Pull-out Test Equipment
The pull-out test device addresses the challenge of applying equal tensile loads to multiple reinforcing bars by using elongated members and wedge-shaped jigs, enabling effective analysis of the group effect on pull-out strength.
Patent Information
- Application Number
- JP2022007983
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-01-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-01-21
AI Technical Summary
Existing pull-out test devices cannot simultaneously apply an equal tensile load to multiple reinforcing bars embedded in a concrete structure, failing to account for the group effect where multiple reinforcing bars influence each other through the concrete.
A pull-out test device that sandwiches multiple reinforcing bars between pairs of elongated members and wedge-shaped jigs, with the thickness of the jigs decreasing towards the concrete structure, ensuring equal tensile loads are applied simultaneously.
The device allows for the investigation of the group effect on the pull-out strength of multiple reinforcing bars by applying equal tensile loads without slippage, facilitating accurate design considerations for densely arranged reinforcing bars.
Smart Images

Figure 0007593342000001 
Figure 0007593342000002 
Figure 0007593342000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a pull-out test device. [Background technology]
[0002] In order to design a concrete structure so that the rebar embedded in it will not be pulled out of the structure, it is necessary to confirm the pull-out strength of the rebar in advance. For this reason, a pull-out test of the rebar is carried out using a pull-out test device as disclosed in Patent Documents 1 and 2. The pull-out test device as disclosed in Patent Documents 1 and 2 applies a tensile load to a single rebar. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 3048994 [Patent Document 2] Patent No. 5464581 Summary of the Invention [Problem to be solved by the invention]
[0004] Generally, multiple rebars are embedded in a concrete structure. If the intervals between the rebars are narrow, a group effect occurs. The group effect means that multiple rebars affect each other through the concrete structure and act as one group.
[0005] In order to investigate the influence of the group effect of multiple rebars, it is necessary to apply a uniform tensile load to these rebars at the same time. However, the pull-out test devices in Patent Documents 1 and 2 cannot apply a uniform tensile load to multiple rebars at the same time.
[0006] Therefore, the present invention has been made in consideration of the above circumstances, and an object of the present invention is to provide a pull-out test device that can simultaneously apply a uniform tensile load to multiple rods such as rebars protruding from a concrete structure. [Means for solving the problem]
[0007] A pull-out test device for solving the above problems comprises a pair of long materials that are embedded in a concrete structure and extend along a row of rods on both sides of the row of rods arranged to protrude from the concrete structure, the pair of long materials being spaced apart from each other and fixed to each other, a plurality of pairs of wedge-shaped jigs that sandwich each of the rods between the pair of long materials in a clamping direction from the pair of long materials to the rods, the thickness in the clamping direction gradually decreasing as the rods approach the concrete structure, a plurality of pairs of wedge-shaped bases that sandwich the rods and the pair of wedge-shaped jigs between the pair of long materials in the clamping direction, the thickness in the clamping direction gradually decreasing as the rods move away from the concrete structure, and a load application unit that applies a load to the pair of long materials in a direction to move the pair of long materials away from the concrete structure.
[0008] According to the above, the multiple pairs of wedge-shaped jigs sandwich multiple rebars between a pair of long materials, the multiple pairs of wedge-shaped bases sandwich multiple pairs of wedge-shaped jigs between a pair of long materials, the thickness of the wedge-shaped bases in the sandwiching direction gradually decreases as they move away from the concrete structure, and the thickness of the wedge-shaped jigs in the sandwiching direction gradually decreases as they move closer to the concrete structure, so that when the load application part applies a load to the pair of long materials, the clamping force with which the pairs of wedge-shaped jigs sandwich the bars increases. Therefore, no slippage occurs between the wedge-shaped jigs and the bars, and the applied load of the load application part acts on the bars simultaneously as an even tensile load. Therefore, the group effect of the multiple bars on the pull-out strength of the bars can be investigated. Effect of the Invention
[0009] According to the present invention, the load applied by the load application section acts on a plurality of rods simultaneously as an equal tensile load, and the influence of the group effect of a plurality of rods on the pull-out resistance of these rods can be examined. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a perspective view of a pull-out test device. [Diagram 2] FIG. 2 is a side view of a pull-out test device. [Diagram 3] 3 is a cross-sectional view taken along the line III-III in FIG. 2, viewed in the direction of the arrows. [Figure 4] 4 is a cross-sectional view taken along the line IV-IV in FIG. 2, viewed in the direction of the arrows. [Diagram 5] FIG. 1 is a perspective view of a reinforcing bar, a twin wedge jig, and a twin wedge base. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, the embodiments of the present invention will be described with reference to the drawings. The embodiments described below are subject to various technically preferable limitations for carrying out the present invention, and the scope of the present invention is not limited to the following embodiments and illustrated examples.
