Buckling Restraint Brace Intermediate Parts and Filler Casting Method

The intermediate product for buckling restraint braces facilitates efficient filler placement by horizontal filling with specific inlet and outlet connections, addressing productivity and filler solidity issues in the manufacturing process.

JP7591934B2Active Publication Date: 2024-11-29NIPPON STEEL & SUMIKIN ENGINEERING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021015241
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-02
Publication Date
2024-11-29
Estimated Expiration
2041-02-02

AI Technical Summary

Technical Problem

The manufacturing process of buckling restraint braces requires a special jig to maintain the diagonal arrangement of the brace core material, leading to reduced productivity and potential local buckling due to uncertain filler solidity, and vertical filling complicates the process further.

Method used

An intermediate product for buckling restraint braces is designed with a steel pipe, core material, and temporary covers with specific inlet and outlet connections to allow horizontal filling, reducing the risk of air entrapment and simplifying the filling process by ensuring the filler overflows from a lower outlet when the pipe is full.

Benefits of technology

This design enables efficient filler placement in fewer steps with reduced air entrapment, ensuring complete filling and minimizing local buckling risks, thus enhancing productivity and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007591934000001
    Figure 0007591934000001
  • Figure 0007591934000002
    Figure 0007591934000002
  • Figure 0007591934000003
    Figure 0007591934000003
Patent Text Reader

Abstract

To provide an intermediate product of a buckling restraint brace and a method for placing a filling material capable of sufficiently filling the filling material in a small number of steps.SOLUTION: An intermediate product 100 of a buckling restraint brace comprises a steel pipe 10, a core 20, a permanent lid 30, an inlet temporary lid 40 having an injection pipe 42, and an outlet temporary lid 50 having an outlet pipe 52. An inlet connection portion 43 is provided at a position that does not coincide with a central axis C of the steel pipe 10, and an outlet connection portion 53 is provided so as to be positioned above the central axis C of the steel pipe 10, when the steel pipe 10 is arranged so that the inlet connection portion 43 is horizontally positioned below the central axis C of the steel pipe 10. At the other end of the injection pipe 42 is provided with a detachable valve, and the other end of the outlet pipe 52 is provided so as to be positioned above the top of the steel pipe 10, when the steel pipe 10 is arranged so that the inlet connecting portion 43 is horizontally positioned below the center axis C of the steel pipe 10.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an intermediate product of a buckling restraint brace and a method for pouring filler material. [Background technology]

[0002] Buckling restrained braces are sometimes used as reinforcing materials for buildings. In the manufacturing process of buckling restrained braces, filler is filled around the brace core material. At that time, a process of filling the filler with the brace core material arranged at an angle has been disclosed (Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 6525765 Summary of the Invention [Problem to be solved by the invention]

[0004] In the above process, the brace core material is tilted to bias the filler material during filling and prevent air from remaining inside the filler material. However, there are issues such as reduced productivity due to the need for special jigs to keep the brace core material in an angled position, the filler material not being filled to the top when the brace core material is tilted, and local buckling of the brace core material occurring when the density of the filler becomes uncertain. In addition, filling the filling material by placing the brace core material vertically can reduce productivity if the brace core material is long, as it may be necessary to move the brace core material to a location where it can be placed vertically.

[0005] The present invention has been made in consideration of the above-mentioned circumstances, and aims to provide an intermediate product of a buckling restraint brace and a method of pouring filler that can be sufficiently filled with filler in a few steps. [Means for solving the problem]

[0006] In order to solve the above problems, the present invention proposes the following means. The intermediate product of the buckling restraint brace according to the present invention comprises a steel pipe, a core material that is placed inside the steel pipe and has both ends located outside the steel pipe, a permanent lid that closes a part of the opening at both ends of the steel pipe, a temporary inlet lid that closes the portion of one of the openings of the steel pipe that is not closed by the permanent lid and has an injection pipe that injects a filler material into the steel pipe, and a temporary outlet lid that closes the portion of the other opening of the steel pipe that is not closed by the permanent lid and has an outlet pipe, and the temporary inlet lid and one end of the injection pipe are connected to each other. The inlet connection portion that is connected is provided at a position that does not coincide with the central axis of the steel pipe, and the outlet connection portion that connects the temporary outlet cover and one end of the outlet pipe is provided so as to be located above the central axis of the steel pipe when the steel pipe is horizontally positioned so that the inlet connection portion is located below the central axis of the steel pipe, and a valve is provided at the other end of the injection pipe, and the other end of the outlet pipe is provided so as to be located above the top of the steel pipe when the steel pipe is horizontally positioned so that the inlet connection portion is located below the central axis of the steel pipe.

