Cable management device and cable management method

The cable management device addresses the lack of comprehensive cable management by integrating construction planning, inspection, and deterioration diagnosis, facilitating efficient maintenance and life cycle management of cables in plants.

JP7588192B2Active Publication Date: 2024-11-21TOSHIBA PLANT SYSTEMS & SERVICES
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023155592
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-09-21
Publication Date
2024-11-21
Estimated Expiration
2038-07-11

AI Technical Summary

Technical Problem

Existing cable management systems fail to support the entire life cycle of a plant, from construction planning to maintenance and material management, lacking comprehensive tools for inspection, deterioration diagnosis, and life prediction.

Method used

A cable management device comprising a construction planning device, construction information generation device, construction management device, inspection device, and deterioration diagnosis device, which associate cable IDs with environmental data and generate life prediction information based on sensor inputs.

Benefits of technology

Enables comprehensive management of cables throughout their life cycle, supporting construction planning, inspection, and maintenance, including deterioration diagnosis and life prediction, ensuring optimal cable usage and replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007588192000001
    Figure 0007588192000001
  • Figure 0007588192000002
    Figure 0007588192000002
  • Figure 0007588192000003
    Figure 0007588192000003
Patent Text Reader

Abstract

To support maintenance of materials over the entire life cycle of a plant.SOLUTION: A material management apparatus according to an embodiment comprises: a construction planning device; a construction information generation device; a construction management device; an inspection device; and a deterioration diagnostic device. The construction planning device generates route information by associating a wiring facility ID with a cable ID for each section where a cable is laid. The construction information generation device generates construction information including design information and cable information. The construction management device generates result information by associating the cable ID with construction result information indicating a result of the construction. The inspection device determines whether or not the wiring facility is within a range in which the measurement result by a sensor indicating environmental information is permitted by specifications of the cable included in the construction information. The deterioration diagnostic device generates deterioration state information generated in each cable on the basis of the inspection result information and generates service life prediction information that predicts the service life of each cable.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] FIELD OF THE PRESENTLY PREFERRED EMBODIMENTS The present invention relates to a cable management device and a cable management method. [Background technology]

[0002] There is a known device that supports the creation of a construction plan for laying cables in the construction of plants such as power plants. Meanwhile, materials constituting the plant, such as cables, continue to be used while undergoing maintenance such as inspection and replacement from the start of operation of the plant to its termination and dismantling. Therefore, it is desirable to realize a device that can not only support the creation of construction plans, but also support the maintenance of materials throughout the entire life cycle of the plant. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2007-058434 A [Patent Document 2] JP 2014-130483 A Summary of the Invention [Problem to be solved by the invention]

[0004] The embodiment of the present invention has been made in view of the above-mentioned background, and an object of the present invention is to support the maintenance of materials over the entire life cycle of a plant. [Means for solving the problem]

[0005] In order to solve the above problems, a cable management device according to an embodiment includes a construction planning device, a construction information generating device, a construction management device, an inspection device, and a deterioration diagnosis device. The construction planning device associates a wiring facility ID of a wiring facility used to lay a cable with a cable ID of a cable for each section where the cable is laid, and generates route information. The construction information generating device generates construction information including design information, which is a condition of the laying design according to the route information, and cable information. The construction management device associates a cable ID that identifies the laid cable with construction result information that indicates the result of the construction, and generates result information. The inspection device determines whether or not a measurement result by a sensor that indicates environmental information that the wiring facility is in at least a room temperature environment, a high temperature and humidity environment, an environment with radiation, an atmosphere with a high salt concentration, or an atmosphere with a chemical gas is within a range allowed by condition information that is included in the construction information and that specifies the specifications of the cable, and did result of Test result information and inspection history information that associates the inspection result information with the date and time when the inspection results were obtained. The deterioration diagnosis device associates the inspection result information with the cable ID. and inspection history information Based on the above, deterioration state information is generated which indicates an estimated result of the deterioration state occurring in each cable, and further, based on cable attribute information which includes at least one of the type, expiration date, and expiration date class according to the environmental load related to heat resistance, life prediction information is generated which predicts the life of each cable which is estimated to be deteriorated. [Brief description of the drawings]

[0006] [Figure 1] FIG. 1 is a diagram showing a power generation plant according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing a configuration of a part of the wiring facility. [Diagram 3] FIG. 2 is a diagram showing a configuration of a tray group that constitutes the wiring facility. [Figure 4] FIG. 2 is a diagram showing a configuration of a tray among a group of trays included in the wiring facility. [Diagram 5] FIG. 13 is a diagram showing the association between the wireless ID of an RFID and the tray ID of a tray. [Figure 6] FIG. 2 is a diagram showing the hardware configuration of a maintenance server. [Figure 7] FIG. 2 is a diagram showing the configuration of a construction / maintenance device realized in a maintenance server. [Figure 8] FIG. 2 is a diagram showing the configuration of a DB device. [Figure 9] FIG. 1 is a first diagram showing information stored and managed by each DB included in a DB device. [Figure 10] FIG. 2 is a second diagram showing the information stored and managed by each DB included in the DB device. [Figure 11] FIG. 3 is a third diagram showing information stored and managed by each DB included in the DB device. [Figure 12] FIG. 4 is a fourth diagram showing information stored and managed by each DB included in the DB device. [Figure 13] FIG. 5 is a fifth diagram showing information stored and managed by each DB included in the DB device. [Figure 14] FIG. 6 is a sixth diagram showing information stored and managed by each DB included in the DB device. [Figure 15] FIG. 7 is a seventh diagram showing information stored and managed by each DB included in the DB device. [Figure 16] 4 is a flowchart showing a process of generating design information by the construction planning device. [Figure 17] FIG. 1 is a diagram showing a configuration of a path detection device that detects a cable path in a power generation plant. [Figure 18] FIG. 13 is a diagram illustrating an example of an image showing the wiring path of a certain cable detected in a power plant. [Figure 19] FIG. 1 is a diagram showing maintenance of a power plant over its entire life cycle, from cable installation to replacement, by a maintenance server. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0007] Hereinafter, the embodiment will be described in detail with reference to the drawings. In each drawing, substantially the same components are given the same reference numerals. In the following description, the subscripts of the reference numerals will be omitted as appropriate. In addition, the embodiment can be applied to general materials such as cables, pipes, and switchboards used in general facilities such as power plants, chemical plants, research facilities, and commercial buildings. However, in the following, for the sake of brevity and clarity, a power plant will be described as the facility, and cables as the material.

