Server, building energy management system and building energy management method
A server optimizes energy storage in buildings with variable power sources by selecting facilities based on weather and facility specifications, addressing surplus power utilization to enhance energy savings and economic efficiency.
Patent Information
- Application Number
- JP2024542979
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-10-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-10-20
Smart Images

Figure 0007584716000001 
Figure 0007584716000002 
Figure 0007584716000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a server, a building energy management system including the server, and a building energy management method. [Background technology]
[0002] In recent years, as the importance of renewable energy has become widely recognized, the number of buildings that have installed photovoltaic (PV) equipment is increasing. As PV equipment becomes more widespread, the amount of power generated by PV equipment is also increasing. As a result of the increase in power generated by PV equipment, there are now "ZEBs (net Zero Energy Buildings)," which are buildings that have achieved an annual primary energy balance of zero (or nearly zero). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2007-295680 A [Patent Document 2] JP 2017-79564 A [Patent Document 3] JP 2019-88151 A [Patent Document 4] International Publication No. 2013 / 168814 Summary of the Invention [Problem to be solved by the invention]
[0004] For example, as disclosed in JP 2007-295680 A (Patent Document 1), in addition to PV equipment, the installation of energy storage equipment in buildings that stores energy in the form of electricity or heat is being considered. These energy storage equipment can store energy during times when electricity demand is low and electricity rates are low (such as at night), while consuming energy during times when electricity demand is high and electricity rates are high (such as during the day), making it possible to reduce electricity rates while realizing energy conservation.
[0005] In buildings such as ZEBs, the amount of power generated by PV equipment can exceed the building's power consumption, resulting in surplus power. This surplus power can fluctuate over time depending on factors such as weather changes. In addition, multiple energy storage facilities (such as a combination of power storage facilities and heat storage facilities) may be installed in the building. In such cases, the challenge can be how to effectively utilize the surplus power to achieve both energy conservation and economic efficiency.
[0006] The present disclosure has been made to solve the above-mentioned problems, and one of the objectives of the present disclosure is to achieve both energy conservation and economic efficiency in buildings. [Means for solving the problem]
[0007] A server according to an embodiment of the present disclosure manages energy in a building provided with a naturally variable power source whose generated power varies depending on weather conditions and multiple energy storage facilities each storing energy in the form of electricity or heat. The server includes a processor that executes calculation processing to determine in which of the multiple energy storage facilities the power generated by the naturally variable power source is to be stored. When the power generated by the naturally variable power source exceeds the power consumption of the building and surplus power is generated, the processor extracts from the multiple energy storage facilities one or more energy storage facilities whose period during which the surplus power exceeds a predetermined amount is longer than the period during which continuous energy storage is required according to the specifications of the facilities, calculates the amount of reduction in electricity charges for each of the one or more energy storage facilities when the surplus power is stored in the energy storage facility, and determines the energy storage facility in which to store the surplus power based on the amount of reduction.
[0008] A building energy management method according to another embodiment of the present disclosure manages energy in a building provided with a naturally variable power source whose generated power varies depending on weather conditions and a plurality of energy storage facilities each storing energy in the form of electricity or heat. The building energy management method includes first to fourth steps. The first step is a step of determining whether or not the generated power of the naturally variable power source exceeds the power consumption of the building, causing surplus power to be generated. The second step is a step of extracting, when surplus power is generated, one or more energy storage facilities from among the plurality of energy storage facilities, the period during which the surplus power exceeds a predetermined amount being longer than the period during which continuous energy storage is required. The third step is a step of calculating, for each of the one or more energy storage facilities, the amount of reduction in electricity charges when the surplus power is stored in the energy storage facility, and determining the energy storage facility that stores the surplus power based on the amount of reduction. Effect of the Invention
[0009] According to the present disclosure, it is possible to achieve both energy conservation and economic efficiency in a building. [Brief description of the drawings]
[0010] [Figure 1] 1 is a diagram showing an example of the overall configuration of a building energy management system according to an embodiment of the present invention; [Diagram 2] FIG. 1 illustrates a typical configuration of a server. [Diagram 3] FIG. 2 is a conceptual diagram for explaining equipment specification data. [Figure 4] FIG. 2 is a conceptual diagram for explaining facility performance data. [Diagram 5] FIG. 4 is a conceptual diagram for explaining first power consumption data. [Figure 6] FIG. 11 is a conceptual diagram for explaining second power consumption data. [Figure 7] FIG. 2 is a conceptual diagram for explaining an electricity rate table. [Figure 8] FIG. 2 is a functional block diagram of a server according to the present embodiment. [Figure 9] FIG. 11 is a diagram for explaining an example of a method for calculating surplus power. [Figure 10] FIG. 10 is a diagram for explaining an example of a method for extracting candidates for energy storage facilities that store surplus power. [Figure 11] FIG. 11 is a diagram for explaining an example of a cost calculation method. [Figure 12] 10 is a flowchart showing a processing procedure of a calculation process related to surplus power in the embodiment. [Figure 13] 13 is a diagram for explaining a method for extracting candidates for energy storage facilities that store surplus power in a modified example. FIG. [Figure 14] 10 is a flowchart showing a processing procedure of a calculation process related to surplus power in a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, the present embodiment will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.
