Work management device and preparation instruction method
The work management device and method address the challenge of optimizing preparatory work sequences in complex production environments by configuring a network to determine and instruct optimal work orders, enhancing efficiency and reducing downtime.
Patent Information
- Application Number
- JP2022510645
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-03-27
- Filing Date
- 2021-03-25
- Publication Date
- 2024-11-11
- Estimated Expiration
- 2041-03-25
AI Technical Summary
Conventional technologies struggle to determine the optimal order of preparatory work in production lines where preparatory work is performed in parallel or serially, in addition to determining the optimal process route for production.
A work management device and method that configures a network linking production orders with preparatory processes across multiple production devices, using a work order determining unit to determine the optimal work order and a preparation instruction creation unit to create instructions based on this order, displaying the production and preparatory work in a hierarchical manner.
Enables optimal pre-production preparation work by determining the sequence and timing of preparatory tasks, ensuring efficient use of resources and reducing downtime.
Smart Images

Figure 0007580059000001 
Figure 0007580059000002 
Figure 0007580059000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a work management device and a preparation instruction method for managing work on a production floor. [Background technology]
[0002] On a production floor where multiple production facilities are installed to process workpieces such as circuit boards to produce products such as printed circuit boards, the workpieces are handed over between the multiple production facilities and the processing steps are executed in series or parallel in order to produce products. When producing products on such a production floor, multiple different process paths can be selected, but for efficient production, it is necessary to select an optimal path from the multiple process paths. Patent Document 1 discloses that when transporting raw materials from a raw material yard to a raw material storage tank in a steelworks using multiple reclaimers, an optimal process path is selected based on a mathematical model for process path selection that is created in advance from an inventory plan, equipment usage plan, etc. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2002-229635 A Summary of the Invention
[0004] The work management device disclosed herein includes a work order determination unit that uses a network configured by linking a production order with a preparatory process for executing the production order by a plurality of production devices in an associated order to determine a work order for a plurality of works occurring in the preparatory process, and a preparation instruction creation unit that creates a preparation instruction corresponding to the determined work order. The network is configured in a hierarchical manner by linking the multiple production devices and the preparatory work at the multiple production devices as nodes in the preparation process, and further includes a display unit that displays the network in a hierarchical manner in the following order: the production order, the preparation process, the multiple production devices, and the preparatory work at the multiple production devices. Another work management device disclosed herein includes a work order determination unit that determines a work order for multiple tasks that occur in a preparatory process using a network configured by linking a production order with a preparatory process for executing the production order by a plurality of production devices in an associated order, and a preparation instruction creation unit that creates preparation instructions corresponding to the determined work order, wherein the network is configured in a hierarchical manner in the preparatory process by linking the plurality of production devices and the preparatory work at the plurality of production devices as nodes, and the hierarchy of the plurality of production devices is configured so that the nodes branch out according to the production format.
[0005] The preparation instruction method of the present disclosure includes: A method for instructing a preparatory work body by a work management device, comprising:The method includes: determining a work order for a plurality of operations occurring in a preparatory process by using a network formed by linking a production order with a plurality of production devices in a related order; and creating a preparatory instruction corresponding to the determined work order. The network is configured in a hierarchical manner by linking the plurality of production devices and the preparatory work at the plurality of production devices as nodes in the preparation process, and the network is further displayed in a hierarchical manner in the order of the production order, the preparation process, the plurality of production devices, and the preparatory work at the plurality of production devices. Another preparation instruction method disclosed herein is a method of instructing a preparation work body by a work management device, which includes determining a work order for a plurality of tasks that occur in the preparation process using a network configured by linking a production order with a plurality of production devices in a related order, and creating preparation instructions corresponding to the determined work order, wherein the network is configured in a hierarchical structure in the preparation process by linking the plurality of production devices and the preparatory tasks at the plurality of production devices as nodes, and the hierarchy of the plurality of production devices is configured so that the nodes branch out according to the production format.
[0006] According to the present disclosure, optimal pre-production preparation work can be instructed. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a diagram illustrating a configuration of a component mounting system according to an embodiment of the present disclosure. [Figure 2A] FIG. 2A is a configuration explanatory diagram of a component mounting line provided in a component mounting system according to an embodiment of the present disclosure. [Figure 2B] FIG. 2B is a configuration explanatory diagram of another component mounting line provided in the component mounting system according to the embodiment of the present disclosure. [Diagram 3] FIG. 3 is a block diagram showing a configuration of a component mounting system according to an embodiment of the present disclosure. [Figure 4] FIG. 4 is an explanatory diagram of an example of production plan information used in the component mounting system according to an embodiment of the present disclosure. [Figure 5A] FIG. 5A is an explanatory diagram of an example of line configuration information used in the work management device according to the embodiment of the present disclosure. [Figure 5B] FIG. 5B is an explanatory diagram of an example of line configuration information used in the work management device according to the embodiment of the present disclosure. [Figure 6A] FIG. 6A is an explanatory diagram of an example of board type switching standard information used in the work management device according to an embodiment of the present disclosure. [Figure 6B] FIG. 6B is an explanatory diagram of an example of board type switching standard information used in the work management device according to the embodiment of the present disclosure. [Figure 6C] FIG. 6C is an explanatory diagram of an example of board type switching standard information used in the work management device according to the embodiment of the present disclosure. [Figure 7A] FIG. 7A is an explanatory diagram of an example of board type switching preparation standard information used in the work management device according to the embodiment of the present disclosure. [Figure 7B] FIG. 7B is an explanatory diagram of an example of board type switching preparation standard information used in the work management device according to the embodiment of the present disclosure. [Figure 8A] FIG. 8A is an explanatory diagram of an example of cart arrangement work standard information used in the work management device according to the embodiment of the present disclosure. [Figure 8B] FIG. 8B is an explanatory diagram of an example of cart group arrangement work standard information used in the work management device according to the embodiment of the present disclosure. [Figure 9] FIG. 9 is an explanatory diagram of an example of a production plan network created by the work management device according to an embodiment of the present disclosure. [Figure 10] FIG. 10 is an explanatory diagram of an example of a board type switching network created by the work management device according to an embodiment of the present disclosure. [Figure 11A] FIG. 11A is an explanatory diagram of an example of a board type switching preparation network created by a work management device according to an embodiment of the present disclosure. [Figure 11B] FIG. 11B is an explanatory diagram of an example of a placement operation network created by the operation management device according to an embodiment of the present disclosure. [Figure 12] FIG. 12 is an explanatory diagram of an example of a work network created by the work management device according to an embodiment of the present disclosure. [Figure 13] FIG. 13 is an explanatory diagram of an example of a work network created by the work management device according to an embodiment of the present disclosure. [Figure 14] FIG. 14 is a diagram illustrating an example of the task margin time calculated by the task management device according to the embodiment of the present disclosure. [Figure 15] FIG. 15 is a diagram illustrating an example of a task order determined by the task management device according to an embodiment of the present disclosure. [Figure 16] FIG. 16 is a flow diagram of a preparation instruction method according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Prior to describing the embodiments of the present disclosure, problems with conventional devices will be briefly described. Conventional technologies including Patent Document 1 can determine an optimal work sequence for producing products on a production line with fixed connection relationships. However, in a production line in which preparation work is performed in parallel or in series inside and outside the line, in addition to determining an optimal process path for production, it is also necessary to determine an optimal work sequence for pre-production preparation work, leaving room for further improvement. Therefore, the present disclosure aims to provide a work management device and a preparation instruction method that can instruct optimal pre-production preparation work.
[0009] An embodiment of the present disclosure will be described in detail below with reference to the drawings. The configurations, shapes, etc. described below are examples for the purpose of explanation and can be changed as appropriate according to the specifications of the component mounting system, component mounting line, work management device, printing device, component mounting device, etc. In the following, the same reference numerals are used for corresponding elements in all drawings, and duplicated explanations will be omitted.
