Method and device for controlling change in thickness during flight

By adjusting the timing of running plate thickness changes based on predicted tension fluctuations, the method and device effectively manage tension without prolonging the process, ensuring consistent plate thickness and quality.

JP7578113B2Active Publication Date: 2024-11-06JFE STEEL CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022053065
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-03-29
Publication Date
2024-11-06
Estimated Expiration
2042-03-29

AI Technical Summary

Technical Problem

Existing methods for suppressing tension fluctuations during running plate thickness changes can result in longer change times and increased deviations from plate thickness tolerance, known as off-gauge.

Method used

A method and device that detect the movement of rolled material and adjust the timing of running plate thickness changes based on predicted tension fluctuations, setting the start timing earlier or later than a reference point to maintain tension within predetermined limits.

Benefits of technology

Suppresses tension fluctuations without increasing the time required for plate thickness changes, thereby preventing material breakage and maintaining plate quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007578113000001
    Figure 0007578113000001
  • Figure 0007578113000002
    Figure 0007578113000002
  • Figure 0007578113000003
    Figure 0007578113000003
Patent Text Reader

Abstract

To provide a flying plate thickness change setting control method and a flying plate thickness change setting control device which can suppress tension fluctuation without making the flying plate thickness change time long.SOLUTION: There is provided a flying plate thickness change setting control method in which, in a facility which detects a movement amount of a rolled material and starts a flying plate thickness change when the detected movement amount matches a set distance to a flying plate thickness change starting point, means in a computer predicts the tension in the time of flying plate thickness change, and determines the flying plate thickness change starting timing according to the prediction result of the tension.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for controlling variation of a flying strip thickness and a device for controlling variation of a flying strip thickness. [Background technology]

[0002] As a method for suppressing tension fluctuations when changing the thickness while flying, for example, Patent Document 1 proposes a method of learning tension fluctuations when an actual thickness change while flying occurs, and calculating the time for changing the thickness while flying based on the learning results so as to keep the tension fluctuations within an acceptable range. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 10-249423 Summary of the Invention [Problem to be solved by the invention]

[0004] The method proposed in Patent Document 1 may be able to suppress tension fluctuations when changing the thickness while the steel plate is in flight. However, depending on the calculation results, the time required for changing the thickness while the steel plate is in flight may become longer, which may result in a larger deviation from the thickness tolerance, known as off-gauge.

[0005] The present invention has been made in consideration of the above, and aims to provide a method for controlling the running thickness change setting and a device for controlling the running thickness change setting that can suppress tension fluctuations without lengthening the running thickness change time. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the objectives, the method for controlling the setting of the flying thickness change according to the present invention is a method for controlling the setting of the flying thickness change in equipment that detects the amount of movement of the rolled material and starts the flying thickness change when the detected amount of movement matches a set distance to the flying thickness change start point, in which a means provided in a computer predicts the tension at the time of the flying thickness change and determines the timing to start the flying thickness change depending on the predicted tension result.

[0007] The method for controlling the setting of a flying thickness change according to the present invention is, in the above-mentioned invention, characterized in that, during a flying thickness change by moving the reduction position in the opening direction, if the predicted tension exceeds a predetermined upper limit, the timing to start the flying thickness change is made later than a predetermined reference timing, and if the predicted tension is less than a predetermined lower limit, the timing to start the flying thickness change is made earlier than the reference timing; and, during a flying thickness change by moving the reduction position in the closing direction, if the predicted tension exceeds a predetermined upper limit, the timing to start the flying thickness change is made earlier than the predetermined reference timing, and if the predicted tension is less than the predetermined lower limit, the timing to start the flying thickness change is made later than the reference timing.

[0008] In order to solve the above-mentioned problems and achieve the object, the flying thickness change setting control device of the present invention detects the amount of movement of the rolled material, and in equipment that starts the flying thickness change when the detected amount of movement matches the set distance to the flying thickness change start point, predicts the tension at the time of the flying thickness change, and determines the timing to start the flying thickness change depending on the predicted tension result. Effect of the Invention

