Drilling equipment and drilling method

The drilling device with plate-like and elastic linear members effectively captures obstacles into the casing by guiding them through gaps between the members, addressing the inefficiencies of previous designs and improving excavation efficiency.

JP7581134B2Active Publication Date: 2024-11-12KAJIMA CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2021103172
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-22
Publication Date
2024-11-12
Estimated Expiration
2041-06-22

AI Technical Summary

Technical Problem

Existing drilling devices struggle to effectively capture obstacles such as gravel into the casing during excavation, as they require the obstacles to rise above elastic linear members before being retained, leading to inefficiencies in capturing these obstacles.

Method used

The drilling device incorporates a cylindrical casing with plate-like members and elastic linear members arranged between them, allowing obstacles to be captured at a lower height by guiding them into the casing through gaps between the plate-like members.

Benefits of technology

This configuration enables efficient capture of obstacles like gravel into the casing, even when they are difficult to rise, enhancing the excavation process by reducing the required height for capture and improving the overall efficiency of the drilling operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007581134000001
    Figure 0007581134000001
  • Figure 0007581134000002
    Figure 0007581134000002
  • Figure 0007581134000003
    Figure 0007581134000003
Patent Text Reader

Abstract

To provide a drilling rig and a drilling method capable of drilling the ground while effectively taking obstacles such as gravel that may exist in the ground into a casing.SOLUTION: A drilling head 30 of a drilling rig 100 includes a rod 20, a casing 31, a plurality of plate members 32 fixing the casing 31 to the rod 20, a plurality of main drilling bits 33, and a plurality of linear members 36. Each plate member 32 has a predetermined plate width in a vertical direction and extends from a lower end side outer peripheral surface 20a to an inner peripheral surface 31a of the casing 31. A bit tip of each main drilling bit 33 is located below the lower end of the casing 31. A plurality of linear members 36 are provided at intervals in a region S between the plate members 32 adjacent to each other. In a drilling method for drilling the ground using the drilling rig 100, obstacles in the ground are recovered inside the casing 31 by embedding the obstacles in the ground between the plurality of linear members 36 during drilling of the ground.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a drilling device that vertically excavates ground to form a borehole, and a method for excavating ground using the drilling device. [Background technology]

[0002] This type of drilling device includes a rod and a drilling head attached to the lower part of the rod, and by rotating the rod about its central axis and lowering it, the ground is excavated in the vertical direction to form a borehole.

[0003] As an example of the drilling head, the drilling head described in Patent Document 1 is known. The drilling head described in Patent Document 1 is used in a top drive reverse construction method (TBH construction method) in which a stabilizing liquid for stabilizing the hole wall and excavated soil are discharged to the ground through a reverse pipe by reverse circulation flow, and is a gravel-compatible drilling head that can continue drilling even if some gravel is present in the ground to be excavated. This drilling head includes a casing pipe having a connecting pipe at the top that is connected to the tip of the reverse pipe, three drilling blades that are fixed to the tip (lower end) of the casing pipe and each have a plurality of bits, and a plurality of elastic linear members provided in the casing pipe. The base end of each elastic linear member is supported on the inner wall side of the casing pipe. Each elastic linear member protrudes toward the radial inside of the casing pipe and is arranged so that gravel can be held in the casing pipe when gravel is encountered during drilling. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2000-274175 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, in the drilling head described in Patent Document 1, multiple elastic linear members are located above the three drilling wings. Therefore, in order for obstacles such as gravel that are thrown out of the ground due to the collision of the bit to move to the area above the multiple elastic linear members and be held in the casing pipe, the obstacles must pass through the area between the adjacent drilling wings, and then pass through the gaps between the elastic linear members to move (rise) to a height position that exceeds each elastic linear member above the drilling wings. In other words, in order for the obstacles to be held and taken in the casing pipe, the obstacles must rise to a height position that exceeds the elastic linear members above the upper end of the drilling wings. Therefore, there are cases where the obstacles do not rise sufficiently and are not taken in the casing pipe, and some ingenuity is required.

[0006] In view of the above circumstances, the present invention has an object to provide an excavation device and an excavation method capable of excavating the ground while effectively incorporating obstacles such as gravel that may be present in the ground into a casing. [Means for solving the problem]

[0007] In response to the above problem, according to one aspect of the present invention, a drilling device is provided that includes a rod and a drilling head attached to a lower portion of the rod, and that drills the ground in a vertical direction to form a drilled hole by lowering the rod while rotating it around the central axis of the rod. The drilling head of the drilling device includes a cylindrical casing, a plurality of plate-shaped members that fix the casing to the rod, a plurality of drilling bits that are provided at the lower ends of the plurality of plate-shaped members, and a plurality of elastic linear members. The casing is provided so as to surround a lower end side outer peripheral surface that is a portion of the outer peripheral surface of the rod that extends over a predetermined length on the lower end side. Each of the plurality of plate-shaped members has a predetermined plate width in the vertical direction and extends from a lower end portion of the lower end side outer peripheral surface to a lower end portion of the inner peripheral surface of the casing. The plurality of drilling bits each have a bit tip located below the lower end of the casing. The plurality of linear members are provided at intervals from each other in a region between the plate-shaped members that are adjacent to each other in the circumferential direction of the rod among the plurality of plate-shaped members.