[0008] [Power Plant 1] Fig. 1 is a diagram showing a power plant 1 according to an embodiment. The power plant 1 generates electric power, adjusts the voltage of the generated electric power, and supplies the voltage-adjusted electric power to a consumption area. As shown in Fig. 1, the power plant 1 has a control building 10, a power generation building 16, a substation facility 22 including a transformer, a circuit breaker, etc., and a transmission tower 23. In the power plant 1, wiring troughs 104 are provided between the control building 10 and the power generation building 16 and between the power generation building 16 and the substation facility 22.

[0009] The wiring equipment 2 may include all of the equipment for laying cables, such as cable trays (hereinafter simply referred to as "trays"), conduits, conduit branching boxes, cable placement shelves, wire suspenders, and other equipment for accommodating, placing, or suspending cables, as well as combinations of these. However, for the sake of brevity and clarity, the following drawings and explanations will be described assuming that the wiring equipment 2 is composed only of a tray group 24 having a plurality of trays 26, and that the power plant 1 has only one system of a continuous wiring equipment 2.

[0010] The control building 10 has a first floor 100 and a second floor 102, a maintenance server 4 and sensors 14 are installed on the second floor 102, and a power generation control device 12 and a sensor 14 that control the power generation operation in the power generation building 16 are installed on the first floor 100. The power generation building 16 has a first floor 160 and a second floor 162, a power generation facility 20 and a sensor 14 are installed on the first floor 160, and a monitoring device 18 and a sensor 14 that monitor the operation of the power generation facility 20 are installed on the second floor 162. Furthermore, a sensor 14 is also provided in the substation facility 22. In the following description, the maintenance server 4, the power generation control device 12, the multiple sensors 14, the monitoring device 18, the power generation facility 20, and the substation facility 22 installed in the power plant 1 may be collectively referred to as nodes.

[0011] In the power plant 1, each of the multiple cables 3 is any of various cables having a metal portion continuously in the length direction of the wiring. The multiple cables 3 may include a power cable with an insulating coating, a metallic cable with an insulating coating, a metallic cable with an insulating coating and a shield, a coaxial cable, an optical fiber with a tension cable, and the like. Each of the multiple cables 3 transmits power and / or a signal. Note that the signals transmitted by the multiple cables 3 may include electrical signals and optical signals.

[0012] 1, a wiring facility 2 is provided between each node of the power plant 1, and each node is connected via a cable 3 laid in the wiring facility 2. The control building 10 and the power generation building 16 are connected via the cable 3 laid in the wiring facility 2 provided in the wiring trough 104. Similarly, the power generation building 16 and the substation facility 22 are connected via the cable 3 laid in the wiring facility 2 provided in the wiring trough 104.

[0013] Each of the multiple sensors 14 operates under the control of the maintenance server 4 via the cable 3, acquires data indicating temperature, humidity, radiation level, salt concentration in the air, presence or absence of harmful gases, insulation resistance of the cable 3, and combinations of these depending on the installed location, and outputs the acquired data to the maintenance server 4 via the cable 3. The power generation control device 12 controls the operation of the power generation equipment 20. The monitoring device 18 monitors the operation of the power generation equipment 20, and when an event such as an abnormality or malfunction occurs in the power generation equipment 20, it notifies the user of the event that has occurred, and further performs processing to respond to the event that has occurred.

[0014] The power generation facility 20 includes a boiler, a turbine, a generator (not shown), and the like, and burns fuel to generate electricity under the control of the power generation control device 12, and outputs the generated electricity to the substation facility 22. The substation facility 22 transforms the voltage of the electricity from the power generation facility 20 into electricity suitable for transmission to the electricity consuming area, and transmits the transformed electricity to the electricity consuming area via an electricity cable 3 installed using a transmission tower 23 or the like.

[0015] [Wiring equipment 2] FIG. 2 is a diagram showing a configuration of a part of the wiring facility 2 shown in FIG. 1. FIG. 2 shows the configuration of a portion A of the wiring facility 2 shown in FIG. 1, which is surrounded by a dotted circle. As shown in FIG. 2, the wiring facility 2 is configured by combining, arranging, and connecting a plurality of tray groups 24 so as to have a shape that allows a connection between a plurality of nodes by a cable 3. Each of the plurality of tray groups 24 may have various shapes, such as an I-shape, a T-shape, a cross shape, or a U-shape, as appropriate, according to the shape of the wiring facility 2. The ends of the tray groups 24 are connected to each other midway along the path of the wiring facility 2.

[0016] FIG. 3 is a diagram showing the configuration of the tray group 24 constituting the distribution facility 2. FIG. 4 is a diagram showing the configuration of the tray 26 in the tray group 24 included in the distribution facility 2. As shown in FIG. 3 and FIG. 4, the distribution facility 2 includes m (m≧2) tray groups 24-i (m≧i≧1). Each tray group 24 includes a required number of stages (n; n≧1), wiring trays 26-i-1 to 26-in that are stacked perpendicularly to the extension direction of the cables 3 and can each hold one or more cables 3. The shape of the tray 26-ij is the same as the shape of the tray group 24-i including this tray 26-ij. The cables 3 are pulled out from an opening (not shown) appropriately provided at the end or midway of the tray group 24, and connected to each node of the power plant 1.

[0017] In this embodiment, the material of the trays 26 is, for example, metal or synthetic resin coated with radio wave absorbing paint, which allows the trays 26 to shield radio wave signals. In other words, when the tray group 24 has a configuration in which a plurality of trays 26 are stacked, radio wave signals are shielded between the cables 3 held in the different trays 26. In the case of other types of wiring facilities, when the wiring facilities overlap or are adjacent to each other, radio wave shielding means is provided between each wiring facility as necessary, taking into consideration the relationship with the arrangement positions of the wireless identification devices described later.

[0018] The width of the bottom surface of the tray 26 that holds the cable 3 perpendicular to the extension direction of the cable 3 is, for example, about 30 to 60 cm, and the height of the side surface provided vertically from the bottom surface is, for example, about 10 cm. In each of the trays 26, a wireless identification device, for example, RFID (Radio Frequency IDentifier) ​​28-ij-1 to 28-ij-7 (FIG. 4) is attached at a position effective for wiring path detection.

[0019] Fig. 5 is a diagram showing the correspondence between the wireless IDs of the RFIDs 28 and the tray IDs of the trays 26. A wireless ID unique to the power generation plant 1 shown in Fig. 1 is assigned to each of the RFIDs 28, and each wireless ID is associated with a tray ID uniquely assigned to each of the trays 26, as shown in Fig. 5. The tray ID may be an ID indicating the tray 26 itself, or an ID indicating a position on the tray 26. Each of the RFIDs 28 operates by receiving power from an external activation signal, and when it receives the activation signal, it transmits a response signal including the wireless ID as a radio wave signal.

