Single-pillar moored wellhead production work platform

The single upright column moored wellhead platform integrates oil extraction, storage, and transportation, reducing costs and maintaining stability, addressing the inefficiencies of traditional models for marginal oil fields.

JP7588435B2Active Publication Date: 2024-11-22SHANDONG DINGSHENG SEIKO
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023134350
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-08-23
Filing Date
2023-08-22
Publication Date
2024-11-22
Estimated Expiration
2040-08-05

AI Technical Summary

Technical Problem

Traditional development models for marginal oil fields in shallow waters are economically inefficient due to high construction costs of wellhead platforms and subsea pipelines, making them unviable for low-production fields, leading to abandonment.

Method used

A single upright column moored wellhead production work platform integrating oil extraction, storage, and transportation functions, eliminating the need for subsea pipelines by using a hollow upright column with a mooring turntable and rotary transport system.

Benefits of technology

Reduces development costs, maintains operational stability and safety, and enables simultaneous performance of production, storage, and transportation functions, enhancing economic viability of marginal oil fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007588435000001
    Figure 0007588435000001
  • Figure 0007588435000002
    Figure 0007588435000002
  • Figure 0007588435000003
    Figure 0007588435000003
Patent Text Reader

Abstract

To provide a single upright column mooring type pit mouth production working platform.SOLUTION: A single upright column mooring type pit mouth production working platform comprises an upright column body of a hollow structure, a positioning and attaching assembly installed at the bottom of the upright column body, a rotary table installed outside the upright column body, being rotatable around the axis line of the upright column body, and comprising a mooring connection device, an oil extraction working platform installed on the top of the upright column body, located at the upper part of the rotary table, and on which an oil extraction working assembly is installed, and at least one in-cylinder pit ditch installed inside the upright column body and connectable to the oil extraction working platform. The pit mouth production working platform can be adapted to an economical efficiency index of a marginal oil field extraction. Simultaneously, a rotational mooring transportation system is disclosed for the single upright column mooring type pit mouth production working platform and oil production works.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the field of offshore oil and gas development, and relates to a single upright moored wellhead production working platform Regarding mu. [Background technology]

[0002] In China's shallow waters, many marginal oil fields have already been discovered. The proven reserves are relatively small (recoverable reserves of a single oil field are approximately 100,000 tons to 2 million tons). The geographic locations are scattered and the distances to other large oil fields are relatively far, making the traditional development model difficult. This refers to oil fields that are developed using a gas turbine and have a relatively low economic return.

[0003] A complete oil field development must have four processes: drilling (construction), oil production, storage and transportation. The traditional development mode of shallow water oil fields in China is mainly: (1) single or multiple wells (2) a floating production storage and offloading (FPSO) platform; and (3) a FPSO. (4) a jacket and single point system for mooring the wellhead platform and the FPSO and a connecting subsea pipeline.

[0004] Here, the wellhead platform is generally a jacket type platform, The wellhead platform is equipped with an oil harvesting tree, and the FPSO is anchored by a single-point mooring system. The wellhead platform is moored to one jacket and the crude oil mix is ​​delivered to the subsea pipeline. The FPSO is transported to the mine by cable for production and storage. The shuttle tanker supplies the platform with electricity and liquids necessary for daily life and work. The oil will be transported to shore after being delivered to the FPSO in due course.

[0005] Until now, the mooring platform for mooring the FPSO and the wellhead platform have been widely used. The two types of jackets are completely different in format from the platform, and cannot be used in FPS games. The O is moored to a mooring platform and then connected to the wellhead platform by a subsea pipeline. The system is connected to the seabed, and in order to leave a safety distance in advance, a submarine pipeline, which is expensive to construct, is buried. In the case of high production and densely populated oil fields, mooring platforms, wells, The cost of constructing the subsea platform and the corresponding subsea pipelines is estimated to be The load can be distributed more evenly, and it has high stability, resulting in ideal economical results. However, in the case of marginal oil fields, this is clearly not appropriate, because the unit of marginal oil fields is This is because production rates are lower than those of densely packed high-producing oil fields, and in the case of a single marginal oil field, the facilities The investment may have a higher or lower return than that which was obtained, Currently, the development of some marginal oil fields has been temporarily abandoned. .

[0006] Based on the consideration of economic requirements, it is considered to develop marginal fields using two operation modes. It is assumed.

[0007] (1) "Sany" Development Mode One wellhead platform for marginal oil and gas fields within 20km of developed fields , one submarine pipeline, one submarine cable to transport the produced oil and gas to the development site Send it to an already developed oil field.

[0008] (2) "Honeybee" development mode Relatively small and isolated areas that are not within 20km of developed oil fields and cannot rely on developed oil fields For small marginal oil and gas fields, drilling (construction), production, power, oil storage, external transportation, and life are all possible. This is a mode of development that uses small, mobile production equipment that integrates

[0009] Currently, most of the marginal oil fields are more than 20 km apart from the developed oil fields, and the length is more than 20 km. Even undersea pipelines located within 0 km of the coast still require high construction costs. The 'bee-type' development mode is the main scheme to resolve many marginal oil fields.

[0010] This development mode mainly provides a mobile platform structure, which allows production, operation, It can integrate the functions of power, oil storage, external transportation, living and other operations into one small production device. The platform structure is like a bee, which can extract oil from one small oil field and then move on to another. The "bee-type" development mode is a method to extract oil from small oil fields. Although it can bring a certain economic effect to the rice field, it is difficult to realize the mobility of the platform. Therefore, the platform shape is subject to certain restrictions and must be designed to provide sufficient space for oil storage. It is difficult to set the interval, and generally the full load storage capacity must not exceed 2,000 tons. The frequency of shuttle tankers taking oil became too high, making the development of the entire field less economical. It ends up like this.

[0011] Another concept is to connect the storage vessel and jacket together under normal production conditions. It is conceivable that the jackets would be used for production and the storage vessels would store the crude oil. It is used for production, power, oil storage, external transportation, and life functions, but the method , the oil storage vessel loads when in production and is placed on the original platform It is much larger than the storage device, so the wind and wave resistance of the whole system is relatively poor, especially When a storage vessel is in beam sea conditions, the lateral load is extremely large and the vessel is subjected to strong panning motion, resulting in the jerk. The jacket, related facilities and tracks may be damaged, leading to accidents.

[0012] Therefore, by changing the conventional wellhead platform structure, the development of marginal oil fields can be improved. There is a need to adapt to economic requirements.

