Electric power infrastructure design device and electric power infrastructure design method
The power infrastructure design device optimizes equipment configuration patterns to minimize costs and ensure resilience by incorporating a CPU and memory for processing and outputting results, addressing the challenges of fixed capacity and varying demands in conventional designs.
Patent Information
- Application Number
- JP2021202605
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-12-14
- Publication Date
- 2024-11-11
- Estimated Expiration
- 2041-12-14
AI Technical Summary
Conventional power infrastructure design devices struggle to design appropriate facility capacity to ensure resilience at low cost in response to varying demands from different operators, and the installed capacity of engine generators is fixed, leading to incorrect evaluation of fuel consumption and resilience.
A power infrastructure design device that includes an equipment information setting unit, load information setting unit, and a resilience evaluation unit to calculate and determine optimal equipment configuration patterns that minimize initial and running costs while ensuring desired resilience, using a CPU and memory for processing and outputting results.
The device enables the design of low-cost power infrastructure equipment that satisfies resilience requirements by optimizing equipment configuration patterns based on initial and running costs, considering both normal and disaster scenarios.
Smart Images

Figure 0007580366000033 
Figure 0007580366000034 
Figure 0007580366000035
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a power infrastructure design device that designs power infrastructure facilities taking into account economy and resilience. [Background technology]
[0002] With the increasing frequency of major power outages caused by natural disasters such as typhoons and earthquakes, resilience measures are beginning to attract attention. In addition, toward a decarbonized society, renewable energy sources such as solar and wind power, storage batteries, and energy storage devices such as electric vehicles are beginning to become more widespread. Against this background, there is a need to design an electric power infrastructure that can ensure resilience at the local level while providing energy at the lowest possible cost.
[0003] In conventional power infrastructure design devices, as disclosed in Patent Document 1, for example, a database of power demand for various types of loads is compiled, and this is used to predict unknown load fluctuations, making it possible to calculate an appropriate capacity for the supply facilities that form a microgrid.
[0004] Furthermore, as disclosed in, for example, Non-Patent Document 1, conventional power infrastructure design devices enable appropriate capacity design for renewable energy, taking into consideration the storage of generated electricity or the use of internal combustion generators to generate electricity at low cost and to avoid power shortages for off-grid or microgrids in order to achieve self-sufficiency in generated electricity within the area as large-scale introduction of renewable energy progresses. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2016-213933 A [Non-patent literature]
[0006] [Non-Patent Document 1] Operation and capacity selection methods for remote island off-grid systems using storage batteries as the main source of renewable energy (Transactions of the Electrical Engineering Society of Japan, Vol. 141, No. 6, pp. 406-414) Summary of the Invention [Problem to be solved by the invention]
[0007] In such a power infrastructure design device, in preparation for the case where the power supply from the upper system is cut off during a disaster, it is possible to prepare for the power outage period until restoration by installing renewable energy power sources, storage batteries, engine generators, etc. and supplying power to the minimum necessary load. However, it is not possible to design an appropriate equipment capacity to ensure the desired resilience at low cost in response to the different requirements of each operator. In addition, since the equipment capacity of the engine generator is fixed and there is no limit to the fuel consumption, if the capacity of the fuel storage facility affects the time until the power shortage, the resilience cannot be properly evaluated.
[0008] The present disclosure has been made to solve the problems described above, and aims to provide a power infrastructure design device that can design power infrastructure equipment at low cost while satisfying the desired resilience. [Means for solving the problem]
[0009] The power infrastructure design device according to the present disclosure includes an equipment information setting unit that sets equipment information including at least information on existing equipment constituting a power infrastructure and information on equipment to be added; a load information and environmental information setting unit that sets load information on future power demand and environmental information on a future power supply environment in normal times and in disaster times; an equipment configuration pattern creation unit that creates a plurality of combinations of equipment capacities of equipment to be added based on the equipment information, the load information in normal times, and the environmental information in normal times, and sets these combinations as a plurality of equipment configuration patterns; an initial cost calculation unit that calculates initial costs for the plurality of equipment configuration patterns; The system includes a normal running cost calculation unit that calculates a running cost during normal times for a configuration pattern, the load information, and the environmental information; a disaster resilience evaluation unit that evaluates resilience during a disaster for the multiple equipment configuration patterns, the load information, and the environmental information; and an optimal equipment configuration pattern determination unit that determines an optimal equipment configuration pattern from the multiple equipment configuration patterns that satisfies resilience and minimizes the sum of the initial cost and the normal running cost, based on the sum of the initial cost and the normal running cost and the evaluation result of the disaster resilience. Effect of the Invention
[0010] According to the power infrastructure design device disclosed herein, by comprising an initial cost calculation unit, a normal running cost calculation unit, a disaster resilience evaluation unit, and an optimal equipment configuration pattern determination unit, it is possible to design low-cost power infrastructure equipment that satisfies the desired resilience. [Brief description of the drawings]
[0011] [Figure 1] 1 is a functional block diagram illustrating a configuration of a power infrastructure design device according to a first embodiment of the present disclosure. [Diagram 2] 4 is a flowchart showing a process flow of the power infrastructure design device according to the first embodiment of the present disclosure. [Diagram 3]3 is a diagram illustrating a table created by an equipment configuration pattern creation unit of the power infrastructure design apparatus according to the first embodiment of the present disclosure. FIG. [Figure 4] 4 is a flowchart showing a process flow of the power infrastructure design device according to the first embodiment of the present disclosure. [Diagram 5] FIG. 11 is a block diagram showing a configuration of a power infrastructure design device according to a fourth embodiment of the present disclosure. [Figure 6] 13 is a flowchart showing a process flow of a power infrastructure design device according to a fourth embodiment of the present disclosure. [Figure 7] FIG. 1 is a diagram illustrating a hardware configuration for implementing a power infrastructure design device according to first to fourth embodiments. [Figure 8] FIG. 1 is a diagram illustrating a hardware configuration for implementing a power infrastructure design device according to first to fourth embodiments. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] <Embodiment 1> <Device configuration> FIG. 1 is a functional block diagram showing a configuration of a power infrastructure design device 100 according to a first embodiment of the present disclosure.
[0013] As shown in FIG. 1, the power infrastructure design device 100 includes a control unit 1, an input unit 2, a calculation condition database 3, an equipment information setting unit 4, an equipment database 5, a load information / environmental information setting unit 6, a normal operation database 7, a disaster operation database 8, an equipment configuration pattern creation unit 9, a calculation result database 10, an initial cost calculation unit 11, a normal operation running cost calculation unit 12, a disaster resilience evaluation unit 13, an optimal equipment configuration pattern determination unit 14, and an output unit 15.
[0014] The control unit 1, input unit 2, calculation condition database 3, equipment database 5, normal operation database 7, disaster operation database 8, equipment configuration pattern creation unit 9, calculation result database 10, initial cost calculation unit 11, normal operation running cost calculation unit 12, disaster resilience evaluation unit 13, optimal equipment configuration pattern determination unit 14 and output unit 15 are connected to each other via an internal network NW.
