Power Conversion Equipment
The power conversion device stabilizes fast restarts by using a 12-phase converter with synchronized BPP operation across phases, addressing instability issues in existing systems.
Patent Information
- Application Number
- JP2021170072
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-10-18
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-10-18
AI Technical Summary
Existing power conversion devices using 12-phase converters face instability during fast restart sequences due to improper operation of phases in bypass pair (BPP) configurations, leading to potential DC voltage shortages and system instability.
A power conversion device with a 12-phase converter configuration that includes a first and second six-phase thyristor valve connected in series, with a 30-degree phase shift, and a control system that ensures synchronized BPP operation across phases to stabilize fast restarts without gate blocking.
Enables stable and rapid restart of power converters by maintaining synchronized BPP operation, preventing DC voltage shortages and ensuring system stability during fast restarts.
Smart Images

Figure 0007595398000001 
Figure 0007595398000002 
Figure 0007595398000003
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a separately excited power conversion device. [Background technology]
[0002] Separately excited power conversion devices are used in DC transmission systems, frequency conversion systems, BTB converters, etc. (hereinafter, simply referred to as DC transmission systems, etc.) In a separately excited power conversion device, a multi-phase converter is sometimes used to suppress the intrusion of harmonics into an AC circuit, and a 12-phase converter may be formed by connecting two 6-phase converters in series and operating with a phase difference of 30° (for example, see Patent Documents 1 and 2, etc.).
[0003] In DC power transmission systems, etc., bypass pair (BPP) operation may be performed to electrically isolate the DC circuit from the AC circuit when the system is started, stopped, or when protective operations are performed in the event of an accident, by turning on the thyristor valves of the same phase.
[0004] In the protective operation of a DC power transmission system in the event of an accident, depending on the severity of the accident, a fast restart sequence may be implemented in which the converter is quickly restarted after the accident condition is resolved, without shutting it down by gate blocking.
[0005] In the fast restart sequence, in order to restart the power converter as soon as possible after the fault condition is resolved, the shutdown sequence is switched to the startup sequence without going through the gate block (GB). If the shutdown and startup during such a fast restart sequence are performed according to the normal shutdown sequence and startup sequence, in the case of a power converter using a 12-phase converter, operation may become unstable depending on the phase in which the BPP operates. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Japanese Patent Publication No. 50-85835 [Patent Document 2] Japanese Patent Application Publication No. 54-54234 Summary of the Invention [Problem to be solved by the invention]
[0007] An object of an embodiment of the present invention is to provide a power conversion device that can be restarted stably and quickly. [Means for solving the problem]
[0008] A power converter according to an embodiment of the present invention includes a power converter connected between a three-phase AC circuit and a DC circuit, and a control device that controls the power converter. The power converter includes a 12-phase converter including a first six-phase thyristor valve, a second six-phase thyristor valve connected in series with the first six-phase thyristor valve, a first transformer connected between the three-phase AC circuit and the first six-phase thyristor valve, and a second transformer connected between the three-phase AC circuit and the second six-phase thyristor valve, the second transformer having a secondary winding configured such that a voltage phase shifted by 30° from a voltage phase appearing in a secondary winding of the first transformer appears. The control device has a restart sequence that is activated in response to an accident occurring in the three-phase AC circuit and restarts the power converter without gate blocking, and when the restart sequence is activated, the phases connected in series among the phases of the first six-phase thyristor valve are made conductive to set a bypass pair state, and the phases connected in series among the phases of the second six-phase thyristor valve are made conductive to set a bypass pair state, and the phases that are made into the bypass pair state in the first six-phase thyristor valve are the same phases that are made into the bypass pair state in the second six-phase thyristor valve, and are set in advance. Effect of the Invention
[0009] In this embodiment, a power conversion device that can be restarted stably and quickly is realized. [Brief description of the drawings]
[0010] [Figure 1] 1 is a schematic block diagram illustrating a power conversion device according to a first embodiment. [Diagram 2] 1 is a schematic block diagram illustrating a portion of a power conversion device according to a first embodiment; [Diagram 3] 3(a) and 3(b) are schematic timing charts illustrating the operation of the power conversion device of the first embodiment. [Figure 4] 4 is a schematic timing chart illustrating the operation of the power conversion device of the first embodiment. [Diagram 5] 4 is a schematic timing chart illustrating the operation of the power conversion device of the first embodiment. [Figure 6] 6(a) and 6(b) are schematic timing charts illustrating the operation of the power conversion device of the comparative example. [Figure 7] FIG. 11 is a schematic block diagram illustrating a portion of a power conversion device according to a second embodiment. [Figure 8] 6 is a schematic timing chart illustrating the operation of the power conversion device of the second embodiment. [Figure 9] FIG. 11 is a schematic block diagram illustrating a part of a power conversion device according to a third embodiment. [Figure 10] 10 is a schematic timing chart illustrating the operation of the power conversion device of the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. The drawings are schematic or conceptual, and the relationship between the thickness and width of each part, the size ratio between parts, etc. are not necessarily the same as in reality. Even when the same part is shown, the dimensions and ratios of each part may be different depending on the drawing. In this specification and each drawing, elements similar to those described above with reference to the previous drawings are given the same reference numerals and detailed description thereof will be omitted as appropriate.
