Voltage Conversion Device

The voltage conversion device stabilizes voltage conversion ratios by detecting reactor current multiple times and correcting the command ON time to account for component variations and deterioration, achieving high efficiency.

JP7578004B2Active Publication Date: 2024-11-06TOYOTA JIDOSHA KK
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021007021
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-20
Publication Date
2024-11-06
Estimated Expiration
2041-01-20

AI Technical Summary

Technical Problem

Existing DC/DC converters face issues with individual variations in voltage conversion ratio due to component variations and deterioration over time, leading to potential insufficient ON time and reduced voltage conversion efficiency.

Method used

A voltage conversion device that includes a reactor, switching element, diode, current sensor, and control unit, which detects current multiple times within a switching period, calculates the estimated execution ON time, and corrects the command ON time based on the difference to maintain a predetermined upper limit, thereby stabilizing the voltage conversion ratio.

Benefits of technology

The solution effectively suppresses individual variations in voltage conversion ratio, ensuring a high and stable voltage conversion ratio by adjusting the command ON time to compensate for component variations and deterioration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007578004000001
    Figure 0007578004000001
  • Figure 0007578004000002
    Figure 0007578004000002
  • Figure 0007578004000003
    Figure 0007578004000003
Patent Text Reader

Abstract

To provide a voltage conversion device capable of suppressing individual variations of voltage conversion ratio and realizing a high voltage conversion ratio.SOLUTION: A voltage conversion device comprises: a reactor; a switching element; a diode; a current sensor; and a control unit. The control unit detects a current value of the reactor multiple times within a switching period. The control unit calculates a length of an estimation execution ON time from transition of the current value of the reactor detected within the switching period. The control unit calculates a difference between the length of the estimation execution ON time and the length of a command ON time commanded by the control unit. The control unit uses the difference to correct the length of the command ON time at the time of performing any run of the next and subsequent ON command within a range not exceeding an upper limit value of a predetermined command ON time by using .SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a voltage conversion device. [Background technology]

[0002] Various research has been conducted on converters installed in systems installed in vehicles such as fuel cell vehicles. DC / DC converters used in various electronic devices often use circuits consisting of reactors, switching elements, diodes, capacitors, etc. The increase or decrease of the current flowing through the reactor is controlled by the ON / OFF signal of the switch. For example, Patent Document 1 discloses a technique for providing a DC / DC converter that can maintain the circuit's protection function against excessive current even if there is a malfunction in the current detection circuit, in which an upper limit for the switching duty ratio (command ON time) is set based on the time delay at which the current flowing through the reactor of the DC / DC converter is detected, and switching is controlled so that the upper limit of the duty ratio is not exceeded. Moreover, Patent Document 2 discloses a discharge lamp lighting device that can improve efficiency during steady lighting and easily reduce noise that occurs during continuous mode operation, such as at startup. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-162939 A [Patent Document 2] JP 2002-216986 A Summary of the Invention [Problem to be solved by the invention]

[0004] Since the boost operation is realized by repeating ON / OFF switching, the upper limit of the command ON time is set so that the OFF time does not become zero. On the other hand, it is known that the length of the actual ON time varies with respect to the length of the command ON time of switching due to variations and deterioration over time of the parts that make up the converter. The technology of the above-mentioned Patent Document 1 takes into consideration the variations and deterioration over time of the parts, and sets the command ON time so that the OFF time does not become zero according to the individual whose expected execution ON time is the longest with respect to the command ON time. With this technology of Patent Document 1, if a similar upper limit of the command ON time is set for an individual whose execution ON time is short, there is a risk that a sufficient ON time will not be obtained, and the expected voltage conversion ratio will not be obtained.

