therefore, the above-mentioned furnace heat control guidance device and furnace heat control guidance method can appropriately guide the operating conditions. Effect of the Invention

[0023] The furnace heat prediction device and furnace heat prediction method according to the present invention can predict the furnace heat of a blast furnace with higher accuracy. According to the present invention, a furnace heat control guidance device and a furnace heat control guidance method can be provided that use the furnace heat prediction device and the furnace heat prediction method, respectively, to guide operation for furnace heat control. [Brief description of the drawings]

[0024] [Figure 1] 1 is a block diagram showing a configuration of a furnace heat control guidance device including a furnace heat prediction device in an embodiment. [Diagram 2] FIG. 1 is a conceptual diagram for explaining the state of a plurality of sensors arranged in a blast furnace. [Diagram 3] 5 is a flowchart showing a data collection operation in the furnace heat control guidance device including the furnace heat prediction device. [Figure 4] 5 is a flowchart showing the operation of furnace heat prediction and furnace heat control guidance in a furnace heat control guidance device equipped with the furnace heat prediction device. [Diagram 5] FIG. 1 is a diagram showing actual and predicted values ​​of the change in molten iron temperature over time. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0025] Hereinafter, one or more embodiments of the present invention will be described with reference to the drawings. However, the scope of the invention is not limited to the disclosed embodiments. In addition, configurations with the same reference numerals in each drawing indicate that they are the same configurations, and their description will be omitted as appropriate. In this specification, when referring to a general term, a reference numeral without a subscript is used, and when referring to an individual configuration, a reference numeral with a subscript is used.

[0026] The furnace heat prediction device in the embodiment is a device for predicting furnace heat, and includes a furnace heat model generation unit that generates a furnace heat model for calculating the amount of change in furnace heat based on past performance data from a predetermined time to a predetermined past time, and a furnace heat change amount processing unit that calculates the amount of change in furnace heat after a predetermined time has elapsed from the predetermined time using the furnace heat model generated by the furnace heat model generation unit, and the furnace heat model is expressed using two parameters, time delay and constant multiplication gain. The furnace heat control guidance device in the embodiment includes the above-mentioned furnace heat prediction device, and a guidance unit that calculates the amount of change in furnace heat at the time of prediction using the furnace heat model generated by the furnace heat model generation unit, and guides the operating conditions for changing the furnace heat based on the amount of change in furnace heat at the time of prediction and the current furnace heat. Below, the furnace heat prediction device and furnace heat control guidance device in the embodiment, as well as the furnace heat prediction method and furnace heat control guidance method executed by these furnace heat prediction device and furnace heat control guidance device, respectively, will be more specifically described by explaining the furnace heat control guidance device equipped with the furnace heat prediction device.

[0027] Fig. 1 is a block diagram showing a configuration of a furnace heat control guide device including a furnace heat prediction device in an embodiment. Fig. 2 is a conceptual diagram for explaining the state of a plurality of sensors arranged in a blast furnace.

[0028] In an embodiment, a furnace heat control guidance device D equipped with a furnace heat prediction device includes, for example, a sensor group 1 consisting of a plurality of sensors 1-1, 1-2, ..., a control processing unit 2, an input unit 3, a display unit 4, an interface unit (IF unit) 5, and a memory unit 6, as shown in Figures 1 and 2.

[0029] The sensor group 1 is a device for measuring furnace heat and a predetermined set causal factor that affects the furnace heat. In this embodiment, the sensor for measuring the furnace heat is a temperature sensor for measuring the molten iron temperature. The type, number, and location of the sensor for measuring the set causal factor relative to the blast furnace BF are appropriately determined according to the set causal factor. In this embodiment, the set causal factors are, for example, six factors: the blast temperature heat amount of the blast sent to the blast furnace BF, the blast humidity heat amount of the blast sent to the blast furnace BF, the input reducing agent combustion heat amount of the input reducing agent (coke) input to the blast furnace BF, the lower input reducing agent combustion heat amount of the lower input reducing agent (pulverized coal) input to the blast furnace from the lower part of the blast furnace BF, the furnace wall heat amount of the heat that escapes from the furnace wall of the blast furnace BF, and the solution loss heat amount due to the solution loss reaction. The set causal factors are not limited to six, and may be a plurality selected from these six factors. The blast temperature heat quantity, blast humidity heat quantity, input reducing agent combustion heat quantity, lower input reducing agent combustion heat quantity, furnace wall heat quantity, and solution loss heat quantity are each directly or indirectly measured by a sensor of a known conventional means. For example, the sensor for measuring the blast temperature heat quantity is an air flow sensor that measures the air flow quantity of the blast, and a temperature sensor that measures the temperature of the blast, etc. Also, for example, the sensor for measuring the blast humidity heat quantity is an air flow sensor that measures the air flow quantity of the blast, and a humidity sensor that measures the humidity of the blast, etc. Note that the same type of sensor may be used in combination or may be separate. Also, for example, the sensor for measuring the furnace wall heat quantity is a temperature sensor that measures the temperature of the cooling water flowing in a cooling pipe arranged in the furnace wall, and a flow rate sensor that measures the flow rate of the cooling water, etc.

[0030] Each of the plurality of sensors 1-1, 1-2, . . . in the sensor group 1 is connected to a control processing unit 2, performs measurement under the control of the control processing unit 2, and outputs the measurement results to the control processing unit 2.