[0015] The control unit 1 controls the processing in the equipment configuration pattern creation unit 9, calculation result database 10, initial cost calculation unit 11, normal running cost calculation unit 12, disaster resilience evaluation unit 13 and optimal equipment configuration pattern determination unit 14.
[0016] The input unit 2 inputs the period during which the power infrastructure will be operated as the calculation period, and also inputs the desired resilience against power outages during disasters, such as whether power can be supplied without power outages for a specified period of time, or whether the total power outage time in a certain period of time can be kept below a specified value, and stores this in the calculation condition database 3.
[0017] The equipment information setting unit 4 sets the system configuration, which is information on the equipment capacity and connection relationship of existing equipment within the power supply equipment's own system, the equipment unit price of the equipment to be added, the maintenance costs of the existing equipment and the equipment to be added, the equipment lifespan, input / output characteristics, upper and lower input / output limits, and equipment characteristics, which are characteristics related to deterioration over time, and stores them in the equipment database 5.
[0018] The load information and environmental information setting unit 6 sets load information on future power demand and environmental information on future power supply environment, for example, forecast information such as the amount of power generated by renewable energy sources, the amount of power purchased, the power purchase price, and the fuel purchase price, as time-series data. However, since the situation differs between normal times and disaster times, these are set separately for normal times and disaster times, and are stored in the normal time database 7 and the disaster time database 8, respectively. Note that normal times refer to a state in which power supply from a higher-level power system is available and power supply within the local system is being performed without problems. A disaster refers to a state in which power supply from a higher-level power system cannot be received due to some kind of disaster, or a state in which there is a problem with the power supply within the local system, for example, power supply is not being performed in part or all of the local system.
[0019] The equipment configuration pattern creation unit 9 creates multiple combinations of equipment capacities for the equipment to be expanded from the equipment information stored in the equipment database 5 and the power demand and power generation amount of the renewable energy power source stored in the normal time database 7, and stores these as equipment configuration patterns in the calculation result database 10. At this time, a combination of equipment capacity to be expanded with respect to the current equipment capacity is created as the equipment configuration pattern, so as to avoid an equipment configuration pattern that is excessively large or excessively small relative to the power demand.
[0020] The initial cost calculation unit 11 refers to the calculation period stored in the calculation condition database 3, calculates the initial cost of each of the multiple equipment configuration patterns created by the equipment configuration pattern creation unit 9, and stores the results in the calculation result database 10. For example, the initial cost representing the investment in the equipment to be expanded is calculated from the equipment unit price stored in the equipment database 5 and the equipment capacity of the target equipment configuration pattern.
[0021] The normal running cost calculation unit 12 refers to the calculation period stored in the calculation condition database 3, calculates the normal running cost of each of the multiple equipment configuration patterns created by the equipment configuration pattern creation unit 9, and stores the results in the calculation result database 10. For example, it calculates the energy operation cost when operating by applying the normal power demand, the amount of power generated by the renewable energy power source, the amount of power purchased, the power purchase price, the fuel purchase price, etc. stored in the normal database 7, that is, the normal running cost representing the total of the power purchase cost, fuel cost, equipment maintenance cost, etc. The calculation result database 10 also stores the normal operation plan of each piece of equipment included in the equipment configuration pattern together with the normal running cost.
[0022] The disaster resilience evaluation unit 13 evaluates the disaster resilience of each of the multiple equipment configuration patterns created by the equipment configuration pattern creation unit 9, and stores the results in the calculation result database 10. For example, the disaster resilience evaluation unit 13 evaluates whether the desired resilience inputted in the input unit 2 can be satisfied in a state where power supply from a higher-level power system cannot be received due to some disaster, that is, the resilience when the power demand, the amount of power generated by the renewable energy power source, the amount of power purchased, the power purchase price, the fuel purchase price, and the like stored in the disaster database 8 are applied to the operation. The calculation result database 10 also stores a disaster operation plan for each piece of equipment included in the equipment configuration pattern together with the disaster resilience.
[0023] The optimal equipment configuration pattern determination unit 14 extracts an equipment configuration pattern that satisfies the desired resilience stored in the calculation condition database 3 based on the results of evaluation by the disaster resilience evaluation unit 13 from the multiple equipment configuration patterns created by the equipment configuration pattern creation unit 9. Then, from among the extracted equipment configuration patterns, it determines the equipment configuration pattern that minimizes the total of the initial cost and normal running cost as the optimal equipment configuration pattern, and stores the determined optimal equipment configuration pattern, i.e., the combination of the optimal equipment capacities of the equipment to be added, in the calculation result database 10.
[0024] The output unit 15 outputs the optimal equipment configuration pattern determined by the optimal equipment configuration pattern determination unit 14 from among the equipment configuration patterns stored in the calculation result database 10, the equipment capacity included in that optimal equipment configuration pattern, the initial cost calculated using that equipment configuration pattern, the running cost under normal circumstances, the operation plan under normal circumstances, the disaster resilience evaluated using that equipment configuration pattern, the operation plan under disaster, etc.
[0025] The output from output unit 15 is not limited to the above, and the display of output unit 15 can be configured to show, for example, a graph or table showing the relationship between disaster resilience and the total initial cost and normal running cost for multiple equipment configuration patterns created by equipment configuration pattern creation unit 9, and the operator can select a desired equipment configuration pattern from the graph or table and store that equipment configuration pattern in calculation result database 10.
[0026] That is, instead of the optimum equipment configuration pattern determination unit 14 automatically determining the equipment configuration pattern, the operator may determine the equipment configuration pattern by looking at a graph or a table.
[0027] The power infrastructure design device 100 can be configured with a computer. The facility database 5, the normal state database 7, the disaster state database 8, and the calculation result database 10 can be realized as databases constructed by storing data on a hard disk drive and memory provided in the computer.
[0028] The control unit 1, equipment configuration pattern creation unit 9, initial cost calculation unit 11, normal running cost calculation unit 12, disaster resilience evaluation unit 13 and optimal equipment configuration pattern determination unit 14 can be realized using a processor such as a CPU (Central Processing Unit) for performing calculations and a memory such as DRAM.
[0029] The input unit 2, facility information setting unit 4 and load information / environment information setting unit 6 are composed of input devices such as a mouse, keyboard and touch panel display, and can store the input data in the calculation condition database 3, facility database 5, normal operation database 7 and disaster database 8. Furthermore, by providing a communication terminal, data communication with the outside becomes possible.
[0030] The output unit 15 is composed of output devices such as a display monitor, and can visualize the data stored in the calculation condition database 3, the equipment database 5, the normal state database 7, the disaster state database 8, and the calculation result database 10, and can further include a communication terminal to enable data communication with the outside.
[0031] <Processing flow> Fig. 2 is a flowchart showing a processing flow in the power infrastructure design device 100 of the first embodiment according to the present disclosure. As shown in Fig. 2, when the processing of the power infrastructure design is started, the operator inputs, in the input unit 2, a period for operating the power infrastructure to be designed, for example, 5 years, 10 years, 15 years, or 20 years, as a calculation period, and also inputs a desired resilience against power outages in the event of a disaster, such as whether power can be supplied without power outages for a predetermined period of time, or whether the total power outage time in a certain period of time can be kept below a predetermined value (step S1). The input information is stored in the calculation condition database 3.
