AI Technical Summary
【0010】 本発明によれば、蓄電池の充放電効率及び電力変換装置の電力変換効率の全体の効率を最適化することが可能になる。
Smart Images

Figure 0007588045000005 
Figure 0007588045000006 
Figure 0007588045000007
Abstract
Description
[Technical field]
[0001] The present invention relates to a controller, a control program, a control method, and a power supply system. [Background technology]
[0002] For example, Patent Document 1 discloses a method for controlling charging and discharging power so that the power conversion efficiency of each of a plurality of power conversion devices connected to a storage battery is increased. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-137131 A Summary of the Invention [Problem to be solved by the invention]
[0004] The charge / discharge efficiency of the storage battery also changes depending on the charge / discharge power. By only looking at the power conversion efficiency of the power conversion device as in Patent Document 1, it may not be possible to optimize the overall efficiency of the charge / discharge efficiency of the storage battery and the power conversion efficiency of the power conversion device.
[0005] An object of the present invention is to optimize the overall efficiency of the charge / discharge efficiency of the storage battery and the power conversion efficiency of the power conversion device. [Means for solving the problem]
[0006] A controller according to one aspect is a controller that controls the charging and discharging of each of a plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, and the at least one operating objective includes a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is an overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.
[0007] A control program according to one aspect is a control program that causes a computer to execute a process for controlling the charging and discharging of each of a plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, the at least one operating objective including a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is an overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.
[0008] A control method according to one aspect is a control method for controlling the charging and discharging of each of a plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, the at least one operating objective including a first operating objective of charging and discharging each of the plurality of storage battery systems so that the operating efficiency of each of the plurality of storage battery systems is high, and the operating efficiency is an overall efficiency of the charging and discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to the charging and discharging power.
[0009] A power supply system according to one aspect includes a plurality of storage battery systems and a controller that controls the charging and discharging of each of the plurality of storage battery systems in accordance with at least one operating objective, each of the plurality of storage battery systems including a storage battery and a power conversion device connected to the storage battery, the at least one operating objective including a first operating objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems, the operating efficiency being an overall efficiency of the charging and discharging efficiency of the storage batteries and the power conversion efficiency of the power conversion device with respect to the charging and discharging power. Effect of the Invention
[0010] According to the present invention, it is possible to optimize the overall efficiency of the charge / discharge efficiency of the storage battery and the power conversion efficiency of the power conversion device. [Brief description of the drawings]
[0011] [Figure 1] 1 is a diagram showing an example of a schematic configuration of a power supply system 100 in which a controller 4 according to an embodiment is used. [Diagram 2] FIG. 4 is a diagram showing an example of system data 444. [Diagram 3] FIG. 4 is a diagram showing an example of system data 444 for each of a plurality of storage battery systems 2. [Figure 4] FIG. 4 is a diagram showing an example of system data 444 for each of a plurality of storage battery systems 2. [Diagram 5] FIG. 4 is a diagram showing an example of system data 444 for each of a plurality of storage battery systems 2. [Figure 6] FIG. 4 is a diagram showing an example of system data 444 for each of a plurality of storage battery systems 2. [Figure 7] 4 is a flowchart showing an example of a process executed in the power supply system 100. [Figure 8] FIG. 2 illustrates an example of a hardware configuration of a controller. [Figure 9] FIG. 1 is a diagram showing an example of a schematic configuration of a power supply system 100 in which a controller 4 according to a first application example is used. [Figure 10] 11 is a diagram showing an example of power PG of a power generation device G. FIG. [Figure 11] 11 is a diagram showing an example of a target value of power P1 of a storage battery 11. FIG. [Figure 12] 13 is a diagram showing an example of the total power (target value of PG+P1) of the target values of the power PG of the power generation device G and the power P1 of the storage battery 11. FIG. [Figure 13] 13 is a diagram showing an example of a target value of power P2 of the storage battery 21. FIG. [Figure 14] FIG. 13 is a diagram showing an example of power P3 at coordination point 3. [Figure 15] 1 is a diagram showing an example of power P1 of a storage battery 11 and an example of a charge / discharge power amount. [Figure 16] 11 is a diagram showing an example of power P2 of the storage battery 21 and an example of the amount of charged and discharged power. FIG. [Figure 17] FIG. 1 is a diagram showing a schematic configuration of a comparative example. [Figure 18] FIG. 13 is a diagram illustrating an example of power P3E in a comparative example. [Figure 19] 11 is a diagram showing an example of electric power P2E and the charge / discharge electric energy of a storage battery 21E of the comparative example. FIG. [Figure 20] 11 is a diagram showing an example of a target value of power P1 of a storage battery 11. FIG. [Figure 21] 13 is a diagram showing an example of the total power (target value of PG+P1) of the target values of the power PG of the power generation device G and the power P1 of the storage battery 11. FIG. [Figure 22] 13 is a diagram showing an example of a target value of power P2 of the storage battery 21. FIG. [Diagram 23] FIG. 13 is a diagram showing an example of power P3 at coordination point 3. [Figure 24] 1 is a diagram showing an example of power P1 of a storage battery 11 and an example of a charge / discharge power amount. [Diagram 25] 11 is a diagram showing an example of power P2 of the storage battery 21 and an example of the amount of charged and discharged power. FIG. [Figure 26] FIG. 13 is a diagram showing an example of calculation of a target value of power P1 based on averaged power PG. [Figure 27] 13 is a diagram showing an example of the total power (target value of PG+P1) of the target values of the power PG of the power generation device G and the power P1 of the storage battery 11. FIG. [Figure 28] 13 is a diagram showing an example of a target value of power P2 of the storage battery 21. FIG. [Figure 29] FIG. 13 is a diagram showing an example of power P3 at coordination point 3. [Diagram 30] 1 is a diagram showing an example of power P1 of a storage battery 11 and an example of a charge / discharge power amount. [Diagram 31] 11 is a diagram showing an example of power P2 of the storage battery 21 and an example of the amount of charged and discharged power. FIG. [Diagram 32] 11 is a diagram showing an example of a shift in power P1 of the storage battery 11. FIG. [Diagram 33] 11 is a diagram showing an example of a shift in power P1 of the storage battery 11. FIG. [Diagram 34] FIG. 13 is a diagram showing an example of a schematic configuration of a power supply system 100A in which a controller 4A according to a second application example is used. [Diagram 35] 11 is a diagram showing an example of a plan for a target value of power P1 of a storage battery 11. FIG. [Diagram 36] 1 is a diagram showing an example of a load, which is connected to a power line W and consumes power from the power line W and is referred to as a load L. [Figure 37] FIG. 13 is a diagram showing an example of a schematic configuration of a controller 4B according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, an embodiment will be described with reference to the drawings. The same elements, functions, processes, etc. will be denoted by the same reference numerals, and duplicated descriptions will be omitted as appropriate.
[0013] 1 is a diagram showing an example of a schematic configuration of a power supply system 100 using a controller 4 according to an embodiment. The power supply system 100 includes a plurality of storage battery systems 2, a coordination point 3, a controller 4, a power line W, and a power line W2.
[0014] First, the power line W, the power line W2, and the coordination point 3 will be described. The power line W and the power line W2 connect the multiple storage battery systems 2 and the coordination point 3. The power line W2 is connected between the multiple storage battery systems 2 and the power line W. Unless otherwise specified, the power line W and the power line W2 are assumed to be AC power lines. AC power refers to active power. For convenience, the power line W2 is illustrated and described as a power line bundling the multiple storage battery systems 2. The power line W2 may be omitted, in which case the power line W connects the storage battery systems 2 and the coordination point 3.
[0015] The connection point 3 is a connection point between the power line W and the power grid 9. Electric power is exchanged between the storage battery system 2 and the power grid 9 via the connection point 3. An example of the power grid 9 is a commercial power grid (commercial system). In this case, the power supply system 100 may operate in cooperation with the power grid 9.
[0016] The multiple storage battery systems 2 are connected in parallel to one another when viewed from the power line W, more specifically, from the power line W2. In order to distinguish each of the multiple storage battery systems 2, they are illustrated as storage battery system 2-1, storage battery system 2-2, storage battery system 2-3, and storage battery system 2-n. Note that the number of the multiple storage battery systems 2 may be two or more, and therefore n may be an integer of two or more.
[0017] The storage battery system 2 includes a storage battery 21, a PCS 22, a terminal 23, and a battery controller 24. In order to distinguish the storage batteries 21 in each of the multiple storage battery systems 2, they are illustrated as storage battery 21-1, storage battery 21-2, storage battery 21-3, and storage battery 21-n. The same applies to the PCS 22, the terminal 23, and the battery controller 24.
[0018] The storage battery 21 charges and discharges between the power line W2 and the power line W via the PCS 22. The PCS 22 is a power conversion device connected to the storage battery 21 and charges and discharges the storage battery 21. More specifically, the PCS 22 is a bidirectional power conversion device that converts power from the storage battery 21 into AC power and supplies it to the power line W2, and converts AC power from the power line W2 into DC power and supplies it to the storage battery 21. The PCS 22 is also called a Power Conditioning System, a Power Converter, etc.