[0012] 1. Steel and concrete structures Fig. 1 is a perspective view of a pull-out test apparatus 1 that applies a tensile load to a plurality of reinforcing bars 90. Fig. 2 is a side view of the pull-out test apparatus 1. Fig. 3 is a cross-sectional view showing the III-III plane shown in Fig. 2, as viewed in the direction of the arrows. Fig. 4 is a cross-sectional view showing the IV-IV plane shown in Fig. 2, as viewed in the direction of the arrows. Fig. 5 is a perspective view of a pair of wedge-shaped bases 40 and a pair of wedge-shaped jigs 50 of the pull-out test apparatus 1.
[0013] The multiple reinforcing bars 90 are steel bars. Some of the reinforcing bars 90 are embedded in the concrete structure 99 and protrude from the concrete structure 99. The reinforcing bars 90 are linearly arranged in a row with gaps between them and are parallel to each other. A plurality of protruding nodes 91 are provided on the peripheral surface of the reinforcing bar 90 along the circumferential direction of the reinforcing bar 90 and at intervals along the longitudinal direction of the reinforcing bar 90. In the following description, the direction along the row of reinforcing bars 90 is referred to as the front-rear direction.
[0014] The concrete structure 99 is a civil engineering or architectural structure such as a foundation, a beam, a slab, a footing, a port structure, a levee, a building, a power generation facility, a transformer facility, a building, or an elevated bridge.
[0015] 2. Configuration of the pull-out test equipment (1) Overview of the pull-out test equipment The pull-out test apparatus 1 is an apparatus that simultaneously applies a tensile load to multiple reinforcing bars 90 and increases the tensile load under load control. The pull-out test apparatus 1 records the tensile load while the tensile load is increasing, and measures and records the displacement of the reinforcing bars 90 due to the tensile load. The number of reinforcing bars 90 to which the pull-out test apparatus 1 applies a tensile load is three in the example shown in the figure, but is not limited to this and may be any number as long as it is more than one.
[0016] The pull-out test apparatus 1 comprises two hydraulic jacks 10, a base plate 20, a pair of channel steels 30, a number of reinforcing steel plates 35, 37, a number of bolt and nut fasteners 36, 38, a number of pairs of wedge-shaped bases 40, a number of pairs of wedge-shaped jigs 50, a number of steel plates 60, a displacement sensor 80 and a control device 85.
[0017] (2) Hydraulic jack 1 and 2, hydraulic jacks 10 as load applying units are placed on a concrete structure 99, in front of the front end of a row of reinforcing bars 90 and behind the rear end of the row. The hydraulic jacks 10 are actuators that receive a reaction force from the concrete structure 99 and lift the base plate 20 and the channel steel 30. In this way, the hydraulic jacks 10 apply a load to the base plate 20 and the channel steel 30 in a direction that moves the base plate 20 and the channel steel 30 away from the concrete structure 99.
[0018] As shown in Figures 1 and 2, a hydraulic jack 10 has a cylinder 11 and a rod 12. The rod 12 is attached to the cylinder 11 so as to be extendable and retractable. The cylinders 11 are disposed in front of the front end and behind the rear end of a row of reinforcing bars 90 on a concrete structure 99. The cylinder 11 is installed on the concrete structure 99 so that the extending and retracting directions of the rod 12 are parallel to the longitudinal direction of the reinforcing bars 90. The cylinder 11 hydraulically advances the rod 12 upward and retracts it downward.
[0019] In addition, the number of hydraulic jacks 10 is two in the example shown in the figure, but is not limited to this and may be one or three or more. In addition, the arrangement of the hydraulic jacks 10 is not limited to the example shown in the figure, and for example, the hydraulic jacks 10 may be arranged between adjacent reinforcing bars 90.
