Water treatment system, control device and control method

The wastewater treatment system optimizes air supply to reaction tanks by using real-time water quality measurements and pipe pressure adjustments, addressing inefficiencies in energy consumption and distribution, thereby enhancing treatment efficiency.

JP7586949B2Active Publication Date: 2024-11-19METAWATER CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023042406
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-03-16
Publication Date
2024-11-19
Estimated Expiration
2037-03-30

AI Technical Summary

Technical Problem

Existing wastewater treatment systems face inefficiencies in air supply to reaction tanks, leading to excessive energy consumption and inconsistent air distribution due to fixed pressure settings based on maximum load assumptions, which can result in unnecessary air supply and uneven distribution across multiple tanks.

Method used

A wastewater treatment system with an air supply amount control device that includes a water quality measurement unit, required air amount acquisition unit, and air blowing control unit to dynamically adjust air supply based on real-time water quality measurements and pipe pressure losses, ensuring optimal air distribution while minimizing energy consumption.

Benefits of technology

The system effectively supplies the required amount of air to each tank while reducing energy consumption by adapting to varying load conditions and pipe pressure losses, ensuring efficient biological treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007586949000001
    Figure 0007586949000001
  • Figure 0007586949000002
    Figure 0007586949000002
  • Figure 0007586949000003
    Figure 0007586949000003
Patent Text Reader

Abstract

It reduces the energy consumption required for air blowing while supplying air appropriately to each tank. [Solution] The wastewater treatment system 1 has multiple reaction tanks 10, an air duct 30, an air blowing unit 20, and an air supply amount control unit 40. The air supply amount control unit 40 has a water quality measurement unit that measures the state of the wastewater in the reaction tanks 10, a required air amount acquisition unit that acquires, for each reaction tank 10, the amount of air required to bring the wastewater in the reaction tanks 10 to a predetermined target water quality based on the measurement results of the water quality measurement unit, a target pipe pressure calculation unit that calculates the air duct pressure loss when the required amount of air is supplied into the air duct 30, calculates a target pipe pressure based on the air duct pressure loss, and changes the calculated target pipe pressure in accordance with changes in the required air amount, and an air blowing control unit that controls the air supply from the air blowing unit 20 so that the pressure in the air duct 30 becomes the target pipe pressure.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a wastewater treatment system, an air supply amount control device for a wastewater treatment device, and a method for controlling the air supply amount for a wastewater treatment device. [Background technology]

[0002] Various treatment methods, including the standard activated sludge process, have been put into practical use as wastewater treatment systems for treating wastewater such as domestic wastewater or industrial wastewater. In wastewater treatment systems, an aeration process is carried out in which the wastewater to be treated is introduced into a reaction tank while air is supplied to the aerobic microorganisms present in the reaction tank. As a result, organic matter contained in the wastewater in the reaction tank is decomposed by the biological treatment of the aerobic microorganisms, and stable treated water quality is obtained.

[0003] Air for aeration in the reaction tank is supplied from a blower through a blower pipe. For example, as shown in Patent Document 1, the blower controls the amount of air supplied so that the amount of air is the amount required for biological treatment in the reaction tank. In addition, the blower may supply air so that the pressure in the blower pipe is constant. When the pressure in the blower pipe is constant, the pressure in the blower pipe is set to a value that can supply the necessary amount of air to ensure biological treatment in the reaction tank. Therefore, the pressure in the blower pipe is set to a value that can sufficiently perform biological treatment even under the assumed maximum load, assuming the case where the load of wastewater flowing into the reaction tank (for example, the concentration of ammonia nitrogen and BOD, which are the target of biological treatment) is the largest. In addition, Patent Document 2 describes a technology for determining the pressure in the blower pipe so that the opening degree of the air introduction valve to the aeration tank that maximizes the required amount of air among multiple aeration tanks is maximized. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Publication No. 9-47780 [Patent Document 2] Japanese Patent Publication No. 56-129088 Summary of the Invention [Problem to be solved by the invention]

[0005] However, when the pressure in the air blower pipe is set assuming the maximum load, if the load in the reaction tank is lower than the maximum load, more air than necessary will be supplied. In this case, the amount of air to the reaction tank is limited by a valve installed in the air blower pipe, but the air blower itself supplies air to a pressure assuming the maximum load, so part of the energy required for the air blowing is wasted. In other words, when the pressure in the air blower pipe is controlled to be constant, the energy consumption required for the air blowing becomes higher than the energy required for the actual air blowing. In addition, when air is blown to multiple aeration tanks, the degree of pressure loss differs for each pipe connected to each aeration tank. Therefore, as in Patent Document 2, when the pipe pressure is set based on the required air volume of one aeration tank, there is a risk that the pipe pressure will not be able to supply an appropriate amount of air to other aeration tanks. For example, when the pipe pressure is set based on the required air volume of one aeration tank, there is a risk that the pipe pressure will not be able to supply the required amount of air to other aeration tanks with a large degree of pressure loss. Thus, in wastewater treatment systems, there is a demand for appropriately supplying air to each tank while suppressing the energy consumption required for blowing air.

[0006] The present invention has been made in consideration of the above, and aims to provide a wastewater treatment system, an air supply volume control device, and an air supply volume control method that appropriately supply air to each tank while reducing the energy consumption required for blowing air. [Means for solving the problem]

[0007] In order to solve the above-mentioned problems and achieve the object, the wastewater treatment system of the present disclosure includes a plurality of reaction tanks for performing biological treatment on wastewater, a blower pipe which is a pipe connected to the plurality of reaction tanks, a blower unit which supplies air for performing the biological treatment to the plurality of reaction tanks via the blower pipe, and an air supply amount control unit which controls the amount of air supplied to the reaction tanks, and the air supply amount control unit is provided in the reaction tank and includes a water quality measurement unit which measures the state of the wastewater in the reaction tank, and a water quality control unit which adjusts the wastewater in the reaction tank to a predetermined target temperature based on the measurement results of the water quality measurement unit. The system includes a required air amount acquisition unit that acquires the amount of air required for each reaction tank to achieve the water quality, a target pipe pressure calculation unit that calculates an air supply pipe loss pressure, which is the pressure of air lost due to pressure loss in the air supply pipe when the required amount of air is supplied into the air supply pipe, calculates a target pipe pressure in the air supply pipe based on the air supply pipe loss pressure, and changes the calculated target pipe pressure in accordance with changes in the required air amount, and an air supply control unit that controls the air supply from the air supply unit so that the pressure in the air supply pipe becomes the target pipe pressure.

[0008] It is preferable that the target pipe pressure calculation unit calculates the target pipe pressure by summing the air blower pressure loss, the pressure loss due to pressure loss in an aeration unit provided in the reaction tank for diffusing air from the air blower pipe into the reaction tank, and the head pressure of wastewater in the reaction tank, so that the target pipe pressure is equal to or greater than the sum of these values.

[0009] The air blower duct preferably has a main pipe connected to the air blower unit, a plurality of branch pipes branching off from the main pipe and connected to each of the reaction tanks, an inlet valve provided in the branch pipe, and a branch pipe air volume measuring unit that measures the amount of air supplied to each of the plurality of branch pipes as a detected air volume, and the air supply volume control unit preferably has an inlet air control unit that adjusts the opening of the inlet valve in each of the branch pipes so that the detected air volume becomes the required air volume.

[0010] It is preferable that the air supply volume control unit further has a differential air volume calculation unit that calculates a differential air volume for each reaction tank, which is the difference between the required air volume and the detected air volume, when the total detected air volume, which is the sum of the detected air volumes for each branch pipe, is different from the total required air volume, which is the sum of the required air volumes for each reaction tank, and the target pipe pressure calculation unit corrects the target pipe pressure based on the loss pressure due to pressure loss in the air supply pipe when air of the differential air volume is supplied into the air supply pipe, and the air supply control unit controls the air supply from the air supply unit so that the pressure in the air supply pipe becomes the corrected target pipe pressure.

[0011] It is preferable that the required air amount acquisition unit has a relationship memory unit that stores a water quality / air amount relationship, which is the relationship between the amount of air supplied to the reaction tank and the amount of change in water quality in the reaction tank when that amount of air is supplied, and a required air amount calculation unit that calculates the amount of air required to change the water quality of the wastewater to the target water quality as the required air amount based on the water quality / air amount relationship, the water quality measurement results by the water quality measuring unit, and the target water quality.

[0012] It is preferable that the relationship memory unit stores the water quality-air quantity relationship as a first-order lag system in which changes in the water quality of the wastewater lag behind changes in the amount of air supplied into the reaction tank, and that the required air quantity calculation unit updates the required air quantity based on the water quality measurement results obtained by the water quality measurement unit at each predetermined time interval.

[0013] In order to solve the above-mentioned problems and achieve the object, the air supply amount control device of the present disclosure is an air supply amount control device that controls the air supply amount of a wastewater treatment device having a plurality of reaction tanks in which wastewater is biologically treated, a blower pipe which is a pipe connected to the plurality of reaction tanks, and a blower unit that supplies air for performing the biological treatment to the plurality of reaction tanks via the blower pipe, and further includes a water quality measurement unit that is provided in the reaction tank and measures the state of the wastewater in the reaction tank, and a water quality control unit that determines whether the wastewater in the reaction tank has a predetermined target water quality based on the measurement result of the water quality measurement unit. the required air volume acquisition unit acquiring the amount of air required for each reaction tank to be filled; a target pipe pressure calculation unit calculating an air pipe loss pressure, which is the pressure of air lost due to pressure loss in the air pipe when the required amount of air is supplied into the air pipe, calculating a target pipe pressure in the air pipe based on the air pipe loss pressure and varying the calculated target pipe pressure in accordance with changes in the required air volume; and an air supply control unit controlling the air supply from the air supply unit so that the pressure in the air pipe becomes the target pipe pressure.