[0019] The charging and discharging power of the storage battery 21 via the PCS 22 is illustrated as power p. With respect to the power p, the discharged power is assumed to be positive. The power p of the storage battery system 2-1, the storage battery system 2-2, the storage battery system 2-3, and the storage battery system 2-n is illustrated as power p-1, power p-2, power p-3, and power pn.
[0020] The power p of each of the multiple storage battery systems 2 is combined by a power line W2. The power combined by the power line W2 is referred to as power P2 and illustrated. It is assumed that the discharge power of power P2 is also positive. Power P2 is the total power of power p-1 to power pn. Hereinafter, the power p of each of the multiple storage battery systems 2 is also referred to as "each power p."
[0021] The terminal 23 is an output terminal of the storage battery system 1, and provides a connection between the PCS 22 and the power line W. The battery controller 24 controls the charging and discharging of the storage battery 21 by controlling the PCS 22. For example, the battery controller 24 provides an output command value to the PCS 22. The output command value specifies, for example, the magnitude and direction (charging or discharging) of the power p. In addition, the battery controller 24 monitors the power p at the terminal 23, and monitors the SOC (State Of Charge) and remaining capacity of the storage battery 21. The battery controller 24 is configured to be able to communicate with the controller 4. An example of the unit of SOC is %, and an example of the unit of remaining capacity is Ah, Wh, etc. Hereinafter, within a range without contradiction, the SOC and remaining capacity may be interpreted as appropriate interchangeably, and one of the SOC and remaining capacity may be interpreted as including the other.
[0022] The controller 4 controls charging and discharging of each of the multiple storage battery systems 2 in accordance with the operation purpose of the power supply system 100. The controller 4 includes an acquisition unit 41, a calculation unit 42, a charge and discharge control unit 43, and a storage unit 44.
[0023] The acquisition unit 41 acquires information necessary for charge / discharge control of the storage battery system 2. For example, the acquisition unit 41 acquires power information. An example of the power information is a power value, etc., which is measured, monitored, etc. by a power measuring device (not shown) or the like. An example of the power is the power p of the storage battery system 2. For example, the information on the power p is transmitted from the battery controller 24 of the storage battery system 2 to the controller 4 and acquired by the acquisition unit 41.
[0024] The acquisition unit 41 also acquires storage battery information. Examples of the storage battery information are the remaining capacity and power price of the storage battery 21. The remaining capacity is referred to as the remaining capacity Q, and the power price is referred to as the power price C. The remaining capacity Q is transmitted from the battery controller 24 to the controller 4 and acquired by the acquisition unit 41. The power price C is the price of the power (power corresponding to the remaining capacity Q) charged to the storage battery 21. For example, the power price C may be the power price (e.g., the electricity rate) during the time period during which the storage battery 21 is charged. When the storage battery 21 is charged during a plurality of time periods with different power prices, a price obtained by weighting and averaging the respective power prices with the corresponding charging power amounts may be used as the power price C. The power price C may be calculated by the battery controller 24 or may be calculated by the controller 4. The power price C calculated by the battery controller 24, or information on the charging time period on which the power price C is calculated, is transmitted from the battery controller 24 to the controller 4 and acquired by the acquisition unit 41.
[0025] The calculation unit 42 calculates the target value of each power p based on the target value of the power P2. The target value of the power P2 may be provided from outside the controller 4, or may be calculated within the calculation unit 42. Details of the calculation by the calculation unit 42 will be described later.
[0026] The charge / discharge control unit 43 controls the charge / discharge of each of the multiple storage battery systems 2 based on the target value of each power p calculated by the calculation unit 42. For example, the charge / discharge control unit 43 transmits an output command value of the PCS 22 corresponding to the target value of the power p to the battery controller 24. The battery controller 24 provides the received output command value to the PCS 22. The PCS 22 charges and discharges the storage battery 21 according to the provided output command value. The power p of the storage battery system 2 approaches the target value.
[0027] The storage unit 44 stores various information necessary for control by the controller 4. Examples of the information stored in the storage unit 44 include a control program 441 and system data 444. The control program 441 is a program that causes a computer to execute control (processing) executed in the controller 4. The system data 444 is data related to the storage battery system 2. The system data 444 will be described with reference to Figs. 2 to 6.
[0028] 2 is a diagram showing an example of the system data 444. In this example, the system data 444 describes the storage battery system 2, an efficiency function E(p), a remaining capacity Q, and an electricity price C in association with each other. The efficiency functions E(p) of the storage battery system 2-1, the storage battery system 2-2, the storage battery system 2-3, and the storage battery system 2-n are described as efficiency functions E1(p), E2(p), E3(p), and E4(p). n The same is true for the remaining capacity Q and the electricity price C.
[0029] The efficiency function E(p) is a function that takes the power p of the storage battery system 2 as an argument and returns the operation efficiency E of the storage battery system 2. The operation efficiency E is the overall efficiency of the charge / discharge efficiency of the storage battery 21 and the power conversion efficiency of the PCS 22 with respect to the charge / discharge power of the storage battery system 2. The charge / discharge efficiency of the storage battery 21 at a certain power p is expressed as η bat Let the power conversion efficiency of PCS22 be η pcs Then, the operating efficiency E at that power p is calculated by multiplying the charge and discharge efficiency η bat and power conversion efficiency η pcs It is expressed as the product of . If the efficiency is different between charging and discharging, each variable can be separated.
number
[0030] The remaining capacity Q and the power price C are as described above. The efficiency function E(p), the remaining capacity Q and the power price C may differ for each of the multiple storage battery systems 2. This will be described with reference to Figs. 3 to 6.
[0031] Fig. 3 to Fig. 6 are diagrams showing examples of system data 444 for each of the multiple storage battery systems 2. Fig. 3, Fig. 4, Fig. 5 and Fig. 6 show examples of system data 444 for storage battery system 2-1, storage battery system 2-2, storage battery system 2-3 and storage battery system 2-n. In each diagram, (A) shows a schematic diagram of efficiency function E(p), and (B) shows a schematic diagram of remaining capacity Q and electricity price C.
[0032] In (A) of FIG. 3 to FIG. 6, an operating region including a peak position where the operating efficiency E with respect to the power p (magnitude) is maximum is surrounded by a dashed line. As can be understood, the peak positions of the operating efficiency of each of the multiple storage battery systems 2 may differ from each other. This is because the peak positions of the charge and discharge efficiency of the storage batteries 21 of each of the multiple storage battery systems 2 may differ, or the peak positions of the power conversion efficiency of each of the PCSs 22 may differ. Examples of factors that cause differences in the peak positions of the charge and discharge efficiency of the storage batteries 21 include cases where the design (model number, etc.) of the storage batteries 21 is different, and cases where the period of use (start of operation, etc.) is different. If the design is different, the charge and discharge efficiency characteristics that indicate the charge and discharge efficiency with respect to the charge and discharge power may differ. If the period of use is different, the degree of progression of deterioration of the storage batteries 21 is different, and therefore the charge and discharge efficiency characteristics may differ. The same can be said for the PCS 22.
[0033] Among the illustrated storage battery systems 2, the magnitude of power p corresponding to the peak position of storage battery system 2-1 is the largest, and the magnitude of power p corresponding to the peak position of storage battery system 2-2 is the smallest. The magnitudes of power p corresponding to the peak positions of storage battery system 2-3 and storage battery system 2-n are between them. When the magnitude of power p of storage battery system 2 is zero, PCS 22 of storage battery system 2 is stopped and power consumption is minimized. The position where the magnitude of power p is zero may also be treated as a peak position. In this case, control of the number of storage battery systems 2 that perform charging and discharging (unit number control) is also included in the charge and discharge control of storage battery system 2.
[0034] As shown in (B) of FIG. 3 to (B) of FIG. 6, the remaining capacity Q of each of the plurality of storage battery systems 2 may differ from one another. The same is true for the power price C. Among the illustrated storage battery systems 2, the remaining capacity Q1 of the storage battery system 2-1 is the largest (e.g., SOC 100%), and the remaining capacity Q of the storage battery system 2-n is the largest (e.g., SOC 100%). n The remaining capacity Q2 of the storage battery system 2-2 and the remaining capacity Q3 of the storage battery system 2-3 are between them (for example, SOC 50% and SOC 70%).
[0035] Returning to FIG. 1 , part of the system data 444 is generated in advance and stored in the storage unit 44, and the rest is generated, acquired, etc., as appropriate in the storage unit 44 and stored in the storage unit 44. For example, an initial efficiency function E(p) of the storage battery system 2 is generated in advance and stored in the storage unit 44. Since the efficiency function E(p) may change depending on the period of use of the storage battery system 2, etc., the efficiency function E(p) may be updated as appropriate. The remaining capacity Q and the electricity price C are acquired by the acquisition unit 41 and stored in the storage unit 44.
[0036] In addition, the storage unit 44 stores various information related to the acquisition by the acquisition unit 41 and the calculation by the calculation unit 42.
[0037] The calculation unit 42 will be described in detail. The calculation unit 42 calculates the target value of each power p based on the target value of power P2 and the system data 444. The calculation unit 42 calculates the target value of each power p so that the sum of the target values of each power p is equal to the target value of power P2. In this embodiment, the target value of each power p is calculated according to at least one operation objective. In the following, three operation objectives will be described as examples.
