Simulation device, simulation method, simulation system and program
The simulation device uses a step-up circuit and capacitor to boost and store power, addressing the challenge of simulating circuits with power generation elements that output less than the load circuit's consumption, ensuring accurate simulation results.
Patent Information
- Application Number
- JP2021064752
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-04-06
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-04-06
AI Technical Summary
Conventional simulation models fail to accurately simulate electric circuits when the power output by power generation elements is smaller than the power consumption of the load circuit.
A simulation device that includes a step-up circuit to boost power from a power generation element, a capacitor to store and accumulate charge, and a model creation unit to create a simulation model of the test circuit, enabling simulation of charging and discharging operations.
Enables appropriate simulation even when the power output by the power generation element is smaller than the power consumption of the load circuit, allowing for accurate simulation of circuit operations.
Smart Images

Figure 0007588542000002 
Figure 0007588542000003 
Figure 0007588542000004
Abstract
Description
[Technical field]
[0001] The present invention relates to a simulation device, a simulation method, a simulation system, and a program. [Background technology]
[0002] Conventionally, devices for simulating electric circuits have been known. Patent Document 1 discloses a power simulation device that simulates a sensor system including a power generating element boost circuit and a load circuit based on a model of the power generating element, boost circuit, and load circuit. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-122151 A Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, power generating elements have become smaller, and power generating elements with smaller output power than before are also being used. When the power that the power generating element can output is smaller than the power consumption of the load circuit, it is not possible to perform an appropriate simulation with the conventional model.
[0005] Therefore, an object of the present invention is to make it possible to perform an appropriate simulation even when the power that the power generating element can output is smaller than the power consumption of the load circuit. [Means for solving the problem]
[0006] A simulation device according to a first aspect of the present invention includes: The test circuit includes: (1) a boost circuit that receives power from a power generation element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that is a boost of the input power to the load circuit; (2) a capacitor that is provided between the power generation element and the boost circuit, that accumulates charge based on the input power from the power generation element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a model creation unit that creates a simulation model of a test circuit that includes at least one of the power generation element or the load circuit, and a simulation unit that is capable of simulating at least one of (A) a charging operation for the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model.
[0007] A simulation method of a second aspect of the present invention includes the steps of: creating a simulation model of a test circuit including: (1) a boost circuit that receives power from a power generation element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generation element and the boost circuit, that accumulates charge based on the input power from the power generation element and is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) at least one of the power generation element or the load circuit, and simulating at least one of (A) a charging operation to the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model.
[0008] A simulation system according to a third aspect of the present invention includes an information terminal and a simulation device. The information terminal includes a data transmission unit that transmits to the simulation device power generating element characteristic data indicating electrical characteristics of a power generating element capable of outputting power smaller than the power consumption of a load circuit, and a display unit that displays a result of a simulation performed by the simulation device. The simulation device includes a data acquisition unit that acquires the power generating element characteristic data, (1) a boost circuit that receives power from the power generating element capable of outputting power smaller than the power consumption of the load circuit and outputs a boosted voltage obtained by boosting the input power to the load circuit, and (2) a boost circuit that outputs a boosted voltage to the power generating element. (3) a capacitor provided between a power generating element and the boost circuit, storing an electric charge based on the input power from the power generating element and capable of operating the boost circuit for a certain period of time using the stored electric charge; (4) a model creation unit that creates a simulation model of a test circuit including at least one of the power generating element or the load circuit; a simulation unit that is capable of simulating at least one of (A) a charging operation of the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model; and a communication unit that transmits the results of the simulation by the simulation unit to the information terminal.
[0009] A fourth aspect of the program of the present invention causes a computer to execute the steps of: creating a simulation model of a test circuit including: (1) a boost circuit that receives power from a power generation element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generation element and the boost circuit, that accumulates charge based on the input power from the power generation element and is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) at least one of the power generation element or the load circuit; and simulating at least one of (A) a charging operation to the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model. Effect of the Invention
[0010] According to the present invention, an effect is achieved in that an appropriate simulation can be performed even when the power that the power generating element can output is smaller than the power consumption of the load circuit. [Brief description of the drawings]
[0011] [Figure 1] 1 is a schematic diagram of an electrical system that is a target for simulation by a simulation device according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a schematic diagram of a simulation system including a simulation device. [Diagram 3] FIG. 1 is a diagram illustrating a configuration of a simulation device. [Figure 4] FIG. 2 is a schematic diagram of a simulation model created by a model creation unit. [Diagram 5] FIG. 11 is a diagram showing an example of a result of a simulation performed by a simulation unit; [Figure 6] 4 is a flowchart showing a flow of operations of the simulation device. [Figure 7] FIG. 11 is a schematic diagram of a simulation model according to a first modified example. [Figure 8] FIG. 13 is a schematic diagram of a simulation model according to a second modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] [Outline of simulation device 1] Fig. 1 is a schematic diagram of an electric system S that is a target for simulation by a simulation device 1 according to this embodiment. Fig. 3 is a schematic diagram of a simulation system T including the simulation device 1.
[0013] The electric system S includes a power generating element 100, a conversion circuit 200, and an electronic device 300. In the electric system S, the voltage of the power generated by the power generating element 100 is converted in the conversion circuit 200, and the power of the converted voltage is supplied to the electronic device 300. The simulation apparatus 1 simulates the operation of the electric system S in which the power generated by the power generating element 100 is converted in the conversion circuit 200, and the power of the converted voltage is supplied to the electronic device 300.