[0020] (3) Base plate 1 and 2, the base plate 20 is a steel plate shaped like a strip. The base plate 20 is attached to the ends of the rods 12 and the reinforcing bars 90 of the hydraulic jack 10 in a position perpendicular to these rods 12. The base plate 20 spans between the ends of these rods 12. The base plate 20 has a plurality of through holes 21 through which the reinforcing bars 90 pass. The base plate 20 receives a load directly from the hydraulic jack 10.
[0021] (4) Channel steel As shown in Figures 1 and 2, the channel steel 30 is a long material. The cross section of the channel steel 30 perpendicular to its longitudinal direction is U-shaped. The channel steel 30 is made up of parallel band-shaped flanges 31 and 32 and a band-shaped web 33 provided between the long sides of the flanges 31 and 32. The space between the flanges 31 and 32 forms a channel 34.
[0022] The channels 30 are arranged so that their longitudinal directions are parallel to each other. As shown in Figures 3 and 4, the webs 33 of the channels 30 face each other with a space between them, and the channels 34 of the channels 30 face in opposite directions.
[0023] These channel steels 30 extend along the row of reinforcing bars 90 on both sides of the row of reinforcing bars 90 on the base plate 20 and are spaced apart from each other. These channel steels 30 are attached to the base plate 20. Specifically, the flanges 32 of the channel steels 30 are stacked on the base plate 20 on the sides of the row of through holes 21 and the row of reinforcing bars 90, and are fixed to the base plate 20 by fasteners 22 such as bolts. These channel steels 30 are fixed to each other by being attached to the base plate 20. The regions between these channel steels 30, i.e., between the webs 33, are spaces through which multiple reinforcing bars 90 are passed vertically, and are spaces in which multiple pairs of wedge-shaped bases 40 and multiple pairs of wedge-shaped jigs 50 are arranged.
[0024] Similar to the base plate 20, these channel steels 30 are suspended between the ends of the rods 12 of the hydraulic jacks 10. The channel steels 30 receive the load from the hydraulic jacks 10.
[0025] Hereinafter, the direction from the channel steel 30 to the reinforcing bar 90 will be referred to as the clamping direction.
[0026] (5) Reinforcing steel plates and fasteners As shown in Figs. 1 to 4, a plurality of reinforcing steel plates 35, 37 are attached and fixed to the web 33 in the channel 34 by a plurality of bolt and nut fasteners 36, 38, respectively. The reinforcing steel plates 35 are disposed beside the through holes 21 and the reinforcing bars 90. The reinforcing steel plates 37 are disposed at the longitudinal ends of the channel steel 30. The reinforcing steel plates 35, 37 reinforce the web 33 of the channel steel 30.
[0027] The bolt and nut fastener 36 spans from the web 33 and reinforcing steel plate 35 of one channel steel 30 to the web 33 and reinforcing steel plate 35 of the other channel steel 30. The bolt and nut fastener 36 tightens the web 33 and reinforcing steel plate 35 of one channel steel 30 and the web 33 and reinforcing steel plate 35 of the other channel steel 30 so as to bring them closer to each other. Similarly, the bolt and nut fastener 38 tightens the web 33 and reinforcing steel plate 37 of one channel steel 30 and the web 33 and reinforcing steel plate 37 of the other channel steel 30 so as to bring them closer to each other.
[0028] The pair of channel steels 30 are fastened to each other by bolt and nut fasteners 36, 38 tightening the channel steels 30 together.
[0029] (6) Wedge-shaped base As shown in Figures 3 to 5, each wedge-shaped base 40 is formed in a wedge shape, and the thickness of each wedge-shaped base 40 gradually decreases from the base end to the tip end of the wedge-shaped base 40. The base end face 41 of each wedge-shaped base 40 is perpendicular to the vertical face 42 of the wedge-shaped base 40, and the tapered face 43 of each wedge-shaped base 40 forms an acute angle with the base end face 41 and the vertical face 42. The tip of the wedge-shaped base 40 refers to the corner portion sandwiched between the tapered face 43 and the vertical face 42. The thickness of the wedge-shaped base 40 refers to the distance between the tapered face 43 and the vertical face 42.