[0038] The first operation objective includes charging and discharging each of the multiple storage battery systems 2 so that the operation efficiency E of each of the multiple storage battery systems 2 is high. The first operation objective can be adopted both during charging (the target value of power P2 is positive) and during discharging (the target value of power P2 is negative). For example, the calculation unit 42 calculates the target value of each power p so that the operation efficiency E of each of the multiple storage battery systems 2 approaches a peak position. By controlling charging and discharging in accordance with the first operation objective, the operation efficiency E of each of the multiple storage battery systems 2 can be optimized.
[0039] The second operation objective includes giving priority to discharging the storage battery 21 with a large remaining capacity Q among the storage batteries 21 of each of the multiple storage battery systems 2, and giving priority to charging the storage battery 21 with a small remaining capacity Q. The second operation objective can be adopted both during charging and discharging. For example, during discharging, the calculation unit 42 calculates the target value of each power p so that the power p of the storage battery 21 with a large remaining capacity Q (i.e., a small free capacity) is larger than the power p of the other storage batteries 21. During charging, the calculation unit 42 calculates the target value of each power p so that the power p of the storage battery 21 with a small remaining capacity Q (i.e., a large free capacity) is larger than the power p of the other storage batteries 21. The difference in the remaining capacity Q of each storage battery 21 can be reduced (balanced) by the charge / discharge control according to the second operation objective. As a result, the remaining capacity Q of each storage battery 21 can be brought to approximately SOC 50%, so that a capacity that can be handled even if the subsequent operation is charging or discharging can be secured.
[0040] The third operation objective includes giving priority to discharging the storage batteries 21 with a low (cheap) price of charged electricity among the storage batteries 21 in each of the multiple storage battery systems 2. The third operation objective can be adopted only during discharging out of during charging and discharging. For example, the calculation unit 42 calculates a target value of each power p so that the power p of the storage battery 21 to which power with a low power price C is charged is greater than the power p of the other storage batteries 21. By controlling charging and discharging in accordance with the third operation objective, it is possible to give priority to supplying power with a low power price C, while conserving as much power with a high power price C as possible in the storage batteries 21. Advantages such as saving on power costs can be obtained.
[0041] In one embodiment, a judgment value D is used. The judgment value D is a value (score) indicating the degree of reflection of at least one driving purpose. When multiple driving purposes are taken into consideration, the judgment value D indicates the degree of each of the multiple driving purposes, each of which is weighted. The calculation unit 42 calculates the target value of each power p so that the judgment value D becomes the largest (so that the score is maximized). The judgment value D used during discharging and during charging may differ. Below, explanations will be given in the order of discharging and charging. Note that the judgment formula shown below is an example.
[0042] The judgment value D used during discharging is referred to as the judgment value D1. The judgment value D1 is determined so that the judgment value D1 increases as the operation efficiency E of the storage battery system 2 increases. The judgment value D1 is also determined so that the judgment value D1 increases as the remaining capacity Q increases. The judgment value D1 is also determined so that the judgment value D1 increases as the power price C decreases.
[0043] For example, the calculation unit 42 calculates each power p so that the judgment value D1 given by the following formula (2) is maximized and formula (3) is satisfied.
number
number
[0044] Coefficient K e The larger the coefficient K is, the larger the ratio of the operation efficiency E in the judgment value D1 becomes, and the weight of the first driving objective becomes larger. q The larger the coefficient K is, the larger the proportion of the remaining capacity Q in the judgment value D1 becomes, and the weight of the second operating objective (here, the second operating objective during discharging) becomes. c The smaller the value is, the greater the proportion of the inverse of the power price C in the judgment value D1, that is, the greater the proportion of supplying power with a low power price C, and the greater the weight of the third operation objective.
[0045] In addition, when the judgment value D1 indicates only the degree of reflection of the first operational objective, the right side of the above formula (2) may be described only in terms related to the efficiency function E(p). Similarly, in the case of the second operational objective, it may be described only in terms related to the remaining capacity Q. In the case of the third operational objective, it may be described only in terms related to the electricity price C.
[0046] The left side of the above formula (3) is the target value for power P2, and the right side is the sum of the target values for each power p.
[0047] On the other hand, the determination value D used during charging is referred to as the determination value D2. The determination value D2 is determined so that the greater the operating efficiency E of the storage battery system 2, the greater the determination value D2. The determination value D2 is also determined so that the smaller the remaining capacity Q, the greater the determination value D2.
[0048] For example, the calculation unit 42 calculates each power p so that the judgment value D2 given by the following formula (4) becomes the largest and the above-mentioned formula (3) is satisfied.
number
[0049] In addition, when the judgment value D2 indicates only the degree of reflection of the first driving objective, the right side of the above formula (4) may be described only in terms related to the efficiency function E(p). Similarly, in the case of the second driving objective, it may be described only in terms related to the remaining capacity Q.
[0050] As mentioned above, the above formulas (2) to (4) are merely examples of the formulas for calculating the judgment value D1 and the judgment value D2. Various formulas capable of giving the judgment value D1 and the judgment value D2 may be used within a range that does not deviate from the spirit of the judgment value D1 and the judgment value D2.
[0051] Returning to FIG. 1, for example, in the manner described above, the calculation unit 42 calculates each power p according to at least one operation objective. The operation objective is set manually or automatically, and is acquired, for example, by the acquisition unit 41. A plurality of operation objectives may be set together with priorities (corresponding to weighting). In this case, the calculation unit 42 calculates the coefficient K e , coefficient K q , coefficient K cAfter adjusting the power p, the target value of each power p2 is calculated. The higher the priority, the larger the corresponding weighting coefficient is adjusted. The charge / discharge control unit 43 controls the charge / discharge of each of the multiple storage battery systems 2 based on each power p calculated by the calculation unit 42, i.e., in accordance with at least one operation purpose. When the determination value D is used, the charge / discharge control unit 43 controls the charge / discharge of each of the multiple storage battery systems 2 so that, for example, the above-mentioned determination value D1 or determination value D2 becomes the largest.
[0052] 7 is a flowchart showing an example of a process (control method) executed in the controller 4. The process of this flowchart is started in response to a target value of the power P2 being given.
[0053] In step S1, it is determined whether the current state is discharging or charging. For example, the calculation unit 42 of the controller 4 determines that the current state is discharging when the target value of the power P2 is positive, and determines that the current state is charging when the target value of the power P2 is negative. If the current state is discharging (step S1: Yes), the process proceeds to step S2. If the current state is not discharging, i.e., if the current state is charging (step S1: No), the process proceeds to step S4.
[0054] In step S2, the coefficient of the judgment value D1 is adjusted. The calculation unit 42 of the controller 4 adjusts the coefficient K e , K q and K c Adjust.
[0055] In step S3, a target value of each power p is calculated. The calculation unit 42 of the controller 4 calculates the target value of each power p so that the judgment value D1, the coefficient of which has been adjusted in the previous step S2, becomes the largest. After the process of step S3 is completed, the process proceeds to step S6.
[0056] In step S4, the coefficient of the judgment value D2 is adjusted. The calculation unit 42 of the controller 4 adjusts the coefficient K e and K q Adjust.
[0057] In step S5, a target value of each power p is calculated. The calculation unit 42 of the controller 4 calculates the target value of each power p so that the judgment value D2 whose coefficient has been adjusted in the previous step S4 becomes the largest. After the process of step S5 is completed, the process proceeds to step S6.
[0058] In step S6, charge / discharge control is performed. The charge / discharge control unit 43 of the controller 4 controls the charge / discharge of each of the multiple storage battery systems 2 based on the target value of each power p calculated in the previous step S3 or step S5.
[0059] 8 is a diagram showing an example of a hardware configuration of a controller. A computer or the like having the illustrated hardware configuration functions as the controller 4 described above. The controller 4 includes, as its hardware configuration, a communication device 4a, a display device 4b, a HDD (Hard Disk Drive) 4c, a memory 4d, and a processor 4e, which are interconnected by a bus or the like.
[0060] The communication device 4a is a network interface card or the like, and enables communication with other devices. The display device 4b is, for example, a touch panel or a display. The HDD 4c functions as a storage unit 44, and stores, for example, a control program 441.
[0061] The processor 4e reads the control program 441 from the HDD 4c or the like and loads it in the memory 4d, thereby causing the computer to function as the controller 4. The functions of the controller 4 include the functions of the acquisition unit 41, the calculation unit 42, and the charge / discharge control unit 43, as described above.
[0062] The control program 441 can be distributed via a network such as the Internet. The control program 441 can be recorded on a computer-readable recording medium such as a hard disk, a flexible disk (FD), a CD-ROM, a magneto-optical disk (MO), or a digital versatile disk (DVD), and can be executed by being read out from the recording medium by a computer.
[0063] As described above, the controller 4 controls the charging and discharging of each of the multiple storage battery systems 2 in accordance with at least one operation objective. Each of the multiple storage battery systems 2 includes a storage battery 21 and a PCS 22 (power conversion device) connected to the storage battery 21. The at least one operation objective includes a first operation objective of charging and discharging each of the multiple storage battery systems 2 so that the operation efficiency E of each of the multiple storage battery systems 2 is high. The operation efficiency E is expressed as the charge / discharge efficiency η of the storage battery 21 with respect to the power p (charge / discharge power). bat and the power conversion efficiency η of PCS22 pcs is the overall efficiency of the
[0064] According to the controller 4, the charge and discharge of the plurality of storage battery systems 2 is controlled so that the operation efficiency E of each of the plurality of storage battery systems 2 is increased. bat and the power conversion efficiency η of PCS22 (power conversion device) pcs The overall efficiency of the system can be optimized.