[0005] The present disclosure has been made in consideration of the above-described circumstances, and has as its main object to provide a voltage conversion device capable of suppressing individual variations in the voltage conversion ratio and realizing a high voltage conversion ratio. [Means for solving the problem]

[0006] The voltage conversion device of the present disclosure is a voltage conversion device, The voltage conversion device includes a reactor, a switching element, a diode, a current sensor, and a control unit. The current sensor acquires a value of a current flowing through the reactor, the control unit performs ON / OFF control of the switching element by switching between an ON command and an OFF command to the switching element; The control unit detects a current value of the reactor a plurality of times within a switching period, The control unit calculates an estimated execution ON time length from a transition of a current value of the reactor detected within the switching period, The control unit calculates a difference between the estimated execution ON time length and a command ON time length commanded by the control unit, The control unit is characterized in that it uses the difference to correct the command ON time length when issuing the ON command next or any subsequent times, within a range not exceeding a predetermined command ON time upper limit value.

[0007] In the voltage conversion device of the present disclosure, the control unit may use the difference to correct the command ON time length when issuing a next ON command within a range not exceeding a predetermined command ON time upper limit value. Effect of the Invention

[0008] According to the voltage conversion device of the present disclosure, individual variations in the voltage conversion ratio can be suppressed, and a high voltage conversion ratio can be realized. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram illustrating an example of the configuration of a boost circuit of a boost converter. [Diagram 2] FIG. 2 is a time chart showing commands for switching on / off the switching elements, actual timing, and reactor current values. [Diagram 3] FIG. 3 is a flowchart showing a flow from multi-point sampling of the reactor current value to correction of the command ON time length. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] The voltage conversion device of the present disclosure is a voltage conversion device, The voltage conversion device includes a reactor, a switching element, a diode, a current sensor, and a control unit. The current sensor acquires a value of a current flowing through the reactor, the control unit performs ON / OFF control of the switching element by switching between an ON command and an OFF command to the switching element; The control unit detects a current value of the reactor a plurality of times within a switching period, The control unit calculates an estimated execution ON time length from a transition of a current value of the reactor detected within the switching period, The control unit calculates a difference between the estimated execution ON time length and a command ON time length commanded by the control unit, The control unit is characterized in that it uses the difference to correct the command ON time length when issuing the ON command next or any subsequent times, within a range not exceeding a predetermined command ON time upper limit value.

[0011] In the present disclosure, the transition of the current value flowing through the reactor is monitored and the executed ON time is estimated using multiple samples. Then, the command ON time is appropriately corrected using the difference between the estimated ON time and the command ON time. This makes it possible to make the upper limit of the executed ON time constant regardless of the individual variations of circuit components such as photocouplers and capacitors. This makes it possible to suppress the individual variations in the voltage conversion ratio and achieve a high voltage conversion ratio.

[0012] FIG. 1 is a diagram illustrating an example of the configuration of a boost circuit of a boost converter. The left side of Fig. 1 is connected to a power source, and the right side of Fig. 1 is connected to a load. An example of the power source is a fuel cell. The fuel cell may have only one unit cell, or may be a fuel cell stack in which multiple unit cells are stacked. An example of the load is a motor connected via an inverter. The boost converter 20 includes six boost circuits that are connected in parallel with each other, and two of the six boost circuits may be magnetically coupled to each other. Although Fig. 1 shows a configuration including six boost circuits, the number of phases is not particularly limited. The boost circuit includes a reactor 21, a current sensor 22, a switching element 23, a diode 24, and a capacitor 25. In each boost circuit, when the switching element 23 is turned ON, the current flowing through the reactor 21 increases, and when the switching element 23 is turned OFF, the current flowing through the reactor 21 decreases. When the current reaches zero, it is maintained at zero. The current sensor 22 acquires the value of the current flowing through the reactor 21. A control unit 30 controls the ON / OFF of the switching element 23 to control the step-up ratio of the converter 20 and the output current value from the power supply.