[0013] The above content is within the technical knowledge of the inventors and does not necessarily constitute prior art. do not have. Summary of the Invention [Problem to be solved by the invention]

[0014] The present invention overcomes the deficiencies of the background art and can improve the economic indicators of marginal oil field development. It is intended to provide a production platform for the placement of oil lift equipment. It can improve the workability, reduce the number of facilities, reduce the input costs, and provide excellent It is safe and stable, and can handle refurbishment, production, power, and oil on one platform. Supports the integration of storage, external transportation, living and other functions, and has a sufficiently large oil storage space Support the expansion of [Means for solving the problem]

[0015] The technical solutions used in the present invention are as follows:

[0016] 1. A single upright moored wellhead production operating platform comprising: A hollow upright column body; a positioning and mounting assembly mounted to a bottom of the upright body; The upright body is provided with a support member, the support member being rotatable about an axis of the upright body; and A rotating table having a mooring connection device; The oil extraction assembly is installed on the top of the upright body, located above the rotating platform, and an oil production platform on which the oil extraction equipment is installed; The upright column is installed inside the upright column body and can be connected to the oil production platform. and at least one internal groove.

[0017] According to the above technical solution, the installation around the hollow upright body, i.e., the positioning of the bottom of the upright body The mounting assembly stably places the upright body in the waters of the oil field. The rotating platform of the part supports the platform and realizes the mooring function, such as floating production storage and offloading. The floating production storage and offloading (FPSO) facility is moored on a rotating platform and then exposed to wind and waves. When the rotating base is rotated, it can rotate around the upright body. A plurality of trenches may be installed, for example, 3 to 6, to support oil extraction operations. where the production assembly is mounted on the production platform atop the rotating bed. The main structure of the upright pole is rationally arranged so that the mooring and oil extraction operations do not affect each other. Mooring and oil production can be carried out simultaneously without any need for a production line. In other words, the conventional shallow water oil field development mode of The mooring platform and the single-point mooring jacket are integrated into one unit. The submarine pipeline between the platform and the seabed is omitted. This will also reduce the number of jackets installed. This will significantly reduce the development costs of marginal oil fields, It always has high popularity value.

[0018] In a preferred embodiment, the positioning and mounting assembly comprises a number of pile foundations and a pile foundation. and a pipe connecting the upright column body.

[0019] In a preferred implementation, the positioning and mounting assembly is disposed along the bottom of the upright body. The pile foundation body extends in the direction of the foundation.

[0020] As an option, the upright column body and the pile foundation body are integrally formed, i.e., the upright column body One end of the bottom is driven into the seabed as a single pile foundation and fixed. The type of the ripper may be selected according to different sea conditions, and multiple positioning methods may be combined simultaneously. It may be possible to do so.

[0021] In a preferred embodiment, the rotating platform comprises a rotating platform body and a rotating platform bearing, The inner race of the pedestal bearing is fixedly connected to the upright body.

[0022] The selected turntable bearing is preferably a roller bearing, in which case The outer ring of the turntable bearing is fixedly connected to the turntable body. A sliding bearing may be selected, in which case the bearing lubricant layer is formed on the outer surface of the bearing. and an inner surface of a bearing position formed by the rotating table body, The inner surface of the upright column and the main body of the upright column are fixed together by a temporary fastening method.

[0023] In a preferred implementation, the rotating platform further comprises a rotary transport assembly connected to the rotating platform, the rotating platform further comprises a rotary transport assembly connected to the rotating platform. The transfer assembly includes several rotating transfer joints, an inner transfer unit and an outer transfer unit. Equipped with The rotary transport joint comprises: an internal transport wheel fixedly connected to the upright body; an outer transport wheel that rotates relative to the inner transport wheel according to the turntable; Between the inner and outer transport wheels, a transport structure is provided that can maintain transport during the rotation process. Has the internal transport unit is connected to the transport structure and to the oil production assembly; The external transport unit is connected to the transport structure.

[0024] A more preferred approach is to secure the transport unit by means of a mooring system.

[0025] By installing a rotary transport joint, the oil extraction operation on the production operation platform can be The present invention provides a solution to effectively resolve the collision between the production and mooring, and is a floating production storage facility moored to a rotating platform. The storage and loading equipment is driven by wind and waves to rotate the turntable, and at this time, the external transport Connect units such as water pipes, oil pipes, and power cords to the floating production storage and offloading facility. In order to avoid winding and tension when rotating the rotary transport joint during the rotation of the turntable, It is necessary to maintain the stability of external and internal transport conditions by

[0026] In a preferred embodiment, the transport structure is used to transport fluid or electrical energy. can be.

[0027] In a preferred embodiment, the oil production platform comprises a wellhead deck, The industrial assembly includes at least one of the oil pick-up tree, manifold terminals, and production support systems. Have one.

[0028] The production support system is a conventional oil field development work facility, which includes power supply facilities, control instrument facilities, and hoisting equipment. This includes, but is not limited to, lifting facilities, fire suppression facilities, safety facilities, and monitoring and measurement facilities.

[0029] In a preferred embodiment, the oil production platform is located above the wellhead deck. The workover deck is adapted to support the workover equipment.

[0030] The workover equipment is preferably hydraulic workover equipment, supports the associated workover facilities and is mainly used for excavation (Workover) May work in conjunction with a conventional workover rig to provide the capability to drill risers into the tunnel. stomach.

[0031] In a preferred embodiment, the inner well is connected to the oil production platform or oil production assembly. A water shielding pipe is provided to be connected to the assembly, A positioning and separating structure for supporting the water shielding pipe is installed inside the upright pillar body.

[0032] In a preferred embodiment, the tethered connection device comprises a pivot joint and a release means for releasing the pivot joint. and a release device for removing the connection between the rotary joint and the rotating base. or the release device is used to remove the connection between the release device and the pivot joint. can be.

[0033] 1. An oil field production operation system, comprising: The single upright moored wellhead production work platform; A floating production storage and offloading facility; a mooring device connected to the floating production storage and offloading facility and the mooring connection device; It is characterized by:

[0034] As an application of the single upright moored wellhead production work platform, a floating production oil storage facility The system cooperates with the oil storage facility to realize both oil production and oil storage operations. It has the advantages of being lightweight, strong wind and wave resistant, and greatly reduces the overall facility and input costs. In the case of a large reduction in capacity, the functions will not be reduced and will still be used for renovation, production, power generation, oil storage, and external export. It has all the functions of transportation and daily life at the same time, and has economic benefits for the development of many isolated marginal oil fields. Can.

[0035] 1. A single upright column type wellhead production operating platform, comprising: A hollow upright column body; a positioning and mounting assembly mounted to a bottom of the upright body; An oil extraction operation platform is installed on the top of the upright body and an oil extraction operation assembly is installed. and The upright column is installed inside the upright column body and can be connected to the oil production platform. and at least one internal groove.