[0012] (First embodiment) FIG. 1 is a schematic block diagram illustrating a power conversion device according to this embodiment. As shown in Fig. 1, the power conversion device 10 includes a power converter 20 and a control device 40. The power conversion device 10 is connected between an AC circuit 1 and a DC circuit 2. The AC circuit 1 is a three-phase AC circuit and may include an AC power source, an AC transmission line, etc. The DC circuit 2 may include a DC transmission line, etc. For example, the power conversion device 10 may be connected to another power conversion device via the DC circuit 2 to configure a DC transmission system, etc.
[0013] The power converter 20 has terminals 21a to 21c. The power converter 20 is connected to the AC circuit 1 via the terminals 21a to 21c. The terminal 21a is connected to the U phase of the AC circuit 1, the terminal 21b is connected to the V phase of the AC circuit 1, and the terminal 21c is connected to the W phase of the AC circuit 1. The power converter 20 has terminals 21d and 21e. The power converter 20 is connected to the DC circuit 2 via the terminals 21d and 21e. A DC current flows out from the terminal 21d and flows into the terminal 21e.
[0014] The power converter 20 includes transformers 22 and 24. In the transformer 22, a star-connected primary winding is connected to terminals 21a to 21c. A secondary winding of the transformer 22 is star-connected and connected to a conversion circuit. In the transformer 24, a star-connected primary winding is connected to terminals 21a to 21c. A secondary winding of the transformer 24 is delta-connected and connected to a conversion circuit. The primary windings of the transformers 22 and 24 are both star-connected, the secondary winding of the transformer 22 is star-connected, and the secondary winding of the transformer 24 is delta-connected, so that the secondary winding of the transformer 24 outputs a three-phase AC voltage having a phase difference of 30° from the three-phase AC voltage appearing in the secondary winding of the transformer 22.
[0015] The power converter 20 includes thyristor valves 26 for 12 phases. Although the thyristor valve 26 for one phase is represented by a circuit symbol of one thyristor in Fig. 1, it includes one or more thyristors. When the thyristor valve 26 includes multiple thyristors, the multiple thyristors are connected in series. The number of thyristors in series is determined according to the AC voltage and DC voltage to be handled.
[0016] Hereinafter, the thyristor valves 26 may be referred to as valves U1, V1, W1, U2, V2, and W2 according to the respective phases of the three-phase AC circuit 1. The valves U1 and X1 are connected in series. The valves V1 and Y1 are connected in series. The valves W1 and Z1 are connected in series. The valves U1 and X1, the valves V1 and Y1, and the valves W1 and Z1 are connected in parallel to form a conversion circuit. The respective series connection nodes of the series circuit of the valves U1 and X1, the series circuit of the valves V1 and Y1, and the series circuit of the valves W1 and Z1 are connected to the secondary winding of the transformer 22.
[0017] The valves U2 and X2 are connected in series. The valves V2 and Y2 are connected in series. The valves W2 and Z2 are connected in series. The valves W1 and Z1 are connected in series. The valves U2 and X2, the valves V2 and Y2, and the valves W2 and Z2 are connected in parallel to form a conversion circuit. The series connection nodes of the series circuit of the valves U2 and X2, the series circuit of the valves V2 and Y2, and the series circuit of the valves W2 and Z2 are connected to the secondary winding of the transformer 24.
[0018] The conversion circuit including the valves U1 to Z1 and the conversion circuit including the valves U2 to Z2 are connected in series between terminals 21d and 21e. The conversion circuit including the valves U1 to Z1 is connected between terminal 21d and the conversion circuit including the valves U2 to Z2. The conversion circuit including the valves U2 to Z2 is connected between the conversion circuit including the valves U1 to Z1 and terminal 21e.
[0019] The control device 40 includes a BPP control unit 50. The control device 40 inputs various commands and outputs gate pulses for each phase valve adapted to the various commands by the BPP control unit 50, thereby controlling the power converter 20. The various commands include a start command, a stop command, a protection interlocking operation command, and a high-speed restart command. Although not shown, these various commands are sent from a higher-level control device provided above the control device 40, for example, or are generated by the control device 40 itself based on data detected by a voltage detector, a current detector, or the like provided in the AC circuit 1.
[0020] In the BPP control unit 50 of the power conversion device 10 of this embodiment, when a fast restart command is input, the phase in which the conversion circuit of the valves U1 to Z1 performs BPP operation and the phase in which the conversion circuit of the valves U2 to Z2 performs BPP operation are set in advance, and the phase in which the BPP operation is performed is set to be the same phase. Therefore, during fast restart, gate pulses with a phase difference of 30° are applied to the conversion circuit of the valves U1 to Z1 and the conversion circuit of the valves U2 to Z2 to sequentially resume operation of both converters, so that the power converter 20 can be restarted stably.