[0013] The voltage conversion device (converter) performs at least one selected from the group consisting of stepping up and stepping down the output voltage of a power supply. The converter may be a step-up converter, a step-down converter, or a step-up / step-down converter. The voltage conversion device includes a reactor, a switching element, a diode, a current sensor, and a control unit, and may also include a photocoupler, a capacitor, and the like as necessary.

[0014] The reactor includes a coil and a core. The core may have one or more coils wound thereon. The core and coil of the reactor may be the same as those used in conventionally known converters.

[0015] The switching element may be an IGBT, a MOSFET, or the like. The diode may be any diode used in a conventionally known converter.

[0016] The current sensor is not particularly limited as long as it can acquire the value of the current flowing through the reactor (reactor current), and a conventionally known ammeter or the like can be used.

[0017] The control unit may be an electronic control unit (ECU), etc. The ECU includes a central processing unit (CPU), a memory, and an input / output buffer.

[0018] The control unit controls the switching element by periodically switching between an ON command and an OFF command, thereby controlling the output current value from the power supply. The control unit detects the value of the current flowing through the reactor multiple times within a switching period. The control unit may detect the value of a current flowing through the reactor based on a signal from a current sensor. In the present disclosure, a switching cycle (switching period) means the period from when a switching element is switched from off to on to when the switching element is switched from off to on again. The controller only needs to detect the reactor current value at least twice within a switching period, and this can be set appropriately depending on the method for estimating the actual ON time length.

[0019] [Estimation of execution ON time length] The control unit calculates an estimated execution ON time length from a transition of a current value of the reactor detected within a switching period. The execution ON time length can be estimated, for example, by the following method. (Example 1): The control unit may sample the reactor current value at multiple points during the ON time of the switching cycle, and estimate the actual ON time length from the difference A between the minimum and maximum reactor current values ​​during the ON time. In this case, it is sufficient to sample the reactor current value at least two points during the ON time of the switching cycle. (Example 2): The control unit samples the reactor current value at multiple points during the ON time and OFF time of the switching cycle. A straight line passing through multiple current values and the reactor during OFF time A straight line passing through multiple current values The actual ON time length may be estimated from the intersection of and In this case, the reactor current value may be sampled at least two times during the ON time of the switching period, and the reactor current value may be sampled at least two times during the OFF time of the switching period. When the converter is a magnetically coupled converter, the actual ON time length may be estimated for each circuit by the above method (Example 1) or (Example 2). In this disclosure, a reactor having a core around which one independent coil is wound is referred to as a non-magnetically coupled reactor. In this disclosure, a converter including a non-magnetically coupled reactor is referred to as a non-magnetically coupled converter. In this disclosure, a reactor having a core around which two or more independent coils are wound is referred to as a magnetically coupled reactor. In this disclosure, a converter including a magnetically coupled reactor is referred to as a magnetically coupled converter. In this disclosure, a separate coil refers to a coil with one or more spiral turns and two terminals.

[0020] The control unit calculates the difference between the estimated executed ON time length and the commanded ON time length commanded by the control unit.

[0021] [Command ON time correction] The control unit uses the difference to correct the command ON time length when issuing the ON command next or any subsequent times, within a range not exceeding a predetermined command ON time upper limit value. The command ON time length to be corrected may be the command ON time length when an ON command is issued the next time or any time thereafter. From the viewpoint of improving the power conversion accuracy, the command ON time length to be corrected may be the command ON time length when an ON command is issued the next time. The predetermined command ON time upper limit is not particularly limited as long as the duty ratio is not 100%. For example, the predetermined command ON time upper limit may be a value that results in a duty ratio of 99.9%. The duty ratio (%) may be expressed by the following formula. Duty ratio (%) = {Command ON time ÷ (Command ON time + Command OFF time)} × 100 The command ON time can be corrected, for example, by the following methods according to the difference between the command ON time and the estimated execution ON time. When the estimated execution ON time is longer than the command ON time, the estimated execution OFF time is shorter than the command OFF time. In this case, the command ON time length may be corrected to shorten the command ON time length so as not to exceed a predetermined command ON time upper limit value and to avoid a short circuit caused by a duty ratio of 100%. If the command ON time exceeds the predetermined command ON time upper limit value by correcting using the difference, it is not necessary to correct the command ON time. Also, if the command ON time exceeds the predetermined command ON time upper limit value by correcting using the difference, it may be corrected to the predetermined command ON time upper limit value. When the estimated execution ON time is shorter than the command ON time, the estimated execution OFF time is longer than the command OFF time. In this case, the executed ON time is too short to ensure the target power conversion ratio. Therefore, the command ON time length should be corrected so that the command ON time length is longer so that the target power conversion ratio can be ensured without exceeding a predetermined command ON time upper limit value.

