Suspended scaffolding installation structure
The suspended scaffold installation structure addresses the challenge of suspending scaffolding on beams of varying specifications by using a combination of holding and support members for indirect suspension, ensuring efficient and precise positioning for construction tasks.
Patent Information
- Application Number
- JP2020123569
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-07-20
- Publication Date
- 2024-11-14
- Estimated Expiration
- 2040-07-20
AI Technical Summary
Existing suspended scaffold installation structures struggle to be properly suspended from beams due to variations in beam specifications, such as structure, shape, and size, leading to inefficiencies in construction work.
A suspended scaffold installation structure that uses a combination of holding members and support members extending in the beam width and length directions, allowing the suspension locking part to be freely locked at multiple positions, enabling indirect suspension from the beam via a support member, and incorporating a wall component attachment fastener for stable attachment.
Enables efficient suspension of scaffolding at appropriate positions on beams of varying specifications, facilitating efficient construction work and allowing for precise positioning for tasks like filling joints and attaching wall components, while avoiding interference with reinforcing bars and column-beam joints.
Smart Images

Figure 0007583543000001 
Figure 0007583543000002 
Figure 0007583543000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a suspended scaffolding installation structure used to install a suspended scaffolding on a beam at a construction site or the like. [Background technology]
[0002] Patent Document 1 describes a suspended scaffolding installation structure in which a suspended scaffolding configured for an H-shaped steel beam, whose suspension locking portion can be freely locked to the upper flange of the H-shaped steel beam, is suspended from the H-shaped steel beam in a state in which the suspension locking portion is locked to the upper flange of the H-shaped steel beam. The above-mentioned suspended scaffolding installation structure can easily suspend the suspended scaffolding from the H-shaped structural beam at the construction site, and furthermore, can suspend the suspended scaffolding at any position in the beam length direction of the H-shaped steel beam, thereby contributing to labor saving and shortening of construction time at the site. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Publication No. 04-068431 (Figure 3, etc.) Summary of the Invention [Problem to be solved by the invention]
[0004] However, because the suspension locking part of the suspended scaffolding is directly locked to the beam, depending on the structure and shape of the beam of the building, the suspension locking part cannot be locked to the beam, and the suspended scaffolding cannot be suspended from the beam. Also, depending on the size of the beam, for example, when the beam width of the building is very large, the suspended scaffolding cannot be suspended at an appropriate position in the beam width direction.
[0005] The present invention has been made in consideration of the above-mentioned problems, and its main object is to provide a suspended scaffolding installation structure that can properly suspend a suspended scaffolding from a beam of a building to enable efficient work, regardless of the specifications of the beam (structure, shape, size, etc.). [Means for solving the problem]
[0010] The present invention 1 The characteristic configuration is: A suspended scaffolding installation structure in which a suspended scaffolding having a suspension engaging portion and a scaffolding plate is suspended from a beam of a building, A plurality of protruding members attached to an upper surface of the beam and extending in a beam width direction of the beam; A support member is provided that is installed across the tip portions of the plurality of support members and extends in the beam length direction of the beam, The support member is configured so that the suspension locking portion of the suspended scaffold can be freely locked at a plurality of positions in the extension direction of the support member, The hanging scaffolding is suspended from the beam via the extension member and the support member in a state in which the suspension locking portion is locked to the support member, The end of the support member is extended at a position outer than the outer surface of the column-beam joint portion in the beam width direction, to a position corresponding to the column-beam joint portion outer than the end face of the beam in the beam length direction, and the suspended scaffolding is suspended from that extended portion.
[0011] According to this configuration, the suspended scaffolding is indirectly suspended from the beam via the extending member and the supporting member with the suspension locking portion locked to the supporting member, so that the suspended scaffolding can be suspended even from a beam with a specification that the suspension locking portion cannot be directly locked. Moreover, since the supporting member to which the suspension locking portion is locked is extended in the beam width direction by the extending member, the suspended scaffolding can be suspended at an appropriate position in the beam width direction according to the beam specification. And, since the suspension locking portion of the suspended scaffolding can be freely locked to the supporting member at multiple positions in the extension direction, the suspended scaffolding can be suspended at a position suitable for work in the beam length direction at the construction site, and work can be performed efficiently. Therefore, regardless of the specifications of the building's beams, the suspended scaffolding can be appropriately suspended from the beams and work can be carried out efficiently. Furthermore, According to this configuration, for example, the support member can be extended to a position corresponding to the column-beam joint while avoiding interference between the support member and reinforcing bars or the like that are protruding from the top of the precast concrete column-beam joint for joining to the column of the upper floor. Then, by using a hanging scaffolding suspended from the extended portion, joining work for the column-beam joint (for example, filling grout into the joint of the precast concrete column-beam joint) can be efficiently performed from the position corresponding to the column-beam joint.
