Steam System
The steam system optimizes warm-up operations by using a control device to adjust flow rates and pressures, ensuring timely completion and energy efficiency by preventing water hammer and excessive steam use.
Patent Information
- Application Number
- JP2020211022
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-21
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2040-12-21
AI Technical Summary
Existing steam system warm-up operations often fail to meet user requests, leading to either prolonged completion times disrupting schedules or excessive steam use resulting in energy inefficiency.
A steam system with a control device that adjusts the flow rate and pressure of steam supply using a flow rate adjustment valve and pressure sensors, employing multiple modes to optimize warm-up operations based on user-defined parameters, preventing water hammer and ensuring efficient steam distribution.
The system enables optimal warm-up operations that meet user-defined times while preventing water hammer and reducing energy waste by adjusting steam flow rates and pressures dynamically.
Smart Images

Figure 0007576305000001 
Figure 0007576305000002 
Figure 0007576305000003
Abstract
Description
[Technical field]
[0001] This application relates to steam systems. [Background technology]
[0002] Warming up of a steam system has been known for some time. For example, a steam system disclosed in Patent Document 1 has a steam pipe connected to a steam-using device, a plurality of drain pipes connected midway along the steam pipe, and a plurality of drain valves provided on each of the drain pipes. In the warming up of this steam system, a small amount of steam is supplied to the steam pipe, and the drain valve on the upstream side of the steam pipe is opened to discharge the drain, and when the temperature of the drain pipe rises to a predetermined value, the drain valve is closed. Such operation of the drain valve is performed sequentially for the plurality of drain valves until the warming up is completed. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 187700 / 1983 Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the above-mentioned warm-up operation method, it may be difficult to perform an optimal operation according to the user's request. For example, even if the warm-up operation is started, the warm-up operation may take longer to complete than the user expects, or may take much shorter than the user expects. In the former case, the operation schedule for normal operation to be performed after the warm-up operation may be hindered. In the latter case, excessive steam is used for warm air, which reduces energy saving.
[0005] The technology disclosed in this application has been made in consideration of the above circumstances, and its purpose is to provide a steam system that can perform optimal warm-up operation in accordance with the needs of a user. [Means for solving the problem]
[0006] The technology disclosed in the present application is a steam system including a supply pipe connected to a steam-using device and supplying steam to the steam-using device, a flow rate control valve provided in the supply pipe, and a control device that controls the flow rate control valve to perform a warm-up operation to increase the pressure of the supply pipe to a set pressure. The control device is configured to control the flow rate control valve based on opening data in which the opening of the flow rate control valve is set according to a pressure difference between upstream and downstream of the flow rate control valve so that the steam flow rate in the supply pipe is equal to or less than a predetermined value. The opening data includes opening data of a plurality of modes in which the opening of the flow rate control valve is set to different values. The control device sets a predetermined elapsed pressure up to the set pressure and a target time for increasing the pressure of the supply pipe to the elapsed pressure, and when the pressure of the supply pipe increases to the elapsed pressure during the warm-up operation, switches between the plurality of modes according to a magnitude relationship between the actual time required for the pressure of the supply pipe to increase to the elapsed pressure and the target time. Effect of the Invention
[0007] According to the technology disclosed in the present application, it is possible to perform an optimal warm-up operation in response to the user's request. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a schematic diagram showing a steam system. [Diagram 2] FIG. 2 is a block diagram illustrating the control device. [Diagram 3] FIG. 3 is a diagram for explaining the opening degree data. [Figure 4] FIG. 4 is a flowchart showing the control operation by the control device. [Diagram 5] FIG. 5 is a schematic diagram showing one state of the steam system. [Figure 6] FIG. 6 is a schematic diagram showing one state of the steam system. [Figure 7] FIG. 7 is a flowchart showing a mode switching operation by the first control unit. [Figure 8] FIG. 8 is a table showing the relationship between the elapsed pressure, the set time, and the elapsed time. [Figure 9] FIG. 9 is a flowchart showing a part of the control operation by the control device according to the modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, embodiments of the present application will be described with reference to the drawings. Note that the following embodiments are essentially preferred examples and are not intended to limit the scope of the technology disclosed in the present application, its applications, or its uses.
[0010] 1 is a schematic diagram showing a steam system 100. The steam system 100 of this embodiment is installed in, for example, a cardboard manufacturing factory, and heats cardboard with steam. In this case, the steam system 100 supplies steam to a heating roll for cardboard, which is a steam-using device 22.
[0011] The steam system 100 includes a steam using system 2, a drain discharge system 3, and a control device 5. The drain discharge system 3 is connected to the steam using system 2. The steam using system 2 is connected to the steam generating system 1.