[0010] First, the configuration of component mounting system 1 will be described with reference to Fig. 1. Fig. 1 is a configuration explanatory diagram of component mounting system 1 according to an embodiment of the present disclosure. Component mounting system 1 is configured to connect two component mounting lines L1 and L2 arranged on a production floor F via a communication network 2, and to manage production using a production management device 3. Hereinafter, component mounting line L1 and component mounting line L2 will be simply referred to as "component mounting lines L1, L2" unless there is a particular need to distinguish them. Component mounting system 1 is realized by a computer including a processor, memories such as a Read Only Memory (ROM) and a Random Access Memory (RAM), a communication interface, and the like.
[0011] The component mounting lines L1, L2 are arranged in a production area Ap provided on the production floor F. Each of the component mounting lines L1, L2 is configured by connecting multiple production facilities including component mounting devices as described below, and has the function of producing mounted boards (products) in which components are mounted on boards (workpieces). Note that the component mounting system 1 does not need to have two component mounting lines, and may have one, three or more lines.
[0012] In FIG. 1, a placement work support device 4 is placed in a preparation area As which is different from the production area Ap provided on the production floor F. The placement work support device 4 is connected to a production management device 3 and the like via a communication network 2. A replacement cart 5 which is the subject of placement work, which will be described later, is connected to the placement work support device 4. A plurality of carts 5 in various states, such as before, during, or after placement work, are stored in the preparation area As. In addition, the preparation area As stores a plurality of screen masks, squeegees, tape feeders, mounting heads, suction nozzles, removable elements such as parts, and refill materials such as cream solder, which are commonly used in the production equipment arranged on the production floor F.
[0013] The trolleys 5 connected to the placement work support device 4 are subjected to placement work (preparation work) corresponding to the production item (board type) of mounted boards to be produced in the component mounting lines L1 and L2. As placement work, the worker OP performs work such as removing the specified tape feeders, components, etc. from the trolleys 5 and attaching them to the specified positions on the trolley 5. For the trolleys 5 stored in the preparation area As, including the trolleys 5 connected to the placement work support device 4, placement work can be performed in parallel with the production of mounted boards in the component mounting lines L1 and L2. Hereinafter, preparation work performed in the preparation area As away from the component mounting devices to change the production item, including placement work on the trolleys 5, is referred to as indirect preparation work.
[0014] When changing the production item (board type) of mounted boards produced in the component mounting lines L1 and L2, the worker OP moves the cart 5 that has completed placement work in the preparation area As to the component mounting line L1 or L2, and performs board type switching work to replace it with the cart 5 attached to the component mounting device. In addition, in the board type switching work, the worker OP moves the screen mask, squeegee, tape feeder, mounting head, suction nozzle, components, cream solder, etc. stored in the preparation area As to the component mounting line L1 or L2 to replace and replenish them. Hereinafter, the preparation work of working on the component mounting device, etc. to change the production item, including the board type switching work of replacing the cart 5, will be referred to as direct preparation work.
[0015] In FIG. 1, a worker OP has a work terminal T to be used in preparation work. The work terminal T is equipped with a terminal communication unit Ta that wirelessly communicates to send and receive various information, and a touch panel Tb with a display function and an input function. The work terminal T displays the received information on the touch panel Tb, and transmits various information input from the touch panel Tb. Note that the work terminal T does not have to be a touch panel Tb as long as it has a display function and an input function, and may be, for example, a glasses-type wearable device. It may also have an input function using voice, gestures, etc.
[0016] On the production floor F, there are transport vehicles V that move replacement screen masks, tape feeders, mounting heads, suction nozzles, components, cream solder, carts 5, etc. stored in the preparation area As to the component mounting lines L1 and L2. The transport vehicles V are equipped with a transport vehicle communication unit Va that wirelessly communicates to send and receive various information. The transport vehicles V autonomously move between predetermined positions on the production floor F based on the received instructions and information collected by the transport vehicles V using beacons (not shown) installed on the production floor F, various sensors (GPS (Global Positioning System) terminals, obstacle sensors, etc.) built into the transport vehicles V, cameras, etc.
[0017] 1, the component mounting system 1 includes a work management device 6 connected to a communication network 2. The work management device 6 determines preparation work based on information such as a production order and the configuration of component mounting lines L1 and L2, and issues (transmits) preparation instructions in the order of work to a placement work support device 4, a work terminal T used by a worker OP, and a preparation work body such as a transport vehicle V. The work management device 6 includes a work wireless communication unit 6a that wirelessly communicates with a terminal communication unit Ta of the work terminal T and a transport vehicle communication unit Va of the transport vehicle V. The work management device 6 transmits work instructions to the work terminal T and the transport vehicle V via the work wireless communication unit 6a.
[0018] Next, a detailed configuration of the component mounting line L1 will be described with reference to Fig. 2A. Fig. 2A is a configuration explanatory diagram of the component mounting line L1 provided in the component mounting system 1. The component mounting line L1 is connected to production equipment equipped with a transport unit 7 that transports a board (workpiece) from the upstream side (left side of the paper) to the downstream side (right side of the paper) in the board transport direction. The transport units 7 connected to each other in the component mounting line L1 form a front transport lane 7F on the front side and a rear transport lane 7R on the rear side. That is, the component mounting line L1 is equipped with a front transport lane 7F and a rear transport lane 7R in parallel.
[0019] The front transport lane 7F is connected from upstream to downstream with a board supply device M1, a printing device M2, a board allocation device M3, a component mounting device M4, a component mounting device M5, a board allocation device M6, a reflow device M7, and a board recovery device M8. The rear transport lane 7R is connected from upstream to downstream with a board supply device M9, a printing device M10, a board allocation device M3, a component mounting device M4, a component mounting device M5, a board allocation device M6, a reflow device M11, and a board recovery device M12.
[0020] In FIG. 2A, the board supplying devices M1 and M9 have a storage unit such as a rack for storing multiple boards, and supply the boards removed from the storage unit to downstream production equipment. The printing devices M2 and M10 print (deposit) cream solder on the electrodes of the boards carried in from the upstream side through a screen mask. The printing devices M2 and M10 may be configured to deposit cream solder on the boards using a dispenser. The board allocation devices M3 and M6 are equipped with an allocation mechanism having a transport unit 7 that receives boards from the upstream side and carries them out to the downstream side. The board allocation device M3 is equipped with two allocation mechanisms, and the board allocation device M6 is equipped with one allocation mechanism.
[0021] The allocation mechanism on the front side of the board allocation device M3 moves back and forth between the front transport lane 7F on the upstream side and the rear transport lane 7R on the downstream side (arrow a). The allocation mechanism on the rear side of the board allocation device M3 moves back and forth between the rear transport lane 7R on the upstream side and the front transport lane 7F on the downstream side (arrow b). The allocation mechanism of the board allocation device M6 includes the front transport lane 7F and the rear transport lane 7R on the upstream side, and moves back and forth between the front transport lane 7F and the rear transport lane 7R on the downstream side (arrow c). The board allocation devices M3 and M6, according to instructions from the production management device 3 and the like, allocate boards received from the front transport lane 7F or the rear transport lane 7R on the upstream side to either the front transport lane 7F or the rear transport lane 7R on the downstream side and transport them out.
[0022] In Fig. 2A, the component mounting devices M4 and M5 are dual lane types equipped with a conveying section 7 constituting a front conveying lane 7F and a conveying section 7 constituting a rear conveying lane 7R, and mount components on boards carried in from the upstream side by each conveying section 7. The reflow devices M7 and M11 are equipped with a board heating section, and while transporting the board from the upstream side to the downstream side, heat the board on which the components are mounted at a predetermined temperature to melt the cream solder and then solidify it, soldering the components to the board. The board recovery devices M8 and M12 are equipped with a storage section such as a rack for storing multiple boards, and receive boards carried out by the upstream production equipment and recover them in the storage section.
