Method for Assembling and Deploying a Floating Offshore Wind Turbine Platform

The method of assembling a floating offshore wind turbine platform with a buoyant floater and negatively buoyant mass addresses inefficiencies in existing deployment techniques, achieving stable and cost-effective installation in deep waters by balancing buoyancy and gravity for reduced motion and enhanced stability.

JP7590012B2Active Publication Date: 2024-11-26UNIVERSITY OF MAINE
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2022562690
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-04-16
Publication Date
2024-11-26
Estimated Expiration
2040-04-16

AI Technical Summary

Technical Problem

Existing methods for assembling and deploying floating offshore wind turbine platforms are inefficient and costly, particularly due to the high expense of fixed foundations and the need for improved assembly and deployment techniques in deep waters.

Method used

A method involving a buoyant floater suspended by suspension lines with a negatively buoyant mass, where a hollow outer tank is floated, ballast material is added to define a mass body, and the platform is assembled by attaching a wind turbine, then towed to its mounting location with a mooring line, using a lift device to suspend the mass and adjust buoyancy for stable deployment.

Benefits of technology

Enables efficient and cost-effective assembly and deployment of floating offshore wind turbine platforms in deep waters, reducing motion and enhancing stability through a balanced center of gravity and buoyancy, suitable for various wind conditions and turbine sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007590012000001
    Figure 0007590012000001
  • Figure 0007590012000002
    Figure 0007590012000002
  • Figure 0007590012000003
    Figure 0007590012000003
Patent Text Reader

Abstract

A method of assembling and deploying a floating offshore wind turbine (FOWT) platform includes floating a buoyant floater and a hollow outer tank in a floating assembly, placing permanent ballast material in the outer tank to define a mass, and lowering the mass to the seabed of a body of water. The buoyant floater is moved to a position above the mass. Transit lines are attached between a lifting device in the buoyant floater and the mass to define the FOWT platform. The mass is lifted to a point just below the buoyant floater, and the FOWT platform is towed to an attachment location. Mooring lines are attached between anchors on the seabed and the buoyant floater, and the mass is lowered to a depth that puts suspension lines attached to the mass into tension, the mass together with the suspension lines defining a suspended mass. The transit lines are then stored or removed from the mass.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001]

[0001] The present invention relates generally to wind turbine platforms and, more particularly, to an improved method of assembling and deploying a floating offshore wind turbine (FOWT) platform in a body of water. [Background technology]

[0002]

[0002] Wind turbines are known for converting wind energy into electricity, providing an alternative energy source to power companies. On land, large groups of wind turbines, often numbering hundreds of wind turbines, may be located together in one geographic area. These large groups of wind turbines may generate undesirably high levels of noise and may be considered aesthetically undesirable. Obstacles such as hills, forests, and buildings may not allow optimal airflow to be available for these land-based wind turbines.

[0003]

[0003] Groups of wind turbines can also be located offshore, that is, locations close to the coast where the water depth allows the wind turbines to be fixedly attached to foundations on the seabed. Over the open ocean, the air flow over the wind turbines is less likely to be disturbed by the presence of various obstacles (i.e. hills, forests, buildings, etc.), which allows for higher average wind speeds and more power to be obtained. The foundations required to attach the wind turbines to the seabed in such coastal locations are relatively expensive and can only be realized at relatively shallow depths, such as a maximum depth of about 45 meters.

[0004]

[0004] The US National Renewable Energy Laboratory has determined that wind from the US coastline over waters with depths of 30 meters or more has an energy capacity of about 3,200 TWh / year. This is equivalent to about 90 percent of the total energy of the US, which is about 3,500 TWh / year. The majority of offshore wind sources are located between 37 and 93 kilometers offshore, where the water depth exceeds 60 meters. Fixed foundations for wind turbines at such depths are unlikely to be economically feasible. Due to these constraints, floating platforms for wind turbines have been developed. Known floating wind turbine platforms are formed of steel and are based on technology developed by the offshore oil and gas industry. However, improved methods of assembling and deploying FOWT platforms are still needed. Summary of the Invention

[0005]

[0005] The present invention generally relates to a method for assembling and deploying a floating offshore wind turbine (FOWT) platform and a wind turbine installed thereon. The FOWT platform described herein features a negatively buoyant mass suspended from a positively buoyant floater by a number of suspension lines. Specifically, the present invention relates to an improved method for assembling and deploying a floating offshore wind turbine (FOWT) platform, the method including: floating a hollow outer tank in a floating assembly area of ​​a body of water, the hollow outer tank having transit and suspension lines attached thereto; floating a buoyant floater in the floating assembly area of ​​the body of water; and placing permanent ballast material in the outer tank to define a mass and lowering the mass to the bottom of the body of water. The free ends of the transit and suspension lines are raised to the surface of the body of water using a buoy, and the buoyant floater is moved to a position above the mass. The transit lines are attached to a lifting device within the buoyant floater and the suspension lines are attached to a portion of the buoyant floater, with the combined buoyant floater and mass defining the FOWT platform. The mass is lifted with the lifting device to a point just below the buoyant floater and the FOWT platform is towed to an attachment location within the body of water. Mooring lines are attached to anchors on the seabed and to the buoyant floater. The mass is lowered with the transit lines and lifting device to a depth that puts the suspension lines in tension, thereby suspending the mass with the suspension lines, thereby defining a suspended mass. The transit lines are then stored or removed from the mass.