[0021] The control device 40 controls the power converter 20 by outputting gate pulses for normal operation in addition to starting, stopping, protection-linked operation, and high-speed restart of the power converter 20. Although not shown, the control device 40 includes components for generating gate pulses by the BPP control unit 50, as well as converting the AC voltage of the AC circuit 1 into a desired DC voltage and generating gate pulses for sending to the DC circuit 2. The control device 40 can output gate pulses for converting not only AC voltage to DC voltage, but also DC voltage to AC voltage.
[0022] FIG. 2 is a schematic block diagram illustrating a part of the power conversion device of the present embodiment. As shown in FIG. 2, the BPP control unit 50 inputs one of a start command, a stop command, a protection interlocking operation command, and a high-speed restart command, and generates a BPP command corresponding to each command. The BPP command is a command for putting the power converter 20 into a BPP state. Bypass pair (BPP) refers to igniting valves connected in series to the power converter 20 to make them conductive. A phase that is put into a BPP state is sometimes called a BPP phase. For example, BPPing the U phase by a BPP command means making the valves U1 and X1 conductive and making the valves U2 and X2 conductive, and the U phase and the X phase are said to be BPP phases.
[0023] The significance of operating the power converter in the BPP mode in a DC power transmission system or the like is as follows. In a DC power transmission system, power converters are provided at both ends of a DC transmission line. In such a DC power transmission system, for example, when the INV side is stopped and the REC side is started without being in the BPP state, an oscillatory circuit system including the REC end is formed due to the inductance and capacitance of the transmission line, power cable, etc., and an overvoltage may occur in the DC circuit including the DC power transmission line. Therefore, by setting the power converter to the BPP state at the time of startup, it is possible to prevent the application of an overvoltage to the DC circuit. In addition, when the power converter is stopped or stopped by a protection interlocking operation accompanied by the BPP operation, it is possible to prevent the power converter from affecting the AC system by setting the power converter to the BPP state. Here, in the DC power transmission system, the REC side refers to a forward converter that converts AC to DC, and is also called the REC end. The INV side refers to an inverse converter that converts DC to AC, and is also called the INV end.
[0024] The fast restart BPP operation unit (in FIG. 2, indicated as fast restart BPP operation) 51 enables the fixed phase BPP circuit 52 when the input command is a fast restart command. When the fixed phase BPP circuit 52 is enabled, it supplies information of a preset BPP phase to the start / protection / stop BPP operation circuit 53. The start / protection / stop BPP operation circuit 53 generates and outputs a gate pulse to put the valve into the BPP state according to the supplied information. In this embodiment, in the fast restart sequence, the phase in which the BPP operation is performed is the same for the conversion circuit of the valves U1 to Z1 and the conversion circuit of the valves U2 to Z2. For example, when the fast restart sequence is entered, the BPP control unit 50 outputs a gate pulse to ignite the U1 phase, the X1 phase, the U2 phase, and the X2 phase to perform the BPP operation.
[0025] Start / protection / stop BPP operation unit (in FIG. 2, indicated as start / protection / stop BPP operation) 54 determines whether the input command is a start command, a protection interlocking operation command, or a stop command, and supplies the determination result to a BPP phase determination circuit 55. Based on the determination result, the BPP phase determination circuit 55 supplies information on the phase to be set as the BPP phase to the start / protection / stop BPP operation circuit 53. The start / protection / stop BPP operation circuit 53 outputs a gate pulse to set the BPP state according to the supplied information.
[0026] The operation of the power conversion device 10 of this embodiment will be described. 3(a) to 5 are schematic timing charts illustrating the operation of the power conversion device of this embodiment. Hereinafter, in the case of timing charts, the horizontal axis is taken as the electrical angle instead of the time axis. Since one period of the electrical angle is 360° (=2π[rad]), in the case of an AC with a frequency of 50 Hz, one period is 20 ms, and an electrical angle of 360° corresponds to 20 ms. Therefore, in the following explanation, the horizontal axis of the timing chart is substantially the same as the time axis.
[0027] Fig. 3(a) shows the gate pulses output by the control device 40 during normal operation. In Fig. 1, the valves U1 to Z1 are fired in the order of U1 → Z1 → V1 → X1 → W1 → Y1. The valves U2 to Z2 are fired in the order of U2 → Z2 → V2 → X2 → W2 → Y2. The valves U1 to Z1 and the valves U2 to Z2 are set so that the firing phases of the same phase are shifted by 30°. In this example, the firing phase of the valve U2 is delayed by 30° from the firing phase of the valve U1, and similarly, the firing phase of the valve Z2 is set to be delayed by 30° from the firing phase of the valve Z1. The phase of the AC voltage output from the secondary winding of transformer 24 lags behind the phase of the AC voltage output from the secondary winding of transformer 22 by 30°, and therefore valves U2 to Z2 are set to have a roll call phase that lags behind that of valves U1 to Z1 by 30°.