[0008] According to another aspect of the present invention, there is provided a method for excavating ground using the excavation device according to the one aspect, in which an obstacle in the ground is embedded between the plurality of linear members while excavating the ground, and the obstacle is retrieved inside the casing. Effect of the Invention

[0009] According to the excavation device according to the one aspect, each of the plurality of plate-like members that fix the cylindrical casing to the rod so as to surround the outer peripheral surface of the lower end of the rod has a predetermined plate width in the vertical direction and extends from the lower end part of the outer peripheral surface of the lower end to the lower end part of the inner peripheral surface of the casing, and the bit tips of the plurality of drilling bits provided at the lower ends of the plurality of plate-like members are located below the lower end of the casing. As a result, the excavated soil generated by the drilling with the plurality of drilling bits at the lower ends of each plate-like member is guided to a region above the plurality of plate-like members in the casing through the region between the plate-like members that are adjacent to each other in the circumferential direction of the rod. The plurality of elastic linear members are provided at intervals from each other in the region between the adjacent plate-like members. Therefore, in order for obstacles such as gravel projected from the ground by the impact of the drilling bit to move to the area above the linear members and be retained in the casing, the obstacles only need to pass through the gaps between the linear members in the area between the adjacent plate-like members and move (rise) to a height position above the linear members. In other words, the obstacles are configured to rise to a lower height than before in order to be taken into the casing. Therefore, even if the obstacles are difficult to rise, they can be easily taken into the casing.

[0010] According to the excavation method of the other aspect, there is provided a method for excavating ground using the excavation device of the one aspect, and an obstacle in the ground is buried between a plurality of linear members during excavation of the ground, thereby recovering the obstacle inside the casing. This makes it possible to easily take the obstacle into the casing even when it is difficult for the obstacle to rise.

[0011] In this way, it is possible to provide an excavation device and an excavation method that can excavate the ground while effectively incorporating obstacles such as gravel that may be present in the ground into the casing. [Brief description of the drawings]

[0012] [Figure 1] 1 is a diagram showing the general configuration of a drilling device according to one embodiment of the present invention, and is also a cross-sectional view of the ground including an area in which a borehole is to be formed. [Diagram 2] FIG. 2 is a diagram for explaining the use of a borehole formed by the drilling device. [Diagram 3] 3 is a cross-sectional view taken along line AA in FIG. 2. [Figure 4] 3 is a schematic cross-sectional view for explaining an internal structure of a drilling head of the drilling device. FIG. [Diagram 5] FIG. [Figure 6] FIG. 2 is a conceptual diagram for explaining a pile construction method including a drilling method using the drilling device. [Figure 7] FIG. 4 is another conceptual diagram for explaining the pile construction method. [Figure 8] FIG. 1 is a conceptual diagram to explain the slime layer at the bottom of a borehole. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, an embodiment of a drilling device and a drilling method for drilling the ground using the same according to the present invention will be described with reference to the accompanying drawings. Fig. 1 is a diagram showing a schematic configuration of a drilling device 100 according to an embodiment of the present invention, and is also a cross-sectional view of the ground including a planned area for drilling a borehole. Fig. 2 is a diagram for explaining the use of the borehole formed by the drilling device 100, and Fig. 3 is a cross-sectional view taken along line AA shown in Fig. 2.

[0014] The drilling device 100 is a boring machine that drills the ground in the up-down direction (specifically, in the vertical direction) to form a borehole H that extends in the ground in the vertical direction.

[0015] As shown in FIG. 1, in this embodiment, the drilling device 100 is installed in a pilot tunnel D that is provided directly below an existing structure T (e.g., a tunnel structure buried in the ground for railway vehicle passage) and crosses the existing structure T. The following describes an example in which a drilling hole H is formed by drilling vertically into the ground from the floor of this pilot tunnel D.

[0016] In this embodiment, the borehole H formed by the drilling device 100 is used as a hole for constructing a temporary pile P1 (see Figs. 2 and 3) that supports an existing structure T from below. The drilling method for excavating the ground using the drilling device 100 according to this embodiment is applied to an excavation step in a pile construction method for constructing the temporary pile P1.

[0017] The existing structure T extends, for example, in a generally horizontal direction underground. The temporary pile P1 is used, for example, as a temporary support pile that supports the existing structure T from below when constructing an underground space directly below a section of the existing structure T. The pilot holes D are provided successively so as to be adjacent to each other in the extension direction of the existing structure T, and the temporary piles P1 are constructed at multiple locations (two locations in the figure) spaced apart in the extension direction of each pilot hole D. Therefore, a borehole H is formed at each planned construction location of the temporary pile P1. In other words, in this embodiment, the existing structure T exists above the borehole H and the construction location of the piles.

[0018] In this embodiment, the ground including the area where the borehole is to be formed includes an upper layer G1 located on the ground surface side, a middle layer G2 located below the upper layer G1, and a support layer G3 located below the middle layer G2. The upper layer G1 includes sandy soil and clayey soil, the middle layer G2 is a layer containing a large amount of gravel and boulders, and the support layer G3 has an appropriate strength. In this embodiment, the borehole H is formed so that its bottom reaches the support layer G3.

[0019] First, the configuration of the drilling device 100 will be described below with reference to Figures 1, 4, and 5. Figure 4 is a schematic cross-sectional view for explaining the internal structure of a drilling head 30 (described later) of the drilling device 100, and Figure 5 is a bottom view of the drilling head 30. Note that Figure 4 is a schematic cross-sectional view taken along line B-B' shown in Figure 5.

[0020] As shown in FIG. 1, the drilling device 100 is a so-called single-axis drilling machine configured to drill the ground in an up-down direction (here, vertical direction) to form a drilling hole H by lowering a rod 20 while rotating it around a central axis X of the rod 20, and includes an apparatus main body 10, a rod 20, and a drilling head 30 attached to the lower part of the rod 20.