[0006]

[0006] The various aspects of this invention will become apparent to those skilled in the art from the following detailed description of the preferred embodiment when read in light of the accompanying drawings. [Brief description of the drawings]

[0007] [Figure 1] 1 is a perspective view of a floating offshore wind turbine platform assembled and deployed in accordance with the improved method of the present invention. [Diagram 2]

[0008] FIG. 2 is an alternative perspective view of the FOWT platform shown in FIG. 1 showing the suspended mass and the suspension lines connecting the suspended mass to the buoyant floater. [Diagram 3]

[0009] FIG. 3 is a cross-sectional view of the suspended mass shown in FIGS. 1 and 2. [Figure 4A]

[0010] FIG. 1 is a schematic diagram showing the first step of a first embodiment of the improved method of the present invention. [Figure 4B]

[0011] FIG. 2 is a schematic diagram showing the second step of the first embodiment of the improved method of the present invention. [Figure 4C]

[0012] FIG. 2 is a schematic diagram showing the third step of the first embodiment of the improved method of the present invention. [Figure 4D]

[0013] FIG. 2 is a schematic diagram showing the fourth step of the first embodiment of the improved method of the present invention. [Figure 4E]

[0014] FIG. 2 is a schematic diagram showing the fifth step of the first embodiment of the improved method of the present invention. [Figure 4F]

[0015] FIG. 2 is a schematic diagram showing the sixth step of the first embodiment of the improved method of the present invention. [Diagram 5]

[0016] FIG. 4 is a top view of a portion of the buoyant floater shown in FIGS. 1 to 3. [Figure 6]

[0017] FIG. 4 is a perspective view of an alternative embodiment of the suspended mass shown in FIGS. 1 to 3. [Figure 7]

[0018] FIG. 1 is a perspective view showing a buoyant floater subassembly. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008]

[0019] The present invention will now be described, as necessary, with reference to specific embodiments thereof. However, the present invention may be embodied in different forms and should not be construed as being limited to only the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.

[0009]

[0020] Referring to the drawings, and specifically to Figures 1 and 2, an embodiment of a floating offshore wind turbine (FOWT) foundation or platform is shown at 10. The FOWT platform 10 is shown secured to the bottom of a body of water BW. The FOWT platform 10 illustrates a FOWT platform that has been assembled and deployed in accordance with the improved methods of the present invention. In the embodiment shown, the FOWT platform 10 is shown secured to a seabed S. It should be understood that the seabed S may be the bottom of any body of water on which the FOWT platform 10 operates.

[0010]

[0021] The FOWT platform 10 shown has a buoyant floater 12 and a negatively buoyant mass 36 suspended from the buoyant floater 12. The buoyant floater 12 supports a tower 14, as will be described in detail below. The tower 14 supports a wind turbine 16. The FOWT platform 10 is structured and configured to be partially submerged and float in a body of water. Thus, when deployed to an operational draft with a portion of the buoyant floater 12 floating in the water, as will be described below, a portion of the buoyant floater 12 is above the water surface. As best shown in FIG. 1, a portion of the buoyant floater 12 is also below the waterline, as indicated by a line WL on the center column 26, as will be described below. The waterline WL, as shown herein, is defined as the approximate line where the surface of the water intersects with the FOWT platform 10. One or more mooring lines 18, two of which are shown in FIG. 1, may be attached to the FOWT platform 10 and may further be attached to anchors, such as anchor 20 in the seabed S, thereby limiting movement of the FOWT platform 10 over the body of water BW.

[0011]

[0022] The buoyant floater 12 shown is formed from four pontoons 22 that extend radially outward from a central hub 24 to provide buoyancy. It should be understood that the buoyant floater 12 is configured to provide the primary source of buoyancy for the FOWT platform 10. When assembled together, the pontoons 22 and the central hub 24 define a generally cross-shaped base 25. A central column 26 is mounted to the central hub 24 and extends outwardly (upward as viewed in FIGS. 1 and 2) perpendicular to the pontoons 22, also providing buoyancy. In addition, the central column 26 supports the tower 14, which is attached to the central column 26. Optionally, a brace 28 can connect the distal ends of the pontoons 22 to an upper portion of the central column 26. Each pontoon 22 can be attached to one of the anchors 20 with one of the mooring lines 18.

[0012]

[0023] The pontoons 22 shown have a rectangular cross-sectional shape. Alternatively, the pontoons 22 may have other shapes, such as, but not limited to, cylindrical, conical, and tubular having other desired geometric cross-sectional shapes, such as pentagonal or hexagonal.

[0013]

[0024] If desired, a catwalk or access platform (not shown) may be attached to the upper portion of the central column 26. Additionally, one or more access ladders (not shown) may be installed on the interior or exterior of the central column 26.

[0014]

[0025] In the embodiment shown herein, the wind turbine 16 is a horizontal axis wind turbine. The size of the wind turbine 16 will vary based on the wind conditions at the location where the FOWT platform 10 is secured and the desired power output. Advantageously, it has been found that the illustrated FOWT platform 10 is ideally suited to support a conventional commercial offshore wind turbine 16 having a power output within the range of about 6 MW to about 20 MW. Alternatively, the FOWT platform 10 may be configured to support wind turbines 16 that may have a power output less than about 6 MW and greater than about 20 MW.