[0028] The valves U1 to Z1 are connected to the star-connected secondary winding of the transformer 22, and therefore may be referred to as the Y-side valves, or simply as the Y-side. The valves U2 to Z2 are connected to the Δ-connected secondary winding of the transformer 24, and therefore may be referred to as the Δ-side valves, or simply as the Δ-side. In this example, therefore, the firing phase of the Y-side leads the firing phase of the Δ-side by 30°. In such a case, hereinafter, the Y-side may be referred to as the leading side, and the Δ-side may be referred to as the lagging side. Note that when the phase of the output voltage of the secondary winding of the transformer 22 is set to lag behind the phase of the output voltage of the secondary winding of the transformer 24, the firing phase of the Y-side valves will lag behind the firing phase of the Δ-side valves by 30°.
[0029] 3(a), the control device 40 outputs gate pulses to the power converter 20 in a cycle (=360°) of U1→U2→Z1→Z2→V1→V2→X1→X2→W1→W2→Y1→Y2. The control device 40 sets the input phase of the gate pulses based on the voltage and current on the AC circuit 1 side, a command value of the DC voltage set by a higher-level control device, etc. When performing normal operation, the control device 40 generates gate pulses without going through the BPP control unit 50, and the power converter 20 operates according to the supplied gate pulses.
[0030] The order of gate pulse generation is set as described above. The control device 40 outputs the generated gate pulse. The control device 40 outputs the generated gate pulse to the power converter 20, which is referred to as DEB (DEBlock), and the state in which the control device 40 outputs the gate pulse to the power converter 20 is referred to as the DEB state. The BPP control unit 50 generates a DEB command to put the power converter 20 into the DEB state. The control device 40 stops generating gate pulses and supplying them to the power converter 20, which is referred to as the GB (Gate Block) state. The control device 40 generates a GB command to put the power converter 20 into the GB state.
[0031] FIG. 3(b) shows the gate pulses output by the control device 40 when the power converter 20 starts from a stopped state. However, when the start-up sequence is executed, the DC circuit 2 is connected to the power converter 20, and a current can flow through the DC circuit 2. For example, a higher-level control device transmits a start-up command to the control device 40, and the control device 40 starts the power converter 20 based on the start-up command. In response to the start-up command, the control device 40 starts generating gate pulses, outputs gate pulses for putting the power converter 20 into a BPP operation, puts the power converter 20 into a BPP state, and disconnects it from the AC circuit 1. After that, after completing settings such as initialization of the control device 40 itself, the control device 40 generates a DEB command, outputs gate pulses, and starts the power converter 20.
[0032] In the case of normal startup, the BPP operation during normal startup is determined by the start / protection / stop BPP operation unit 54, the BPP phase determination circuit 55, and the start / protection / stop BPP operation circuit 53 of the BPP control unit 50 shown in FIG. 2, and the BPP control unit 50 generates a gate pulse for the determined BPP operation and supplies it to the power converter 20. In the normal startup sequence, in this example, the BPP control unit 50 of the control device 40 generates a leading side BPP command to the Y side and a lagging side BPP command to the Δ side. In this embodiment, which of the Y side and the Δ side is the leading side and which is the lagging side is determined when the power conversion device 10 is installed. Therefore, when the phase of the Y side is lagging behind the phase of the Δ side, the control device 40 generates a lagging side BPP command to the Y side and a leading side BPP command to the Δ side.
[0033] More specifically, the power conversion device 10 operates as follows. 3(b), at θ1, the BPP control unit 50 generates a leading BPP command based on the start command, and fires the U1 and X1 phases on the Y side to enter the BPP state. Next, the control device 40 fires the U2 and X2 phases on the Δ side at θ2, which is delayed by 30° from θ1, based on a lagging BPP command.
[0034] At normal startup, which phase is to be in the BPP state is set as a preset fixed phase, and for example, as in this example, it can be the U phase and the X phase. In addition to the U phase and the X phase, the V phase and the Y phase, or the W phase and the Z phase can also be set as the fixed phase at startup.
[0035] In this way, the power conversion device 10 puts the leading phase into the BPP state, followed by the lagging phase into the BPP state. In the BPP command at the time of start-up, the valves of the same phase are fired. In this example, the U1 phase and the X1 phase are fired, and then the U2 phase and the X2 phase are fired 30° behind. Not limited to this, when the V1 phase and the Y1 phase are fired, the V2 phase and the Y2 phase are fired 30° behind, and when the W1 phase and the Z1 phase are fired, the W2 phase and the Z2 phase are fired 30° behind.
[0036] The dashed lines in Fig. 3(b) are gate pulses generated within the control device 40 and indicate gate pulses that can be output by a DEB command. Such gate pulses are not supplied to the power converter 20, so the stopped state of the power converter 20 is maintained. The meanings of the gate pulses indicated by dashed lines are the same in the following figures.
[0037] At θ3, the controller 40 completes the setup for startup and is therefore able to generate a DEB command. The DEB command is made up of a lead-side DEB command for firing and operating the lead-side valve, and a delay-side DEB command for firing and operating the delay-side valve.
[0038] The control device 40 generates a leading DEB command after θ3 and outputs a gate pulse. In the leading DEB command, the timing is determined so as to ignite the same phase as the BPP phase. In this example, since the U phase and the X phase are in the BPP state, the control device 40 outputs a gate pulse so as to ignite the U1 phase after θ3 (θ4). At the same time, the control device 40 outputs a gate pulse so as to commutate from the X1 phase, which is in the BPP state, to the Y1 phase.