[0036] According to the above technical solution, the installation around the hollow upright body, i.e., the positioning of the bottom of the upright body The mounting assembly stably places the upright body in the waters of the oil field. A cylindrical trench is installed in the area, and multiple trenches, for example 3 to 6 trenches, can be installed, making it possible to carry out oil extraction work. where the production assembly is mounted on the production platform on top of the rotating bed. The vertical column body structure is rationally installed, and each function required for oil extraction is provided. All of them can be integrated into a production work platform based on the same upright column body, In the case of subsea transportation mode, there is no need to deploy an FPSO, and the single-point mooring jacket and The subsea pipeline installed between the jacket and the wellhead platform is omitted. It can significantly reduce the development costs of oil fields and has very high popularization value.

[0037] In a preferred embodiment, the positioning and mounting assembly includes a number of pile foundations and a pile foundation. and piping connecting the foundation and the upright column body.

[0038] In a preferred embodiment, the positioning and mounting assembly is disposed along the bottom of the upright body. It has a pile foundation body extending downward.

[0039] As an option, the upright column body and the pile foundation body are integrally formed, i.e., the upright column body One end of the bottom is driven into the seabed as a single pile foundation and fixed. The type of the ripper may be selected according to different sea conditions, and multiple positioning methods may be combined simultaneously. It may be possible to do so.

[0040] In a preferred embodiment, the radial dimension of the hollow part of the upright column body is 2 to 6 meters. It is Tor.

[0041] In a preferred embodiment, the inner well is provided on the oil production platform or oil production area. A water shielding pipe is provided to be connected to the assembly. A positioning and separating structure for supporting the water shielding pipe is installed inside the upright pillar body.

[0042] In a preferred embodiment, the number of the water shielding pipes is more than one. The positioning and isolating structure includes: The pipes are fitted on the outside of the water shielding pipe, and are connected to each other by connecting ribs. A plurality of positioning rings; The positioning ring and / or the connecting rib are connected to the inner wall of the hollow portion of the upright body. and a radial support member abutting or connected to the

[0043] Positioning separation supports the placement of multiple internal grooves inside the upright body. In addition, the positioning separation structure can support stable production of multiple drillings.

[0044] As a preferred implementation method, the water shielding pipe is uniformly arranged in the circumferential direction around the axis of the upright column body. To be placed.

[0045] In a preferred embodiment, the oil production platform comprises a wellhead deck, and the oil production The working assembly may include at least one of the oil pick-up tree, the manifold terminals, and the production support systems. It also has one.

[0046] The production support system is a conventional oil field development work facility, which includes power supply facilities, control instrument facilities, and hoisting equipment. This includes, but is not limited to, lifting facilities, fire suppression facilities, safety facilities, and monitoring and measurement facilities.

[0047] In a preferred embodiment, the oil production platform is located above the wellhead deck. The workover deck is used to support the workover equipment.

[0048] The workover equipment is preferably hydraulic workover equipment, supports the associated workover facilities and is mainly used for excavation (Workover) May work in conjunction with a conventional workover rig to provide the capability to drill risers into the tunnel. stomach.

[0049] In a preferred embodiment, the oil production platform further comprises a manifold deck and and / or a water injection deck and / or a boarding deck.

[0050] Application of single upright column type wellhead production work platform, common area close to developed oil field In cooperation with energy facilities, we will realize both oil production and oil storage operations, and establish an oil field network. Since the system does not require mooring the FPSO, it has strong wind and wave resistance and The overall facilities are significantly reduced, and input costs are significantly reduced, but it is dependent on developed oil fields. It can simultaneously perform all functions of renovation, production, power, external transportation, and life. This will have an economic impact on the development of many marginal oil fields close to the existing oil fields.

[0051] It is also intended to improve the structure of the production operation platform and to develop marginal oil fields. It can improve the economic efficiency index of development, improve the compactness of the oil extraction equipment arrangement, It can reduce the number of facilities, reduce input costs, and has excellent safety and stability. At the same time, a single platform will be used for renovation, production, power generation, oil storage, external transportation, and daily life. It is supported to integrate functions such as the above, and to expand to a sufficiently large oil storage space. It is expected that the rotational speed of the wellhead platform will be improved. The objective of the project is to provide a moored transportation system for the FPSO moored to the wellhead platform. Fluids and energy may be transferred to and from the lift equipment.

[0052] The present invention further provides a rotary moored transportation system, comprising: a number of rotary transportation joints, an internal transportation unit; A knit and an external transport unit, Each said rotary transport joint comprises: An internal transport wheel; An outer transport wheel that is rotatable relative to the inner transport wheel; Between the inner and outer transport wheels, a transport structure is provided that can maintain transport during the rotation process. Has The internal transport unit is connected to the internal transport wheel; The external transport unit is connected to the external transport wheel; The inner transport wheel of each of the rotary transport joints is fixedly connected.

[0053] In the development and production of marginal oil fields, one concept is to use a single-point mooring to the wellhead platform. The problem that needs to be solved is to integrate the wellhead and jacket into a single unit. The FPSO, which is moored to a rotating platform installed on a platform, sways and rotates according to wind and waves. In order to achieve this, the oil extraction equipment installed on the wellhead platform and the FPSO will be connected to the mooring process. transportation will not be interrupted or affected, and the normal operation of the oil production platform will not be affected. This is something that needs to be maintained so that it doesn't happen.

[0054] By installing a rotary transport joint, the oil extraction operation on the production operation platform can be A solution to resolve the conflict between production and mooring is provided, and a floating production, storage and offloading vessel moored on a rotating platform is The equipment is driven by wind waves to rotate the turntable, and at this time, the external transport unit For example, when connecting water pipes, oil pipes, power cords, etc. to the FPS, In order to avoid winding and tension, the rotary transport joint is used during the rotation of the turntable. Stability of external and internal transport conditions must be maintained.

[0055] In a preferred embodiment, the rotary transport joints are arranged in a top-to-bottom order, The internal transport unit connected to the internal transport wheel of the rotary transport joint located below is The inner conveyor wheel passes through an internal passageway provided in the inner conveyor wheel of the rotary conveyor joint located therein.

[0056] In a preferred embodiment, at least one of the rotary transport joints is a fluid transport joint. It is.

[0057] In a preferred embodiment, the transport structure is formed between the inner transport wheel and the outer transport wheel. the internal transport unit includes a fluid conduit, and the fluid conduit is connected to the annular fluid channel. In communication with the fluid groove.