[0015]

[0026] The wind turbine 16 has a rotatable hub 30. At least one rotor blade 32 is coupled to and extends outwardly from the hub 30. The hub 30 is rotatably coupled to a generator (not shown). The generator may be coupled to a power grid (not shown) via a transformer (not shown) and an underwater power cable (not shown), as shown in FIG. 1. In the embodiment shown, the rotor has three rotor blades 32. In other embodiments, the rotor may have more than three or less than two rotor blades 32. A nacelle 34 is attached to the wind turbine 16 opposite the hub 30. In the embodiment shown herein, the wind turbine 16 is a horizontal-axis wind turbine (HAWT). Alternatively, the FOWT platform 10 may be configured to have a vertical-axis wind turbine (VAWT) mounted thereon.

[0016]

[0027] Referring to Figure 1, a negatively buoyant mass 36 is shown suspended from a buoyant floater 12 by a number of suspension lines 38. Advantageously, the mass 36 has a simple design including a housing or outer tank 40 having a cylindrical wall 42 surrounded by a first axial end wall 44 (upper wall as viewed in Figures 1 to 3) and a second axial end wall 46 (lower wall as viewed in Figures 1 to 3). The outer tank 40 shown is preferably formed from reinforced concrete and has a diameter of 15.15m and a height of 11.94m. The interior of the outer tank 40 has a permanent ballast space in its lower portion adapted to hold permanent ballast material 48 and a variable ballast space 50 in its upper portion. As best shown in Figure 2, four rigging conductors 52 are mounted to the first end wall 44. Alternatively, the outer tank 40 may have more than four rigging conductors 52, may have three rigging conductors 52, or may have two rigging conductors 52. In addition, the first end wall 44 may have only one centrally located rigging conductor 52, as shown in FIG. 6. The mass 36 shown has a cylindrical shape. Alternatively, the mass 36 may have other shapes, such as a sphere or a cylinder with a hemispherical lower portion.

[0017]

[0028]

[0029] The permanent ballast material 48 may be any desired material, such as iron ore or other material selected to obtain the desired predetermined mass required to maintain balance between gravity and buoyancy of the assembled FOWT platform 10 as a complete system.

[0018]

[0030] The suspension lines 38 attaching the mass 36 to the buoyant floater 12 may be formed from synthetic ropes, chains, cables such as steel cables, and steel tubing structures. As shown in FIG. 2, the mass 36 is attached to each pontoon 22 by two suspension lines 38 for a total of eight suspension lines 38. The mass 36 may be attached to each pontoon 22 by a single suspension line 38 or by three or more suspension lines 38. When the FOWT platform 10 is fully deployed in the body of water BW as described in detail below, each suspension line 38 has a length sufficient to suspend the mass 36 approximately 75.10 m below the buoyant floater 12. The mass 36 may have a pump (not shown) for removing seawater from the variable ballast space 50.

[0019]

[0031] The distance that the mass 36 may be suspended below the buoyant floater 12 will vary based on the size of the buoyant floater 12 and the size of the wind turbine 16 and the tower 14 supported on the wind turbine 16. For example, in an alternative embodiment of the FOWT platform 10, the mass 36 may be suspended approximately 40 m below the lower surface of the buoyant floater 12.

[0020]

[0032] The central hub 24 shown is hollow and has four side walls, each having a width of about 10.98 m and an axial length or height of about 8.53 m. Each side wall of the central hub 24 defines a substantially vertical connection surface to which the pontoons 22 will be attached. In the embodiment shown, the central hub 24 has four side walls and has a substantially square cross-sectional shape. The four side walls are surrounded by a first axial end wall 24A (upper side wall as viewed in FIGS. 1 and 2) and a second axial end wall (lower side wall as viewed in FIGS. 1 and 2). Alternatively, the central hub 24 may have other configurations, such as three side walls for mounting the three pontoons 22. The central hub 24 may further have an internal watertight bulkhead for strength and / or to define a variable water ballast chamber (not shown).

[0021]

[0033] The central hub 24 shown may be formed from prestressed reinforced concrete and may have an internal central cavity (not shown). Any desired process may be used to manufacture the central hub 24, such as a spun concrete process using conventional or reusable concrete forms in a semi-automated process utilized in the precast concrete industry. The concrete of the central hub 24 may be reinforced with any conventional reinforcing material, such as high tensile steel cables and high tensile steel reinforcing bars, or REBARs. Alternatively, the central hub 24 may be formed from FRP, steel, or a combination of prestressed reinforced concrete, FRP, and steel. The central hub 24 may be formed in multiple sections, as described below.

[0022]

[0034] Each pontoon 22 is also hollow and has a width of 10.98 m, a height of 8.53 m, and a length of 27.08 m. Like the central hub 24, the pontoons 22 shown are formed from prestressed reinforced concrete as described above. Alternatively, the pontoons 22 may be formed from FRP, steel, or a combination of prestressed reinforced concrete, FRP, and steel. The pontoons 22 may be formed in multiple sections, as will be described later.