[0012] Embodiment <System configuration> 1 is a diagram showing an example of the overall configuration of a building energy management system (BEMS) according to the present embodiment. In this embodiment, the BEMS 1 manages the supply and demand of energy (electricity and / or heat) used in an office building. However, facilities to which the BEMS 1 can be applied are not limited to office buildings, and may be commercial facilities (such as shopping malls), sports facilities (such as stadiums), cultural facilities (such as theaters), or a complex of these.
[0013] The BEMS 1 includes a server 10. The server 10 is a computer that manages each facility of the BEMS 1. The hardware configuration of the server 10 will be described with reference to Fig. 2. The server 10 is connected to a central server 5 and external servers 6 and 7 via a network 8 such as the Internet so as to be able to communicate with each other.
[0014] The central server 5 is installed in an information center operated by a business operator who comprehensively manages many buildings. The central server 5 provides the server 10 with various information necessary for managing each facility of the BEMS 1. The central server 5 is also configured to enable remote control of each facility in the BEMS 1.
[0015] The external server 6 is operated by the Japan Meteorological Agency, a private weather service provider, or the like, and provides weather forecasts and meteorological information (weather, outside temperature, amount of solar radiation, wind speed, wind direction, amount of precipitation, probability of precipitation, etc.) to the server 10. The external server 6 may provide weather disaster forecasts (advisories or warnings regarding typhoons, heavy rain, floods, heavy snow, strong winds, heat waves, cold waves, lightning strikes, etc.) to the server 10.
[0016] The external server 7 is operated by, for example, an electric power company (which may be a power generation company or a power transmission and distribution company), and provides the server 10 with information related to electricity charges.
[0017] In addition to the server 10, the BEMS 1 further includes one or more naturally variable power sources 20, a plurality of energy storage facilities 30, a load 40, and an occupancy management system 50. The naturally variable power sources 20, the energy storage facilities 30, and the loads 40 are connected to a power grid 9, for example.
[0018] Each of the one or more variable naturally occurring power sources 20 is a power generation facility whose generated power may vary depending on weather conditions. In this embodiment, the variable naturally occurring power source 20 is a photovoltaic power generation facility (PV facility). However, the variable naturally occurring power source 20 may be a wind power generation facility or a combination of a PV facility and a wind power generation facility.
[0019] Each of the multiple energy storage facilities 30 is a facility that stores energy in the form of electricity or heat. In this embodiment, the multiple energy storage facilities 30 include an electricity storage facility 31, a heat storage facility 32, and a hot water supply facility 33. The multiple energy storage facilities 30 may include only one or two types of facilities among these facilities. The multiple energy storage facilities 30 may include a power to gas facility (not shown) that produces gas fuel (hydrogen, methane, etc.) using electric power.
[0020] The power storage facility 31 is configured to store the power generated by the naturally variable power source 20. The power storage facility 31 is typically a secondary battery (lithium ion battery, nickel metal hydride battery, etc.) or an electric double layer capacitor. The power that the power storage facility 31 can store or supply varies depending on the charge / discharge power, charging time, and charging efficiency. The power stored (accumulated) in the power storage facility 31 may decrease over time.