[0012] The steam generating system 1 generates steam. The steam generating system 1 has a boiler 11 and a supply pipe 12. The boiler 11 heats water to generate steam. The boiler 11 is connected to a steam consuming system 2 via the supply pipe 12. In other words, the supply pipe 12 supplies the steam from the boiler 11 to the steam consuming system 2.
[0013] The steam using system 2 uses the steam generated in the steam generating system 1. Specifically, the steam using system 2 heats an object (e.g., cardboard) with steam. The steam using system 2 has a header 21, a supply pipe 23, a first control valve 25, and a plurality of second control valves 26.
[0014] The header 21 is connected to the supply pipe 12 of the steam generation system 1. The header 21 is a steam header that receives steam from the supply pipe 12 and temporarily stores the supplied steam. The header 21 is connected to a supply pipe 23. The supply pipe 23 supplies the steam from the header 21 to a plurality of steam-using devices 22.
[0015] Specifically, the supply pipe 23 has a main pipe 23a and a plurality of branch pipes 23b. The main pipe 23a is connected to the header 21. The main pipe 23a is a pipe into which steam flows from the header 21. The plurality of branch pipes 23b branch off from the main pipe 23a and are connected to the plurality of steam-using devices 22, respectively. That is, each of the plurality of branch pipes 23b has an inlet end, which is one end, connected to the main pipe 23a, and an outlet end, which is the other end, connected to the steam-using device 22. The plurality of branch pipes 23b are connected in order from the upstream side (i.e., the header 21 side) of the main pipe 23a. In the supply pipe 23, steam flowing from the header 21 into the main pipe 23a is divided into each of the branch pipes 23b.
[0016] The first control valve 25 is provided in the main pipe 23a. More specifically, the first control valve 25 is provided in a portion upstream of the connection position of the branch pipe 23b located most upstream in the main pipe 23a. The multiple second control valves 26 are provided in each of the multiple branch pipes 23b. That is, the multiple branch pipes 23b are each provided with one second control valve 26. The first control valve 25 adjusts the flow rate of steam in the main pipe 23a, and constitutes a flow rate control valve according to the present invention. The second control valve 26 is a flow rate control valve that adjusts the flow rate of steam in the branch pipe 23b. That is, the first control valve 25 and the second control valve 26 are configured to have variable openings.
[0017] In the steam-using device 22, the steam supplied from the branch pipe 23b exchanges heat with an object (for example, cardboard), and the object is heated. Meanwhile, the steam condenses to become drain.
[0018] Further, the main pipe 23a is provided with a drain trap 27. The drain trap 27 is provided near the downstream end of the main pipe 23a. In other words, the drain trap 27 is provided in a portion of the main pipe 23a downstream of the connection position of the branch pipe 23b located most downstream in the main pipe 23a. The drain trap 27 discharges only the drain that has flowed in from the main pipe 23a to the downstream side. The main pipe 23a is capable of discharging the remaining drain in the main pipe 23a to the outside via the drain trap 27.
[0019] The drain discharge system 3 discharges drain generated in the steam usage system 2. The drain discharge system 3 has a discharge pipe 31 and a drain trap 32. The discharge pipe 31 is connected to the steam usage device 22, and discharges drain generated by condensation of steam in the steam usage device 22. The drain trap 32 is provided in the discharge pipe 31. The drain trap 32 discharges only the drain that flows in from the discharge pipe 31 to the downstream side.
[0020] The steam system 100 is also provided with a first pressure sensor 41, a second pressure sensor 42, and a plurality of third pressure sensors 43.
[0021] The first pressure sensor 41 is provided in the header 21 and detects the pressure of the header 21. The second pressure sensor 42 is provided in the main pipe 23a. Specifically, the second pressure sensor 42 is provided in a portion upstream of the connection position of the branch pipe 23b located most upstream in the main pipe 23a. More specifically, the second pressure sensor 42 is provided downstream of the first control valve 25. The second pressure sensor 42 detects the pressure of the main pipe 23a. The multiple third pressure sensors 43 are provided in each of the multiple branch pipes 23b. Specifically, the third pressure sensor 43 is provided in a portion downstream of the second control valve 26 in the branch pipe 23b. The third pressure sensor 43 detects the pressure downstream of the second control valve 26, i.e., the pressure of the steam-using device 22.
[0022] The control device 5 executes normal operation and warm-up operation. The normal operation is an operation in which steam is supplied to the steam-using device 22 to heat an object to a predetermined temperature. The warm-up operation is an operation in which the pressure in the supply pipe 23 (main pipe 23a, multiple branch pipes 23b) is increased to a set pressure in advance before the normal operation is performed.