[0065] 2 to 6, the peak positions of the operating efficiencies E of the multiple storage battery systems 2 are different from one another, and the first operation objective may include bringing the operating efficiency E of each of the multiple storage battery systems 2 closer to the peak position. In this manner, for example, the operating efficiency E of each of the multiple storage battery systems 2 can be optimized.
[0066] The charge / discharge efficiency η of each storage battery 21 in the multiple storage battery systems 2 batFor example, the charge / discharge efficiency η may differ from one another due to differences in the design and duration of use of the storage batteries 21 in each of the multiple storage battery systems 2. bat The peak positions of the power consumption may differ from each other. It is possible to optimize the operation efficiency E of a plurality of storage battery systems 2 each including storage batteries 21 with different designs and periods of use. For example, it is possible to flexibly respond to addition or replacement of the storage battery system 2.
[0067] The at least one operation objective may further include a second operation objective of preferentially discharging a storage battery 21 having a large remaining capacity Q and preferentially charging a storage battery 21 having a small remaining capacity Q among the storage batteries 21 in each of the multiple storage battery systems 2. By controlling charging and discharging according to the second operation objective, the remaining capacities Q of the storage batteries 21 can be made closer to each other (balanced).
[0068] The at least one operation objective may further include a third operation objective of preferentially discharging the storage battery 21 with a low price of charged electricity (electricity price C) among the storage batteries 21 in each of the multiple storage battery systems 2. By controlling charging and discharging in accordance with the third operation objective, it is possible to preferentially supply electricity with a low electricity price C, while conserving electricity with a high electricity price C as much as possible in the storage battery 21. This provides benefits such as saving electricity costs.
[0069] The controller 4 may control the charging and discharging of each of the multiple storage battery systems 2 so that a judgment value D (judgment value D1 or judgment value D2) indicating the degree of reflection of at least one driving purpose becomes large. The judgment value D may indicate the degree of each of the multiple driving purposes, each of which is weighted. For example, by using such a judgment value D, it is possible to perform charging and discharging control according to the driving purpose.
[0070] The control program 441 described with reference to FIG. 1 and the like is also one of the techniques disclosed. The control program 441 causes a computer to execute a process of controlling the charging and discharging of each of the multiple storage battery systems 2 according to at least one operating purpose (including the first operating purpose). The control method described with reference to FIG. 7 and the like is also one of the techniques disclosed. The control method controls the charging and discharging of each of the multiple storage battery systems 2 according to at least one operating purpose (including the first operating purpose) (step S6). The power supply system 100 described with reference to FIG. 1 and the like is also one of the techniques disclosed. The power supply system 100 includes multiple storage battery systems 2 and a controller 4 that controls the charging and discharging of each of the multiple storage battery systems 2 according to at least one operating purpose (including the first operating purpose). As described above, the control program 441, the control method, and the power supply system 100 can also increase the charging and discharging efficiency η of the storage battery 21. bat and the power conversion efficiency η of PCS22 pcs The overall efficiency of the system can be optimized.
[0071] <Application Examples> The multiple storage battery systems 2 described above are used, for example, for power smoothing. In that case, the multiple storage battery systems 2 may be used in combination with another storage battery system. The controller 4 may control the charging and discharging of each of these storage battery systems. Hereinafter, the charging and discharging power of the storage battery systems described above may be simply referred to as the charging and discharging power of the storage batteries. The charging and discharging control of the storage battery system may be simply referred to as the charging and discharging control of the storage batteries.
[0072] <First application example> FIG. 9 is a diagram showing an example of a schematic configuration of a power supply system 100 in which a controller 4 according to a first application example is used. The power supply system 100 further includes a power generation device G and a storage battery system 1. The multiple storage battery systems 2 are simply called storage battery systems 2 unless otherwise specified. The charging and discharging power of the storage battery 21 of the storage battery system 2 is the power P2 described above. The power line W connects the power generation device G, the storage battery system 1, and the storage battery system 2 to a connection point 3. Power is exchanged between the power generation device G, the storage battery system 1, and the storage battery system 2, and the power grid 9 via the connection point 3. The power exchanged at the connection point 3 is called power P3 and illustrated. In the power P3, the power toward the power grid 9 is assumed to be positive.
[0073] Power generation by the power generation device G includes power generation using natural energy. Examples of natural energy are wind energy, solar energy, etc., and in that case, the power generation device G is configured to include a wind power generation device, a solar power generation device, etc. The power generated by the power generation device G, more specifically, the power flowing from the power generation device G to the power line W is referred to as power PG and illustrated.
[0074] Fig. 10 is a diagram showing an example of the electric power PG of the power generation device G. The horizontal axis of the graph indicates time t, and the vertical axis of the graph indicates electric power (kW). The graph shows an example of the change in the electric power PG over time in a certain time period. As shown in Fig. 10, the generated electric power PG changes every moment.
[0075] The rate of change is used as an index to express the change in power over time. The rate of change indicates the rate of change in power value per unit period, and is expressed as the ratio (%) of the change in power value to the rated power (rated output) of the power generating device G, for example. The unit period for the short-cycle stability target is generally 1 minute, and the rate of change is % / min.
[0076] When only the power PG of the power generation device G is supplied to the power line W, the large rate of change of the power PG appears as the rate of change of the power P3 at the connection point 3. From the viewpoint of the stability of the power grid 9, it is necessary to suppress the rate of change of the power P3 at the connection point 3. Suppressing this rate of change, in other words, stabilizing the power generation device, is one of the purposes of the storage battery system 1 and the storage battery system 2.
[0077] Returning to Fig. 9, the storage battery system 1 includes a storage battery 11, a PCS 12, a terminal 13, and a battery controller 14. These elements are similar to the corresponding parts of the storage battery system 2, and detailed description will be omitted. The charging and discharging power of the storage battery system 1 is referred to as power P1 and illustrated. It is assumed that the discharging power of the power P1 is also positive.
[0078] The storage battery 11 and the storage battery 21 are a first storage battery and a second storage battery having different characteristics. The storage battery 11 is a large-capacity storage battery, and the storage battery 21 is a high-output storage battery. The large-capacity storage battery is characterized in that it is easy to obtain a large amount of charge / discharge power (battery capacity) but it is difficult to obtain a large amount of charge / discharge power (output) compared to a high-output storage battery. The high-output storage battery is characterized in that it is easy to obtain a large amount of charge / discharge power but it is difficult to obtain a large amount of charge / discharge power compared to a large-capacity storage battery. Since it is publicly known that there are storage batteries with these different characteristics, further detailed explanation will be omitted.
[0079] The storage battery 11 has a battery capacity larger than that of the storage battery 21. The controller 4 controls the charging and discharging of the storage battery 11 and the storage battery 21 so that the maximum charging and discharging power (maximum output) of the storage battery 11 is smaller than the maximum charging and discharging power of the storage battery 21. Note that the maximum charging and discharging power of the storage battery 11 here indicates the maximum absolute value of power P1. The maximum charging and discharging power of the storage battery 21 indicates the maximum absolute value of power P2.
[0080] The controller 4 controls charging and discharging of the storage battery 11 of the storage battery system 1 and the storage battery 21 of the storage battery system 2. The power information acquired by the acquisition unit 41 of the controller 4 includes the power PG of the power generation device G, the power P1 of the storage battery 11, the power P2 of the storage battery 21, the power P3 of the coordination point 3, and the like. For example, the information on the power PG is transmitted from the power generation device G to the controller 4 and acquired by the acquisition unit 41. The information on the power P1 and the power P2 is transmitted from the battery controller 14 and the battery controller 24 to the controller 4 and acquired by the acquisition unit 41. The information on the power P3 is transmitted from the coordination point 3 to the controller 4 and acquired by the acquisition unit 41. The storage battery information acquired by the acquisition unit 41 also includes the remaining capacity of the storage battery 11, and the like.
[0081] The calculation unit 42 calculates a target value of the power P1 of the storage battery 11 and a target value of the power P2 of the storage battery 21 based on the information acquired by the acquisition unit 41. Details will be described later.
[0082] The charge / discharge control unit 43 controls the charge / discharge of the storage battery 11 and the storage battery 21 based on the target value of the power P1 and the target value of the power P2 calculated by the calculation unit 42. For example, the charge / discharge control unit 43 transmits an output command value of the PCS 12 corresponding to the target value of the power P1 to the battery controller 14. The battery controller 14 provides the received output command value to the PCS 12. The PCS 12 charges and discharges the storage battery 11 according to the provided output command value. The power P1 of the storage battery 11 approaches the target value. In addition, the charge / discharge control unit 43 transmits an output command value of the PCS 22 corresponding to the target value of the power P2 to the battery controller 24. The battery controller 24 provides the received output command value to the PCS 22. The PCS 22 charges and discharges the storage battery 21 according to the provided output command value. The power P2 of the storage battery 21 approaches the target value.