[0021] The heat storage equipment 32 is configured to store heat generated with air conditioning (cooling or heating) in the building. The heat storage equipment 32 includes, for example, a heat storage tank, and stores a liquid medium (typically hot water) in the heat storage tank in a warm state. The heat storage equipment 32 may be a waste heat recovery system or an ice heat storage system. The heat storage equipment 32 supplies the heat stored in the form of hot water or ice to the loads 40 of the building (particularly the air conditioning equipment). The temperature of the hot water or ice stored in the heat storage equipment 32 may change over time.
[0022] The hot water supply system 33 includes a heat exchanger that heats water. The hot water supply system 33 can be various types of hot water heaters, such as an electric hot water heater, a heat pump hot water heater, a solar hot water heater, etc. The hot water supply system 33 provides hot water to the building loads 40. The temperature of the hot water stored in the hot water supply system 33 can also change over time.
[0023] In the power storage equipment 31, the stored energy is the amount of stored electricity, and is expressed, for example, by the state of charge (SOC). In the heat storage equipment 32 or the hot water supply equipment 33, the stored energy is the amount of stored heat, and is expressed, for example, by the temperature of hot water or water.
[0024] The load 40 is a device that consumes energy (mainly electricity). The load 40 includes, for example, air conditioning equipment, elevators (elevators, escalators, etc.), lighting equipment, and various OA (Office Automation) devices installed in a building.
[0025] The presence management system 50 is configured to manage data regarding people entering and leaving each room in a building using technologies such as IC (Integrated Circuit) cards, surveillance cameras, and biometric authentication.
[0026] The following describes the calculation process executed by the server 10 in the BEMS 1. Although not shown, a central server 5 installed in an information center may have a configuration similar to that of the server 10. Therefore, the following calculation process may be executed by the central server 5 instead of the server 10.
[0027] <Server configuration> 2 is a diagram showing a typical configuration of the server 10. The server 10 includes a processor 11, a memory 12, an input device 13, a display 14, a communication interface 15, and a database 16.
[0028] The processor 11 is, for example, a CPU (Central Processing Unit) and is configured to execute a predetermined arithmetic processing according to a program. The memory 12 includes a ROM (Read Only Memory) 121, a RAM (Random Access Memory) 122, and a HDD (Hard Disk Drive) 123, and stores the program executed by the processor 11 and various data (maps, relational expressions, parameters, etc.) used in the program. The input device 13 is a keyboard, a mouse, etc., and accepts user operations. The display 14 provides various information to the user. The communication interface 15 is configured to communicate with the outside (the central server 5, the external servers 6, 7, etc.).
[0029] In this example, the database 16 includes an equipment specification database 161 that stores equipment specification data, an equipment performance database 162 that stores equipment performance data, a weather database 163 that stores first power consumption data, an occupancy database 164 that stores second power consumption data, and an electricity rate database 165 that stores an electricity rate table. Each of these data or tables will be described with reference to Figs. 3 to 7.
[0030] <Database> 3 is a conceptual diagram for explaining the equipment specification data. The equipment specification data is data in which the specifications of each piece of equipment are recorded in order to manage the naturally variable power sources 20 and the energy storage equipment 30 in the BEMS 1. In this example, an identification number (equipment ID) is assigned to each piece of equipment in the naturally variable power sources 20 and the energy storage equipment 30. The equipment specification data includes, for each equipment ID, the type of equipment, the capacity (the maximum energy that can be stored in the equipment), and the rated power (the maximum energy that can be input / output to / from the equipment per unit time). The equipment specification data may also include the manufacturer (not shown), model number (not shown), installation location, etc.