[0007] According to this invention, the other end of the outlet pipe is positioned above the top of the steel pipe when the steel pipe is horizontally positioned so that the inlet connection portion is positioned below the central axis of the steel pipe. In this state, when the filler is injected into the steel pipe from the injection pipe, it will not overflow from the outlet pipe until the inside of the steel pipe is filled with the filler. In other words, the filler can be poured until the inside of the steel pipe is filled while keeping the steel pipe horizontal. Furthermore, the fact that the inside of the steel pipe is filled with the filler can be confirmed by the filler overflowing from the outlet pipe.

[0008] In addition, the inlet connection part is located below the central axis of the steel pipe. Therefore, when the filler is injected from the injection pipe, the filler can be injected from the bottom of the steel pipe. Therefore, compared to the case where the filler is injected from the top of the steel pipe, the possibility of the filler mixing with the air in the steel pipe can be reduced. In other words, the possibility of air remaining in the filler after pouring can be reduced. Therefore, the number of steps required for pouring the filler material can be reduced, and the filler material can be sufficiently poured into the steel pipe with fewer steps.

[0009] In addition, the temporary inlet cover and the temporary outlet cover may be releasably fixed to the steel pipe.

[0010] According to this invention, the temporary inlet and outlet covers are removably fixed to the steel pipe. As a result, after the filler is poured into the steel pipe and hardens, the temporary inlet and outlet covers can be removed from the steel pipe and replaced with permanent covers. Therefore, the buckling restraint brace can be manufactured without leaving the injection pipe and outlet pipe after pouring the filler.

[0011] In addition, a method of pouring filler material into an intermediate product of a buckling restraint brace according to the present invention includes the steps of leveling the steel pipe so that the inlet connection portion is positioned below the central axis of the steel pipe, injecting the filler material into the steel pipe from the injection pipe, and stopping the injection of the filler material after confirming that the filler material has been sprayed out of the outlet pipe.

[0012] According to this invention, the filler is injected while the steel pipe is held horizontally. In other words, the effort required to hold the steel pipe can be reduced compared to when the filler is injected while the steel pipe is tilted or vertical. In addition, injection of the filler is stopped after it is confirmed that the filler has sprayed out from the outlet pipe. This ensures that the steel pipe is filled with the filler. Therefore, the filling material can be cast reliably with fewer steps. Effect of the Invention

[0013] According to the present invention, it is possible to provide an intermediate product of a buckling restraint brace and a method for pouring filler that can be sufficiently filled with filler in a few steps. [Brief description of the drawings]

[0014] [Figure 1] FIG. 13 illustrates an intermediate product of a buckling restrained brace in accordance with an embodiment of the present invention. [Diagram 2] FIG. 2 is a plan view of FIG. [Diagram 3] FIG. 2 is a side view taken in the direction III shown in FIG. [Figure 4] FIG. 2 is a side view taken along line IV in FIG. [Diagram 5] 3 is a diagram showing a process of injecting a filler material into the inside of a steel pipe in the cross section of straight line VV shown in FIG. 2. [Figure 6] FIG. 6 is a diagram showing the state in which the inside of the steel pipe is filled with a filler material in the process of FIG. 5. [Figure 7] A diagram showing the relationship between a permanent lid and a temporary lid in one embodiment of the present invention. [Figure 8] 1 is a schematic diagram showing a process of replacing a temporary lid with a permanent lid in one embodiment of the present invention. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an intermediate product 100 of a buckling restrained brace according to one embodiment of the present invention (hereinafter, referred to as intermediate product 100) will be described with reference to the drawings. As shown in FIG. 1, the intermediate product 100 includes a steel pipe 10, a core material 20, a permanent lid 30, a temporary inlet lid 40, and a temporary outlet lid 50. The intermediate product 100 in this embodiment is an intermediate product in the middle of manufacturing a buckling restrained brace. The buckling restrained brace is completed by pouring a filler material 60 into the intermediate product 100 and replacing the temporary inlet lid 40 and the temporary outlet lid 50 with the permanent lid 30, respectively. In the following, the longitudinal direction (left-right direction on the paper) of the intermediate product 100 shown in FIG. 1 is the first direction D1, the vertical direction on the paper in FIG. 1 is the second direction D2, and the front-rear direction on the paper in FIG. 1 (the vertical direction on the paper in FIG. 2) is the third direction D3. These first direction D1, second direction D2, and third direction D3 are perpendicular to each other. Also, the second direction D2 (the vertical direction on the paper in FIG. 1) coincides with the vertical direction.