[0058] In a preferred embodiment, the fluid transport joint transports water, oil, gas, etc. It is one or more selected items.

[0059] In a preferred embodiment, a dynamic seal ring is provided between the inner and outer conveyor wheels. Thus, a seal structure is formed which isolates the annular fluid groove from the outside.

[0060] In a preferred embodiment, at least one of the rotary transport joints is an energy transport joint. The transport structure is a brush installed between the inner transport wheel and the outer transport wheel. and the internal transport unit includes a power cord electrically connected to the brush. Or it can be used to transport data, with the data line being the transport unit. Cut.

[0061] In a preferred embodiment, a dynamic seal ring is provided between the inner and outer conveyor wheels. Thus, a seal structure is formed which isolates the annular fluid groove from the outside.

[0062] In a preferred embodiment, a bearing is provided between the inner and outer conveying wheels. .

[0063] In a preferred embodiment, the system further comprises a rotating platform, said rotating platform being connected to each of the external transport wheels. [Brief description of the drawings]

[0064] The drawings described herein are intended to provide a further understanding of the present invention and are not intended to limit the scope of the present invention. The exemplary embodiments and their explanations are provided for the purpose of illustrating the present invention. This is not intended to unduly limit the invention. [Figure 1]FIG. 1 is a schematic diagram showing the overall structure of an oil field production operation system according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic diagram of the overall structure of an oil field production operation system according to one embodiment of the present invention, and each part is shown. [Diagram 3] FIG. 3 is a schematic diagram showing a partial structure of an oil field production operation system according to one embodiment of the present invention. [Figure 4] FIG. 4 is a partial structural schematic diagram showing the upper half of a single upright moored wellhead platform according to one embodiment of the present invention, in which the rotating platform is omitted. [Diagram 5] FIG. 5 is a horizontal cross-sectional schematic diagram showing an upright body in a single upright moored wellhead platform according to one embodiment of the present invention. [Figure 6] FIG. 6 is a partial structural schematic diagram showing the upper half of a single upright pole-moored wellhead platform according to one embodiment of the present invention, in which part of the upright pole body is omitted in the drawing. [Figure 7] FIG. 7 is a partial cross-sectional structural schematic diagram showing a portion where a rotary transportation joint is installed in a single upright moored wellhead platform according to one embodiment of the present invention. [Figure 8] FIG. 8 is a schematic diagram showing a rotating platform and related structures in a single upright moored wellhead platform according to one embodiment of the present invention. [Figure 9] FIG. 9 is a schematic diagram of the overall structure of a single upright pillar type wellhead platform according to one embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0065] In order to more clearly explain the overall concept of the present invention, the following description will be given with reference to the drawings, in which: The following will be explained in detail.

[0066] It should be noted that in the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. However, the invention may also be practiced in other ways than those described herein. Therefore, the scope of protection of the present invention should not be limited by the specific embodiments disclosed below. There is none.

[0067] Before describing the alternative implementation methods of the present invention with reference to the drawings, the present invention will first be described. Explain the technical concept.

[0068] Conventional wellhead platforms for carrying out oil extraction operations are limited by structure and have a single point of attachment. It was not possible to install the bearings of the fastening system, and the structure of the wellhead platform needs to be improved, and similarly, conventional mooring jackets cannot accommodate oil harvesting trees. However, the mooring and wellhead are not available to complete the oil extraction operations. All of these operations are essential, and in the case of high-yielding, densely populated oil fields, It is feasible to deploy the platform and the single-point mooring jacket simultaneously. The entire system has a long service life and costs can be shared equally among multiple oil fields. , The development cost of unit production can be very low, and it has a high economic effect, but there is a limit In the case of oil fields, the unit production cost of this development mode is relatively high, and it is difficult to meet the economic requirements. It is not possible to do so.

[0069] Therefore, the technical objectives that the present invention aims to achieve are as follows: In the case of shallow water marginal oil fields, one set of system can be used for workover, production, power, oil storage, It has all the functions of external transportation and daily life at the same time, while reducing the number of facilities as much as possible. Reduce input costs as much as possible and make modifications possible while still in normal operation. There is no need to stop production, and it can support a sufficiently large oil storage space. Furthermore, it is necessary for the ship to have a strong ability to withstand adverse marine environments, and to be able to withstand once-in-50-year sea conditions. It is possible to avoid production interruption in the sea conditions that occur once a year, and to achieve the once-in-a-century ultimate goal. It can be quickly deactivated in poor sea conditions.

[0070] The core of achieving the above technical objectives is a hollow upright column-type platform structure. The outside of the upright pillar body is designed to prevent collision with the top and inside of the upright pillar during oil extraction work. The aim of this project is to install a mooring turntable that can easily be used for mooring.

[0071] Figures 1 and 2 show an oil field production operation based on a single upright moored wellhead production operation platform. The system mainly consists of a floating production storage and offloading facility 1, a single upright moored wellhead, It is equipped with a production work platform and a floating soft yoke single point mooring system. The implementation mode of the integrated production storage and offloading equipment can be a production storage tanker, or an old tanker can be modified. The tanker may be constructed in a size appropriate to the actual needs of the oil field. Select a ship and add the necessary production facilities, power generation units, mooring frames, and external transport modules. It is best to follow the above.

[0072] As shown in Figure 3, the single upright pole moored wellhead production work platform mainly consists of upright pole 2, Positioning mounting assembly 3, rotating table 4, wellhead deck 5, oil tree 6, manifold Terminal 7, workover deck 8, hydraulic workover rig 9, rotary transport assembly 10 and rotary bed bearings Equipped with 11.

[0073] Here, the diameter of the upright pillar body is about 2 to 6 meters, and it is driven into the seabed with a pile driving hammer. It can be driven into the ground, has a certain depth, is hollow inside, and has an array of internal grooves. The bottom of the upright can be used to place a drilling riser or a production riser. The outer ends of each pipe are fixed to the seabed by driving pile foundations. will be done.

[0074] The wellhead deck is installed on the top of the upright column body, and the top of each riser is installed on the wellhead deck. Trees are installed and each tree converges on a manifold terminal on the wellhead deck. Above the wellhead is a workover deck and a hydraulic workover rig. A rotating base is provided on the upright column, and the rotating base is connected to the upright column body by a rotating base bearing. A rotary transport assembly joystick is provided above the rotary platform, which can rotate in a horizontal plane around the main body. The ports include rotary transport joints for transporting, for example, oil, electricity, and water, respectively. Oil pipes, water pipes and cables connect the manifold to the stationary part of the rotary joint. do.