[0022] FIG. 2 is a time chart showing commands for switching on / off the switching elements, actual timing, and reactor current values. FIG. 3 is a flowchart showing a flow from multi-point sampling of the reactor current value to correction of the command ON time length. Between the signal input to turn the switch on / off and the actual switching operation, there will be variations in the amount of signal delay for each individual switch due to variations in components such as capacitors and photocouplers that are configured in the transmission path. Conventionally, the amount of signal delay caused by the above-mentioned component variations is taken into consideration and an upper limit for the command ON time, i.e., an upper limit for the duty ratio, is determined so that the actual OFF time does not become 0 even in the worst case. In this embodiment, the reactor current value is sampled at multiple points during a switching period, the actual execution ON time length is estimated based on the sampled values, the difference A between the command ON time and the execution ON time is derived, and the command ON time length is corrected using the difference A. [Explanation of symbols]

[0023] 20: Boost converter 21: Reactor 22: Current sensor 23: Switching element 24: Diode 25: Capacitor 30: Control unit

Claims

1. A voltage conversion device, The voltage conversion device includes a reactor, a switching element, a diode, a current sensor, and a control unit. The current sensor acquires a value of a current flowing through the reactor, The control unit performs ON / OFF control of the switching element by switching between an ON command and an OFF command to the switching element, The control unit detects a current value of the reactor a plurality of times within a switching period, The control unit calculates an estimated execution ON time length from a transition of a current value of the reactor detected within the switching period, The control unit calculates a difference between the estimated execution ON time length and a command ON time length commanded by the control unit, The control unit corrects the command ON time length when issuing the ON command next or any subsequent times, using the difference, within a range not exceeding a predetermined command ON time upper limit value; the control unit samples a current value of the reactor at a plurality of points during an ON time within the switching period, and calculates the estimated execution ON time length from a difference A between a minimum value and a maximum value of the current value of the reactor during the ON time, or calculates the estimated execution ON time length from an intersection point between a straight line passing through a plurality of current values ​​of the reactor during the ON time, obtained by sampling a current value of the reactor at a plurality of points during the ON time and the OFF time within the switching period, and a straight line passing through a plurality of current values ​​of the reactor during the OFF time; when the estimated execution ON time length is longer than the command ON time length, the control unit corrects the command ON time length so that the command ON time length when issuing the ON command next or any subsequent times is shortened within a range not exceeding a predetermined command ON time upper limit value; The control unit corrects the command ON time length when the estimated execution ON time length is shorter than the command ON time length so that the command ON time length when issuing the ON command next or any subsequent time is longer, within a range not exceeding a predetermined command ON time upper limit value.

2. The voltage conversion device according to claim 1 , wherein the control unit uses the difference to correct the command ON time length when issuing a next ON command within a range not exceeding a predetermined command ON time upper limit value.

Citation Information

Patent Citations

  • Electric discharge lamp lighting equipment

    JP2002216986A

  • Voltage converter, and control method for vehicle and voltage converter

    JP2008182839A

  • Power supply circuit

    JP2011091937A

  • DC / DC converter and control method therefor

    JP2015162939A

  • JPP3906843B