[0031] The input unit 3 is connected to the control processing unit 2 and is a device for inputting various commands, such as a command to predict furnace heat after a predetermined time has passed, and various data required for operating the furnace heat control guidance device D equipped with a furnace heat prediction device, such as a predetermined time point, a predetermined past time point, a predetermined time, etc., to the furnace heat control guidance device D, and is, for example, a plurality of input switches, a keyboard, a mouse, etc., to which predetermined functions are assigned. The display unit 4 is connected to the control processing unit 2 and is a device for displaying commands and data input from the input unit 3, each measurement result of the sensor group 1, furnace heat (molten iron temperature), set causal factors, furnace heat control guidance, etc., under the control of the control processing unit 2, and is, for example, a display device such as a CRT display, a liquid crystal display, an organic EL display, etc.

[0032] The predetermined time is the starting point of the past performance data used to generate the furnace heat model, and is the starting point of the prediction time for predicting the furnace heat. The predetermined time is preferably the current time (t=0), but may be appropriately set to a time one hour ago (t=-60 minutes) due to missing data or other reasons.

[0033] The predetermined past time is a time for setting (determining) the amount of past performance data used to generate a furnace thermal model, and past performance data from the predetermined time to the predetermined past time is used to generate a furnace thermal model. The predetermined time and the predetermined past time determine an end point in the past in the past performance data used to generate a furnace thermal model. The predetermined past time is preferably a time during which unobserved factors are assumed to be substantially constant, and is, for example, any one of 24 hours, 48 ​​hours, and 72 hours.

[0034] The predetermined time is a time for setting (determining) a prediction time point for predicting furnace heat, and a time point after a predetermined time has elapsed from the predetermined time point becomes the prediction time point. The predetermined time is preferably a time during which two parameters, a time delay and a constant multiplication gain, calculated as described below based on the past performance data from the predetermined time point to the predetermined past time, are assumed to be substantially valid (substantially unchanged), and is, for example, any one of 3 hours, 5 hours, and 6 hours.

[0035] In one example, the specified time is the present time, the specified past time is 24 hours, and the specified time is 2 hours. As a result, a furnace heat model is generated as described below based on past performance data going back 24 hours from the present time, and the furnace heat two hours from now is predicted. In another example, the specified time is one hour ago, the specified past time is 24 hours, and the specified time is two hours. As a result, a furnace heat model is generated as described below based on past performance data going back 24 hours from one hour before the present time, and the furnace heat one hour from the present time is predicted.

[0036] The input unit 3 and the display unit 4 may form a so-called touch panel. In the case of forming this touch panel, the input unit 3 is a position input device that detects and inputs an operation position, for example, a resistive film type or a capacitive type. In this touch panel, the position input device is provided on the display surface of the display device, and one or more input content candidates that can be input to the display device are displayed. When a user touches a display position that displays the input content that the user wants to input, the position is detected by the position input device, and the display content displayed at the detected position is input to the furnace heat control guidance device D as the user's operation input content. In such a touch panel, the user can easily intuitively understand the input operation, so that a furnace heat control guidance device D that is easy for the user to handle is provided.

[0037] The IF unit 5 is a circuit connected to the control processing unit 2 and inputs and outputs data to and from an external device under the control of the control processing unit 2, such as an interface circuit for RS-232C, which is a serial communication method, an interface circuit using the Bluetooth (registered trademark) standard, an interface circuit for infrared communication such as the IrDA (Infrared Data Association) standard, and an interface circuit using the USB (Universal Serial Bus) standard. The IF unit 5 is also a circuit for communicating with an external device, and may be, for example, a data communication card or a communication interface circuit conforming to the IEEE802.11 standard.

[0038] The storage unit 6 is connected to the control processing unit 2, and is a circuit that stores various predetermined programs and various predetermined data under the control of the control processing unit 2. The various predetermined programs include, for example, a control processing program, and the control processing program includes a control program for controlling each part 1, 3 to 6 of the furnace heat control guidance device D equipped with a furnace heat prediction device according to the function of each part, a data acquisition processing program for acquiring measurement results from the sensor group 1 and performing predetermined processing, a furnace heat model generation program for sequentially generating a furnace heat model for determining the change amount of the furnace heat based on past performance data from a predetermined time to a predetermined past time, a furnace heat change amount processing program for determining the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time using the furnace heat model generated by the furnace heat model generation program, a furnace heat prediction processing program for determining the furnace heat after a predetermined time has elapsed from the predetermined time based on the change amount of the furnace heat determined by the furnace heat change amount processing program and the furnace heat at the predetermined time, and a guidance processing program for determining the change amount of the furnace heat at the prediction time using the furnace heat model generated by the furnace heat model generation program, and displaying and providing guidance on the operating conditions for changing the furnace heat on the display unit 4 based on the change amount of the furnace heat at the prediction time determined by the furnace heat change amount processing program and the furnace heat at the present time. The various types of predetermined data include data necessary for executing each of these programs, such as past performance data, furnace heat and setting causal factors in past performance, a threshold for determining whether or not to guide the operation conditions (guidance determination threshold), and guidance of the operation conditions. Such a storage unit 6 includes, for example, a ROM (Read Only Memory) which is a nonvolatile storage element, an EEPROM (Electrically Erasable Programmable Read Only Memory) which is a rewritable nonvolatile storage element, and the like. The storage unit 6 also includes a RAM (Random Access Memory) which is a so-called working memory of the control processing unit 2 for storing data generated during the execution of the predetermined programs, and the like. The storage unit 6 may include a hard disk device capable of storing a large capacity in order to store learning data which is relatively large in capacity.