[0023] Specifically, the warm-up operation is an operation in which a first operation is performed by controlling the first control valve 25 with the multiple second control valves 26 closed to increase the pressure of the main pipe 23a to a set pressure PS while maintaining the steam flow rate in the main pipe 23a below a predetermined value, and a second operation is performed by opening the multiple second control valves 26 to a set opening degree DS while maintaining the pressure in the main pipe 23a within a predetermined range including the set pressure PS.
[0024] Fig. 2 is a block diagram showing the control device 5. The control device 5 has, as functional blocks, an acquisition unit 51, a boiler command unit 52, a first control unit 54, and a second control unit 55. The control device 5 also has a storage unit 53 and a display unit 56. For the sake of convenience, Fig. 2 omits the illustration of the second control valve 26 and the third pressure sensor 43.
[0025] The acquisition unit 51 is configured to be able to communicate with each of the pressure sensors 41, 42, and 43 described above. The acquisition unit 51 acquires by receiving detection values of each of the pressure sensors 41, 42, and 43. Specifically, the acquisition unit 51 acquires the pressure of the header 21 detected by the first pressure sensor 41 as the measured pressure PA, and acquires the pressure of the main pipe 23a detected by the second pressure sensor 42 as the measured pressure PB. In addition, the acquisition unit 51 acquires the pressure of the steam-using device 22 detected by the third pressure sensor 43 as the measured pressure PC.
[0026] The boiler command unit 52 is configured to be able to communicate with the boiler 11. The boiler command unit 52 outputs a drive command for the boiler 11 to a control device of the boiler 11 as necessary. The boiler command unit 52 receives an input of the operating state (drive state, stop state) of the boiler 11 from the boiler 11.
[0027] The storage unit 53 is a computer-readable storage medium that stores various programs and various data. Fig. 3 is a diagram for explaining the opening data 531. The storage unit 53 stores the opening data 531, which is correlation data between the pressure difference ΔP (PA-PB) between the measured pressure PA and the measured pressure PB, and the opening of the first control valve 25. That is, in the opening data 531, the opening of the first control valve 25 is set within a range in which safe operation during warm-up is possible according to the pressure difference ΔP. The pressure difference ΔP can also be said to be the pressure difference between the upstream and downstream of the first control valve 25.
[0028] As shown in FIG. 3, the opening data 531 has opening data for a plurality of modes. In this embodiment, the plurality of modes are three, namely, a high speed mode, a medium speed mode, and a low speed mode. The opening data for these modes are set to values different from each other. Specifically, the opening DH for the high speed mode is set to a value larger than the opening DM for the medium speed mode, and the opening DL for the low speed mode is set to a value smaller than the opening DM for the medium speed mode. That is, when the pressure difference ΔP is the same, the opening DL for the low speed mode has a larger value in the order of the opening DM for the medium speed mode and the opening DH for the high speed mode. Furthermore, the high speed mode is a mode that can perform warm-up operation faster than the medium speed mode and the low speed mode, and the medium speed mode is a mode that can perform warm-up operation faster than the low speed mode.
[0029] In the opening data 531, the openings DH, DM, DL of the first control valve 25 in each mode are set to openings at which the steam flow rate in the main pipe 23a is equal to or lower than a predetermined value. The predetermined value is a value that can prevent the occurrence of water hammer caused by steam flowing into the main pipe 23a at a high speed. Basically, the larger the pressure difference ΔP, the higher the steam flow rate in the main pipe 23a, so the openings DH, DM, DL of the first control valve 25 are set to be smaller. The opening data 531 is read out and used by the first control unit 54.
[0030] The first control unit 54 is configured to be able to communicate with the first adjustment valve 25, and controls (controls the opening degree of) the first adjustment valve 25. More specifically, the first control unit 54 executes the first operation of the warm-up operation described above. The first control unit 54 has a setting unit 541, a valve driving unit 542, a mode switching unit 543, and a timing unit 544.
[0031] The setting unit 541 sets the set pressure PS of the main pipe 23a during warm-up operation according to an input operation by the user. Furthermore, the setting unit 541 sets a plurality of transitional pressures and set times corresponding to these transitional pressures according to an input operation by the user. The transitional pressures are pressures on the way to the set pressure PS. The set times are target times for increasing the pressure of the main pipe 23a (supply pipe 23) to the transitional pressure. Furthermore, the setting unit 541 initially sets the mode of the opening data 531 according to an input operation by the user. That is, it is initially set as to which mode of the opening data 531 the first control valve 25 is to be controlled based on.
[0032] During warm-up operation, the valve driver 542 controls the aperture of the first control valve 25 based on the aperture data 531 for each mode, thereby increasing the measured pressure PB to the set pressure PS. The valve driver 542 controls the aperture of the first control valve 25 by outputting a drive signal corresponding to the apertures DH, DM, DL of the aperture data 531 for each mode to the first control valve 25. In this manner, by controlling the first control valve 25 to the apertures DH, DM, DL of the aperture data 531 corresponding to the pressure difference ΔP, the steam flow rate in the main pipe 23a is maintained at or below a predetermined value.