[0012] The present invention 2 The characteristic configuration is: A suspended scaffolding installation structure in which a suspended scaffolding having a suspension engaging portion and a scaffolding plate is suspended from a beam of a building, A plurality of protruding members attached to an upper surface of the beam and extending in a beam width direction of the beam; A support member is provided that is installed across the tip portions of the plurality of support members and extends in the beam length direction of the beam, The support member is configured so that the suspension locking portion of the suspended scaffold can be freely locked at a plurality of positions in the extension direction of the support member, The hanging scaffolding is suspended from the beam via the extension member and the support member in a state in which the suspension locking portion is locked to the support member, A wall component mounting fastener for mounting a lower end portion of a wall component that constitutes a wall of a building is embedded and fixed to the upper surface of the beam, The projection members are at the points where they attach to the wall component mounting fasteners.
[0013] According to this configuration, the suspended scaffolding is indirectly suspended from the beam via the extending member and the supporting member with the suspension locking portion locked to the supporting member, so that the suspended scaffolding can be suspended even from a beam with a specification that the suspension locking portion cannot be directly locked. Moreover, since the supporting member to which the suspension locking portion is locked is extended in the beam width direction by the extending member, the suspended scaffolding can be suspended at an appropriate position in the beam width direction according to the beam specification. And, since the suspension locking portion of the suspended scaffolding can be freely locked to the supporting member at multiple positions in the extension direction, the suspended scaffolding can be suspended at a position suitable for work in the beam length direction at the construction site, and work can be performed efficiently. Therefore, regardless of the specifications of the building's beams, the suspended scaffolding can be appropriately suspended from the beams and work can be carried out efficiently. Furthermore, according to this configuration, the extension member can be attached to the upper surface of the beam by utilizing the wall component mounting fastener for mounting the lower end of the wall component, and the suspended scaffolding can be easily, stably and reliably suspended from the beam. do. Books Invention No. 3 The characteristic configuration is that the suspended scaffolding is a suspended scaffolding for H-shaped steel beams, in which the suspension locking portion is configured to be freely locked to the upper flange of the H-shaped steel beam, The support member is made of an H-shaped steel, The tip of the extension member is connected to a portion below the upper flange of the support member made of H-shaped steel. According to this configuration, while the suspended scaffolding is a suspended scaffolding for H-shaped steel beams, the support member is made of H-shaped steel, and further, the tip of the extending member is connected to a position below the upper flange of the support member made of H-shaped steel, so that the suspension engagement portion of the suspended scaffolding for H-shaped steel beams can be engaged over the entire length of the upper flange of the support member made of H-shaped steel without being obstructed by the extending member. This allows for more precise adjustment of the position of the suspended scaffolding in the beam length direction at the construction site, making work even more efficient. [Brief description of the drawings]
[0014] [Figure 1] Perspective view of a construction site using a suspended scaffolding installation structure [Diagram 2] Plan of a construction site using a suspended scaffolding installation structure [Diagram 3] Side cross-sectional view of a construction site using a suspended scaffolding installation structure [Figure 4] A schematic diagram showing the construction process using a suspended scaffolding installation structure. [Diagram 5] Side cross-sectional view of a construction site using a suspended scaffolding installation structure [Figure 6] Diagram showing an example of the use of fasteners for mounting wall components DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] An embodiment of the suspended scaffolding installation structure of the present invention will be described with reference to the drawings. As shown in Fig. 1, the suspended scaffolding installation structure is a structure in which a suspended scaffolding 2 having a suspension locking part 21 and a scaffolding board 22 is suspended from a beam 11 of a building 1 at a construction site. The illustrated example shows a case in which the suspended scaffolding 2 is suspended using the suspended scaffolding installation structure at a construction site where the outer perimeter frame of the building 1 consisting of reinforced concrete beams 11, columns 12, and column-beam joint parts 14 is being constructed.