[0023] Next, a detailed configuration of the component mounting line L2 will be described with reference to Fig. 2B. Fig. 2B is a configuration explanatory diagram of the component mounting line L2 equipped in the component mounting system 1. In the component mounting line L2, production equipment such as a board supplying device M13 equipped with a transport section 7 for transporting a board (workpiece), a printing device M14, a component mounting device M15, a component mounting device M16, a reflow device M17, and a board recovery device M18 are connected in series from the upstream side to the downstream side. The transport sections 7 connected to each other in the component mounting line L2 form a transport lane 7M.
[0024] The component mounting devices M15 and M16 are single lane type devices equipped with only one transport unit 7, and mount components on the boards carried in from the upstream side. The board supply device M13, the printing device M14, the reflow device M17, and the board recovery device M18 are similar to the board supply devices M1 and M9, the printing devices M2 and M10, the reflow devices M7 and M11, and the board recovery devices M8 and M12 equipped in the component mounting line L1, and detailed explanations are omitted. The screen mask, the squeegee, and the cream solder are shared by the printing device M2, the printing device M10, and the printing device M14. The dolly 5, the tape feeder, the mounting head, the suction nozzle, and the components are shared by the dual lane type component mounting devices M4 and M5 and the single lane type component mounting devices M15 and M16.
[0025] 2A and 2B, in component mounting line L1, a front transport lane 7F and a rear transport lane 7R are used to transfer boards from upstream to downstream production equipment, while production work is performed on the boards, in addition to the transport lane 7M in component mounting line L2. Note that component mounting line L1 and component mounting line L2 may have the same configuration. In addition, the configuration of the production equipment of component mounting lines L1 and L2 can be freely changed depending on the type of mounted boards to be produced and the production volume.
[0026] Next, referring to Fig. 3, a configuration relating to preparation work management for managing preparation work occurring in a preparation process for executing a production order for a mounted board (product), among the functions of component mounting system 1, will be described. Fig. 3 is a block diagram showing the configuration of component mounting system 1. In Fig. 3, a production management device 3 and a work management device 6 included in component mounting system 1 transmit and receive various information and instructions to each other via communication network 2.
[0027] The production management device 3 includes a management communication unit 10, a planning unit 11, and a management memory unit 12. The management memory unit 12 is a storage device, and stores production order information 12a, production data information 12b, floor configuration information 12c, material information 12d, cart information 12e, worker information 12f, production plan information 12g, etc. The work management device 6 includes a work communication unit 20, a work wireless communication unit 6a, a display unit 21, an information acquisition unit 22, a network creation unit 23, a display processing unit 24, a work order determination unit 25, a preparation instruction creation unit 26, a performance collection unit 27, a preparation instruction transmission unit 28, and a work memory unit 29.
[0028] In Figure 3, the work memory unit 29 is a storage device and stores a production plan 29a, production data 29b, line configuration information 29c, board type switching standard information 29d, board type switching preparation standard information 29e, placement work standard information 29f, production plan network information 29g, board type switching network information 29h, board type switching preparation network information 29i, placement work network information 29j, work network information 29k, work margin 29l, preparation instructions 29m, performance information 29n, and the like.
[0029] The management communication unit 10 of the production management device 3 transmits and receives various information and instructions to and from the work management device 6 and other devices via the communication network 2. The work communication unit 20 of the work management device 6 transmits and receives various information and instructions to and from the production management device 3, the placement work support device 4, and other devices via the communication network 2. The work wireless communication unit 6a of the work management device 6 transmits and receives various information and instructions to and from the work terminal T and the transport vehicle V via wireless communication. The display unit 21 of the work management device 6 is a display device such as a liquid crystal panel, and displays various information stored in the work memory unit 29 on a display screen.
[0030] 3, the management communication unit 10 of the production management device 3 acquires information about the production order from an order management device (not shown). The production order includes a board type name (production item) that specifies the mounted boards to be produced in the component mounting system 1, the number of boards to be produced, the production lead time, and the like. The management communication unit 10 issues a unique order number W for managing the production order as a single unit lot, and associates the order number W with the production order and stores it in the management storage unit 12 as production order information 12a. The order management device may have management functions other than order receiving, and may be an ERP (Enterprise Resources Planning) that also manages purchasing, accounting, shipping, and the like.
[0031] The management communication unit 10 acquires production data including information necessary for production such as the board size of the board type corresponding to the production order, the screen mask type, the squeegee type, the type of components to be mounted, the mounting position, and the reflow temperature from a product information management device (not shown), and stores the data as production data information 12b in the management storage unit 12. The management communication unit 10 also acquires information such as the type, arrangement, and number of placement work support devices 4 of the production equipment constituting the component mounting lines L1, L2 arranged on the production floor F from a line management device (not shown), and stores the information as floor configuration information 12c in the management storage unit 12. The management communication unit 10 also acquires inventory status of components, screen masks, suction nozzles, etc. used in the production of the mounted boards of the production order from a material management device (not shown), and stores the information as material information 12d in the management storage unit 12.
[0032] 3, the management communication unit 10 acquires information such as the state of the cart 5 (used for production on component mounting lines L1, L2, being placed in preparation area As, stored in preparation area As, etc.), the tape feeders attached to the cart 5, and components (type of components being supplied) from the work management device 6, and stores this information in the management storage unit 12 as cart information 12e. In addition, the management communication unit 10 acquires worker information 12f including information such as working hours and work skill level for each piece of information identifying a worker OP working on the production floor F from a worker management device (not shown), and stores this information in the management storage unit 12.
[0033] 3, the planning unit 11 of the production management device 3 executes a simulation based on production order information 12a, production data information 12b, floor configuration information 12c, material information 12d, cart information 12e, and worker information 12f to create (create) an optimal production plan for producing mounted boards in the component mounting system 1 in a predetermined period such as one day or one week. The created production plan is stored in the management storage unit 12 as production plan information 12g. Note that, in addition to simulation, a method such as machine learning may be used to create (create) the optimal production plan, as long as the optimal production plan is created (created) so as to meet the delivery date set in each production order information 12a.
[0034] In the production plan, information for identifying the component mounting lines L1, L2 that produce the mounted boards, the production start time, the production end time, the number of pieces to be produced, information for identifying the cart 5 (cart group) to be used for production, the number of workers OP, and the like are associated with the order number W. Note that the production management device 3 may receive production plan information 12g created by another device such as a production planning device (not shown) and store it in the management storage unit 12.
[0035] Here, an example of the production plan information 12g displayed along the production time will be described with reference to Fig. 4. Fig. 4 is an explanatory diagram of an example of the production plan information 12g used in the component mounting system 1. In Fig. 4, the production plan for each production order included in the production plan information 12g is displayed along the production time for each component mounting line L1, L2. At the present time, mounted boards for each production item are being produced on component mounting line L1 according to the production order of order number W1, and on component mounting line L2 according to the production order of order number W2.
[0036] On component mounting line L1, after order number W1, the production of mounted boards, production items W3, W4, and W7 are scheduled in that order. Similarly, on component mounting line L2, after order number W2, the production of mounted boards, production items W5 and W6 are scheduled in that order. The left side of the rectangle representing the production time of mounted boards for each production order indicates the production start time, and the right side indicates the production end time. For example, production of mounted boards, order number W5, is scheduled to start at production start time T22 and end at production end time T23.
[0037] 4, the production plan information 12g includes the allocation of cart groups Z consisting of multiple carts 5 used on component mounting lines L1 and L2, and the order of placement work on the carts 5 of cart group Z in preparation area As. In this example, two placement work support devices 4 are placed in preparation area As, and it is planned to execute placement work in parallel on the two cart groups Z. On the production floor F, four cart groups Z1 to Z4 are prepared for use by being attached to component mounting devices M4 and M5 on component mounting line L1 or component mounting devices M15 and M16 on component mounting line L2.