[0039] The lagging DEB command outputs a gate pulse so as to ignite the same phase as the leading DEB command. In this example, the lagging DEB command outputs a gate pulse so as to ignite the U2 phase and the Y2 phase. In the leading DEB command and the lagging DEB command, it is sufficient to ignite the same phase as one of the BPP phases. In this example, where the BPP phases are the U phase and the X phase, the U phase is not limited to being ignited, and the X phase may be ignited. In the leading DEB command and the lagging DEB command, by putting one of the BPP phases into the DEB state, the phase commutated during DEB can be one phase, and the effect of commutation on the DC circuit can be reduced. Note that, in the DEB command, when the U phase is put into the DEB state, the commutation phase is not limited to the Y phase and may be the Z phase.
[0040] In this way, the lagging DEB command can be set to a phase that is 30° lagging closest to the phase at which the leading DEB command was generated, so that the power converter 20 is started up stably.
[0041] In the case of a DC power transmission system including the power conversion device 10, other power conversion devices are connected via the DC circuit 2. In this case, when the power conversion device 10 is set as the REC end, the power converter 20 and other power conversion devices are set to the BPP state in response to a start-up command from a higher-level control device, and after the power converter 20 is set to the DEB state, the other power conversion devices are set to the DEB state, whereby the entire DC power transmission system can be started up.
[0042] FIG. 4 shows how gate pulses are output when the power conversion device 10 is normally stopped. In a normal stop sequence, when the control device 40 judges that a stop command has been input, it immediately generates a stop-time BPP command. The stop-time BPP command is generated simultaneously on both the Y side and the Δ side. As shown in FIG. 4, for example, when a stop command is transmitted from a higher-level control device and the control device 40 judges that it has received the stop command, in this example, the stop-time BPP command is generated at θ11. In the BPP control unit 50, in the stop operation, the phase in which the BPP operates is preset according to the phase that is conductive before the input of the stop command on each of the leading side and lagging side. The phase in which the BPP operates may be preset to the phase that is ignited immediately before the BPP command, or may be the phase that is ignited immediately before the phase that is ignited immediately before the BPP command. By setting the phase that is ignited by the BPP command to the phase that is ignited immediately before the BPP command or the phase that is ignited immediately before the BPP command, the phase that is commutated when the BPP command is issued can be one, so that the effect on the DC circuit 2 when the BPP command is issued can be reduced.
[0043] In this example, the U phase and the Z phase are in a conducting state and are ignited. At the time θ11 when the stop BPP command is generated, on the leading side, the phase ignited immediately before the Z1 phase ignited immediately before the generation of the stop BPP command is the U1 phase. On the lagging side, the phase ignited immediately before the Z2 phase ignited immediately before the generation of the stop BPP command is the U2 phase. The control device 40 outputs gate pulses to ignite the U1 phase, the X1 phase, the U2 phase, and the X2 phase, and puts them into the BPP state. If the phase ignited immediately before the generation of the stop BPP command is set as the BPP phase, the W1 phase, the Z1 phase, the W2 phase, and the Z2 phase are set as the BPP phase.
[0044] After the BPP state is set by the stop BPP command, the control device 40 executes processing for stopping. When the control device 40 completes a predetermined stop processing at θ12, it generates a GB command and stops generating and outputting all gate pulses.
[0045] In this manner, the power conversion device 10 is normally shut down.
[0046] As will be described later in a comparative example, in the stop BPP command, the BPP phase is determined under the same conditions (such as immediately before the generation timing or the timing immediately before that) based on the generation timing of the stop BPP command. Therefore, depending on the generation timing of the BPP command at the time of stopping, different phases may be set as the BPP phase on the leading side and the lagging side. For example, when the stop BPP command is generated in a phase between the V1 phase and the V2 phase, if the phase that was ignited immediately before the generation timing of the stop BPP command is set as the BPP phase, the W1 phase and the Z1 phase are set as the BPP phase on the leading side, and the U2 phase and the X2 phase are set as the BPP phase on the lagging side. In the normal stop sequence as described above, since the GB command is generated thereafter, the control device 40 stops generating the gate pulse, and then starts the power converter 20 by the normal start sequence described in relation to FIG. 3(b). Therefore, problems such as instability do not occur during normal stopping and starting.
[0047] In addition, in the case of a DC power transmission system including the power conversion device 10, the entire DC power transmission system can be stopped by the following sequence. That is, the power conversion device 10 is considered to be the INV end, and the power converter 20 at the INV end is put into the BPP state in response to a stop command from a higher-level control device, and after the other power conversion devices at the REC end are stopped, the power converter 20 is stopped by a GB command. In this manner, the entire DC power transmission system can be stopped.