[0039] The storage unit 6 functionally includes a past performance information storage unit 61 that stores past performance data and furnace heat and set causal factors in the past performance. The past performance data is stored in the past performance information storage unit 61 in association with the date and time (e.g., date and time expressed in year, month, day, hour, minute, and second) at which the past performance data was acquired from the sensor group 1. The furnace heat and set causal factors in the past performance are stored in the past performance information storage unit 61 in association with the date and time (e.g., date and time expressed in year, month, day, hour, minute) that represent each date and each time at which the multiple past performance data used to obtain the furnace heat and set causal factors were acquired from the sensor group 1.

[0040] The control processing unit 2 is a circuit for controlling each of the units 1, 3 to 6 of the furnace heat control guidance device D equipped with a furnace heat prediction device according to the function of each unit, generating a furnace heat model to predict the furnace heat at the prediction time, and providing guidance for furnace heat control. The control processing unit 2 is configured, for example, with a CPU (Central Processing Unit) and its peripheral circuits. In the control processing unit 2, a control unit 21, a data acquisition processing unit 22, a furnace heat model generating unit 23, a furnace heat change amount processing unit 24, a furnace heat prediction processing unit 25, and a guidance processing unit 26 are functionally configured by executing the control processing program.

[0041] The control unit 21 controls each of the units 1, 3 to 6 of the furnace heat control and guidance device D equipped with the furnace heat prediction device according to the function of each unit, and controls the furnace heat control and guidance device D as a whole.

[0042] The data acquisition processing unit 22 acquires each measurement result from the sensor group 1 at a predetermined sampling interval (first time interval), performs a predetermined process, and stores the processed measurement result as past performance data in the past performance information storage unit 61 in association with the date and time of acquisition. The predetermined process is, for example, so-called pre-processing, such as removing noise from the measurement result and interpolating missing measurement results. Then, the data acquisition processing unit 22 calculates a moving average from a plurality of past performance data of the first time interval at a predetermined second time interval, calculates the furnace heat and the set causal factor by a well-known conventional means based on the calculated moving average, and stores the calculated furnace heat and set causal factor as the furnace heat and set causal factor of the past performance in the past performance information storage unit 61 in association with the date and time representing each date and each time of acquisition of the plurality of past performance data from the sensor group 1. The second time interval is set to a length equal to or longer than the first time interval (first time interval≦second time interval).

[0043] The furnace heat model generating unit 23 generates a furnace heat model for determining the amount of change in furnace heat based on past performance data from a predetermined time point to a predetermined past time stored in the past performance information storage unit 61. In this embodiment, the furnace heat model generating unit 23 sequentially generates a furnace heat model. That is, the furnace heat model generating unit 23 repeatedly generates a furnace heat model based on past performance data from a predetermined time point to a predetermined past time stored in the past performance information storage unit 61 at a predetermined time interval (model generation time interval).

[0044] The furnace heat model is expressed using two parameters, a time delay and a constant multiplication gain. The time delay parameter represents a time delay until a change in each heat quantity such as a set causal factor appears as a change in furnace heat, and in this embodiment, it is two subparameters, a delay offset and a first-order delay transient time. The time delay refers to the time from a first time point when an operation is performed (a first time point when an operation condition is changed) to a second time point when the molten iron temperature becomes steady, and in this embodiment, it is composed of a delay offset and a transient time. The delay offset (dead time) refers to the time from the first time point when an operation condition is changed to a third time point when a change in the molten iron temperature appears, and the transient time refers to the time from the third time point when a change in the molten iron temperature appears to the second time point when the molten iron temperature becomes steady. As an example, in the case of a sigmoid function, the dead time is the time until the intermediate time when the value in the steady state is half, and the transient time is a parameter that governs the slope of the sigmoid function at the intermediate time. The parameter of the constant multiplication gain represents the degree of influence that the amount of change in each heat quantity, such as the set causal factor, has on the amount of change in furnace heat.

[0045] More specifically, the furnace thermal model generating unit 23 calculates the equation (1).

[0046]

number

[0047]

number

[0048]

number

[0049] Here, argmin(A) for θ is an operator that finds the optimal θ that minimizes A. T(t) is the furnace heat at time t. In Equation 1, the predetermined time is the present time (t=0), so T(0) is the furnace heat at the present time. C(t) is the heat capacity of the pig iron in the furnace. In a blast furnace, the amount of pig iron in the furnace changes over time, so the heat capacity is also a function of time. △Q ~ l (θ i , t) is the change in furnace heat, and is expressed by Equation 2, and the lag function f θi (t) is expressed by formula 3. In the formula, "~" is placed above Q, but for convenience of notation, in the text of the specification, it is placed as a superscript as above. The same applies below.