[0032] In addition, the operator sets the system configuration of the power supply equipment in the equipment information setting unit 4, i.e., equipment information on power supply equipment and load equipment, including equipment capacities such as existing distribution lines, utility poles, transformers, switches, power generation capacity and storage capacity, and their connection information (step S2).
[0033] In step S2, the operator also sets, as equipment information, the unit equipment cost of the equipment to be expanded, i.e., the price per unit amount of the equipment to be expanded (for example, 100,000 yen / kW for a power source), and the maintenance costs of the existing equipment and the equipment to be expanded, i.e., the cost per unit amount and unit time of the existing and expanded equipment, for example, 10,000 yen / kW-year.
[0034] In step S2, the operator sets, as equipment information, the equipment lifespan, i.e., the remaining lifespan of the existing equipment and the lifespan of the equipment to be added, equipment characteristics, i.e., input / output characteristics expressing the relationship between input and output such as the amount of power generated relative to fuel consumption, upper and lower limits of input and output, temperature characteristics, i.e., characteristics in which the output changes depending on the outside temperature for the same input, characteristics related to aging, i.e., characteristics in which the output decreases for the same input each time the equipment is installed, etc. The set equipment information, etc. are stored in the equipment database 5.
[0035] In the load information / environmental information setting unit 6, the operator sets the power demand for the future, for example, 20 years from the present, or for a total of four years, such as one year 5 years from now, one year 10 years from now, one year 15 years from now, and one year 20 years from now, by thinning out the years in between, as well as the power generation amount of renewable energy sources, the power purchase amount, the power purchase price, the fuel purchase price, etc., as time-series data, for example, every 30 minutes, and sets this as the load information / environmental information (step S3).
[0036] However, because the situation differs between normal times and disasters, time series data is set separately for normal times and disasters. During normal times, time series data is set on an annual basis, assuming normal operation when power supply from the upper system is available, and during disasters, assuming a state in which power supply from the upper system cannot be received, time series data is set for a harsh period of about one to two weeks when power supply is the most severe, that is, when demand is high relative to supply. Note that the period is not limited to this, and a period sufficient for evaluating disaster resilience in the later step S7 is set.
[0037] When the normal time series data is taken every 30 minutes, for example, one year's worth of data every 30 minutes can be prepared for a total of four years, one year 5 years from now, one year 10 years from now, one year 15 years from now, and one year 20 years from now. However, when calculating normal running costs for 365 days or 366 days at once in the subsequent step S6, the amount of data is large and the calculation time may be long. Therefore, the number of days to be calculated can be reduced by breaking down the data for each year into days, and narrowing down the representative days by clustering days with similar power demand, power generation amount of renewable energy sources, power purchase amount, power purchase price, fuel purchase price, etc., or by grouping by season or day of the week, etc., and narrowing down the representative days to several days. However, when calculating normal running costs in this way, the running costs for each representative day are multiplied by the number of days included in the same cluster or group to calculate the weighted sum, etc., to calculate the running costs assumed for the year.
[0038] The load information and environmental information set during normal times and during disasters are stored in a normal time database 7 and a disaster time database 8, respectively.
[0039] 3 shows in a table the equipment configuration patterns created by the equipment configuration pattern creation unit 9 of the power infrastructure design device 100. The equipment configuration pattern creation unit 9 creates multiple combinations of equipment capacities of equipment to be expanded based on the equipment information stored in the equipment database 5 in step S2 and the power demand and power generation amount of renewable energy power sources stored in the normal time database 7 in step S3, and sets these as equipment configuration patterns (step S4). The created equipment configuration patterns are stored in the calculation result database 10.
[0040] However, if no limit is set, the number of combinations will be enormous, so limits are set appropriately. For example, if the power infrastructure to be designed is for a town, and the power demand is a maximum of 1000kW, the power generation capacity of the generator to be added will be at most 1000kW, so the equipment capacity is set in 100kW intervals, such as 0kW, 100kW, 200kW, ..., 1000kW, and 11 types of patterns are set. Similarly, when considering the addition of storage batteries, the storage capacity of the storage battery will be at most 1000kW, so the equipment capacity is set in 100kW intervals, such as 0kWh, 100kWh, 200kWh, ..., 1000kWh, and 11 types of patterns are set. In this case, the number of combinations of patterns for these two types of equipment is 11 x 11 = 121. As the number of assumed facilities increases, the number of combinations increases exponentially. Therefore, if the number of combinations is too large, the processing in the facility configuration pattern creation unit 9 is set so that the set interval is increased and the number of combinations that can be calculated in a realistic time, for example, about 100 patterns, is reached.
[0041] In the example of Figure 3, combinations of equipment capacities for each piece of equipment, such as the equipment capacity of equipment 1, the equipment capacity of equipment 2, the equipment capacity of equipment 3, etc., are given names such as equipment configuration pattern 1, equipment configuration pattern 2, equipment configuration pattern 3, etc., and are organized into a table.
[0042] Without being limited to the example of FIG. 3, for example, a combination of facility capacities capable of supplying part or all of the power demand in accordance with the maximum annual power demand may be created as a facility configuration pattern.
[0043] As a simple example, if the maximum annual power demand is 100kW and the installed capacity of the existing power source is 60kW, and the remaining 40kW is supplied as purchased power, when adding diesel generators to an existing power infrastructure, the installed capacity is set in 10kW intervals, and five types of diesel generators are set: 0kW, 10kW, 20kW, 30kW, and 40kW.If a 30kW diesel generator is added, the remaining 10kW will be supplied as purchased power, which will be the equipment configuration pattern.
[0044] Similarly, if a 20kW diesel generator is added, the remaining 20kW will be supplied as purchased power, and if a 10kW diesel generator is added, the remaining 30kW will be supplied as purchased power.
[0045] In this way, by setting a set interval for the equipment capacity, it is possible to prevent an increase in the number of combinations of equipment configuration patterns and to simplify the creation of equipment configuration patterns. For example, when setting a set interval for the equipment capacity as described above, a combination pattern of the equipment capacity to be expanded can be created so that "maximum power demand-Σj (existing equipment capacity)=Σi (equipment capacity to be expanded), (i, j represent equipment)".
[0046] Although the above example shows a diesel generator, it is also possible to create a combination of equipment capacities by combining a plurality of types of power sources, including other generators, storage batteries, solar power generation, wind power generation, etc., and use these combinations as equipment configuration patterns. Furthermore, the equipment capacities of fuel storage facilities and the like, in addition to power sources, can also be included in the equipment configuration patterns.
[0047] In this case, the optimum facility configuration pattern determination unit 14 can determine an optimum facility configuration pattern including the fuel storage facility.
[0048] Furthermore, when considering equipment configuration patterns over a long period such as 20 years, it is necessary to consider not only the initial equipment configuration pattern, but also equipment configuration patterns resulting from mid-way equipment updates (replacements) by considering the equipment lifespan of each piece of equipment stored in the equipment database 5. In such cases, equipment configuration patterns may be created for each year.