[0048] The case of protection interlocking operation will be explained. There are several protection interlocking patterns for protection interlocking operation, but in the case of protection interlocking operation via BPP operation, it becomes GB operation via BPP operation, as in the case of shutdown described above. Note that protection interlocking operation refers to an emergency shutdown of the DC power transmission system in the procedure according to the type of fault that has occurred when an abnormality occurs in the DC circuit or AC circuit in the DC power transmission system.
[0049] Next, a fast restart will be described. Fast restart refers to, when a fault or the like is detected, quickly restarting the power converter after the fault or the like is resolved without GB. FIG. 5 shows how gate pulses are output when the control device 40 performs a high-speed restart of the power converter 20. When the control device 40 judges that the fast restart sequence is to be executed, the BPP control unit 50 immediately generates a fast restart BPP command and outputs a gate pulse to fire the preset BPP phase. The fast restart BPP command is generated simultaneously for both the Y side and the Δ side. In this example, the preset BPP phases for fast restart are the U phase and the X phase. 5, at θ21, the control device 40 generates a BPP command at fast restart. The BPP control unit 50 outputs gate pulses to ignite the U1 phase, the X1 phase, the U2 phase, and the X2 phase, regardless of the conduction phase immediately before the generation of the BPP command at fast restart, and sets the U phase and the X phase to the BPP state.
[0050] The control device 40 determines that the conditions for restarting are met at θ22. The control device 40 generates a leading DEB command at θ23. With the leading DEB command, the control device 40 outputs a gate pulse so that the leading valve is ignited at the ignition timing of the phase that is in the BPP state after θ22. The control device 40 monitors the arrival of the ignition timing of the U1 phase or the X1 phase after θ22, and in this example, the control device 40 outputs a gate pulse so as to ignite the X1 phase since the ignition timing of the X1 phase arrives at θ23. At the same time, the control device 40 outputs a gate pulse so as to commutate the U1 phase that is in the BPP state to the V1 phase.
[0051] The control device 40 generates a lagging DEB command 30° behind the phase at which the leading DEB command was generated. Since the BPP phase is the same for the leading valve and the lagging valve, in this example, the lagging DEB command can be set as the timing for firing the X2 phase. The control device 40 outputs a gate pulse to fire the X2 phase. The control device 40 also outputs a gate pulse to commutate the U2 phase to the V2 phase.
[0052] In this manner, in the power conversion device 10 of the present embodiment, the BPP phase during fast restart is set to the same phase that is preset on the leading side and lagging side by the BPP control unit 50. Therefore, even if a fast restart command is input and a restart BPP command is generated at any timing, the power converter 20 can be restarted stably.
[0053] The effects of the power conversion device 10 of this embodiment will be described in comparison with a comparative example. 6(a) and 6(b) are schematic timing charts illustrating the operation of the power conversion device of the comparative example. In the power conversion device of the comparative example, the BPP phase at the time of the fast restart command is not fixed, and the BPP phase is determined according to the phase that is conducting immediately before the command is generated, as in the case of the normal stop command and the protection interlocking operation. Note that the sequences at the normal start-up, stop, and protection interlocking operation in the comparative example are the same as those in the present embodiment. FIG. 6(a) shows the state of gate pulses when the power conversion device of the comparative example is normally restarted during fast restart. FIG. 6(b) shows the state of the gate pulse in the power conversion device of the comparative example when the device is unable to be properly restarted during fast restart.
[0054] In the power conversion device of the comparative example, even when a fast restart command is issued, a BPP command is generated at the same timing as during normal shutdown as described in relation to Figure 4 above, and a DEB command is generated at the same timing as during normal startup as described in relation to Figure 3(b) above. As shown in FIG. 6(a), at θ31, the control device generates a BPP command at high speed restart. In the comparative example, on the leading side and the lagging side, the phase that is conducting immediately before the phase that was fired immediately before θ31 is set as the BPP phase. In this example, on the leading side, the phase that was fired immediately before θ31 is the Z1 phase, and the phase that was fired immediately before the Z1 phase is the U1 phase. Therefore, on the leading side, the U1 phase and the X1 phase are set as the BPP phase. On the lagging side, the phase that was fired immediately before θ31 is the Z2 phase, and the phase that was fired immediately before the Z2 phase is the U2 phase. Therefore, on the lagging side, the U2 phase and the Z2 phase are set as the BPP phase. The control device outputs gate pulses to fire these phases.
[0055] After that, the restart condition is satisfied at θ32, and after θ32, on the leading side, a leading DEB command is generated at the timing of ignition of the U1 phase or the X1 phase, whichever is earlier, and a gate pulse is output. In this example, since the timing of ignition of the X1 phase is at θ33, the control device 40 outputs a gate pulse to ignite the X1 phase at this timing by the leading DEB command. The control device 40 outputs a gate pulse to ignite the V1 phase to commutate the U1 phase, simultaneously with ignition of the X1 phase at θ33 by the leading DEB command. The control device 40 generates a lagging DEB command at θ34, 30° behind the ignition phases of the V1 phase and the X1 phase, and outputs a gate pulse to ignite the V2 phase and the X2 phase.
[0056] In this example, since the phases that perform the BPP operation are the same on the leading and lagging sides, the appropriate phases can be fired with a difference of 30° when the DEB command is issued.