[0016] Moreover, the intermediate product 100 shown in Fig. 1 is a posture that satisfies the following conditions (1) to (3). That is, it is a posture that satisfies all of the following conditions: (1) the steel pipe 10 is a square columnar shape, and one of the sides of the steel pipe 10 faces downward, (2) the injection pipe 42 (described later) is located below the central axis C of the steel pipe 10, and the outlet pipe 52 (described later) is located above the central axis C, and (3) the width direction of the first core material 21 (described later) is arranged along the up-down direction (second direction D2). Hereinafter, the posture that satisfies the above three conditions may be referred to as the reference posture.

[0017] The completed buckling restrained brace is suitable for use, for example, in reinforcing buildings. The intermediate product 100 is columnar, with small sizes ranging from about 1.5 to 3 m, and large sizes of 9 to 10 m or more. An appropriate size is selected from these sizes, taking into account the construction conditions, etc. The steel pipe 10 is a member located on the outside of the intermediate product 100. In this embodiment, the steel pipe 10 has a rectangular prism shape. Inside the steel pipe 10, a core material 20 is provided, or a filler material 60 is filled (details will be described later).

[0018] The core material 20 is disposed inside the steel pipe 10. The core material 20 includes a first core material 21 and a second core material 22. The first core material 21 and the second core material 22 are both plate-shaped members, and the core material 20 is formed by welding these together. 5 or 6, the first core material 21 penetrates the inside of the steel pipe 10 in the longitudinal direction, with both ends located outside the steel pipe 10. The dimension (width dimension) of the first core material 21 in the second direction D2 is relatively large near both ends in the first direction D1 and is relatively small in the central portion (particularly the portion located inside the steel pipe 10).

[0019] Only one end of the second core material 22 is located inside the steel pipe 10 in the first direction D1, and the other end is located outside the steel pipe 10. The second core material 22 is provided on both sides of the first core material 21 in the third direction D3. At this time, as shown in Fig. 2, the shape formed at both ends of the intermediate product 100 by the multiple second core materials 22 is similar to the first core material 21 shown in Fig. 1. In this state, the first core material 21 and the second core material 22 are welded together to form the core material 20.

[0020] The core material 20 thus formed penetrates the inside of the steel pipe 10 in the longitudinal direction, with both ends located outside the steel pipe 10. As shown in Figs. 1 and 2, bolt holes 21B are provided at both ends of the first core material 21. Bolt holes 22B are provided in the second core material 22, respectively. These are used to bolt the buckling restrained brace to a building. Alternatively, they may be used for suspending the buckling restrained brace with a crane when transporting it.

[0021] As shown in Figures 3 and 4, the permanent cover 30 is a plate-shaped member that closes a portion of the opening at both ends of the steel pipe 10. In this embodiment, the permanent cover 30 closes half of the opening of the steel pipe 10, with the first core material 21 as the boundary, as shown in Figure 7. Figure 7 shows a temporary outlet cover 50 (described later) as an example, but the same applies to the temporary inlet cover 40 (described later). The permanent cover 30 and the steel pipe 10 are preferably fixed by welding.