[0030] Pairs of wedge-shaped foundations 40 are disposed between the web 33 of one channel steel 30 and the web 33 of the other channel steel 30. Each wedge-shaped foundation 40 is placed on the base plate 20 with its tip facing upward and its base end facing the base plate 20. Each wedge-shaped foundation 40 is oriented such that its thickness direction is the clamping direction. Therefore, the thickness of the wedge-shaped foundation 40 in the clamping direction gradually decreases with increasing distance from the concrete structure 99.
[0031] Each pair of wedge-shaped bases 40 are spaced apart from each other in the clamping direction, with the through holes 21 and reinforcing bars 90 between them. The vertical faces 42 of each pair of wedge-shaped bases 40 face opposite each other, and the tapered faces 43 of each pair of wedge-shaped bases 40 face each other. Therefore, a tapered space is formed between the tapered faces 43 of each pair of wedge-shaped bases 40, with the width between the tapered faces 43 gradually decreasing toward the bottom.
[0032] A surface 41 at the base end of each wedge-shaped base 40 is in surface contact with the base plate 20. A vertical surface 42 of each wedge-shaped base 40 is in surface contact with the web 33 of the channel steel 30. A tapered surface 43 of each wedge-shaped base 40 slopes upward from the center between the pair of channel steels 30 toward the web 33 of the channel steel 30.
[0033] (7) Wedge-shaped jig As shown in Figures 3 to 5, each wedge-shaped jig 50 is formed in a wedge shape, and the thickness of each wedge-shaped jig 50 gradually decreases from the base end to the tip end of the wedge-shaped jig 50. The base end face 51 of each wedge-shaped jig 50 is perpendicular to the vertical face 52 of the wedge-shaped jig 50. The tapered face 53 of each wedge-shaped jig 50 forms an acute angle with the base end face 51 and the vertical face 52. The tip end of the wedge-shaped jig 50 refers to the corner portion sandwiched between the tapered face 53 and the vertical face 52. The thickness of the wedge-shaped jig 50 refers to the distance between the tapered face 53 and the vertical face 52.
[0034] A circular groove 54 is formed on the vertical surface 52 of each wedge-shaped jig 50 from the tip to the base end of the wedge-shaped jig 50. A plurality of circumferential grooves 55 are formed on the inner surface of the circular groove 54 at intervals in the longitudinal direction of the circular groove 54.
[0035] The vertical surfaces 52 of the wedge-shaped jigs 50 of each pair face each other, and the round grooves 54 of the wedge-shaped jigs 50 of each pair face each other with the reinforcing bar 90 placed between them. Each pair of wedge-shaped jigs 50 is fitted between the tapered surfaces 43 of the wedge-shaped bases 40 of each pair with the tip of the wedge-shaped jigs 50 facing downward and the base end of the wedge-shaped jigs 50 facing the base plate 20. Each pair of wedge-shaped jigs 50 is fitted between the tapered surfaces 43 of the wedge-shaped bases 40 of each pair with the thickness direction of the wedge-shaped jigs 50 being the clamping direction. Therefore, the thickness of the wedge-shaped jigs 50 in the clamping direction gradually increases as they approach the concrete structure 99.
[0036] Each pair of wedge-shaped jigs 50 sandwiches each reinforcing bar 90 between them in the clamping direction. Specifically, each reinforcing bar 90 is accommodated in the round groove 54 of each pair of wedge-shaped jigs 50, and the inner surfaces of the round groove 54 of each pair of wedge-shaped jigs 50 sandwich each reinforcing bar 90 between them in the clamping direction. Since the tapered surface 53 of each wedge-shaped jig 50 is in surface contact with the tapered surface 43 of each wedge-shaped base 40, when each pair of wedge-shaped bases 40 is pressed downward, a clamping force is generated that sandwiches each reinforcing bar 90 between each pair of wedge-shaped jigs 50.
[0037] When the reinforcing bar 90 is inserted into the circular grooves 54 of the pair of wedge-shaped jigs 50 , the nodes 91 of the reinforcing bar 90 are caught in the circumferential grooves 55 .