[0031] In this embodiment, the equipment specification data further includes a required power and a required period for the energy storage equipment 30. In general, the power storage equipment 31 can immediately store any amount of power within a range not exceeding the capacity and rated power. In contrast, in the heat storage equipment 32 and the hot water supply equipment 33, conversion from electric energy to thermal energy is performed. More specifically, generation (reheating) of hot water in the heat storage tank, generation of ice in the ice storage system, generation (reheating) of hot water for hot water supply, etc. are performed. For such energy conversion, it is necessary that power exceeding a predetermined amount is continuously supplied to the heat storage equipment 32 or the hot water supply equipment 33 for a certain period of time. Therefore, the minimum power and period required for efficient energy conversion are determined as the required power and the required period, respectively.
[0032] 4 is a conceptual diagram for explaining facility performance data. Facility performance data is data in which the performance of facility usage (past monitoring results by the server 10) is recorded. For the naturally variable power source 20, the facility performance data includes, as data linked to the facility ID, a time and a performance value of generated power at that time. For the energy storage facility 30, the facility performance data includes, as data linked to the facility ID, a time and a performance value of stored energy at that time, or a performance value of supplied energy (supply amount of stored energy) at that time. The time includes a power generation time, an energy storage time, and an energy supply time.
[0033] 5 is a conceptual diagram for explaining the first power consumption data. The first power consumption data is data in which the power consumption of the BEMS 1 (entire building) is recorded in association with meteorological information. In this example, the first power consumption data includes, for each hour of the day, meteorological information at that time (outdoor temperature, amount of solar radiation, amount of precipitation, various issued warnings, etc.) and the actual value of the power consumption of the entire building by the loads 40 in the building at that time. The server 10 acquires the meteorological information from an external server 6.
[0034] 6 is a conceptual diagram for explaining the second power consumption data. The second power consumption data is data in which the power consumption of the BEMS1 (entire building) is recorded in association with occupancy information. As described above, in the BEMS1, the occupancy management system 50 acquires the number of people occupying each room. In this example, the second power consumption data includes the time, the number of people occupying each room at that time, and the actual value of the power consumption of the entire building by the loads 40 in the building at that time.
[0035] The more people in a room, the higher the room temperature becomes due to heat generated by people. Also, the more people in a room, the more the power consumption of lighting equipment and office equipment tends to increase. The second power consumption data may be data obtained by obtaining a correlation between the number of people in the room and the power consumption of each piece of equipment through multivariate analysis, machine learning, or the like.
[0036] 7 is a conceptual diagram for explaining the electricity rate table. The electricity rate table includes data on the unit price of electricity (price per kWh) for each range of generated or consumed power amount for each time period. The server 10 obtains the electricity rate table from the external server 7.
[0037] <Function block> 8 is a functional block diagram of server 10 in this embodiment. Server 10 includes a generated power estimation unit 101, a power demand estimation unit 102, a surplus power calculation unit 103, a candidate extraction unit 104, a cost calculation unit 105, and a facility determination unit 106.
[0038] The generated power estimation unit 101 estimates the power generated by the naturally variable power source 20 (PV equipment in this embodiment). When the naturally variable power source 20 includes a plurality of equipment (for example, PV equipment and wind power generation equipment), the generated power estimation unit 101 estimates the generated power for each of the plurality of equipment. The generated power is estimated for each predetermined time frame (for example, 30 minutes) over a predetermined period of time (which may be 24 hours, three days, or one week) from the present time. The generated power estimation unit 101 can estimate the generated power for each time frame based on a weather forecast (weather, outside temperature, amount of solar radiation, wind speed, wind direction, amount of precipitation, probability of precipitation, etc.) acquired from the external server 6 and the actual value (history) of the generated power included in the equipment actual data. The generated power estimation unit 101 outputs the estimated result of the generated power to the surplus power calculation unit 103.
[0039] The power demand estimation unit 102 estimates the power demand (which may be referred to as power consumption) in the BEMS 1 for each of the above-mentioned time frames over the above-mentioned predetermined period. More specifically, the power demand estimation unit 102 can estimate the power demand for each time frame based on a weather forecast acquired from the external server 6, occupancy management information acquired from the occupancy management system 50, and actual values of power consumption included in the first power consumption data and the second power consumption data.
[0040] The power demand estimation unit 102 may estimate the power demand based only on the first power consumption data. However, the power demand estimation unit 102 can improve the accuracy of the power demand estimation by using both the first power consumption data and the second power consumption data, in other words, by correcting the first power consumption data using the second power consumption data. The power demand estimation unit 102 outputs the power demand estimation result to the surplus power calculation unit 103.