[0021] In this embodiment, the drilling equipment 100 further includes a circulation unit 40 that supplies a stabilizing liquid into the borehole H, discharges the excavated soil and sand produced by the excavation of the ground together with the stabilizing liquid out of the borehole H, and supplies the discharged stabilizing liquid back into the borehole H for circulation. The stabilizing liquid is supplied into the borehole H during drilling to stabilize the borehole wall (prevent the collapse of the borehole wall), and its specific gravity and viscosity are appropriately adjusted. Generally, there are two types of stabilizing liquid circulation methods: a forward circulation type and a reverse circulation type, and in this embodiment, a forward circulation type is adopted.

[0022] Specifically, the drilling device 100 is configured to form a borehole H by a rotary boring method (BH method) in which the ground is excavated while the stabilizing liquid is circulated in a positive direction. In this positive circulation type BH method, an upward flow is generated in the space between the rod 20 and the borehole H by discharging the stabilizing liquid from the lower end of the rod 20, and this upward flow causes muddy water consisting of the excavated earth and the stabilizing liquid to rise toward the hole mouth and be discharged outside the borehole H. In the BH method, the muddy water discharged outside the borehole H is separated into the excavated earth and the stabilizing liquid, and the separated stabilizing liquid is supplied again to the rod 20 and discharged from the lower end of the rod 20, thereby circulating the stabilizing liquid between the inside and outside of the borehole H.

[0023] The device body 10 has a rod driver 11 that rotates the rod 20 about its central axis X and holds it so that the rod can be raised and lowered along the central axis X. The device body 10 is installed in a pilot tunnel D provided directly below an existing structure T here.

[0024] The rod 20 is held by the rod driver 11 in a position extending vertically. The rod 20 also functions as a supply pipe for supplying the stabilizing fluid of the BH method to the borehole H, and is formed in a cylindrical shape.

[0025] The rod 20 consists of a cylindrical tip rod tube 21, a central drilling bit 22 attached to the tip (lower end) of this tip rod tube 21, and an appropriate number of cylindrical extension rod tubes 23 which are successively connected to the base end side (upper end side) of the tip rod tube 21.

[0026] The upper end portion of the rod 20 protrudes from the ground (here, the floor of the pilot hole D) and is held by the rod driver 11. The tip rod pipe 21 and the extension rod pipe 23, and each of the extension rod pipes 23, 23, are connected via appropriate joints. A swivel 24 is connected to the upper end opening of the extension rod pipe 23 that is to be added last.

[0027] A center plate 25 (see Figures 4 and 5) is attached to a predetermined circumferential position at the lower end of the tip rod tube 21. The center plate 25 extends in the rod radial direction so as to penetrate the tube wall of the tip rod tube 21. The lower end of the center plate 25 protrudes downward from the lower end surface of the tip rod tube 21, and multiple center drilling bits 22 (three in the figure) are attached to the lower end of this center plate 25. The cutting edges of the center drilling bits 22 are directed in the rotation direction R of the casing 31 (rod 20), and each center drilling bit 22 is used to excavate a ground portion corresponding to the radial center of the borehole H.

[0028] The drilling head 30 includes a cylindrical casing 31, a plurality of plate-like members 32 that fix the casing 31 to the rod 20, and a plurality of main drilling bits 33. In this embodiment, the plurality of main drilling bits 33 correspond to the "plurality of drilling bits" according to the present invention.

[0029] The casing 31 is provided so as to surround the lower end side outer peripheral surface 20a, which is a portion of the outer peripheral surface of the rod 20 (tip rod tube 21) that extends over a predetermined length on the lower end side. The position of the lower end surface of the casing 31 in the extension direction of the rod 20 is aligned with the position corresponding to the lower end surface of the rod 20. That is, the vertical position of the lower end surface of the casing 31 coincides with the vertical position of the lower end surface of the rod 20 in a side view (see FIG. 4), and the casing 31 and the rod 20 are arranged so that the vertical positions of their respective lower end surfaces are aligned with each other. A plurality of outer excavation bits 34 (six in the figure) are provided on the lower end surface of the casing 31. The plurality of outer excavation bits 34 are spaced apart from each other in the circumferential direction of the casing 31, and each cutting edge is directed in the rotation direction R of the casing 31 (rod 20). The casing 31 is made of a steel pipe material having an appropriate thickness (for example, about several mm to 30 mm). The outer diameter of the casing 31 is appropriately set according to the diameter of the drilled hole H to be formed. The upper end opening of the casing 31 is closed by a disk-shaped cover 35 having a hole through which the rod 20 (tip rod tube 21) passes. The upper end side portion of the casing 31 is fixed to the rod 20 via the cover 35.

[0030] Each of the plate-like members 32 has a predetermined width in the up-down direction (vertical direction) and extends from a lower end portion of the lower end side outer peripheral surface 20a to a lower end portion of the inner peripheral surface 31a of the casing 31.

[0031] Specifically, the plurality of (here, three) plate-like members 32 are arranged radially around the distal end rod tube 21 in the region between the distal end rod tube 21 and the casing 31. That is, each plate-like member 32 extends from the lower end side outer peripheral surface 20a toward the inner peripheral surface 31a of the casing 31, and has one end connected to the outer peripheral surface (lower end side outer peripheral surface 20a) of the rod 20 and the other end connected to the inner peripheral surface 31a of the casing 31. The plurality of plate-like members 32 are provided at equal intervals in the circumferential direction of the rod. Each plate-like member 32 is formed in a substantially rectangular shape and has a predetermined plate thickness. One of the two long sides of each rectangle of the plate-like member 32 faces substantially downward, and one short side of the rectangle of each plate-like member 32 is connected to the outer peripheral surface of the rod 20, and the other short side of the rectangle is connected to the inner peripheral surface 31a of the casing 31. Each plate-like member 32 is connected to the rod 20 with its short side inclined at a predetermined angle (for example, about 20 to 30 degrees) with respect to the central axis X.