[0014] The simulation device 1 is, for example, a computer that executes a simulation program. The simulation device 1 executes at least one of an input side simulation corresponding to the operation of a test circuit including at least one of the power generating element 100 and the conversion circuit 200, an output side simulation corresponding to the operation of a test circuit including at least one of the conversion circuit 200 and the electronic device 300, and a system simulation corresponding to the operation of a test circuit including at least one of the power generating element 100, the conversion circuit 200, and the electronic device 300.
[0015] The power generating element 100 is an element that generates weak power. The power generating element 100 is an element that can output power smaller than the power consumption of a load circuit of the electronic device 300. The power generating element 100 is an energy harvesting element such as an ultraviolet sensor, a sunlight sensor, a temperature sensor, a sugar sensor, a soil sensor, a sweat sensor, a water leakage sensor, an oil sensor, a gas sensor, a urine sensor, a plant sensor, a catalyst sensor, a vibration sensor, or an electromagnetic wave sensor.
[0016] The electronic device 300 includes a load circuit that operates based on the power supplied from the conversion circuit 200. The electronic device 300 is a device that can operate intermittently. The electronic device 300 is, for example, a microcomputer, a communication controller, a light-emitting diode, a buzzer, or a motor, and outputs a signal or operates a mechanism based on the supplied power. The electronic device 300 may be an electronic device having multiple load circuits.
[0017] The power generated by the power generating element 100 is, for example, 1 mW or less. The power consumption of the load circuit of the electronic device 300 is, for example, 10 mW or more. In the electric system S, the conversion circuit 200 accumulates the power generated by the power generating element 100 in a capacitor and then boosts the power. The capacitor accumulates the power generated by the power generating element 100 that is less than the input voltage that the conversion circuit 200 can boost, thereby increasing the voltage of the power input to the conversion circuit 200 until it becomes equal to or greater than the input voltage that the conversion circuit 200 can boost.
[0018] The conversion circuit 200 then supplies the boosted power to the electronic device 300. The electronic device 300 intermittently transmits radio waves and operates an actuator based on the boosted power. With the electrical system S configured in this way, the electronic device 300 can operate intermittently by the power generated by the power generating element 100, even though the power generated by the power generating element 100 is smaller than the power consumption of the load circuit of the electronic device 300.
[0019] However, in the past, in simulations of electric circuits including a power generating element, the operation in the case where the power generated by the power generating element 100 is stored in a capacitor and then boosted has not been taken into consideration. Therefore, in the past, it was not possible to perform an appropriate simulation when the power that the power generating element can output is smaller than the power consumption of the load circuit. The simulation device according to this embodiment makes it possible to perform an appropriate simulation when the capacitor provided between the power generating element 100 and the conversion circuit 200 and the power that the power generating element can output is smaller than the power consumption of the load circuit.
[0020] In order for the simulation device 1 to simulate the operation of the electrical system S, simulation models of the power generating element 100, the conversion circuit 200, and the electronic device 300 are required. For example, as shown in Fig. 2, the simulation device 1 acquires power generating element characteristic data indicating the electrical characteristics of the power generating element 100 via an information terminal 2 connected via a network N, and acquires device characteristic data indicating the electrical characteristics of the electronic device 300 via an information terminal 3 connected via the network N. The information terminal 2 and the information terminal 3 are, for example, a smartphone, a tablet, or a personal computer.
[0021] The information terminal 2 has, for example, a data transmission unit that transmits power generating element characteristic data of the power generating element 100 to the simulation apparatus 1, and a display unit that displays the results of the simulation by the simulation apparatus 1. The information terminal 3 may have a data transmission unit that transmits device characteristic data of the electronic device 300 to the simulation apparatus 1, and a display unit that displays the results of the simulation by the simulation apparatus 1.
[0022] The simulation device 1 creates a simulation model using at least a part of the acquired power generating element characteristic data and device characteristic data, and executes a simulation. The simulation device displays the results of the simulation on a display, or displays them on a computer such as the information terminal 2 or the information terminal 3. The configuration and operation of the simulation device will be described in detail below.
[0023] [Configuration of simulation device] 3 is a diagram showing a configuration of the simulation device 1. The simulation device 1 has an operation unit 11, a display unit 12, a communication unit 13, a storage unit 14, and a control unit 15. The control unit 15 has a data acquisition unit 151, a model creation unit 152, a simulation unit 153, and an output unit 154.
[0024] The operation unit 11 is a device for performing operations for a simulation by a user who uses the simulation device 1, and includes, for example, at least one of a keyboard, a mouse, and a touch panel. The operation unit 11 notifies the data acquisition unit 151 of the contents of the operations performed by the user.
[0025] The display unit 12 is a device, such as a display, that displays a screen for a user to perform various operations and a simulation result. The display unit 12 displays the simulation result output from the output unit 154.