[0083] The charge / discharge control by the charge / discharge control unit 43 is performed at intervals equal to or shorter than the unit period (such as one minute) of the rate of change described above. Examples of the intervals of the charge / discharge control are several seconds, tens of seconds, several tens of seconds, one minute, etc. The intervals of calculation by the calculation unit 42 may also be the same as the intervals of the charge / discharge control.
[0084] The calculation unit 42 will be described in detail. The calculation unit 42 includes a first calculation unit 421 and a second calculation unit 422. The first calculation unit 421 calculates a target value of power P1. The second calculation unit 422 calculates a target value of power P2. The first calculation unit 421 and the second calculation unit 422 calculate the target value of power P1 and the target value of power P2 so as to suppress the rate of change of the power P3 of the coordination point 3. In the following, it is assumed that the rate of change is suppressed to 1% / min or less.
[0085] The first calculation unit 421 calculates a target value for the power P1 so as to suppress the rate of change of the power P3 of the coordination point 3 within a range in which the magnitude of the power P1 does not exceed the set value. The set value is set to a value smaller than the maximum charge / discharge power of the storage battery 21. When the magnitude of the target value of the power P1 exceeds the set value in the calculation, the first calculation unit 421 calculates a power of the same magnitude as the set value as the target value of the power P1. As a result, the target value of the power P1 is limited (fixed) to the set value. In the following, an example in which the set value is 400 kW will be described.
[0086] 11 is a diagram showing an example of a target value of power P1 of the storage battery 11. The target value of power P1 is calculated so as to suppress the rate of change of power P3 within a range in which the magnitude of power P1 does not exceed 400 kW, i.e., within a range of power P1 of ±400 kW. If the calculated power P1 exceeds +400 kW, +400 kW is calculated as the target value of power P1. If the calculated power P1 falls below -400 kW, -400 kW is calculated as the target value of power P1.
[0087] 9, the second calculation unit 422 calculates the total power of the power PG and the target value of the power P1 calculated by the first calculation unit 421. This total power is the power P3 after the rate of change is suppressed by the power P1, and corresponds to the power P3 when it is assumed that the power P2 of the storage battery 21 does not exist.
[0088] FIG. 12 is a diagram showing an example of the total power (target value of PG+P1) of the power PG of the power generation device G and the target value of the power P1 of the storage battery 11. Compared to the original power PG (FIG. 10), the rate of change is significantly suppressed. However, during the period in which the target value of the power P1 is limited to the set value, the rate of change is not sufficiently suppressed. In other words, the rate of change is not suppressed to 1% / min or less.
[0089] Returning to FIG. 9, the second calculation unit 422 calculates the target value of power P2 so as to further suppress the rate of change of the total power of power PG and the target value of power P1, i.e., the rate of change of power P3 after it has been suppressed by power P1.
[0090] Fig. 13 is a diagram showing an example of a target value of the power P2 of the storage battery 21. The target value of the power P2 of the storage battery 21 is calculated so as to further suppress the rate of change in the period in which the rate of change was not sufficiently suppressed in Fig. 12 described above.
[0091] Returning to Fig. 9, in the calculation unit 42, the target value of the power p (each power p) of each of the multiple storage battery systems 2 is calculated based on the target value of the power P2 calculated by the second calculation unit 422. The specific calculation method is as described above with reference to Figs. 1 to 7, and therefore detailed description will not be repeated. In the following description, the target value of the power P2 may be appropriately interpreted as the sum of the target values of the power p.
[0092] The charge / discharge control unit 43 controls the charge / discharge of the storage battery 11 and the storage battery 21 based on the target value of the power P1 and the target value of the power P2 calculated by the calculation unit 42. That is, the charge / discharge control unit 43 charges / discharges the storage battery 11 and the storage battery 21 so that the maximum charge / discharge power of the storage battery 11 is smaller than the maximum charge / discharge power of the storage battery 21. More specifically, the charge / discharge control unit 43 charges / discharges the storage battery 11 so as to suppress the rate of change of the power P3 within a range in which the magnitude of the power P1 does not exceed a set value (a value smaller than the maximum charge / discharge power of the storage battery 21). Then, the charge / discharge control unit 43 charges / discharges the storage battery 21 so as to further suppress the rate of change of the power P3 after it has been suppressed by the storage battery 11.
[0093] 14 is a diagram showing an example of power P3 at the coordination point 3. The change rates of power P3 at any time t are all suppressed by power P1 and power P2. In other words, the change rates are suppressed to 1% / min or less.
[0094] The maximum charge / discharge power and the battery capacity of each of the storage batteries 11 and 21 that are subjected to the charge / discharge control as described above will be described with reference to FIGS.
[0095] 15 is a diagram showing an example of the power P1 and the charge / discharge power amount of the storage battery 11. The maximum charge / discharge power of the storage battery 11 is 400 kW because the power P1 is limited within a range of ±400 kW. The battery capacity required by the storage battery 11 is about 1500 kWh because the charge / discharge power amount varies between about +70 kWh and about -1430 kWh.
[0096] 16 is a diagram showing an example of the power P2 and the charge / discharge power amount of the storage battery 21. The maximum charge / discharge power of the storage battery 21 is about 930 kW because the power P2 varies between about +480 kW and about -930 kW. The battery capacity required by the storage battery 21 is about 270 kWh because the charge / discharge power amount varies between about +0 kWh and about -270 kWh.
[0097] The maximum charge / discharge power of 400 kW of the storage battery 11 is smaller than the maximum charge / discharge power of approximately 930 kW of the storage battery 21. Furthermore, the battery capacity of approximately 270 kWh required by the storage battery 21 is smaller than the battery capacity of approximately 1500 kWh required by the storage battery 11. Therefore, the battery capacity (amount of charge / discharge power) of the storage battery 21 can be suppressed while suppressing the output (maximum charge / discharge power) of the storage battery 11. This effect will be further described using a comparative example.
[0098] Fig. 17 is a diagram showing a schematic configuration of a comparative example. A power supply system 100E according to the comparative example differs from the power supply system 100 (Fig. 9) described above in particular in that it does not include a storage battery system 1. An "E" is added to the reference characters of some elements in the power supply system 100E. In the power supply system 100E, the rate of change of the power P3E at the coordination point 3E is suppressed only by the power P2E of the storage battery 21E of the storage battery system 2E.
[0099] 18 is a diagram showing an example of power P3E in a comparative example. The charging and discharging of the storage battery 21E is controlled by power P2E that suppresses the rate of change of the power P3E.
[0100] Fig. 19 is a diagram showing an example of the power P2E and the charge / discharge power amount of the storage battery 21E of the comparative example. The maximum charge / discharge power of the storage battery 21E is about 1270kW because the power P2E varies between about +820kW and about -1270kW. The battery capacity required by the storage battery 21E is about 600kWh because the charge / discharge power amount varies between about +0kWh and about -600kWh. The battery capacity of about 600kWh required by the storage battery 21E of the comparative example is significantly larger than the battery capacity of about 270kWh required by the storage battery 21 described above with reference to Fig. 16.
[0101] 18 and 19, the cause of the increase in the charge / discharge power amount (required battery capacity) of the storage battery 21E will be considered. For example, from time t1 to time t2, the time change of the power PG becomes considerably large, and a gradient state in which the difference between the power PG and the power P3E of the link point 3E becomes large continues. The continuation of the gradient state here means that the gradient difference (positive difference or negative difference) with the same sign continues. As a result of such a difference continuing, the state in which the power P2E is in the same direction (charging direction in this example) continues, and the battery capacity required by the storage battery 21E becomes large. In the power supply system 100 according to the embodiment, the storage battery 11 bears the capacity for suppressing the gradient. The battery capacity required by the storage battery 21 is suppressed accordingly. Therefore, as described above, it is possible to suppress not only the output of the storage battery 11 but also the battery capacity of the storage battery 21.
[0102] <Temporary stop of storage battery 11> 18 and 19, even if the charging / discharging of the storage battery 11 is stopped when the gradient state does not continue for a long time, the effect of suppressing the battery capacity of the storage battery 21 can be obtained. Such a charging / discharging control may be performed by the charging / discharging control unit 43.
[0103] For example, when the first calculation unit 421 of the calculation unit 42 determines that a state in which the gradient state does not continue for a long time (non-gradient state) has continued for a certain period of time, it calculates the target value of the power P1 of the storage battery 11 as zero. A threshold judgment may be used to determine whether the non-gradient state continues. For example, when a state in which the rate of change of the power PG of the power generation device G is less than a threshold continues for a certain period of time, the first calculation unit 421 determines that the non-gradient state continues. For example, when the average gradient for 10 minutes is 10% or less, the charging and discharging of the storage battery 11 may be temporarily halted. The magnitude of the threshold and the length of the certain period may be set arbitrarily.
[0104] As described above, as a result of the first calculation unit 421 calculating the target value of the power P1 as zero, the charge / discharge control unit 43 controls the charge / discharge of the storage battery 11 so that the power P1 becomes zero. During this time, the charge / discharge of the storage battery 11 is temporarily stopped. That is, the charge / discharge control unit 43 temporarily stops the charge / discharge of the storage battery 11 in response to the fact that the rate of change of the power P3 has remained below the threshold for a certain period of time.