[0014] In order to solve the above-mentioned problems and achieve the object, the air supply amount control method of the present disclosure is an air supply amount control method for controlling the air supply amount of a wastewater treatment device having a plurality of reaction tanks for biological treatment of wastewater, a blower duct which is a tube connected to the plurality of reaction tanks, and a blower unit which supplies air for performing the biological treatment to the plurality of reaction tanks through the blower duct, and includes a measurement step for measuring the state of the wastewater in the reaction tank, a required air amount acquisition step for acquiring, for each reaction tank, the amount of air required for the wastewater in the reaction tank to reach a predetermined target water quality based on the measurement result of the state of the wastewater, a target pipe pressure calculation step for calculating a blower duct loss pressure, which is the pressure of air lost due to pressure loss in the blower duct when the required amount of air is supplied into the blower duct, calculating a target pipe pressure in the blower duct based on the blower duct loss pressure, and changing the calculated target pipe pressure in accordance with the change in the required amount of air, and an air supply control step for controlling the air supply from the blower unit so that the pressure in the blower duct becomes the target pipe pressure. Effect of the Invention

[0015] According to the present invention, it is possible to appropriately supply air to each tank while suppressing the energy consumption required for blowing air. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1 is a schematic diagram of a wastewater treatment system according to a first embodiment. [Diagram 2] FIG. 2 is a block diagram showing the configuration of the control unit according to the first embodiment. [Diagram 3] FIG. 3 is a graph for explaining the relationship between water quality and air quantity. [Figure 4] FIG. 4 is a graph showing an example of the relationship between the required air amount and the target pipe pressure. [Diagram 5] FIG. 5 is a flow chart illustrating a control flow for supplying a required amount of air to each reaction tank by setting the pressure inside the air blower pipe to a target pipe pressure. [Figure 6] FIG. 6 is a flowchart illustrating the control of the blower by the blower control unit. [Figure 7] FIG. 7 is a graph illustrating the control of the blower by the blower. [Figure 8] FIG. 8 is a block diagram showing the configuration of a control unit according to the second embodiment. [Figure 9] FIG. 9 is a flowchart illustrating a flow of correcting the pipe internal pressure according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment of a wastewater treatment system according to the present invention will be described in detail below with reference to the drawings. However, the present invention is not limited to this embodiment.

[0018] (First embodiment) (Configuration of wastewater treatment system) Fig. 1 is a schematic diagram of a wastewater treatment system according to the first embodiment. As shown in Fig. 1, the wastewater treatment system 1 according to the first embodiment includes reaction tanks 10A, 10B, and 10C, a blower unit 20, a blower duct 30, and an air supply amount control unit 40. The wastewater treatment system 1 supplies air from the blower unit 20 into the reaction tank 10 through the blower duct 30 while controlling the amount of air supplied into the reaction tank 10 with the air supply amount control unit 40, and biologically treats the wastewater W inside the reaction tank 10 with activated sludge.

[0019] The reaction tanks 10A, 10B, and 10C have an aeration unit 12 therein and are tanks in which activated sludge is stored. Wastewater W flows into the reaction tanks 10A, 10B, and 10C from a settling tank (not shown). The wastewater W is water after some solids have been separated from the raw water by a settling tank (not shown). The raw water here refers to wastewater and sewage discharged from homes, factories, etc. The aeration unit 12 aerates the stored activated sludge with air supplied from the blower unit 20. The reaction tanks 10A, 10B, and 10C perform biological treatment on the wastewater W using the aerated activated sludge, and discharge the treated water, which is the wastewater W after the biological treatment, into a solid-liquid separation tank (not shown). In this solid-liquid separation tank (not shown), the treated water is further subjected to solid-liquid separation treatment, and the water after the solid-liquid separation treatment is discharged to the external environment, for example, after disinfection treatment.

[0020] The reaction tanks 10A, 10B, and 10C are provided in parallel. That is, wastewater W is supplied from a settling tank to the reaction tanks 10A, 10B, and 10C in parallel. However, the reaction tanks 10A, 10B, and 10C may be arranged in series with each other. That is, the reaction tank 10B may be connected to the reaction tank 10A, and the wastewater W after biological treatment in the reaction tank 10A may be introduced into the reaction tank 10B, and biological treatment may be performed again in the reaction tank 10B. In addition, the reaction tanks 10A, 10B, and 10C are three aerobic tanks in total, but the number of them is arbitrary. In addition, an anaerobic tank or anoxic tank may be connected in series to the reaction tanks 10A, 10B, and 10C. Hereinafter, when the reaction tanks 10A, 10B, and 10C are not distinguished from each other, they will be described as reaction tanks 10.

[0021] As shown in FIG. 1, the blower unit 20 has a plurality of blowers, 22A, 22B, 22C, and 22D. The blowers 22A, 22B, 22C, and 22D are blowers having the same functions. The blowers 22A, 22B, 22C, and 22D introduce air from the outside through an inlet vane and exhaust the introduced air by a rotating blade portion. The opening degree of the inlet vane of the blowers 22A, 22B, 22C, and 22D is adjustable, and the rotation speed of the blade portion is also adjustable. The blowers 22A, 22B, 22C, and 22D are connected to the blower duct 30 in parallel on the side discharging air from the blade portion, and each blows the discharged air into the blower duct 30. Hereinafter, when the blowers 22A, 22B, 22C, and 22D are not distinguished from each other, they will be referred to as the blower 22. The number of fans 22 included in the blower unit 20 is arbitrary.

[0022] The air duct 30 is a tube that conducts air inside. The air duct 30 has an inlet pipe 31, a main pipe 32, branch pipes 34A, 34B, and 34C, and an inlet valve 36. One end of the inlet pipe 31 branches and is connected to each of the blowers 22, and air is supplied from the blowers 22. The other end of the inlet pipe 31 is connected to the main pipe 32, and the air from each blower 22 is joined together, and the joined air A is conducted to the main pipe 32. The main pipe 32 is a single pipe. The main pipe 32 is connected to branch pipes 34C, 34B, and 34A in this order from the upstream side of the flow of air A, i.e., the blower 22 side.

[0023] The branch pipe 34A is connected to the aeration section 12 of the reaction tank 10A on the side opposite to the connection section of the mother pipe 32, and supplies a part of the air A from the mother pipe 32 to the reaction tank 10A. The branch pipe 34B is connected to the aeration section 12 of the reaction tank 10B on the side opposite to the connection section of the mother pipe 32, and supplies a part of the air A from the mother pipe 32 to the reaction tank 10B. The branch pipe 34C is connected to the aeration section 12 of the reaction tank 10C on the side opposite to the connection section of the mother pipe 32, and supplies a part of the air A from the mother pipe 32 to the reaction tank 10C. The introduction valves 36 are attached to the branch pipes 34A, 34B, and 34C. The introduction valves 36 are valves that are opened and closed by the air supply amount control unit 40, and the amount of air supplied to each reaction tank 10 is adjusted by adjusting the opening degree of the introduction valves. Hereinafter, when the branch pipes 34A, 34B, and 34C are not to be distinguished from one another, they will be referred to as the branch pipes 34.

[0024] The air supply amount control unit 40 as an air supply amount control device has a control unit 42, a nitric acid meter 43 and an ammonia meter 44 as water quality measurement units, an intake measurement unit 46, a main pipe internal pressure measurement unit 47, and a branch pipe air amount measurement unit 48. The control unit 42 is a control device that controls the amount of air supplied to each reaction tank 10 based on the measurement results of the nitric acid meter 43, the ammonia meter 44, the intake measurement unit 46, the main pipe internal pressure measurement unit 47, and the branch pipe air amount measurement unit 48. The control unit 42 will be described in detail later. The air supply amount control unit 40 controls the amount of air supplied to multiple reaction tanks 10, but may be provided for each reaction tank 10 to control the amount of air supplied to one reaction tank 10.

[0025] The nitric acid meter 43 is a sensor provided in each reaction tank 10 and measures the nitric acid concentration of the wastewater W in the reaction tank 10. In this embodiment, the nitric acid in the wastewater W is nitric acid (HNO3), nitrous acid (HNO2), nitrate nitrogen (NO3-N), nitrite nitrogen (NO2-N), a combination of nitrate nitrogen and nitrite nitrogen, and NO2, which indicates both nitric acid and nitrous acid. x That is, the nitric acid concentration in this embodiment includes nitric acid, nitrous acid, nitrate nitrogen, nitrite nitrogen, a combination of nitrate nitrogen and nitrite nitrogen, and NO 2 , which indicates both nitric acid and nitrous acid. x The concentration may be any of the above.

[0026] The ammonia meter 44 is provided in each reaction tank 10 and is a sensor that measures the ammonia concentration of the wastewater W in the reaction tank 10. In this embodiment, the ammonia concentration of the wastewater W is a concept that includes ammonia and ammoniacal nitrogen. That is, the ammonia concentration in this embodiment may be the concentration of either ammonia (NH3) or ammoniacal nitrogen (NH4-N). That is, the nitric acid meter 43 and the ammonia meter 44 can be said to measure the state of the wastewater W in the reaction tank 10. Note that, although one water quality measurement unit, i.e., one nitric acid meter 43 and one ammonia meter 44, is provided for each reaction tank 10, a configuration in which one water quality measurement unit is provided for multiple reaction tanks 10 may also be used.

[0027] The intake measuring unit 46 is provided on the intake side of each blower 22 and measures the amount of air taken in by the blower 22. The mother pipe internal pressure measuring unit 47 is attached to the mother pipe 32 and measures the pressure inside the mother pipe 32, i.e., the pressure of the air supplied by each blower 22. More specifically, the mother pipe internal pressure measuring unit 47 is provided upstream of the flow of air A from the branch pipe 34C, i.e., upstream of the flow of air A from the connections with all the branch pipes 34. The branch pipe air amount measuring unit 48 is provided in each branch pipe 34 and measures the amount of air supplied from each branch pipe 34 to the reaction tank 10. More specifically, the branch pipe air amount measuring unit 48 is provided upstream of the air flow from the introduction valve 36, i.e., between the introduction valve 36 and the mother pipe 34 in the branch pipe 34. The branch pipe air amount measuring unit 48 measures the amount of air supplied to the branch pipe 34, more specifically, the amount of air upstream of the inlet valve 36 in the branch pipe 34, as the detected air amount. In other words, the branch pipe air amount measuring unit 48 measures the amount of air supplied from the branch pipe 34 to the reaction tank 10 via the inlet valve 36 as the detected air amount.

[0028] (Water treatment in a reactor) Next, a description will be given of the biological treatment of the wastewater W in the reaction tank 10. In the reaction tank 10, a nitrification reaction is carried out by nitrifying bacteria, which are aerobic microorganisms in activated sludge, under aerobic conditions, in which ammonia nitrogen (NH4-N) in the treated water is nitrified into nitrite nitrogen (NO2-N) and nitrate nitrogen (NO3-N) as shown in the following reaction formulas (1) to (3).