[0041] The surplus power calculation unit 103 calculates surplus power in the BEMS 1 based on the generated power estimated by the generated power estimation unit 101 and the power demand estimated by the power demand estimation unit 102 .
[0042] 9 is a diagram for explaining an example of a method for calculating surplus power. The surplus power calculation unit 103 calculates the difference between the surplus power and the power demand as the surplus power for each of the time frames over the predetermined period.
[0043] Returning to FIG. 8, the candidate extraction unit 104 extracts, from among the multiple energy storage facilities 30, one or more facilities capable of storing energy equivalent to surplus power (i.e., facilities capable of storing surplus power, or facilities capable of storing heat generated by surplus power) as candidates.
[0044] 10 is a diagram for explaining an example of a method for extracting candidates for the energy storage facility 30 that stores surplus power. The candidate extractor 104 extracts candidates based on two conditions.
[0045] The first condition is a condition related to the free capacity of the energy storage facility 30 (remaining energy that can be stored in the facility). The free capacity of the energy storage facility 30 can be calculated from the difference between the capacity of the facility (maximum energy that can be stored in the facility) and the energy already stored in the facility. The candidate extraction unit 104 can obtain the capacity from the facility specification data and obtain the energy already stored from the facility performance data. When the energy storage facility 30 has free capacity that can store energy equivalent to the surplus power, the candidate extraction unit 104 determines that the facility satisfies the first condition.
[0046] 10, the plurality of energy storage facilities 30 includes three facilities A, B, and C. Here, it is assumed that all of the three facilities A, B, and C satisfy the first condition.
[0047] The second condition is a condition related to the required power and required period required for efficient energy conversion, as described in FIG. 4. The required power of facility A is written as Pa, and the required period of facility A is written as Ta. The same applies to facilities B and C. In this example, the required period Ta, during which the surplus power is required to exceed the required power Pa, corresponds to four time frames (e.g., 2 hours). The required periods Tb and Tc correspond to three time frames (e.g., 1.5 hours). The surplus power in the four time frames t1 to t4 is written as P1 to P4, respectively.
[0048] For facility A, surplus power P1-P3 exceeds the required power Pa in three time frames t1-t3 out of four time frames t1-t4 that fall into the request period Ta. However, surplus power P4 in time frame t4 is less than the required power Pa. In this case, the energy required for producing hot water in the heat storage tank and ice in the ice storage system will not be supplied to facility A in time frame t4, and efficient energy conversion may not be achieved. Therefore, facility A is not extracted as a candidate.
[0049] On the other hand, for equipment B, the surplus power P1-P3 exceeds the required power Pb in all three time frames t1-t3 that correspond to the required period Tb. Similarly, for equipment C, the surplus power P1-P3 exceeds the required power Pc in all three time frames t1-t3. In this case, the energy required for producing hot water, ice, etc. is supplied to equipment B and C, so efficient energy conversion can be achieved. Therefore, equipment B and C are extracted as candidates.
[0050] Referring again to FIG. 8, the cost calculation unit 105 calculates, for each of one or more candidates (in this example, facilities B and C) extracted by the candidate extraction unit 104, the cost that will be reduced when surplus power (energy equivalent to surplus power) is stored in that candidate.
[0051] FIG. 11 is a diagram for explaining an example of a cost calculation method. First, the cost calculation unit 105 calculates the cost reduction amount for each of the facilities B and C. The cost reduction amount is the expected cost reduction amount when energy is stored in the energy storage facility 30. For example, the cost calculation unit 105 can calculate the cost reduction amount by the facility by converting the energy stored in the facility (electric energy, or the amount of heat converted into electric energy) into a monetary value using the unit price included in the electricity rate table. In this example, the cost reduction amount for the facility B is 14,000 yen, and the cost reduction amount for the facility C is 15,000 yen.