[0032] A plurality of main drilling bits 33 are provided at the lower ends of the plurality of plate-shaped members 32 , respectively, and the tips of the respective bits are positioned below the lower end of the casing 31 .

[0033] Specifically, a plurality of (here, three) main drilling bits 33 are provided on the lower long side portion (i.e., the lower end surface) of each plate-shaped member 32. The main drilling bits 33 are spaced apart from each other on the lower end surface, and each cutting edge is directed in the rotation direction R of the casing 31 (rod 20).

[0034] Returning to FIG. 1, the circulation unit 40 has a stabilizer tank 41, a stabilizer supply pump 42, and a muddy water suction pump 43, and is installed around the device main body 10.

[0035] The stabilizing liquid tank 41 stores an appropriate stabilizing liquid having a density higher than that of water. For example, an appropriate mixture of water, bentonite, CMC, and a dispersant is used as the stabilizing liquid. In the following, the stabilizing liquid having a density higher than that of water is described as an example, but the present invention is not limited to this, and water may be used as the stabilizing liquid in some cases.

[0036] The stabilizing liquid supply pump 42 is provided in the stabilizing liquid tank 41 and supplies the stabilizing liquid into the borehole H via the stabilizing liquid supply pipe L1, supplying the stabilizing liquid to the upper end of the rod 20 and discharging it from the lower end of the rod 20.

[0037] The mud suction pump 43 discharges mud consisting of the stabilizing liquid and the excavated soil from the borehole H through the mud discharge pipe L2, and sucks the mud from the mouth side of the borehole H. A mouth pipe 44 and a mud discharge pit 45 are provided in advance in the area where the borehole H is to be formed (the area where the temporary pile P1 is to be constructed). The mouth pipe 44 is made of a steel pipe, and is erected into the ground from the ground (here, the floor of the pilot tunnel D) in the area where the borehole H is to be formed. The mouth pipe 44 has a diameter larger than the diameter of the borehole H (for example, when the diameter of the borehole H is 650 mm, the diameter of the mouth pipe 44 is about 800 mm), and the length of the mouth pipe 44 is, for example, about 1 m. The mud discharge pit 45 is provided near the mouth pipe 44. The inside of the mouth pipe 44 and the sludge discharge pit 45 are excavated, for example, by human power, and the sludge discharge pit 45 communicates with the space inside the mouth pipe 44 through a notch in the upper end of the mouth pipe 44. A mud suction pump 43 is installed in the sludge discharge pit 45 so that it can pump up muddy water (sludge).

[0038] When the drilling device 100 is operated to form a borehole H, first, with the drilling head 30 positioned above the area where the borehole is to be formed, the rod driver 11 is driven to rotate and lower the rod 20. As the rod 20 rotates and lowers, each bit (22, 33, 34) excavates the ground, and the borehole H begins to be formed. Then, the extension rod pipe 23 is successively added, and the rod 20 is lowered until each bit (22, 33, 34) penetrates the supporting layer G3. As a result, a borehole H is formed from the floor of the pilot hole D to the supporting layer G3, as shown in FIG. 1.

[0039] In parallel with the excavation of the ground, the excavation device 100 supplies the stabilizing liquid from the lower end of the rod 20 into the borehole H by the stabilizing liquid supply pump 42 via the stabilizing liquid supply pipe L1, the swivel 24, and the rod 20. The swivel 24 is configured to be connectable to the upper end of the rod 20 so that the stabilizing liquid can be continuously introduced into the rod 20 from the upper end opening of the rod 20, which is rotated by the rod driver 11. Then, as the stabilizing liquid is discharged from the lower end of the rod 20, an upward flow is generated in the annular space between the rod 20 and the borehole H. The mud water consisting of the excavated soil and the stabilizing liquid in the borehole H rises toward the hole mouth due to the upward flow, and is guided to the primary screen S1 provided above the stabilizing liquid tank 41 via the mouth pipe 44, the mud discharge pit 45, the mud suction pump 43, and the mud discharge pipe L2, and is discharged outside the borehole H.

[0040] The primary screen S1 is a relatively coarse screen that extracts soil and sand with relatively large grain sizes from the muddy water sent from the muddy water suction pump 43 via the muddy water discharge pipe L2. The muddy water from which the large grain size soil and sand have been removed passes through the primary screen S1 and falls into the stabilizing liquid tank 41. Meanwhile, the large grain size soil and sand captured by the primary screen S1 is stored in the residual soil tank 46.

[0041] The secondary screen S2 is a relatively fine screen and is disposed above the primary screen. The secondary screen extracts relatively small grains of soil and sand from the muddy water in the stabilizing liquid tank 41, which has been sent via the secondary screen pipe L3 and a pump (not shown). The muddy water from which the relatively small grains of soil and sand have been removed passes through the secondary screen, and falls into the stabilizing liquid tank 41, again passing through the primary screen S1. The relatively small grains of soil and sand captured by the secondary screen S2 is stored in the residual soil tank 46.

[0042] The cyclone screen S3 is configured to be able to extract soil having a smaller particle size than the secondary screen S2 by a centrifugal separation method. The cyclone screen S3 extracts soil having a smaller particle size from the muddy water in the stabilizing liquid tank 41 sent through the cyclone screen pipe L4 and a pump (not shown). The muddy water from which the smaller particle size soil has been removed passes through the cyclone screen S3, passes through the secondary screen S2 and the primary screen S1, and falls into the stabilizing liquid tank 41. Meanwhile, the soil extracted by the cyclone screen S3 is stored in the residual soil tank 46. In this way, the circulation unit 40 is able to recover the stabilizing liquid from the muddy water consisting of the stabilizing liquid and the excavated soil. The recovered stabilizing liquid is then supplied again into the borehole H, and is then circulated between the stabilizing liquid tank 41 and the borehole H.