[0033] The mode switching unit 543 executes a mode switching operation for switching between a plurality of modes of the opening data 531. When the pressure in the main pipe 23a (supply pipe 23) rises to the elapsed pressure set in the setting unit 541, the mode switching unit 543 switches between a plurality of modes of the opening data 531 depending on whether the actual time (hereinafter referred to as the elapsed time) required for the pressure in the main pipe 23a to rise to the elapsed pressure is larger than the set time. Details will be described later. The timing unit 544 times the above-mentioned elapsed time.
[0034] The second control unit 55 is configured to be able to communicate with the second adjustment valve 26, and controls (controls the opening degree of) the second adjustment valve 26. More specifically, the second control unit 55 executes the second operation of the warm-up operation described above. The second control unit 55 has a setting unit 551 and a valve driving unit 552.
[0035] The setting unit 551 sets the above-mentioned set pressure PS and the set opening degree DS of the second control valve 26 in the warm-up operation by the user's input operation. This set opening degree DS is, for example, an opening degree set as an initial opening degree of the second control valve 26 in the normal operation. The valve driving unit 552 opens the second control valve 26 to the set opening degree DS in the warm-up operation while maintaining the measured pressure PB within a predetermined range including the set pressure PS. More specifically, the valve driving unit 552 opens the second control valve 26 to the set opening degree DS at a predetermined constant speed. The valve driving unit 552 outputs a drive signal to the second control valve 26 so that the opening degree of the second control valve 26 increases at a predetermined constant speed. Note that the set opening degrees DS may be different values for the multiple second control valves 26.
[0036] The display unit 56 is configured to be capable of displaying the opening data 531 for each mode, a table showing the relationship between the elapsed pressure and the set time, which will be described later, etc. The display unit 56 is, for example, a touch panel.
[0037] <Normal operation> In normal operation of the steam system 100, steam generated in the boiler 11 is supplied to the header 21 and temporarily stored therein. The steam in the header 21 is branched from the main pipe 23a to a plurality of branch pipes 23b and supplied to each of the steam-using devices 22. At this time, the first control unit 54 controls the aperture of the first control valve 25 so that the measured pressure PB of the acquisition unit 51 is maintained at the set pressure PS. In addition, the second control unit 55 controls the aperture of the second control valve 26 so that the measured pressure PC of the acquisition unit 51 becomes a predetermined pressure.
[0038] In the steam-using device 22, heat is exchanged between the steam and the object, and the object is heated to a predetermined temperature. The steam is condensed to become drain. The drain generated by the condensation of the steam is discharged from the steam-using device 22 through the exhaust pipe 31 and the drain trap 32.
[0039] <Warm-up> In the steam system 100, the following warm-up operation method is performed by the control device 5. Fig. 4 is a flowchart showing the control operation during the warm-up operation by the control device 5. Figs. 5 and 6 are schematic configuration diagrams showing one state during the warm-up operation of the steam system 100. Specifically, the warm-up operation method of this embodiment includes the first and second operations described above.
[0040] First, the first control unit 54 fully closes the first control valve 25, and the second control unit 55 fully closes the second control valve 26 (step S1). In the following step S2, the boiler command unit 52 outputs a drive command to the boiler 11 as necessary. That is, when the boiler command unit 52 determines that the boiler 11 is in a stopped state, it outputs a drive command to operate the boiler 11. As a result, the boiler 11 is driven, and steam is stored from the boiler 11 in the header 21.
[0041] Next, a first operation is performed by the first control unit 54. First, the first control unit 54 determines whether or not the measured pressure PA acquired by the acquisition unit 51 has reached the set pressure PS (step S3). If the measured pressure PA has not reached the set pressure PS, the first control unit 54 waits as it is.
[0042] When the measured pressure PA reaches the set pressure PS, the first control unit 54 controls the opening degree of the first control valve 25 (step S4). That is, the first control unit 54 controls the first control valve 25 with the multiple second control valves 26 closed to increase the pressure in the main pipe 23a to the set pressure PS while maintaining the steam flow rate in the main pipe 23a at or below a predetermined value.
[0043] Specifically, the first control unit 54 calculates the pressure difference ΔP (PA-PB) from the measured pressures PA and PB acquired by the acquisition unit 51. Then, the first control unit 54 controls the first adjustment valve 25 to an opening degree corresponding to the above-mentioned pressure difference ΔP based on the opening degree data 531 in the storage unit 53. As a result, the measured pressure PB gradually increases. Furthermore, in step S4, the first control unit 54 performs a mode switching operation. This operation will be described later. Next, the first control unit 54 determines whether the measured pressure PB has reached the set pressure PS (step S5).