[0020] The range of this response signal is approximately the width of the tray 26. The frequency and transmission timing of the response signal from each RFID 28 are randomly determined within a predetermined range for each transmission. The reason why the frequency of the response signal and the like are determined in this manner is to ensure that the transmitter of the activation signal can reliably identify the wireless IDs contained in the response signals returned from all RFIDs 28 by transmitting the activation signal one or more times.

[0021] [Maintenance Server 4] Fig. 6 is a diagram showing a hardware configuration of the maintenance server 4 shown in Fig. 1. As shown in Fig. 6, the maintenance server 4 has an arithmetic circuit 402, a ROM (Read Only Memory) 404, a RAM (Random Access Memory) 406, an input interface (IF; InterFace) 408, an output IF 412, a network IF (NIF; Network InterFace) 416, a sensor IF (SIF; Sensor InterFace) 418, a storage device 420, a construction / maintenance device 5, and a path detection device 8, all of which are connected via a bus 400 so as to be able to input and output data to and from each other. Note that the power generation control device 12 and the monitoring device 18 shown in Fig. 1 also have the components of the maintenance server 4 other than the construction / maintenance device 5 and the path detection device 8.

[0022] The arithmetic circuit 402 includes a CPU (Central Processing Unit), peripheral circuits for the CPU, a circuit for managing the date and time, etc. (not shown), and executes instruction codes of a program that is supplied from the outside via the NIF 416, the storage device 420, etc., and is loaded into the RAM 406 for execution. The ROM 404 is only capable of reading data that has been written in advance in the maintenance server 4. The instruction codes of the program and data required for its execution are written in the RAM 406, and the written data is read out as necessary.

[0023] An input device 410 including a keyboard, mouse, memory card reader, etc. (not shown) is connected to the input IF 408, which accepts data input by user operation to the input device 410, etc., and outputs it to the arithmetic circuit 402, etc.

[0024] An output device 414 including a display device, a printer, a memory card writer (not shown) and the like is connected to the output IF 412, and outputs data input from the arithmetic circuit 402 and the like to the outside.

[0025] The NIF 416 is connected to a network 106 such as the Internet via a communication cable 3, and transmits and receives data to and from an external computer (not shown) connected to the network 106.

[0026] The SIF 418 controls each of the multiple sensors 14 connected via the cable 3 to obtain data such as temperature, humidity, and radiation level.

[0027] The storage device 420 reads and writes data from and to a non-volatile storage medium 422 such as a hard disk (HD) or a digital versatile disk (DVD).

[0028] The construction / maintenance device 5 performs maintenance of the cables 3. The path detection device 8 detects the path along the wiring equipment 2 of each of the multiple cables 3 in the power plant 1, and judges whether each of the multiple cables 3 has been laid according to the construction plan. Note that the construction / maintenance device 5 and the path detection device 8 can be realized by a program executed in the maintenance server 4 by specifically utilizing its hardware resources, by hardware added to the maintenance server 4 as appropriate, or by a combination of these.

[0029] [Construction and maintenance equipment 5] The construction / maintenance device 5 supports the design and construction for laying the cable 3 in the power plant 1. In addition, the construction / maintenance device 5 performs maintenance such as inspection and deterioration prediction of the cable 3 in the power plant 1 during operation, and displays the results of the maintenance to the user of the power plant 1.

[0030] Fig. 7 is a diagram showing the configuration of the construction / maintenance device 5 realized in the maintenance server 4 shown in Fig. 6. As shown in Fig. 7, the construction / maintenance device 5 has an input processing device 500, an output processing device 502, a database (DB; Data Base) management device 504, a material search device 506, an image information generating device 510, a display processing device 512, a construction / management device 52, and a DB device 6. The construction / management device 52 has a construction planning device 520, a construction information generating device 522, a construction management device 524, an inspection device 526, and a deterioration diagnosis device 528.

[0031] Fig. 8 is a diagram showing the configuration of the DB device 6 shown in Fig. 7. As shown in Fig. 8, the DB device 6 has a wireless DB 600, a tray DB 602, a material DB 604, a design DB 606, a construction DB 608, a construction result DB 610, an inspection result DB 612, and a deterioration DB 614.

[0032] First, we will explain the information stored and managed in the DB device 6 of the construction / maintenance device 5. For the sake of simplicity and clarity, in each diagram showing the information stored in each DB included in the DB device 6, only one entry of all the information is shown.

[0033] Fig. 9 to Fig. 15 are first to seventh diagrams showing information stored and managed by each DB included in the DB device 6 shown in Fig. 8. As shown in Fig. 5, the wireless DB 600 stores and manages wireless information that associates each of the wireless IDs of all the RFIDs 28 (Figs. 3 and 4) used in the power generation plant 1 with a tray ID unique to the tray 26 to which each of these RFIDs 28 is attached.

[0034] The tray DB 602 stores and manages the tray information shown in Fig. 9. As shown in Fig. 9, the tray information includes a tray ID, a plant ID, a facility ID, position information, shape information, adjacent tray information, and environmental information, all of which are associated with each other. In the tray information, a tray ID is uniquely assigned to each of all trays 26-ij (Figs. 3 and 4) used in the power plant 1, and includes the suffixes i and j of the reference numerals of the trays 26-ij.

[0035] The plant ID is uniquely assigned to the power plant 1 in which the tray 26 with this tray ID is used. The equipment ID is uniquely assigned to any one of the control building 10, the power generation building 16, and the substation equipment 22 in the power plant 1 in which the tray 26 with this tray ID is used. The position information indicates the position of this tray 26 in any one of the control building 10, the power generation building 16, and the substation equipment 22 in which the tray 26 with this tray ID is attached, by a code indicating a room or duct, three-dimensional coordinates, or the like.

[0036] The adjacent tray information indicates the tray IDs of all trays 26 adjacent to and connected to the tray 26 to which this tray ID is attached. The environmental information indicates the surrounding environment of this tray 26, such as whether this tray 26 is in a room temperature environment, a high temperature and high humidity environment, an environment with radiation, an atmosphere with a high salt concentration, or an atmosphere with chemical gas. This environmental information may be input in advance in association with the tray ID, or may be input based on information from the sensor 14, or a combination of these may be used. The tray DB 602 outputs the tray information to the construction / maintenance device 5 via the DB management device 504.