[0049] Next, the initial cost calculation unit 11 refers to the calculation period stored in the calculation condition database 3 and calculates the initial cost of each of the multiple equipment configuration patterns created in step S4 (step S5). The calculated initial costs are stored in the calculation result database 10.
[0050] For example, the initial cost representing the investment in the equipment to be expanded is calculated from the equipment unit price stored in the equipment database 5 set in step S2 and the equipment capacity of the target equipment configuration pattern as shown in the following formula (1), where the initial cost is I_cost, the equipment unit price is P[i] (i represents the equipment), and the equipment capacity is V[i].
[0051]
number
[0052] When considering initial costs over a long period such as 20 years, not only the initial capital investment but also equipment updates (replacement) during the period should be considered. In such a case, the initial cost, i.e., the cost related to equipment expansion during the period being calculated, can be calculated using the annual equipment unit cost taking into account the depreciation of the equipment to be expanded, and the equipment capacity included in the equipment configuration pattern for that year, as shown in the following formula (2). Here, the annual equipment unit cost is P[i, y] (y represents the year), and the annual equipment capacity is V[i, y].
[0053]
number
[0054] Next, the normal running cost calculation unit 12 refers to the calculation period stored in the calculation condition database 3, and calculates the normal running cost of each of the multiple equipment configuration patterns created in step S4 (step S6).
[0055] For example, the energy operating cost when operating by applying the normal power demand, the amount of power generated by renewable energy sources, the amount of power purchased, the power purchase price, the fuel purchase price, etc. stored in the normal database 7 is calculated, that is, the normal running cost which represents the sum of the power purchase cost, fuel cost, equipment maintenance cost, etc.
[0056] At this time, a normal operation plan for each piece of equipment included in the equipment configuration pattern is created along with the normal running cost. Specifically, the normal running cost, which represents the sum of the power purchase cost, fuel cost, and equipment maintenance cost, is set as an objective function to be minimized as shown in the following formula (3), and an operation plan is created by obtaining a solution that minimizes the objective function under given constraints using an optimization method such as mathematical programming, and the normal running cost is calculated and the normal operation plan is created. Here, the power purchase price at each time is E_price[t], the power purchase amount at each time is E_buy[t], the fuel purchase price at each time is F_price[t], the fuel consumption of each piece of equipment at each time is F_use[i, t], and the annual maintenance cost is M_price[y]. Here, t represents the time during normal times, for example, a 30-minute time section, and the fuel consumption value is generated only for equipment that consumes fuel, and is 0 for equipment that does not consume fuel.
[0057]
number
[0058] The calculated normal running costs and the created normal operation plan are stored in a calculation result database 10.
[0059] Constraint conditions include those expressed in the following formula (4) that satisfy the power demand at each time with the total amount of power generated by renewable energy sources, the amount of power purchased, and the amount of power generated by the power generation facilities included in the facility configuration pattern, where the power demand at each time is E_dem[t], the amount of power generated by renewable energy sources at each time is E_re[t], and the amount of power generated by each facility at each time is E_gen[i, t].
[0060]
number
[0061] In addition, the constraint conditions include a constraint condition that expresses the power generation amount of each facility as a function of fuel consumption, as shown in the following formula (5), where fi is the power generation characteristic stipulated by a function that expresses the power generation amount relative to the fuel consumption amount of each facility.
[0062]
number
[0063] Furthermore, the constraint condition may be such that the amount of power purchased does not exceed a predetermined upper limit, as expressed by the following formula (6), where the upper limit of the amount of power purchased at each time is E_buy_max[t].
[0064]
number
[0065] In addition, the constraint condition may be a constraint condition that the amount of power generated by the power generation equipment falls within a predetermined operating range, as expressed by the following formula (7), where the operation value of each equipment at each time, such as fuel consumption and power generation, is X[i, t], the lower limit of the operation value of each equipment is X_min[i], and the upper limit of the operation value of each equipment is X_max[i].
[0066]
number
[0067] In the above formulas (3) to (7), E_buy[t], F_use[i,t], E_gen[i,t], and X[i,t] are continuous variables, and E_price[t], F_price[t], M_price[i,y], V[i,y], E_dem[t], E_re[t], E_buy_max[t], X_min[i], and X_max[i] are constants.
[0068] Although not described here, when a storage battery is added to an equipment configuration pattern, constraints on the remaining charge of the storage battery and constraints on the charge / discharge amount of the storage battery are added.
[0069] In addition, while the purchase of electricity from a higher-level grid has been considered here, if the sale of electricity to a higher-level grid is also considered, a term related to the electricity sales cost (revenue) would be added to the objective function, and a constraint related to the amount of electricity sold would also be added.
[0070] Also, although no mention is made here of emissions of greenhouse gases such as carbon dioxide, for example, it is possible to add constraints such as converting fuel consumption and purchased electricity amounts during the calculation period into carbon dioxide emissions so as not to exceed a predetermined specified emission level.
[0071] In this case, it is possible to calculate the running costs under normal circumstances and create a normal operation plan so that the amount of greenhouse gas emissions does not exceed a predetermined value.
[0072] Next, the disaster resilience evaluation unit 13 evaluates the disaster resilience of each of the multiple facility configuration patterns created in step S4 (step S7). For example, the resilience when operating by applying the power demand, the amount of power generated by the renewable energy power source, the amount of power purchased, the power purchase price, the fuel purchase price, and the like stored in the disaster database 8 during a disaster, that is, whether or not the desired resilience against power outages during a disaster can be satisfied, such as whether or not power can be supplied without power outage for a predetermined period inputted in the input unit 2 in a state where power supply from a higher-level power system cannot be received due to some disaster, or whether or not the total power outage time in a certain period can be kept below a predetermined value, is evaluated.
[0073] At this time, in addition to the disaster resilience evaluation, a disaster operation plan is created for each piece of equipment included in the equipment configuration pattern. Specifically, the time when the power supply cannot meet the power demand for the first time after the disaster occurs is set as the objective function to be maximized as shown in the following formula (8), and an operation plan is created by obtaining a solution that maximizes the objective function under the given constraints using an optimization method such as mathematical programming, and the disaster resilience evaluation and disaster operation plan are created. Here, the time when the power supply cannot meet the demand for the first time after the disaster occurs is set as B_time.
[0074]
number
[0075] The evaluated disaster resilience and the created disaster operation plan are stored in the calculation result database 10.
[0076] The constraints include constraints for expressing the time when the power supply will not be sufficient after the occurrence of a disaster in the optimization problem, as expressed in the following formula (9). Note that the flag (0: no power outage, 1: power outage) indicating the power supply shortage at each time is B_outage[t'], and a number sufficiently large compared to other values is BigM. Here, t' represents the time of the disaster, for example, a 30-minute time section.
[0077]
number
[0078] The constraint condition is a slack variable that avoids a constraint violation when the power supply cannot meet the power demand, as shown in the following formula (10), here a constraint condition on the load shedding amount to avoid a power supply shortage. Here, the slack variable at each time is E_slack[t'].