[0038] (8) Steel plate 1, each pair of steel plates 60 is sandwiched between the webs 33 of the channel steel 30 in a state where they are overlapped in the tightening direction of the bolt and nut fasteners 36 in the region between adjacent pairs of wedge-shaped bases 40. Through holes through which the bolt and nut fasteners 36 are passed are formed in the steel plates 60, and the steel plates 60 are sandwiched between the webs 33 of the channel steel 30 by the tightening force of the bolt and nut fasteners 36. Each pair of steel plates 70 is sandwiched between the webs 33 of the channel steel 30 in a state where they are overlapped at both ends of the channel steel 30 in the tightening direction of the bolt and nut fasteners 38. Through holes through which the bolt and nut fasteners 38 are passed are formed in the steel plates 70, and the steel plates 70 are sandwiched between the webs 33 of the channel steel 30 by the tightening force of the bolt and nut fasteners 38.
[0039] (9) Displacement sensor 1 and 2, the displacement sensor 80 is provided on the channel steel 30. The displacement sensor 80 is connected to a control device 85 via wiring (not shown). The displacement sensor 80 measures the displacement of the channel steel 30 in the advancing and retracting directions of the hydraulic jack 10. The displacement sensor 80 transfers a signal indicating the measured value of the displacement of the channel steel 30 to the control device 85.
[0040] (10) Control device As shown in Fig. 1, the control device 85 is a computer having a CPU, a RAM, a GPU, a storage device, an input device, a display device, etc. The control device 85 is connected to the hydraulic jack 10 via wiring. The control device 85 controls the load applied by the hydraulic jack 10 in a direction in which the hydraulic jack 10 moves the base plate 20 and the channel steel 30 away from the concrete structure 99. The control device 85 periodically records the load applied by the hydraulic jack 10 in the storage device. In addition, the control device 85 records the displacement measured by the displacement sensor 80 in the storage device in synchronization with the periodic recording of the load applied by the hydraulic jack 10.
[0041] 3. Pull-out test method A pull-out test method using the pull-out test apparatus 1 will be described, along with the operation of the pull-out test apparatus 1.
[0042] (1) Setting First, an operator assembles the pull-out test device 1 and sets the pull-out test device 1 to the reinforcing bar 90. For example, the assembly sequence of the pull-out test device 1 is as follows.
[0043] The hydraulic jacks 10 are installed on the concrete structure 99 in front of the first row of rebars 90 and behind the last row of rebars 90.
[0044] Next, the reinforcing bars 90 are passed through the through holes 21 of the base plate 20, and the base plate 20 is attached to the tip of the rod 12 of the hydraulic jack 10.
[0045] Next, with the webs 33 of a pair of channel steels 30 facing each other and parallel to each other, the channel steels 30 are fixed onto the base plate 20 on both sides of the row of reinforcing bars 90 by fasteners 22.
[0046] Next, each pair of steel plates 60 is inserted into the region between adjacent reinforcing bars 90 in the gap between the webs 33 of the channel steel 30 and sandwiched between the webs 33 of the channel steel 30.
[0047] Next, each pair of steel plates 70 is inserted into the gaps between the webs 33 of the channel steel 30 at each end of the channel steel 30 and sandwiched between the webs 33 of the channel steel 30 .
[0048] Next, a plurality of reinforcing steel plates 35 are attached to the webs 33 within the channel 34, and bolt and nut fasteners 36 are passed from the webs 33 and reinforcing steel plates 35 of one channel steel 30 through the steel plate 60 to the webs 33 and reinforcing steel plates 35 of the other channel steel 30. The bolt and nut fasteners 36 are then tightened to bring the webs 33 and reinforcing steel plates 35 of one channel steel 30 and the webs 33 and reinforcing steel plates 35 of the other channel steel 30 closer to each other. This generates a clamping force that clamps the pair of steel plates 60 between the webs 33 of the channel steel 30. Similarly, a plurality of reinforcing steel plates 37 are attached to the webs 33 within the channels 34, and bolt and nut fasteners 38 tighten the webs 33 and reinforcing steel plates 37 of one channel steel 30 and the webs 33 and reinforcing steel plates 37 of the other channel steel 30 so as to approach each other, thereby generating a clamping force that causes the webs 33 of the channel steel 30 to clamp the pair of steel plates 70 therebetween.
[0049] Next, each pair of wedge-shaped foundations 40 is placed on the base plate 20 on both sides of each reinforcing bar 90. At this time, the base end faces 41 of each pair of wedge-shaped foundations 40 are in surface contact with the base plate 20, the tapered faces 43 face each other, and the vertical faces 42 are in surface contact with the webs 33 of the channel steel 30.