[0044] If the measured pressure PB has not reached the set pressure PS, the process returns to step S4, and the opening of the first control valve 25 is controlled again. That is, the first control unit 54 calculates the pressure difference ΔP, and controls the first control valve 25 to the openings DH, DM, DL of the opening data 531 according to the pressure difference ΔP. Since the pressure difference ΔP decreases over time, the opening of the first control valve 25 is controlled to increase.
[0045] When the measured pressure PB reaches the set pressure PS, the first control unit 54 ends the first operation. By performing the first operation in this manner, the pressure in the portion of the main pipe 23a and the branch pipe 23b upstream of the second control valve 26 can be increased to the set pressure PS, as shown by the thick solid line in Fig. 5. At that time, the steam flow rate in the main pipe 23a is maintained at or below a predetermined value, so that the occurrence of water hammer can be prevented. Furthermore, by performing the first operation, the drain remaining in the main pipe 23a is discharged to the outside via the drain trap 27.
[0046] Next, the second control unit 55 performs a second operation. First, the second control unit 55 opens the multiple second control valves 26 (step S6). Specifically, the second control unit 55 opens the second control valves 26 at a predetermined constant speed. That is, the second control unit 55 increases the opening degree of the second control valves 26 at a predetermined constant speed. As a result, steam flows into the portion of the branch pipe 23b downstream of the second control valve 26 or the steam using device 22. Therefore, the pressure in the portion of the branch pipe 23b downstream of the second control valve 26 or the steam using device 22 gradually increases.
[0047] Next, the second control unit 55 determines whether the measured pressure PB has dropped from the set pressure PS by a predetermined amount or more (step S7). That is, it determines whether the measured pressure PB is maintained within a predetermined range including the set pressure PS, in other words, whether the measured pressure PB has dropped beyond the predetermined range including the set pressure PS.
[0048] If the measured pressure PB has not dropped below the set pressure PS by a predetermined amount or more, that is, if the measured pressure PB is maintained within a predetermined range including the set pressure PS, the second control unit 55 judges whether the opening of the second control valves 26 has reached the set opening DS (step S8). If the opening of the second control valves 26 has not reached the set opening DS, the process returns to step S6, and the opening operation of the second control valves 26 continues. In other words, the opening of the second control valves 26 continues to increase. Then, the judgment of step S7 is performed again.
[0049] On the other hand, when the second control unit 55 determines in step S7 that the measured pressure PB has dropped from the set pressure PS by a predetermined amount or more, it stops the valve opening operation of the plurality of second control valves 26 (step S9). In other words, when the measured pressure PB has dropped beyond a predetermined range including the set pressure PS, the opening degree of the second control valve 26 is maintained without increasing. This makes it possible to suppress an increase in the amount of steam flowing from the main pipe 23a side to the downstream side of the second control valve 26 (including the steam-using device 22), and therefore makes it possible to reduce the degree of drop in the measured pressure PB.
[0050] Next, the second control unit 55 determines whether the measured pressure PB has returned to the set pressure PS (step S10). That is, it determines whether the measured pressure PB has returned to within a predetermined range including the set pressure PS. If the measured pressure PB has not returned to the set pressure PS, the process returns to step S9, and the stop of the valve opening operation of the second control valve 26 continues.
[0051] If the measured pressure PB returns to the set pressure PS, the process proceeds to step S8. If the second control unit 55 determines in step S8 that the opening degree of the second control valve 26 has not reached the set opening degree DS, the process returns to step S6 and resumes the valve opening operation of the multiple second control valves 26 (step S6). That is, the opening degree of the second control valve 26 increases again at a predetermined constant speed.
[0052] When it is determined in step S8 that the opening degree of the second control valve 26 has reached the set opening degree DS, the second operation by the second control unit 55 is terminated. By performing the second operation in this manner, as shown by the thick solid line in FIG. 6, the pressure in the portion downstream of the second control valve 26 in the branch pipe 23b or the steam using device 22 can also be raised to the set pressure PS. At that time, since the measured pressure PB is maintained within a predetermined range including the set pressure PS, the steam maintained at a high pressure can be made to flow into the portion downstream of the second control valve 26 (including the steam using device 22). Therefore, the mass flow rate of the steam can be increased, and the pressure in the portion downstream of the second control valve 26 (including the steam using device 22) can be quickly raised to the set pressure PS. With the above, the warm-up operation is terminated.
[0053] In the second action described above, the reason why the restriction of maintaining the steam flow velocity in the branch pipe 23b at or below a predetermined value is not actively set is as follows. First, because most of the drain remaining in the main pipe 23a is discharged from the drain trap 27 by the first action, the amount of drain flowing through the branch pipe 23b is small, and the possibility of water hammer occurring is low. In addition, because the branch pipe 23b is shorter than the main pipe 23a, the amount of remaining drain is small. In addition, because the second control valve 26 is opened gradually (at a constant speed) in the second action, a sudden increase in the steam flow velocity is suppressed.