[0038] Carriage group Z1 is assigned to the production of the mounted board of order number W1. After the production of order number W1 ends at production end time T11, and before the production of order number W3 starts at production start time T12, board type switching work is planned to remove cart 5 of cart group Z1 from component mounting line L1 and attach cart 5 of cart group Z3 that has been placed for the production of order number W3. The removed cart 5 of cart group Z1 is transported to preparation area As, where placement work for the production of order number W6 is planned. Placement work of order number W6 on cart group Z1 is scheduled between production end time T11 of order number W1 and production start time T24 of order number W6.
[0039] 4, in the board type switching work between production end time T13 and production start time T14 when production is changed from order number W3 to order number W4, the plan is to replace the tape feeders and parts attached to cart 5, but not to replace cart 5. In other words, order numbers W3 and W4 are planned as the same group using the same cart group Z3.
[0040] 3, the work communication unit 20 of the work management device 6 acquires information necessary for preparation work for production from the production plan information 12g and production data information 12b stored in the management storage unit 12 of the production management device 3, and stores them as a production plan 29a and production data 29b in the work storage unit 29. The line configuration information 29c is information that describes the configuration of the production equipment of component mounting lines L1 and L2 installed on the production floor F as a hierarchy of multiple pieces of production equipment.
[0041] Here, an example of the line configuration information 29c of the component mounting lines L1, L2 shown in Fig. 2 will be described with reference to Fig. 5A and Fig. 5B. Fig. 5A is an explanatory diagram of an example of the line configuration information 29c of the component mounting line L1 shown in Fig. 2A. Fig. 5B is an explanatory diagram of an example of the line configuration information 29c of the component mounting line L2 shown in Fig. 2B.
[0042] In the line configuration information 29c, the range in which production work such as printing work and component mounting work is performed in each production facility is described as one production facility node. In addition, a start node Ns is placed on the upstream side of the component mounting lines L1 and L2, and an end node Ne is placed on the downstream side. In addition, the description of production facilities that do not require preparation work (e.g., board supply devices M1, M9, and M13) is omitted. In other words, the preceding and following production facility nodes are connected as if the production facility node does not exist.
[0043] 5A, each of the printing device M2, the printing device M10, the reflow device M7, and the reflow device M11 is described as one production equipment node. The dual lane type component mounting devices M4 and M5 are described in parallel as production equipment nodes for the front component mounting device M4F and the rear component mounting device M4R and the rear component mounting device M5R, respectively.
[0044] In FIG. 5B, each of the printing device M14, the component mounting device M15, the component mounting device M16, and the reflow device M11 is described as one production equipment node. The production equipment nodes are linked to form a directed graph having a conveying direction (from upstream to downstream) of the board during production, that is, a direction of the production work sequence. In this way, the line configuration information 29c, which is a hierarchy of multiple production equipment, is configured so that the nodes branch in series or parallel depending on the production format. This makes it possible to create a preparation instruction as described below, even in a case where the production item (board type) is changed only in the front conveying lane 7F in the component mounting line L1.
[0045] 3, the board type switching standard information 29d is information that describes the preparatory work executed to produce mounted boards in the production equipment equipped with the component mounting lines L1 and L2 as a hierarchy of the preparatory work in the production equipment. The board type switching standard information 29d describes all preparatory work that can be directly performed in the production equipment.
[0046] Here, an example of the board type switching standard information 29d will be described with reference to Figs. 6A to 6C. Figs. 6A to 6C are explanatory diagrams of an example of the board type switching standard information 29d used in the work management device 6. The board type switching standard information 29d is created for each production facility having different functions, options, etc. Fig. 6A shows the board type switching standard information 29d common to the printing device M2, the printing device M10, and the printing device M14. In the printing devices M2, M10, and M14, "lane width change", "screen mask replacement", "squeegee replacement", and "cream solder replenishment" can be simultaneously performed as direct preparatory work. These preparatory work nodes are linked in parallel to form a directed graph between the start node Ns and the end node Ne.
[0047] 6B shows board type switching standard information 29d common to component mounting devices M4F, M4R, M5F, M5R, M15, and M16. In component mounting devices M4F, M4R, M5F, M5R, M15, and M16, in addition to "lane width change," "cart replacement," "feeder replacement," "component replacement," "mounting head replacement," and "suction nozzle replacement," which can be performed simultaneously, there are consecutive operations that cannot be started until the previous operation is completed.
[0048] For example, the preparatory work of executing "feeder replacement" on a cart 5 after "cart replacement", the preparatory work of executing "component replacement" on a tape feeder after "feeder replacement", and the preparatory work of executing "suction nozzle replacement" on a mounting head after "mounting head replacement" are cascaded works. The preparatory work nodes for preparatory works that can be executed simultaneously are linked in parallel, and the preparatory work nodes for cascaded works are linked in series, to form a directed graph between the start node Ns and the end node Ne.
[0049] 6C shows board type switching standard information 29d common to reflow equipment M7, reflow equipment M11, and reflow equipment M17. In reflow equipment M7, M11, and M17, the preparatory work node for "changing the heating temperature" is linked to form a directed graph between start node Ns and end node Ne. In this way, board type switching standard information 29d, which is a hierarchy of preparatory work in the production equipment, is configured so that nodes branch in series or parallel depending on the order of preparation.
[0050] 3, the board type switching preparation standard information 29e is information describing, for each production facility, the indirect preparation work carried out in an area away from the production facility, such as the preparation area As, for producing mounted boards in the production facility equipped with the component mounting lines L1 and L2, excluding the placement work on the cart 5. The board type switching preparation standard information 29e describes all possible preparation work as the indirect preparation work for the production facility. The placement work standard information 29f is information describing, for each cart 5 (or cart groups Z1 to Z4), the placement work, which is the indirect preparation work in the preparation area As for component mounting work in the component mounting devices M4F, M4R, M5F, M5R, M15, and M16.
[0051] Here, an example of the board type switching preparation standard information 29e will be described with reference to Figs. 7A and 7C. Figs. 7A and 7C are explanatory diagrams of an example of the board type switching preparation standard information 29e used in the work management device 6. The board type switching preparation standard information 29e is created for each production facility. Note that the board type switching preparation standard information 29e is not created for the reflow devices M7, M11, and M17, which do not require indirect preparation work. Fig. 7A shows the board type switching preparation standard information 29e common to the printing device M2, the printing device M10, and the printing device M14. In the printing devices M2, M10, and M14, the preparation work nodes of "screen mask preparation," "squeegee preparation," and "cream solder preparation," which can be executed simultaneously, are linked to form a directed graph in parallel between the start node Ns and the end node Ne.
[0052] 7B shows board type switching preparation standard information 29e common to component mounting devices M4F, M4R, M5F, M5R, M15, and M16. In component mounting devices M4F, M4R, M5F, M5R, M15, and M16, preparation work nodes of "feeder preparation," "component preparation," "mounting head preparation," and "suction nozzle preparation," which can be executed simultaneously, are linked to form a directed graph in parallel between start node Ns and end node Ne.
[0053] Here, an example of the arrangement work standard information 29f will be described with reference to FIG. 8. FIG. 8A is an explanatory diagram of an example of the arrangement work standard information 29f of a dolly used in the work management device 6. FIG. 8B is an explanatory diagram of an example of the arrangement work standard information 29f of a dolly group used in the work management device 6. FIG. 8A is the arrangement work standard information 29f of an arrangement work performed by connecting one dolly 5 to the arrangement work support device 4. In the dolly 5, preparation work nodes of "preparing the dolly", "preparing parts", "preparing the feeder", "removing the feeder", "moving the feeder", "attaching the feeder", and "attaching parts" which are performed in series are linked between the start node Ns and the end node Ne so as to form a directed graph in series. Note that the connection referred to here includes not only a physical connection but also a virtual connection by wireless communication.