[0050] i represents the set causal factor, and in this embodiment, 1 (i=1) represents the heat amount of the blowing air temperature, 2 (i=2) represents the heat amount of the blowing air humidity, 3 (i=3) represents the heat amount of the input reducing agent combustion, 4 (i=4) represents the heat amount of the lower input reducing agent combustion, 5 (i=5) represents the heat amount of the furnace wall, and 6 (i=6) represents the heat amount of the solution loss (i=1 to 6). θ i、j represents a parameter of the furnace thermal model, and in this embodiment, θ i、1 represents the parameter of the constant multiplication gain, and θ i、2 represents the delay offset sub-parameter of the time delay parameter, and θ i、3 Among the time delay parameters, θ represents the sub-parameter of the first-order delay transient time. These time delay parameters (the delay offset sub-parameter and the first-order delay transient time sub-parameter) and the constant multiplication gain parameter are provided for each set causal factor. For example, θ 1、1 represents a parameter of a constant multiplication gain related to the blowing air temperature and heat quantity, and for example, θ 4、1 represents a parameter of a constant multiplication gain for the amount of heat of combustion of the lower-injected reducing agent, and, for example, θ 1、3 represents a sub-parameter of the first-order lag transient time regarding the blowing air temperature and heat quantity. Therefore, in this embodiment, θ i、j There are 18 (=3×6) pieces (j=1~3, i=1~6). Simply put, θ iWhen writing as θ i、1 , θ i、2 , θ i、3 The three variables are combined to form a three-dimensional variable. Furthermore, when simply written as θ, i、j The variables are 18 dimensions (j = 1 to 3, i = 1 to 6). τ represents a given past time (τ < 0). Therefore, Equation 2 expresses the change in the set causal factor △Q from the given past time τ to time t for each set causal factor i. i The lag function f θi By convolving with (t), the change in furnace heat △Q ~ i (θ i , t). Equation 1 expresses the change in furnace heat (T(t)-T(0)) based on past performance data and the change in furnace heat ((Σ i △Q ~ i (θ i , t)) / C(t)) is minimized by the objective function expressed as the difference between the i、1 Therefore, in this embodiment, the furnace heat model generating unit 23 generates the furnace heat model by determining the parameters (including sub-parameters here) so that an objective function expressed using the difference between the amount of change in furnace heat according to past performance data and the amount of change in furnace heat determined by the furnace heat model based on the past performance data is minimized. Here, for example, a nonlinear least squares method or the like is used to solve Equation 1. Note that in this embodiment, the lag function f θi (t) is θ i However, the present invention is not limited to this sigmoid function, and other functions may be used depending on the blast furnace plant. i、j If the positive / negative value and the range of variation (possible numerical range) of are known, these positive / negative values ​​and the range of variation are i、j Equation 1 may be calculated as the constraint condition.

[0051] The furnace heat change amount processing unit 24 calculates the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point by using the furnace heat model generated by the furnace heat model generation unit 23. More specifically, the furnace heat change amount processing unit 24 calculates the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point by using the furnace heat model generated by the furnace heat model generation unit 23. i Using △Q ~ i (θ i , t).

[0052] The furnace heat prediction processing unit 25 calculates the furnace heat after a predetermined time has elapsed from the predetermined time point based on the change in the furnace heat calculated by the furnace heat change amount processing unit 24 and the furnace heat at the predetermined time point. More specifically, the furnace heat prediction processing unit 25 calculates the furnace heat T ^ (t) is found. In the formula, "^" is placed above T and θ, but for convenience of notation, in the text of the specification, it is placed as a superscript as above. The same applies below. θ ^ i is the θ calculated by the furnace thermal model generating unit 23. i Represents.

[0053]

number

[0054] The guidance processing unit 26 uses the furnace heat model generated by the furnace heat model generation unit 23 to obtain the change amount of the furnace heat at the time of prediction, and displays and guides the operation conditions for changing the furnace heat on the display unit 4 based on the obtained change amount of the furnace heat at the time of prediction and the current furnace heat. More specifically, the guidance processing unit 26 obtains the time from a predetermined time to the prediction time as a predetermined time, obtains the furnace heat at the time of prediction using Equation 4 in the same manner as the furnace heat prediction processing unit 25, and compares the obtained furnace heat at the time of prediction with the guidance judgment threshold. If the result of this comparison shows that the furnace heat at the time of prediction is below the guidance judgment threshold, the guidance processing unit 26 displays and guides the operation conditions for changing the furnace heat on the display unit 4. For example, the guidance processing unit 26 displays a message on the display unit 4 saying "Increase the blast temperature". For another example, the guidance processing unit 26 displays a message on the display unit 4 saying "Reduce the blast humidity". For another example, the guidance processing unit 26 displays a message on the display unit 4 saying "Increase the coke ratio". Also, for example, the guidance processing unit 26 displays a message saying "Increase the amount of pulverized coal" on the display unit 4. Alternatively, if the result of the comparison shows that the furnace heat at the time of prediction exceeds the guidance determination threshold, the guidance processing unit 26 may provide guidance by displaying the operating conditions for changing the furnace heat on the display unit 4. In this case, for example, the guidance processing unit 26 displays a message with the opposite meaning to the above, such as a message saying "Lower the blast temperature" on the display unit 4.

[0055] Here, in this embodiment, the furnace heat prediction device is configured to include, as an example, a furnace heat model generation unit 23, a furnace heat change amount processing unit 24, and a furnace heat prediction processing unit 25 in the control processing unit 2, and a past performance information storage unit 61 in the storage unit 6. In this embodiment, the guidance unit is configured to include, as an example, a guidance processing unit 26 and a display unit 4.

[0056] The control processing unit 2, the input unit 3, the display unit 4, the IF unit 5, and the storage unit 6 can be configured by, for example, a desktop computer, a notebook computer, etc. The computer configuring each of these units 2 to 6 may be placed, for example, in an operation room of the blast furnace BF and incorporated in the console of the blast furnace BF (may also serve as the console), or may be separate from the console.