[0054] <Mode switching operation> Next, the mode switching operation by the first control unit 54 will be described with reference to Fig. 7 and Fig. 8. As described above, the mode switching operation is performed in step S4 shown in Fig. 4. Fig. 7 is a flowchart showing the mode switching operation by the first control unit 54. Fig. 8 is a table showing the relationship between the elapsed pressure PEn, the set time TSn, and the elapsed time TEn.
[0055] Here, it is assumed that the setting unit 541 sets N elapsed pressures PEn (n=1, 2, . . . N) and set times TSn (n=1, 2, . . . N). The Nth (last) elapsed pressure (nth elapsed pressure PEn) is the set pressure PS. It is also assumed that the setting unit 541 initially sets the opening data 531 for the medium speed mode.
[0056] In the mode switching operation, first, the timer 544 starts measuring the elapsed time TEn (step Sa1). Next, the mode switching unit 543 (first control unit 54) determines whether the measured pressure PB has reached the first elapsed pressure PEn (first elapsed pressure PE1) (step Sa2). If the measured pressure PB has reached the first elapsed pressure PE1, the process proceeds to step Sa3. If the measured pressure PB has not reached the first elapsed pressure PE1, the process waits.
[0057] In step Sa3, the mode switching unit 543 determines whether the elapsed time TE1 when the measurement pressure PB reaches the first elapsed pressure PE1 is longer than the set time TS1. If the elapsed time TE1 is shorter than the set time TS1, the process proceeds to step Sa4. In step Sa4, the mode switching unit 543 determines whether the elapsed time TE1 is shorter than the set time TS1 by a predetermined time or more.
[0058] If the elapsed time TE1 is not earlier than the set time TS1 by a predetermined time or more, the mode switching unit 543 does not switch the mode of the opening data 531 (step Sa5). That is, in this embodiment, the mode of the opening data 531 remains the medium speed mode. Therefore, the control according to the user's set time TSn can be maintained for the subsequent opening control. On the other hand, if the elapsed time TE1 is earlier than the set time TS1 by a predetermined time or more, the mode switching unit 543 switches the mode of the opening data 531 to the slow mode (step Sa6). That is, in this embodiment, the opening data 531 of the medium speed mode is switched to the opening data 531 of the low speed mode. Therefore, the subsequent elapsed time TEn can be made closer to the user's set time TSn.
[0059] In step Sa3, if the mode switching unit 543 determines that the elapsed time TE1 is slower than the set time TS1, the mode of the opening data 531 is switched to the fast mode (step Sa7). That is, in this embodiment, the opening data 531 of the medium speed mode is switched to the opening data 531 of the high speed mode. Therefore, the subsequent elapsed time TEn can be made to approach the user's set time TSn.
[0060] In this way, when the mode of the opening data 531 is switched or maintained in steps Sa5 to Sa7, n is incremented by 1 (step Sa8). That is, n changes from 1 to 2. Next, the mode switching unit 543 determines whether n is equal to N (step Sa9). If n is different from N, that is, if n has not reached N, the process returns to step Sa2. In step Sa2, it is determined whether the measured pressure PB has reached the second elapsed pressure PE2, and then the same operations as those in steps Sa3 to Sa9 described above are performed.
[0061] In this way, the operations of steps Sa2 to Sa9 are repeated until n becomes N-1. Therefore, each time the measured pressure PB reaches each elapsed pressure PEn except for the set pressure PS, the mode of the opening data 531 is reviewed based on the magnitude relationship between the set time TSn and the elapsed time TEn. Therefore, it is possible to control the opening of the first control valve 25 according to the set time TSn desired by the user. Then, when n becomes N, the mode switching operation ends. When the mode switching operation ends, the process proceeds to step S5 in FIG. 4.
[0062] As described above, the steam system 100 of the above embodiment includes the supply pipe 23 connected to the steam using device 22 and supplying steam to the steam using device 22, the first control valve 25 (flow rate control valve) provided in the supply pipe 23, and the control device 5 that controls the first control valve 25 to execute a warm-up operation to increase the pressure of the supply pipe 23 to the set pressure PS. The control device 5 is configured to control the first control valve 25 based on the opening data 531 in which the openings DH, DM, and DL of the first control valve 25 are set according to the upstream and downstream pressure difference ΔP in the first control valve 25 so that the steam flow rate in the supply pipe 23 is equal to or lower than a predetermined value. The opening data 531 includes opening data 531 for a plurality of modes (high speed mode, medium speed mode, and low speed mode) in which the openings DH, DM, and DL of the first control valve 25 are set to different values. The control device 5 sets a predetermined elapsed pressure PEn up to the set pressure PS and a set time TSn (target time) for raising the pressure in the supply pipe 23 to the elapsed pressure PEn, and when the pressure in the supply pipe 23 rises to the elapsed pressure PEn during warm-up operation, switches between a plurality of modes depending on the relationship between the elapsed time TEn (actual time) required for the pressure in the supply pipe 23 to rise to the elapsed pressure PEn and the set time TSn.