[0043] In this way, the drilling equipment 100 is configured to supply a stabilizing liquid into the borehole H when the borehole H is formed, discharge the excavated soil and sand generated by the excavation of the ground together with the stabilizing liquid outside the borehole H, and supply the discharged stabilizing liquid back into the borehole H to circulate it.

[0044] Here, as in this embodiment, a gravel layer (middle layer G2) containing a large amount of gravel and boulders may exist in the ground including the area where the borehole is to be formed. Therefore, the drilling device 100 has the following structure in the drilling head 30 so that the drilling can be efficiently performed when the drilling device 100 encounters a gravel layer during drilling.

[0045] As shown in Figures 4 and 5, the drilling head 30 is configured to include a plurality of elastic linear members 36 that are spaced apart from each other in a region S between adjacent plate-like members 32 among the plurality of plate-like members 32 in the rod circumferential direction.

[0046] The area S between the adjacent plate-like members 32 is provided as a space having a sector-shaped cross section surrounded by the two adjacent plate-like members 32 and the casing 31. In this embodiment, the drilling head 30 has three plate-like members 32, so that three areas S are provided, and a plurality of linear members 36 are provided for each of these areas S. Although not particularly limited, in the figure, four linear members 36 are provided for each area S, and the drilling head 30 has a total of 12 linear members 36. The number of linear members 36 is set according to the diameter (drilling diameter) of the drilling hole H to be formed, and is not limited to four, and may be increased or decreased as appropriate.

[0047] Specifically, the multiple linear members 36 are arranged in each region S in a direction extending substantially perpendicular to the central axis X of the rod 20 (substantially horizontal direction) and arranged parallel to each other at intervals in the substantially horizontal direction. The interval between adjacent linear members 36 is set according to the expected diameter of gravel, boulders, etc., and is not particularly limited, but is assumed to be about 50 mm here.

[0048] Here, the four linear members 36 in each region S are divided into two first linear members 36a located on the center side in the rod radial direction and two second linear members 36b located on the outer side of the first linear members 36a in the rod radial direction. In each region S, one end of the first linear members 36a is connected to a portion constituting the region S of the inner circumferential surface 31a of the casing 31, and the other end of the first linear members 36a is connected to a side surface of one of the two plate-like members 32 constituting the region S. In each region S, one end of the second linear members 36b located in the same direction as the one end of the first linear members 36a is connected to a portion constituting the region S of the inner circumferential surface 31a of the casing 31, and the other end of the second linear members 36b penetrates the one plate-like member 32 and is connected to a portion constituting another region S adjacent to the region S of the inner circumferential surface 31a of the casing 31. By providing a plurality of linear members 36 in this manner, an obstacle recovery net N is constructed in the lower end region within the excavation head 30.

[0049] In this embodiment, the multiple linear members 36 are disposed in a position closer to the bit tip side in the up-down direction (vertical direction) in the region S. In other words, the obstacle recovery net N including the multiple linear members 36 is disposed in the region S near the lower end of the main drilling bit 33.

[0050] In this embodiment, each linear member 36 is a wire rope. Specifically, each linear member 36 is a wire rope made by twisting a plurality of strands around a core rope, and has a predetermined outer diameter (diameter of a circumscribed circle) of about 10 mm to 40 mm. The strands are made by twisting a plurality of wires (steel wires).

[0051] In this embodiment, the multiple main drilling bits 33 are arranged with their projection lengths d1 from the lower ends of the casings 31 aligned with each other. That is, the vertical distances (projection lengths d1) between the lower ends of the main drilling bits 33 and the lower end of the casing 31 are set to be the same distance (projection length). In this way, the projection lengths d1 of the main drilling bits 33, which are the main bits forming the bottom of the borehole H, are aligned, so that the bottom of the borehole H is formed as a flat surface parallel to the lower end surface of the casing 31 (in other words, a surface perpendicular to the rotation center line X or a horizontal surface).

[0052] In relation to the main excavation bits 33 arranged in this manner with the same protrusion length d1, the obstacle recovery net N including multiple linear members 36 is positioned within a predetermined distance L (e.g., approximately 50 mm or less) above the lower end of the main excavation bit 33.

[0053] In this embodiment, the projection lengths d2 of the outer drilling bits 34 provided on the lower end surface of the casing 31 from the lower end (lower end surface) of the casing 31 are aligned with each other and coincide with the projection length d1 of the main drilling bit 33. The lower end of the center drilling bit 22 is located lower than the lower ends of the main drilling bit 33 and the outer drilling bits 34. Therefore, the center drilling bit 22 is the first to bite into the ground during drilling, and has a centering function when drilling the borehole H. In addition, since the center drilling bit 22 is located below the lower end opening of the rod 20, which is the outlet for the stabilizing liquid, the center drilling bit 22 also has a function of preventing the outlet from closing.

[0054] In this embodiment, the excavation head 30 (in other words, the obstacle recovery net N) further includes a linear support member 37 (see FIG. 5) for suppressing the deflection of the linear member 36 after the obstacle is recovered. The linear support member 37 is a linear member having one end connected to the inner circumferential surface 31a of the casing 31 and the other end supporting at least one of the multiple linear members 36 from below, and having elasticity. In a side view, the support member 37 is located, for example, below the linear member 36 and above the lower end surface of the casing 31. The support member 37 is, for example, a wire rope, similar to the linear member 36. Although not particularly limited, in FIG. 5, one support member 37 is provided in each region S. In FIG. 5, the support member 37 is provided so as to cross two linear members 6 (second linear member 36b).

[0055] In this embodiment, the other end of the second linear member 36b on the first linear member 36a side of the two second linear members 36b extends to cross below the two first linear members 36a and supports the first linear member 36a from below. Thus, a part of the second linear member 36b functions as a support member for suppressing deflection of the first linear member 36a.