[0057] Next, the operation of this embodiment will be described. Fig. 3 is a flowchart showing the operation of data collection in a furnace heat control guidance device equipped with the furnace heat prediction device. Fig. 3A shows the operation of collecting past performance data, and Fig. 3B shows the operation of collecting furnace heat and set causal factors in the past performance. Fig. 4 is a flowchart showing the operation of furnace heat prediction and furnace heat control guidance in a furnace heat control guidance device equipped with the furnace heat prediction device. Fig. 5 is a diagram showing the actual values ​​and predicted values ​​of the time change of molten iron temperature. The horizontal axis of Fig. 5 is the elapsed time from the present (current time), and the vertical axis is the molten iron temperature.

[0058] When the power is turned on, the furnace heat control and guidance device D equipped with the furnace heat prediction device configured as described above initializes each required part and starts its operation. In the control processing unit 2, a control unit 21, a data acquisition processing unit 22, a furnace heat model generating unit 23, a furnace heat change amount processing unit 24, a furnace heat prediction processing unit 25, and a guidance processing unit 26 are functionally configured by executing the control processing program.

[0059] In collecting past performance data, the furnace heat control guidance device D accumulates the past performance data by repeatedly executing each of the following processes at a predetermined sampling interval (first time interval) using the data acquisition processing unit 22 of the control processing unit 2.

[0060] In FIG. 3A, first, the data acquisition processing unit 22 acquires each measurement result from each of the sensors 1-1, 1-2, . . . of the sensor group 1 (S1).

[0061] Next, the data acquisition processing unit 22 performs pre-processing on each of these acquired measurement results (S2).

[0062] Then, the data acquisition processing unit 22 stores each of the pre-processed measurement results as past performance data in the past performance information storage unit 61 in association with the date and time of acquisition (S3), and ends this processing for the current sampling timing.

[0063] In collecting furnace heat and set causal factors based on past performance, the furnace heat control guidance device D accumulates the furnace heat and set causal factors based on past performance by repeatedly executing each of the following processes at a predetermined second time interval using the data acquisition processing unit 22 of the control processing unit 2.

[0064] 3B, first, the data acquisition processing unit 22 obtains a moving average from a plurality of past performance data for the first time interval, and obtains the furnace heat and the set causal factors by a known conventional means based on the obtained moving average (S11). In this embodiment, as described above, the blowing air temperature heat amount, blowing air humidity heat amount, input reducing agent combustion heat amount, lower input reducing agent combustion heat amount, furnace wall heat amount, and solution loss heat amount are obtained as the set causal factors.

[0065] Then, the data acquisition processing unit 22 stores the furnace heat and the set causal factors obtained in process S11 as the furnace heat and the set causal factors in the past performance in the past performance information storage unit 61 in association with the dates and times representing each date and each time acquired from the sensor group 1 (S12), and terminates this process for the current timing.

[0066] In predicting furnace heat and providing guidance on furnace heat control, in Figure 4, when the furnace heat control guidance device D receives, via the control processing unit 2, input of a specified point in time, a specified past time, and a specified time for setting the prediction point in time via the input unit 3 (S21), the furnace heat control guidance device D reads and obtains, via the furnace heat model generation unit 23 of the control processing unit 2, the furnace heat and set causal factors in the past results based on the past performance data from the received specified point in time to the specified past time from the past performance information memory unit 61 of the memory unit 6 (S22).

[0067] Next, the furnace heat model generating unit 23 calculates the formula 1 using the furnace heat and the set causal factors in the acquired past results to obtain the parameters (including the sub-parameters of this embodiment) θ i、1 is calculated, a furnace thermal model is generated, and stored in the storage unit 6 (S23).

[0068] Next, the furnace heat control guidance device D uses the furnace heat change amount processing unit 24 of the control processing unit 2 to calculate the amount of change in furnace heat after a predetermined time has elapsed from the specified point in time received in the process S21, using the furnace heat model generated by the furnace heat model generation unit 23, and uses the furnace heat prediction processing unit 25 of the control processing unit 2 to calculate the furnace heat after a predetermined time has elapsed from the specified point in time using Equation 4 based on the amount of change in furnace heat calculated by the furnace heat change amount processing unit 24 and the furnace heat at the specified point in time, and displays this calculated furnace heat on the display unit 4 as the furnace heat at the predicted time (S24).

[0069] Next, the furnace heat control guidance device D uses the guidance processing unit 26 of the control processing unit 2 to compare the furnace heat at the predicted time with a guidance judgment threshold value to determine whether guidance is necessary or not (S25). If the result of this determination is that guidance is necessary (Yes), the guidance processing unit 26 displays the operating conditions for changing the furnace heat on the display unit 4 to provide guidance (S26), and ends this process. On the other hand, if the result of the above determination is that guidance is not necessary (No), the guidance processing unit 26 ends this process.

[0070] The furnace heat control guidance device D repeatedly executes each of the processes S21 to S26 at model generation time intervals to sequentially generate a furnace heat model, sequentially predict the furnace heat, and sequentially provide guidance on operating conditions as necessary.

[0071] FIG. 5 shows the results of the furnace heat predicted by the furnace heat control guide device D equipped with such a furnace heat prediction device and the actual results, expressed in terms of molten iron temperature. The solid line LA is the actual molten iron temperature, and the dashed line LC is the predicted molten iron temperature. In FIG. 5, a furnace heat model was generated using past actual data going back 25 hours from the current time, and the furnace heat (molten iron temperature) was predicted for each hour up to 5 hours from the current time. Since the blast furnace in which the actual molten iron temperature was measured was a type in which molten iron was alternately tapped from two tap holes, the actual molten iron temperature was obtained by dividing the two temperatures obtained by linearly complementing the measured temperatures of each tap hole in a ratio of 7:3 so as to lean toward the lower temperature side. As shown in FIG. 5, the predicted tapping temperature LC shows a tendency that is approximately the same as the actual tapping temperature LA.