[0105] After the vehicle starts to stop, when a certain period of time (the length may be set arbitrarily) has elapsed or when the gradient state starts to continue again, the first calculation unit 421 calculates the target value of the power P1 so as to suppress the rate of change of the power P3, as before. The charge / discharge control unit 43 charges and discharges the storage battery 11. A specific example will be described with reference to Figs. 20 to 25.
[0106] FIG. 20 is a diagram showing an example of a target value of power P1 of the storage battery 11. Time t3 is a time later than time t2 in FIG. 18 described above. The non-gradient state continues for a certain period of time, and time t3 is reached. At time t3, the target value of power P1 is calculated as zero. This calculation is repeated until time t4. At time t4, the target value of power P1 is calculated again within the range of ±400 kW.
[0107] 21 is a diagram showing an example of the total power (target value of PG+P1) of the power PG of the power generation device G and the target value of the power P1 of the storage battery 11. In a period in which the target value of the power P1 is limited to a set value or calculated as zero, the rate of change is not sufficiently suppressed.
[0108] The second calculation unit 422 is the same as above. The second calculation unit 422 calculates a target value for the power P2 so as to further suppress the rate of change of the power P3 after it has been suppressed by the power P1.
[0109] Fig. 22 is a diagram showing an example of a target value of power P2 of the storage battery 21. The target value of power P2 of the storage battery 21 is calculated so as to further suppress the rate of change in the period in which the rate of change was not sufficiently suppressed in Fig. 21 described above.
[0110] 23 is a diagram showing an example of power P3 at the coordination point 3. The rate of change of power P3 at any time t is suppressed by power P1 and power P2.
[0111] 24 is a diagram showing an example of the power P1 and the charge / discharge power amount of the storage battery 11. The maximum charge / discharge power of the storage battery 11 is 400 kW because the power P1 is limited within a range of ±400 kW. The battery capacity required by the storage battery 11 is about 530 kWh because the charge / discharge power amount varies between about +110 kWh and about -420 kWh.
[0112] 25 is a diagram showing an example of the power P2 and the charge / discharge power amount of the storage battery 21. The maximum charge / discharge power of the storage battery 21 is 930 kW because the power P2 varies between about +480 kW and about -930 kW. The battery capacity required by the storage battery 21 is about 330 kWh because the charge / discharge power amount varies between about +0 kWh and about -330 kWh.
[0113] The battery capacity of approximately 330 kWh required by the storage battery 21 is smaller than the battery capacity of approximately 530 kWh required by the storage battery 11. In this way, even if the charging and discharging of the storage battery 11 is temporarily suspended in a non-gradient state, the battery capacity of the storage battery 21 can still be suppressed.
[0114] <Battery 11 as a long-period battery cancels the gradient> Returning to Fig. 9 again, charging and discharging of storage battery 11, which is a large-capacity storage battery, may be used for smoothing over a relatively long period (long cycle), and charging and discharging of storage battery 21, which is a high-output storage battery, may be used for smoothing over a relatively short period (short cycle). In this case, storage battery 11 can be said to be a long-cycle storage battery, and storage battery 21 can be said to be a short-cycle storage battery. Storage battery system 1 can be said to be a long-cycle storage battery system, and storage battery system 2 can be said to be a short-cycle storage battery system.
[0115] For example, the first calculation unit 421 calculates the target value of the power P1 based on the power PG of the power generation device G for each predetermined period. The predetermined period is a period longer than the unit period (such as one minute) of the rate of change described above, and is, for example, a period of several minutes, several tens of minutes, several hours, etc.
[0116] In one embodiment, the first calculation unit 421 may calculate the target value of the power P1 based on the averaged power PG of the power generation device G. The period for obtaining one average value corresponds to the predetermined period. The averaging method is not particularly limited, and for example, exponential averaging, interval averaging, moving averaging, etc. may be used. The exponential averaging requires less memory capacity than other averaging methods and is characterized by being easy to follow sudden changes. The interval averaging is characterized by being easy to show the trend when the same change continues for a long time, and by having a small data processing load after averaging. The moving average is typically used when the same change continues for a long time. The first calculation unit 421 calculates the averaged power PG.
[0117] 26 is a diagram showing an example of calculation of the target value of power P1 based on the averaged power PG. The first calculation unit 421 calculates the target value of power P1 calculated to suppress the fluctuation of the averaged power PG as power P1c. Power P1c can also be said to be a candidate value for the target value of power P1. In the following, an example will be described in which the set value is 400 kW.
[0118] The power P1c varies over a wide range from about 1140 kW to about -510 kW. As described above, for example, when the set value is 400 kW, the first calculation unit 421 calculates the target value of the power P1 within a range of ±400 kW (within the set value range). When the magnitude of the power P1c exceeds 400 kW, the target value of the power P1 may be fixed to the set value. When the non-gradient state continues for a certain period of time, the target value of the power P1 may be calculated as zero. Calculation methods other than these are also possible. In the embodiment exemplified here, when the magnitude of the power P1c exceeds 400 kW, the first calculation unit 421 shifts the magnitude of the target value of the power P1. A specific description will be given below.
[0119] In one embodiment, the first calculation unit 421 shifts the magnitude of the target value of the power P1 so that the magnitude of the target value of the power P1 does not exceed a set value while continuing the time change of the target value of the power P1 similar to the time change of the power P1c. In this example, the time change corresponds to the time change of the averaged power PG. For example, the first calculation unit 421 shifts the magnitude of the power by providing an offset equivalent to the shift amount at the timing when the magnitude of the power exceeds 400 kW. If the magnitude of the power after the shift exceeds 400 kW again, the first calculation unit 421 provides a further offset at that timing. For example, the value of the power obtained in this manner is calculated as the target value of the power P1 of the storage battery 11.
[0120] In the example shown in Fig. 26, the magnitude of the target value of power P1 shifts to zero at each of times t11 to t15. Specifically, at times t14 and t15, the target value of power P1 shifts from near +400 kW to zero. For example, an offset of -400 kW is applied at each of those times. From time t11 to time t13, the target value of power P1 shifts from near -400 kW to zero. For example, an offset of +400 kW is applied at each of those times.
[0121] 27 is a diagram showing an example of the total power (target value of PG+P1) of the power PG of the power generation device G and the target value of the power P1 of the storage battery 11. Large fluctuations for each predetermined period are smoothed out, but the rate of change for a unit period shorter than the predetermined period is not yet suppressed.
[0122] 28 is a diagram showing an example of a target value of the power P2 of the storage battery 21. The target value of the power P2 of the storage battery 21 is calculated so as to suppress the rate of change of the power P3.
[0123] The charge / discharge control unit 43 may control the charge / discharge of the storage battery 11 and the storage battery 21 based on the target value of power P1 and the target value of power P2 calculated as described above. For example, the charge / discharge control unit 43 controls the charge / discharge of the storage battery 11 based on the power PG for each predetermined period that is longer than the unit period of the rate of change of the power P3. The charge / discharge control unit 43 then controls the charge / discharge of the storage battery 21 based on the power PG for each unit period. In this case, the charge / discharge control unit 43 shifts the magnitude of the power P1 so that the magnitude does not exceed a set value while continuing the time change of the power P1 of the storage battery 11.
[0124] 29 is a diagram showing an example of power P3 at the coordination point 3. The rate of change of power P3 at any time t is suppressed by power P1 and power P2.
[0125] 30 is a diagram showing an example of the power P1 and the charge / discharge power amount of the storage battery 11. The maximum charge / discharge power of the storage battery 11 is 400 kW because the power P1 is limited within a range of ±400 kW. The battery capacity required by the storage battery 11 is about 800 kWh because the charge / discharge power amount varies between about +280 kWh and about -520 kWh.
[0126] 31 is a diagram showing an example of power P2 and the amount of charge and discharge power of the storage battery 21. The maximum charge and discharge power of the storage battery 21 is about 1120 kW because the power P2 varies between about +960 kW and about -1120 kW. The battery capacity required by the storage battery 21 is about 380 kWh because the amount of charge and discharge power varies between about +0 kWh and about -380 kWh.
[0127] Therefore, even if the storage battery 11 is used as a long-cycle storage battery or the magnitude of the power P1 is shifted within the range of the limit value, it is possible to suppress the output of the storage battery 11 while suppressing the battery capacity of the storage battery 21. Note that the reason why the battery capacity of the storage battery 21 is suppressed even by shifting the power P1 is that the storage battery 11 is controlled to charge and discharge so as to continue the time change according to the time change of the power PG of the power generation device G, and thus bears the capacity for suppressing the gradient.
[0128] In the above, an example has been described in which the magnitude of the power P1 of the storage battery 11 is shifted to zero. In addition to this, various other shifts are possible. For example, the magnitude of the power P1 may be shifted to a magnitude at which the charging and discharging of the storage battery 11 are reversed. This point will also be described with reference to Figs. 32 and 33.
[0129] 32 and 33 are diagrams showing an example of a shift in the power P1 of the storage battery 11. UL and lower limit power P1 LL The upper limit power P1 UL specifies the upper limit of power P1. LL defines the lower limit of power P1.