[0009] According to the present invention, the timing for starting the on-flight gauge change is determined in accordance with the tension prediction result, so that tension fluctuations can be suppressed without lengthening the on-flight gauge change time. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a diagram showing the configuration of a flying strip thickness variation setting control device according to an embodiment of the present invention, and an example of rolling equipment to which the flying strip thickness variation setting control device can be applied. [Diagram 2] FIG. 2 is a diagram showing the results of a comparison between a case in which tension fluctuations are suppressed by a conventional technique and a case in which tension fluctuations are suppressed by the method for controlling the setting of the flying thickness change according to the present embodiment, in a situation in which the predicted tension exceeds a predetermined upper limit value during the flying thickness change by moving the roll reduction position in the opening direction. [Diagram 3] FIG. 3 is a diagram showing the results of a comparison between a case in which tension fluctuations are suppressed by a conventional technique and a case in which tension fluctuations are suppressed by the method for controlling the setting of the flying thickness change according to the present embodiment, in a situation in which the predicted tension is below a predetermined lower limit value during the flying thickness change by moving the reduction position in the closing direction. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] A method and an apparatus for controlling variation of a running thickness according to an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment described below.

[0012] (Rolling equipment) 1 shows an example of a rolling facility to which the running thickness change setting control device according to the present embodiment can be applied. This rolling facility includes a plurality of rolling stands 11, a plurality of screw down control devices 12, a plurality of electric motors 13, a plurality of electric motor speed control devices 14, a plurality of loopers 15, and a plurality of tension detection devices 16.

[0013] Each of the multiple rolling stands 11 is equipped with a work roll and a backup roll, and sequentially rolls the transported rolled material S. The roll gap control device 12 controls the roll gap position (the gap between the work rolls of the rolling stand 11) in order to control the delivery thickness of each rolling stand 11.

[0014] The electric motor 13 drives the rolling stand 11. The electric motor speed controller 14 controls the speed of the electric motor 13. More specifically, the electric motor speed controller 14 performs speed control so that the speed of the electric motor 13 coincides with a speed command value obtained by adding a set speed and various speed correction values.

[0015] The loopers 15 are disposed between the rolling stands 11. The tension detectors 16 detect the tension of the rolled material S received by each looper 15. Although FIG. 1 shows a hot rolling facility equipped with the loopers 15 as an example, a cold rolling facility without the loopers 15 may be used.

[0016] (Flying thickness change setting control device) The flying thickness variation setting control device 2 according to this embodiment includes a flying thickness variation setting unit 21, a tension fluctuation learning unit 22, a tension prediction model 23, and a tension fluctuation prediction unit 24, as shown in FIG.

[0017] The flying thickness change setting unit 21 determines the thickness schedule of each rolling stand 11 after the flying thickness change and the material speed of each rolling stand 11 based on the given pass schedule of each rolling stand 11 before the flying thickness change and the final stand target thickness after the flying thickness change. The flying thickness change setting unit 21 also determines the reduction position change amount and the motor speed change amount of each rolling stand 11 based on the determined thickness schedule and material speed. The flying thickness change setting unit 21 then outputs the reduction position change amount to the reduction control device 12 and outputs the motor speed change amount to the motor speed control device 14.

[0018] The flying thickness change setting unit 21 also detects the amount of movement of the rolling material S in the rolling equipment, and starts the flying thickness change when the detected amount of movement matches the set distance to the flying thickness change start point. This is set as the "reference timing." After that, the flying thickness change setting unit 21 determines the timing to start the flying thickness change according to the tension prediction result by the tension fluctuation prediction unit 24.

[0019] Specifically, when the tension predicted by the tension fluctuation prediction unit 24 is within a range of predetermined upper and lower limits, the flying thickness change setting unit 21 keeps the timing for starting the flying thickness change at the predetermined reference timing.

[0020] Furthermore, when changing the flying thickness by moving the reduction position in the opening direction, if the tension predicted by the tension fluctuation prediction unit 24 exceeds a predetermined upper limit, the flying thickness change setting unit 21 delays the timing to start changing the flying thickness from the reference timing. Furthermore, when changing the flying thickness by moving the reduction position in the opening direction, if the tension predicted by the tension fluctuation prediction unit 24 is less than a predetermined lower limit, the flying thickness change setting unit 21 advances the timing to start changing the flying thickness from the reference timing.

[0021] Furthermore, when changing the flying thickness by moving the reduction position in the closing direction, if the tension predicted by the tension fluctuation prediction unit 24 exceeds a predetermined upper limit, the flying thickness change setting unit 21 makes the timing to start changing the flying thickness earlier than the reference timing. Furthermore, when changing the flying thickness by moving the reduction position in the closing direction, if the tension predicted by the tension fluctuation prediction unit 24 is less than a predetermined lower limit, the flying thickness change setting unit 21 makes the timing to start changing the flying thickness later than the reference timing.