[0026] The communication unit 13 includes a communication interface for transmitting and receiving data to and from an external device via a network such as the Internet or an intranet. The communication unit 13 receives power generating element characteristic data indicating electrical characteristics of the power generating element 100 from an information terminal 2 used by, for example, a user, a seller, or a manufacturer of the power generating element 100. The communication unit 13 may receive power generating element characteristic data measured in an element measuring circuit connected to the network and the power generating element 100 from the element measuring circuit. The element measuring circuit is a circuit for measuring electrical characteristics of the power generating element 100 in a state in which the power generating element 100 to be simulated is operated. The element measuring circuit may include a communication circuit for transmitting the power generating element characteristic data. The information terminal 2 may function as the element measuring circuit.
[0027] The communication unit 13 may also receive device characteristic data indicating electrical characteristics of the electronic device 300 from the information terminal 3 used by a user, a seller, a manufacturer, or the like of the electronic device 300. The communication unit 13 may receive device characteristic data indicating electrical characteristics of the electronic device 300 measured in a device measurement circuit connected to a network and the electronic device 300 from a device measurement circuit. The device measurement circuit is a circuit for measuring electrical characteristics of the electronic device 300 in a state in which the electronic device 300 to be simulated is operated. The device measurement circuit may include a communication circuit for transmitting the device characteristic data. The information terminal 3 may function as the device measurement circuit. The communication unit 13 inputs the received device characteristic data to the data acquisition unit 151.
[0028] Furthermore, the communication unit 13 transmits the simulation result output by the output unit 154 to an external device. The communication unit 13 transmits the simulation result to, for example, a computer that has transmitted the power generating element characteristic data indicating the electrical characteristics of the power generating element 100 and a computer that has transmitted the device characteristic data indicating the electrical characteristics of the electronic device 300.
[0029] The storage unit 14 includes a storage medium such as a ROM (Read Only Memory), a RAM (Random Access Memory), or a hard disk. The storage unit 14 stores a program executed by the control unit 15. The storage unit 14 also stores a simulation model used when the control unit 15 executes a simulation.
[0030] The storage unit 14 also stores a model database in which a plurality of electrical characteristics of a plurality of power generating elements 100 are associated with a plurality of model candidates of the power generating elements 100. The model candidate of the power generating element 100 is composed of an equivalent circuit of the power generating element 100 and constants of a plurality of elements included in the equivalent circuit. In the model database, at least one of the type name and electrical characteristics of the power generating element 100 is associated with the model candidate. The electrical characteristics of the power generating element 100 are electrical characteristics of the power generating element 100 that are required when performing a simulation, and include, for example, the output resistance, output current, or output voltage of the power generating element 100.
[0031] In the model database, a plurality of electrical characteristics of the plurality of electronic devices 300 may be further associated with a plurality of electronic device model candidates. The electronic device model candidate is configured by an equivalent circuit of the electronic device 300 and constants of a plurality of elements included in the equivalent circuit. The electrical characteristics of the electronic device 300 are electrical characteristics of the electronic device 300 that are required when performing a simulation, and include, for example, the input resistance, current consumption, or required input voltage of the electronic device 300.
[0032] The control unit 15 includes, for example, a CPU (Central Processing Unit). The control unit 15 executes the programs stored in the storage unit 14 to function as a data acquisition unit 151, a model creation unit 152, a simulation unit 153, and an output unit 154.
[0033] The data acquisition unit 151 acquires power generating element characteristic data indicating electrical characteristics of the power generating element 100 via the communication unit 13. The data acquisition unit 151 notifies the acquired power generating element characteristic data to the model creation unit 152. The data acquisition unit 151 may notify the model creation unit 152 of the power generating element characteristic data by storing the power generating element characteristic data in the storage unit 14.
[0034] As an example, the data acquiring unit 151 acquires, via the network, power generating element characteristic data measured in an element measuring circuit connected to the network and the power generating element 100. The data acquiring unit 151 acquires, for example, power generating element characteristic data indicating the relationship between the output voltage and the output current of the power generating element 100. By acquiring the power generating element characteristic data measured in the element measuring circuit, the simulation device 1 can perform a simulation based on the electrical characteristics of the power generating element 100 in an environment in which the power generating element 100 is actually used, thereby improving the accuracy of the simulation. In particular, by creating a model of the power generating element 100 including the power generating element characteristic data indicating the relationship between the output voltage and the output current of the power generating element 100, the charging current value from the power generating element 100 for each charging voltage of the capacitor provided between the power generating element 100 and the conversion circuit 200 can be accurately reproduced. Therefore, the accuracy of the simulation in which the charging of the capacitor provided between the power generating element 100 and the conversion circuit 200 is performed with the power generated by the power generating element can be significantly improved.
[0035] The data acquiring unit 151 may acquire, via the network, device characteristic data indicating electrical characteristics of the electronic device 300 measured in a device measuring circuit connected to the network and the electronic device 300. The data acquiring unit 151 acquires, as device characteristic data, an operation time of the electronic device at a predetermined time and a current profile indicating the relationship between time and an input current. By acquiring the device characteristic data obtained by using the device measuring circuit, the simulation apparatus 1 can perform a simulation based on the electrical characteristics of the electronic device 300 in an environment in which the electronic device 300 is actually used, thereby improving the accuracy of the simulation.