[0029] NH3+O2+2e - +2H + →NH2OH+H2O …(1) NH2OH+H2O→NO2 - +5H + +4e - …(2) NO2 - +0.5O2 → NO3 - …(3)

[0030] On the other hand, in the region in the reaction tank 10 where the amount of oxygen in the water to be treated is low, a denitrification reaction (anaerobic reaction) occurs due to the low amount of oxygen. If a sufficient carbon source is supplied to the region where this denitrification reaction occurs (denitrification reaction region), the denitrification reaction can also proceed sufficiently. As a result, a region in the reaction tank 10 where the denitrification reaction takes place is partially generated. This allows nitrogen removal by decomposing nitrous oxide (NO) gas generated due to insufficient nitrification into nitrogen and carbon dioxide, or by reducing nitrite without generating nitrous oxide, as shown in the following reaction equations (4) to (10).

[0031] NO2 - +3H + +2e - → 0.5N2O+1.5H2O …(4) NO2 - +H + +2(H) → 0.5N2O+1.5H2O …(5) No.3 - +H + +5(H) → 0.5N2+3H2O …(6) No.3 - +2H → NO2 - +H2O …(7) NO2 - +H + +(H) → NO+H2O …(8) NO+(H) → 0.5N2O+0.5H2O …(9) N2O+2(H) → N2+H2O …(10)

[0032] The nitric acid meter 43 detects the progress of the denitrification reaction, i.e., the degree of decomposition of nitric acid, by measuring the nitric acid concentration of the wastewater W in the reaction tank 10. The ammonia meter 44 detects the progress of the nitrification reaction, i.e., the degree of decomposition of ammonia, by measuring the ammonia concentration of the wastewater W in the reaction tank 10. The air supply amount control unit 40 controls the amount of air supplied to the reaction tank 10 based on the measurement results of the nitric acid meter 43 and the ammonia meter 44. For example, when the nitric acid concentration is higher than a predetermined numerical range, the air supply amount control unit 40 determines that the denitrification reaction is insufficient and reduces the amount of air supplied to the reaction tank 10, and when the nitric acid concentration is lower than the predetermined numerical range, the air supply amount control unit 40 determines that the denitrification reaction has progressed too much and the nitrification reaction is insufficient and increases the amount of air supplied to the reaction tank 10. Similarly, when the ammonia concentration is higher than a predetermined range, the air supply amount control unit 40 determines that the nitrification reaction is insufficient and increases the amount of air supplied to the reaction tank 10, and when the ammonia concentration is lower than the predetermined range, it determines that the nitrification reaction has progressed too far and the denitrification reaction is insufficient and decreases the amount of air supplied to the reaction tank 10. In other words, the nitric acid meter 43 detects the relative degree of progress of the denitrification reaction with respect to the degree of progress of the nitrification reaction.

[0033] An example of confirmation of the progress of the denitrification reaction by the nitric acid meter 43 will be supplementarily described. In this embodiment, the reaction tank 10 is operated so that the activated sludge concentration is constant, and the rate of the nitrification reaction by one nitrifying bacterium and the rate of denitrification by one denitrifying bacterium are almost constant at room temperature. In addition, the water quality of the wastewater W, that is, the ammonia concentration, is kept within a predetermined concentration by a predetermined design water quality and is almost constant. In addition, the inflow amount of the wastewater W into the reaction tank 10 fluctuates. In addition, the reaction tank 10, where the nitrification reaction and the denitrification reaction occur in parallel, is divided into an aerobic region and an anaerobic region. The aerobic region is an oxygen-rich region, where the nitrification reaction mainly proceeds. The anaerobic region is an anoxic or low oxygen concentration region, where the denitrification reaction mainly proceeds. For example, the amount of nitrification (amount of nitrification) and the amount of denitrification (amount of denitrification) at the position where the nitric acid meter 43 is installed correspond to the ratio of the aerobic region to the anaerobic region. The nitrate concentration corresponds to a value obtained by subtracting the amount of denitrification from the amount of nitrification. The nitrate meter 43 detects the nitrate concentration to detect the difference in volume between the aerobic region and the anaerobic region from the upstream in the reaction tank 10 to the position where the nitrate meter 43 is installed. The total volume from the upstream in the reaction tank 10 to the position where the nitrate meter 43 is installed is known due to the size of the reaction tank 10. Therefore, the nitrate meter 43 can detect the amount of denitrification, that is, the progress of the denitrification reaction, by detecting the nitrate concentration. In this embodiment, the progress of the denitrification reaction is detected by the nitrate meter 43, but it is not limited to the nitrate meter 43 as long as it can confirm the progress of the denitrification reaction. For example, a pair of dissolved oxygen concentration meters, a pair of ORP meters, a pair of ammonia meters, etc. may be used.

[0034] The nitric acid meter 43 is disposed upstream of the wastewater W in the reaction tank 10, that is, on the side where the wastewater is supplied (the sedimentation tank side, not shown) from the ammonia meter 44. The reaction tank 10 is divided into an upstream treatment region and a downstream treatment region from the upstream side of the wastewater W toward the downstream side, that is, from the side where the wastewater W is supplied (the sedimentation tank side, not shown) toward the side where the treated water after biological treatment is discharged (the solid separation tank side, not shown). The upstream region and the downstream region are regions where the progress rates of the nitrification treatment and the denitrification treatment are different from each other. The upstream region is a region upstream of the wastewater W, and is a region where the nitrification treatment and the denitrification treatment proceed at, for example, approximately the same predetermined ratio. The downstream region is a region downstream of the wastewater W from the upstream region, and the nitrification treatment and the denitrification treatment are performed in the same manner as in the upstream region. However, the progress rate of the nitrification treatment in the downstream region is higher than the progress rate of the nitrification treatment in the upstream region and the progress rate of the denitrification treatment in the downstream region. The nitric acid meter 43 is provided between the upstream region and the downstream region (for example, at the central position along the upstream to downstream side of the wastewater W), and the ammonia meter 44 is positioned in the downstream region downstream of the nitric acid meter 43.

[0035] As described above, the air supply amount control unit 40 controls the amount of air in the reaction tank 10 based on the detection results of the nitric acid meter 43 and the ammonia meter 44, and executes simultaneous nitrification and denitrification control including both biological treatments of nitrification and denitrification in the reaction tank 10. However, the air supply amount control unit 40 does not have to perform simultaneous nitrification and denitrification in the reaction tank 10. For example, the air supply amount control unit 40 may have either the nitric acid meter 43 or the ammonia meter 44, and may control the amount of air in the reaction tank 10 based on the measurement results. Also, for example, the air supply amount control unit 40 may have a dissolved oxygen meter that measures the amount of dissolved oxygen in the wastewater W in the reaction tank 10 as a water quality measurement unit, instead of the nitric acid meter 43 and the ammonia meter 44. In this case, the air supply amount control unit 40 controls the amount of air supplied to the reaction tank 10 based on the amount of dissolved oxygen in the wastewater W measured by the dissolved oxygen meter so that the amount of dissolved oxygen is a constant value (dissolved oxygen amount control). In the case of controlling the amount of dissolved oxygen, an anaerobic tank or anoxic tank may be connected in series to the reaction tank 10, and the wastewater W after the nitrification treatment in the reaction tank 10 may be subjected to denitrification treatment.

[0036] Further, the air supply amount control unit 40 may have a flow meter for measuring the inflow amount of the wastewater W in the reaction tank 10 as the water quality measurement unit, instead of the nitric acid meter 43 and the ammonia meter 44. In this case, the air supply amount control unit 40 controls the amount of air supplied to the reaction tank 10 based on the inflow amount of the wastewater W into the reaction tank 10 measured by the flow meter so as to make that amount of the wastewater W a target concentration (inflow amount control). In the case of this inflow amount control, an anaerobic tank or anoxic tank may be connected in series to the reaction tank 10, and the wastewater W after the nitrification treatment in the reaction tank 10 may be denitrified. In this way, the wastewater treatment system 1 may perform any air amount control other than the simultaneous nitrification / denitrification control, dissolved oxygen amount control, and inflow amount control described above, as long as it controls the amount of air supplied to the reaction tank 10 based on the measurement results of the water quality measurement unit. In addition, the wastewater treatment system 1 may be divided into series for performing different treatments (for example, a series for performing simultaneous nitrification / denitrification control and a series for performing dissolved oxygen control), and each reaction tank 10 may perform one of the treatments (for example, a series for performing simultaneous nitrification / denitrification control and a series for performing dissolved oxygen control).

[0037] (Control Unit Configuration) Next, the control unit 42 of the air supply amount control unit 40 will be described. Fig. 2 is a block diagram showing the configuration of the control unit according to the first embodiment. The control unit 42 is, for example, a calculation device such as a computer. As shown in Fig. 2, the control unit 42 has a water quality measurement result acquisition unit 70, a detected air amount acquisition unit 71, a required air amount acquisition unit 72, a target pipe pressure calculation unit 74, an air supply control unit 76, and an intake air control unit 78.

[0038] The water quality measurement result acquisition unit 70 acquires the state of the wastewater W in the reaction tank 10, that is, the measurement results of the nitric acid concentration and ammonia concentration of the wastewater W, from the nitric acid meter 43 and the ammonia meter 44. When the water quality measurement unit is a dissolved oxygen meter, the water quality measurement result acquisition unit 70 acquires the amount of dissolved oxygen in the reaction tank 10 as the state of the wastewater W. When the water quality measurement unit is a flow meter, the water quality measurement result acquisition unit 70 acquires the amount of wastewater W that has flowed into the reaction tank 10 as the state of the wastewater W. That is, the state of the wastewater W in the reaction tank 10 is the measurement target measured by the water quality measurement unit. In other words, the water quality measurement unit can be said to measure at least one of the nitric acid concentration, ammonia concentration, amount of dissolved oxygen, and inflow amount of the wastewater W in the reaction tank 10 as the state of the wastewater W.

[0039] The detected air volume acquisition unit 71 acquires the value of the detected air volume of each branch pipe 34 from the branch pipe air volume measurement unit 48, i.e., the value of the air volume supplied to the reaction tank 10 from the inlet valve 36 of each branch pipe 34.

[0040] The required air amount acquisition unit 72 acquires, for each reaction tank 10, the amount of air required to bring the water quality of the wastewater W in the reaction tank 10 to a predetermined target water quality, based on the measurement results of the state of the wastewater W acquired by the water quality measurement result acquisition unit 70. The method of acquiring the required air amount will be described later.

[0041] The target pipe pressure calculation unit 74 calculates the target pipe pressure based on the value of the required air volume. The target pipe pressure is the pressure of air in the blower pipe required to supply the required air volume to each reaction vessel 10. The method of calculating the target pipe pressure will be described later.