[0054] Fig. 8B shows standard information 29f for the placement work for cart groups Z1 to Z4 consisting of four carts 5-1 to 5-4. In cart groups Z1 to Z4, the hierarchical levels of "cart 5-1 placement work", "cart 5-2 placement work", "cart 5-3 placement work", and "cart 5-4 placement work" that are executed in series are linked to form a directed graph between start node Ns and end node Ne. The preparation work nodes for one cart 5 shown in Fig. 8A are hierarchically linked to each of the hierarchical levels of carts 5-1 to 5-4.
[0055] 3, network creation unit 23 includes, as internal processing units, production plan network creation unit 23a, board type switching network creation unit 23b, board type switching preparation network creation unit 23c, placement work network creation unit 23d, and work network creation unit 23e. Based on production plan 29a, production plan network creation unit 23a creates a production plan network in which production of mounted boards on production floor F is linked in order of production as production plan nodes for each production order. The created production plan network is stored in work memory unit 29 as production plan network information 29g.
[0056] An example of a production plan network created by the production plan network creation unit 23a will now be described with reference to Fig. 9. Fig. 9 is an explanatory diagram of an example of a production plan network created by the work management device 6. The production plan network in Fig. 9 is a production plan network for the production plans of the production orders with order numbers W1 to W7 included in the production plan information 12g shown in Fig. 4.
[0057] The layer of component mounting line L1 has production plan nodes for order numbers W1, W3, W4, and W7. The layer of component mounting line L2 has production plan nodes for order numbers W2, W5, and W6. The production plan nodes for order numbers W1 to W7 each have start nodes Ns1 to Ns7 that hold the production start time and end nodes Ne1 to Ne7 that hold the production end time. For example, the production plan node for order number W6 has a start node Ns6 that holds the production start time T24 and an end node Ne6 that holds the production end time T25.
[0058] 9, the production plan nodes for component mounting line L1 are linked in series in production order between the start node Ns and the end node Ne. Also, the production plan nodes for component mounting line L2 are linked in series in production order between the start node Ns and the end node Ne. And the hierarchical levels of the production plan nodes for component mounting line L1 and the hierarchical levels of the production plan nodes for component mounting line L2 are linked in parallel between the start node Ns and the end node Ne.
[0059] 3, the board type switching network creation unit 23b creates a board type switching network, which is a directed graph formed by linking preparation work nodes of direct preparation work executed in the production equipment of the component mounting lines L1 and L2, based on the production plan 29a, production data 29b, line configuration information 29c, and board type switching standard information 29d. The board type switching network is created for each production order (for each of the order numbers W1 to W7). The created board type switching network is stored in the working memory unit 29 as board type switching network information 29h.
[0060] Here, the creation process of the board type switching network by the board type switching network creation unit 23b will be specifically described with reference to Fig. 10. Fig. 10 is an explanatory diagram of an example of a board type switching network created by the work management device 6. Fig. 10 shows a board type switching network of direct preparation work executed to produce a mounted board based on a production order of order number W6 on the component mounting line L2. The board type switching network creation unit 23b hierarchically links a plurality of preparation work nodes of the production equipment included in the board type switching standard information 29d to each production equipment node of the line configuration information 29c of the component mounting line L2.
[0061] Next, the board type switching network creation unit 23b compares the production data 29b for the immediately preceding order number W5 with the production data 29b for order number W6, and deletes preparatory work nodes that do not require preparatory work. In this example, the printing device M14 uses the same squeegee for order numbers W5 and W6, so the preparatory work node for "squeegee replacement" is deleted. For component mounting devices M15 and M16, the required tape feeder replacement and component replacement are completed by cart replacement, so the preparatory work nodes for "feeder replacement" and "component replacement" are deleted. Also, for component mounting device M16, there is no replacement of the mounting head, so the preparatory work node for "mounting head replacement" is deleted.
[0062] In addition, the production equipment node of the production equipment for which no direct preparatory work is scheduled is deleted from the board type switching network. For example, if the preparatory work of "changing the heating temperature" is not required for the reflow equipment M17, the production equipment node of the reflow equipment M17 is deleted from the board type switching network. The start node Ns holds the production end time T23 at which the production of order number W5 ends as the start time. The end node Ne holds the production start time T24 at which the production of order number W6 starts as the end time. In other words, the start time of the start node Ns is the earliest time possible for the production plan 29a, and the end time of the end node Ne is the latest time possible for the production plan 29a.
[0063] 3, the board type switching preparation network creation unit 23c creates a board type switching preparation network, which is a directed graph formed by linking preparation work nodes of indirect preparation work executed in the production equipment equipped in the component mounting lines L1 and L2, based on the production plan 29a, production data 29b, line configuration information 29c, and board type switching preparation standard information 29e. The board type switching preparation network is created for each production order (for each of the order numbers W1 to W7). The created board type switching preparation network is stored in the working memory unit 29 as board type switching preparation network information 29i.
[0064] Here, the creation process of the board type switching preparation network by the board type switching preparation network creation unit 23c will be specifically described with reference to Fig. 11A. Fig. 11A is an explanatory diagram of an example of the board type switching preparation network created by the work management device 6. Fig. 11A shows a board type switching preparation network of indirect preparation work performed in an area away from the component mounting line L2 to produce a mounted board based on the production order of order number W6 in the component mounting line L2. The board type switching preparation network creation unit 23c hierarchically links a plurality of preparation work nodes of the production equipment included in the board type switching preparation standard information 29e to each production equipment node of the line configuration information 29c of the component mounting line L2.
[0065] Next, the board type switching preparation network creation unit 23c deletes from the board type switching preparation network any production equipment whose board type switching preparation standard information 29e does not include indirect preparation work. In this example, the reflow equipment M17, which does not have indirect preparation work, is deleted from the board type switching preparation network. Next, the board type switching preparation network creation unit 23c refers to the board type switching network of order number W6 and deletes preparation work nodes that do not require indirect preparation work.
[0066] In this example, since printing device M14 does not perform "squeegee replacement," the preparation work node for "squeegee preparation" has been deleted. Since component mounting device M15 and component mounting device M16 do not perform "feeder replacement" and "component replacement," the preparation work nodes for "feeder preparation" and "component preparation" have been deleted. Furthermore, since component mounting device M16 does not perform "mounting head replacement," the preparation work node for "mounting head preparation" has been deleted. End node Ne holds production end time T23, when production of order number W5 ends, as the end time. In other words, the end time of end node Ne is the latest time that production should end according to production plan 29a.
[0067] In this way, the board type switching network and the board type switching preparation network are configured in a hierarchical structure in the preparation process (board type switching, board type switching preparation) for executing production orders at multiple production facilities, by linking multiple production facilities and preparatory work at the production facilities (direct preparatory work, indirect preparatory work) as production facility nodes and preparatory work nodes.
[0068] 3, the placement work network creation unit 23d creates a placement work network, which is a directed graph formed by linking placement works (indirect preparation works) executed in the preparation area As, based on the production plan 29a, production data 29b, and placement work standard information 29f. The placement work network is created for each production order (for each of the order numbers W1 to W7). The created placement work network is stored in the work memory unit 29 as placement work network information 29j.
[0069] Here, the creation process of the placement work network by the placement work network creation unit 23d will be specifically described with reference to Fig. 11B. Fig. 11B is an explanatory diagram of an example of a placement work network created by the work management device 6. Fig. 11B shows a placement work network of placement work (indirect preparation work) performed in the preparation area As to produce a mounting board based on the production order of order number W6. The placement work network creation unit 23d hierarchically links the preparation work nodes of the carts 5-1 to 5-4 to the cart group node of the cart group Z1 (carts 5-1 to 5-4) in the placement work standard information 29f.
[0070] In this example, preparation work nodes for placement work (from "carriage preparation" to "parts attachment") that is performed in order on each of the carts 5-1, 5-2, 5-3, and 5-4 that make up the cart group Z1 are linked in series between the start node Ns and the end node Ne. The start node Ns holds, as its start time, the production end time T11 at which production of order number W1 that immediately precedes the use of cart group Z1 ends. The end node Ne holds, as its end time, the production end time T23 at which production of order number W5 ends. In other words, the start time of the start node Ns is the earliest possible time in the production plan 29a, and the end time of the end node Ne is the latest time that should be ended in the production plan 29a.