[0036] Here, when modeling the electronic device 300, an average current consumption during operation of the electronic device 300 may be calculated, and a resistive element model having a resistance value corresponding to this average current consumption may be used. That is, the model creation unit 152 creates a simulation model of the electronic device 300 by replacing the electronic device 300 with a resistive element having a resistance value corresponding to the average current consumption of the electronic device. This prevents the simulation based on the electrical characteristics of the electronic device 300 from becoming complicated, and is expected to reduce the simulation time and improve the simulation accuracy. Note that, in the electronic device 300 that performs intermittent operation based on normal operation (OPE) / standby (STANDBY), its average current consumption (I AVE ) is I OPE = Current consumption during normal operation, I STANDBY = Standby current consumption, T OPE = normal operating time, T STANDBY = standby operation time, which can be calculated using the following formula:
number
[0037] The model creation unit 152 creates a simulation model for simulating the operation of the test circuit in a state where the power generating element 100 and the conversion circuit 200 are connected. The model creation unit 152 creates a simulation model of the test circuit including the power generating element 100, a boost circuit that outputs a boosted voltage generated by boosting the power output by the power generating element 100 to a load circuit, and a capacitor provided between the power generating element 100 and the boost circuit. The model creation unit 152 may create a simulation model for simulating the operation in a state where the electronic device 300 is further connected.
[0038] That is, the model creation unit 152 creates a simulation model of a test circuit including: (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of the load circuit and outputs a boosted voltage obtained by boosting the input power to the load circuit; (2) a capacitor that is provided between the power generating element 100 and the boost circuit and that is capable of storing charge based on the input power from the power generating element and operating the boost circuit for a certain period of time using the stored charge; and (3) at least one of the power generating element 100 and the load circuit. The model creation unit 152 may create a simulation model in which the boost circuit is operated intermittently multiple times, or may create a simulation model in which the boost circuit is operated only once. The model creation unit 152 may create a simulation model by setting a numerical value acquired by the data acquisition unit 151 via the operation unit 11 or the communication unit 13 to a simulation model previously stored in the storage unit 14.
[0039] The model creation unit 152 inputs the created simulation model to the simulation unit 153. The model creation unit 152 may store the created simulation model in the storage unit .
[0040] 4 is a schematic diagram of a simulation model created by the model creation unit 152. The model creation unit 152 creates a model including a current source Io and an output resistance Ro as a simulation model of the power generating element 100. The model creation unit 152 creates a simulation model of the power generating element 100 based on, for example, the power generating element characteristic data of the power generating element 100 acquired by the data acquisition unit 151. Specifically, the model creation unit 152 refers to a model database stored in the storage unit 14 and creates the simulation model of the power generating element 100 by selecting, from a plurality of model candidates of the power generating element 100, a model candidate of the power generating element 100 corresponding to the electrical characteristics indicated by the power generating element characteristic data acquired by the data acquisition unit 151.
[0041] 4, the model creation unit 152 creates a simulation model of the conversion circuit 200 including a capacitor Co and a boost circuit 201. The model creation unit 152 creates the simulation model of the conversion circuit 200 by determining a constant of the capacitor Co for enabling the boost circuit 201 to boost the power of the voltage G(Vo) input from the power generating element 100 to a predetermined voltage H(Vo) based on, for example, the electrical characteristics of the power generating element 100. The model creation unit 152 may create the simulation model of the conversion circuit 200 by using a model candidate selected from a plurality of model candidates for the boost circuit 201.
[0042] The model creation unit 152 may create a simulation model of a test circuit in which the power generated by the power generating element 100 is smaller than the drive power of the boost circuit 201, and the power that can be stored in the capacitor Co is greater than the power generated by the power generating element 100 for a certain period of time based on the drive power required to operate the boost circuit 201 for the certain period of time. The model creation unit 152 may also create a simulation model of a test circuit in which the power that can be stored in the capacitor Co is greater than the drive power required to operate a load circuit for a certain period of time.
[0043] The model creation unit 152 may create a simulation model of the conversion circuit 200 further based on the electrical characteristics of the electronic device 300. The model creation unit 152 creates, for example, a simulation model of the conversion circuit 200 capable of outputting a voltage that satisfies the current consumption and required input voltage of the electronic device 300. Specifically, the model creation unit 152 may create the simulation model of the conversion circuit 200 by determining a constant of a capacitor Co that enables the boost circuit 201 to output the current consumption of the electronic device 300.
[0044] The model creation unit 152 may create a simulation model including a boost circuit 201 that starts operating when a voltage equal to or greater than a predetermined first threshold voltage is input from the capacitor Co, and stops operating when the output voltage of the capacitor Co drops to a second threshold voltage lower than the first threshold voltage. When the output voltage of the capacitor Co becomes equal to or greater than the first threshold voltage while not yet in operation, the boost circuit 201 generates power to be output to the electronic device 300 and performs a boost operation using the generated power. By configuring the boost circuit 201 in this way, even if the voltage of the capacitor Co becomes less than the first threshold voltage, the boost circuit 201 can continue operating until the voltage becomes less than the second threshold voltage.
[0045] The capacitance of the capacitor Co is arbitrary, but as an example, when the electronic device 300 has a BLE (Bluetooth Low Energy, registered trademark) circuit and the circuit needs to operate for 0.5 seconds, the capacitance of the capacitor Co is, for example, 5 mF. This capacitance is far larger than the capacitance of the order of μF when the capacitor Co is used as a bypass capacitor for removing noise.