[0037] The material DB 604 stores and manages the material information shown in Fig. 10. As shown in Fig. 10, the material information includes a material ID uniquely assigned to each of the cables 3 used in the power plant 1 and all of the cables 3 that have not been used but may be used, condition information, compatible circuit information, and attribute information, all of which are associated with each other.

[0038] In the material information, the condition information indicates conditions such as whether the cable 3 with this material ID can be used in a normal temperature environment, a hot and humid environment, or an environment with radiation in the power plant 1. The compatible circuit information indicates circuits with which the cable 3 is compatible, such as whether the cable 3 can be used in a control system circuit, a power system circuit, a circuit to which a high range voltage is applied, or only a circuit to which only a low range voltage is applied in the power plant 1.

[0039] The attribute information indicates attributes such as the manufacturer of the cable 3 to which this material ID is attached, the type of this cable 3, such as whether it is a coaxial cable, a power cable, or an optical fiber with a tension cable, the number of cores of this cable 3, and the expiration date of this cable 3. As described above, the material information preferably includes a class (condition information and / or attribute information) of the cable 3 to which the ID is attached, such as a class for environmental loads such as heat resistance, radiation resistance, weather resistance, and chemical resistance, a class of expiration date, or a class of expiration date according to environmental load.

[0040] The design DB 606 stores and manages the design information shown in Fig. 11. The design information includes a cable ID unique to each of the multiple cables 3 used in the power plant 1, a material ID (Fig. 10) corresponding to the cable 3, circuit information, route information, and construction content information, all associated with each other. Furthermore, the design DB 606 outputs the design information to the route detection device 8 via the DB management device 504. Each piece of information shown in Figs. 10 to 15 can be associated with each other by a cable ID and a material ID.

[0041] In the design information, the circuit information indicates the circuit in which the cable 3 indicated by the cable ID is used, such as whether the cable 3 is used in a control system circuit, a power system circuit, a circuit to which a high range voltage is applied, or a circuit to which only a low range voltage is applied. The route information includes a section indicating from which position in the control building 10, the power generation building 16, or the substation equipment 22 the cable 3 is laid in the power plant 1 to which position in the control building 10, the power generation building 16, or the substation equipment 22 the cable 3 is laid, the tray IDs of all the trays 26 used to lay the cable 3, and the like. The construction content information indicates the content of the construction required when laying the cable 3.

[0042] The construction DB 608 stores and manages the construction information shown in Fig. 12. The construction information includes the design information, cable information, and work information shown in Fig. 11, which are associated with each other, and is also associated with the condition information shown in Fig. 10. The cable information indicates a number used in the work to lay the cable 3 indicated by the cable ID, the expiration date of this cable 3 in the power plant 1, etc. The work information indicates the name of the work to lay the cable 3, the content of the work, the period of the work, etc.

[0043] The construction result DB 610 stores and manages the result information shown in Fig. 13. The result information includes a cable ID and result information indicating the result of construction, such as whether or not the construction of the cable 3 indicated by the cable ID was performed normally, in association with each other.

[0044] The inspection result DB 612 stores and manages the inspection result information shown in Fig. 14. The inspection result information includes, in association with each other, a cable ID, inspection result information indicating the contents and results of all inspections performed on the cable 3 indicated by this cable ID, and inspection history information indicating the history of all inspections performed on this cable 3 since the power plant 1 started operating.

[0045] The deterioration DB 614 stores and manages the deterioration information shown in Fig. 15. The deterioration information includes a cable ID, deterioration state information, and life prediction information, which are associated with each other. The deterioration state information indicates the deterioration state of the cable 3 indicated by the cable ID, which is estimated based on data obtained from the sensor 14. The life prediction information indicates the life of the cable 3, which is estimated from the deterioration state of the cable 3.

[0046] In the construction / maintenance device 5, an input processing device 500 (FIG. 7) receives information indicating operations on the input device 410 (FIG. 6) and information input to the input device 410 from a memory card or the like via an input IF 408. The input processing device 500 outputs the received information to each component of the construction / maintenance device 5. The input processing device 500 also controls the sensor 14 via the cable 3, causing the sensor 14 to measure temperature, humidity, radiation level, insulation resistance of the cable 3, and combinations of these, receives data indicating the results of such measurements, and outputs the data to an inspection device 526 and a deterioration diagnosis device 528.

[0047] The output processing device 502 reads information from other components of the construction / maintenance device 5 via the DB management device 504 according to the contents of the information input from the input device 410 via the input processing device 500 and indicating the user's operation (FIGS. 5, 9 to 15). The output processing device 502 outputs the read information to the path detection device 8 and the display processing device 512.

[0048] The DB management device 504 generates information to be stored and managed in each DB (FIG. 8) of the DB device 6 from the information input from the input processing device 500 and the material search device 506 and the information obtained by processing each component of the construction and management device 52. The DB management device 504 outputs the information thus generated to each DB of the DB device 6 and each of the other components of the construction and management device 52. The DB management device 504 also reads information from each DB of the DB device 6 and each of the components of the construction and management device 52 according to the information input from the input processing device 500. The DB management device 504 outputs the information thus read to each of the components of the construction and management device 52 other than the DB device 6.

[0049] The material search device 506 performs search processing using information indicating an operation to the input device 410 input via the input processing device 500, information input from the deterioration diagnosis device 528, and information input from the deterioration DB 614 via the DB management device 504. In other words, the material search device 506 searches for cables 3 that may be used in the power generation plant 1 in accordance with the user's operation.

[0050] Furthermore, the material search device 506 automatically searches for cables 3 that may be used in the power plant 1 using the network 106, according to the deterioration information (FIG. 15). The material search device 506 outputs condition information, compatible circuit information, and attribute information (FIG. 10) of the cables 3 obtained by such searches to the DB management device 504. Furthermore, the material search device 506 receives material information of the cables 3 that may be used in the power plant 1 from the input device 410 via the input processing device 500, and outputs the material information to the DB management device 504.

[0051] The image information generating device 510 is a display processing device for so-called 3D-CAD (three dimensional CAD), and generates 3D image information showing the construction information ( FIG. 12 ) generated by the construction information generating device 522 of the construction / management device 52. The image information generating device 510 outputs the generated 3D image information to the display processing device 512.

[0052] The display processing device 512 receives information from the DB management device 504 and the construction planning device 520, and 3D image information from the image information generating device 510. Furthermore, the display processing device 512 performs output processing for displaying the received information and 3D image information on the display device of the output device via the output IF 412, writing to a memory card, etc.