[0057] As shown in FIG. 6(b), in this example, the phases that perform the BPP operation are different between the leading side and the lagging side. Specifically, on the leading side, the U1 phase and the X1 phase are the BPP phases, and on the lagging side, the V2 phase and the Y2 phase are the BPP phases. In the example of FIG. 6(b), the phase that is conducted immediately before the phase that is conducted immediately before θ41 at which the BPP command is generated is the U1 phase on the leading side and the Y2 phase on the lagging side. Although not shown in the figure, the phase immediately before θ41 is the U2 phase, so the phase that is fired immediately before the U2 phase is the Y2 phase. Therefore, the control device outputs gate pulses to perform the BPP operation of the U1 phase and the X1 phase, and outputs gate pulses to perform the BPP operation of the V2 phase and the Y2 phase.
[0058] After that, when the restart condition is satisfied at θ42, a leading DEB command is generated at the ignition timing of the X1 phase that has undergone BPP operation on the leading side, and the control device outputs gate pulses to ignite the V1 and X1 phases at θ43. After θ43, the control device outputs gate pulses to ignite the V2 or Y2 phase that has undergone BPP operation, whichever arrives earlier, by a lagging DEB command. The lagging DEB command is generated 30° or more later than the leading DEB command. Therefore, the ignition timing θ44 of the Y2 phase arrives earlier, but it is 150° later than the ignition timing θ43 by the leading DEB command.
[0059] In this way, in the case of the comparative example, the ignition timing on the delayed side may be significantly delayed from the ignition timing at the time of the DEB command at the time of restart. Therefore, the start-up time of the power converter 20 becomes longer, and a state of DC voltage shortage, etc. may occur. If the power converter has a DC voltage shortage protection function, a protection function for the start-up time, etc., the protection function may be activated before the start-up is completed, or the start-up may become unstable.
[0060] As described above, in the power conversion device of the comparative example, the conditions for becoming the BPP phase at the time of restart are set for the leading side and the lagging side, respectively, and the BPP operation may occur in different phases on the leading side and the lagging side. The reason why the leading side and the lagging side have different BPP phases is that the BPP command is generated after the same phase or after different phases on the leading side and the lagging side. Therefore, the probability that the ignition timing on the lagging side is significantly delayed is 1 / 2, and there is also a 1 / 2 probability that an unstable phenomenon may occur during a fast restart.
[0061] In the power conversion device 10 of this embodiment, the control device 40 has a BPP control unit 50 that sets the BPP phase during fast restart to a specific phase that is set in advance, so that the phase in which the BPP operates on the leading side and the lagging side does not differ. Therefore, the fast restart sequence can be stably executed.
[0062] Second Embodiment In the other embodiment described above, the phases in which the BPP operation is performed during fast restart are fixed to the U phase and the X phase, etc., thereby making it possible to avoid unstable operation during fast restart. On the other hand, due to a signal delay in the control device or the turn-on time of the thyristor, etc., a delay may occur until the BPP operation is actually completed, and it may be necessary to commutate from another phase before entering the BPP operation. In this embodiment, the phase in which the BPP operation is performed during fast restart is not fixed, and the BPP operation is first determined on either the leading side or the lagging side, and then the BPP phase on the other side is determined so that it is the same phase as the already determined BPP phase.
[0063] FIG. 7 is a schematic block diagram illustrating a part of the power conversion device of the present embodiment. In this embodiment, the configuration of the BPP control unit 250 included in the control device differs from that of the other embodiments described above.
[0064] As shown in Fig. 7, the BPP control unit 250 includes a first circuit 251 for determining the BPP operation on the leading side, and a second circuit 252 for determining the BPP operation on the lagging side. In addition to the BPP control unit 250, the control device also includes a circuit (not shown) for determining the phase for BPP operation based on a start command, a stop command, and a protection interlocking operation command. This circuit includes, for example, the start / protection / stop BPP operation unit 54, the BPP phase determination circuit 55, and the start / protection / stop BPP operation circuit 53 described in relation to Fig. 2. The BPP operation based on the start command, the stop command, and the protection interlocking operation can be the same as that described above.
[0065] In the first circuit 251, when a fast restart command is input to the fast restart BPP operation unit 253, the fast restart BPP operation unit 253 supplies information on the conduction phase to the BPP phase determination circuit 254. The BPP phase determination circuit 254 interprets the fast restart command as a BPP command and determines the phase that performs the BPP operation at a preset timing after the input of the BPP command. Determining the phase that performs the BPP operation at a preset timing after the input of the BPP command means, for example, igniting the phase that was ignited immediately before the timing at which the BPP command was input. Alternatively, the phase that performs the BPP operation may be the phase that was ignited one phase before the phase that was ignited immediately before the timing at which the BPP command was input. The BPP phase determination circuit 254 supplies information on the phase that performs the BPP operation to the start / protection / stop BPP operation circuit 255, and the start / protection / stop BPP operation circuit 255 generates and outputs a gate pulse for igniting the target phase.