[0052] The cost calculation unit 105 calculates the energy loss amount for each of the facilities B and C. The energy loss amount is the amount of energy loss that occurs until the energy stored in the energy storage facility 30 is supplied to the load 40. As described above, the facility performance data includes the energy loss that occurs per unit time (per time frame) in each energy storage facility 30. In addition, since the facility performance data includes the energy supply time of each energy storage facility 30, it is possible to predict the time when each energy storage facility 30 next supplies energy to the load 40. Therefore, the cost calculation unit 105 can calculate the energy loss amount by calculating the total amount of energy loss up to the energy supply time based on the energy loss per unit time and converting the calculated total amount of energy loss into a monetary amount using the unit price included in the electricity rate table. In this example, the energy loss amount of the facility B is 1,000 yen, and the energy loss amount of the facility C is 3,000 yen.
[0053] The cost calculation unit 105 calculates the actual cost reduction amount by subtracting the energy loss amount from the cost reduction amount for each of the facilities B and C. In this example, the actual cost reduction amount for the facility B is 14,000 yen-1,000 yen=13,000 yen, and the actual cost reduction amount for the facility C is 15,000 yen-3,000 yen=12,000 yen. In other words, when comparing the facilities B and C, the actual cost reduction amount for the facility C without considering the energy loss is larger, but the actual cost reduction amount for the facility B with considering the energy loss is larger.
[0054] Returning to Fig. 8, the equipment determination unit 106 determines an equipment for storing surplus power from among the candidates extracted by the candidate extraction unit 104 (equipment B and C in the example described in Fig. 10) based on the calculation result by the cost calculation unit 105. More specifically, the equipment determination unit 106 determines the equipment for which the cost calculated by the cost calculation unit 105 results in the largest effective cost reduction (equipment B in the example described in Fig. 11) as the equipment for storing surplus power. The equipment determination unit 106 outputs an energy storage command to the determined equipment.
[0055] <Processing flow> 12 is a flowchart showing the procedure of a calculation process related to surplus power in an embodiment. The process shown in this flowchart is executed when a predetermined condition is met (for example, at a predetermined interval). Each step is realized by software processing by the processor 11 in the server 10, but may also be realized by hardware (electrical circuitry) arranged in the server 10. Hereinafter, steps are abbreviated as S.
[0056] In S11, the server 10 estimates the power generation by the variable natural power sources 20 of the entire building for each time frame over a predetermined period in the future. In this embodiment, the power generation by the PV equipment is estimated. The server 10 can estimate the power generation for each time frame over a predetermined period based on meteorological information (e.g., solar radiation) and the actual value of the power generation by each PV equipment included in the equipment performance data.
[0057] In S12, the server 10 estimates the power demand of the entire building for each time frame over the above-mentioned predetermined period. For example, the server 10 can estimate the power demand of the entire building based on the first power consumption data based on meteorological information and the actual value of the power consumption by the load 40 included in the equipment performance data. As described above, the server 10 can improve the accuracy of estimating the power demand by using the first power consumption data based on the occupancy information.
[0058] In S13, the server 10 calculates the surplus power for each time frame over the above-mentioned predetermined period based on the generated power calculated in S11 and the power demand calculated in S12. As described in Fig. 9, the surplus power is calculated by subtracting the power demand from the generated power.
[0059] In S14, the server 10 determines whether surplus power will be generated. If the power demand is greater than the generated power over the above-mentioned predetermined period and surplus power will not be generated (NO in S14), the server 10 ends the series of processes without executing the following processes. If surplus power will be generated for at least a portion of the above-mentioned predetermined period (YES in S14), the server 10 proceeds to S15.
[0060] In S15, the server 10 extracts one or more facilities capable of storing surplus power (energy equivalent to surplus power) as candidates from among the multiple energy storage facilities 30, based on the required power and the required period determined for each energy storage facility 30. This extraction method has been described in detail with reference to FIG. 10, and therefore will not be described again here.
[0061] In S16, the server 10 calculates the actual cost reduction amount for each candidate extracted in S15, taking into consideration the energy loss that occurs from storing energy to supplying it. This calculation method has also been described in detail with reference to FIG. 11, and therefore will not be described again.