[0075] The soft yoke mooring system consists of a mooring support frame 12, a horizontal counterweight yoke 13, and a Unterweight cabin 14, boom 15, rigid transport pipeline 16, flexible bridge pipeline 17 ( (can be used to transport fluids and energy), tilt bearing 18, pan bearing It has a gasket 19 and a cardan joint 20.

[0076] Specifically, the soft yoke single-point mooring system consists of an on-board support frame, two booms and one water It consists of a flat counterweight yoke, one end of which is a single straight It is connected to the rotating platform of the vertical column by a releasable cardan joint. The counterweight yoke can rotate arbitrarily with respect to the rotating base (i.e., horizontal axis, vertical axis, (rotating around the straight axis and the central axis), and allows for quick release and tie-back, Two counterweight cabins are provided at the other end of the counterweight yoke, A counterweight can be added, and the counterweight cabin is above the cardinal. The boom is connected to the ship by a cardan joint, and the upper part of the boom is supported on the ship by a cardan joint. It is connected to a frame.

[0077] As shown in FIG. 4, a water shielding pipe 21 is located within the hollow structure of the upright column body 2. The number and arrangement of the water shielding pipes 21 may be determined according to the inner diameter and the needs of the oil field. The inside of the water shield pipe can be used to extend the riser, and the riser can be connected to the production riser and The production riser includes a water injection riser and a production riser which transports the crude oil mixture from the seabed to the wellhead deck 5. The oil tree 6 is extracted, and the water injection riser injects water from the upper oil tree 6 into the subsea oil well. A manifold terminal 7 on the wellhead deck 5 is used to bundle the tracks of all the oil trees 6. There are oil and water pipelines leading to the oil extraction tree 6, as well as further cables, but this Their oil, water and power will eventually need to be connected to the FPSO.

[0078] The interaction between the single pole moored wellhead production platform and the FPSO is twofold. Divided into parts.

[0079] On the one hand, the single-pillar moored wellhead production platform is attached to the FPSO. The soft yoke provides mooring positioning and acts as a mooring anchor for the FPSO. To transmit the retaining force and to allow the FPSO to rotate around the upright column body due to the action of wind, waves and currents. As shown in FIG. 8, the rotating table bearing inner ring 49 is fixed to the upright column body 2, and the rotating table The bearing outer ring 50 is fixed to the rotating table 4, which is a horizontal counter of the soft yoke. -The weight yoke 13 is connected to the FPSO and the soft yoke, so that the rotating base 4 is upright. The tilt bearing 18 and the pan The bearing 19 prevents the horizontal counterweight yoke 13 from tilting or panning. Therefore, the horizontal counterweight yoke 13 can be freely moved by the drive of the FPSO. The system can be tilted and tilted without constraining the FPSO, which makes it relatively It is possible to support large loads and thereby provide large tonnage storage. On the other hand, the mooring support frame is rigidly fixed to the FPSO, and the boom 15 is fixed to the mooring support frame 12. The FPSO is suspended and connected to the lowered counterweight cabin 14, allowing it to perform surge operation. When moving, the boom 15 tilts to lift the counterweight cabin 14 and However, the pulling force of the counterweight cabin 14 on the boom 15 is one This generates a horizontal component of force, which acts in the opposite direction to the ship's motion and acts as a restoring force. The FPSO is pulled back to the equilibrium position by the suction. A quick release device is also installed at the cardan joint 20. If the weather is extremely bad (for example, once-in-a-century sea conditions) that exceed the design limit, Quick release devices are a common safety measure in the field and can be used to The release can be achieved automatically by changing the weight. As an alternative, a quick release device may be installed at the mooring connection points.

[0080] The other part transports oil, water and electricity as the FPSO rotates relative to the upright body. This part is mainly completed by the rotary transport assembly 10. The specific structure is As follows:

[0081] In addition, an annular cavity is provided on the contact surface between the inner and outer rings to transport fluids such as water and oil. The vacant cavity is provided with a dynamic seal ring at the connection surface of the two rings, and the vacant cavity is The fluid in the cavity can be ensured not to leak, and the vacant cavity is divided into the inner ring and the outer ring. There is one passage outlet on each ring side, and one more groove on the contact surface between the inner ring and the upright body. and a passageway is formed from bottom to top, the passageway being adapted to allow liquid or A pipe or cable is passed through the outlet of the stationary part of the power rotary joint, and the wellhead deck Leads to the upper manifold.

[0082] When the oil field is operating normally, the FPSO is positioned on the platform by the single point of the soft yoke. It can only rotate around the form and perform limited surge, tilt and pan movements. FP Power and human life are provided in the SO, and electricity and water are passed through the rotary joint to the platform. Once in the foam manifold, it passes through the oil tree and riser into the well and The collected crude oil mixture is then pumped through the oil trees and risers to the platform manifold. The oil enters the field, passes through a rotating joint, and reaches the FPSO, where production takes place and the oil is then released. The oil is stored in the FPSO and awaits shuttle tankers to periodically pick up the oil. If necessary, the oil tree needs to be refurbished without the need to stop production. The production or water injection riser was removed and replaced with a drilling riser, and the workover was carried out using the workover rig 9. After completing the rework, it will only be necessary to switch to the production risers and begin production.

[0083] In addition, the following methods can be implemented based on the above scheme: The number of decks above the single-pole moored wellhead production platform is the wellhead deck and the modified deck. Not only repair decks, but also decks required for other production operations, such as manifold decks, water injection decks, etc. Decks, boarding decks, etc. may be added.

[0084] The bottom positioning assembly of the upright body is structured with three braces at a 120 degree angle. Not limited to the form of a frame support, other forms, such as frame supports, may be used according to the actual conditions of the seabed and the structural design. The support legs can be fixed to the seabed by means of piles, one-sided bracing, cable-stayed ropes, etc. The connection is not limited to driving-in connection, and suction anchors may be used. Furthermore, the main body of the upright column may be directly connected to the pile base of a single pile. It may also be driven into the seabed as a foundation.

[0085] The number of rotary transport joints is not limited to three, and additional passages can be added according to the actual needs of the oil field. The types are not limited to oil, water, and power rotary joints, but also gas rotary joints, and many more. Auxiliary functions such as rotary joints may be added.

[0086] The repair method is not limited to hydraulic repair rigs, but also includes a derrick installed above the repair deck, and a conventional repair method. A repair rig may also be used.

[0087] The quick release device of the soft yoke system is located between the horizontal counterweight yoke and the rotating base. not only at the connection points installed on the boom, but also at the connection points between the boom and the counterweight yoke It may be installed.