[0046] Furthermore, the model creation unit 152 may create a simulation model of the electronic device 300. For example, as shown in Fig. 4, the model creation unit 152 creates a simulation model of the electronic device 300 including an input resistance Ra and a control circuit 301. The control circuit 301 generates, for example, a pulse signal indicating the timing of operating the electronic device 300, and outputs a signal of a voltage Va during the period in which the pulse signal is generated. The electronic device 300 consumes a current Ia determined based on the voltage Va during the period in which the control circuit 301 outputs the voltage Va.
[0047] The simulation unit 153 simulates the operation of the boost circuit 201 and the capacitor Co due to the power generated by the power generating element 100, based on the simulation model created by the model creation unit 152. The simulation unit 153 creates image data of a waveform indicating at least one of the output voltage or output current of the conversion circuit 200, for example. The simulation unit 153 may create image data indicating the relationship between at least one of the input voltage or input current of the boost circuit 201 and at least one of the output voltage or output current of the boost circuit 201. The simulation unit 153 inputs the created image data to the output unit 154. The output unit 154 displays the input image data on the display unit 12, or transmits it to an external device via the communication unit 13.
[0048] The simulation unit 153 simulates the operation of charging the capacitor Co with the power generated by the power generating element 100 while supplying a portion of the power charged in the capacitor Co to the electronic device 300, based on a simulation model that connects a model of the power generating element 100, a model of the capacitor Co, and an electronic device model corresponding to the electrical characteristics of the electronic device 300.
[0049] The simulation unit 153, for example, simulates an operation of charging a capacitor Co having a capacity determined based on electrical characteristics indicated by the power generating element characteristic data acquired by the data acquisition unit 151. The simulation unit 153 may perform a simulation based on a simulation model including a capacitor Co having a capacity determined based on electrical characteristics of an electronic device 300 used in connection with a conversion circuit 200, which is an electronic circuit corresponding to the simulation model. By simulating an operation of charging the capacitor Co having a capacity determined in this manner, a user who uses the power generating element 100 and the electronic device 300 can determine whether the determined capacity of the capacitor Co is appropriate.
[0050] Fig. 5 is a diagram showing an example of a result of a simulation performed by the simulation unit 153. Fig. 5 shows a first waveform indicating the operating state of the conversion circuit 200, a second waveform indicating the amount of power stored in the capacitor Co, and a third waveform indicating the operating current of the load circuit of the electronic device 300.
[0051] The period when the first waveform is at a low level (the period from time T1 to time T2) is a storage period in which the power output by the power generating element 100 is stored, and the amount of stored power indicated by the second waveform increases over time. The period when the first waveform is at a high level (the period from time T2 to time T3) is a discharge period in which the power stored in the capacitor Co of the conversion circuit 200 is discharged.
[0052] During the charge period, the power generated by the power generating element 100 is stored in the capacitor Co, and the boost circuit 201 does not consume the stored power. During the discharge period, the boost circuit 201 consumes the power stored in the capacitor Co. During the discharge period, the load circuit operates and a load current flows as shown in the third waveform, so that the amount of stored power shown in the second waveform decreases over time. By checking the waveforms shown in FIG. 5, the user can determine whether or not the electronic device 300 can be operated using the power generating element 100 and the conversion circuit 200 for which the simulation has been performed. The output unit 154 may output information indicating whether or not the electronic device 300 can be operated using the power generating element 100 and the conversion circuit 200 for which the simulation has been performed.
[0053] The simulation unit 153 may simulate an operation of outputting power to the electronic device 300 after the output voltage of the capacitor Co becomes equal to or higher than the first threshold and the boost circuit 201 starts an operation of boosting the output power of the capacitor Co. In this case, the simulation unit 153 may stop the simulation and notify the output unit 154 that an error has occurred when the output power of the capacitor Co is less than the first threshold. For example, the simulation unit 153 stops the simulation when, as a result of the simulation, the voltage across the capacitor Co at the time when the power output by the power generating element 100 is accumulated in the capacitor Co over a non-operation period when the electronic device 300 operates intermittently is less than the first threshold.
[0054] As described above, the first threshold is, for example, the minimum input voltage required for the boost circuit 201 to boost. The first threshold may be the minimum input voltage required for the boost circuit 201 to boost to a voltage required for operating the electronic device 300. The output unit 154 outputs error information indicating that the voltage cannot be boosted to a voltage required for operating the electronic device 300. By the simulation unit 153 and the output unit 154 operating in this manner, the user can recognize that the voltage required for operating the electronic device 300 cannot be generated using the conversion circuit 200.
[0055] When the output voltage of the capacitor Co is less than the first threshold value as a result of the simulation, the simulation unit 153 may instruct the model creation unit 152 to change the capacitance of the capacitor Co in the simulation model. For example, the simulation unit 153 causes the model creation unit 152 to create a simulation model in which the capacitance of the capacitor Co is increased, and executes the simulation again using the created simulation model.
[0056] When the output voltage of the capacitor Co is less than the first threshold value as a result of the simulation, the simulation unit 153 may instruct the model creation unit 152 to change the period for storing the power output by the power generating element 100 in the simulation model. That is, the simulation unit 153 causes the model creation unit 152 to create a simulation model in which the capacity of the capacitor Co is increased to extend the period for storing the power output by the power generating element 100, and executes the simulation again using the created simulation model.