[0130] In the example shown in Fig. 32, the power P1 of the storage battery 11 changes over time to form a gradient from negative to positive. UL When the power P1 exceeds the power P1 U This makes it possible to suppress the amount of charge / discharge power required to shift the storage battery 21 from negative to positive.
[0131] In the example shown in Fig. 33, the power P1 changes over time to create a gradient from positive to negative. LL When the power P1 falls below the power P1 L This makes it possible to suppress the charge / discharge capacity required to shift the storage battery 21 from positive to negative.
[0132] It's the gradient that matters, not the magnitude. P1 LL and P1 UL If the value of is in the charging direction, the amount of charging power of the storage battery 11 can be increased, and P1 LL and P1 UL If the value of is in the discharging direction, it is possible to increase the amount of discharged power of the storage battery 11. This also makes it possible to control and restrict the storage capacity of the storage battery 11.
[0133] Upper limit power P1 ULand lower limit power P1 LL The magnitude (absolute value) of the shifted power P1 shown in FIG. U is the upper limit power P1 UL Any value smaller than the power P1 U may be less than or equal to zero. U When is smaller than zero, the magnitude of the power P1 shifts to a magnitude where the charging and discharging of the storage battery 11 are reversed. L is the lower limit power P1 LL Any value greater than the power P1 L may be greater than or equal to zero. L is greater than zero, the magnitude of the power P1 shifts to a magnitude where the charging and discharging of the storage battery 11 are reversed.
[0134] <Second application example> In the second application example, the charging and discharging of the storage battery 11 is controlled systematically based on the prediction.
[0135] Fig. 34 is a diagram showing an example of a schematic configuration of a power supply system 100A in which a controller 4A according to application example 2 is used. The controller 4A differs from the controller 4 (Fig. 9) in that it includes an acquisition unit 41A, a calculation unit 42A, and a storage unit 44A instead of the acquisition unit 41, the calculation unit 42, and the storage unit 44, and in that it further includes a planner 45.
[0136] The acquisition unit 41A acquires, in addition to the power information and storage battery information described above, information necessary for predicting the power PG of the power generation device G. An example of such information is meteorological information, such as information indicating wind power, solar radiation, temperature, etc. for each time and time period. The meteorological information is acquired, for example, via an external network (not shown).
[0137] The planner 45 plans a target value for the power P2 of the storage battery 21. For example, the planner 45 predicts the future power PG of the power generation device G based on meteorological information acquired by the above-mentioned acquisition device 41A. More specifically, the planner 45 calculates a predicted value of the power PG of the power generation device G for each future time and time period. Various known methods for predicting power generation may be used.
[0138] The planner 45 plans a target value of power P1 that suppresses fluctuations in the calculated predicted value of power PG of the power generating device G. For example, the planner 45 plans a target value of power P1 for each planned time slot based on the predicted value of power PG for each planned time slot. The planned time slot may correspond to the predetermined period in the first embodiment described above. The length of each planned time slot does not have to be the same. For example, the target value of power P1 for each planned time slot of 15 minutes, 30 minutes, etc. is planned up to 24 hours ahead, 48 hours ahead, etc.
[0139] 35 is a diagram showing an example of a plan of a target value of power P1 of the storage battery 11. Time t21 to time t22, time t22 to time t23, time t23 to time t24, time t24 to time t25, time t25 to time t26, time t26 to time t27, time t27 to time t28, and time t28 to time t29 correspond to planned time slots. Based on the predicted value of power PG for each planned time slot, a target value of power P1 that suppresses fluctuations in power PG is planned.
[0140] In this example, the target value of power P1 is planned to change with a constant gradient over time or to have a constant magnitude for each planned time period. From time t23 to time t24 and from time t27 to time t28, the target value of power P1 is planned to change with a positive gradient. From time t21 to time t22 and from time t25 to time t26, the target value of power P1 is planned to change with a negative gradient. From time t22 to time t23, from time t24 to time t25, from time t26 to time t27, and from time t28 to time t29, the target value of power P1 is planned to have a constant magnitude.
[0141] The planner 45 shifts the magnitude of the target value of the electric power P1 while continuing the time change thereof so that the magnitude does not exceed a set value. The shifting method may be the same as that used by the first calculator 421 of the calculator 42 in the first embodiment described above. For example, from time t21 to time t22, the target value of the electric power P1 is shifted so as not to fall below -400 kW while continuing the negative slope. From time t23 to time t24, the target value of the electric power P1 is shifted so as not to exceed +400 kW while continuing the positive slope.
[0142] Of course, there may be planned time periods during which the target value of power P1 does not shift, such as from time t25 to time t26 and from time t27 to time t28. Also, from time t22 to time t23, from time t24 to time t25, from time t26 to time t27, and from time t28 to time t29, the target value of power P1 is constant, so the target value of power P1 does not shift.
[0143] 34, calculation unit 42A differs from calculation unit 42 (FIG. 1) in that it includes a first calculation unit 421A instead of the first calculation unit 421. For example, first calculation unit 421A calculates the target value of power P1 planned by planner 45 as the target value of power P1 as is. The first calculation unit 421A may not be present, in which case the planner 45 also has the function of the first calculation unit 421A.
[0144] The second calculation unit 422 calculates a target value of the power P2 that suppresses the rate of change of the power P3 of the coordination point 3. The charge / discharge control unit 43 controls the charge / discharge of the storage battery 11 and the storage battery 21 based on the calculation result of the calculation unit 42A. The details are similar to those of the first application example, and therefore the description will not be repeated.
[0145] The storage unit 44A stores various information necessary for control in the controller 4A. An example of the information stored in the storage unit 44A is a control program 441A. The control program 441A is a program that causes a computer to execute control (processing) executed in the controller 4A. In addition, the storage unit 44A stores power information, storage battery information, weather information, and the like acquired by the acquisition unit 41A, and stores information necessary for planning in the planning unit 45 and calculation in the calculation unit 42.
[0146] In the power supply system 100A, the power P1 of the storage battery 11 continues to change over time, but is shifted so that its magnitude does not exceed a set value. This makes it possible to simultaneously suppress the output of the storage battery 11 and the battery capacity of the storage battery 21.
[0147] In the power supply system 100A, it is only necessary to plan the target value of the power P1 to change with a certain gradient or to have a certain magnitude for each planned time period. This has the effect of, for example, avoiding complicated control. This effect can be obtained even if there is no shift in the power P1, and in this sense, a form in which the power P1 is not shifted can also be one of the forms of the power supply system 100A.
[0148] In one embodiment, control may be performed taking into account the SOC of the storage battery. For example, the planner 45 may plan a target value of the power P1 of the storage battery 11 so that the SOC of the storage battery 21 at the end of the planned time period is close to a target SOC (target value of remaining capacity). This can also be said to be a plan to supply the power of the storage battery 21 with the storage battery 11. The end of the planned time period may be several seconds, several tens of seconds, or several minutes before the end time of the planned time period. An example of the target SOC is about 50%. The possibility of maximizing the battery capacity of the storage battery 21 is increased. For example, a lithium ion battery has a characteristic that deterioration progresses if it is left near full charge, so by increasing the frequency of charging and discharging near SOC 50%, the possibility of suppressing the progress of deterioration of the storage battery is increased.
[0149] The planner 45 may re-plan the target value of the power P2 for the next planning time slot based on the actual SOC of the storage battery 21 at the end of the planning time slot. The SOC of the storage battery 21 at the end of the next planning time slot is more likely to be close to the target SOC. Re-planning the target value of the power P2 for the next planning time slot may include re-planning the target value of the power P1 for 24 hours, 48 hours, etc. from that time slot.
[0150] In one embodiment, the charge and discharge of the storage battery 21 may be controlled so as to reduce the power P2 of the storage battery 21 as much as possible within an allowable range. For example, a charge and discharge control may be adopted in which the rate of change of the power P3, which is smaller than ±1% / min, is intentionally brought closer to +1% / min or -1% / min, and the power P2 of the storage battery 21 is reduced accordingly. Since the magnitude of the power P2 is reduced, the battery capacity required by the storage battery 21 can be further reduced. Furthermore, by suppressing the charge and discharge of the storage battery 21, the progress of deterioration can be suppressed.
[0151] <Modification> Some modified examples of the above-described embodiments will be described. In one embodiment, a load (demand) that consumes power may be included in the power supply system. This will be described with reference to FIG.
[0152] Fig. 36 is a diagram showing an example of a load. A load that is connected to a power line W and consumes power from the power line W is referred to as load L and illustrated. Examples of the load L are a house, a factory, etc. The power consumed by the load L is referred to as power consumption PL and illustrated. Information on the power consumption PL is also transmitted from the load L to the controller and acquired, for example.
[0153] At least a portion of the power PG of the power generation device G is consumed by the load L. The remaining power (PG-PL) is power that can be supplied to the power grid 9 via the connection point 3. By treating this power in the same way as the power PG described above, the rate of change in the power P3 of the connection point 3 can be suppressed. To the extent that there is no contradiction, the power PG of the power generation device G may be interpreted as the power obtained by subtracting the power PL of the load L from the power PG of the power generation device G.
[0154] At least a portion of the power PG of the power generation device G is consumed by the load L. The remaining power (PG-PL) is power that can be supplied to the power grid 9 via the connection point 3. By treating this power in the same way as the power PG described above, the rate of change in the power P3 of the connection point 3 can be suppressed. To the extent that there is no contradiction, the power PG of the power generation device G may be interpreted as the power obtained by subtracting the power PL of the load L from the power PG of the power generation device G.