[0042] The air blowing control unit 76 controls the air supply from the air blowing unit 20 so that the pressure in the air blower duct 30 becomes the target pipe pressure calculated by the target pipe pressure calculation unit 74. Specifically, the air blowing control unit 76 acquires the value of the air pressure in the main pipe 32 measured by the main pipe pressure measurement unit 47, and controls the amount of air supplied from the air blowing unit 20 so that the air pressure in the main pipe 32 becomes the target pipe pressure.

[0043] The introduced air control unit 78 acquires the value of the amount of air supplied to each branch pipe 34 measured by the branch pipe air amount measurement unit 48 from the detected air amount acquisition unit 71. More specifically, the introduced air control unit 78 acquires the value of the detected air amount of each branch pipe 34, i.e., the value of the amount of air supplied from the introduction valve 36 of each branch pipe 34 to the reaction tank 10. Based on the required air amount and the acquired detected air amount, the introduced air control unit 78 adjusts the aperture of each introduction valve 36 so that the amount of air supplied from the branch pipe 34 to the reaction tank 10 becomes the required air amount. In other words, the introduced air control unit 78 adjusts the aperture of each introduction valve 36 so that the detected air amount matches the required air amount. A method of adjusting the aperture of the introduction valve 36 will be described later.

[0044] (Obtaining the required air volume) A method for acquiring the required air volume by the required air volume acquisition unit 72 will be described below. The required air volume acquisition unit 72 has a relationship storage unit 82 and a required air volume calculation unit 84. Note that the water quality referred to below refers to the concentration or amount of a predetermined component contained in the wastewater W, and in this embodiment, refers to the nitric acid concentration and ammonia concentration of the wastewater W. The water quality may also be, for example, the amount of dissolved oxygen in the wastewater W.

[0045] The relationship storage unit 82 stores the water quality-air amount relationship. The water quality-air amount relationship is the relationship between the amount of air supplied to the reaction tank 10 and the amount of change in the water quality in the reaction tank 10 when that amount of air is supplied. The relationship storage unit 82 stores the water quality-air amount relationship as a first-order lag system in which the change in the water quality in the reaction tank 10 lags behind the change in the amount of air supplied to the reaction tank 10. A specific description will be given below.

[0046] Fig. 3 is a graph for explaining the water quality-air amount relationship. Fig. 3 is a graph showing an example of the amount of change in ammonia concentration when air is supplied to the reaction tank 10. The horizontal axis of Fig. 3 indicates time, the left side of the vertical axis indicates the amount of air supplied to the reaction tank 10, and the right side of the vertical axis indicates the ammonia concentration of the wastewater W in the reaction tank 10. Line segment L1 in Fig. 3 indicates the amount of air supplied per hour. Line segment L2 indicates the ammonia concentration per hour when the ammonia concentration changes according to the water quality-air amount relationship when the amount of air supplied changes as shown by line segment L1.

[0047] As shown by line segment L1, in the example of FIG. 3, the amount of supplied air is increased from M1 to M2 at time t1. As shown by line segment L2, in accordance with the water quality / air amount relationship, the ammonia concentration remains at concentration P1 from time t1 until time t2, which is delayed from time t1, then begins to decrease from time t2, decreases at a constant rate until time t3, the rate of decrease of the ammonia concentration slows down from time t3, and at time t4 it reaches concentration P2 and converges at concentration P2. Here, the change in the amount of supplied air when the amount of supplied air is changed from M1 to M2 is expressed as the amount of change in supplied air per unit (for example, the amount of change in air per m 3 ) In this case, the amount of change in ammonia concentration from P1 to P2, i.e., the amount of change in water quality after convergence when the supply air volume is changed by a unit amount, is denoted as K. The time from time t1 to t2, i.e., the dead time, is denoted as Ls. The time from time t2 to t3, i.e., the first-order lag time, is denoted as Ts. If the transfer function of the ammonia concentration relating to the supply air volume and time is denoted as y, then the water quality-air volume relationship is given by the following equation (11).

[0048] y = (K e -Ls ) / (1+Ts) (11)

[0049] The relationship storage unit 82 stores a water quality-air amount relationship in which the previously measured values ​​of K, Ls, and Ts are applied to the above formula (11). For example, based on the detection result of the time between times t2 and t4, the relationship storage unit 82 stores a predetermined percentage (here, 63%) of the detected time as Ts, which is the time between times t2 and t3. In this example, the relationship between the ammonia concentration and the supply air amount has been described, but if the values ​​of K, Ls, and Ts are measured in advance, the water quality-air amount relationship can also be applied to the relationship between each water quality and the supply air amount, such as the relationship between the nitric acid concentration and the supply air amount, and the relationship between the dissolved oxygen amount and the supply air amount. The relationship storage unit 82 in this embodiment stores different water quality-air amount relationships for each of the relationship between the ammonia concentration and the supply air amount and the relationship between the nitric acid concentration and the supply air amount.

[0050] The required air amount calculation unit 84 shown in FIG. 2 reads out the water quality-air amount relationship from the relationship storage unit 82. Then, the required air amount calculation unit 84 acquires a target water quality of the wastewater W in the reaction tank 10, which is a target concentration, which is a value of a target ammonia concentration and a target nitric acid concentration. This target concentration is a certain numerical range set in advance. For example, the target concentration of the nitric acid concentration is a predetermined numerical range of 5.0 mg or less. Also, for example, the target concentration of the ammonia concentration is 1.0 mg / L or more and 5.0 mg / L or less, more preferably 1.0 mg / L or more and 2.0 mg / L or less. The required air amount calculation unit 84 calculates the required air amount of the reaction tank 10 based on the water quality-air amount relationship, the target concentration, and the current nitric acid concentration and ammonia concentration of the wastewater W acquired by the water quality measurement result acquisition unit 70. The required air amount calculation unit 84 calculates the required air amount for the reaction tank 10 so that the nitric acid concentration of the wastewater W becomes the target concentration and the ammonia concentration of the wastewater W becomes the target concentration. The required air amount is the amount of air necessary (and sufficient) to make the water quality of the reaction tank a predetermined target water quality, i.e., to make both the ammonia concentration and the nitric acid concentration of the wastewater W in the reaction tank the target concentrations, and is calculated as an absolute value.

[0051] Specifically, the required air amount calculation unit 84 calculates a difference concentration, which is the difference between the target concentration and the concentration calculated by the water quality measurement result acquisition unit 70, and calculates the required air amount so that the ammonia concentration of the wastewater W changes toward the target concentration by the difference concentration, and the nitrate concentration of the wastewater W changes toward the target concentration by the difference concentration. Therefore, it can be said that the required air amount changes according to the value of the difference concentration. For example, when the ammonia concentration is taken into consideration, the required air amount calculation unit 84 determines that the nitrification treatment has progressed too much and decreases the required air amount when the calculated ammonia concentration is lower than the target concentration, as the difference concentration increases, i.e., the current ammonia concentration decreases. When the calculated ammonia concentration is higher than the target concentration, the required air amount calculation unit 84 determines that the nitrification treatment is insufficient and increases the required air amount when the difference concentration increases, i.e., the current ammonia concentration increases. Also, when the nitrate concentration is taken into consideration, the required air amount calculation unit 84 determines that the nitrification treatment is insufficient and increases the required air amount when the calculated nitrate concentration is lower than the target concentration, as the difference concentration increases, i.e., the current nitrate concentration decreases. When the calculated nitric acid concentration is higher than the target concentration, the required air amount calculation unit 84 determines that the denitrification treatment is insufficient as the difference concentration increases, that is, the current nitric acid concentration increases, and therefore reduces the required air amount.

[0052] The required air amount calculation unit 84 calculates the required air amount for all of the reaction tanks 10. Alternatively, the required air amount calculation unit 84 may sum up the required air amounts calculated for all of the reaction tanks 10 and calculate the sum as the total required air amount. Since the required air amount changes based on the current state of the wastewater W in the reaction tank 10, i.e., the nitric acid concentration and the ammonia concentration, the total required air amount also changes based on the current state of the wastewater W in the reaction tank 10.

[0053] When the above-mentioned dissolved oxygen amount control is performed, the required air amount calculation unit 84 reads out the water quality-air amount relationship showing the relationship between the amount of dissolved oxygen and the amount of supplied air, and calculates the amount of air required for the reaction tank 10 based on the current amount of dissolved oxygen in the wastewater W acquired by the water quality measurement result acquisition unit 70 so that the wastewater W has a predetermined target water quality (target amount of dissolved oxygen). When the above-mentioned inflow water amount control is performed, the required air amount calculation unit 84 calculates the amount of air required to achieve the target water quality according to the inflow amount of the wastewater W into the reaction tank 10. The required air amount calculation unit 84 assumes that the amount of air required to achieve the target water quality has a relationship according to the inflow amount of the wastewater W into the reaction tank 10, stores the relationship, and calculates the amount of air required based on the inflow amount of the wastewater W acquired by the water quality measurement result acquisition unit 70.

[0054] (Calculation of target pipe pressure) Next, a method of calculating the target pipe pressure by the target pipe pressure calculation unit 74 will be described. The target pipe pressure calculation unit 74 obtains the value of the required air volume from the required air volume calculation unit 84, and calculates the air duct loss pressure based on the value of the required air volume. The air duct loss pressure is the pressure of air lost due to pressure loss in the air duct 30 when the required air volume is supplied into the air duct 30. In other words, the air duct loss pressure is the same value as the pressure loss in the air duct 30 when the required air volume is supplied into the air duct 30. Then, the target pipe pressure calculation unit 74 calculates the target pipe pressure based on this air duct loss pressure. This target pipe pressure changes depending on the value of the required air volume. In other words, the target pipe pressure calculation unit 74 changes the calculated target pipe pressure depending on the change in the required air volume.

[0055] This will be explained in more detail below. The pressure loss H of a pipe is generally calculated from the following formulas (12) and (13).

[0056] H=4 f1 (l / d) (γ v 2 / 2) ···(12) H = f2 (γ v 2 / 2) ···(13)

[0057] Equation (12) is a formula for calculating pressure loss H when the pipe is a straight pipe. Equation (13) is a formula for calculating pressure loss H when the pipe is a non-straight pipe. f1 and f2 are loss coefficients and are predetermined constants. f1 and f2 are calculated in advance, for example, based on the results of measuring the pressure loss of the pipe in advance. l is the length of the straight pipe (m), and d is the inside diameter of the straight pipe (m), and these are also constants that are predetermined according to the shape of the pipe. γ is the air density (kg / m 3 ) is a predetermined constant. v is the flow velocity of the flowing air (m / s). That is, in equations (12) and (13), the variable is the flow velocity v. Therefore, the pressure loss H in the pipe changes according to the flow velocity v. Furthermore, the flow velocity v is proportional to the air flow rate Q, as shown in the following equation (14) (Bernoulli's theorem). A in equation (14) is the flow path area, and is also a constant that is predetermined according to the shape of the piping.