[0057] The simulation unit 153 may execute a plurality of simulations using the simulation model modified in this manner until the output voltage of the capacitor Co becomes equal to or greater than the first threshold value. By repeating such a simulation by the simulation unit 153, the user can determine parameters of the conversion circuit 200 suitable for operating the electronic device 300 using the power generating element 100.
[0058] If the simulation result shows that the current that the conversion circuit 200 can output is smaller than the current required to operate the electronic device 300, the simulation unit 153 may stop the simulation and notify the output unit 154 that an error has occurred. The output unit 154 outputs error information indicating that the conversion circuit 200 cannot output the current required to operate the electronic device 300. By the simulation unit 153 and the output unit 154 operating in this manner, the user can recognize that the conversion circuit 200 cannot output the current required to operate the electronic device 300.
[0059] The simulation unit 153 may simulate an operation in which, after the boost circuit 201 starts an operation of boosting the output power of the capacitor Co, the power stored in the capacitor Co decreases and the boost operation of the boost circuit 201 stops at the point in time when the output voltage of the capacitor Co becomes less than a second threshold value. When a simulation result is obtained in which the boost circuit 201 stops the boost operation before a period necessary for the operation of the electronic device 300 has elapsed, the simulation unit 153 may output error information indicating that the capacitance of the capacitor Co is insufficient.
[0060] When the simulation unit 153 obtains a simulation result that the boost circuit 201 stops boosting operation before the period required for the operation of the electronic device 300 has elapsed, the simulation unit 153 may cause the model creation unit 152 to create a simulation model in which the capacitance of the capacitor Co is increased, and may execute the simulation again using the created simulation model. In this case, the simulation unit 153 may repeat the simulation until the output voltage of the capacitor Co is maintained at or above the second threshold until the period required for the operation of the electronic device 300 has elapsed. By repeating such a simulation by the simulation unit 153, the user can determine the capacitance of the capacitor Co so that the conversion circuit 200 can output power for the time required for the operation of the electronic device 300 using the power generating element 100.
[0061] Fig. 6 is a flowchart showing the flow of the operation of the simulation device 1. The flowchart shown in Fig. 6 starts at the point when the data acquisition unit 151 acquires, via the operation unit 11 or the communication unit 13, an instruction to execute a simulation.
[0062] The data acquiring unit 151 acquires power generating element characteristic data of the power generating element 100. The data acquiring unit 151 acquires the power generating element characteristic data indicating the results of actual measurement of the electrical characteristics of the power generating element 100, for example, via the communication unit 13 (S11). The model creating unit 152 creates a model of the power generating element 100 based on the power generating element characteristic data acquired by the data acquiring unit 151 (S12).
[0063] When the model creation unit 152 acquires the device characteristic data of the electronic device 300 via the data acquisition unit 151 (YES in S13), it determines the capacitance value of the capacitor Co based on the power generating element identification data and the device characteristic data (S14). For example, the model creation unit 152 determines the capacitance value of the capacitor Co to be a capacitance value suitable for the boost circuit 201 to boost the voltage of the power output by the power generating element 100 to a voltage required by the electronic device 300. When the model creation unit 152 has not acquired the device characteristic data of the electronic device 300 (NO in S13), it determines the capacitance value of the capacitor Co based on the power generating element characteristic data (S15).
[0064] The model creation unit 152 creates a simulation model based on the determined capacitance value (S16). The model creation unit 152 creates the simulation model by determining the length of the period for storing electricity in the capacitor Co and the length of the period for discharging the capacitor Co based on, for example, device characteristic data of the electronic device 300. The simulation unit 153 executes a simulation using the simulation model created by the model creation unit 152 (S17).
[0065] [Input side simulation and output side simulation] In the above explanation, an example has been given of the case where the simulation apparatus 1 performs a simulation of the entire system consisting of the power generating element 100, the conversion circuit 200, and the electronic device 300. However, the simulation apparatus 1 may also perform a simulation of the operation of the power generating element 100 and the conversion circuit 200 (input side simulation), as well as a simulation of the operation of the conversion circuit 200 and the electronic device 300 (output side simulation).
[0066] When the data acquisition unit 151 receives an instruction to execute an input side simulation, the model creation unit 152 creates a simulation model of the power generating element 100 and the conversion circuit 200 based on the power generating element characteristic data indicating the electrical characteristics of the power generating element 100. The simulation unit 153 executes a simulation that outputs, for example, the output voltage of the power generating element 100, the voltage waveform across the capacitor Co when the power generating element 100 generates power, and the voltage waveform output by the conversion circuit 200. By the simulation device 1 executing such an input side simulation, the user can confirm what voltage the conversion circuit 200 outputs based on the power generated by the power generating element 100.
[0067] When the data acquisition unit 151 receives an instruction to execute an output side simulation, the model creation unit 152 creates a simulation model of the conversion circuit 200 and the electronic device 300 based on the device characteristic data of the electronic device 300. The simulation unit 153 executes a simulation of an operation of operating the electronic device 300 based on the power output by the conversion circuit 200. The simulation unit 153 executes a simulation to output, for example, a voltage waveform between both ends of the capacitor Co, an output voltage waveform of the boost circuit 201, and a waveform of a current flowing through the electronic device 300. By the simulation apparatus 1 executing such an output side simulation, the user can check whether the electronic device 300 operates based on the power supplied from the conversion circuit 200.