[0079]
number
[0080] In addition, the constraint condition may be expressed by the following formula (11), where the power demand at each time is satisfied by the sum of the amount of power generated by renewable energy sources, the amount of power purchased, and the amount of power generated by the power generation facilities included in the facility configuration pattern. This includes slack variables in the case where the constraint condition cannot be satisfied. Here, the power demand at each time is E_dem[t'], the amount of power generated by renewable energy sources at each time is E_re[t'], the amount of power purchased at each time is E_buy[t'], and the amount of power generated by each facility at each time is E_gen[i, t'].
[0081]
number
[0082] In addition, the constraint conditions include a constraint condition that expresses the power generation amount of each facility as a function of fuel consumption, as expressed by the following formula (12): where fi is the power generation characteristic stipulated by a function that expresses the power generation amount relative to the fuel consumption amount of each facility.
[0083]
number
[0084] In addition, the constraint condition may be a constraint condition that prevents the amount of power purchased from exceeding a predetermined upper limit, as expressed by the following formula (13), where the upper limit of the amount of power purchased at each time is E_buy_max[t'].
[0085]
number
[0086] In addition, the constraint condition may be such that the total fuel consumption of each facility does not exceed the amount of fuel stored in the fuel storage facility, as expressed by the following formula (14), where the capacity of the fuel storage facility is F_tank.
[0087]
number
[0088] In addition, the constraint condition may be a constraint condition that the amount of power generated by the power generation equipment falls within a predetermined operating range, as expressed by the following formula (15), where the operation value of each equipment at each time, such as fuel consumption and power generation, is X[i, t'], the lower limit of the operation value of each equipment is X_min[i], and the upper limit of the operation value of each equipment is X_max[i].
[0089]
number
[0090] In the above formulas (8) to (15), B_time, E_slack[t'], E_buy[t'], F_use[i, t'], E_gen[i, t'], and X[i, t'] are continuous variables. B_outage[t'] is a discrete variable (binary variable) that takes on either 0 or 1. BigM, E_dem[t'], E_re[t'], E_buy_max[t'], and F_tank are constants. E_buy_max[t'] is 0 when power supply from the upper system is not available.
[0091] Although not described here, when a storage battery is added to an equipment configuration pattern, constraints on the remaining charge of the storage battery, constraints on the charge / discharge amount of the storage battery, etc. will be added.
[0092] Also, instead of the objective function of equation (8), it is possible to use the sum of slack variables (E_slack[t']), that is, the sum of the load shedding amounts, as the objective function and minimize it.
[0093] Furthermore, instead of equation (8), it is also possible to perform calculations to minimize the total amount of time during which the power supply is insufficient as an objective function aimed at minimizing the total amount of time during which the power supply is insufficient during the calculation period.
[0094] Next, the control unit 1 calculates the initial cost and normal running cost for all of the multiple equipment configuration patterns stored in the calculation result database 10, and determines whether or not the disaster resilience has been evaluated (step S8).If there are any equipment configuration patterns for which calculation has not been completed (if No), it re-executes the processing from step S5 onwards, and if calculation has been completed for all equipment configuration patterns, it proceeds to step S9.
[0095] In step S9, the optimum equipment configuration pattern determination unit 14 extracts an equipment configuration pattern from the multiple equipment configuration patterns stored in the calculation result database 10, the equipment configuration pattern whose disaster resilience satisfies the desired resilience stored in the calculation condition database 3 and whose total of the initial cost and normal running cost is minimized, and determines it as the optimum equipment configuration pattern, i.e., a combination of equipment capacities of the equipment to be added. The determined optimum equipment configuration pattern is stored in the calculation result database 10.
[0096] In addition, in step S9, the equipment configuration pattern can be determined by narrowing down the equipment configuration patterns based on the normal operation plan stored in the calculation result database 10 to those in which the amount of power generated by renewable energy sources and the amount of purchased power that comes from renewable energy sources are equal to or greater than a certain ratio to the power demand.
[0097] In this case, the optimum facility configuration pattern determination unit 14 can determine an optimum facility configuration pattern so that the amount of power supply from renewable energy power sources is equal to or greater than a predetermined ratio.
[0098] Finally, the output unit 15 outputs the optimal equipment configuration pattern determined by the optimal equipment configuration pattern determination unit 14 from among the equipment configuration patterns stored in the calculation result database 10, the equipment capacity included in the optimal equipment configuration pattern, the initial cost calculated using the equipment configuration pattern, the normal running cost, the normal operation plan, the disaster resilience evaluated using the equipment configuration pattern, and the disaster operation plan (step S10).
[0099] As described above, in the power infrastructure design device 100 of embodiment 1, the initial cost calculation unit 11 calculates the initial cost (step S5), the normal running cost calculation unit 12 calculates the normal running cost (step S6), the disaster resilience evaluation unit 13 evaluates the disaster resilience (step S7), and the optimal equipment configuration pattern determination unit 14 determines the equipment configuration pattern (step S9), thereby making it possible to determine an optimal equipment configuration pattern that minimizes the sum of the initial cost and normal running cost while satisfying the desired resilience.
[0100] <Embodiment 2> In the power infrastructure design device 100 of the first embodiment, operation is performed under the assumption that all facility capacity is used to supply power to the system itself, but in the power infrastructure design device 100A of the second embodiment, operation is performed taking into consideration LFC (Load Frequency Control) capacity and reserve power in preparation for maintaining the frequency in the system itself, power demand, and sudden changes in the amount of power generated by renewable energy. Note that the device configuration of the power infrastructure design device 100A of the second embodiment is the same as that of the power infrastructure design device 100 of the first embodiment shown in Fig. 1, and the diagram showing the device configuration is the same as that of Fig. 1.
[0101] The power infrastructure design device 100A of the second embodiment is characterized in that it changes the constraint conditions used to formulate a normal operation plan in step S6, where the normal running cost is calculated in the normal running cost calculation unit 12, and the constraint conditions used to formulate a disaster operation plan in step S7, where the disaster resilience evaluation unit 13 evaluates disaster resilience.
[0102] That is, in the power infrastructure design device 100A, a constraint condition that considers LFC capacity and reserve power in normal operation as expressed in the following formula (16) is added as a constraint condition used in creating a normal operation plan in the normal running cost calculation unit 12. Here, the output suppression possible amount secured at each time is E_down[t], and the output increase possible amount secured at each time is E_up[t], both of which are constants. These constants are input from the input unit 2, stored in the calculation condition database 3, and extracted from the calculation condition database 3 when performing calculations in steps S5 and S6.
[0103]
number
[0104] By adding equation (16) as a constraint, it becomes possible to determine X[i, t], i.e., fuel consumption and power generation, etc., so that E_down[t] is secured as a margin for lowering output and E_up[t] is secured as a margin for increasing output at time t, so that the supply amount can be changed according to fluctuations in power demand and renewable energy. By considering E_down[t] and E_up[t], it becomes possible to express the LFC capacity and reserve power.
[0105] In this case, the optimum facility configuration pattern determination unit 14 can determine the optimum facility configuration pattern while taking into consideration the securing of LFC capacity and reserve power.