[0058] Q = A v (14)

[0059] Therefore, the pipe pressure loss H can be calculated from the air flow rate Q. In this embodiment, the pressure loss H corresponds to the air duct loss pressure, and the flow rate Q corresponds to the required air volume. Based on equation (14), the target pipe pressure calculation unit 74 calculates the air flow velocity v when the required air volume is supplied to the main pipe 32 and the branch pipe 34. The flow velocity v here is the flow velocity in the main pipe 32 and the branch pipe 34. As shown in equations (12) and (13), the target pipe pressure calculation unit 74 sets the terms other than the flow velocity v to preset values ​​in calculating the pressure loss in the piping, and calculates the air duct loss pressure H based on the flow velocity v and these preset values. P Calculate the pressure loss of the blower duct H P changes in value in proportion to the change in flow velocity v, i.e., the required amount of air.

[0060] The target pipe pressure calculation unit 74 calculates the air duct loss pressure H P That is, in the example of this embodiment, the target pipe pressure calculation unit 74 calculates the air duct loss pressure H P The pressure loss of the air duct of branch pipe 34A is H PA and the pressure loss H of the blower pipe of the branch pipe 34BPB and the pressure loss of the blower pipe of branch pipe 34C, H PC Calculate the following:

[0061] Blower pipe pressure loss H PA is the pressure loss when the required amount of air calculated for the reaction vessel 10A is supplied to the passage of the blower duct 30 from the blower unit 20 to the reaction vessel 10A. More specifically, the blower duct pressure loss H PA is the pressure loss in the path from the inlet of the mother pipe 32 to the outlet of the branch pipe 34A when the total required air volume is supplied to the path from the inlet of the mother pipe 32 (the connection between the mother pipe 32 and the introduction pipe 31) to the outlet of the mother pipe 32 (the connection between the mother pipe 32 and the branch pipe 34A) and the required air volume calculated for the reaction tank 10A is supplied to the path from the inlet of the branch pipe 34A (the connection between the mother pipe 32 and the branch pipe 34A) to the outlet of the branch pipe 34A (the connection between the branch pipe 34A and the aeration section 12).

[0062] Blower pipe pressure loss H PB is the pressure loss when the required amount of air calculated for the reaction vessel 10B is supplied to the passage of the blower duct 30 from the blower unit 20 to the reaction vessel 10B. More specifically, the blower duct pressure loss H PB is the pressure loss in the path from the inlet of the mother pipe 32 to the outlet of the branch pipe 34B when the total required amount of air is supplied to the path from the inlet of the mother pipe 32 (the connection between the mother pipe 32 and the introduction pipe 31) to the outlet of the mother pipe 32 (the connection between the mother pipe 32 and the branch pipe 34B) and the required amount of air calculated for the reaction tank 10B is supplied to the path from the inlet of the branch pipe 34B (the connection between the mother pipe 32 and the branch pipe 34B) to the outlet of the branch pipe 34B (the connection between the branch pipe 34B and the aeration section 12).

[0063] Blower pipe pressure loss H PC is the pressure loss when the required amount of air calculated for the reaction vessel 10C is supplied to the passage of the blower duct 30 from the blower unit 20 to the reaction vessel 10C. More specifically, the blower duct pressure loss H PCis the pressure loss in the path from the inlet of the parent pipe 32 to the outlet of the branch pipe 34C when the total required air volume is supplied to the path from the inlet of the parent pipe 32 (the connection part of the parent pipe 32 and the introduction pipe 31) to the outlet of the parent pipe 32 (the connection part of the parent pipe 32 and the branch pipe 34C) and the required air volume calculated for the reaction tank 10C is supplied to the path from the inlet of the branch pipe 34C (the connection part of the parent pipe 32 and the branch pipe 34C) to the outlet of the branch pipe 34C (the connection part of the branch pipe 34C and the aeration section 12). However, the blower pipe loss pressure H PA , Blower pipe pressure loss H PB , and the blower duct loss pressure H PC The paths at may be pressure losses from the inlet of introduction pipe 31 (where blower 22 is connected) to the outlets of branch pipes 34A, 34B, and 34C, respectively.

[0064] Then, the target pipe pressure calculation unit 74 calculates the target pipe pressure P Y Calculate.

[0065] P Y =h+H C +H P +H M +H A (15)

[0066] Here, h is the head pressure of the wastewater W in the reaction tank 10. C is the pressure of the air lost due to pressure loss (passage resistance) caused by an air filter (not shown) provided in the blower 22. M is the pressure of the air lost due to the pressure loss (passage resistance) caused by the branch pipe air amount measuring section 48. A is the pressure of the air lost due to pressure loss (passage resistance) caused by the air diffusion unit 12. That is, the target pipe internal pressure calculation unit 74 calculates the air pipe loss pressure H P and head pressure h and air filter pressure loss H C and branch pipe air volume measurement section pressure loss H M and the pressure loss in the aeration section H A The total value is the target pipe pressure P Y However, for example, the target pipe pressure calculation unit 74 calculates the air duct loss pressure H Pand head pressure h and branch pipe air volume measurement section pressure loss H M and the pressure loss in the aeration section H A The sum of these gives the target pipe pressure P Y The target pipe pressure P Y may be calculated.

[0067] The head pressure h may be a value preset based on the volume of the reaction tank 10. Alternatively, a sensor may be provided in the reaction tank 10 to detect the water level or amount of the wastewater W in the reaction tank 10, and the target pipe pressure calculation unit 74 may calculate the head pressure h based on the detected value. C , Branch pipe air volume measurement section pressure loss H M , and the pressure loss of the aeration section H A is, for example, a design value or a value measured in advance. That is, the target pipe pressure calculation unit 74 calculates the air filter loss pressure H C , Branch pipe air volume measurement section pressure loss H M , Pressure loss in the diffuser H A is a predetermined constant, and if a previously measured value exists, the measured value is used. P The terms other than the above are constants or calculated values ​​that are predetermined, and the air duct loss pressure H P and this predetermined value are added together, and the sum is set as the target pipe pressure P Y It can be said that the calculation is as follows.

[0068] More specifically, the target pipe pressure calculation unit 74 calculates the target pipe pressure for each reaction vessel 10, and the maximum target pipe pressure among them is designated as the target pipe pressure P Y In this embodiment, the target pipe pressure calculation unit 74 calculates the target pipe pressure P YA , target pipe pressure P YB , and the target pipe pressure P YC Calculate the target pipe pressure PY A is the pressure loss in the blower tube H PA , the head pressure h of the reaction vessel 10A, and the air filter loss pressure H C and the branch pipe air quantity measuring section loss pressure H of the branch pipe air quantity measuring section 48 in the branch pipe 34A. M and the pressure loss H of the aeration section 12 in the reaction tank 10A.A Similarly, the target pipe pressure PY B is the pressure loss in the blower tube H PB , the head pressure h of the reaction vessel 10B, and the air filter loss pressure H C and the branch pipe air quantity measuring section pressure loss H of the branch pipe air quantity measuring section 48 in the branch pipe 34B. M and the pressure loss H of the aeration section 12 in the reaction tank 10B. A Similarly, the target pipe pressure PY C is the pressure loss in the blower tube H PC , the head pressure of the reactor 10C, h, and the air filter loss pressure, H C and the branch pipe air quantity measuring section loss pressure H of the branch pipe air quantity measuring section 48 in the branch pipe 34C. M and the pressure loss H of the aeration section 12 in the reaction tank 10C. A The target pipe pressure calculation unit 74 calculates the target pipe pressure P YA , target pipe pressure P YB , and the target pipe pressure P YC The maximum value of the target pipe pressure P Y The target pipe pressure calculation unit 74 also adds a predetermined margin to the determined target pipe pressure Pr and calculates the resulting margin as the actual target pipe pressure P Y It is also possible to use the following.

[0069] However, the target pipe pressure calculation unit 74 calculates the air duct loss pressure H P Other values, namely, head pressure h and air filter pressure loss H C and branch pipe air volume measurement section pressure loss H M and the pressure loss in the aeration section H A The sum of these values ​​is set as a common value (predetermined value J) for each reaction tank 10, and the target pipe internal pressure P YA , target pipe pressure P YB , and the target pipe pressure P YC That is, the target pipe pressure calculation unit 74 may calculate the air duct loss pressure H PA The target pipe pressure P is calculated by adding this to a predetermined value J. YA Calculate the pressure loss in the duct H PB The target pipe pressure P is calculated by adding this to a predetermined value J. YB Calculate the pressure loss in the duct H PCThe target pipe pressure P is calculated by adding this to a predetermined value J. YC The maximum value of these is the target pipe pressure P Y The target pipe pressure calculation unit 74 may determine the air duct loss pressure H P The values ​​other than the head pressure h are set as predetermined values ​​J1, and the head pressure h of the reaction vessel 10A and the blower pipe loss pressure H PA The sum of the above and a predetermined value J1 is set as the target pipe pressure P YA In this case, the target pipe pressure P YB , target pipe pressure P YC is calculated in the same way.

[0070] In this way, the target pipe pressure calculation unit 74 calculates the air blower pipe loss pressure H PA、 H PB、 H PC Calculate the pressure loss of the air duct H PA、 H PB、 H PC Based on this, the target pipe pressure P YA、 P YB、 P YC The target pipe pressure calculation unit 74 calculates the target pipe pressure P YA、 P YB、 P YC The maximum value of the target pipe pressure P Y Let us assume that.

[0071] 4 is a graph showing an example of the relationship between the required air volume and the target pipe pressure. As described above, the target pipe pressure calculation unit 74 calculates the air duct loss pressure H P Calculate the pressure loss of the air duct H P Based on the target pipe pressure P Y Calculate the pressure loss of the blower duct H P changes according to the value of the required air volume. Therefore, as shown in Figure 4, the target pipe pressure P Y As shown in Fig. 4, the target pipe pressure P Y changes in proportion to the required air volume in a two-dimensional curve.

[0072] The airflow control unit 76 shown in FIG. 2 detects whether the pressure in the airflow duct 30 is equal to or smaller than the target pipe pressure P Y The air supply from the blower unit 20 is controlled so that the pressure in the blower duct 30 (main duct 32) is adjusted to the target duct pressure P Y The target pipe pressure P Y The pressure in the blower duct 30 here refers to the pressure at the position where this pressure is measured, that is, the position where the mother pipe internal pressure measuring unit 47 measures the pressure in the blower duct 30. In addition, the target pipe internal pressure P Y is the target pipe pressure at the location where this pressure is to be measured.