[0068] [First Modification] FIG. 7 is a schematic diagram of a simulation model according to a first modification. In a test circuit corresponding to the simulation model shown in FIG. 7, a conversion circuit 200a is included instead of the conversion circuit 200 shown in FIG. 4. The conversion circuit 200a is different from the schematic diagram of the simulation model shown in FIG. 4 in that a second capacitor C1 is provided between the boost circuit 201 and the electronic device 300 functioning as a load circuit, but is the same in other respects. In the simulation model, the power that can be stored in the capacitor Co is smaller than the driving power required to operate the electronic device 300 for a certain period of time, and the second capacitor C1 can store the power required to operate the electronic device 300 for a certain period of time. According to this configuration, even if the driving power (power consumption) of the electronic device 300 is relatively large, the simulation can be performed appropriately.
[0069] [Second modified example] FIG. 8 is a schematic diagram of a simulation model according to a second modified example. In a test circuit corresponding to the simulation model shown in FIG. 8, a conversion circuit 200b is included instead of the conversion circuit 200a shown in FIG. 7. In the conversion circuit 200b, a second boost circuit 202 is connected between the second capacitor C1 and the electronic device 300. When the second capacitor C1 is provided in the test circuit, the voltage for driving the second boost circuit 202 is higher than the voltage for driving the boost circuit 201, so that the capacitance of the second capacitor C1 may be smaller than the capacitance of the first capacitor Co. When the first capacitor Co is 5 mF, the second capacitor C1 is, for example, 680 μF. According to this configuration, even if the driving power (power consumption) of the electronic device 300 is relatively large, the simulation can be performed appropriately.
[0070] [Effects of simulation device 1] As described above, the model creation unit 152 creates a simulation model of a circuit including the power generating element 100 capable of outputting power smaller than the power consumption of the load circuit, the boost circuit 201 that outputs a boosted voltage generated by boosting the power output by the power generating element 100 to the electronic device 300, and the capacitor Co provided between the power generating element 100 and the boost circuit 201. Then, the simulation unit 153 simulates the operation of the boost circuit 201 using the power generated by the power generating element 100 based on the simulation model created by the model creation unit 152. Since the simulation device 1 is configured in this way, the simulation device 1 can simulate the operation when the power output by the power generating element 100 is boosted by the conversion circuit 200 even when the power that the power generating element 100 can output is smaller than the power consumption of the electronic device 300.
[0071] Although the present invention has been described above using the embodiments, the technical scope of the present invention is not limited to the scope described in the above embodiments, and various modifications and changes are possible within the scope of the gist of the present invention. For example, all or part of the device can be configured by distributing or integrating functionally or physically in any unit. In addition, new embodiments resulting from any combination of multiple embodiments are also included in the embodiments of the present invention. The effect of the new embodiment resulting from the combination combines the effect of the original embodiment. [Explanation of symbols]
[0072] 1 Simulation device 2. Information terminal 11 Control section 12 Display section 13. Communications Department 14 Storage section 15 Control section 100 Power generating element 151 Data Acquisition Section 152 Model Creation Department 153 Simulation Department 154 Output section 200 Conversion circuit 201 Boost circuit 202 Second boost circuit 300 Electronic Devices 301 Control circuit
Claims
1. (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generating element and the boost circuit, that accumulates charge based on the input power from the power generating element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a model creation unit that creates a simulation model of a circuit that includes the power generating element, the boost circuit, and the capacitor in a test circuit that includes the power generating element and the load circuit. A data acquisition unit that acquires power generating element characteristic data indicating electrical characteristics of the power generating element; a simulation unit capable of simulating at least one of (A) a charging operation to the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model; having the model creation unit refers to a database in which a plurality of electrical characteristics of the plurality of power generating elements is associated with a plurality of power generating element model candidates, and creates a model of the power generating element by selecting, from the plurality of power generating element model candidates, a power generating element model candidate corresponding to the electrical characteristics indicated by the power generating element characteristic data acquired by the data acquisition unit. Simulation device.
2. creating a simulation model of the test circuit, the power that can be stored in the capacitor being greater than a drive power required to operate the load circuit for the certain period of time; The simulation device according to claim 1 .
3. the model creation unit creates a simulation model of the test circuit including a second capacitor between the boost circuit and the load circuit, wherein power storable in the capacitor is smaller than a drive power required to operate the load circuit for the certain period of time, and the second capacitor is capable of accumulating the power required to operate the load circuit for the certain period of time. The simulation device according to claim 1 or 2.
4. the model creation unit creates the simulation model of the test circuit in which a second boost circuit is connected between the second capacitor and the load circuit. The simulation device according to claim 3.
5. The data acquisition unit acquires the power generating element characteristic data indicating a relationship between an output voltage and an output current of the power generating element. The simulation device according to claim 1 .
6. The data acquisition unit acquires, via the network, the power generating element characteristic data measured in an element measuring circuit connected to the network and the power generating element. The simulation device according to claim 1 .
7. the simulation unit simulates an operation of outputting power to an electronic device after the boost circuit boosts the output power when the output power of the capacitor is equal to or higher than a threshold value; The simulation device according to claim 1 .
8. the simulation unit performs a simulation based on the simulation model of the test circuit including the capacitor having a capacitance determined based on electrical characteristics of the load circuit used in connection with an electronic circuit corresponding to the simulation model; The simulation device according to claim 1 .