[0022] As shown in FIG. 3, the temporary inlet cover 40 is a member that closes a portion of one opening of the steel pipe 10 that is not closed by the permanent cover 30. The temporary inlet cover 40 includes a main body 41 and an injection pipe 42. The main body 41 is a plate-shaped member that closes the opening of the steel pipe 10. The main body 41 and the steel pipe 10 are temporarily fixed to each other by welding or the like so as to be detachable. In other words, the permanent cover 30 and the steel pipe 10 are preferably fixed to each other by continuous welding in addition to intermittent welding, whereas the main body 41 and the steel pipe 10 are preferably welded to each other by intermittent welding only. The temporary inlet cover 40 is removed after the filling material 60 is poured (described later) and replaced with the permanent cover 30.

[0023] Injection tube 42 is a tube having one end connected to main body 41. Hereinafter, the connection portion between main body 41 and injection tube 42 may be referred to as inlet connection portion 43. Injection tube 42 is provided so as to extend linearly in first direction D1 from inlet connection portion 43. In this embodiment, as shown in Figs. 2 and 3, injection tube 42 has a 90° bent shape and extends in the opposite direction to first core material 21 in third direction D3.

[0024] The inlet connection part 43 is provided at a position that does not coincide with the central axis C of the steel pipe 10. For example, in the reference posture shown in Fig. 1, the inlet connection part 43 is provided so as to be located below the central axis C. The central axis C is the center line of the rectangular prism shape of the steel pipe 10, and is parallel to the first direction D1 in Fig. 1.

[0025] One end of a valve 44 is connected to the other end of the injection pipe 42. An injection hose 45 is connected to the other end of the valve 44. The valve 44 is provided between the injection pipe 42 and the injection hose 45. One end of the injection hose 45 is connected to the valve 44, and the other end is connected to a filler supplying device (not shown). The filler supplying device pressure-feeds the filler 60 via the injection hose 45. By opening and closing the valve 44 in this state, the filler 60 supplied from the injection hose 45 is transported to the injection pipe 42. As a result, the temporary inlet cover 40 injects the filler 60 supplied from the injection hose 45 into the inside of the steel pipe 10 via the inlet connection part 43, with the opening of the steel pipe 10 being closed.

[0026] For connection between injection pipe 42, valve 44, and injection hose 45, a method of detachable attachment by bolt fastening, for example, is preferably used. For this reason, the other end of injection pipe 42 and the end of injection hose 45 connected to valve 44 are preferably provided with male threads, and both ends of valve 44 are preferably provided with female threads.

[0027] As shown in FIG. 4, the temporary outlet cover 50 is a member that closes the other opening of the steel pipe 10, which is not closed by the permanent cover 30. The temporary outlet cover 50 includes a main body 51 and an outlet pipe 52. The main body 51 is a plate-shaped member that closes the opening of the steel pipe 10. The main body 51 and the steel pipe 10 are temporarily fixed in a detachable manner, for example, by intermittent welding, similar to the main body 41 of the temporary inlet cover 40. The temporary outlet cover 50 is removed, similar to the temporary inlet cover 40, after the filling material 60 is poured, and is replaced with the permanent cover 30.

[0028] The outlet pipe 52 is a pipe having one end connected to the main body 51. Hereinafter, the connection portion between the main body 51 and the outlet pipe 52 may be referred to as an outlet connection portion 53. The outlet pipe 52 is provided so as to extend linearly from the outlet connection portion 53 in the first direction D1. In this embodiment, as shown in Figs. 1 and 4, the outlet pipe 52 has a 90° bent shape and extends in the opposite direction to the second core material 22 in the third direction D3. The outlet connection portion 53 is provided so as to be located above the central axis C when in the reference position shown in Fig. 1, for example.

[0029] As shown in Fig. 1, the other end of the outlet pipe 52 is provided so as to be located above the top of the steel pipe 10 when the steel pipe 10 is horizontally positioned so that the inlet connection part 43 is located below the central axis C of the steel pipe 10. This serves as an air vent when the filler material 60 is injected into the steel pipe 10 through the inlet connection part 43 with both end openings of the steel pipe 10 closed. Alternatively, when the inside of the steel pipe 10 is filled with the filler material 60, the filler material 60 overflows from the outlet pipe 52. By visually observing this, it is determined whether to end the injection of the filler material 60 (details will be described later).