[0063] According to the above configuration, when the pressure in the supply pipe 23 reaches the intermediate pressure PEn on the way to the set pressure PS, the mode of the opening data 531 can be reviewed based on the user's set time TSn. Therefore, an optimal warm-up operation can be performed according to the set time TSn desired by the user. Moreover, since the openings DH, DM, and DL of the opening data 531 are set so that the steam flow rate in the supply pipe 23 is equal to or less than a predetermined value, by setting the predetermined value to a value that can prevent water hammer, an optimal warm-up operation according to the user's request can be performed while preventing water hammer.
[0064] Furthermore, in the steam system 100 of the above embodiment, when the pressure in the supply pipe 23 rises to the elapsed pressure PEn during warm-up operation, if the elapsed time TEn is slower than the set time TSn, the control device 5 switches to the opening data 531 of a mode in which the openings DH, DM, DL of the first control valve 25 are set larger than the opening data 531 of the current mode.
[0065] According to the above configuration, the mode is switched to one in which the openings DH, DM, DL of the first control valve 25 are set larger than in the current mode (faster mode), so that the subsequent elapsed time TEn can be made faster according to the user-set time TSn. Therefore, the warm-up operation can be completed at the time desired by the user, preventing any disruption to the operation schedule of the normal operation performed after the warm-up operation.
[0066] Furthermore, in the steam system 100 of the above embodiment, when the pressure in the supply pipe 23 rises to the elapsed pressure PEn during warm-up operation, if the elapsed time TEn is earlier than the set time TSn by a predetermined time or more, the control device 5 switches to the opening data 531 of a mode in which the openings DH, DM, DL of the first control valve 25 are set smaller than the opening data 531 of the current mode.
[0067] According to the above configuration, the mode is switched to one in which the openings DH, DM, DL of the first control valve 25 are set smaller than in the current mode, so that the subsequent elapsed time TEn can be delayed according to the user-set time TSn. Therefore, it is possible to prevent excessive steam from being supplied to the supply pipe 23 during warm-up operation, and energy saving can be improved.
[0068] In the steam system 100 of the above embodiment, the control device 5 sets a plurality of elapsed pressures PEn and set times TSn.
[0069] According to the above configuration, by setting a plurality of elapsed pressures PEn and set times TSn, it is possible to obtain a plurality of opportunities to review the mode of the opening data 531. Therefore, it is possible to perform an optimal warm-up operation in accordance with the user's request.
[0070] In the warm-up operation of the above embodiment, the target region of the warm-up operation is divided into two regions, and the pressures of these regions are raised in sequence. That is, by performing the first operation, the pressure of the main pipe 23a and the portion upstream of the second control valve 26 in the branch pipe 23b is raised to the set pressure PS. Then, by performing the second operation after the first operation, the pressure of the portion downstream of the second control valve 26 (including the steam-using device 22) is also raised to the set pressure PS. At that time, since the pressure of the main pipe 23a is maintained within a predetermined range including the set pressure PS, the steam kept at high pressure can be made to flow into the portion downstream of the second control valve 26 (including the steam-using device 22). Therefore, the pressure of the portion downstream of the second control valve 26 can be quickly raised to the set pressure PS. As a result, the time required for the warm-up operation can be shortened compared to, for example, a case where the pressure is raised all at once without dividing the target region of the warm-up operation.
[0071] In other words, if you try to increase the pressure all at once without dividing the target range of the warm-up operation, that is, if you try to control the first control valve with multiple second control valves fully open, the pressure in the target range will not increase easily because the range is wide. In that case, the pressure difference ΔP between the upstream and downstream of the first control valve will not decrease easily, so it will be difficult to increase the opening of the first control valve from the perspective of preventing water hammer. As a result, it will take a long time to increase the pressure in the entire target range, which will lengthen the warm-up operation time.
[0072] (Modification of the embodiment) A modified example of the above embodiment will be described with reference to Fig. 9. Fig. 9 is a flow chart showing a part of the control operation by the control device 5 according to the modified example. In this modified example, in the control operation by the control device 5 of the above embodiment, a drive command is output to the boiler 11 as necessary before the second operation by the second control unit 55.
[0073] Specifically, in the control operation by the control device 5 of this modified example, steps S11 and S12 are added between steps S5 and S6 in the flow chart of FIG.