[0106] Furthermore, in the power infrastructure design device 100A, a constraint condition is added to consider LFC capacity and reserve power in operation during a disaster as expressed in the following formula (17) as a constraint condition used in the disaster resilience evaluation unit 13's disaster operation plan. However, the amount of output suppression that can be secured at each time is E_down[t'], and the amount of output increase that can be secured at each time is E_up[t'], both of which are constants. These constants are input by the input unit 2, stored in the calculation condition database 3, and extracted from the calculation condition database 3 when performing calculations in steps S5 and S6.
[0107]
number
[0108] By adding equation (17) as a constraint, it becomes possible to determine X[i, t'], i.e., fuel consumption and power generation, etc., so as to secure E_down[t'] as a margin for lowering output and E_up[t'] as a margin for increasing output at time t', so that the supply amount can be changed according to fluctuations in power demand and renewable energy. These E_down[t'] and E_up[t'] make it possible to express the LFC capacity and reserve power.
[0109] In this case, the optimum facility configuration pattern determination unit 14 can determine the optimum facility configuration pattern while taking into consideration the securing of LFC capacity and reserve power.
[0110] As described above, in the power infrastructure design device 100A of the second embodiment, by performing calculations taking into account the LFC capacity and reserve power, it becomes possible to realize more precise operation when determining an equipment configuration pattern that minimizes the sum of the initial cost and normal running cost while satisfying the desired resilience.
[0111] <Embodiment 3> In the power infrastructure design device 100 of the first embodiment and the power infrastructure design device 100A of the second embodiment described above, it has been shown that the optimal equipment configuration pattern determination unit 14 determines an equipment configuration pattern, but no consideration has been given to the impact that the power operation according to that equipment configuration pattern has on the power system.
[0112] In the power infrastructure design device 100B of the third embodiment, it is possible to check whether there is a problem with the operation of power in the determined optimal facility configuration pattern by simulating a power system. The device configuration of the power infrastructure design device 100B of the third embodiment is the same as that of the power infrastructure design device 100 of the first embodiment shown in Fig. 1, and the diagram showing the device configuration is the same as that of Fig. 1.
[0113] Fig. 4 is a flowchart showing a processing flow in the power infrastructure design device 100B. Steps S1 to S9 of the flowchart shown in Fig. 4 are the same as those of the power infrastructure design device 100 of the first embodiment shown in Fig. 2, but differ in that step S11 of executing a simulation simulating a power system is included immediately after step S9.
[0114] In step S11, power supply equipment included in the optimal equipment configuration pattern determined by the optimal equipment configuration pattern determination unit 14 is installed in a power system, and a simulation is performed to calculate the current and voltage in power system equipment such as transformers and distribution lines when the power supply equipment is operated while taking into account the power demand and the power generation amount of renewable energy sources stored in the normal operation database 7 or the disaster database 8, simulating the target power system.
[0115] Then, it is determined whether the current and voltage calculated by the simulation are within the allowable range (step S12), and if they are within the allowable range (Yes), the process proceeds to step S10. On the other hand, if they are not within the allowable range (No), the calculation conditions are changed so that they are within the allowable range, and the processes from step S1 onwards are repeated again, and similar processes are repeated until they are within the allowable range.
[0116] The simulation can be performed by using a known simulation technique such as that disclosed in “Kano, Kitayama, and Takano: Simulation Technology Supporting Smart Grids, Mitsubishi Electric Technical Review, Vol. 86, No. 2, 2012” and can be executed by the optimal equipment configuration pattern determination unit 14.
[0117] As described above, in the power infrastructure design device 100B of the third embodiment, after determining an optimal equipment configuration pattern, a simulation simulating a power system is executed, so that it is possible to determine an equipment configuration pattern after confirming that the current and voltage fall within the allowable range when operation is performed with a power supply configuration included in the determined optimal equipment configuration pattern.
[0118] <Fourth embodiment> In the power infrastructure design device 100 of the first embodiment, the power infrastructure design device 100A of the second embodiment, and the power infrastructure design device 100B of the third embodiment described above, a plurality of equipment configuration patterns are set, and the initial cost and normal running cost are calculated for each equipment configuration pattern, and disaster resilience is evaluated, and then an equipment configuration pattern that satisfies the desired resilience and minimizes the sum of the initial cost and normal running cost is determined.
[0119] The power infrastructure design device 200 of the fourth embodiment is characterized in that it determines an optimal equipment configuration pattern by solving an optimization problem that simultaneously minimizes either the total of the initial cost and normal running cost and / or disaster resilience.
[0120] That is, in the power infrastructure design device 100 of the first embodiment, the equipment capacity itself is not a variable, but a constant incorporated in the equipment configuration pattern is used. Since one optimization calculation is performed for one equipment configuration pattern, the optimization calculation is performed as many times as the number of combinations of equipment configuration patterns, and the equipment configuration pattern with the best objective function (minimum or maximum) is determined as the final equipment configuration pattern from the results of multiple optimization calculations.
[0121] On the other hand, in the power infrastructure design apparatus 200 of the fourth embodiment, the optimization calculation is performed using the facility capacity itself as a variable (decision variable), so that the optimization calculation is sufficient only once.
[0122] <Device configuration> Fig. 5 is a functional block diagram showing a configuration of a power infrastructure design device 200 according to a fourth embodiment of the present disclosure. In Fig. 5, the same components as those in the power infrastructure design device 100 described using Fig. 1 are denoted by the same reference numerals, and duplicated descriptions will be omitted.
[0123] As shown in FIG. 5, the power infrastructure design device 200 includes a control unit 1, an input unit 2, a calculation condition database 3, an equipment information setting unit 4, an equipment database 5, a load information / environmental information setting unit 6, a normal state database 7, a disaster state database 8, a calculation result database 10, an output unit 15, and an optimization calculation unit 16.
[0124] Based on the information stored in the calculation condition database 3, the equipment database 5, the normal operation database 7, and the disaster operation database 8, the optimization calculation unit 16 determines an equipment configuration pattern, i.e., a combination of equipment capacities of the equipment to be added, that satisfies the desired resilience and minimizes the total of the initial cost and normal operation running cost, and stores this in the calculation result database 10.
[0125] <Processing flow> Fig. 6 is a flowchart showing a processing flow in the power infrastructure design device 200 according to the fourth embodiment of the present disclosure. As shown in Fig. 6, when the power infrastructure design process is started, the operator inputs, in the input unit 2, the number of days or hours for which power is desired to be supplied after a disaster occurs, as the desired resilience against a power outage during a disaster (step S1). The input information is stored in the calculation condition database 3.
[0126] In addition, the operator sets the system configuration of the power supply equipment in the equipment information setting unit 4, i.e., equipment information on power supply equipment and load equipment, including equipment capacities such as existing distribution lines, utility poles, transformers, switches, power generation capacity and storage capacity, and their connection information (step S2).
[0127] In step S2, the operator also sets, as equipment information, the unit equipment cost of the equipment to be expanded, i.e., the price per unit amount of the equipment to be expanded (for example, 100,000 yen / kW for a power source), and the maintenance costs of the existing equipment and the equipment to be expanded, i.e., the cost per unit amount and unit time of the existing and expanded equipment, for example, 10,000 yen / kW-year.