[0030] The filler 60 is a component that is cast inside the steel pipe 10 in the intermediate product 100. The filler 60 has the role of ensuring the strength of the intermediate product 100 by filling the gap between the steel pipe 10 and the core material 20 disposed inside the steel pipe 10. As the filler 60, for example, mortar is suitably used.

[0031] Next, the steps of the method for pouring the filler 60 into the intermediate product 100 according to one embodiment of the present invention will be described. 5, the intermediate product 100 having the above-mentioned configuration is placed horizontally in the longitudinal direction with the other end of the outlet pipe 52 facing upward. In this state, the valve 44 and the injection hose 45 are connected to the inlet connection part 43.

[0032] Next, the valve 44 is opened, and the filler 60 supplied from the injection hose 45 is injected into the steel pipe 10 through the injection pipe 42. Here, as described above, the openings at both ends of the steel pipe 10 are closed by the permanent lid 30, the temporary inlet lid 40, and the temporary outlet lid 50. Therefore, as shown in FIG. 5, when the filler 60 is being injected into the steel pipe 10, the air inside the steel pipe 10 escapes through the outlet pipe 52. This prevents the air inside the steel pipe 10 from being compressed, causing the air pressure to rise and hindering the injection of the filler 60.

[0033] As shown in FIG. 6, when the inside of the steel pipe 10 is filled with the filler 60, the filler 60 gushes out from the outlet pipe 52. Here, as described above, in the intermediate product 100 in which the filler 60 is being injected, the other end of the outlet pipe 52 is located above the top of the steel pipe 10. As a result, the filler 60 does not gush out from the outlet pipe 52 until the inside of the steel pipe 10 is filled with the filler 60. Therefore, the steel pipe 10 can be filled with the filler 60 by closing the valve 44 and ending the injection of the filler 60 after visually confirming the gush of the filler 60 from the outlet pipe 52. In addition, when the filler 60 is pumped by the filler supply device, the steel pipe 10 is in a horizontal state, so no large height difference occurs inside the steel pipe. Therefore, the pressure when injecting the filler 60 can be made smaller than when the steel pipe 10 is in a vertical state.

[0034] After the above-mentioned pouring work of the filler 60 is completed and the filler 60 in the steel pipe 10 has hardened, the temporary inlet cover 40 and the temporary outlet cover 50 are removed as shown in Fig. 8. Then, after the surface of the filler 60 is shaped, it is replaced with the permanent cover 30. In Fig. 8, the temporary outlet cover 50 is taken as an example, but the same applies to the temporary inlet cover 40. Through this operation, the injection pipe 42 provided on the temporary entrance cover 40 and the outlet pipe 52 provided on the temporary exit cover 50 are removed, and the intermediate product 100 is brought into a completed state.

[0035] As described above, according to the intermediate product 100 of the buckling restraint brace of this embodiment, the other end of the outlet pipe 52 is positioned above the top of the steel pipe 10 when the steel pipe 10 is horizontally positioned so that the inlet connection portion 43 is positioned below the central axis C of the steel pipe 10. In this state, when the filler 60 is injected into the steel pipe 10 from the injection pipe 42, the filler 60 will not overflow from the outlet pipe 52 until the inside of the steel pipe 10 is filled with the filler 60. In other words, the filler 60 can be poured until the inside of the steel pipe is filled while keeping the steel pipe 10 in a horizontal position. Furthermore, it can be confirmed that the inside of the steel pipe 10 is filled with the filler 60 by the filler 60 overflowing from the outlet pipe 52.

[0036] Also, the inlet connection part 43 is located below the central axis C of the steel pipe 10. Therefore, when the filler 60 is injected from the injection pipe 42, the filler 60 can be injected from below the steel pipe 10. Therefore, compared to the case where the filler 60 is injected from above the steel pipe 10, it is possible to reduce the possibility that the filler 60 and the air inside the steel pipe 10 will mix together. In other words, it is possible to reduce the possibility that air will remain in the filler 60 after pouring. Therefore, the number of steps required for pouring the filler 60 can be reduced, and the filler 60 can be sufficiently poured into the steel pipe 10 with fewer steps.