[0053] The construction planning device 520 of the construction / management device 52 processes information input via the input IF 408 and the input processing device 500, which indicates the user's operation on the input device 410, and generates design information (FIG. 11). The construction planning device 520 outputs the generated design information to the DB management device 504, or notifies that the specified cable 3 cannot be used in the specified section.

[0054] Fig. 16 is a flowchart showing a generation process of design information by the construction planning device 520. As shown in Fig. 16, in step S100, the construction planning device 520 receives inputs of a cable ID, a material ID of the cable 3 corresponding to the cable ID, and a section in which the cable 3 is to be laid, by a user via the input processing device 500 or the like.

[0055] In step S102, the construction planning device 520 determines a route for laying the cable 3 indicated by the cable ID input in the processing of S100 in the section input in the processing of S100. Furthermore, the construction planning device 520 reads all of the tray information (FIG. 9) from the tray DB 602 (FIG. 8) and determines the tray IDs of all of the trays 26 located within the determined route. Note that when there are multiple such routes, the construction planning device 520 determines all of the routes and the tray IDs of all of the trays 26 located within these routes. Furthermore, the construction planning device 520 reads all of the material information (FIG. 10) including the material ID input in the processing of S100 from the material DB 604.

[0056] In step S104, the construction planning device 520 processes the tray information and material information obtained in the processing of S102, and judges whether the cable 3 can be used in the route determined in the processing of S102. That is, the construction planning device 520 judges whether all of the cables 3 corresponding to the cable IDs accepted in the processing of S100 are compatible with the determined route. When it is judged that one or more of the cables 3 are compatible with the determined route, the construction planning device 520 proceeds to the processing of S108. When it is judged that all of the cables 3 are not compatible with the determined route, the construction planning device 520 proceeds to the processing of S106.

[0057] In the processing of step S106, the construction planning device 520 displays to the user via the display processing device 512 that the cable 3 accepted in the processing of S100 cannot be laid in the section accepted in this processing, and ends the processing.

[0058] In the process of step S108, when multiple routes are obtained in the process of S102, the construction planning device 520 selects which of the multiple routes is optimal for laying the cable 3 corresponding to the cable ID accepted in the process of S100. The construction planning device 520 selects the optimal route for laying the cable 3 according to predetermined conditions, such as the route with the shortest distance or the route in which the environment along the route is suitable for the cable 3.

[0059] When selecting an optimal route for laying the cable 3, the construction planning device 520 considers the condition information and / or attribute information of the cable 3 and the environmental information in the tray information to select the optimal route for the cable 3. For example, when focusing on the heat resistance of the cable, the construction planning device 520 selects the optimal (e.g., shortest) route for the cable 3 by considering the heat resistance class of the cable 3 corresponding to the cable ID and the ambient temperature according to the environmental information. In other words, the construction planning device 520 has in advance a table in which the ambient temperature range suitable for each class related to the heat resistance of the cable 3 is set, and by referring to this table, the construction planning device 520 automatically selects the optimal (e.g., shortest) route that can be taken for the cable 3 while avoiding high temperature points.

[0060] Such a route selection process by the construction planning device 520 can also be applied to cases where a route is selected taking into consideration the relationship between the radiation resistance, weather resistance, salt resistance, chemical resistance, expiration date, etc. of the cable, or a combination of these, and the surrounding environment information. In addition, the construction planning device 520 selects the route of the cable 3 so that the ratio of the total cross-sectional area of ​​all the cables 3 laid on the tray 26 to the cross-sectional area of ​​each of the trays 26 is equal to or less than a predetermined value.

[0061] Furthermore, in the case where the cable with the input cable ID is not suitable for the environment in light of the environmental information, the construction planning device 520 may perform a process of displaying a message prompting the user to specify a cable of a higher rank. Alternatively, the construction planning device 520 may automatically perform a process of selecting a cable of a higher rank and create route information adopting the newly selected cable ID. Note that, when only one route is obtained in the process of S102, the construction planning device 520 selects the obtained route as the optimal route.

[0062] In step S110, the construction planning device 520 associates the section accepted in the processing of S100 with the tray IDs of all the trays 26 used to lay the cable 3 in this section, and generates route information.

[0063] In step S112, the construction planning device 520 reads out tray information (FIG. 9) of all the trays 26 included in the route information corresponding to the route selected in the process of S108 from the tray DB 602. Furthermore, the construction planning device 520 selects environmental information included in the tray information according to a predetermined condition, and displays the selected environmental information to the user via the display processing device 512.

[0064] In step S114, the construction planning device 520 accepts the construction content information input by the user to the input device 410 in accordance with the displayed environmental information, includes the accepted construction content information in the design information, and ends the process.

[0065] Every time the construction planning device 520 (FIG. 7) generates design information, it outputs the generated design information to the DB management device 504, the display processing device 512, and the construction information generating device 522. The display processing device 512 displays the design information input from the construction planning device 520 on the display device of the output device 414 to show it to the user.

[0066] The construction information generating device 522 generates construction information (FIG. 12) by associating the design information input from the construction planning device 520 with the cable information and work information, and outputs the generated construction information to the DB management device 504, the image information generating device 510, and the construction management device 524. The construction information generating device 522 reads material information from the material DB 604 via the DB management device 504, and automatically generates cable information based on the read material information and the design information input from the construction planning device 520. Alternatively, the construction information generating device 522 generates the cable information according to an operation performed by a user on the input device 410 in response to the display of the design information on the output device 414.

[0067] The construction information generating device 522 generates work information according to the operation performed by the user on the input device 410 in response to the display of the design information and construction information on the output device 414. The construction information generating device 522 generates construction information by associating the generated cable information and work information and the condition information included in the material information read from the material DB 604 of the DB device 6 via the DB management device 504 with the design information. The construction information generating device 522 outputs the generated construction information to the DB management device 504, the image information generating device 510, and the construction management device 524 every time construction information is generated. The image information generating device 510 generates 3D image information from the input construction information every time construction information is input from the construction information generating device 522, outputs the generated image information to the display processing device 512, and displays it on the display device of the output device 414.

[0068] As described above, the construction planning device 520 and the construction information generating device 522 generate and display the design information and the construction information in cooperation with each other. Therefore, the user can create all of the design information and the construction information at any time while viewing the design information displayed on the output device 414. In addition, the user can change a part of the design information and the construction information that have already been created at any time.