[0023]

[0035] The central column 26 is hollow and has a diameter of 10.44 m and a height of 26.5 m. The central column 26 has a cylindrical side wall 27 with an outer surface, a first axial end wall 26A (upper wall as viewed in FIGS. 1 and 2) and a second axial end wall 26B (lower wall as viewed in FIGS. 1 and 2) and defines a hollow interior space (not shown). The hollow central column 26 may have lateral bulkheads or decks configured and positioned for strength or for locating electrical and mechanical components of the FOWT platform 10.

[0024]

[0036] The central column 26 shown, like the central hub 24 and pontoons 22, is formed from prestressed reinforced concrete, as described above. Alternatively, the central column 26 may be formed from FRP, steel, or a combination of prestressed reinforced concrete, FRP, and steel. The central column 26 may be formed in multiple sections, as described below. The braces 28 shown are formed from steel.

[0025]

[0037] The pontoons 22 provide a source of buoyancy and define the waterline area when the buoyant floater 12 is towed through the body of water BW. Although not shown, each pontoon 22 may have transverse watertight bulkheads and longitudinally extending bulkheads for watertight stability, and a deck arranged perpendicular to the sidewalls of the pontoons 22 for strength. In addition, an internal bulkhead within each pontoon 22 may define a ballast chamber (not shown) for variable water ballast.

[0026]

[0038] The FOWT platform 10 shown has four pontoons 22. However, a FOWT platform 10 assembled in accordance with the improved methods of the present invention may be constructed with three pontoons 22 or with five or more pontoons 22.

[0027]

[0039] Advantageously, a temporary transit line 56 and a lifting device, such as a winch or chain jack, generally indicated at 58, movably connect the mass 36 to the buoyant floater 12 during deployment or redeployment, as will be described later. The transit line 56 may be a length of chain or cable, such as a steel cable. As best shown in Figures 4E and 5, the transit line 56 connects the mass 36 to the buoyant floater 12 via a winch or chain jack 58. The chain jack 58 may be installed at any desired location on or within the buoyant floater 12, such as on the first axial end wall 24A of the central hub 24, as shown in Figure 5. Alternatively, the chain jack 58 may be installed in the central hub 24 or on or within one or more of the pontoons 22.

[0028]

[0040] As mentioned above, the mass 36 and each of the components of the buoyant floater 12, namely the central hub 24, the pontoons 22, and the central column 26, may be formed from concrete and may have cross-sectional shapes other than those shown.

[0029]

[0041] The buoyant floater 12, including the mass 36 and the individual components of the buoyant floater 12, may be formed in a variety of sizes, which will be determined by the size of the wind turbine 16 and the tower 14 supported on the wind turbine 16.

[0030]

[0042] In a first embodiment of a method of forming the mass 36 and buoyant floater 12, the outer tank 40 may be formed, i.e., precast, as one large monolithic section, or may be formed as two or more sections (not shown). Such sections may then be post-tensioned together during assembly of the outer tank 40. Similarly, the central hub 24 may be formed, i.e., as one large monolithic section, or may be formed as two or more sections (not shown), but preferably no more than four sections. Such sections may then be laterally post-tensioned together (i.e., transversely to their axial length) during assembly of the central hub 24.

[0031]

[0043] The pontoons 22 may be formed in multiple sections, such as sections having lengths of about 3 meters. Thus, in one exemplary embodiment, each pontoon 22 may be formed in nine sections. As will be described later, the pontoons 22 may be longitudinally post-tensioned in pairs after each of the pair of pontoons 22 is assembled to the central hub 24.

[0032]

[0044] The central column 26 may similarly be formed in multiple sections, such as sections having lengths of about 3 meters. Thus, in one exemplary embodiment, the central column 26 may be formed in about nine sections. As will be described later, the central column 26 may be longitudinally post-tensioned.

[0033]

[0045] A first embodiment of a method for assembling and deploying a buoyant floater 12 includes forming and assembling a plurality of pontoons 22, a central hub 24, a central column 26, a mass 36, and braces 28 at an onshore location by any of the methods described herein. Two of the pontoons 22 may then be assembled to the central hub 24, and the assembled pontoons 22 and central hub 24 may be post-tensioned from a distal end of one of the pontoons 22 to a distal end of the other of the pontoons 22. A third pontoon 22 and a fourth pontoon 22 may then be assembled to the central hub 24, and may also be post-tensioned from a distal end of the third pontoon 22 to a distal end of the fourth pontoon 22.

[0034]

[0046] The central column 26 may then be assembled from sections on the first axial end wall 24A of the central hub 24 and longitudinally post-tensioned. Braces 28, if provided, may then be attached between the pontoons 22 and the central column 26. The tower 14 and wind turbine 16 may then be attached, thereby defining the buoyant floater 12. The buoyant floater 12 may be launched into the body of water B by any conventional method, such as using finger piers (not shown).

[0035]

[0047] For example, a pair of finger piers (not shown) may extend outwardly from the shoreline SL or dock (not shown). The buoyant floater 12 may be moved, such as by rails or other desired transport means, onto the finger piers such that portions of the buoyant floater 12 are supported on the distal ends of both finger piers and, further, above the surface of the body of water BW on the distal ends of the finger piers, such that portions of the buoyant floater 12 remain supported on the shoreline or dock from which the finger piers extend. A floating launching platform, such as a semi-submersible or launching boat (not shown), may be moved beneath the buoyant floater 12 between the finger piers. Once positioned beneath the buoyant floater 12, ballast is removed from the launching platform, causing it to rise in the body of water BW, and ultimately, the launching platform lifts the buoyant floater 12 off the finger piers and the shoreline, thereby carrying the buoyant floater 12 above the launching platform. The launching platform is then towed to the launching area in the body of water BW.