[0022] Here, the optimal timing for starting the thickness change while on the run may be obtained in advance for each steel grade specification and steel plate size, for example, by experiments, analyses, etc. Furthermore, the range within which the actual tension fluctuation falls with respect to the change time of the thickness change start timing while on the run may be learned by machine learning, and the thickness change start timing while on the run that minimizes the tension fluctuation may be set.

[0023] The tension fluctuation learning unit 22 learns tension fluctuations at the time of past changes in running thickness and constructs a tension prediction model 23. Note that the tension prediction model 23 may be expressed by a predetermined transfer function as in the method of the conventional technology (for example, see Patent Document 1), or may be constructed by machine learning or the like.

[0024] The tension fluctuation prediction unit 24 predicts the tension when the flying thickness is changed based on a pre-constructed tension prediction model 23. Then, the tension fluctuation prediction unit 24 outputs the predicted tension to the flying thickness change setting unit 21.

[0025] 2 shows the results of comparing the case where tension fluctuation is suppressed by the method of the prior art (see, for example, Patent Document 1) and the case where tension fluctuation is suppressed by the method of controlling the setting of the flying thickness change according to the present embodiment in a situation where the predicted tension exceeds a predetermined upper limit value during the flying thickness change by moving the rolling position in the opening direction. Also, (a) to (f) in the figure respectively indicate the following.

[0026] The example in Figure 2 shows a case where the thickness of a rolled material, in which a preceding and following material are connected at a welded point, is changed while traveling near the welded point to make the post-rolling thickness of the following material greater than the post-rolling thickness of the preceding material. The entry thickness of each rolling stand is set according to the post-rolling thickness, and when the post-rolling thickness is greater, the entry thickness is also set to a larger value.

[0027] The start time of the on-the-fly thickness change is initially set to a time earlier than the time when the welding point passes. FIG. 2(a) is a graph showing a schematic change in the roll-down position over time when the on-the-fly thickness change is performed according to the initial setting, and shows the relationship between the roll-down position at the start timing of the on-the-fly thickness change, the end timing of the on-the-fly thickness change, and the time when the welding point passes. FIG. 2(b) is a graph showing the change in the predicted value of tension fluctuation over time when the on-the-fly thickness change is performed according to the initial setting, and shows a case where the predicted tension value exceeds the upper limit. As shown in FIG. 2(a), when the on-the-fly thickness change starts (a time earlier than the time when the welding point passes each rolling stand), the roll-down control device 12 of each rolling stand starts the operation of changing the roll-down position in the opening direction.

[0028] When the roll position of a rolling stand is changed in the opening direction, the entry tension of that rolling stand increases as shown in Figure 2(b). Then, when the welding point passes through the rolling stand, the entry thickness of the material being rolled in that rolling stand increases suddenly, so the entry tension of that rolling stand drops suddenly.

[0029] At this time, as shown in Fig. 2(b), if the entry tension exceeds a preset upper tension limit just before passing the welding point, there is a risk that the rolled material will break at the welding point. Therefore, it is necessary to ensure that the tension does not exceed the set upper tension limit.

[0030] Figure 2(c) shows an example of a case where the on-the-fly thickness change time is lengthened so that the predicted tension fluctuation falls within the allowable range. That is, the time preceding the timing of passing the welding point at the start of the on-the-fly thickness change is kept the same as in Figure 2(a), but the speed of the operation for changing the reduction position in the opening direction is slowed down so that the tension at the time of passing the welding point does not exceed the upper limit (see Figure 2(d)). In this case, the on-the-fly thickness change time is lengthened, which causes the problem of the off-gauge also becoming longer.

[0031] On the other hand, the change over time of the roll down position and the change over time of the tension prediction value in the method for controlling thickness change while running according to this embodiment are shown in (e) and (f) of FIG. 2, respectively. In the method for controlling thickness change while running according to this embodiment, when the tension predicted by the tension fluctuation prediction unit 24 exceeds a predetermined upper limit, the timing for starting thickness change while running is delayed from the reference timing (the timing for starting thickness change while running in (a) of FIG. 2). This makes it possible to suppress tension fluctuations without lengthening the thickness change time while running (i.e., without lengthening the off-gage). Note that in the method for controlling thickness change while running according to this embodiment, the timing for starting thickness change while running is merely delayed, so the thickness change time while running is the same as the thickness change time while running in (a) of FIG. 2.