[0069] Each time construction work is performed to lay one cable 3 in the power plant 1, the user inputs the cable ID of the cable 3 and the result of the construction into the input device 410. The construction management device 524 generates result information (FIG. 13) by associating the cable ID input into the input device 410 with construction result information indicating the result of the construction. Each time the construction management device 524 generates result information, it outputs the generated result information to the DB management device 504. When all construction work to lay the cables 3 is completed, the construction management device 524 controls the path detection device 8 (FIGS. 6 and 17) to detect the paths of all the cables 3 and to confirm that all the cables have been laid as planned.

[0070] The inspection device 526 receives construction information from the construction DB 608 via the DB management device 504. Based on the condition information included in the received construction information, the inspection device 526 judges whether or not the result of the measurement by the sensor 14 input from the input processing device 500 is within a range in which the use of the cable 3 corresponding to the cable ID included in the construction information is permitted. The inspection device 526 associates the result of this judgment with the cable ID as inspection result information.

[0071] Furthermore, the inspection device 526 generates inspection history information by associating the inspection result information obtained after the power plant 1 started operating with the date and time when the inspection results were obtained. The inspection device 526 further associates the generated inspection history information with a cable ID. The inspection device 526 also generates inspection result information ( FIG. 14 ) by further associating the mismatch information input from the path detection device 8 with the cable ID, and outputs the generated inspection result information to the DB management device 504 and the degradation diagnosis device 528.

[0072] The deterioration diagnosis device 528 analyzes the inspection result information and inspection history information of the inspection result information input from the inspection device 526, estimates the state of deterioration occurring in each cable 3, and generates deterioration state information indicating this estimation result. Furthermore, the deterioration diagnosis device 528 predicts the date at which the life of each cable 3 estimated to be deteriorated will end based on the result of the analysis of the inspection result information and the attribute information included in the material information read from the material DB 604 via the DB management device 504, and generates life prediction information indicating the predicted date. The deterioration diagnosis device 528 generates deterioration information by associating the cable ID with the generated deterioration state information and life prediction information, and outputs the generated deterioration information to the DB management device 504 and the material search device 506.

[0073] [Route detection device 8] Fig. 17 is a diagram showing the configuration of a path detection device 8 that detects the path of the cable 3 in the power plant 1 shown in Fig. 1. The path detection device 8 performs processing in accordance with a user's operation on the input device 410 or control of the construction management device 524. It energizes the RFIDs 28 attached to each of the trays 26-ij (n ≥ j ≥ 1) included in the tray group 24-i that constitutes the wiring facility 2, receives and identifies response signals returned from each of the RFIDs 28, and detects the path of the cable 3.

[0074] 17, the path detection device 8 includes a detection control device 800, an RFID reader 802, an ID detection device 804, a path detection device 806, and a path display device 810. The path detection device 8 also uses the wireless DB 600, the tray DB 602, and the design DB 606 (FIGS. 5, 7 to 9, and 11) of the construction / maintenance device 5 via a DB management device 504 (not shown in FIG. 17). In FIG. 17, an I-shaped tray 26-ij to which RFIDs 28-ij-1 to 28-ij-6 are attached is illustrated.

[0075] In the path detection device 8, the detection control device 800 controls the RFID reading device 802 and the ID detection device 804 to perform processing required to detect the wireless IDs of all the RFIDs 28 for each of the cables 3 in the power plant 1. The detection control device 800 controls the RFID reading device 802 and the ID detection device 804 in response to a user's operation on the input device 410 (FIG. 7) shown in FIG. 6, for example, for each cable 3 or for multiple cables 3 simultaneously.

[0076] This control is performed each time a new or additional cable is laid in the wiring facility 2. This control can also be performed for an already laid cable 3 whose laying route has not yet been confirmed. The RFID reader 802 transmits an activation signal to the RFIDs 28 from the cable 3, receives response signals returned from the RFIDs 28 in response to the transmission of this activation signal via the cable 3, and outputs the response signals to the ID detector 804.

[0077] When the cable 3 is an unshielded metallic cable, the RFID reader 802 transmits an activation signal and receives a response signal via the cable 3 itself. When the cable 3 is a metallic cable with an outer sheath or a coaxial cable, the RFID reader 802 transmits an activation signal and receives a response signal via a shielded portion included in the cable 3. When the cable 3 is an optical cable, the RFID reader 802 transmits an activation signal and receives a response signal via a metallic tension cable attached to the optical cable for installation.

[0078] The ID detection device 804 detects the wireless ID of each RFID 28 from the response signal input from the RFID reader 802, and outputs the detected wireless IDs to the detection control device 800 and the path detection device 806. In order to detect the wireless IDs from all RFIDs 28 for one cable 3, the detection control device 800 repeatedly performs control for detecting wireless IDs at predetermined time intervals until the wireless IDs of new RFIDs 28 are no longer detected. When the detection control device 800 determines that the wireless IDs of new RFIDs 28 for one cable 3 are no longer detected, it controls the ID detection device 804 to output all of the detected wireless IDs of RFIDs 28 to the path detection device 806.

[0079] The wireless DB 600 and the tray DB 602 output the wireless information and the tray information to the path detection device 806 every time detection of the wiring path of the cable 3 is performed. The design DB 606 outputs the design information to the path display device 810.

[0080] The path detection device 806 detects the path of the cable 3 in the power plant 1 and the wiring facility 2 based on the wireless information and tray information corresponding to the wireless IDs of all RFIDs 28 for one cable 3 input from the ID detection device 804, and outputs the path to the path display device 810. In other words, the path detection device 806 sorts the position information of the trays 26-ij corresponding to the wireless IDs included in the wireless information for all cables 3 input from the ID detection device 804 so that the subscript i is consecutive. The path detection device 806 extracts a set of position information indicating consecutive positions obtained as a result of this sorting from the tray information, and detects it as wiring path information of the cable 3 in the power plant 1 and the wiring facility 2.

[0081] Fig. 18 is a diagram illustrating an example of an image showing the wiring path of a certain cable 3 detected in the power plant 1 shown in Fig. 1. Fig. 18 shows a case where the cable 3 is laid from the third floor of the data center to the fourth floor of the control building. The path display device 810 displays on the output device 414 the wiring path information of the cable 3 input from the path detection device 806 in an image that is easy for the user to understand, as shown by a thick line in Fig. 18.

[0082] Furthermore, the route display device 810 compares the wiring route information of the cable 3 input from the route detection device 806 with the planned wiring route information input from the design DB 606, and displays the positions where there is a mismatch between these pieces of wiring route information by superimposing an X mark on the output device 414 as shown in Fig. 18. In Fig. 18, the position X where the mismatch occurs is labeled with the term "mismatch."