[0088] Therefore, the technical goal of the present invention is to provide a hollow upright platform. The structure is designed to prevent collisions with the oil extraction work carried out at the top and inside of the upright column on the outside of the column. The method further includes providing a mooring turntable that is free from any damage caused by the mooring.

[0089] Figures 1 and 2 show an oil field production operation based on a single upright moored wellhead production operation platform. The system mainly consists of a floating production storage and offloading facility 1, a single upright moored wellhead, It is equipped with a production work platform and a floating soft yoke single point mooring system. The implementation mode of the integrated production storage and offloading equipment can be a production storage tanker, or an old tanker can be modified. The tanker may be constructed in a size appropriate to the actual needs of the oil field. Select a ship and add the necessary production facilities, power generation units, mooring frames, and external transport modules. It is best to follow the above.

[0090] As shown in Figure 3, the single upright pole moored wellhead production work platform mainly consists of upright pole 2, Positioning mounting assembly 3, rotating table 4, wellhead deck 5, oil tree 6, manifold Terminal 7, workover deck 8, hydraulic workover rig 9, rotary transport assembly 10 and rotary bed bearings Equipped with 11.

[0091] Here, the interaction between the single-pillar moored wellhead production platform and the FPSO is divided into two parts.

[0092] On the one hand, the single-pillar moored wellhead production platform is attached to the FPSO. The soft yoke provides mooring positioning and acts as a mooring anchor for the FPSO. To transmit the retaining force and to allow the FPSO to rotate around the upright column body due to the action of wind, waves and currents. As shown in FIG. 8, the rotating table bearing inner ring 49 is fixed to the upright column body 2, and the rotating table The bearing outer ring 50 is fixed to the rotating table 4, which is a horizontal counter of the soft yoke. -The weight yoke 13 is connected to the FPSO and the soft yoke, so that the rotating base 4 is upright. The tilt bearing 18 and the pan The bearing 19 prevents the horizontal counterweight yoke 13 from tilting or panning. Therefore, the horizontal counterweight yoke 13 can be freely moved by the drive of the FPSO. The system can be tilted and tilted without constraining the FPSO, which makes it relatively It is possible to support large loads and thereby provide large tonnage storage. On the other hand, the mooring support frame is rigidly fixed to the FPSO, and the boom 15 is fixed to the mooring support frame 12. The FPSO is suspended and connected to the lowered counterweight cabin 14, allowing it to perform surge operation. When moving, the boom 15 tilts to lift the counterweight cabin 14 and However, the pulling force of the counterweight cabin 14 on the boom 15 is one This generates a horizontal component of force, which acts in the opposite direction to the ship's motion and acts as a restoring force. The FPSO is pulled back to the equilibrium position by the suction. A quick release device is also installed at the cardan joint 20. If the weather is extremely bad (for example, once-in-a-century sea conditions) that exceed the design limit, Quick release devices are a common safety measure in the field and can be used to The release can be achieved automatically by changing the weight. As an alternative, a quick release device may be installed at the mooring connection points.

[0093] The other part transports oil, water and electricity as the FPSO rotates relative to the upright body. This part is mainly completed by the rotary transport assembly 10. Rotary Transport and Oil Extraction In order to prevent the work from interfering with each other, each rotary transport joint in the rotary mooring transport system The yoke is installed in a hollow form, and the rotary mooring transportation system is positioned below the wellhead deck. In the implementation shown in Figures 6 and 7, the rotating mooring transport system conveys water from top to bottom in sequence. The joints are S1, S2 and S3. The outer rings (23, 24, 31, 32, 39, 40) are the inner and outer bearing rings (27, 28) , 35, 36, 43, 44). When the rotating table 4 rotates, the bearings (27 , 28, 35, 36, 43, 44) to the rotating table, the drive arm bracket The swivel joint outer ring 24 (water), 32 (oil), 40 (electric The rotating joint inner rings 23 (water), 31 (oil), 39 (power) is rigidly connected to the upright column body and remains stationary. 1 between the inner ring of the rotary joint 23 (water), 31 (oil) and 32 (oil) Two annular vacant cavities 26, 34 are formed, and one end of the vacant cavities 26, 34 is It is connected to pipes 29 and 37 leading to the PSO, and the other end is connected to the platform manifold. The edges of the vacant cavities 26 and 34 are connected to the pipes 30 and 38 that are connected to the inner and outer rings. The contact surfaces are provided with dynamic seal rings 25, 33, which are corrosion-resistant and Rubber materials with high temperature, wear resistance, high elasticity, etc., such as silicon rubber, fluororubber, etc. It is made of ethylene propylene rubber and acrylate rubber, and the cavity is 26, 3 4. Ensure the rotational friction of the contact surface between the inner and outer rings of the rotary joint when the pressure is relatively large The inner ring 39 and the outer ring 40 of the power transmission rotary joint are provided with brakes. The brush 42 is connected to the rotary joint, and the brush is annular. When the rotary joint rotates, the brush The two ends of the rudder are always in contact and the circuit is connected. Similarly, a seal ring 41 is provided on the contact surface between the outer ring 40 and the bearing 41 .

[0094] As an extended selectable realization method, a signal transport joint with a structure similar to that of a power transmission joint is used. In the embodiment, the wires and brushes are used to transmit electrical signals.

[0095] In addition, there is an annular cavity in the contact surface between the inner and outer rings that transports fluids such as water and oil. The empty cavity is provided with a dynamic seal ring on the connection surface of the two rings, and the empty cavity is The fluid in the cavity can be prevented from leaking, and the empty cavity is There is one passage outlet on each of the inner and outer rings, and one more recess on the contact surface between the inner ring and the upright body. A groove is formed to form a passage from bottom to top, and the passage is for liquid below the rotating joint. or a conduit or cable at the exit of the stationary part of the power rotary joint, It connects to the manifold on the switch.

[0096] When the oil field is operating normally, the FPSO is positioned on the platform by the single point of the soft yoke. Only rotation around the form and limited surge, tilt and pan movements are possible. Power and human life are provided on the FPSO, with electricity and water passing through the rotating joint to the plant. Once it reaches the platform manifold, it passes through the oil tree and riser into the well. In both cases, the collected crude oil mixture is transported through the oil production tree and riser to the platform manifold. After entering the hold, the oil reaches the FPSO through the rotary joint and production takes place. The extracted crude oil will be stored on the FPSO, waiting for shuttle tankers to pick it up periodically. If necessary, there is no need to stop production and temporarily refurbish the oil tree. The production or water injection riser was removed and replaced with a drilling riser. After the refurbishment is complete, it will only be necessary to replace the production riser and begin production. .