[0016] At this construction site, as shown in Fig. 4, two spans of beams 11 and two beam-beam connections 14A, 14B at one end and the middle of the beam length direction Y are integrally constructed as a beam-side precast concrete member P1, and are joined to a column-side precast concrete member P2 consisting of a column 12 to construct an outer periphery frame. In this embodiment, the suspended scaffolding 2 is pre-assembled on the exterior side of the building of the beam-side precast concrete member P1 using a suspended scaffolding installation structure, and then the construction work is performed by lifting it with a crane or the like.
[0017] As shown in Figure 1, the suspended scaffolding 2 is used to perform joining work in which a worker fills a hardening filler such as grout from the outside of the building to join joint A between the lower end faces of column-beam joints 14A, 14B of the beam-side precast concrete member P1 and the upper end face of the column-side precast concrete member P2, and joint B between the side of the column-beam joint 14A of the beam-side precast concrete member P1 and the end face of a beam 11 of another beam-side precast concrete member P1.
[0018] 1 to 3, this suspended scaffolding installation structure includes a plurality of steel-framed corrugated members 3 attached to the upper surfaces of reinforced concrete beams 11 and extending in the beam width direction X of the beams 11, and a single steel-framed support member 4 erected across the tips of the plurality of corrugated members 3 and extending in the beam length direction Y of the beams 11. Then, the suspended scaffolding 2 is suspended from the reinforced concrete beams 11 via the corrugated members 3 and the support member 4 with the suspension locking parts 21 locked to the steel-framed support member 4.
[0019] 1 to 3, the suspended scaffolding 2 is provided with four vertical frames 23 arranged at each corner of a rectangle in plan view, and a plurality of connecting frames 24 connecting adjacent vertical frames 23 to each other. A scaffolding board 22 is supported by the four lowermost connecting frames 24 constituting each side of the rectangle in plan view. Furthermore, the upper ends of the two vertical frames 23 arranged on the beam 11 side are provided with long bolts 25 that protrude toward the beam 11 side (the building interior side) in the beam width direction X, and a hook-shaped suspension locking portion 21 is screwed into the long bolts 25.
[0020] This suspension locking part 21 can be locked to the flange of an H-shaped steel, and further, by changing the position in the longitudinal direction of the long bolt 25 according to the size of the H-shaped steel, it can be locked to H-shaped steel of various sizes. In other words, the suspended scaffolding 2 is configured as a suspended scaffolding for an H-shaped steel beam in which the suspension locking part 21 is configured to be freely locked to the upper flange of the H-shaped steel beam. Also, the suspended scaffolding 2 is configured as a suspended scaffolding unit in which the vertical frame 23, the connecting frame 24, the scaffolding board 22, and the suspension locking part 21 are assembled in advance in a foldable manner.
[0021] The corrugated members 3 are steel members made of channel steel attached to the upper surfaces of reinforced concrete beams 11 and extending in the beam width direction X of the beams 11, with their base ends on the inside of the building attached to the upper surfaces of the reinforced concrete beams 11 and their tip ends on the outside of the building attached to the support members 4. The multiple corrugated members 3 (four in the illustrated example) are provided at positions spaced apart in the beam length direction Y and away from the column-beam joints 14.
[0022] In this embodiment, fasteners 16 for mounting wall components are embedded and fixed into the upper surface of the reinforced concrete beams 11, and the base ends of the protruding members 3 on the inside of the building are attached using the fasteners 16 for mounting wall components as temporary mounting members.
[0023] As shown in FIG. 6, the wall-constituting member mounting fastener 16 is used to mount a wall-constituting member 15 that constitutes the wall of the building 1 in an exterior material installation process or the like following the construction process, and as shown in FIG. 3, it is configured with, for example, an anchor 16a, an embedded plate 16b that is embedded and fixed in the beam 11 by the anchor 16a, and an mounting bolt 16d that is inserted into the embedded plate 16b from below so that only the bolt shaft of the mounting bolt 16d protrudes upward from the top surface of the beam 11, and the like.
[0024] 6, in the exterior material installation process, a mounting member 17 that is bolted to a curtain wall sash, which is an example of a wall constituent member 15, is fastened with a mounting bolt 16d of a wall constituent member mounting fastener 16 and a nut N, thereby mounting the curtain wall sash to the upper surface of the beam 11. Note that the wall constituent member 15 that constitutes the wall of the building 1 is not limited to the above-mentioned curtain wall sash, but may be a wall body made of precast concrete or any of various members that constitute a wall that closes off the area surrounded by the pillar 12 and the beam 11.