[0036]

[0048] Although the first embodiment of the method for assembling and deploying the buoyant floater 12 is described as taking place at a land location, it should be understood that the buoyant floater 12 may also be assembled in a dry dock if the dry dock is large enough to accommodate the assembled buoyant floater or any of its component parts or subassemblies, such as the assembled assembly of the two pontoons 22 and the central hub 24.

[0037]

[0049] A second embodiment of a method for assembling and deploying the buoyant floater 12 is performed in a dry dock (not shown) and includes forming and assembling two of the pontoons 22, assembling the central hub 24, assembling the pontoons 22 to the central hub 24, and post-tensioning the assembled pontoons 22 and central hub 24 from a distal end of one of the pontoons 22 to a distal end of the other of the pontoons 22 to define a buoyant floater subassembly 60 that is capable of floating completely on its own.

[0038]

[0050] Once assembled, the buoyant floater subassembly 60 may be launched from the drydock in a conventional manner and allowed to float in a floating assembly area (not shown), preferably near the drydock.

[0039]

[0051] The two additional pontoons 22 may then be assembled in the drydock and temporarily post-tensioned to provide structural integrity to the pontoons 22 before being assembled onto the buoyant floater subassembly 60. Once assembled, the two additional pontoons 22 may be launched from the drydock in a conventional manner and allowed to float in a floating assembly area (not shown) in which the buoyant floater subassembly 60 is located.

[0040]

[0052] Each of the two additional pontoons 22 is then coupled to and attached to an open wall of the central hub 24 of the buoyant floater subassembly 60. The two additional pontoons 22 and the central hub 24 are then post-tensioned from the distal end of one of the pontoons 22 to the distal end of the other of the pontoons 22 to define the buoyant floater 12.

[0041]

[0053] It should be appreciated that when floating, a portion of the buoyant floater subassembly 60 and a portion of the buoyant floater 12 remain above the waterline, as shown in Figure 7. It should further be appreciated that the step of post-tensioning the buoyant floater subassembly 60 and additional pontoons 22 to the buoyant floater subassembly 60 for the purpose of defining the buoyant floater 12 occurs above the waterline, and thus into the dry portions of the pontoons 22 and central hub 24.

[0042]

[0054] The central column 26 may then be formed in sections on land as described above and assembled onto the first axial end wall 24A of the central hub 24 and longitudinally post-tensioned while the buoyant floater 12 is floating in place such as along a dock. Braces 28 may then be attached between the pontoons 22 and the central column 26, again while the buoyant floater 12 is floating along a dock.

[0043]

[0055] The tower 14 and wind turbine 16 can then be mounted on the central column 26 while the buoyant floater 12 floats above the preferably submerged mass 36 as described above. Alternatively, if the depth of the body of water BW allows, ballast can be added to the buoyant floater 12 to temporarily move it to the seabed S for the purpose of mounting the tower 14 and wind turbine 16.

[0044]

[0056] The depth of the mass 36 is variable, thereby allowing a shallow tow-out draft of 10 m or less, comparable to a semi-submersible FOWT. Thus, the FOWT platform 10 has the mobility characteristics of a semi-submersible FOWT combined with the stability characteristics of a spars type platform.

[0045]

[0057] As configured in the embodiment described herein, the buoyant floater 12 has a pull-in or shallow draft of 7.53 m and the assembled FOWT platform 10 has an operating draft of 21.25 m.

[0046]

[0058] A first embodiment of a method for assembling and deploying the mass 36 includes forming, such as by casting, multiple sections (not shown) of the outer tank 40 at a land location. These sections may then be post-tensioned together. The assembled but empty outer tank 40 may then be launched into the body of water BW by any desired method and allowed to float in a floating assembly area (not shown) in which the buoyant floaters 12 are located.

[0047]

[0059] A second embodiment of a method for assembling and deploying the mass 36 involves forming the outer tank 40 as one large monolithic section at a land location using conventional slip-molding or staged casting methods. Once cast, the outer tank 40 may then be launched into the body of water BW by any desired method and allowed to float in a floating assembly area (not shown) in which the buoyant floater 12 is located.

[0048]

[0060] A first embodiment of an improved method for assembling and deploying a FOWT platform 10 into a body of water BW is shown generally in Figures 4A to 4F.

[0061] As shown in Figure 4A, the empty outer tank 40 of the mass 36 can be launched into the body of water BW from a dock or shoreline SL by any desired method and allowed to float in a floating assembly area (not shown) in which the buoyant floater 12 is located (the buoyant floater 12 is not shown in Figures 4A or 4B, but is shown in Figures 4C to 4F).

[0049]

[0062] Permanent ballast material 48 may then be added to the outer tank 40, thereby defining the mass 36 and causing the mass 36 to sink to the seabed S, as shown in Figure 4B. As the mass 36 sinks, the variable ballast space 50 fills with seawater.

[0050]

[0063] The transit line 56 and the suspension line 38 may be pre-mounted on the mass 36 and may be delivered to the surface of the body of water BW with marker buoys attached to the free ends of the transit line 56 and the suspension line 38, respectively.