[0032] 3 shows the results of comparing the case where tension fluctuation is suppressed by the method of the prior art (see, for example, Patent Document 1) and the case where tension fluctuation is suppressed by the method of controlling the setting of the flying thickness change according to the present embodiment in a situation where the predicted tension falls below a predetermined lower limit during the running thickness change by moving the reduction position in the closing direction. Also, (a) to (f) in the figure respectively indicate the following.

[0033] The example in Fig. 3 shows a case where the thickness of a rolled material, in which a preceding and following material are connected at a weld point, is changed while traveling near the weld point to make the post-rolling thickness of the following material smaller than the post-rolling thickness of the preceding material. The entry thickness of each rolling stand is set according to the post-rolling thickness, and when the post-rolling thickness is small, the entry thickness is also set to a small value.

[0034] The start time of the flying thickness change is initially set to a time earlier than the time when the welding point passes. FIG. 3(a) is a graph showing a schematic change in the roll position over time when the flying thickness change is performed according to the initial setting, and shows the relationship between the roll position at the start timing of the flying thickness change, the end timing of the flying thickness change, and the time when the welding point passes. FIG. 3(b) is a graph showing the change over time of the predicted value of tension fluctuation when the flying thickness change is performed according to the initial setting, and shows a case where the predicted tension value is less than the lower limit value. As shown in FIG. 3(a), when the flying thickness change start time (a time earlier than the time when the welding point passes each rolling stand) is reached, the roll position control device 12 of each rolling stand starts the operation of changing the roll position in the closing direction.

[0035] When the roll position of a rolling stand is changed in the closing direction, the entry tension of that rolling stand decreases as shown in Figure 3(b). Then, when the welding point passes through the rolling stand, the entry thickness of the material being rolled in that rolling stand suddenly decreases, so the entry tension of that rolling stand suddenly increases.

[0036] At this time, as shown in Fig. 3(b), if the entry tension falls below a preset lower limit just before passing through the welding point, there is a risk that the material being rolled will meander at the welding point, which will impair sheet passing. Therefore, it is necessary to ensure that the tension does not fall below the set lower limit.

[0037] Figure 3(c) shows an example of a case where the on-the-fly thickness change time is lengthened so that the predicted tension fluctuation falls within the allowable range. That is, the time preceding the timing of passing the welding point at the start of the on-the-fly thickness change is kept the same as in the case of Figure 3(a), but the speed of the operation for changing the reduction position in the opening direction is slowed down so that the tension at the time of passing the welding point does not fall below the lower limit (see Figure 3(d)). In this case, the on-the-fly thickness change time is lengthened, which causes a problem of the off-gauge also becoming longer accordingly.

[0038] On the other hand, the change over time of the roll down position and the change over time of the tension prediction value in the method for controlling thickness change while running according to this embodiment are shown in (e) and (f) of FIG. 3, respectively. In the method for controlling thickness change while running according to this embodiment, when the tension predicted by the tension fluctuation prediction unit 24 is below a predetermined lower limit, the timing for starting thickness change while running is delayed from the reference timing (the timing for starting thickness change while running in (a) of FIG. 3). This makes it possible to suppress tension fluctuations without lengthening the thickness change time while running (i.e., without lengthening the off-gage). Note that in the method for controlling thickness change while running according to this embodiment, the timing for starting thickness change while running is merely delayed, and the thickness change time while running is the same as the thickness change time while running in (a) of FIG. 3.

[0039] According to the on-the-fly plate thickness change setting control method and on-the-fly plate thickness change setting control device of the present embodiment described above, tension fluctuations can be suppressed without lengthening the on-the-fly plate thickness change time by determining the on-the-fly plate thickness change start timing in accordance with the tension prediction result.

[0040] That is, in the method and device for controlling the on-the-fly plate thickness change setting according to this embodiment, a means (tension change learning unit 22) is provided for learning tension changes during on-the-fly plate thickness changes, and the timing for starting the on-the-fly plate thickness change is automatically changed the next time the on-the-fly plate thickness is changed. This makes it possible to suppress tension changes during on-the-fly plate thickness changes. In addition, since the on-the-fly plate thickness change is performed automatically, there is no need for a human (e.g., an operator) to maintain the on-the-fly plate thickness change timing.