[0025] 2 and 3, the base end of the corrugating member 3 on the building interior side is provided with a pair of mounting plates 31 that protrude from a lower flange 32 of the corrugating member 3 to both outside sides in the width direction of the corrugating member 3. Each mounting plate 31 has a bolt hole (not shown) formed therethrough, and the corrugating member 3 is attached to the beam 11 by inserting the mounting bolt 16d of the wall component mounting fastener 16 through the bolt hole from below and screwing a nut N onto the mounting bolt from above.
[0026] As shown in Figures 1 and 2, the support member 4 is a steel member made of an H-shaped steel beam that is erected across the building-exterior end portions of multiple extending members 3 and extends in the beam length direction Y of the beam 11.As shown in Figure 3, the supporting member 4 is extended to the exterior side of the building by the extending members 3 while leaving a gap between the beam 11 and the column-beam joint portion 14, and is positioned in an appropriate position that is more suitable for joining work on the exterior of the building than the outer surfaces (the exterior sides of the building) of the beams 11 and the column-beam joint portion 14.
[0027] Furthermore, the support member 4 is configured so that the suspension locking portions 21 of the suspended scaffolding 2 can be locked at a plurality of positions in its extension direction (beam length direction Y). Specifically, as shown in Fig. 3, the height dimension of the support member 4 is configured to be larger than the height dimension of the corrugation member 3 (about twice as large in this embodiment), and with the bottom ends of the corrugation member 3 and the support member 4 aligned, the tip of the corrugation member 3 is joined to a portion below the upper flange 41 of the support member 4 by welding or the like.
[0028] Therefore, the upper flange 41 of the support member 4 can be positioned at a position higher than the upper end of the support member 3 throughout the entire extension direction of the support member 4 (beam length direction Y), and the suspension engagement portion 21 of the suspended scaffolding 2 can be engaged at the desired position in the extension direction of the support member 4 (beam length direction Y) without being obstructed by the support member 3.
[0029] Furthermore, the end of the support member 4 is extended at a position outside the building further outside the outer surface (the outer side of the building) of the column-beam joint portion 14 in the beam width direction X, to a position corresponding to the column-beam joint portions 14A, 14B which are outside both end surfaces of the beam 11 in the beam length direction Y, and the suspended scaffolding 2 is suspended from the extended portions 4A, 4B.
[0030] Specifically, as shown in Fig. 2, the length of the support member 4 in the extension direction (beam length direction Y) is set to the length from a position corresponding to the column-beam joint portion 14A on one end side of the beam 11 to a position corresponding to the column-beam joint portion 14B in the middle part on the other end side of the beam 11. Then, the part 4A protruding toward the column-beam joint portion 14A on one end side of the support member 4 is protruding in a cantilever state with two supporting members 3 arranged at adjacent parts on one side (right side in the figure) of the column-beam joint portion 14A, and the suspended scaffolding 2 is suspended. On the other hand, the part 4B protruding toward the column-beam joint portion 14B in the middle part of the support member 4 is protruding with two supporting members 3 arranged separately on both sides (left and right sides in the figure) of the column-beam joint portion 14B between them, and the suspended scaffolding 2 is suspended.
[0031] Therefore, workers can use the hanging scaffolding 2 suspended from the protruding portions 4A, 4B of the support member 4 to efficiently perform joining work to joints A, B of the column-beam connection portions 14A, 14B from positions corresponding to the column-beam connection portions 14A, 14B.
[0032] In addition, in this suspended scaffolding installation structure, as shown in Figure 5, an external protection unit 5 for preventing water from scattering to the outside of the building can also be supported at a position between the suspended scaffoldings 2 (not shown) in the extension direction of the support member 4 (beam length direction Y).
[0033] The external curing unit 5 is configured to include a support section 51 disposed in the gap between the support member 4 and the beam 11, a net mounting frame section 52 extending from the upper end of the support section 51 along the beam width direction X to the outside of the building, and a curing net 53 hanging down from the tip of the net mounting frame section 52. Then, by engaging the clamp-shaped engaging section 51a of the support section 51 disposed in the gap between the support member 4 and the beam 11 with the upper flange 41 of the support member 4 from the inside of the building, the external curing unit 5 can be supported by the beam 11 via the extension member 3 and the support member 4 in addition to the suspended scaffolding 2.