[0051]

[0064] If not already launched into the body of water BW, the buoyant floater 12 may be launched and floated, i.e., moved to a position above the mass 36. In this step of the method of assembling and deploying the FOWT platform 10 into the body of water BW, the ballast chamber in the buoyant floater 12 does not contain ballast water, thereby allowing the buoyant floater 12 to float. This step also allows the tower 14 and wind turbine 16 to be mounted on the central column 26 while the buoyant floater 12 is floating.

[0052]

[0065] At this point, a temporary transit line 56 and associated chain jack 58 may be used to lift the mass 36 to a point just below the buoyant floater 12, thereby defining a shallow draft configuration, i.e., a draft of 7.53 m, as shown in Figures 4C and 4D. The attached suspension lines 38 are attached to the mass 36 and left in a slack state. At this point, the FOWT platform 10 behaves as a rigid body characterized by a vertical center of gravity above its vertical center of buoyancy. Thus, stability of the FOWT platform 10 is achieved via the waterplane moment of inertia created by the partially submerged pontoons 22 of the FOWT platform 10.

[0053]

[0066] The now assembled FOWT platform 10 may then be towed to a mounting location in the body of water BW. At this point, the FOWT platform 10 continues to behave as a rigid body characterized by a vertical center of gravity above its vertical center of buoyancy. Thus, the natural period of the FOWT platform 10 may fall within the range of normal wave periods. Therefore, this step of towing the assembled FOWT platform to a mounting location in the body of water BW should only be performed in relatively calm seas.

[0054]

[0067] Alternatively, means other than a winch or chain jack 58 may be used to raise and lower the mass 36 up to and from the buoyant floater 12. Alternative means for raising and lowering the mass 36 include, but are not limited to, removable floatation devices such as inflatable devices, removable external ballast tanks, and temporary barge supports. In addition, the mass 36 may be configured to float below or alongside the buoyant floater 12.

[0055]

[0068] Once the FOWT platform 10 reaches its mounting location in the body of water BW, the mooring lines 18 attached to the pontoons 22 of the FOWT platform 10 may be connected to anchors 20 in the seabed S. The mass 36 may then be lowered using temporary transit lines 56 and associated chain jacks 58, as shown in FIG 4E. Once the suspension lines 38 are under tension and carrying the full weight of the suspended mass 36, the temporary transit lines 56 may be detached from the mass 36, as shown in FIG 4F.

[0056]

[0069] The pontoons 22 may be fully submerged by flooding the internal ballast chambers with seawater, at which point the FOWT platform 10 is at rest at its design draft, as shown in FIG 4E, where the FOWT platform 10 is positioned in the body of water BW with the waterline WL located at the midpoint of the central column 26.

[0057]

[0070] 1 through 4F show the mass 36 having four conductors 52 for connection of the suspension lines 38, the mass 36 can have any desired number of conductors 52 configured to attach any desired number of suspension lines 38. For example, the mass 36 can have three conductors 52, two conductors 52, or a single conductor 52, as shown in FIG 6, where an alternative embodiment of a mass 66 has only one conductor 52 mounted on its first end wall 68.

[0058]

[0071] Advantageously, allowing the suspended mass 36 to rotate freely and have its natural vibration period allows the suspended mass 12 to be pivoted in order to reduce the motion experienced by the deployed buoyant floater 12. This vibration period can be achieved by precisely selecting the number of suspension lines 38, their attachment points on the mass 36, and adjusting the location of the center of gravity and the mass moment of inertia of the suspended mass 36 to obtain a vibration frequency that is favorable for reducing the motion of the buoyant floater 12 and the wind turbine nacelle 34.

[0059]

[0072] The principles and modes of operation of this invention have been explained and illustrated in its preferred embodiment. However, it must be understood that the invention can be practiced otherwise than as specifically explained and illustrated without departing from the spirit or scope of the invention.

Claims

1. 1. A method of assembling and deploying a floating offshore wind turbine (FOWT) platform, comprising: floating a hollow outer tank within a floating assembly area of ​​a body of water, said hollow outer tank having transit and suspension lines attached to said hollow outer tank; floating a buoyant floater within the floating assembly area of ​​the body of water; placing permanent ballast material within the hollow outer tank to define a mass and lowering the mass to the bottom of the body of water; using a buoy to raise the free ends of the transit line and the suspension line to the surface of the body of water; moving the buoyant floater to a position above the mass; attaching the transit line to a lift device in the buoyant floater and attaching the suspension line to a portion of the buoyant floater, the buoyant floater and the mass defining a FOWT platform; lifting the mass with the lift device to a point just below the buoyant floater; towing the FOWT platform to a mounting location within the body of water; Attaching mooring lines to said seabed anchors and to said buoyant floater; lowering the mass using the transit line and the lift device to a depth that puts the suspension lines under tension, thereby suspending the mass using the suspension lines to define a suspended mass; one of storing the transit line and removing the transit line from the mass; A method comprising:

2. 2. The method of assembling and deploying a FOWT platform as described in claim 1, wherein said hollow outer tank and said buoyant floater are launched into said body of water from one of a dock and a shoreline.

3. The method of assembling and deploying a FOWT platform as recited in claim 1 , wherein said permanent ballast material is iron ore.