[0073] (Adjustment of opening of introduction valve) Next, the adjustment of the opening of the introduction valve 36 by the introduction air control unit 78 will be described. The introduction air control unit 78 acquires the value of the detected air amount of each branch pipe 34, that is, the value of the amount of air supplied from the introduction valve 36 of each branch pipe 34 to the reaction tank 10. Based on the required air amount and the acquired detected air amount, the introduction air control unit 78 adjusts the opening of each introduction valve 36 so that the amount of air supplied from the branch pipe 34 to the reaction tank 10 becomes the required air amount. That is, when the air amount in the branch pipe 34 is larger than the required air amount, the introduction air control unit 78 reduces the opening of the introduction valve 36 (reducing the opening area) so that the amount of air flowing into the reaction tank 10 does not become too large. Also, when the required air amount fluctuates and increases, the introduction air control unit 78 increases the opening of the introduction valve 36 (increases the opening area), and when the required air amount decreases, the introduction air control unit 78 reduces the opening of the introduction valve 36.

[0074] In this embodiment, the pressure in the blower duct 30 is set to a target pipe pressure P YTherefore, the main pipe 32 is supplied with more than the total required amount of air. The intake air control unit 78 distributes the air in the main pipe 32 to each branch pipe 34 by adjusting the opening of the intake valve 36 of each branch pipe 34 so that only the required amount of air is supplied to each branch pipe 34. Therefore, even if the length or shape of each branch pipe 34 is different and the pressure loss is different for each branch pipe 34, the opening of the intake valve 36 is adjusted for each branch pipe 34, so that the required amount of air can be appropriately supplied to each branch pipe 34. In this embodiment, the air supply control unit 76 changes the pipe pressure in the air supply pipe 30 according to the required amount of air, and supplies air so that the amount of air follows the required amount of air. Therefore, the intake air control unit 78 adjusts the opening of the intake valve 36 less than when the target pipe pressure is constant. In other words, since the air duct 30 is always supplied with an amount of air close to the minimum required, the intake air control unit 78 can control the opening of the intake valve 36 within a range in which the opening of the intake valve 36 does not become too low.

[0075] The above-described control flow for supplying the required amount of air to each reaction tank 10 by setting the pressure in the air blower pipe 30 to the target pipe pressure will be described with a flowchart. Fig. 5 is a flowchart for explaining the control flow for supplying the required amount of air to each reaction tank 10 by setting the pressure in the air blower pipe to the target pipe pressure. As shown in Fig. 5, the air supply amount control unit 40 first measures the nitric acid concentration and ammonia concentration of the wastewater W in each reaction tank 10 by the nitric acid meter 43 and the ammonia meter 44 (step S10).

[0076] After measuring the nitric acid concentration and the ammonia concentration, the air supply amount control unit 40 calculates the required air amount for each reaction tank 10 by the required air amount calculation unit 84 based on the water quality air amount relationship, the measured concentration, and the target concentration (step S12). Specifically, the required air amount calculation unit 84 reads out the water quality air amount relationship for each of the relationship between the ammonia concentration and the supply air amount and the relationship between the nitric acid concentration and the supply air amount from the relationship storage unit 82. The required air amount calculation unit 84 acquires the target concentration values ​​for each of the ammonia concentration and the nitric acid concentration. The required air amount for the reaction tank 10 is calculated so that the nitric acid concentration of the wastewater W becomes the target concentration and the ammonia concentration of the wastewater W becomes the target concentration. The required air amount calculation unit 84 calculates the required air amount for all reaction tanks 10.

[0077] After calculating the required air volume, the air supply volume control unit 40 calculates the air duct loss pressure H from the required air volume by the target pipe pressure calculation unit 74. P (Step S16), and the blower duct loss pressure H P Based on the target pipe pressure P Y The target pipe pressure calculation unit 74 calculates the pressure loss of the blower duct 30 when the required amount of air is supplied to the blower duct 30 as the blower duct loss pressure H P The target pipe pressure calculation unit 74 calculates the air duct loss pressure H P and a predetermined value J, and the sum is set as the target pipe pressure P Y More specifically, the target pipe internal pressure calculation unit 74 calculates the target pipe internal pressure P YA , target pipe pressure P YB , and the target pipe pressure P YC The maximum value of these is set as the target pipe pressure P Y Let us assume that.

[0078] Target pipe pressure P Y After calculating the above, the air supply amount control unit 40 controls the air blowing control unit 76 to adjust the inside of the blower duct 30 to the target pipe internal pressure P YThe air supply of the blowers 22 is controlled so as to satisfy the above requirement (step S20). The blower control unit 76 controls the number of blowers 22 in operation, the opening degree of the inlet vanes of the blowers 22, and the rotation speed of the blades to adjust the amount of air discharged from the blowers 22, and sets the air pressure in the mother pipe 32 to the target pipe pressure. A specific control flow of the blower control unit 76 will be described later.

[0079] After calculating the required amount of air, the air supply amount control unit 40 adjusts the opening of the introduction valve 36 by the introduction air control unit 78 so that the required amount of air is supplied to each reaction tank 10 (step S22). After steps S20 and S22, the process proceeds to step S24. If the process is not to be ended (step S24; No), the process returns to step S10 and repeats the same process. That is, the air supply amount control unit 40 measures the nitric acid concentration and ammonia concentration of the wastewater W in each reaction tank 10 at predetermined time intervals, updates the required amount of air and the target pipe pressure based on the measurement results, and sequentially controls the amount of air discharged from the blower 22 so as to achieve the updated target pipe pressure. The air supply amount control unit 40 also sequentially controls the opening of the introduction valve 36 so that the updated required amount of air is supplied to the reaction tank 10. If the process is to be ended in step S24 (step S24; Yes), the process is terminated.

[0080] In the case of the above-mentioned dissolved oxygen amount control, the amount of dissolved oxygen in the reaction tank 10 is calculated in step S10, and the amount of air required to make the amount of dissolved oxygen reach a target amount (target water quality) is calculated in step S12. The other processing is the same as that described above.

[0081] (Control of the blower by the blower control unit) Next, the control of the blower 22 by the blower control unit 76 will be described. Fig. 6 is a flowchart explaining the control of the blower by the blower control unit. Fig. 7 is a graph explaining the control of the blower by the blower. As shown in Fig. 6, the blower control unit 76 first acquires the value of the target pipe pressure from the target pipe pressure calculation unit 74 (step S30).

[0082] The blower control unit 76 judges whether the pipe pressure at the maximum output of the blower 22 is equal to or greater than the target pipe pressure (step S32). The maximum output of the blower 22 is the output when the output of all the blowers 22 is maximized for the number of blowers 22 currently in operation. More specifically, the output when the opening degree of the inlet vane of the blower 22 is maximized and the rotation speed of the blade portion is maximized is the maximum output. The horizontal axis of FIG. 7 is the output value of the blower 22, and the vertical axis is the pipe pressure of the blower duct 30. As shown in FIG. 7, the pipe pressure when one blower 22 is operating becomes pipe pressure Pr1 at maximum output. When two blowers 22 are operating, the pipe pressure rises to pipe pressure Pr2 at rated output, for example, and rises to pipe pressure Pr3 as the output is increased to maximum output. When three blowers 22 are operating, the pipe pressure rises to pipe pressure Pr4 at rated output, for example, and rises to pipe pressure Pr5 as the output is increased to maximum. When four blowers 22 are operating, the pipe pressure rises to pipe pressure Pr6 at rated output, for example, and rises further as the output is increased to maximum. The example of FIG. 7 illustrates a case where the target pipe pressure is a value between pipe pressure Pr3 and pipe pressure Pr4. The margin pipe pressure is a value greater than the target pipe pressure, and in the example of FIG. 7, the pipe pressure is a value between pipe pressure Pr5 and pipe pressure Pr6.

[0083] If the pipe pressure at maximum output is not equal to or greater than the target pipe pressure (step S32; No), i.e., lower than the target pipe pressure, the air blowing control unit 76 increases the number of operating blowers 22 (step S34). In the example of Fig. 7, the pipe pressure at maximum output when two blowers 22 are operating is lower than the target pipe pressure, and in this case, the air blowing control unit 76 increases the number of operating blowers to three. After increasing the number of operating blowers, the process returns to step S32, and it is determined whether the maximum output of blowers 22 for the increased number of operating blowers is equal to or greater than the target pipe pressure.

[0084] If the pipe pressure at maximum output is equal to or higher than the target pipe pressure (step S32; Yes), the airflow control unit 76 judges whether the pipe pressure at maximum output of the blower 22 is equal to or lower than the margin pipe pressure (step S36). If the pipe pressure at maximum output is equal to or lower than the margin pipe pressure (step S36; Yes), the airflow control unit 76 controls the output of the operating blowers 22 so as to achieve the target pipe pressure while keeping the number of operating blowers unchanged (step S38). In the example of FIG. 7, the pipe pressure at maximum output when three blowers 22 are operating is equal to or higher than the target pipe pressure and is equal to or lower than the margin pipe pressure. In the example of FIG. 7, when three blowers 22 are operating, the opening degree of the inlet vanes and the rotation speed of the blades are controlled to reduce the output below the rated output, so that the pipe pressure reaches the target pipe pressure.

[0085] If the pipe pressure at maximum output is not equal to or lower than the margin pipe pressure (step S36; No), that is, if the pipe pressure is higher than the margin pipe pressure, the number of operating blowers 22 is reduced (step S40). In the example of FIG. 7, the pipe pressure at maximum output when four blowers 22 are operating is lower than the margin pipe pressure, and in this case, the air blowing control unit 76 reduces the number of operating blowers to three. After reducing the number of operating blowers, the process proceeds to step S38, and the output of the operating blowers 22 is controlled so as to achieve the target pipe pressure. After step S38, the process proceeds to step S42. If the process is not to be ended (step S42; No), the process returns to step S30, and information on the updated target pipe pressure is obtained, and the same process is repeated so as to achieve the target pipe pressure. If the process is to be ended (step S42; Yes), the process is ended.