[0072] Since the blast furnace is a very large system, the unobserved factors that affect the furnace heat of the blast furnace are considered to be approximately constant without rapid change for a relatively short period of time relative to continuous operation, such as a dozen hours or several tens of hours. As described above, the furnace heat control guidance device D equipped with the furnace heat prediction device in this embodiment, and the furnace heat prediction method and furnace heat control guidance method executed by each of these furnace heat prediction devices and furnace heat control guidance devices absorb the influence of the unobserved factors on the furnace heat with two parameters, time delay and constant multiplication gain, generate a furnace heat model based on past performance data from a predetermined time to a predetermined past time, and obtain the change in furnace heat after a predetermined time has elapsed from the predetermined time. Therefore, the furnace heat model and the change in furnace heat after the predetermined time can be obtained within a period in which the unobserved factors are considered to be approximately constant, so that the furnace heat of the blast furnace can be predicted more accurately.

[0073] As described above, the molten iron temperature of a blast furnace changes with a delay of several hours or more from the first time point when the operating conditions are changed. In the furnace heat prediction device and furnace heat prediction method, the time delay parameter is composed of two sub-parameters, ie, the delay offset and the transient time, so that such characteristics of the blast furnace can be incorporated into the furnace heat model, and a more appropriate furnace heat model can be generated.

[0074] The furnace heat prediction device and furnace heat prediction method generate the furnace heat model by determining the parameters so that the difference between the amount of change in furnace heat based on past actual data and the amount of change in furnace heat determined by the furnace heat model based on the past actual data is minimized, thereby enabling the parameters to be determined appropriately.

[0075] The furnace heat control guidance device D and the furnace heat control guidance method are provided with the furnace heat prediction device and the furnace heat prediction method, so that the furnace heat at the time of prediction can be predicted more accurately based on the change in the furnace heat at the time of prediction and the current furnace heat. Therefore, the furnace heat control guidance device and the furnace heat control guidance method can appropriately guide the operating conditions.

[0076] In the above embodiment, the past performance data is treated as having an equivalent effect on the furnace heat from a predetermined time point to a predetermined past time, but the past performance data may be treated as having a greater effect on the furnace heat the closer it is to the predetermined time point. In other words, the furnace heat model generating unit 23 may use the past performance data by assigning a weight ω(t) of a larger value the closer it is to the predetermined time point. More specifically, the furnace heat model generating unit 23 calculates the parameter θ by calculating Equation 5 instead of Equation 1 above. i、1 is calculated and a furnace thermal model is generated.

[0077]

number

[0078] As described above, it is considered that the unobserved factors are approximately constant over a predetermined period, but it is difficult to imagine that the unobserved factors do not change at all, even if they change slightly. The furnace heat prediction device and furnace heat prediction method using such Equation 5 use past performance data with a weight ω(t) that is larger the closer the data is to the predetermined time point, so that the influence of unobserved factors closer to the predetermined time point can be largely reflected in the furnace heat model, and the furnace heat of the blast furnace can be predicted with higher accuracy.

[0079] In the above embodiment, the set causal factor is treated as a constant value (not changing with time) during prediction, but it may be changed with time. For example, the furnace wall heat extraction amount and the solution loss heat amount may change with time even if the operating conditions are not changed. For this reason, the furnace heat model is further expressed by a function related to a plurality of preset set causal factors that affect the furnace heat, and the furnace heat control guide device D equipped with the furnace heat prediction device further includes a factor model generation unit 27 in the control processing unit 2 that generates a factor model for determining at least one set causal factor among the plurality of set causal factors based on past performance data from the predetermined time point to a second predetermined past time, as shown by a broken line in FIG. 1, and the furnace heat change amount processing unit 24 further uses the factor model generated by the factor model generation unit 27 to determine the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point. That is, the furnace heat change amount processing unit 24 uses the furnace heat model generated by the furnace heat model generation unit 23 and the factor model generated by the factor model generation unit 27 to determine the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point. The second predetermined past time when generating the factor model may be the same as the predetermined past time when generating the furnace heat model, or may be different. The factor model generating unit 27 generates at least one factor model of, for example, a heat loss factor model for calculating the furnace wall heat loss amount and a Sol-Loss factor model for calculating the solution loss heat amount. Since the furnace wall heat loss amount and the solution loss heat amount are more strongly influenced by the past self-state than other factors, it is preferable that the heat loss factor model and the Sol-Loss factor model are time series models using autocorrelation. The factor model generating unit 27 generates the heat loss factor model and the Sol-Loss factor model, which are time series models using autocorrelation, by, for example, ARIMA (Auto Regresive Integrated Moving Average) and RNN (Recurrent Neural Network), etc.

[0080] A furnace heat prediction device and furnace heat prediction method that generate and use such a factor model use the furnace heat model and factor model to determine the amount of change in furnace heat after a specified time has elapsed from the specified point in time, so that changes in the set causal factors can be taken into account and the furnace heat of a blast furnace can be predicted more accurately.