[0062] In S17, the server 10 determines, from among one or more candidates, the facility with the largest actual cost reduction amount as the storage destination for the surplus power. Note that, for example, when there are many candidates, the server 10 may determine, in addition to the facility with the largest actual cost reduction amount, other facilities with large actual cost reduction amounts (such as the facility with the second largest actual cost reduction amount) as the storage destination for the surplus power. Also, for example, when the surplus power is large, the server 10 may determine two or more facilities with large actual cost reduction amounts as the storage destination for the surplus power.
[0063] As described above, in this embodiment, one or more energy storage facilities 30 that satisfy the conditions related to the requested power and the requested period are extracted from a plurality of energy storage facilities 30. This allows surplus power to be efficiently stored in the extracted energy storage facility 30. More specifically, the extracted energy storage facility 30 performs efficient energy conversion, so energy loss is small. Therefore, it is possible to increase the amount of stored energy while reducing the amount of energy loss. Therefore, according to this embodiment, it is possible to achieve both energy saving and economic efficiency in a building.
[0064] Variations. In this modification, a configuration will be described in which surplus power is stored more efficiently by executing energy saving control in a building.
[0065] 13 is a diagram for explaining a method for extracting candidates for the energy storage facility 30 that stores surplus power in the modified example. The server 10 can execute energy saving control of the building (load 40 of the BEMS 1) by controlling, for example, air conditioning equipment, lighting equipment, or elevators. When the power consumption of the entire building is reduced by the energy saving control, the surplus power increases accordingly.
[0066] In FIG. 10, it has been explained that facility A is not extracted as a candidate. This is because the surplus power P4 in time frame t4 is less than the required power Pa, and efficient energy conversion cannot be realized. However, as shown in FIG. 13, when the surplus power increases due to energy saving control, the surplus power P4 in time frame t4 may exceed the required power Pa. In that case, facility A can also realize efficient energy conversion, and facility A is also extracted as a candidate. In this way, by increasing the surplus power through energy saving control, it is possible to increase the number of candidates for one or more energy storage facilities 30 that satisfy the conditions related to the required power and the required period.
[0067] 14 is a flowchart showing the procedure of the calculation process related to surplus power in the modified example. The processes of S21 and S22 are equivalent to the processes of S11 and S12 (see FIG. 12) in the embodiment.
[0068] In S23, the server 10 determines whether the power generated by the variable natural power source 20 and / or the power demand of the entire building meets a predetermined condition. For example, the server 10 may determine that the condition is met when the power generation does not reach a first reference amount, or when the power demand exceeds a second reference amount, or when the power generation does not reach the first reference amount and the power demand exceeds the second reference amount. If the condition is met (YES in S23), the server 10 proceeds to S24. If the condition is not met (NO in S23), the server 10 skips the process of S24 and proceeds to S25.
[0069] In S24, the server 10 executes energy saving control of the building (load 40 of the BEMS 1). The energy saving control may be reducing the air volume of the air conditioning equipment, changing the set temperature, or reducing the illumination range and light intensity of the lighting equipment. The energy saving control may be, for example, thinning out the operation of elevators (elevators, escalators, etc.), or power saving control of office automation equipment. The process from S25 onwards is the same as the process from S13 onwards in the embodiment, and therefore description will not be repeated.
[0070] Furthermore, although not shown, when the server 10 receives a weather disaster forecast (a warning or alert regarding a typhoon, heavy rain, flood, heavy snow, strong wind, heat wave, cold wave, lightning strike, etc.) from the external server 6, the server 10 may increase the amount of energy stored in the energy storage facilities 30 in preparation for the occurrence of a weather disaster, compared to normal times (when no weather disaster forecast has been received). In other words, when no weather disaster forecast has been received, the server 10 causes each of the multiple energy storage facilities 30 to store energy in excess of a first specified amount. On the other hand, when the server 10 receives a weather disaster forecast, the server 10 causes each of the multiple energy storage facilities 30 to store energy in excess of a second specified amount that is larger than the first specified amount.