[0086] As described above, the wastewater treatment system 1 according to this embodiment includes a plurality of reaction tanks 10 for performing biological treatment on wastewater W, an air blower pipe 30 which is a pipe connected to the plurality of reaction tanks 10, an air blower unit 20 for supplying air for performing biological treatment to the plurality of reaction tanks 10 via the air blower pipe 30, and an air supply amount control unit 40 for controlling the amount of air supplied to the reaction tanks 10. The air supply amount control unit 40 includes a water quality measurement unit (a nitric acid meter 43 and an ammonia meter 44 in this embodiment), a required air amount acquisition unit 72, a target pipe pressure calculation unit 74, and an air blower control unit 76. The water quality measurement unit is provided in the reaction tank 10 and measures the state of the wastewater W in the reaction tank 10 (the nitric acid concentration and ammonia concentration of the wastewater W in this embodiment). The required air amount acquisition unit 72 acquires the amount of air required for making the wastewater W in the reaction tank 10 a predetermined target water quality (the target concentration in this embodiment) for each reaction tank 10 based on the measurement result of the water quality measurement unit. The target pipe pressure calculation unit 74 calculates the air pressure loss H in the air duct 30, which is the pressure of air lost due to pressure loss in the air duct when the required amount of air is supplied to the air duct 30. P The target pipe pressure calculation unit 74 calculates the air duct loss pressure H P Based on this, the target pipe pressure P Y The target pipe pressure calculation unit 74 calculates the target pipe pressure P Y Change the value.

[0087] This wastewater treatment system 1 measures the current state of the wastewater W, calculates the amount of air required to bring the wastewater W to a target water quality, and calculates the air loss pressure H of the air duct 30 when the required amount of air is supplied. P In the wastewater treatment system 1, the pressure in the air duct 30 is calculated as the air duct loss pressure H P The target pipe pressure P calculated based on Y The blower unit 20 is controlled so that the target pipe pressure P YIn other words, the wastewater treatment system 1 controls the pipe pressure so as to supply the minimum amount of air required for biological treatment to the air blower unit 20 based on the current water quality. Therefore, the wastewater treatment system 1 can suppress the supply of air unnecessary for biological treatment and suppress the energy consumption required for air blowing. In the wastewater treatment system 1, since the power consumption is largely consumed by blowing air by the air blower unit 20, suppressing the air blowing pressure can effectively reduce the power consumption. In addition, the wastewater treatment system 1 sets the target pipe pressure P based on the amount of air required for all the reaction tanks 10. Y Furthermore, the target pipe pressure P is calculated based on the pressure loss of the pipes connected to the multiple transfer tanks 10. Y is calculated. Therefore, the wastewater treatment system 1 can appropriately supply the required amount of air to each reaction tank 10 even when the degree of pressure loss in the pipes connected to each reaction tank 10 is different. As described above, the wastewater treatment system 1 according to this embodiment can appropriately supply air to each reaction tank 10 while suppressing the energy consumption required for blowing air.

[0088] In addition, the target pipe pressure calculation unit 74 calculates the air duct loss pressure H P and the pressure loss of the aeration section 12 that is provided in the reaction tank 10 and diffuses air from the air blower 30 into the reaction tank 10 (aeration section loss pressure H A ) and the head pressure h of the wastewater in the reaction tank 10 are summed to obtain the target pipe pressure P Y The target pipe pressure P Y This target pipe pressure calculation unit 74 calculates the target pipe pressure P Y The pressure loss in the air duct H P and the pressure loss in the aeration section H A and the head pressure h. Therefore, this wastewater treatment system 1 can appropriately supply the required amount of air even if there is a pressure loss in the air blower pipe 30 or the aeration section 12, or if there is head pressure due to the wastewater W.

[0089] The blower duct 30 also has a main pipe 32 connected to the blower unit 20, a plurality of branch pipes 34 branching off from the main pipe 32 and respectively connected to the plurality of reaction vessels 10, an inlet valve 36 provided in the branch pipe 34, and a branch pipe air volume measurement unit 48 that measures the volume of air supplied to each of the plurality of branch pipes 34 as a detected air volume. The air supply volume control unit 40 has an inlet air control unit 78 that adjusts the opening of the inlet valve 36 in each of the branch pipes 34 so that the detected air volume becomes the required air volume. In this embodiment, the pressure in the blower duct 30 is set to a target pipe internal pressure P Y This allows the total required amount of air to be appropriately supplied to the parent pipe 32. Furthermore, the inlet air control unit 78 distributes the air in the parent pipe 32 to each branch pipe 34 by adjusting the opening of the inlet valve 36 of each branch pipe 34 so that only the required amount of air is supplied to each branch pipe 34. Therefore, this wastewater treatment system 1 can appropriately supply the required amount of air to each branch pipe 34 even if the pressure loss differs from one branch pipe 34 to another.

[0090] In addition, the air blowing control unit 76 controls at least one of the number of operating air blowers 22, the opening degree of the inlet vane, and the rotation speed of the blade portion. Therefore, the wastewater treatment system 1 can appropriately set the internal pressure of the air blower duct 30 to the target internal pressure.

[0091] The water quality measurement unit measures at least one of the nitrate nitrogen concentration, the ammonia nitrogen concentration, the amount of dissolved oxygen, and the amount of wastewater inflowing into the reaction tank 10 as the state of the wastewater W in the reaction tank 10. Therefore, the wastewater treatment system 1 can appropriately calculate the required amount of air.

[0092] The water quality measurement unit measures at least one of the nitrate nitrogen concentration, ammonia nitrogen concentration, and dissolved oxygen amount of the wastewater W as the water quality of the wastewater W in the reaction tank 10, and the required air amount acquisition unit 72 calculates the required air amount so that the water quality of the wastewater W becomes the target water quality. This wastewater treatment system 1 measures the water quality and calculates the required air amount so that the water quality becomes the target value, so that the required air amount can be calculated more accurately. The wastewater treatment system 1 may also perform simultaneous nitrification and denitrification treatment. In the simultaneous nitrification and denitrification treatment, the nitrification treatment, which is an aerobic treatment, and the denitrification treatment, which is an anaerobic treatment, are performed in the same tank, so that the fluctuation in the amount of consumed oxygen is large and the fluctuation in the amount of required air is also large. The fact that the fluctuation in the amount of required air is large means that the amount of required air is often low, and therefore it is possible to suppress energy consumption to a greater extent.

[0093] Furthermore, the required air amount acquisition unit 72 has a relationship storage unit 82 and a required air amount calculation unit 84. The relationship storage unit 82 stores a water quality-air amount relationship, which is a relationship between the amount of air supplied to the reaction tank 10 and the amount of change in the water quality (here, the nitrate concentration and the ammonia concentration) of the wastewater W when that amount of air is supplied. The required air amount calculation unit 84 calculates the amount of air required to change the water quality of the wastewater W to the target water quality as the required air amount based on the water quality-air amount relationship, the water quality measurement result by the water quality measurement unit, and the target water quality (here, the target concentration). The required air amount calculation unit 84 calculates the required air amount based on the water quality-air amount relationship, and therefore can calculate the required air amount more accurately.

[0094] Moreover, the relationship storage unit 82 stores the water quality-air amount relationship as a first-order lag system in which the change in the water quality of the wastewater W lags behind the change in the amount of air supplied into the reaction tank 10. The required air amount calculation unit 84 updates the required air amount based on the water quality measurement results every predetermined time. Since this wastewater treatment system 1 calculates the required air amount as a first-order lag system, it is possible to predict the amount of change in water quality every hour. Furthermore, since the wastewater treatment system 1 repeatedly calculates the required air amount and updates the calculation result, it is possible to more accurately control the air supply amount based on the latest measurement result. That is, the wastewater treatment system 1 can more accurately control the air supply amount by performing feedforward control.

[0095] Second embodiment Next, a second embodiment will be described. The wastewater treatment system 1 according to the second embodiment differs from the first embodiment in that the air supply amount control unit 40A has a differential air amount calculation unit 79A and corrects the pipe internal pressure of the blower duct 30 based on the differential air amount calculated by the differential air amount calculation unit 79A. Explanations of the configurations of the second embodiment common to the first embodiment will be omitted.

[0096] FIG. 8 is a block diagram showing the configuration of the control unit according to the second embodiment. As shown in FIG. 8, the control unit 42A according to the second embodiment has a differential air amount calculation unit 79A. The differential air amount calculation unit 79A acquires the value of the total required air amount from the required air amount acquisition unit 72. The total required air amount is a value obtained by adding up all the required air amounts calculated for each reaction tank 10. In addition, the differential air amount calculation unit 79A acquires the detected air amount of each branch pipe 34, that is, the value of the actual air amount supplied to the branch pipe 34 measured by the branch pipe air amount measurement unit 48, from the detected air amount acquisition unit 71. As a result, the differential air amount calculation unit 79A acquires the total detected air amount, which is the sum of the detected air amounts of each branch pipe 34.

[0097] Here, the target pipe pressure calculation unit 74 calculates the target pipe pressure P Yis set. Therefore, air is supplied to the mother pipe 32 at a pressure capable of supplying the required amount of air to all reaction vessels 10. Also, the inlet air control unit 78 distributes the air in the mother pipe 32 to each branch pipe 34 by adjusting the opening of the inlet valve 36. Therefore, normally, only the required amount of air is supplied to each branch pipe 34, and the detected air amount of each branch pipe 34 is the required air amount of each branch pipe 34. And the total detected air amount is equal to the total required air amount.

[0098] However, for example, deterioration of the branch pipe 34 or clogging of the air outlet of the air diffuser 12 may cause the target pipe pressure P Y In such a case, the pressure loss value (predetermined constant) of each part used in the calculation of the target pressure P may differ from the actual value. Y In other words, the total detected air volume, which is the sum of the amounts of air actually being supplied, becomes smaller than the total required air volume. In this case, there is a risk that the air required for the reaction vessel 10 cannot be adequately supplied. Furthermore, if the pipe pressure for actually supplying the required amount of air to the reaction vessel 10 is greater than the calculated target pipe pressure P Y In this case, the total detected amount of air actually supplied will be greater than the total required amount of air. In this way, the pipe pressure for actually supplying the required amount of air to the reaction vessel 10 may be smaller than the calculated target pipe pressure P Y If the total required air amount and the total detected air amount are different, there is a risk that the values ​​will be different.