[0041] In addition, the method and device for controlling the thickness change setting while on the run according to the present embodiment learn tension fluctuations during past thickness changes while on the run, and when the rolling position is moved in the open direction to change the thickness while on the run, if the predicted tension exceeds a predetermined upper limit, the timing for starting the thickness change while on the run is delayed to make it equal to or lower than the upper limit, and when the tension is less than a predetermined lower limit, the timing for starting the thickness change while on the run is advanced to make it equal to or higher than the lower limit. In addition, the method and device for controlling the thickness change setting while on the run according to the present embodiment learn tension fluctuations during past thickness changes while on the run, and when the rolling position is moved in the closed direction to change the thickness while on the run, if the predicted tension exceeds a predetermined upper limit, the timing for starting the thickness change while on the run is advanced to make it equal to or lower than the upper limit, and when the tension is less than a predetermined lower limit, the timing for starting the thickness change while on the run is delayed to make it equal to or higher than the lower limit. This makes it possible to keep tension fluctuations that occur when the plate thickness is changed while the train is running within preset upper and lower limits, thereby reducing problems such as plate breakage.

[0042] The method and device for controlling the thickness variation setting while traveling according to the present invention have been specifically described above by way of the embodiment and examples, but the gist of the present invention is not limited to these descriptions and should be broadly interpreted based on the claims. Furthermore, it goes without saying that various changes and modifications based on these descriptions are also included in the gist of the present invention. [Explanation of symbols]

[0043] 11 Rolling Stand 12 Rolling control device 13 Electric motor 14 Motor speed control device 15 Rupa 16 Tension detector 2. Speed ​​gauge change setting control device 21. Running thickness change setting section 22 Tension Fluctuation Learning Unit 23 Tension prediction model 24 Tension Fluctuation Prediction Section S rolled material

Claims

1. In a facility that detects the amount of movement of a rolled material and starts a running thickness change when the detected amount of movement matches a set distance to a running thickness change start point, A means provided in the computer predicts the tension at the time of the running thickness change, and determines the timing of starting the running thickness change according to the predicted tension, When the rolling position is moved in the opening direction to change the thickness while the rolling is in progress, if the predicted tension exceeds a predetermined upper limit, the timing to start and end the thickness while the rolling is in progress is delayed from a predetermined reference timing, and if the predicted tension is less than a predetermined lower limit, the timing to start and end the thickness while the rolling is in progress is advanced from the reference timing; When the rolling position is moved in the closing direction to change the thickness while the rolling is in progress, if the predicted tension exceeds a predetermined upper limit, the timing to start and end the thickness while the rolling is in progress is made earlier than a predetermined reference timing, and if the predicted tension is less than a predetermined lower limit, the timing to start and end the thickness while the rolling is in progress is made later than the reference timing. A method for controlling the setting of thickness changes while traveling.

2. In a facility that detects the amount of movement of a rolled material and starts a running thickness change when the detected amount of movement matches a set distance to a running thickness change start point, A tension at the time of changing the thickness while flying is predicted, and a timing for starting the thickness change while flying is determined according to the predicted tension; When the rolling position is moved in the opening direction to change the thickness while the rolling is in progress, if the predicted tension exceeds a predetermined upper limit, the timing to start and end the thickness while the rolling is in progress is delayed from a predetermined reference timing, and if the predicted tension is less than a predetermined lower limit, the timing to start and end the thickness while the rolling is in progress is advanced from the reference timing; When the rolling position is moved in the closing direction to change the thickness while the rolling is in progress, if the predicted tension exceeds a predetermined upper limit, the timing to start and end the thickness while the rolling is in progress is made earlier than a predetermined reference timing, and if the predicted tension is less than a predetermined lower limit, the timing to start and end the thickness while the rolling is in progress is made later than the reference timing. A control device for changing the running thickness.

Citation Information

Patent Citations

  • Control method in changing schedule of tandem rolling mill

    JP1985152310A

  • Method for controlling hot finishing mill

    JP1994015317A

  • Controller for setting change of flying plate thickness and supporting device for determining equipment specification

    JP1998249423A

  • Method for changing plate thickness in running in continuous cold tandem mill

    JP2002178015A

  • Tension variation prediction method, generation method of tension variation prediction model, flying plate thickness changing method, and manufacturing method of steel plate

    JP2022021794A