[0097] In addition, the diameter of the upright pillar body is about 2 meters to 6 meters, and the pile It can be driven into the seabed with a hammer, has a certain depth, and is a hollow cylindrical tunnel. The trenches can be installed in an array to accommodate drilling or production risers. At the bottom of the building, there are three pipes arranged at 120 degrees, and the outer ends of each pipe are piled to the pile foundation. The cable is secured to the seabed by a

[0098] The wellhead deck is installed on the top of the upright column body, and the top of each riser is installed on the wellhead deck. Trees are installed and each tree converges on a manifold terminal on the wellhead deck. Above the wellhead is a workover deck and a hydraulic workover rig. A rotating base is provided on the upright column, and the rotating base is connected to the upright column body by a rotating base bearing. The vehicle can rotate around the main body in a horizontal plane, and the rotating moored transportation system is mounted above the rotating platform. The joints include rotary transport joints for transporting oil, electricity, and water, respectively. Oil and water pipes and cables connect the manifold to the stationary part of the rotary joint. do.

[0099] The soft yoke mooring system consists of a mooring support frame 12, a horizontal counterweight yoke 13, and a Unterweight cabin 14, boom 15, rigid transport pipeline 16, flexible bridge pipeline 17 ( (can be used to transport fluids and energy), tilt bearing 18, pan bearing It has a gasket 19 and a cardan joint 20.

[0100] Specifically, the soft yoke single-point mooring system consists of an on-board support frame, two booms and one water It consists of a flat counterweight yoke, one end of which is a single straight It is connected to the rotating platform of the vertical column by a releasable cardan joint. The counterweight yoke can rotate arbitrarily with respect to the rotating base (i.e., horizontal axis, vertical axis, (rotating around the straight axis and the central axis), and allows for quick release and tie-back, Two counterweight cabins are provided at the other end of the counterweight yoke, A counterweight can be added, and the counterweight cabin is above the cardinal. The boom is connected to the ship by a cardan joint, and the upper part of the boom is supported on the ship by a cardan joint. It is connected to a frame.

[0101] As shown in FIG. 4, a water shielding pipe 21 is located within the hollow structure of the upright column body 2. The number and arrangement of the water shielding pipes 21 may be determined according to the inner diameter and the needs of the oil field. The inside of the water shield pipe can be used to extend the riser, and the riser can be connected to the production riser and The production riser is equipped with a water injection riser and a production riser that transports the crude oil mixture from the seabed to the wellhead deck 5. The oil tree 6 is extracted, and the water injection riser injects water from the upper oil tree 6 into the subsea oil well. A manifold terminal 7 on the wellhead deck 5 is used to bundle the tracks of all the oil trees 6. There are oil and water pipelines leading to the oil extraction tree 6, as well as further cables, but this All of these oil, water and power will eventually need to be connected to the FPSO.

[0102] In addition, the following methods can be implemented based on the above scheme: The number of decks above the single-pole moored wellhead production platform is the wellhead deck and the modified deck. Not only repair decks, but also decks required for other production operations, such as manifold decks, water injection decks, etc. Decks, boarding decks, etc. may be added.

[0103] The structure of the positioning mounting assembly at the bottom of the upright body is three braces at a 120 degree angle. Not limited to the above, other types, such as frame support, may be used according to the actual conditions of the seabed and the structural design. The support legs can be fixed to the seabed by pile driving. In addition, suction anchors may be used. Furthermore, the upright column body may be directly connected to the single pile foundation. It may also be driven into the seabed as a

[0104] The number of rotary transport joints is not limited to three, and additional passages can be added according to the actual needs of the oil field. The types are not limited to oil, water, and power rotary joints, but also gas rotary joints, and many more. Auxiliary functions such as rotary joints may be added.

[0105] The repair method is not limited to hydraulic repair rigs, but also includes a derrick installed above the repair deck, and a conventional repair method. A repair rig may also be used.

[0106] The quick release device of the soft yoke system is located between the horizontal counterweight yoke and the rotating base. The connection between the boom and the counterweight yoke is not limited to the It may be installed at a location.

[0107] The technical objective of the present invention is to achieve the following in the case of a single isolated shallow water marginal oil field: A set of systems can simultaneously perform all functions including renovation, production, power, external transportation, and daily life. At the same time, the number of facilities should be reduced as much as possible, input costs should be reduced as much as possible, and normal Repairs can be made simultaneously while the plant is in operation, without the need to stop production, and even in bad seas. This further includes the absence of need to be concerned about the impact of the ocean environment.

[0108] The core of achieving the above technical objectives is a hollow upright column-type platform structure. At least one, preferably a plurality of, cylindrical grooves are disposed within the hollow interior of the upright body; and Positioning separation measures allow multiple excavations to be operated independently without interfering with each other The transportation pipes are located close to developed oil fields by undersea pipelines and cables. The FPSO may be connected to a nearby site and may not need to be moored, thereby To prevent the SO from being subjected to the impact loads of sea waves and wind, and therefore to cope with extremely bad sea conditions. It is possible.

[0109] Figure 9, Figure 2 and Figure 3 show the structural configuration of the single upright pillar type wellhead production work platform. .

[0110] The single upright pole moored wellhead production work platform is mainly composed of upright pole 2, positioning mounting a Assembly 3, wellhead deck 5, oil extraction tree 6, manifold terminal 7, workover deck 8 and hydraulic Equipped with Modification Rig 9.

[0111] Here, the diameter of the upright pillar body is about 2 to 6 meters, and it is driven into the seabed with a pile driving hammer. It can be driven into the ground, has a certain depth, is hollow inside, and has an array of internal grooves. The bottom of the upright can be used to place a drilling riser or a production riser. The outer ends of each pipe are fixed to the seabed by driving pile foundations. will be done.

[0112] The wellhead deck is installed on the top of the upright column body, and the top of each riser is installed on the wellhead deck. Trees are installed and each tree converges on a manifold terminal on the wellhead deck. Above the manifold is a workover deck and a hydraulic workover rig. The system will connect the undersea pipelines and cables to the platform and adjacent developed oil fields. It is used to transport energy and extracted crude oil between the two nations.

[0113] As shown in FIG. 3, a water shielding pipe 21 is located within the hollow structure of the upright column body 2. The number and arrangement of the water shielding pipes 21 may be determined according to the inner diameter and the needs of the oil field. The inside of the water shield pipe can be used to extend the riser, and the riser can be connected to the production riser and The production riser is equipped with a water injection riser and a production riser that transports the crude oil mixture from the seabed to the wellhead deck 5. The oil tree 6 is extracted, and the water injection riser injects water from the upper oil tree 6 into the subsea oil well. A manifold terminal 7 on the wellhead deck 5 is used to bundle the tracks of all the oil trees 6. There are oil and water pipelines leading to the oil extraction tree 6, as well as further cables, but this These oil, water and power will eventually need to be connected to adjacent developed oil fields.