[0083] Furthermore, in response to a user's operation of specifying the position of the discrepancy on the input device 410, the route display device 810 displays discrepancy information (not shown) indicating the specified position of the discrepancy on the output device 414. This discrepancy information includes identification information of the tray 26-ij in which the discrepancy has occurred and information indicating its position in the power generation plant 1 and the wiring facility 2.

[0084] Hereinafter, an automatic wiring route detection process using the tray 26 to which the RFID 28 is attached and the route detection device 8 shown in FIG. 17 in the power plant 1 shown in FIG. 1 will be described. First, a builder of the power plant 1 lays one or more new or additional cables 3 using the bottom surfaces of the multiple trays 26 included in the wiring facility 2. Furthermore, every time a new or additional cable 3 is laid, the user connects the RFID reader 802 of the route detection device 8 to the cable 3 or its metal part, and performs an operation for detecting the wiring route on the input device 410 of the maintenance server 4. In addition, as necessary, an operation for detecting the wiring route is also performed for cables 3 that have already been laid but whose route has not been confirmed.

[0085] When the user performs this operation, the detection control device 800 controls the RFID reader 802 to transmit an activation signal to the RFID 28 provided on the tray 26. When the RFID 28 receives the activation signal from the RFID reader 802 via the cable 3, it transmits a response signal. That is, only the RFID 28 attached to the path along which the cable 3 is actually laid is activated and transmits a response signal. The RFID reader 802 receives the response signal from the RFID 28 via the cable 3, and outputs it to the ID detection device 804. The ID detection device 804 detects the wireless ID of each RFID 28 from the received signal input from the RFID reader 802, stores it in the RAM 406 (FIG. 6) of the maintenance server 4, and further outputs it to the detection control device 800.

[0086] The detection control device 800 controls the RFID reader 802 and the ID detection device 804 to detect the wireless IDs of the RFIDs 28 until the ID detection device 804 no longer detects the wireless IDs of the new RFIDs 28. When the ID detection device 804 no longer detects the wireless IDs of the new RFIDs 28, the detection control device 800 controls the ID detection device 804 to output the wireless IDs of all the detected RFIDs 28 to the path detection device 806.

[0087] The route detection device 806 processes position information indicating the positions in the wiring facility 2 of the trays 26 corresponding to all of the wireless IDs input from the position DB 808, generates wiring route information for the cable 3 in the power generation plant 1 and the wiring facility 2, and outputs it to the route display device 810.

[0088] The route display device 810 processes the position information input from the position DB 808 and the wiring route information input from the route detection device 806, and displays an image showing the wiring route of the laid cable 3 on the output device 414 to show it to the user, as shown in Fig. 18. In addition, the route display device 810 compares the planned wiring route information of the cable 3 input from the design DB 606 with the wiring route information input from the route detection device 806, and detects a position in the wiring facility 2 where a discrepancy occurs between these pieces of wiring route information.

[0089] Furthermore, the route display device 810 displays the position where the inconsistency occurs in the wiring route information by superimposing it on the image showing the wiring route. Also, the route display device outputs inconsistency information showing the position where the inconsistency occurs in the wiring route information to the inspection device 526 of the construction / maintenance device 5.

[0090] When the user performs an operation on the input device 410 to specify the position of the mismatch displayed on the output device 414, the route display device 810 generates mismatch information indicating the wireless ID of the cable 3 corresponding to the specified position of the mismatch and in which tray 26 the cable 3 is installed. Furthermore, the route display device 810 displays the generated mismatch information in the image showing the wiring route in association with the specified position of the mismatch.

[0091] If the wiring route detection method described here is performed each time a new or additional cable 3 is added to the wiring facility 2, the wiring routes of all the cables 3 in the power plant 1 and the locations of discrepancies between the wiring routes and the plan before installation and the discrepancy information can be obtained. Each time detection of the wiring routes of the cables 3 is completed, or after detection of the wiring routes of all the cables 3 is completed, the cables 3 for which a discrepancy has occurred between the wiring routes and the plan before installation are modified by the installer so that they follow the wiring routes as planned.

[0092] Fig. 19 is a diagram showing the maintenance of materials over the entire life cycle from laying of wiring of the cable 3 to replacement by the maintenance server 4 shown in Fig. 7 etc., which is performed in the power plant 1 shown in Fig. 1 etc. As shown in Fig. 19, the construction planning device 520 (Fig. 7) performs a design for laying the cable 3 in response to a user's operation, generates plan information (Fig. 11), and stores it in the design DB 606 (Fig. 8) of the DB device 6. In step S200, the construction information generating device 522 further processes the generated plan information in response to a user's operation, generates construction information (Fig. 12), and stores it in the construction DB 608.

[0093] Each time construction is performed for laying one cable 3 in the power plant 1 according to the construction information, the user inputs the cable ID of the cable 3 and the result of the construction into the input device 410. In step S202, the construction management device 524 generates result information ( FIG. 13 ) by associating the cable ID input into the input device 410 with construction result information indicating the result of the construction, and stores the result information in the construction result DB 610 of the DB device 6. The result information is used by the user to check the result of the construction for laying the cable 3.

[0094] In step S204, the inspection device 526 inspects the cable 3 using the sensor 14 (FIG. 1), associates the inspection result with the discrepancy information obtained by the processing of the path detection device 8, generates inspection information (FIG. 14), and stores it in the inspection result DB 612 of the DB device 6. This inspection result information is used by the user to check the state of each cable 3.

[0095] In step S206, the deterioration diagnosis device 528 estimates the deterioration state of the power plant 13 using the sensor 14, generates deterioration information (FIG. 15), and stores it in the deterioration DB 614 of the DB device 6. This deterioration information is required by the user to check the deterioration state of each cable 3, and is also used to generate material information (FIG. 10) by the material search device 506. The material information generated by the material search device 506 is stored in the material DB 604 of the DB device 6.

[0096] In step S208, when the user determines that any of the cables 3 has deteriorated by referring to the deterioration information, the user searches the material DB 604, selects a new cable 3 to replace the deteriorated cable 3, and replaces the deteriorated cable 3 with the new cable 3. The selection of a new cable 3 to replace the deteriorated cable 3 may be automatically performed by the material search device 506. In this case as well, it is preferable to create (select) the laying route of the new cable 3 based on the class of the cable 3 and environmental information about the wiring facility.