[0071] 3, the work network creation unit 23e creates a work network in which the production plan network, the board type switching network, the board type switching preparation network, and the placement work network are linked in an associated order based on the production order (order numbers W1 to W7) based on the production plan network information 29g, the board type switching network information 29h, the board type switching preparation network information 29i, and the placement work network information 29j. The created work network is stored in the work memory unit 29 as work network information 29k. The display processing unit 24 displays the work network on the display unit 21 based on the work network information 29k stored in the work memory unit 29.
[0072] Here, an example of a work network displayed on the display unit 21 and the work network creation process by the work network creation unit 23e will be described with reference to Fig. 12 and Fig. 13. Fig. 12 and Fig. 13 are explanatory diagrams of an example of a work network created by the work management device 6. Fig. 12 displays a work network including production plans for order numbers W3 and W4, which are planned to be produced on component mounting line L1. Fig. 13 displays a work network including production plans for order numbers W5 and W6, which are planned to be produced on component mounting line L2.
[0073] 12 and 13, the work network creation unit 23e links the end node Ne of the production plan of the order number (production order) to be produced immediately before in the production plan network to the start node Ns of the board type switching network. The work network creation unit 23e also links the end node Ne of the board type switching network to the start node Ns of the production plan of the same order number (production order) in the production plan network.
[0074] The work network creation unit 23e also links the end node Ne of the board type switching preparation network and the end node Ne of the placement work network to the start node Ns of the board type switching network with the same order number (production order). The work network creation unit 23e also links the end node Ne of the production plan node with the order number (production order) that used the cart group immediately before in the production plan network to the start node Ns of the placement work network.
[0075] 12 and 13, the linked board type switching network, board type switching preparation network, and placement work network constitute a preparation process network for executing a production order in a plurality of production facilities. In other words, the preparation process network is a network configured by linking production orders and preparation processes (board type switching, board type switching preparation, placement work) in an associated order.
[0076] Here, the details of the preparation process network for order number W6 displayed in Fig. 13 will be explained. The start node Ns of order number W6 in the board type switching network is linked to the end node Ne5 of the production plan for order number W5. In addition, the end node Ne of order number W6 in the board type switching network is linked to the start node Ns6 of the production plan for order number W6. In other words, the preparation process network is created so that the board type switching work (direct preparation work) for order number W6 is performed between the production end time T23 of order number W5 and the production start time T24 of order number W6.
[0077] The end node Ne of order number W6 in the board type switching preparation network is linked to the start node Ns of order number W6 in the board type switching network. In other words, the preparation process network is created so that the board type switching preparation work (indirect preparation work) for order number W6 is completed by the time the board type switching preparation work for order number W6 starts (the production end time T23 for order number W5). The end node Ne of order number W6 in the placement work network is linked to the start node Ns of order number W6 in the board type switching network.
[0078] Also, the start node Ns of order number W6 in the placement work network is linked to the end node Ne1 of the production plan for order number W1. That is, the preparation process network is created so that the placement work (indirect preparation work) of order number W6 starts after the production end time T11 of order number W1 and ends by the time the board type switching preparation work of order number W6 starts (the production end time T23 of order number W5). Note that in Fig. 13, the directed graph formed by linking the end node Ne1 of the production plan for order number W1 and the start node Ns of the placement work network for order number W6 is omitted.
[0079] In Fig. 13, when the board type switching network of order number W6 is selected on display unit 21 by a predetermined operation (for example, double-clicking with the mouse), the hierarchy of the board type switching network shown in Fig. 10 is displayed. Similarly, when the board type switching preparation network of order number W6 is selected, the hierarchy of the board type switching preparation network shown in Fig. 11A is displayed, and when the placement work network of order number W6 is selected, the hierarchy of the placement work network shown in Fig. 11B is displayed.
[0080] That is, the display unit 21 displays the preparation process network hierarchically in the order of production order, preparation process (switching board type, preparation for switching board type, placement work), multiple production facilities (production facility nodes), and preparation work in the production facilities (preparation work nodes). Note that in Fig. 12, the preparation process for changing order number W3 to order number W4, which is in the same group, does not have placement work (indirect preparation work) in the preparation area As, so there is no placement work network in the preparation process network for order number W4.
[0081] 3, the operation sequence determination unit 25 includes an operation slack time calculation unit 25a as an internal processing unit. The operation slack time calculation unit 25a calculates an operation slack time 29l of each preparatory operation node from the difference between the operation time based on the time held by the start node Ns of the preparatory process network and the operation time based on the time held by the end node Ne, based on the operation network information 29k. The calculated operation slack time 29l is stored in the operation memory unit 29. For example, in the board type switching network of order number W6, the operation slack time 29l of each preparatory operation node is calculated from the operation time based on the production end time T23 of the end node Ne5 of order number W5 and the operation time based on the production start time T24 of the start node Ns6 of order number W6.
[0082] Here, the calculation process of the work slack time 29l by the work slack time calculation unit 25a will be described with reference to Fig. 14. Fig. 14 is an explanatory diagram of an example of the calculation process of the work slack time 29l calculated by the work management device 6. Here, the calculation process of the work slack time 29l will be described with reference to a simplified preparation process network. In Fig. 14, in the preparation process network, preparatory work node N1, preparatory work node N2, and preparatory work node N3 are linked in series between the start node S and the end node E, and preparatory work node N4 is linked between the preparatory work node N1 and the end node E.
[0083] Start node S holds "9:00" as the possible start time RD, and end node E holds "10:00" as the completion time DD. At preparatory work node N1 and preparatory work node N2, preparatory work is planned in work area A1 with planned work times MH of "10 minutes" and "20 minutes". Similarly, at preparatory work node N3, preparatory work is planned in work area A2 with a planned work time MH of "10 minutes", and at preparatory work node N4, preparatory work is planned in work area A3 with a planned work time MH of "25 minutes".
[0084] 14, first, the task slack time calculation unit 25a calculates the earliest start time ES and earliest completion time EF for each node according to the flow of time. Specifically, for the start node S, the possible start time RD (9:00) becomes the earliest start time ES and earliest completion time EF. For the preparation task node N1, the earliest completion time EF (9:00) of the immediately preceding start node S becomes the earliest start time ES, and the time (9:10) obtained by adding the scheduled task time MH (10 minutes) to the earliest start time ES becomes the earliest completion time EF.
[0085] Similarly, the earliest start time ES of preparatory work node N2 and preparatory work node N4 is the earliest completion time EF (9:10) of preparatory work node N1. The earliest completion times EF of preparatory work node N2 and preparatory work node N4 are (9:30) and (9:35), respectively. The earliest start time ES of preparatory work node N3 is the earliest completion time EF (9:30) of preparatory work node N2, and the earliest completion time EF is (9:40). The earliest start time ES and earliest completion time EF of end node E are the later of the earliest completion time EF (9:40) of preparatory work node N3 and the earliest completion time EF (9:35) of preparatory work node N4 (9:40).
[0086] In Fig. 14, the task slack time calculation unit 25a then calculates the latest start time LS and latest completion time LF for each of the preparatory task nodes N1 to N4 in the opposite direction to the flow of time. Specifically, the completion time DD (10:00) of end node E becomes the latest start time LS and latest completion time LF. For preparatory task node N3 and preparatory task node N4, the latest start time LS (10:00) of the immediately succeeding end node E becomes the latest completion time LF. The latest start time LS of preparatory task node N3 is the time (9:50) obtained by subtracting the scheduled task time MH (10 minutes) from the latest completion time LF (10:00). Similarly, the latest start time LS of preparatory task node N4 becomes the time (9:35).