[0037] In addition, the temporary inlet cover 40 and the temporary outlet cover 50 are removably fixed to the steel pipe 10. As a result, after the filling material 60 is poured into the steel pipe 10 and hardens, the temporary inlet cover 40 and the temporary outlet cover 50 can be removed from the steel pipe 10 and replaced with the permanent covers 30, respectively. Therefore, after the filling material 60 is poured, the buckling restraint brace can be manufactured without leaving the injection pipe 42 and the outlet pipe 52.

[0038] Furthermore, the filler 60 is injected with the steel pipe 10 held horizontally. In other words, the effort required to hold the steel pipe 10 can be reduced compared to when the filler 60 is injected with the steel pipe 10 held at an angle or vertically. Furthermore, injection of the filler 60 is terminated after it is confirmed that the filler 60 has spurted out from the outlet pipe 52. This ensures that the steel pipe 10 is filled with the filler 60. Therefore, the filling material 60 can be reliably poured with fewer steps.

[0039] The technical scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, when pouring the filling material 60, the permanent cover 30 may not be installed, and the entire opening of the steel pipe 10 may serve as the temporary inlet cover 40 and the temporary outlet cover 50. Furthermore, the inlet connection portion 43 does not have to be located below the central axis C when the steel pipe 10 is held horizontally. Furthermore, the injection pipe 42 and the valve 44 may be formed integrally. Furthermore, the outlet connection portion 53 does not have to be located above the central axis C of the steel pipe 10, as long as the other end of the outlet pipe 52 is located above the top of the steel pipe 10 when the steel pipe 10 is held horizontal. Furthermore, the steel pipe 10 is not limited to being rectangular prism-shaped, and may be, for example, cylindrical. In addition, in this embodiment, it has been described that the permanent cover 30 closes half of the opening of the steel pipe 10 with the first core material 21 as the boundary, but the second core material 22 may be the boundary.

[0040] In addition, within the scope of the invention, the components in the above-described embodiments may be replaced with well-known components, and the above-described modified examples may be combined as appropriate. [Explanation of symbols]

[0041] 10 Steel pipe 20 Core material 30 Main lid 40 Temporary Entrance Cover 42 Injection tube 43 Inlet Connection 44 Valve 50 Temporary Exit Cover 52 Outlet pipe 53 Outlet Connection 60 Filling material 100 Intermediate C center axis

Claims

1. Steel pipes and A core material is disposed inside the steel pipe, and both ends are located outside the steel pipe; A permanent cover that closes a portion of the opening at each end of the steel pipe; A temporary inlet lid having an injection pipe for closing a portion of the opening of one of the steel pipes that is not closed by the permanent lid and injecting a filler material into the steel pipe; A temporary outlet cover that closes a portion of the other opening of the steel pipe that is not closed by the permanent cover and has an outlet pipe; Equipped with an inlet connection portion that connects the temporary inlet cover and one end of the injection pipe is provided at a position that does not coincide with a central axis of the steel pipe; an outlet connection portion connecting the temporary outlet cover and one end of the outlet pipe is provided so as to be located above a central axis of the steel pipe when the steel pipe is horizontally positioned so that the inlet connection portion is located below a central axis of the steel pipe; The other end of the outlet pipe is provided so as to be located above the uppermost part of the steel pipe when the steel pipe is horizontally positioned so that the inlet connection portion is located below the central axis of the steel pipe. An intermediate buckling restraint brace.

2. The inlet temporary cover and the outlet temporary cover are releasably fixed to the steel pipe. An intermediate product of the buckling restrained brace of claim 1.

3. A method for pouring the filler into an intermediate product of the buckling restraint brace according to claim 1 or 2, A step of horizontally positioning the steel pipe such that the inlet connection portion is located below a central axis of the steel pipe; injecting the filler from the injection pipe into the steel pipe; a step of terminating the injection of the filler after confirming that the filler has been ejected from the outlet pipe; Equipped with How to pour filler material.

Citation Information

Patent Citations

  • Concrete filled truss member and manufacture thereof

    JP1992368531A

  • Brace

    JP1999172782A

  • Grout holding cap

    JP2000257173A

  • Grouting method and grouting control system for joint part of precast reinforced concrete member

    JP2008002213A

  • Buckling-restrained brace and method of manufacturing the same

    JP2016118090A