[0081] In the above embodiment, the furnace thermal model generating unit 23 may obtain the time lag parameter at a predetermined time interval, and add a second difference between a previously obtained constant multiplication gain parameter and a currently predicted constant multiplication gain parameter to the objective function. Alternatively, the furnace thermal model generating unit 23 may obtain the time lag parameter at a predetermined time interval, and obtain the time lag parameter by making a third difference between a previously obtained time lag parameter and a currently predicted time lag parameter smaller.

[0082] When the specified past time is relatively short, there is a risk that the furnace heat model may overfit temporary fluctuations or may underestimate set causal factors that do not change much over time due to the small amount of past performance data, and as a result, the furnace heat model may not be generated appropriately. For this reason, if the specified past time is set to a long period, this problem can be solved, but it takes time to generate the furnace heat model. In particular, when generating a furnace heat model to predict furnace heat while operating a blast furnace, if it takes time to generate the furnace heat model, there is a risk that the appropriate timing for changing the operating conditions will be lost, and there is a limit to how long the specified past time can be.

[0083] On the other hand, the blast furnace is a very large system, and the production of pig iron is a reaction process that takes time, so the parameter θ i、j does not change significantly in a short time. Therefore, as described above, the parameter θ is calculated by adding the second difference between the parameter of the constant multiplication gain calculated in the past and the parameter of the constant multiplication gain predicted at the present time to the objective function, or by calculating the parameter of the time lag so as to reduce the third difference between the parameter of the time lag calculated in the past and the parameter of the time lag predicted at the present time. i、j In the repeated calculation to find the parameter θi、j The change in can be made small.

[0084] More specifically, the furnace thermal model generating unit 23 calculates the parameter θ by calculating the formula 6 instead of the above formula 1. i、1 is calculated and a furnace thermal model is generated.

[0085]

number

[0086] Here, θ ,k =[θ 1,k , θ 2,k , θ 3,k , θ 4,k , θ 5,k , θ 6,k The variable α is a value that sets a past point in the parameter of the constant multiplication gain obtained in the past and a past point in the parameter of the time lag obtained in the past, and the parameter θ i、j The time is equal to the time interval in the repeated calculation to obtain θ and is smaller than the predetermined past time τ. ,k -α is the θ calculated at the past time determined by α ,k The coefficient λ k is appropriately set, for example, by a round robin method based on past performance data, so that the predicted molten iron temperature matches well with the actual molten iron temperature.

[0087] A furnace heat prediction device and furnace heat prediction method using such equation 6 take into account the second difference, thereby avoiding cases where the parameters are accidentally calculated to be too large (or too small), and a more appropriate furnace heat model can be generated, and since the time delay parameters are calculated so as to reduce the third difference, it is possible to avoid cases where the parameters are accidentally calculated to be too large (or too small), and a more appropriate furnace heat model can be generated.

[0088] In order to express the present invention, the present invention has been described adequately and sufficiently through the embodiments with reference to the drawings in the above description, but it should be recognized that those skilled in the art can easily change and / or improve the above-mentioned embodiments. Therefore, unless the changes or improvements made by those skilled in the art are at a level that departs from the scope of the claims described in the claims, the changes or improvements are interpreted as being included in the scope of the claims. [Explanation of symbols]

[0089] D. Furnace heat control guide device equipped with furnace heat prediction device 1 Sensor group 1-1, 1-2, ... each sensor 2. Control processing section 3. Input section 4 Display 5 Interface section (IF section) 6 Memory section 21 Control section 22 Data acquisition processing section 23 Furnace thermal model generation section 24 Furnace heat change processing section 25 Furnace heat prediction processing section 26 Guidance processing section 27 Factor model generation section 61 Past performance information storage unit

Claims

1. A furnace heat prediction device for predicting furnace heat, a furnace heat model generating unit that sequentially generates a furnace heat model for determining a change amount of furnace heat based on past performance data from a predetermined time point to a predetermined past time; a furnace heat change amount processing unit that uses the furnace heat model generated by the furnace heat model generation unit to obtain a change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point, The furnace thermal model is represented by the following Equation 1 and Equation 2: the furnace heat model generation unit generates the furnace heat model by calculating parameters θ i,1 , θ i,2 , and θ i,3 so that an objective function expressed using a difference between an amount of change in furnace heat according to the past performance data and an amount of change in furnace heat calculated by the furnace heat model based on the past performance data is minimized; Furnace heat prediction device. [0010] [0025] Here, in the formula, the symbols above the letters are written as superscripts, so △Q ~ i (θ i , t) is the change in furnace heat, i represents a plurality of preset causal factors that affect the furnace heat, i=1 represents the heat amount of the blowing air temperature, i=2 represents the heat amount of the blowing air humidity, i=3 represents the heat amount of the input reducing agent combustion, i=4 represents the heat amount of the lower input reducing agent combustion, i=5 represents the heat amount of the furnace wall extraction, and i=6 represents the heat amount of the solution loss. In the above formulas 1 and 2, at least one of 1, 2, 3, 4, 5, and 6 is used as i, and θ i、j represents the parameters of the furnace thermal model, and θ i、1 represents the parameter of the constant multiplication gain, and θ i、2 represents the delay offset sub-parameter of the time delay parameter, and θ i、3 represents the sub-parameter of the first-order lag transient time among the time lag parameters.

2. the furnace thermal model generating unit uses the past performance data by weighting the data with a larger value the closer the data is to the predetermined time point; The furnace heat prediction device according to claim 1 .