[0074] When it is determined in step S5 that the measured pressure PB has reached the set pressure PS, the boiler command unit 52 determines whether the boiler 11 is being driven (step S11). That is, the boiler command unit 52 determines the operating state (driven state, stopped state) of the boiler 11. When the boiler command unit 52 determines that the boiler 11 is not being driven, that is, when it determines that the boiler is in a stopped state, it outputs a drive command to operate the boiler 11 to the boiler 11 (step S12). When the drive command is output to the boiler 11, the process returns to step S11. When it is determined in step S11 that the boiler 11 is being driven, the process proceeds to step S6, and the second control unit 55 performs the second operation.
[0075] As described above, according to this modification, a drive command is output to the boiler 11 as necessary before the second operation by the second control unit 55, so that the measured pressure PA (pressure of the header 21) is reliably maintained at the set pressure PS. Therefore, in the second operation, it becomes easy to maintain the measured pressure PB within a predetermined range including the set pressure PS. This makes it possible to suppress the stopping of the valve opening operation of the second control valve 26 (step S9), and as a result, the time for the second operation and therefore the time for the warm-up operation can be further shortened, making it possible to perform the warm-up operation more in accordance with the user's wishes.
[0076] In the warm-up operation of the above embodiment, the first operation and the second operation are performed, that is, the target region of the warm-up operation is divided into two regions and the pressure in these regions is increased in sequence, but the target region of the warm-up operation may be increased all at once without being divided. In other words, only the first operation (including the mode switching operation) by the first control unit 54 may be performed. In this case, the first control unit 54 controls the opening degree of the first control valve 25 while the second control valve 26 is opened (fully open), and increases the pressure in the supply pipe 23 (the main pipe 23a and the multiple branch pipes 23b) to the set pressure PS.
[0077] In addition, in the above embodiment, the number of modes of the opening degree data 531 is described as three, but it may be two or four or more.
[0078] In the above embodiment, the second control valve 26 is opened at a predetermined constant speed in the second action, but the opening speed of the second control valve 26 may be accelerated. In other words, the rate at which the opening degree of the second control valve 26 increases may be accelerated.
[0079] Furthermore, in the above embodiment, the opening operation of the second control valve 26 is stopped in step S9 in FIG. 4, but the speed at which the second control valve 26 is opened may be reduced.
[0080] In addition, in the above embodiment, in step S10 of Figure 4, it is determined whether the measured pressure PB has returned to the set pressure PS, but it may also be determined whether the measured pressure PB has returned to within a predetermined range including the set pressure PS. [Industrial Applicability]
[0081] As described above, the technology disclosed in the present application is useful for steam systems. [Explanation of symbols]
[0082] 100 Steam System 5. Control device 22 Steam-using equipment 23 Supply pipe 25 First control valve (flow control valve) 531 Opening Data PS Set pressure ΔP pressure difference DH,DM,DL opening degree PEn Transient pressure TSn Set time (target time) TEn Elapsed time (actual time)
Claims
1. A supply pipe connected to a steam using device and supplying steam to the steam using device; a flow rate control valve provided in the supply pipe; a control device that controls the flow rate regulating valve to perform a warm-up operation to increase the pressure in the supply pipe to a set pressure, the control device is configured to control the flow rate control valve based on opening data in which an opening of the flow rate control valve is set according to a pressure difference between upstream and downstream of the flow rate control valve so that the steam flow velocity in the supply pipe is equal to or less than a predetermined value, The opening data includes opening data for a plurality of modes in which the openings of the flow rate regulating valve are set to different values, The control device sets a predetermined transitional pressure up to the set pressure and a target time for increasing the pressure in the supply pipe to the transitional pressure, and when the pressure in the supply pipe increases to the transitional pressure during the warm-up operation, switches between the plurality of modes depending on the relationship between the actual time required for the pressure in the supply pipe to increase to the transitional pressure and the target time. A steam system comprising:
2. 2. The steam system of claim 1, When the pressure in the supply pipe rises to the elapsed pressure during the warm-up operation, if the actual time is slower than the target time, the control device switches to opening data of the mode in which the opening of the flow rate control valve is set larger than the opening data of the current mode. A steam system comprising:
3. 3. The steam system according to claim 1, When the pressure in the supply pipe rises to the elapsed pressure during the warm-up operation, if the actual time is earlier than the target time by a predetermined time or more, the control device switches to opening data of the mode in which the opening of the flow rate control valve is set smaller than the opening data of the current mode. A steam system comprising:
4. 4. The steam system according to claim 1, The control device sets a plurality of the elapsed pressures and the target times. A steam system comprising:
Citation Information
Patent Citations
Warming-up method of steam pipeline
JP1983187700A
Method and device for inhibiting hammering
JP1986066996A