[0071] As described above, in this modification, as in the embodiment, one or more energy storage facilities 30 that satisfy the conditions related to the requested power and the requested period are extracted from among a plurality of energy storage facilities 30. This allows both energy saving and economic efficiency in the building to be achieved. Furthermore, in this modification, surplus power is increased by energy saving control in the building. This allows the number of candidates for storing surplus power to be increased. In other words, it is possible to increase the possibility of extracting an energy storage facility 30 that performs more efficient energy conversion and has less energy loss as a candidate. This allows both energy saving and economic efficiency in the building to be achieved at an even higher level.
[0072] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0073] 1 BEMS, 5 central server, 6,7 external server, 8 network, 9 power system, 10 server, 11 processor, 12 memory, 13 input device, 14 display, 15 communication interface, 16 database, 161 equipment specification database, 162 equipment performance database, 163 weather database, 164 occupancy database, 165 electricity rate database, 20 naturally variable power source, 30 energy storage equipment, 31 power storage equipment, 32 heat storage equipment, 33 hot water equipment, 40 load, 50 occupancy management system, 101 power generation estimation unit, 102 power demand estimation unit, 103 surplus power calculation unit, 104 candidate extraction unit, 105 cost calculation unit, 106 equipment decision unit.
Claims
1. A server for managing energy in a building provided with a naturally variable power source whose generated power varies depending on weather conditions and a plurality of energy storage facilities each storing energy in the form of electricity or heat, a processor that executes a calculation process to determine in which of the plurality of energy storage facilities the generated power of the variable natural power source is to be stored; The processor, When the power generated by the naturally variable power source exceeds the power consumption of the building and surplus power is generated, extracting from the plurality of energy storage facilities one or more energy storage facilities for which the period during which the surplus power exceeds a predetermined amount is longer than a period during which continuous energy storage is required according to the specifications of the facility; A server that calculates, for each of the one or more energy storage facilities, an amount of reduction in electricity charges when the surplus electricity is stored in the energy storage facility, and determines an energy storage facility in which to store the surplus electricity based on the amount of reduction.
2. The server according to claim 1 , wherein the processor increases the number of energy storage facilities extracted as the one or more energy storage facilities by executing energy saving control that suppresses power consumption of the building so that the period during which the surplus power exceeds the predetermined amount becomes longer.
3. 2. The server according to claim 1, wherein the processor calculates the reduction amount for each of the one or more energy storage facilities based on an amount obtained by converting the energy stored in the energy storage facility as the surplus electricity into an electricity bill and an amount obtained by converting the energy loss that occurs until the surplus electricity stored in the energy storage facility is consumed into an electricity bill.
4. The building is further provided with an entrance / exit management system that manages information on the presence of people in each of a plurality of rooms in the building; The server of claim 1 , wherein the processor estimates power consumption of the building using the occupancy information.
5. The processor, When no weather disaster is forecast, storing the generated power of the naturally variable power sources in the plurality of energy storage facilities such that energy exceeding a first specified amount is stored in each of the plurality of energy storage facilities; 2. The server according to claim 1, wherein, when the forecast is received, the server causes the plurality of energy storage facilities to store the generated power of the naturally variable power source so that each of the plurality of energy storage facilities stores energy in excess of a second specified amount that is greater than the first specified amount in preparation for the occurrence of the weather disaster.
6. A server according to any one of claims 1 to 5; The naturally variable power source; and a plurality of energy storage facilities.
7. A building energy management method for managing energy in a building provided with a naturally variable power source whose generated power varies depending on weather conditions and a plurality of energy storage facilities each storing energy in the form of electricity or heat, comprising: determining whether the power generated by the variable natural power source exceeds the power consumption of the building, resulting in surplus power; When the surplus power occurs, extracting, from the plurality of energy storage facilities, one or more energy storage facilities for which a period during which the surplus power exceeds a predetermined amount is longer than a period during which continuous energy storage is required; and calculating, for each of the one or more energy storage facilities, an amount of reduction in electricity charges when the surplus electricity is stored in the energy storage facility, and determining an energy storage facility in which to store the surplus electricity based on the amount of reduction.
Citation Information
Patent Citations
Load control device
JP2007295680A
Power management device
JP2017022918A
Power controller
JP2017079564A
Hot-water supply device control system and hot-water supply device control method
JP2019088151A
Power supply system
JP2021023062A