[0155] In the above embodiment, an example has been described in which the charging and discharging of each of the multiple storage battery systems 2 is controlled by the controller 4. However, multiple storage battery systems 1 may be present, and in that case, each of the multiple storage battery systems 1 may be controlled to charge and discharge by the controller 4, similar to the storage battery system 2.
[0156] In one embodiment, a trained model may be used to calculate the target values of power P1 and power P2. This will be described with reference to FIG.
[0157] 37 is a diagram showing an example of a schematic configuration of a controller 4B according to a modified example. The controller 4B differs from the controller 4 (FIG. 9) in that it includes a calculation unit 42B and a storage unit 44B instead of the calculation unit 42 and the storage unit 44, and further includes a learning unit 46.
[0158] Examples of information stored in the storage unit 44B include a control program 441B, a trained model 442, and training data 443. The control program 441B is a program that causes a computer to execute control (processing) executed in the controller 4B. When data (input data) corresponding to information acquired by the acquisition unit 41 is input, the trained model 442 outputs data (output data) corresponding to the target values of power P1 and power P2, for example. The target values of power P1 and power P2 corresponding to the output data are similar to the target values of power P1 and power P2 calculated by the calculation unit 42 (FIG. 1) described above.
[0159] The trained model 442 is generated by training (machine learning, etc.) using training data 443 so as to output output data when input data is input. An example of the training data 443 is a data set combining input data and output data. The data set may be prepared using data of past charge / discharge control of the storage batteries 11 and 21 performed in the power supply system, experimental data, simulation data, etc.
[0160] The calculation unit 42B calculates the target values of power P1 and power P2 using the trained model 442. The calculation unit 42B acquires output data obtained by inputting input data to the trained model 442 as the target values of power P1 and power P2.
[0161] The charge / discharge control unit 43 controls the charge / discharge of the storage battery 11 and the storage battery 21 based on the target values of the power P1 and the power P2 calculated (acquired) by the calculation unit 42B.
[0162] The learning unit 46 learns the trained model 442 by using the training data 443 stored in the storage unit 44B. This makes it possible to generate the trained model 442 and to update the trained model 442 based on the latest training data 443. The learning unit 46 and the training data 443 may be provided outside the controller 4B (for example, an information processing device such as a server device not shown). In this case, the trained trained model 442 generated outside the controller 4B is provided to and used by the controller 4B.
[0163] Although not shown, the learned model may also be used for planning the target value of the power P1 by the planner 45 of the controller 4A (FIG. 34). The learned model may also be used for calculating the target value of the power p of each of the multiple storage battery systems 2.
[0164] In one embodiment, the function of the battery controller 14 of the storage battery system 1 may be incorporated into the controller 4. This enables the configuration of the storage battery system 1 to be simplified, etc. The function of the battery controller 24 of the storage battery system 2 may be incorporated into the controller 4. This enables the configuration of the storage battery system 2 to be simplified, etc.
[0165] In the application example described above, the controller 4 controls the charging and discharging of the storage battery system 1 and the storage battery system 2 based on the power PG (generated power) of the power generator G so as to suppress the rate of change (rate of change in power value per unit period) of the power P3 (transferred and received power) at the connection point 3 between the power generator G, the storage battery system 1 (first storage battery system) and the storage battery system 2 (second storage battery system) connected to the power generator G, and the power grid 9. The storage battery 11 of the storage battery system 1 has a battery capacity larger than that of the storage battery 21 of the storage battery system 2. The charging and discharging control includes charging and discharging the storage battery system 1 and the storage battery system 2 so that the maximum charging and discharging power of the storage battery system 1 is smaller than the maximum charging and discharging power of the storage battery system 2. The storage battery system 2 here is a plurality of storage battery systems 2, and as previously described with reference to Figs. 1 to 7 and the like, each of them is controlled to be charged and discharged according to at least one operation purpose (including the first operation purpose).
[0166] In the above controller 4, the two types of storage batteries, the storage battery 11 and the storage battery 21, are controlled to charge and discharge so as to suppress the rate of change of the power P3 at the connection point 3. The power generation device can be stabilized. In addition, the charging and discharging are controlled. The storage battery 11 has a battery capacity larger than that of the storage battery 21. The charging and discharging control is performed so that the maximum charging and discharging power of the storage battery 11 is smaller than the maximum charging and discharging power of the storage battery 21. The storage battery 11 used in this manner is a large-capacity storage battery. The storage battery 21 is a high-output storage battery. As described with reference to Figs. 15 to 19 and the like, the battery capacity (amount of charging and discharging power) of the storage battery 21 can be suppressed more than when the storage battery 11 is not used while suppressing the output (maximum charging and discharging power) of the storage battery 11. It is possible to achieve both suppression of the output of the storage battery 11 (large-capacity storage battery) and suppression of the battery capacity of the storage battery 21 (high-output storage battery).
[0167] In addition, the charging and discharging of the multiple storage battery systems 2 is controlled so that the operation efficiency E of each of the multiple storage battery systems 2 is high. Therefore, the charging and discharging efficiency η bat and the power conversion efficiency η of PCS22 (power conversion device) pcs In particular, by increasing the operation efficiency E of the storage battery system 2 including the storage battery 21, which is a high-output storage battery, the effect of suppressing the battery capacity of the storage battery 11 can be further enhanced. [Explanation of symbols]
[0168] 1. Battery storage system 2. Battery storage system 3. Linkage points 4. Controller 41 Acquisition Department 42 Calculation section 43 Charge / discharge control unit 44 Storage section 45 Planning Department 46 Learning Department 441 Control Program 442 trained models 443 Training Data 444 System Data G. Power generating equipment P1 Power P2 power p power PG power PL power consumption
Claims
1. A controller that controls charging and discharging of each of a plurality of storage battery systems according to an operation purpose, comprising: Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery, the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority; the operating efficiency is an overall efficiency of the charging / discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging / discharging power, The controller controls charging and discharging of each of the plurality of storage battery systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large. controller.
2. The peak positions of the operation efficiencies of the plurality of storage battery systems are different from one another, The first operating objective includes bringing the operating efficiency of each of the plurality of storage battery systems closer to a peak position. The controller of claim 1 .
3. The peak positions of the charge / discharge efficiency of each of the plurality of storage battery systems are different from each other. The controller of claim 2 .
4. The storage batteries of the plurality of storage battery systems are different from each other in at least one of design and period of use. The controller of claim 3 .
5. The determination value indicates an overall degree of each of the weighted driving purposes. The controller of claim 1 .
6. the controller controls charging and discharging of the first storage battery system and the second storage battery system so as to suppress a rate of change in power exchanged between the power generation device, the first storage battery system and the second storage battery system connected to the power generation device, and a power grid, based on power generated by the power generation device; a storage battery of the first storage battery system has a battery capacity larger than a battery capacity of a storage battery of the second storage battery system; the charge / discharge control includes charging / discharging the first storage battery system and the second storage battery system such that a maximum charge / discharge power of the first storage battery system is smaller than a maximum charge / discharge power of the second storage battery system; The second storage battery system is the plurality of storage battery systems. The controller according to any one of claims 1 to 4.
7. On the computer, A control program for executing a process of controlling charging and discharging each of a plurality of storage battery systems according to an operation purpose, Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery, the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority; the operating efficiency is an overall efficiency of the charging / discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging / discharging power, controlling charging and discharging of each of the plurality of battery storage systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large; Control program.
8. A control method for controlling charging and discharging of each of a plurality of storage battery systems according to an operation purpose, comprising: Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery, the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority; the operating efficiency is an overall efficiency of the charging / discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging / discharging power, controlling charging and discharging of each of the plurality of battery storage systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large; Control methods.
9. A plurality of storage battery systems; a controller that controls charging and discharging of each of the plurality of storage battery systems according to an operation purpose; Equipped with Each of the plurality of storage battery systems includes a storage battery and a power conversion device connected to the storage battery, the operation objectives include a first operation objective of charging and discharging each of the plurality of storage battery systems so as to increase the operating efficiency of each of the plurality of storage battery systems; a second operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a large remaining capacity with priority and charging, among the batteries of each of the plurality of storage battery systems, a battery having a small remaining capacity with priority; and a third operation objective of discharging, among the batteries of each of the plurality of storage battery systems, a battery having a low price of electricity being charged with priority; the operating efficiency is an overall efficiency of the charging / discharging efficiency of the storage battery and the power conversion efficiency of the power conversion device with respect to charging / discharging power, The controller controls charging and discharging of each of the plurality of storage battery systems so that a determination value indicating a degree of overall reflection of the first operation objective, the second operation objective, and the third operation objective becomes large. Power supply system.
Citation Information
Patent Citations
Power control system
JP2012016258A
Secondary battery system comprising a plurality of batteries and distribution method for charge / discharge power and the like
JP2014171335A
Power fluctuation suppressing device using multiple power storage devices and controlling method therefor
JP2015033307A
Energy stabilizer
JP2017118654A
Power storage system, controller, charge / discharge control method, and program
JP2018191486A