3. A furnace heat prediction device for predicting furnace heat, comprising: a furnace heat model generating unit that sequentially generates a furnace heat model for determining a change amount of furnace heat based on past performance data from a predetermined time point to a predetermined past time; a furnace heat change amount processing unit that uses the furnace heat model generated by the furnace heat model generation unit to obtain a change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point, The furnace thermal model is represented by the following Equation 1 and Equation 2: The furnace thermal model generation unit generates the furnace thermal model by solving the following equation 3 to obtain parameters θ i,1 , θ i,2 , and θ i,3 . Furnace heat prediction device. [0030] [0045] [0050] Here, argmin(A) for θ is an operator for finding an optimal θ that minimizes A, and in the formula, the symbols above the letters are written as superscripts, ΔQ ∼ i (θ i ,t) is the change amount of furnace heat, i represents a plurality of predetermined set causal factors that affect the furnace heat, i = 1 represents the heat amount of the blowing air temperature, i = 2 represents the heat amount of the blowing air humidity, i = 3 represents the heat amount of the input reducing agent combustion, i = 4 represents the heat amount of the lower input reducing agent combustion, i = 5 represents the heat amount removed from the furnace wall, and i = 6 represents the heat amount of the solution loss. In the formulas 1 to 3, at least one of 1, 2, 3, 4, 5, and 6 is used as i, θ i,j represents a parameter of the furnace heat model, θ i,1 represents a parameter of the constant multiplication gain, θ i,2 represents a sub-parameter of the delay offset among the time delay parameters, and θ i,3 represents a sub-parameter of the delay offset among the time delay parameters. represents a sub-parameter of the first-order lag transient time among the time lag parameters, ω(t) is the weight at time t, θ , k = [θ 1,k , θ 2,k , θ 3,k , θ 4,k , θ 5,k , θ 6,k ], variable α is a value that sets a past time point in the parameter of the constant multiplication gain obtained in the past and a past time point in the parameter of the time lag obtained in the past, θ , k -α indicates θ , k obtained at the past time point determined by α, and λ k is a predetermined coefficient.

4. The system further includes a factor model generation unit that generates at least one of a heat loss factor model for calculating a furnace wall heat loss amount and a solution loss factor model for calculating a solution loss heat amount based on past performance data from the specified time point to a second specified past time, The furnace heat change amount processing unit uses the factor model generated by the factor model generation unit to predict and obtain at least one of the furnace wall heat extraction amount and the solution loss heat amount at the predetermined time point, and then uses the furnace heat model generated by the furnace heat model generation unit to obtain the change amount of the furnace heat after a predetermined time has elapsed from the predetermined time point. The furnace heat prediction device according to any one of claims 1 to 3.

5. A furnace heat prediction method for predicting furnace heat, comprising: a furnace heat model generating step of sequentially generating a furnace heat model for determining a change amount of furnace heat based on past performance data from a predetermined time point to a predetermined past time; a furnace heat change amount processing step of determining a change amount of furnace heat after a predetermined time has elapsed from the predetermined time point using the furnace heat model generated in the furnace heat model generation step, The furnace thermal model is represented by the following Equation 1 and Equation 2: The furnace heat model generating step generates the furnace heat model by calculating parameters θ i,1 , θ i,2 , and θ i,3 so that an objective function expressed by a difference between an amount of change in furnace heat according to the past performance data and an amount of change in furnace heat calculated by the furnace heat model based on the past performance data is minimized. Furnace heat prediction method. [006] [0070] Here, in the formula, the symbols above the letters are written as superscripts, so △Q ~ i (θ i , t) is the change in furnace heat, i represents a plurality of preset causal factors that affect the furnace heat, i=1 represents the heat amount of the blowing air temperature, i=2 represents the heat amount of the blowing air humidity, i=3 represents the heat amount of the input reducing agent combustion, i=4 represents the heat amount of the lower input reducing agent combustion, i=5 represents the heat amount of the furnace wall extraction, and i=6 represents the heat amount of the solution loss. In the above formulas 1 and 2, at least one of 1, 2, 3, 4, 5, and 6 is used as i, and θ i、j represents the parameters of the furnace thermal model, and θ i、1 represents the parameter of the constant multiplication gain, and θ i、2 represents the delay offset sub-parameter of the time delay parameter, and θ i、3 represents the sub-parameter of the first-order lag transient time among the time lag parameters.

6. A furnace heat prediction device according to any one of claims 1 to 4, A guidance unit is provided which obtains a change in furnace heat at a time of prediction using the furnace heat model generated by the furnace heat model generation unit, and provides guidance on operating conditions for changing the furnace heat based on the obtained change in furnace heat at the time of prediction and the current furnace heat. Furnace heat control guide device.

7. A furnace heat prediction method according to claim 5; and a guidance step of calculating a change in furnace heat at a time of prediction using the furnace heat model generated in the furnace heat model generation step, and providing guidance on operation conditions for changing the furnace heat based on the change in furnace heat at the time of prediction calculated and the current furnace heat. Furnace heat control guide method.

Citation Information

Patent Citations

  • Method for controlling heat level of blast furnace

    JP1985248804A

  • Device and method for estimating blast furnace heat

    JP2015117431A

  • Device and method of thermal prediction for blast furnace

    JP2018145520A

  • Method and device for predicting molten iron temperature, operation method of blast furnace, operation guidance device, and method and device for controlling molten iron temperature

    JP2019019385A

  • Manufacturing process control with deep learning-based predictive model for hot metal temperature of blast furnace

    US20190093186A1