[0056] Next, the function of the plurality of linear members 36 in the excavation device 100 will be described.

[0057] When the drilling head 30 is rotated and lowered via the rod 20, each bit (22, 33, 34) starts drilling the ground. Directly above the flat bottom of the drilled hole H formed by this drilling (drilling), an obstacle recovery net N including multiple linear members 36 faces, and the excavated soil generated by this drilling (drilling) is guided to a region above the multiple plate-like members 32 (obstacle recovery net N) in the casing 31 through a region S between the plate-like members 32 adjacent to each other in the circumferential direction of the rod among the multiple plate-like members 32. When the drilling head 30 reaches a layer (here, the middle layer G2) containing a large amount of obstacles such as gravel and boulders, the gravel and boulders start to fly out of the bottom of the hole (ground) due to the impact force applied by each bit (22, 33, 34). At this time, since the drilling head 30 is descending while rotating, the gravel and boulders projecting from the bottom of the hole collide with the lower end of the plate-like member 32 or the side of the plate-like member 32 and fly or roll irregularly. In this state, the obstacle recovery net N including the plurality of linear members 36 is located immediately above the bottom of the hole, and the obstacle recovery net N itself is descending. Therefore, the flying or rolling gravel and boulders collide with the plurality of linear members 36 immediately after projecting from the bottom of the hole, elastically deforming the linear members 36, and then start to sink between the adjacent linear members 36. Then, the gravel and boulders that have become embedded between the adjacent linear members 36 pass through the gaps between the adjacent linear members 36 due to the inertial force of their own movement or due to the upward pressing force of other gravel, boulders, etc., and move (rise) to a height position exceeding the linear members 36 (obstacle recovery net N). After that, the interval between the adjacent linear members 36 is restored to approximately the original interval. As a result, the gravel and boulders that have been thrown out from the bottom of the hole are successively taken into the space between the cover 35 of the casing 31 and the obstacle recovery net N including the plurality of linear members 36.

[0058] As described above, the excavation device 100 is configured to collect obstacles such as gravel and boulders in the ground into the casing 31 by embedding the obstacles in the ground, such as gravel and boulders, between the linear members 36 during excavation of the ground. The deflection of the linear members 36 due to the weight of the obstacles taken into the casing 31 is suppressed by the support members 37.

[0059] Next, a pile construction method including an excavation method according to this embodiment will be described with reference to Figs. 1, 6, 7, etc.

[0060] The construction area of ​​the temporary pile P1 by the pile construction method is the area directly below the existing structure T shown in FIG. 6(a). Here, prior to the construction by the pile construction method, the installation of the earth retaining wall (FIG. 6(b)), excavation, construction and lining of the new structure (FIG. 6(c)), and formation of the pilot tunnel (FIG. 7(d) and FIG. 7(e)) are performed. Specifically, as shown in FIG. 6(b), two earth retaining walls W sandwiching the existing structure T are constructed from the ground surface to the bearing layer G3. Then, as shown in FIG. 6(c), the ground between the earth retaining walls W except for the area directly below the existing structure T is excavated to a depth corresponding to the floor of the pilot tunnel D (FIG. 7(e)), and a lower slab SL1 and an upper slab SL2 are newly constructed as structures around the existing structure T. The lower slab SL1 is supported by the permanent pile P2 constructed from the ground surface by an appropriate construction method. The opening on the ground surface side is covered with a lining member Z, which is supported by an appropriate temporary support member P3. Next, as shown in Fig. 7(d), the ground in the area where the pilot tunnel D is to be formed directly below the existing structure T is excavated with a small hydraulic excavator (not shown) or the like, while, as shown in Fig. 7(d) and Fig. 7(e), for example, a plurality of portal frames F made of steel members are arranged, and plate materials are provided between each of the portal frames F, thereby forming the pilot tunnel D in the portion corresponding to the area where the temporary pile P1 is to be constructed directly below the existing structure T.

[0061] The pile construction method includes a drilling step of forming a hole (drilling hole H) in which the temporary pile P1 is to be constructed, a slime treatment step, a placing step of placing a core material Pm in the drilling hole H, and a casting step.

[0062] In the excavation step, an excavation method is applied in which the excavation equipment 100 is used to excavate the ground. In this excavation step (excavation method), first, a mouth pipe 44 and a sludge discharge pit 45 are provided in the pilot tunnel D, and the excavation equipment 100 is installed on the floor of the pilot tunnel D. Then, the excavation equipment 100 is operated to excavate the ground to a predetermined depth to penetrate into the supporting layer G3, while circulating the stabilizing solution between the stabilizing solution tank 41 and the borehole H in a positive circulation manner. In this excavation step (excavation method), obstacles such as gravel and boulders in the ground are embedded between the multiple linear members 36 during excavation of the ground, and the gravel and boulders are collected inside the casing 31.

[0063] The slime treatment process is a process for performing a process to reduce the amount of slime that is generated by excavating the ground and floats in the borehole H. Specifically, at least one of the following is performed: air lift, which supplies air into the borehole H to raise the slime in the borehole H to the mouth side and discharge it outside the borehole H; and good liquid replacement, which operates the circulation unit 40 to circulate the stabilizing liquid and replaces the liquid in the borehole H with good liquid.

[0064] Although the amount of slime in the borehole H is reduced by carrying out the slime treatment process, it is often difficult to completely remove the slime. As a result, the slime remaining and floating in the borehole H subsequently settles and remains at the bottom of the borehole H. In particular, in the case of the positive circulation type BH method in which the stabilizing liquid is discharged from the lower end of the rod 20 as in this embodiment, the muddy water containing slime is guided to the hole mouth side using the upward flow generated in the space between the hole wall of the borehole H and the rod 20, so the amount of slime remaining in the borehole H in the BH method tends to be greater than the amount of slime remaining in the case of the reverse circulation type TBH method in which the muddy water containing slime is forcibly sucked up from the lower end of the rod 20.