[0087] Similarly, the latest completion time LF of preparatory work node N2 is the latest start time LS (9:50) of preparatory work node N3, and the latest start time LS is time (9:30). The latest completion time LF of preparatory work node N1 is the earlier of the latest start time LS (9:30) of preparatory work node N2 and the latest start time LS (9:35) of preparatory work node N4 (9:30). The latest start time LS of preparatory work node N1 is (9:20). The latest completion time LF and latest start time LS of start node S is the latest start time LS (9:20) of preparatory work node N1.
[0088] 14, the work slack calculation unit 25a then calculates the work slack 29l (slack) for each of the preparatory work nodes N1 to N4. Specifically, the work slack 29l is the time obtained by subtracting the earliest start time ES from the latest start time LS for each of the preparatory work nodes N1 to N4. For the preparatory work node N1, the work slack 29l is the time (20 minutes) obtained by subtracting the earliest start time ES (9:00) from the latest start time LS (9:20). Similarly, the work slack 29l for the preparatory work nodes N2 and N3 is (20 minutes), and the work slack 29l for the preparatory work node N4 is (25 minutes).
[0089] In this way, the task slack calculation unit 25a calculates task slack 29l for each of the preparation task nodes N1 to N4 from the difference between the task time (earliest start time ES) based on the production start time (time when work can be started at start node S RD) and the task time (latest start time LS) based on the production end time (completion time DD at end node E). The calculated task slack 29l is stored in the task memory unit 29.
[0090] In FIG. 3, the work sequence determination unit 25 groups the preparation work nodes N1 to N4 based on the work margin time 29l calculated by the work margin time calculation unit 25a, and determines a work sequence that satisfies the production start time (the possible start time RD of the start node S) and the production end time (the completion time DD of the end node E) set in the production order.
[0091] Here, with reference to Fig. 15, the determination process in which the work order determination unit 25 assigns the preparatory work nodes N1 to N4 to two workers OP1 and OP2 to determine the work order will be described. Fig. 15 is an explanatory diagram of an example of the determination process of the work order determined by the work management device 6. First, the work order determination unit 25 groups the preparatory work nodes N1, N2, and N3, which have a short work slack time 29l of 20 minutes, into one group, and the preparatory work node N4, which has a work slack time 29l of 25 minutes, into another group. Next, the work order determination unit 25 assigns the preparatory work nodes N1 to N4 to the workers OP1 and OP2 in the order of the earliest start time ES in the group with the shortest work slack time 29l. In this example, the preparatory work node N1 and the preparatory work node N2 in the same work area A1 are assigned to the worker OP1, and the preparatory work node N3 in the work area A2 is assigned to the worker OP2.
[0092] Next, the work order determination unit 25 considers whether the remaining preparatory work node N4 can be assigned to the worker OP who has the shortest total scheduled work time MH. At this point, the total scheduled work time MH of worker OP1 is 30 minutes, and the total scheduled work time MH of worker OP2 is 10 minutes, so the work order determination unit 25 considers whether the preparatory work node N4 can be assigned to worker OP2. Because the earliest start time ES (9:10) of preparatory work node N4 is earlier than the earliest start time ES (9:30) of preparatory work node N3, the work order determination unit 25 considers whether the preparatory work node N4 can be assigned before the preparatory work node N3. In this case, the earliest completion time EF of preparatory work node N4 is 9:35, and the work completion time of preparatory work node N3 is 9:45, which is earlier than the latest completion time LF (10:00), so it is determined that assignment is possible.
[0093] 3, the operation sequence determination unit 25 uses the preparation process network stored in the operation network information 29k in accordance with the above-mentioned determination process to determine the operation sequence of preparation tasks that occur in preparation processes for executing a production order in a plurality of production facilities. The preparation instruction creation unit 26 creates preparation instructions 29m for executing the preparation tasks corresponding to the operation sequence determined by the operation sequence determination unit 25 in preparation operation node units. The created preparation instructions 29m are stored in the operation memory unit 29.
[0094] The result collecting unit 27 collects the results of the preparation work from the placement work support device 4, the work terminal T, and the transport vehicle V. The result collecting unit 27 also collects the results of the production work from the production equipment of the component mounting lines L1 and L2. The collected results of the preparation work and the production work are stored in the work memory unit 29 as result information 29n. The preparation instruction transmitting unit 28 transmits the preparation instruction 29m to the placement work support device 4, the work terminal T, and the transport vehicle V based on the preparation instruction 29m and the result information 29n. That is, when the preparation instruction transmitting unit 28 collects result information indicating that the preparation instruction 29m has been completed or result information indicating that the production of the production order has been completed, it transmits the preparation instruction 29m of the next order. This allows the optimal preparation work before production to be instructed.
[0095] Next, along with Fig. 16, and with reference to Figs. 9 to 15, a preparation instruction method for creating and issuing (transmitting) preparation instructions 29m for executing a production order at a plurality of production facilities by the work management device 6 will be described. Fig. 16 is a flow diagram of the preparation instruction method according to an embodiment of the present disclosure. First, the production plan network creation unit 23a creates a production plan network based on the production plan 29a, in which directed graphs formed with production plans for mounting boards in production order units as production plan nodes are linked in order of production (ST1: production plan network creation step) (see Fig. 9).
[0096] Next, based on the production plan 29a, production data 29b, line configuration information 29c, and board type switching standard information 29d, the board type switching network creation unit 23b creates a board type switching network in which preparation work nodes for multiple direct preparation work performed in the production equipment are hierarchically linked to production equipment nodes for each production equipment (ST2: board type switching network creation step) (see FIG. 10). Next, based on the production plan 29a, production data 29b, line configuration information 29c, and board type switching preparation standard information 29e, the board type switching preparation network creation unit 23c creates a board type switching preparation network in which preparation work nodes for multiple indirect preparation work performed outside the production equipment are hierarchically linked to production equipment nodes for each production equipment (ST3: board type switching preparation network creation step) (see FIG. 11A).
[0097] 16, next, the placement work network creation unit 23d creates a placement work network, which is a directed graph formed by linking the preparation work nodes of the placement work (indirect preparation work) in the preparation area As in the order of work, based on the production plan 29a, production data 29b, and placement work standard information 29f (ST4: placement work network creation step) (see FIG. 11B). Next, the work network creation unit 23e creates a preparation process network by linking the created production plan network, board type switching network, board type switching preparation network, and placement work network in an associated order based on the production order (ST5: preparation process network creation step) (see FIG. 12, FIG. 13).
[0098] In this way, the preparation process network is configured in a hierarchy by linking multiple production equipment nodes in the preparation process (switching board type, preparation for switching board type, placement work) with preparation work nodes in the production equipment. The hierarchy of multiple production equipment is configured so that the production equipment nodes branch out in series or parallel depending on the production format (see, for example, Figure 5). The hierarchy of preparation work in the production equipment is configured so that the preparation work nodes branch out in series or parallel depending on the order of preparation (see, for example, Figures 6 and 7).
[0099] 16, next, the operation slack time calculation unit 25a calculates the operation slack time 29l (Slack shown in FIG. 14) of each preparatory work node from the difference between the operation time (earliest start time ES or latest start time LS) based on the production start time (possible start time RD) held by the start node Ns of the production plan network and the operation time (latest start time LS or earliest start time ES) based on the production end time (completion time DD) held by the end node Ne (ST6: slack time calculation step). Next, the work sequence determination unit 25 groups the preparatory work nodes based on the calculated operation slack time 29l, and determines the operation sequence that satisfies the production start time and production end time set in the production order (ST7: work sequence determination step) (for example, see FIG. 15).
[0100] In this way, a preparation process network is created by linking the production order and the preparation processes for executing the production order in a plurality of production facilities in an associated order (ST1 to ST5), and the preparation process network is used to determine the work order of the work occurring in the preparation process (ST6 to ST7). Next, the preparation instruction creation unit 26 creates a preparation instruction 29m for executing the preparation work corresponding to the determined work order in preparation work node units (ST8: preparation instruction creation process). Next, the preparation instruction transmission unit 28 transmits the created preparation instruction 29m to the placement work support device 4, the work terminal T, and the transport vehicle V (ST9: preparation instruction transmission process). This allows instructions for optimal preparation work before production to be given.