[0128] In the load information / environmental information setting unit 6, the operator sets the power demand for the future, for example, 20 years from the present, or for a total of four years, such as one year 5 years from now, one year 10 years from now, one year 15 years from now, and one year 20 years from now, by thinning out the years in between, as well as the power generation amount of renewable energy sources, the power purchase amount, the power purchase price, the fuel purchase price, etc., as time-series data, for example, every 30 minutes, and sets this as the load information / environmental information (step S3).
[0129] In the power infrastructure design device 200 of the fourth embodiment, the processes of steps S4 to S9 of the power infrastructure design device 100 of the first embodiment described with reference to FIG. 2 are replaced with the execution of an optimization calculation in step S20.
[0130] In the optimization calculation unit 16 that executes step S20, the optimization problem is formulated as shown in the following formula (18) to formula (30). The formulation is basically a combination of the formulations shown in steps S6 and S7, and formula (3) used in step S6 is expressed below as formula (18) as an objective function aimed at minimizing.
[0131]
number
[0132] In step S7, the time when the power supply cannot be satisfied for the first time after the occurrence of a disaster is expressed by the objective function of formula (8), but it is converted into a constraint condition such that the time when the power supply cannot be satisfied for the first time after the occurrence of a disaster is after the time set as the desired resilience, as shown in the following formula (19). However, the time set as the desired resilience stored in the calculation condition database 3, that is, the allowable time among the times when the power supply cannot be satisfied for the first time after the occurrence of a disaster, is set as Resilience. In addition, F_tank is a continuous variable, X_max[i] is a continuous variable representing the upper limit of the operation value of equipment i, that is, the equipment capacity of equipment i, and X_min[i] representing the lower limit of the operation value of equipment i changes according to the fluctuation of X_max[i]. These variables are extracted from the calculation condition database 3 when performing the calculation in step S11.
[0133]
number
[0134] In addition, the constraint condition may be a constraint condition for expressing the time when the power supply cannot be satisfied after the occurrence of a disaster in the optimization problem, as expressed in the following formula (20). Note that formula (20) is the same as formula (9).
[0135]
number
[0136] More specifically, the power infrastructure design device 100 of the first embodiment performs optimization calculations so as to delay as long as possible the time when the power supply cannot be met. That is, the operation is optimized so as to extend the period during which power can be supplied after a disaster occurs, using equipment of the set equipment configuration pattern. In other words, the maximum number of days or hours that power can be supplied after a disaster occurs is calculated using the set equipment configuration pattern.
[0137] On the other hand, in the power infrastructure design device 200 of the fourth embodiment, a power infrastructure business operator (operator) sets in advance how many days or hours he or she wants to continue supplying power after a disaster occurs, and determines the facility capacity to meet that period and minimize the cost. In other words, it calculates the minimum cost of continuing to supply power for the desired period after a disaster occurs.
[0138] The constraint conditions include a slack variable that avoids a constraint violation when the power supply cannot meet the power demand, as shown in the following formula (21), which is a constraint on the amount of load shedding to avoid a power supply shortage. Note that formula (21) is the same as formula (10).
[0139]
number
[0140] In addition, the constraint condition may be expressed by the following formula (22), which satisfies the power demand at each time by the total amount of power generated by renewable energy sources, the amount of power purchased, and the amount of power generated by power generation facilities included in the facility configuration pattern. Note that formula (22) is the same as formula (4).
[0141]
number
[0142] In addition, the constraint conditions include the constraint conditions expressed by the following formula (23) that satisfy the power demand at each time with the total amount of power generated by renewable energy sources, the amount of power purchased, and the amount of power generated by the power generation facilities included in the facility configuration pattern. This includes slack variables in the case where the constraint conditions cannot be satisfied. Note that formula (23) is the same as formula (11).
[0143]
number
[0144] In addition, the constraint conditions include a constraint condition that expresses the power generation amount of each facility as a function of the fuel consumption amount, as expressed by the following formula (24). Note that formula (24) is the same as formula (5).
[0145]
number
[0146] The constraints include a constraint that expresses the power generation amount of each facility as a function of the fuel consumption amount, as expressed by the following formula (25). Note that formula (25) is the same as formula (12).
[0147]
number
[0148] Furthermore, the constraint condition may be a constraint condition that prevents the amount of electricity purchased from exceeding a predetermined upper limit, as expressed by the following formula (26). Note that formula (26) is the same as formula (6).
[0149]
number
[0150] Furthermore, the constraint condition may be a constraint condition that prevents the amount of electricity purchased from exceeding a predetermined upper limit, as expressed by the following formula (27). Note that formula (27) is the same as formula (13).
[0151]
number
[0152] In addition, the constraint condition is such that the total fuel consumption of each facility does not exceed the amount of fuel stored in the fuel storage facility, as expressed in the following formula (28). Note that formula (28) is the same as formula (14).
[0153]
number
[0154] In addition, the constraint condition may be a constraint condition that the amount of power generated by the power generation facility falls within a predetermined operation range, as expressed by the following formula (29). Note that formula (29) is the same as formula (7).
[0155]
number
[0156] In addition, the constraint condition may be a constraint condition that the amount of power generated by the power generation facility falls within a predetermined operation range, as expressed by the following formula (30). Note that formula (30) is the same as formula (15).
[0157]
number
[0158] <Modification> In the power infrastructure design device 200 of the above-mentioned embodiment 4, an optimal equipment configuration pattern is determined by solving an optimization problem that minimizes the sum of the initial cost and the normal running cost so as to satisfy the desired resilience, but the formulation may be changed so as to maximize the resilience, that is, the time when the power supply cannot be met for the first time after the occurrence of a disaster, so as to satisfy the desired cost, that is, so that the sum of the initial cost and the normal running cost is equal to or less than a predetermined value.
[0159] Specifically, formula (18) is changed to formula (31) shown below, and formula (19) is changed to formula (32) shown below. Note that the desired cost is a constant, TargetCost, which is input in advance from the input unit 2 and stored in the calculation condition database 3.
[0160]
number
[0161]
number
[0162] The equipment configuration patterns obtained as a result of the optimization calculations in the above-mentioned fourth embodiment and its modified examples, which are represented by combinations of the initial cost, normal running cost, normal operation plan, disaster resilience, disaster operation plan, and equipment capacities such as X_max[i] and F_tank, are stored in the calculation result database 10.
[0163] As described above, in the power infrastructure design device 200 of embodiment 4, the optimization calculation unit 16 performs optimization calculations using equipment capacity as a variable, making it possible to determine an equipment configuration pattern that minimizes the sum of the initial cost and normal running cost while satisfying the desired resilience.
[0164] <Hardware configuration> Each of the components of the power infrastructure design devices 100, 100A, 100B, and 200 of the above-described first to fourth embodiments can be configured using a computer, and is realized by the computer executing a program. That is, the power infrastructure design devices 100 to 200 are realized, for example, by a processing circuit 50 shown in Fig. 7. A processor such as a CPU (Central Processing Unit) or a DSP (Digital Signal Processor) is applied to the processing circuit 50, and the function of each part is realized by executing a program stored in a storage device.
[0165] Dedicated hardware may be applied to the processing circuit 50. When the processing circuit 50 is dedicated hardware, the processing circuit 50 corresponds to, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination of these.