[0114] When you need to renovate, you don't need to stop production, you need to renovate the oil tree The production or water injection risers were removed and replaced with drilling risers, and the workover rig was After the repair is completed, it is only necessary to replace the production riser and start production. It becomes.

[0115] In addition, the following methods can be implemented based on the above scheme: The number of decks above the single-pole moored wellhead production platform is the wellhead deck and the modified deck. Not only repair decks, but also decks required for other production operations, such as manifold decks, water injection decks, etc. Decks, boarding decks, etc. may be added.

[0116] The structure of the positioning mounting assembly at the bottom of the upright body is three braces at a 120 degree angle. Not limited to the above, other types, such as frame support, may be used according to the actual conditions of the seabed and the structural design. The support legs can be fixed to the seabed by pile driving. In addition, suction anchors may be used. Furthermore, the upright column body may be directly connected to the single pile foundation. It may also be driven into the seabed as a

[0117] The repair method is not limited to hydraulic repair rigs, but also includes a derrick installed above the repair deck, and a conventional repair method. A repair rig may also be used.

[0118] In addition, the scheme of the present invention is provided for the development of marginal oil fields, but the present invention Under the conditions that do not restrict the application environment of the scheme, satisfy economic efficiency, and ensure the equipment is safe and stable, The scheme of the present invention may be implemented in oil fields other than marginal oil fields and may be used in a multi-platform A "platform network" will be formed using the team method. [Explanation of symbols]

[0119] 1. Floating Production Storage and Offloading (FPSO) 2. Upright column body 3 Locating Mounting Assembly 4 Rotating table 5. Head deck 6. Oil Tree 7 Manifold Terminal 8 Renovation Deck 9. Hydraulic Workover Rig 10 Rotating Transport Assembly 11 Rotating table bearing 12 Mooring support frame 13 Horizontal counterweight yoke 14 Counterweight Cabin 15 Mooring boom 16 Rigid transport pipeline 17 Flexible cross-linked conduit 18 Tilt Bearing 19 Pan Bearing 20 Cardan joint (One cardan joint is provided at each end of each boom. (to be placed) 21 Water shielding pipe 22 Positioning separation structure 23 Water supply rotating joint inner ring (stationary ring) 24 Water supply rotating joint outer ring (rotating ring) 25 Water supply rotating joint seal ring 26 Water room 27 Water bearing outer ring (connected to the outer ring of the rotating joint) 28 Water bearing inner ring (connected to the inner ring of the rotating joint) 29 External water pipeline (leading to FPSO) 30 Internal water supply pipeline (leading to manifold terminal) 31 Oil supply rotating joint inner ring (stationary ring) 32 Oil supply rotating joint outer ring (rotating ring) 33 Oil supply rotating joint seal ring 34 Oil room 35 Oil bearing outer ring (connected to the outer ring of the rotary joint) 36 Oil-feed bearing inner ring (connected to the inner ring of the rotary joint) 37 External oil pipeline (leading to FPSO) 38 Internal oil pipeline (leading to manifold terminal) 39 Power transmission rotating joint inner ring (stationary ring) 40 Power transmission rotating joint outer ring (rotating ring) 41 Power transmission rotary joint seal ring 42 Brush 43 Power transmission bearing outer ring (connected to the outer ring of the rotary joint) 44 Power transmission bearing inner ring (connected to the inner ring of the rotary joint) 45 External power transmission line (leading to FPSO) 46 Internal power transmission line (leading to manifold terminal) 47 Rotating joint drive arm 48 Drive arm support frame 49 Rotating table bearing inner ring (stationary ring, rigidly fixed to the upright column) 50 Rotating table bearing outer ring (rotating ring, rigidly fixed to the rotating table)

Claims

1. 1. A rotating moored transportation system comprising: A number of rotary transport joints, an internal transport unit and an external transport unit are provided; Each said rotary transport joint comprises: An internal transport wheel; An outer transport wheel that is rotatable relative to the inner transport wheel; A transport structure is provided between the inner transport wheel and the outer transport wheel, which can maintain transport during the rotation process; The internal transport unit is connected to the internal transport wheel; The external transport unit is connected to the external transport wheel; The inner transport wheel of each of the rotary transport joints is fixedly connected, A rotary mooring transport system characterized in that a number of the rotary transport joints are arranged in order from top to bottom, and an internal transport unit connected to an internal transport wheel of a lower rotary transport joint passes through an internal passage opened in an internal transport wheel of an upper rotary transport joint.

2. 10. The rotary tethered transport system of claim 1, wherein at least one said rotary transport joint is a fluid transport joint.

3. The rotary tethered transportation system of claim 2, characterized in that the transportation structure is an annular fluid groove formed between the inner transport wheel and the outer transport wheel, the inner transport unit has a fluid pipeline, and the fluid pipeline is connected to the annular fluid groove.

4. 3. The rotary moored transportation system of claim 2, wherein the fluid transport joint transports one or more of the following fluids: water, oil, and gas.

5. The rotary tethered transportation system according to claim 3, characterized in that a dynamic seal ring is installed between the inner transport wheel and the outer transport wheel, forming a seal structure that isolates the annular fluid groove from the outside.

6. At least one of the rotary transport joints is an energy transport joint, the transport structure is a brush installed between the inner transport wheel and the outer transport wheel, and the inner transport unit includes a power cord electrically connected to the brush; or 2. The rotary tethered transportation system of claim 1, wherein at least one of the rotary transportation joints is a data transportation joint, the transportation structure is a brush installed between the inner transportation wheel and the outer transportation wheel, and the inner transportation unit includes a data line electrically connected to the brush.

7. The rotary tethered transportation system according to claim 5, characterized in that a dynamic seal ring is installed between the inner transport wheel and the outer transport wheel, forming a seal structure that isolates the annular fluid groove from the outside.

8. 2. The rotary tethered transportation system of claim 1, wherein a bearing is installed between the inner transportation wheel and the outer transportation wheel.

9. 10. The rotary tethered transportation system of claim 1, further comprising a rotating platform, said rotating platform connected to each outer transport wheel.

Citation Information

Patent Citations

  • A bearing structure and a floating vessel comprising such structure

    EP0207915A1

  • Ship-shaped floating type oil production system

    JP1999321780A

  • Turret mooring system with product swivel stack

    US5823837A

  • A connector assembly and a connector body for offshore transfer of fluid

    WO2002092423A1