4. 2. The method of assembling and deploying a FOWT platform as described in claim 1, wherein the hollow outer tank defines a permanent ballast space and a variable ballast space, and when the mass sinks, the variable ballast space fills with seawater.

5. 2. The method of assembling and deploying a FOWT platform as described in claim 1, wherein the step of lifting the mass with the lift device to a point just below the buoyant floater includes the step of attaching a marker buoy to the free end of each of the transit line and the suspension line.

6. 2. The method of assembling and deploying a FOWT platform as described in claim 1, further comprising the step of mounting a tower and wind turbine on top of the buoyant floater prior to the step of using the lift device to lift the mass to a point just below the buoyant floater.

7. 2. The method of assembling and deploying a FOWT platform as described in claim 1, wherein when said mass is lifted and positioned directly beneath said buoyant floater, said FOWT platform is in a shallow draft configuration.

8. The method of assembling and deploying a FOWT platform as described in claim 7, wherein in said shallow draft configuration, said suspension lines are slack.

9. 9. The method of assembling and deploying a FOWT platform as set forth in claim 8, wherein in said shallow draft configuration, said FOWT platform behaves as a rigid body by having its vertical center of gravity above its vertical center of buoyancy.

10. 2. The method of assembling and deploying a FOWT platform as recited in claim 1, wherein a first end wall of said hollow outer tank of said mass has rigging for attaching at least one of said suspension lines.

11. 2. The method of assembling and deploying a FOWT platform as described in claim 1, wherein a first end wall of the hollow outer tank of the mass has a plurality of rigging conductors each configured to attach at least one of the suspension lines.

12. The buoyancy floater is A central hub; three or more buoyancy pontoons extending radially outward from the central hub to define a base of a cruciform; a central column mounted to the central hub and extending outwardly perpendicular to the buoyancy pontoons; a brace connecting a distal end of the buoyancy pontoon to an upper portion of the central column; 2. A method for assembling and deploying a FOWT platform as claimed in claim 1, comprising:

13. The method of assembling and deploying a FOWT platform as recited in claim 12, further comprising a tower supporting a wind turbine on said central column.

14. 13. The method of assembling and deploying a FOWT platform as described in claim 12, wherein at least one of the hollow outer tank, the central hub, the buoyancy pontoons, and the central column are formed as multiple sections.

15. forming and assembling a plurality of said buoyancy pontoons, said central hub, said mass, and said braces at an onshore location; assembling a first buoyancy pontoon and a second buoyancy pontoon to the central hub; post-tensioning the assembled first and second buoyant pontoons and central hub from a distal end of the first buoyant pontoon to a distal end of the second buoyant pontoon to define a buoyant floater subassembly; assembling a third buoyant pontoon and a fourth buoyant pontoon to the central hub of the buoyant floater subassembly; post-tensioning the assembled third and fourth buoyant pontoons and the buoyant floater subassembly from a distal end of the third buoyant pontoon to a distal end of the fourth buoyant pontoon; The method of assembling and deploying a FOWT platform according to claim 13, further comprising:

16. forming a plurality of sections of the central column; assembling the sections of the central column onto a first axial end wall of the central hub; longitudinally post-tensioning the central column relative to the central hub; attaching the brace between the buoyancy pontoon and the central column; mounting the tower and the wind turbine, thereby defining the buoyant floater; launching the buoyant floater into the body of water; 20. The method of assembling and deploying a FOWT platform as recited in claim 15, further comprising:

17. forming and assembling a first buoyancy pontoon and a second buoyancy pontoon in a drydock; assembling the central hub in the drydock; assembling the first buoyancy pontoon and the second buoyancy pontoon to the central hub; post-tensioning the assembled first and second buoyant pontoons and central hub from a distal end of the first buoyant pontoon to a distal end of the second buoyant pontoon to define a buoyant floater subassembly; launching the buoyant floater subassembly into a floating assembly area; forming and assembling a third buoyancy pontoon and a fourth buoyancy pontoon in the drydock; temporarily post-tensioning each of the third buoyancy pontoon and the fourth buoyancy pontoon; launching the third buoyancy pontoon and the fourth buoyancy pontoon into the floating assembly area; assembling a third buoyant pontoon and a fourth buoyant pontoon to the central hub of the buoyant floater subassembly; post-tensioning the assembled third and fourth buoyant pontoons and the buoyant floater subassembly from a distal end of the third buoyant pontoon to a distal end of the fourth buoyant pontoon to define the buoyant floater; The method of assembling and deploying a FOWT platform as recited in claim 12, further comprising:

18. 16. The method of assembling and deploying a FOWT platform as described in claim 15, wherein the steps of post-tensioning the assembled first and second buoyant pontoons and the central hub and post-tensioning the assembled third and fourth buoyant pontoons and the buoyant floater subassembly occur within a portion of the first, second, third, and fourth buoyant pontoons and the central hub that is above the waterline of the buoyant floater subassembly and the third and fourth buoyant pontoons when they float in the body of water.

19. 2. The method of assembling and deploying a FOWT platform as described in claim 1, wherein the suspended mass has a characteristic period of motion selected based on the geometric location of the mass and the attachment points of the suspension lines on the mass to reduce overall motion of the FOWT platform.