[0034] As described above, with this suspended scaffolding installation structure, even if the beams 11 of the building 1 are other than H-shaped steel beams to which the suspension engaging portion 21 cannot be directly engaged, the suspended scaffolding 2 can be suspended via the extending member 3 and the support member 4. Furthermore, since the support member 4 to which the suspension engaging portion 21 is engaged is extended in the beam width direction X by the extension member 3, the suspended scaffolding 2 can be suspended at an appropriate position in the beam width direction X according to the specifications of the beam 11. Furthermore, since the suspension engagement portion 21 of the suspended scaffolding 2 can be engaged at the desired position in the extension direction of the support member 4 (beam length direction Y), the suspended scaffolding 2 can be suspended in the beam length direction Y at a position suitable for work, allowing work to be performed efficiently. Furthermore, since the external curing unit 5 can also be supported by the beams 11 in addition to the suspended scaffolding 2, there is no need to provide a separate structure to support the external curing unit 5, and work can be carried out using the suspended scaffolding 2 while preventing the external curing unit 5 from scattering outside the building.
[0035] [Another embodiment] Other embodiments of the present invention will be described below. Note that the configurations of the embodiments described below are not limited to being applied alone, but may also be applied in combination with the configurations of other embodiments.
[0036] (1) In the above embodiment, an example is shown in which the suspended scaffolding 2 is suspended from a beam 11 made of reinforced concrete. However, the suspended scaffolding installation structure of the present invention can also be suitably applied to cases in which the suspended scaffolding 2 is suspended from beams of various structures, such as steel-reinforced concrete structure or steel frame structure.
[0037] (2) In the above embodiment, an example was shown in which the protruding member 3 is attached to the upper surface of the beam 11 by utilizing the wall component mounting fasteners 16 present on the upper surface of the beam 11 as temporary mounting members. However, even if such wall component mounting fasteners 16 do not exist, the protruding member 3 can be attached to the upper surface of the beam 11 by, for example, attaching a dedicated fastener to the upper surface of the beam 11. [Explanation of symbols]
[0038] 1. Building 2 Suspended scaffolding 3. Removable materials 4 Support member 11 Beam 12 Pillars 14 Column and beam joint section 15 Wall components 16 Wall component mounting fasteners 21 Hanging locking part 22 Scaffolding Board X Beam width direction Y Beam length direction
Claims
1. A suspended scaffolding installation structure in which a suspended scaffolding having a suspension engaging portion and a scaffolding plate is suspended from a beam of a building, A plurality of protruding members attached to an upper surface of the beam and extending in a beam width direction of the beam; A support member is provided that is installed across the tip portions of the plurality of support members and extends in the beam length direction of the beam, The support member is configured so that the suspension locking portion of the suspended scaffold can be freely locked at a plurality of positions in the extension direction of the support member, The hanging scaffolding is suspended from the beam via the extension member and the support member in a state in which the suspension locking portion is locked to the support member, A suspended scaffolding installation structure in which an end of the support member is extended to a position corresponding to the column-beam joint portion that is outer than the end face of the beam in the beam length direction, at a position outer than the outer surface of the column-beam joint portion in the beam width direction, and the suspended scaffolding is suspended from the extended portion.
2. A suspended scaffolding installation structure in which a suspended scaffolding having a suspension engaging portion and a scaffolding plate is suspended from a beam of a building, A plurality of protruding members attached to an upper surface of the beam and extending in a beam width direction of the beam; A support member is provided that is installed across the tip portions of the plurality of support members and extends in the beam length direction of the beam, The support member is configured so that the suspension locking portion of the suspended scaffold can be freely locked at a plurality of positions in the extension direction of the support member, The hanging scaffolding is suspended from the beam via the extension member and the support member in a state in which the suspension locking portion is locked to the support member, A wall component mounting fastener for mounting a lower end portion of a wall component that constitutes a wall of a building is embedded and fixed to the upper surface of the beam, A suspended scaffolding installation structure in which the extension member is attached to the wall component mounting fastener.
3. The suspended scaffolding is a suspended scaffolding for an H-shaped steel beam, the suspension engaging portion being configured to be freely engaged with the upper flange of the H-shaped steel beam, The support member is made of an H-shaped steel, 3. A suspended scaffolding installation structure according to claim 1 or 2, wherein the tip of the extension member is connected to a portion below the upper flange of the support member made of H-shaped steel.
Citation Information
Patent Citations
Construction of exterior material
JP1982172061A
Reinforcement skeletal construction and handrail for pre-mounting of beam member