9. (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generating element and the boost circuit, that accumulates charge based on the input power from the power generating element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a model creation unit that creates a simulation model of a circuit that includes the boost circuit, the capacitor, and the load circuit, out of a test circuit that includes the power generating element and the load circuit. a data acquisition unit that acquires, via the network, characteristic data indicating electrical characteristics of the electronic device measured by a device measurement circuit connected to the network and the electronic device, the operation time of the electronic device at a predetermined time and a current profile indicating the relationship between time and an input current; a simulation unit that simulates an operation of charging the capacitor having a capacitance determined based on the electrical characteristics indicated by the characteristic data acquired via the network, based on the simulation model in the test circuit including the capacitor that is used by being connected to an electronic circuit corresponding to the simulation model; A simulation device having the above configuration.
10. the data acquisition unit calculates an average current consumption during operation of the electronic device based on an operation time of the electronic device and the current profile; the model creation unit creates a simulation model of the load circuit by replacing the electronic device with a resistive element having a resistance value corresponding to an average current consumption of the electronic device. The simulation device according to claim 9.
11. the model creation unit creates the simulation model of a circuit further including a model of the power generating element and an electronic device model corresponding to electrical characteristics of the electronic device; the simulation unit simulates an operation of supplying a portion of the power charged in the capacitor to the electronic device while charging the capacitor with power generated by the power generating element, based on the simulation model in which a model of the power generating element, a model of the capacitor, and the electronic device model are connected; The simulation device according to claim 9 or 10.
12. The computer executes (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generating element and the boost circuit, that accumulates charge based on the input power from the power generating element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a step of creating a simulation model of a circuit that includes the power generating element, the boost circuit, and the capacitor in a test circuit that includes the power generating element and the load circuit. acquiring power generating element characteristic data indicating electrical characteristics of the power generating element; simulating at least one of (A) a charging operation to the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model; creating a model of the power generating element by referring to a database in which a plurality of electrical characteristics of the power generating elements is associated with a plurality of power generating element model candidates, and selecting, from the plurality of power generating element model candidates, a power generating element model candidate corresponding to an electrical characteristic indicated by the acquired power generating element characteristic data; The simulation method includes:
13. The computer executes (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generating element and the boost circuit, that accumulates charge based on the input power from the power generating element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a step of creating a simulation model of a circuit that includes the boost circuit, the capacitor, and the load circuit out of a test circuit that includes the power generating element and the load circuit. acquiring, via the network, characteristic data indicating electrical characteristics of the electronic device measured by a device measurement circuit connected to the network and the electronic device, the operation time of the electronic device at a predetermined time and a current profile indicating the relationship between time and an input current; a step of simulating an operation of charging the capacitor having a capacitance determined based on the electrical characteristics indicated by the characteristic data acquired via the network, based on the simulation model in the test circuit including the capacitor used by being connected to an electronic circuit corresponding to the simulation model; The simulation method includes:
14. An information terminal and a simulation device according to any one of claims 1 to 11, The information terminal includes: a data transmission unit that transmits to the simulation device power generating element characteristic data indicating electrical characteristics of a power generating element capable of outputting power smaller than the power consumption of the load circuit; a display unit that displays a result of the simulation performed by the simulation device; A simulation system having the above configuration.
15. On the computer, (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generating element and the boost circuit, that accumulates charge based on the input power from the power generating element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a step of creating a simulation model of a circuit that includes the power generating element, the boost circuit, and the capacitor in a test circuit that includes the power generating element and the load circuit. acquiring power generating element characteristic data indicating electrical characteristics of the power generating element; simulating at least one of (A) a charging operation to the capacitor or (B) a discharging operation from the capacitor in the test circuit based on the simulation model; creating a model of the power generating element by referring to a database in which a plurality of electrical characteristics of the power generating elements is associated with a plurality of power generating element model candidates, and selecting, from the plurality of power generating element model candidates, a power generating element model candidate corresponding to an electrical characteristic indicated by the acquired power generating element characteristic data; A program for executing the above.
16. On the computer, (1) a boost circuit that receives power from a power generating element capable of outputting power smaller than the power consumption of a load circuit, and outputs a boosted voltage that boosts the input power to the load circuit; (2) a capacitor that is provided between the power generating element and the boost circuit, that accumulates charge based on the input power from the power generating element, and that is capable of operating the boost circuit for a certain period of time using the accumulated charge; and (3) a step of creating a simulation model of a circuit that includes the boost circuit, the capacitor, and the load circuit out of a test circuit that includes the power generating element and the load circuit. acquiring, via the network, characteristic data indicating electrical characteristics of the electronic device measured by a device measurement circuit connected to the network and the electronic device, the operation time of the electronic device at a predetermined time and a current profile indicating the relationship between time and an input current; a step of simulating an operation of charging the capacitor having a capacitance determined based on the electrical characteristics indicated by the characteristic data acquired via the network, based on the simulation model in the test circuit including the capacitor used by being connected to an electronic circuit corresponding to the simulation model; A program for executing the above.
Citation Information
Patent Citations
Load device
JP2013134619A
Power simulation apparatus and power simulation method
JP2019122151A
Electronic apparatus
JP2019144729A
Power supply system, power converting device, and control method
JP2021033878A
System and method for implementing virtual solar cell
US20050051209A1