20. The method of assembling and deploying a FOWT platform as recited in claim 1 , wherein the lift device is one of a winch and a chain jack.

21. 1. A method of assembling and deploying a floating offshore wind turbine (FOWT) platform, comprising: floating a hollow outer tank within a floating assembly area of ​​a body of water, said hollow outer tank having transit and suspension lines attached to said hollow outer tank; Assembling a buoyancy floater; floating a buoyant floater within the floating assembly area of ​​the body of water; placing permanent ballast material within the hollow outer tank to define a mass and lowering the mass to the bottom of the body of water; using a buoy to raise the free ends of the transit line and the suspension line to the surface of the body of water; moving the buoyant floater to a position above the mass; attaching the transit line to a lift device in the buoyant floater and attaching the suspension line to a portion of the buoyant floater, the buoyant floater and the mass defining a FOWT platform; lifting the mass with the lift device to a point just below the buoyant floater; towing the FOWT platform to a mounting location within the body of water; Attaching mooring lines to said seabed anchors and to said buoyant floater; lowering the mass using the transit line and the lift device to a depth that puts the suspension lines under tension, thereby suspending the mass using the suspension lines to define a suspended mass; one of storing the transit line and removing the transit line from the mass; Including, The buoyancy floater is A central hub; three or more buoyancy pontoons extending radially outward from the central hub to define a base of a cruciform; a central column mounted to the central hub and extending outwardly perpendicular to the buoyancy pontoons; a brace connecting a distal end of the buoyancy pontoon to an upper portion of the central column; a tower supporting a wind turbine on said central column; having The method further comprising: forming and assembling a plurality of said buoyancy pontoons, said central hub, said mass, and said braces at an onshore location; assembling a first buoyancy pontoon and a second buoyancy pontoon to the central hub; post-tensioning the assembled first and second buoyant pontoons and central hub from a distal end of the first buoyant pontoon to a distal end of the second buoyant pontoon to define a buoyant floater subassembly; assembling a third buoyant pontoon and a fourth buoyant pontoon to the central hub of the buoyant floater subassembly; post-tensioning the assembled third and fourth buoyant pontoons and the buoyant floater subassembly from a distal end of the third buoyant pontoon to a distal end of the fourth buoyant pontoon; forming a plurality of sections of the central column; assembling the sections of the central column onto a first axial end wall of the central hub; longitudinally post-tensioning the central column relative to the central hub; attaching the brace between the buoyancy pontoon and the central column; mounting the tower and the wind turbine, thereby defining the buoyant floater; launching the buoyant floater into the body of water; The method further comprising:

22. 1. A method of assembling and deploying a floating offshore wind turbine (FOWT) platform, comprising: floating a hollow outer tank within a floating assembly area of ​​a body of water, said hollow outer tank having transit and suspension lines attached to said hollow outer tank; floating a buoyant floater within the floating assembly area of ​​the body of water; placing permanent ballast material within the hollow outer tank to define a mass and lowering the mass to the bottom of the body of water; using a buoy to raise the free ends of the transit line and the suspension line to the surface of the body of water; moving the buoyant floater to a position above the mass; attaching the transit line to a lift device in the buoyant floater and attaching the suspension line to a portion of the buoyant floater, the buoyant floater and the mass defining a FOWT platform; lifting the mass with the lift device to a point just below the buoyant floater; towing the FOWT platform to a mounting location within the body of water; Attaching mooring lines to said seabed anchors and to said buoyant floater; lowering the mass using the transit line and the lift device to a depth that puts the suspension lines under tension, thereby suspending the mass using the suspension lines to define a suspended mass; one of storing the transit line and removing the transit line from the mass; Including, The buoyancy floater is A central hub; three or more buoyancy pontoons extending radially outward from the central hub to define a base of a cruciform; a central column mounted to the central hub and extending outwardly perpendicular to the buoyancy pontoons; a brace connecting a distal end of the buoyancy pontoon to an upper portion of the central column; having The method further comprising: forming and assembling a first buoyancy pontoon and a second buoyancy pontoon in a drydock; assembling the central hub in the drydock; assembling the first buoyancy pontoon and the second buoyancy pontoon to the central hub; post-tensioning the assembled first and second buoyant pontoons and central hub from a distal end of the first buoyant pontoon to a distal end of the second buoyant pontoon to define a buoyant floater subassembly; launching the buoyant floater subassembly into a floating assembly area; forming and assembling a third buoyancy pontoon and a fourth buoyancy pontoon in the drydock; temporarily post-tensioning each of the third buoyancy pontoon and the fourth buoyancy pontoon; launching the third buoyancy pontoon and the fourth buoyancy pontoon into the floating assembly area; assembling a third buoyant pontoon and a fourth buoyant pontoon to the central hub of the buoyant floater subassembly; post-tensioning the assembled third and fourth buoyant pontoons and the buoyant floater subassembly from a distal end of the third buoyant pontoon to a distal end of the fourth buoyant pontoon to define the buoyant floater; The method further comprising:

Citation Information

Patent Citations

  • Underwater mooring apparatus for working ship

    JP1980001262A

  • Floating wind turbine platform and assembly method

    JP2015513046A

  • Construction method of offshore structure

    JP2016022783A

  • Method for mooring a floating wind turbine platform

    JP2017505262A

  • Floating structure and method for installing floating structure

    JP2017521296A