[0065] As for excavation methods, in addition to the BH method as in this embodiment, there are also the TBH method and the like. However, the excavation method is selected taking into consideration the space at the construction site, construction costs, track record, etc., and there are cases where the BH method has to be selected.

[0066] FIG. 8 is a conceptual diagram for explaining the slime layer m1 consisting of slime precipitated at the bottom of the borehole H, and FIG. 8(a) shows the slime layer m1 precipitated at the flat bottom of the borehole H formed by the drilling device 100 according to this embodiment and the good liquid layer m2 above it. FIG. 8(b) shows the shape of the bottom of the borehole H in the case of the comparative example, the slime layer m1 and the good liquid layer m2. In this comparative example, the multiple main drilling bits in the drilling head 30 of the drilling device 100 using the BH method are arranged in a roughly V-shaped arrangement in cross section (more specifically, the drilling head 30 is changed to a so-called wing bit type). In other words, in the comparative example, only the arrangement of the main drilling bits is different from this embodiment, and in both this embodiment and the comparative example, the same BH method is adopted as the drilling method, and the amount (volume) of slime remaining in the borehole H after the slime treatment process is the same in both cases. Therefore, even if the same BH construction method is adopted, the thickness t1 (see Figure 8(a)) of the slime layer m1 when the hole bottom is flat as in this embodiment is smaller than the thickness t2 (see Figure 8(b)) of the slime layer m1 when the hole bottom has a V-shaped cross section as in the comparative example.

[0067] In the erection process, the core material Pm of the temporary pile P1 is erected in the borehole H. The core material Pm is divided into a plurality of members in the longitudinal direction, and each member is connected by an appropriate connecting member C. In this erection process, the borehole H is filled with a stable liquid (good liquid layer m2) as it is, as shown in FIG. 8(a). The core material Pm has its top (upper end) temporarily fixed in the pilot hole D with a predetermined gap (for example, about 500 mm) between its lower end and the bottom of the borehole H, which is the lower end of the borehole. In other words, the upper end of the core material Pm is temporarily fixed so that the lower end of the core material Pm is located in the good liquid layer m2 to suppress subsidence and avoids the slime layer m1.

[0068] In the casting process, for example, in a state where the borehole H is filled with a stabilizing liquid, an injection pipe (tremie pipe) is erected in the borehole H so that its lower end is located in front of the bottom of the borehole H. In this embodiment, mortar is supplied into the borehole H from the lower end opening of the injection pipe, and the mortar is shot up from the bottom of the hole toward the hole mouth side, while the injection pipe is lifted up by a small crane (not shown) in accordance with the mortar being shot up. At this time, the injection pipe is lifted up with its lower end opening (tube tip) in the mortar. The muddy water that overflows from the hole mouth and accumulates in the mud discharge pit 45 as the mortar is shot up (cast) is sucked up by the muddy water suction pump 43 and discharged outside the borehole H. Then, as shown in FIG. 1, mortar is cast into the entire borehole H. As a result, a temporary pile P1 is constructed as a lower support pile directly below the existing structure T. Thereafter, the above-mentioned steps are repeatedly performed for the remaining temporary piles P1 in the pilot tunnel D, thereby completing the construction of the temporary piles P1 in the same pilot tunnel D. Then, by performing the above steps for each pilot tunnel D, the construction of the multiple temporary piles P1 in the area spanning the multiple pilot tunnels D directly below the existing structure T is completed.

[0069] In this embodiment, for example, a lower support girder K is constructed above each temporary pile P1 so as to extend from the lower slab SL1 above the temporary pile P1, and a hydraulic jack J is installed between the lower support girder K and the lower surface of the existing structure T. This allows a pre-load test to be performed on the temporary pile P1. In this pre-load test, the jack J is operated to apply a predetermined downward load to the temporary pile P1 to cause the temporary pile P1 to sink in advance. As a result, the slight slime layer m1 remaining at the bottom of the borehole H is crushed in advance, effectively reducing the risk of the pile sinking.

[0070] According to the drilling device 100 of this embodiment, the elastic linear members 36 are provided at intervals in the region S between the adjacent plate members 32. Therefore, in order for an obstacle such as gravel protruding from the ground due to the collision of the main drilling bit 33 provided at the lower end of each plate member 32 to move to the region above the linear members 36 and be held in the casing 31, the obstacle needs to pass through the gap between each linear member 36 in the region S between the adjacent plate members 32 and move (rise) to a height position above the linear members 36. In other words, the obstacle is configured so that the rise height of the obstacle required for taking it into the casing 31 can be lower than that of Prior Art Document 1. Therefore, even if the obstacle is difficult to rise, the obstacle can be easily taken into the casing 31.

[0071] According to the excavation method of this embodiment, a method for excavating the ground using the excavation device 100 is provided, and obstacles in the ground are embedded between the linear members 36 during excavation of the ground, thereby recovering the obstacles inside the casing 31. This makes it possible to easily take the obstacles into the casing 31 even when it is difficult for the obstacles to rise.

[0072] In this way, it is possible to provide an excavation device 100 and an excavation method that can excavate the ground while effectively taking in into the casing 31 obstacles such as gravel that may be present in the ground.