[0050] Next, the vertical surfaces 52 of each pair of wedge-shaped jigs 50 face each other with the reinforcing bar 90 placed between them, and the tips of each pair of wedge-shaped jigs 50 are directed downward. Then, each pair of wedge-shaped jigs 50 is inserted between the tapered surfaces 43 of each pair of wedge-shaped bases 40. As a result, the reinforcing bar 90 is sandwiched between the inner surfaces of the round grooves 54 of the wedge-shaped jigs 50, and the tapered surfaces 53 of the wedge-shaped jigs 50 come into surface contact with the tapered surfaces 43 of the wedge-shaped bases 40. Each pair of wedge-shaped jigs 50 is pushed downward, and a clamping force is generated that clamps each reinforcing bar 90 in the clamping direction. Also, the nodes 91 of each reinforcing bar 90 are caught in the circumferential grooves 55 of each pair of wedge-shaped jigs 50. The wedge-shaped jig 50 does not slide relative to the reinforcing bar 90 in the longitudinal direction of the reinforcing bar 90.
[0051] Next, the displacement sensor 80 is provided on the channel steel 30. In addition, the displacement sensor 80 and the hydraulic jack 10 are connected to a control device 85 via wiring.
[0052] The assembly order of the pull-out test device 1 is not limited to the above-mentioned process order.
[0053] (2) Load application The control device 85 operates the hydraulic jack 10. The rod 12 of the hydraulic jack 10 advances from the cylinder 11, and the hydraulic jack 10 receives a reaction force from the concrete structure 99 and applies a load to the base plate 20 and the channel steel 30 in a direction to separate the base plate 20 and the channel steel 30 from the concrete structure 99. As a result, an upward load is applied to each pair of wedge-shaped bases 40, and the clamping force with which each pair of wedge-shaped jigs 50 clamps each reinforcing bar 90 increases. Therefore, each pair of wedge-shaped jigs 50 does not slip relative to each reinforcing bar 90 in the longitudinal direction of each reinforcing bar 90.
[0054] Since each pair of wedge-shaped jigs 50 clamps each reinforcing bar 90 with a strong clamping force, the load applied from the hydraulic jack 10 to the base plate 20 and the channel steel 30 acts simultaneously on each reinforcing bar 90 as a tensile load.
[0055] During the application of the load by the hydraulic jack 10, the control device 85 controls the hydraulic jack 10 to statically increase the applied load of the hydraulic jack 10. Therefore, the tensile load of each reinforcing bar 90 is statically increased.
[0056] While the hydraulic jack 10 is applying a load, the control device 85 periodically records the load applied by the hydraulic jack 10 in the storage device. In addition, the control device 85 records the displacement measured by the displacement sensor 80 in the storage device in synchronization with the periodic recording of the load applied by the hydraulic jack 10.
[0057] When the tensile load of the reinforcing bars 90 reaches the pull-out strength, the reinforcing bars 90 are pulled out of the concrete structure 99. This causes the channel steel 30 to be suddenly displaced, and the displacement measured by the displacement sensor 80 to suddenly increase.
[0058] When the reinforcing bar 90 is pulled out, the control device 85 stops the hydraulic jack 10. This ends the pull-out test. After the pull-out test, the control device 85 selects the applied load at which the measured displacement increases rapidly, and identifies the applied load as the pull-out strength of the reinforcing bar 90. The pull-out strength identified in this way is influenced by the group effect of multiple reinforcing bars 90. Therefore, the pull-out strength identified in this way can be used in designing foundations and the like in which reinforcing bars are densely arranged.
[0059] 4. Beneficial Effects (1) As described above, the pull-out test apparatus 1 according to this embodiment includes a pair of channel steels 30 that are embedded in a concrete structure 99 and extend along the row of reinforcing bars 90 on both sides of the row of reinforcing bars 90 arranged to protrude from the concrete structure 99, and are spaced apart from each other and fixed to each other; a plurality of pairs of wedge-shaped jigs 50 that sandwich the reinforcing bars 90 between the pair of channel steels 30 in the clamping direction from the pair of channel steels 30 to the reinforcing bars 90, and whose thickness in the clamping direction gradually decreases as they approach the concrete structure 99; a plurality of pairs of wedge-shaped bases 40 that sandwich the reinforcing bars 90 and the pairs of wedge-shaped jigs 50 between the pair of channel steels 30, and whose thickness in the clamping direction gradually decreases as they move away from the concrete structure 99; and a hydraulic jack 10 that applies a load to the pair of channel steels 30 in a direction to move the pair of channel steels 30 away from the concrete structure 99. This increases the clamping force with which the pairs of wedge-shaped jigs 50 clamp the reinforcing bars 90. As a result, no slippage occurs between the wedge-shaped jigs 50 and the reinforcing bars 90, and the load applied by the hydraulic jack 10 acts simultaneously as an even tensile load on the reinforcing bars 90. This makes it possible to examine the effect of the group effect of the reinforcing bars 90 on the pull-out resistance of these reinforcing bars 90.