[0097] As described above, the maintenance server 4 (FIG. 6, etc.) can support the design, construction, confirmation of the construction results, post-construction inspection, deterioration prediction, and selection of a replacement for a deteriorated cable 3 for laying the cable 3 in the power plant 1. Therefore, the maintenance server 4 can not only support the construction of the cable 3, but also support the maintenance of materials such as the cable 3 throughout the entire life cycle of the power plant 1.

[0098] The number of cables 3 arranged on the bottom surface of the tray 26 is, for example, about 10 to about 200-300. Although FIG. 4 illustrates an example in which each tray 26 has seven RFIDs 28, and FIG. 17 illustrates an example in which each tray 26 has six RFIDs 28, the number of RFIDs 28 in one tray 26 is arbitrary. Furthermore, each tray 26 may be covered with a lid that can prevent the activation signal and the response signal from leaking to other trays 26. The specific values ​​of the reach, frequency, transmission timing, and the like of the response signal shown in the embodiment are merely examples, and may be changed as appropriate depending on the configurations of the power plant 1 and the path detection device 8.

[0099] In addition, although an embodiment using the RFID 28 as an example of a wireless identification device has been described, the wireless identification device of the present invention is not limited to the RFID 28. For example, a device capable of transmitting and receiving at a frequency other than the frequency band standardized for RFID (for example, a low frequency band of around 5 kHz) can also be used as the wireless identification device. In addition, the wireless identification device may be attached to the wiring facility 2 itself or to a location other than the wiring facility 2 as long as it is attached to a location suitable for transmitting and receiving signals between the wiring (cable). In addition, although the confirmation of the state and deterioration state of the cable 3 generated by the inspection device 526 and the deterioration diagnosis device 528 has been described, the maintenance server 4 may also have a live line monitor that can be used to confirm the live line state of each cable route when an accident occurs in the power plant 1, using the confirmation data generated by these devices.

[0100] Although the embodiment of the present invention has been described above, this embodiment is presented as an example and is not intended to limit the scope of the invention. The embodiment can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. The embodiment and its modifications are included in the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0101] 1. Power plants 10 Control Building 100,160 First floor part 102,162 Second floor part 104 Wiring Trough 106 Network 12 Power generation control device 14 Sensors 16 Power Generation Building 18 Monitoring equipment 20 Power generation facilities 22 Substation Equipment 23 Transmission Tower 2. Wiring equipment 24 Tray Group 26 Tray 28 RFID 3 Cable 4 Maintenance Server 400 Bus 402 Arithmetic circuit 404 ROM 406 RAM 408 Input IF 410 Input Device 412 Output IF 414 Output Device 416 NIF 418 SIF 420 Storage device 422 Storage medium 5. Installation and maintenance equipment 500 Input processing device 502 Output Processing Device 504 DB management device 506 Material Search Device 510 Image information processing device 512 Display Processing Device 52 Construction / management equipment 520 Construction planning device 522 Construction information generation device 524 Construction management equipment 526 Inspection Equipment 528 Deterioration diagnosis device 6 DB device 600 Wireless DB 602 Tray DB 604 Materials DB 606 Design DB 608 Construction DB 610 Construction result DB 612 Test result DB 614 Degradation DB 8. Path detection device 800 Detection control device 802 RFID Reader 804 ID detection device 806 Path Finder 810 Route display device

Claims

1. a construction planning device that generates route information by associating a distribution facility ID of a distribution facility used for laying a cable with a cable ID of the cable for each section in which the cable is laid; a construction information generating device that generates construction information including design information and cable information, which are conditions for installation design according to the route information; a construction management device that generates result information by associating a cable ID that identifies an installed cable with construction result information that indicates a result of the construction; an inspection device that judges whether or not a measurement result by a sensor indicating environmental information, such as whether the wiring facility is in at least a room temperature environment, a high temperature and humidity environment, an environment with radiation, an atmosphere with a high salt concentration, or an atmosphere with a chemical gas, is within a range permitted by condition information included in the installation information and defining cable specifications, and associates inspection result information of the judgment result and inspection history information that associates the inspection result information with the date and time when the inspection results were obtained, with a cable ID; a degradation diagnosis device that generates degradation state information indicating an estimation result of a degradation state occurring in each cable based on the inspection result information and the inspection history information, and further generates life prediction information that predicts the life of each cable estimated to be degraded based on cable attribute information including at least one of a type, an expiration date, and an expiration date class corresponding to an environmental load related to heat resistance; A cable management device having:

2. the degradation diagnosis device generates the life prediction information based on one or more of a temperature, a humidity, and a radiation dose at a position where the cable is arranged, and on a type of the cable. The cable management device of claim 1 .

3. When all the cable laying work is completed, the construction management device controls the path detection device to detect the paths of all the cables and to confirm that all the cables have been laid as planned. The cable management device according to claim 1 or 2.

4. the construction planning device generates the route information so that a ratio of a cross-sectional area of ​​the cable laid in the wiring facility to a cross-sectional area of ​​each of the wiring facilities becomes a predetermined value. A cable management device according to any one of claims 1 to 3.

5. Using a construction planning device, a wiring equipment ID of a wiring equipment used to lay a cable is associated with a cable ID of the cable for each section in which the cable is laid, and route information is generated; generating construction information including design information and cable information, which are conditions for laying design according to the route information, by a construction information generating device; generating result information by associating a cable ID that identifies the laid cable with construction result information that indicates the result of the construction by the construction management device; an inspection device judges whether or not a measurement result by a sensor indicating environmental information of whether the wiring equipment is in at least a room temperature environment, a high temperature and humidity environment, an environment with radiation, an atmosphere with a high salt concentration, or an atmosphere with a chemical gas is within a range permitted by condition information included in the installation information and defining the cable specifications, and associates inspection result information of the judgment result and inspection history information that associates the inspection result information with the date and time when the inspection results were obtained with a cable ID; A degradation diagnosis device generates degradation state information showing an estimation result of a degradation state occurring in each cable based on the inspection result information and the inspection history information, and further generates life prediction information predicting a life of each cable estimated to be degraded based on cable attribute information including at least one of type, expiration date, and expiration date class according to environmental load related to heat resistance; A cable management method including:

Citation Information

Patent Citations

  • Method and system for controlling degradation of cable

    JP1997274094A

  • Processing method and device for operating passive component management, work support terminal, program for operating passive component management, and storage medium using it

    JP2004252851A

  • Cable construction plan information management system

    JP2007058434A

  • Support system and support method of electric instrumentation designing

    JP2014035761A

  • Cable construction management support system and method

    JP2014130483A