[0101] As described above, the work management device 6 of this embodiment includes a work order determination unit 25 that determines the work order of the work occurring in the preparation process using a preparation process network (work network information 29k) that is configured by linking the production order and the preparation processes (switching board type, preparation for switching board type, placement work) for executing the production order in a plurality of production equipment (printing devices M2, M10, M14, component mounting devices M4, M5, M15, M16, reflow devices M7, M11, M17) in an associated order, and a preparation instruction creation unit 26 that creates a preparation instruction 29m corresponding to the determined work order. This allows optimal preparation work before production to be instructed.
[0102] Although the work management device 6 described above is configured with one computer, it may be configured as a work management system in which the functions of the work management device 6 are distributed and processed by multiple computers. For example, the function of creating a work network (network creation unit 23), the function of creating preparation instructions 29m (work sequence determination unit 25, preparation instruction creation unit 26), and the function of transmitting preparation instructions 29m to the placement work support device 4, the work terminal T, and the transport vehicle V (preparation instruction transmission unit 28) may each be processed by different computers.
[0103] Note that the above describes the creation of preparation instructions using as an example the preparation work before the production of mounted boards in component mounting lines L1 and L2 composed of multiple production facilities including component mounting devices M4, M5, M15, and M16 that mount components on boards, but the creation of preparation instructions is not limited to this. For example, the preparation work may be preparation work before the production of semiconductors in a semiconductor production line that manufactures semiconductors, preparation work before the assembly of electrical equipment in an assembly production line that assembles electrical equipment, or preparation work before the production of processed food products in a food processing line that produces processed food products.
[0104] The steps in the work instruction method may be executed by a computer (computer system). The present disclosure can be realized as a program for causing a computer to execute the steps included in the work instruction method. Furthermore, the present disclosure can be realized as a non-transitory computer-readable recording medium, such as a CD-ROM, on which the program is recorded.
[0105] For example, when the present disclosure is realized by a program (software), each step is executed by executing the program using hardware resources such as a computer's CPU (Central Processing Unit), memory, and input / output circuits, etc. In other words, each step is executed by the CPU acquiring data from the memory or input / output circuits, etc., performing calculations, and outputting the calculation results to the memory or input / output circuits, etc.
[0106] Furthermore, each of the components included in the component mounting system 1 of the above embodiment may be realized as a dedicated or general-purpose circuit.
[0107] Furthermore, each of the components included in the component mounting system 1 of the above-described embodiment may be realized as an LSI (Large Scale Integration) which is an integrated circuit (IC: Integrated Circuit).
[0108] Furthermore, the integrated circuit is not limited to an LSI, and may be realized by a dedicated circuit or a general-purpose processor. A programmable FPGA (Field Programmable Gate Array) or a reconfigurable processor in which the connections and settings of circuit cells within an LSI can be reconfigured may also be used.
[0109] Furthermore, if an integrated circuit technology that can replace LSI emerges due to advances in semiconductor technology or a different derivative technology, naturally, that technology may be used to integrate the components included in component mounting system 1.
[0110] In addition, the present disclosure also includes forms obtained by applying various modifications to the embodiments that a person skilled in the art may conceive, and forms realized by arbitrarily combining the components and functions of each embodiment within the scope that does not deviate from the spirit of the present disclosure. [Industrial Applicability]
[0111] The work management device and preparation instruction method disclosed herein have the effect of being able to instruct optimal pre-production preparation work, and are useful in the field of mounting components on boards. [Explanation of symbols]
[0112] 6 Work management device As Preparation area (area away from component mounting equipment) M2, M10, M14 printing equipment (production equipment) M4, M5, M15, M16 component mounting equipment (production equipment) M7, M11, M17 reflow equipment (production equipment)
Claims
1. a work order determination unit that determines a work order for a plurality of tasks occurring in a preparatory process by using a network that is configured by linking a production order with a plurality of production devices in a related order; a preparation instruction creating unit that creates a preparation instruction corresponding to the determined work order, the network is configured in a hierarchy in the preparation step by linking the plurality of production devices and the preparation operations of the plurality of production devices as nodes; The work management device further includes a display unit that displays the network hierarchically in the following order: the production order, the preparatory process, the plurality of production devices, and the preparatory work in the plurality of production devices.
2. A work order determination unit that determines a work order for a plurality of tasks occurring in a preparatory process by using a network that links a production order with a plurality of production devices in a related order; a preparation instruction creating unit that creates a preparation instruction corresponding to the determined work order, the network is configured in a hierarchy in the preparation step by linking the plurality of production devices and the preparation operations of the plurality of production devices as nodes; A work management device, wherein the hierarchy of the plurality of production devices is configured so that the nodes branch according to a production format.
3. The work management device according to claim 2 , wherein the hierarchy of the preparation work in the plurality of production devices is configured so that the nodes branch out according to an order of preparation.
4. 4. The work management device according to claim 2, wherein the work sequence determination unit determines a work sequence that satisfies a production start time and a production end time set in the production order.
5. the operation sequence determination unit calculates an operation margin time from a difference between an operation time based on the production start time and an operation time based on the production end time, The work management device according to claim 4 , further comprising: a task order determining unit that groups the nodes based on the calculated task margin time.
6. 4. The work management device according to claim 2, wherein the production device is a component mounting device that mounts components on a board.
7. 7. The work management device according to claim 6, wherein the preparatory work includes indirect preparatory work performed in an area away from the component mounting device, and direct preparatory work performed on the component mounting device.
8. A method for instructing a preparatory work body by a work management device, comprising: determining a sequence of operations for a plurality of tasks occurring in a preparatory process by using a network formed by linking the production order with a plurality of production devices in a related sequence; creating a preparation instruction corresponding to the determined work order; the network is configured in a hierarchy in the preparation step by linking the plurality of production devices and the preparation operations of the plurality of production devices as nodes; The preparation instruction method further includes displaying the network in a hierarchical structure in the order of the production order, the preparation process, the plurality of production devices, and the preparation work in the plurality of production devices.
9. A method for instructing a preparatory work body by a work management device, comprising: determining a sequence of operations for a plurality of tasks occurring in a preparatory process by using a network formed by linking the production order with a plurality of production devices in a related sequence; creating a preparation instruction corresponding to the determined work order; the network is configured in a hierarchy in the preparation step by linking the plurality of production devices and the preparation operations of the plurality of production devices as nodes; A preparation instruction method, wherein the hierarchy of the plurality of production devices is configured so that the nodes branch according to a production format.
10. The preparation instruction method according to claim 9 , wherein the hierarchy of the preparation work in the production device is configured such that the nodes branch according to an order of preparation.
11. 11. The preparation instruction method according to claim 9, wherein determining the operation sequence includes determining an operation sequence that satisfies a production start time and a production end time set in the production order.
12. Determining the work order includes: calculating a work margin time from a difference between a work time based on the production start time and a work time based on the production end time; The preparation instruction method according to claim 11, further comprising: determining an order of operations by grouping the operations based on the calculated operation margin time.
13. 11. The preparation instruction method according to claim 9, wherein the production device is a component mounting device that mounts components on a board.
14. 14. The preparation instruction method according to claim 13, wherein the preparation work includes indirect preparation work performed in an area away from the component mounting device, and direct preparation work performed on the component mounting device.
Citation Information
Patent Citations
Back-up device for production of process network
JP1990162463A
Processing plan preparing method and device in manufacturing / Carrier process, physical distribution controlling method and device, computer readable recording medium and computer program
JP2002229635A
Production control device
JP2002373015A
Component mounting apparatus or component mounting system and component mounting setting method therein
JP2008010707A
Production schedule creation device
JP2011048778A