[0060] (2) The pull-out test apparatus 1 according to this embodiment further includes bolt and nut fasteners 36, 38 that fasten the pair of channel steels 30 in a direction in which the pair of channel steels 30 approach each other. This makes it possible to prevent the clamping force with which the pair of wedge-shaped jigs 50 clamp the reinforcing bar 90 from being relaxed.
[0061] (3) Furthermore, in the pull-out test apparatus 1 according to this embodiment, the reinforcing bar 90 is accommodated in the circular grooves 54 of the pair of wedge-shaped jigs 50 and sandwiched between the inner surfaces of the circular grooves 54. This not only ensures that the reinforcing bar 90 fits snugly, but also prevents slippage between the wedge-shaped jigs 50 and the reinforcing bar 90.
[0062] (4) In addition, in the pull-out test apparatus 1 according to this embodiment, the pair of channel steels 30 sandwich the multiple reinforcing bars 90, the multiple pairs of wedge-shaped jigs 50, and the multiple pairs of wedge-shaped bases 40, so that the pair of channel steels 30 is used to pull out the multiple reinforcing bars 90. This reduces the number of parts in the pull-out test apparatus 1.
[0063] 5. Variations (1) The bar material is not limited to the reinforcing bar 90. For example, when a plurality of anchor bolts are embedded in the concrete structure 99 instead of the plurality of reinforcing bars 90, the pull-out test device 1 may simultaneously apply a tensile load to these anchor bolts, as in the case of the reinforcing bars 90. In this case, a thread groove is formed on the inner surface of the round groove 54 of each wedge-shaped jig 50, which engages with the male thread on the outer peripheral surface of the anchor bolt.
[0064] (2) The long material is not limited to the channel steel 30. For example, instead of the channel steel 30, an angle steel, an H-shaped steel, or a square steel pipe may be used. [Explanation of symbols]
[0065] 30…Slot type steel (long material) 40…Wedge-shaped base 50…Wedge-shaped jig 90...Reinforcing bars (bars) 99…Concrete structures
Claims
1. a pair of elongated members that are embedded in a concrete structure, extend along a row of a plurality of rods arranged to protrude from the concrete structure on both sides of the row of rods, are spaced apart from each other, and are fixed to each other; a plurality of pairs of wedge-shaped jigs that sandwich the bar between the pair of elongated members in a sandwiching direction from the pair of elongated members to the bar, the thickness of which in the sandwiching direction gradually decreases as the jig approaches the concrete structure; A plurality of pairs of wedge-shaped bases, each of which sandwiches the bar and the pair of wedge-shaped jigs between the pair of elongated members in the sandwiching direction, the thickness of which in the sandwiching direction gradually decreases as the base moves away from the concrete structure; and a load applying unit that applies a load to the pair of elongated members in a direction that moves the pair of elongated members away from the concrete structure. Pull-out test equipment.
2. The apparatus further includes a fastener for fastening the pair of elongated members in a direction in which the pair of elongated members approach each other.
2. The pull-out test device according to claim 1.
3. Grooves are formed on the surfaces of the pair of wedge-shaped jigs facing each other, the grooves face each other, the bar is accommodated in the grooves, and the bar is sandwiched between the inner surfaces of the grooves. A pull-out test device according to claim 1 or 2.
Citation Information
Patent Citations
Anti-floating anchor rod test fixture
CN210066841U
Polymerization of olefin
JP1979064581A
Reinforcing-bar pullout tester
JP2011106971A
Reinforcing bar pull-out testing apparatus
JP2011107000A
Rebar pull-out test equipment
JP3048994B2