[0099] The differential air amount calculation unit 79A calculates the differential air amount when the total required air amount differs from the total detected air amount. The differential air amount is the difference between the required air amount and the detected air amount. The differential air amount calculation unit 79A calculates the differential air amount for all reaction vessels 10. When the total required air amount differs from the total detected air amount, the required air amount and the detected air amount for at least one reaction vessel 10 differ. The target pipe internal pressure calculation unit 74 according to the second embodiment calculates the differential air amount based on this differential air amount. The differential air pipe loss pressure is the pressure of air lost due to pressure loss in the air pipe 30 when this differential air amount of air is supplied to the air pipe 30. The target pipe internal pressure calculation unit 74 calculates the differential air pipe loss pressure H P In other words, the target pipe pressure calculation unit 74 calculates the differential blower pipe loss pressure H P The required air volume used in the calculation of is replaced with this difference in air volume, and the air duct loss pressure H P The total required air volume used in the calculation of is replaced with the total differential air volume to calculate the differential blower duct loss pressure. The total differential air volume is the sum of the differential air volumes, i.e., the difference between the total required air volume and the total detected air volume. The target pipe pressure calculation unit 74 then calculates the differential pipe pressure based on the differential blower duct loss pressure. The target pipe pressure calculation unit 74 calculates the target pipe pressure P Y That is, the target pipe pressure calculation unit 74 calculates the differential pipe pressure P Y The pressure loss in the blast duct used to calculate H P with this differential blower tube loss pressure to calculate the differential pipe pressure. The target pipe pressure calculation unit 74 calculates the differential pipe pressure for each path to the reaction vessels 10A, 10B, and 10C, and determines the maximum value of these differential pipe pressures as the actual maximum value.

[0100] The target pipe pressure calculation unit 74 calculates the target pipe pressure P Y Specifically, when the total detected air amount is smaller than the total required air amount, the target pipe pressure calculation unit 74 corrects the target pipe pressure P YWhen the total detected air volume is greater than the total required air volume, the target pipe pressure calculation unit 74 calculates the corrected target pipe pressure P Y The value obtained by subtracting the differential pipe pressure from the calculated target pipe pressure is calculated as the corrected target pipe pressure. The air blowing control unit 76 controls the air supply from the air blowing unit 20 so that the pressure in the air blowing pipe 30 becomes the corrected target pipe pressure. This allows the pressure in the air blowing pipe 30 to approach the pipe pressure for actually supplying the required amount of air to the reaction tank 10, and makes it possible to match the total detected air amount with the total required air amount. The introduced air control unit 78 adjusts the opening of the introduction valve 36 again to adjust the amount of air to the branch pipe 34, so that the detected air amount of each branch pipe 34 matches the required air amount. This makes it possible to appropriately supply the required air to the reaction tank 10 even if there is a fluctuation in pressure loss due to, for example, deterioration. For example, if the detected air amount in one branch pipe 34 is insufficient for the required air amount, it is possible to adjust the opening of the introduction valve connected to this branch pipe 34 or the opening of the introduction valve 36 connected to another branch pipe 34 to compensate for the branch pipe 34 that is lacking in air with the air supplied to the other branch pipe 34. However, if the detected air volume in that branch pipe 34 is insufficient to meet the required air volume, it is possible that the pressure in that branch pipe 34 is insufficient due to pressure loss. In this case, therefore, even if the introduction valve 36 is adjusted, the pressure will not increase, and there is a risk that it will not be possible to supplement air into the branch pipe 34. In contrast, in this embodiment, the pressure inside the pipe is increased taking into account the pressure loss, so that even if the introduction valve 36 cannot supplement air, it is possible to appropriately supplement the required air.

[0101] The flow of correcting the pipe internal pressure of the blower duct 30 in the second embodiment described above will be described with reference to a flowchart. Fig. 9 is a flowchart illustrating the flow of correcting the pipe internal pressure according to the second embodiment. Fig. 9 shows the flow of correcting the pipe internal pressure when the process shown in Fig. 5 is executed and the blower duct 30 (main pipe 32) is set to the target pipe internal pressure P YThis is the process after the above. Then, the differential air volume calculation unit 79A acquires the value of the total detected air volume from the detected air volume acquisition unit 71, and acquires the value of the total required air volume from the required air volume acquisition unit 72. As shown in FIG. 9, the air supply volume control unit 40A determines whether the total detected air volume is different from the total required air volume by the differential air volume calculation unit 79A (step S50). The differential air volume calculation unit 79A may determine that the total detected air volume is different from the total required air volume when the difference between the total detected air volume and the total required air volume is equal to or greater than a predetermined threshold, and may determine that the total detected air volume is the same as the total required air volume when the difference between the total detected air volume and the total required air volume is lower than the predetermined threshold. If the total detected air volume is not different from the total required air volume (step S50; No), the process proceeds to step S62.

[0102] If the total detected air volume is different from the total required air volume (step S50; Yes), the air supply volume control unit 40A calculates the differential air volume using the differential air volume calculation unit 79A (step S52), calculates the differential air volume from the differential air volume using the target pipe pressure calculation unit 74 (step S54), and calculates the differential pipe pressure from the differential air volume using the differential pipe pressure (step S56). After calculating the differential pipe pressure, the air supply volume control unit 40A calculates the corrected target pipe pressure from the differential pipe pressure and the target pipe pressure using the target pipe pressure calculation unit 74 (step S58). That is, the target pipe pressure calculation unit 74 corrects the target pipe pressure with the differential pipe pressure, and sets the corrected value as the corrected target pipe pressure. After calculating the corrected target pipe pressure, the air supply amount control unit 40A controls the air supply from the blower unit 20 by the blower control unit 76 so that the pressure in the blower pipe 30 (main pipe 32) becomes the corrected target pipe pressure (step S60). Then, the process proceeds to step S62, and if the process is to be ended (step S62; Yes), the process is ended, and if the process is not to be ended (step S62; No), the process returns to step S50 and is repeated.

[0103] As described above, the air supply volume control unit 40A according to the second embodiment has a differential air volume calculation unit 79A. When the total detected air volume differs from the total required air volume, the differential air volume calculation unit 79A calculates the differential air volume, which is the difference between the required air volume and the detected air volume, for each reaction vessel 10. The target pipe pressure calculation unit 74 according to the second embodiment calculates the target pipe pressure P based on the pressure loss (differential air pipe loss pressure) in the air blower duct 30 when air of the differential air volume is supplied into the air blower duct 30. Y The airflow control unit 76 according to the second embodiment corrects the pressure in the air blower duct 30 to the corrected target pipe internal pressure P Y The air supply from the blower unit 20 is controlled so as to achieve the corrected target pipe pressure.

[0104] In the wastewater treatment system 1 according to the second embodiment, when the total detected air volume is different from the total required air volume, the target pipe pressure P Y The pressure in the air duct 30 is corrected to the corrected target pipe pressure P Y (corrected target pipe pressure). Therefore, the wastewater treatment system 1 according to the second embodiment can appropriately supply the necessary air to the reaction tank 10 even when the pressure loss fluctuates due to, for example, deterioration.

[0105] Although the embodiments of the present invention have been described above, the embodiments are not limited to the contents of these embodiments. The above-described components include those that a person skilled in the art can easily imagine, those that are substantially the same, and those that are within the so-called equivalent range. Furthermore, the above-described components can be appropriately combined. Furthermore, various omissions, substitutions, or modifications of the components can be made without departing from the gist of the above-described embodiments. [Explanation of symbols]

[0106] 1. Wastewater treatment system 10 Reactor 12 Aeration section 20 Blower unit 22 Blower 30 Air pipe 31 Introductory tube 32 Main pipe 34 Branch pipe 40 Air supply amount control section 42 Control section 43 Nitrate meter 44 Ammonia meter 46 Intake measurement section 47 Main pipe internal pressure measurement section 48 Branch Air Volume Measurement Section 70 Water quality measurement result acquisition section 72 Required air volume acquisition section 74 Target pipe pressure calculation unit 76 Air flow control unit 78 Intake air control section 82 Relationship Memory Unit 84 Required air volume calculation section W Wastewater

Claims

1. A plurality of reaction tanks for performing biological treatment on the water to be treated; A blower pipe which is a pipe connected to a plurality of the reaction vessels; A blower unit that supplies air for performing the biological treatment to the plurality of reaction tanks through the blower pipe; an air supply amount control unit for controlling the amount of air supplied to the reaction tank; an air blowing control unit that controls the supply of air from the air blowing unit so that the pressure in the air blowing pipe becomes a target pipe pressure; A water quality measuring unit that measures the state of the water to be treated in the reaction tank, The air blowing control unit is Based on the measurement results of the water quality measurement unit, the amount of air required for carrying out the biological treatment in the reaction tank is obtained; obtaining target pipe internal pressures for the plurality of reaction vessels based on a pressure loss in the air blower pipe when the required amount of air is supplied; setting the target pipe pressure in the air blower pipe based on the target pipe pressures of the plurality of reaction tanks, and controlling the supply of air from the air blower unit; Water treatment system.

2. A control device for a water treatment system having a plurality of reaction tanks for performing biological treatment on water to be treated, a blower pipe which is a tube connected to the plurality of reaction tanks, a blower unit which supplies air for performing the biological treatment to the plurality of reaction tanks via the blower pipe, and a water quality measuring unit which measures the state of the water to be treated in the reaction tanks, a blowing control unit that controls the supply of air from the blowing unit so that the pressure in the blowing pipe becomes a target pipe pressure; The air blowing control unit is Based on the measurement results of the water quality measurement unit, the amount of air required for carrying out the biological treatment in the reaction tank is obtained; obtaining target pipe internal pressures for the plurality of reaction vessels based on a pressure loss in the air blower pipe when the required amount of air is supplied; setting the target pipe pressure in the air blower pipe based on the target pipe pressures of the plurality of reaction tanks, and controlling the supply of air from the air blower unit; Control device.

3. A method for controlling a water treatment system having a plurality of reaction tanks for performing biological treatment on water to be treated, a blower pipe which is a tube connected to the plurality of reaction tanks, a blower unit which supplies air for performing the biological treatment to the plurality of reaction tanks via the blower pipe, and a water quality measuring unit which measures the state of the water to be treated in the reaction tanks, a blowing control step of controlling the supply of air from the blowing unit so that the pressure in the blowing pipe becomes a target pipe pressure; In the air blowing control step, Based on the measurement results of the water quality measurement unit, the amount of air required for carrying out the biological treatment in the reaction tank is obtained; obtaining target pipe internal pressures for the plurality of reaction vessels based on a pressure loss in the air blower pipe when the required amount of air is supplied; setting the target pipe pressure in the air blower pipe based on the target pipe pressures of the plurality of reaction tanks, and controlling the supply of air from the air blower unit; Control methods.

Citation Information

Patent Citations

  • Control of air blow in sewage disposal

    JP1981129088A

  • Airflow controller for aeration vessel

    JP1983027692A

  • Method for controlling concentration of dissolved oxygen of aeration tank

    JP1985125297A

  • Apparatus for controlling air feed amount of aeration tank

    JP1986129092A

  • JP1986143697U