[0073] In this embodiment, the drilling equipment 100 is equipped with a circulation unit 40 that circulates and supplies the stabilizing liquid. This allows the drilling hole H to be formed while stabilizing the hole wall of the drilling hole H. In general, the BH method of drilling the ground while circulating the stabilizing liquid in the forward direction is superior in workability in a narrow construction space and can be constructed at a low cost compared to the TBH method of drilling the ground while circulating the stabilizing liquid in the reverse direction. In this embodiment, the drilling equipment 100 is configured to form the drilling hole H by the BH method, and therefore has excellent workability in a narrow construction space such as directly below the existing structure T, and is also superior in terms of construction cost.

[0074] In this embodiment, the multiple main drilling bits 33 are arranged so that the protruding lengths d1 from the lower ends of the respective casings 31 are aligned with each other. This allows the drilling hole H to be formed with a flat hole bottom, thereby reducing the thickness t1 of the slime layer m1. As a result, even when the BH method is adopted as in this embodiment, the risk of the pile (temporary pile P1) sinking can be efficiently reduced. Furthermore, when a preliminary loading test is performed as in this embodiment, the load of the load is reduced and the stroke of the jack J can also be reduced because the thickness t1 of the slime layer m1 is reduced.

[0075] In this embodiment, the multiple linear members 36 are disposed at positions closer to the bit tip side in the vertical direction in a region S between the multiple plate-like members 32 adjacent to each other in the circumferential direction of the rod. This allows the multiple plate-like members 32 to effectively capture obstacles such as gravel and boulders into the casing 31.

[0076] In this embodiment, the drilling head 30 includes a linear support member 37. This makes it possible to suppress deflection of the linear member 36 when obstacles such as gravel and boulders are collected in the casing 31, so that the obstacles can be securely held in the casing 31.

[0077] In the present embodiment, the linear member 36 is a wire rope, but is not limited to this. The linear member 36 may be any member having elasticity.

[0078] In addition, although the temporary pile P1 is constructed in the borehole H, the present invention is not limited to this, and a permanent pile may be constructed in the borehole H. The casting material into the borehole H is not limited to mortar, and may be concrete or cement paste. In addition, the pile (temporary pile or permanent pile) is a so-called cast-in-place pile constructed by setting the core material Pm in the borehole H and casting the casting material (mortar in this embodiment), but the type of pile is not limited to this. For example, a concrete pile or a steel pipe pile formed in advance in pieces may be sequentially set in the borehole H, and then any one of concrete, mortar, and cement paste may be filled between the hole wall of the borehole H and the concrete pile or the steel pipe pile that has been set in the borehole H to construct the pile in the borehole H.

[0079] In addition, in this embodiment, the construction site of the borehole H and the pile (P1) is directly below the existing structure T, and the existing structure T exists above the construction site, but this is not limited to this. The construction site of the borehole H and the pile may be a place where there is no existing structure above.

[0080] Although the preferred embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and various modifications and changes are possible based on the technical concept of the present invention. [Explanation of symbols]

[0081] 20…Rod, 20a…lower end side outer circumferential surface, 30…Drilling head, 31…Casing, 31a...inner peripheral surface, 32...plate-shaped member, 33...Main drilling bit (drilling bit), 36...Linear member, 37...support member, 40…Circulation unit, 42…Stabilizing liquid supply pump, 43…Mud suction pump, 100…Drilling rig, d1...protrusion length, H…borehole, S: Area between adjacent plate-like members; X…Central axis line

Claims

1. A drilling device including a rod and a drilling head attached to a lower portion of the rod, the rod being rotated about a central axis of the rod while being lowered to vertically drill a ground to form a drilled hole, The drilling head includes: a cylindrical casing provided to surround a lower end side outer circumferential surface of the rod, the lower end side being a portion of the outer circumferential surface of the rod over a predetermined length; a plurality of plate-like members for fixing the casing to the rod, each of the plate-like members having a predetermined width in the vertical direction and extending from a lower end portion of the lower end side outer peripheral surface to a lower end portion of the inner peripheral surface of the casing; A plurality of drilling bits provided at the lower ends of the plurality of plate-shaped members, each of the drilling bits having a bit tip located below the lower end of the casing; a plurality of elastic linear members provided at intervals in a region between adjacent plate-like members in a circumferential direction of the rod among the plurality of plate-like members; Including, Drilling rig.

2. The present invention further includes a circulation unit that supplies a stabilizing liquid into the borehole, discharges the excavated soil and sand produced by the excavation of the ground together with the stabilizing liquid out of the borehole, and supplies the discharged stabilizing liquid back into the borehole to circulate the stabilizing liquid. The rod is formed in a cylindrical shape, The excavation equipment described in claim 1, wherein the circulation unit includes a stabilizing liquid supply pump that supplies the stabilizing liquid to the upper end of the rod and discharges it from the lower end of the rod, and a mud suction pump that sucks mud consisting of excavated soil and stabilizing liquid in the borehole from the mouth side of the borehole.

3. The drilling device according to claim 1 or 2, wherein the plurality of drill bits are arranged such that their protruding lengths from the lower end of the casing match each other.

4. The drilling device according to any one of claims 1 to 3, wherein the plurality of linear members are arranged in the region at positions closer to the bit tip side in the up-down direction.

5. The excavation device according to any one of claims 1 to 4, wherein the linear member is a wire rope.

6. The drilling head has one end connected to the inner surface of the casing and the other end supporting at least one of the plurality of linear members from below, and includes an elastic linear support member. A drilling device as described in any one of claims 1 to 5.

7. A method for excavating ground using the excavation device according to any one of claims 1 to 6, An excavation method comprising the steps of: embedding an obstacle in the ground between the plurality of linear members while excavating the ground, thereby recovering the obstacle inside the casing.

Citation Information

Patent Citations

  • Gravel corresponding type excavating head

    JP2000274175A

  • Boring execution method and its device excavating gravel layer or obstacle layer

    JP2005097936A