[0166] In the power infrastructure design devices 100 to 200, the functions of the components may be realized by individual processing circuits, or the functions may be realized collectively by one processing circuit.
[0167] 8 shows a hardware configuration in the case where the processing circuit 50 is configured using a processor. In this case, the functions of each part of the power infrastructure design devices 100-200 are realized by a combination of software, etc. (software, firmware, or software and firmware). The software, etc. are written as a program and stored in the memory 52. The processor 51 functioning as the processing circuit 50 realizes the functions of each part by reading and executing the program stored in the memory 52 (storage device). In other words, it can be said that this program causes a computer to execute the procedure and method of operation of the components of the power infrastructure design devices 100-200.
[0168] Here, the memory 52 may be, for example, a non-volatile or volatile semiconductor memory such as RAM, ROM, flash memory, EPROM (Erasable Programmable Read Only Memory), EEPROM (Electrically Erasable Programmable Read Only Memory), HDD (Hard Disk Drive), magnetic disk, flexible disk, optical disk, compact disk, mini disk, DVD (Digital Versatile Disc) and its drive device, or any storage medium to be used in the future.
[0169] The above describes a configuration in which the functions of each component of the power infrastructure design devices 100-200 are realized by either hardware or software, etc. However, the present invention is not limited to this, and some of the components of the power infrastructure design devices 100-200 may be realized by dedicated hardware, and other components may be realized by software, etc. For example, it is possible to realize the functions of some of the components by a processing circuit 50 as dedicated hardware, and realize the functions of other components by having the processing circuit 50 as a processor 51 read and execute a program stored in a memory 52.
[0170] As described above, the power infrastructure design devices 100 to 200 can realize the above-mentioned functions by hardware, software, or a combination of these.
[0171] In addition, within the scope of the present disclosure, it is possible to freely combine the respective embodiments, and to appropriately modify or omit the respective embodiments. [Explanation of symbols]
[0172] 2 Input section, 3 Calculation condition database, 4 Equipment information setting section, 5 Equipment database, 6 Load information / environmental information setting section, 7 Normal operation database, 8 Disaster operation database, 9 Equipment configuration pattern creation section, 10 Calculation result database, 11 Initial cost calculation section, 12 Normal operation running cost calculation section, 13 Disaster resilience evaluation section, 14 Optimal equipment configuration pattern determination section, 15 Output section, 16 Optimization calculation section.
Claims
1. A facility information setting unit that sets facility information including at least information on existing facilities constituting the power infrastructure and information on facilities to be added; a load information / environment information setting unit that sets load information related to future power demand and environmental information related to a future power supply environment in normal times and in disaster times; an equipment configuration pattern creation unit that creates a plurality of combinations of equipment capacities of the equipment to be expanded based on the equipment information, the load information under normal conditions, and the environmental information under normal conditions, and creates a plurality of equipment configuration patterns; an initial cost calculation unit that calculates an initial cost for the plurality of facility configuration patterns; a normal running cost calculation unit that calculates a normal running cost for the plurality of equipment configuration patterns, the load information, and the environmental information; a disaster resilience evaluation unit that evaluates disaster resilience for the plurality of facility configuration patterns, the load information, and the environmental information; and an optimal equipment configuration pattern determination unit that determines, from the plurality of equipment configuration patterns, an optimal equipment configuration pattern that satisfies resilience and minimizes the sum of the initial cost and the running cost under normal circumstances, based on the sum of the initial cost and the running cost under normal circumstances and an evaluation result of the resilience in the event of a disaster.
2. The normal running cost calculation unit is Calculating the normal running cost by using an optimization method to find a solution that minimizes a predetermined objective function under a plurality of given constraints; The plurality of constraints include: The power infrastructure design device according to claim 1 , further comprising a constraint condition such that a preset greenhouse gas emission amount is not exceeded.
3. The environmental information is Includes electricity generated by renewable energy sources and purchased electricity. The optimal equipment configuration pattern determination unit is The power infrastructure design device according to claim 1, wherein the optimal facility configuration pattern is determined so that the amount of power generated by the renewable energy power source and the amount of power purchased from the renewable energy power source are equal to or greater than a predetermined ratio to the power demand.
4. The facility information is Contains information on fuel storage facilities, The equipment configuration pattern creation unit is creating an equipment configuration pattern including the fuel storage equipment among the plurality of equipment configuration patterns; The optimal equipment configuration pattern determination unit is The power infrastructure design device according to claim 1 , further comprising: determining an equipment configuration pattern including the fuel storage facility as the optimal equipment configuration pattern.
5. The normal running cost calculation unit is Calculating the normal running cost by using an optimization method to find a solution that minimizes a predetermined objective function under a plurality of given constraints; The plurality of constraints include: The power infrastructure design device of claim 1 , further comprising a constraint on load frequency control capacity or reserve power.
6. The disaster resilience evaluation unit Using an optimization method, a solution that maximizes an objective function under a number of given constraints is obtained to evaluate the resilience during the disaster. The plurality of constraints include: The power infrastructure design device of claim 1 , further comprising a constraint on load frequency control capacity or reserve power.
7. The optimal equipment configuration pattern determination unit is The power infrastructure design device according to claim 1 , further comprising: a power system simulation executed to confirm power operation in the determined optimal facility configuration pattern.
8. 2. The power infrastructure design device according to claim 1, further comprising an optimization calculation unit that combines the processing of the equipment configuration pattern creation unit, the initial cost calculation unit, the normal running cost calculation unit, the disaster resilience evaluation unit, and the optimal equipment configuration pattern determination unit to formulate values related to the equipment capacity as decision variables, and simultaneously optimizes either or both of the sum of the initial cost and the normal running cost and the disaster resilience using an optimization method to determine the optimal equipment configuration pattern.
9. In the processing circuit, equipment information including at least information on existing equipment constituting the power infrastructure and information on equipment to be added; and A power infrastructure design method for designing the power infrastructure based on load information related to future power demand during normal times and during disasters and environmental information related to a future power supply environment, comprising: an equipment configuration pattern creation process for creating a plurality of combinations of equipment capacities of the equipment to be expanded based on the equipment information, the load information under normal conditions, and the environmental information under normal conditions, and forming the combinations into a plurality of equipment configuration patterns; an initial cost calculation process for calculating an initial cost for the plurality of equipment configuration patterns; a normal running cost calculation process for calculating a normal running cost for the plurality of equipment configuration patterns, the load information, and the environmental information; a disaster resilience evaluation process for evaluating resilience in the event of a disaster for the plurality of facility configuration patterns, the load information, and the environmental information; and an optimal equipment configuration pattern determination process for determining, from the plurality of equipment configuration patterns, an optimal equipment configuration pattern that satisfies resilience and minimizes the sum of the initial cost and the running cost under normal circumstances, based on the sum of the initial cost and the running cost under normal circumstances and on an evaluation result of the resilience in the event of a disaster.
Citation Information
Patent Citations
Plant optimal design method
JP2006048475A
Apparatus and method for supplying supply facilities of micro grid or smart grid
JP2016213933A
Energy system optimization program, energy system optimization method, and energy system optimization device
WO2020004454A1