[0066] In the second circuit 252, when a fast restart command is input to the fast restart BPP operation unit 256, the fast restart BPP operation unit 256 interprets the fast restart command as a BPP command and supplies a signal that becomes active at the timing when the BPP command is input to the BPP phase determination circuit 257. Information on the BPP operation phase determined by the first circuit 251 is input to the BPP phase determination circuit 257. The BPP phase determination circuit 257 takes a logical AND of the information that is set to active and input from the first circuit 251 and the active signal from the fast restart BPP operation unit 256, and supplies it to the start / protection / stop BPP operation circuit 258. The start / protection / stop BPP operation circuit 258 generates and outputs a gate pulse so as to ignite the BPP operation phase determined by the BPP phase determination circuit 257.
[0067] The operation of the power conversion device of this embodiment will be described. FIG. 8 is a schematic timing chart illustrating the operation of the power conversion device of the present embodiment. As shown in Fig. 8, when the control device determines that a high-speed restart command has been issued at θ51, it immediately generates a leading BPP command. The BPP phase at this time is set to a phase including the U1 phase that was fired immediately before the Z1 phase that was fired immediately before θ51. That is, the U1 phase and the X1 phase are set to the BPP phase, and the first circuit 251 outputs a gate pulse to fire the U1 phase and the X1 phase.
[0068] The second circuit 252 determines the BPP phase based on the firing phase information generated by the first circuit 251. In this example, the first circuit 251 sets the U1 phase and the X1 phase as the BPP phase, so the second circuit 252 outputs gate pulses to fire the U2 phase and the X2 phase to set the U2 phase and the X2 phase as the BPP phase.
[0069] The control device determines that the conditions for restarting are met at θ53. The control device generates a leading DEB command at θ54. With the leading DEB command, the control device outputs a gate pulse so as to ignite at the ignition timing of the phase that arrives first among the ignition timings of the phases that are in the BPP state on the leading side after θ53. In this example, the BPP phases are the U1 phase and the X1 phase, and the control device outputs a gate pulse so as to ignite the X1 phase, whose ignition timing arrives first after θ53. At the same time, the control device outputs a gate pulse so as to commutate the U1 phase that is in the BPP state to the V1 phase.
[0070] The control device generates a lagging DEB command with a phase delay of 30° from the leading DEB command. Since the BPP phase is the same on the leading and lagging sides, the lagging DEB command can be set as the timing for igniting the X2 phase, and the control device outputs a gate pulse to ignite the X2 phase. The control device also outputs a gate pulse to commutate the U2 phase to the V2 phase. In this example, the leading BPP phase is determined first, and then the lagging BPP phase is determined, but the lagging BPP phase may be determined first (for example, the lagging side is set to the first circuit), and then the leading BPP phase may be determined (for example, the leading side is set to the second circuit).
[0071] In this way, the power conversion device of this embodiment determines the BPP phase of one of the leading and lagging sides based on the information of the BPP phase determined for the other side. Therefore, the lagging side can be started with a minimum delay of 30° at the time of the DEB command, and stable start-up can be ensured.
[0072] (Third embodiment) In the case of the other embodiment described above, the BPP command during fast restart is set to the same phase on the lead side and the lag side, so that the DEB command can be supplied to the lag side valve in the shortest time from the start of the lead side valve. In this embodiment, the BPP phase is not fixed, and it is determined that the BPP occurs in a different phase, and the order of the DEB commands on the lead side and the lag side is set based on the determination result. FIG. 9 is a schematic block diagram illustrating a part of the power conversion device of the present embodiment. In this embodiment, the BPP control unit 350 is provided on each of the Y side and the Δ side. Fig. 9 shows the configuration of either the Y side or the Δ side. For example, the BPP control unit 350 in Fig. 9 is provided for generating the BPP command and the DEB command on the Y side, and another BPP control unit (not shown) is provided for generating the BPP command and the DEB command on the Δ side.
[0073] In the following description, it is assumed that the BPP control unit 350 having the illustrated configuration is used to generate the BPP command and the DEB command on the Y side. As shown in Fig. 9, the output of the BPP control unit on the Δ side (not shown) is connected to the other side DEB input unit (indicated as other side DEB in Fig. 9) 351 of the BPP control unit 350 on the Y side. Both BPP control units output an active signal when they generate a DEB command. In Fig. 9, "DEB condition met" is displayed. Initially, an inactive signal ("0") is input to the other side DEB inputs on both the Y side and the Δ side.
[0074] The binary signal of “0” (inactive) or “1” (active) input to the counterpart DEB input unit 351 is input to an AND circuit 354 .
[0075] A binary signal indicating whether the phase of the Y-side voltage is leading or lagging relative to the phase of the Δ-side voltage is input to the Y-side leading side determination unit (represented as leading side in FIG. 9) 352. When the phase of the Y-side is leading the phase of the Δ-side, an active signal ("1") is input. An inactive signal ("0") is input to the Δ-side leading side determination unit (not shown).
[0076] Furthermore, when the phase of the Y side lags behind the phase of the Δ side, an inactive signal ("0") is input to the Y-side lead side determination unit 352, and an active signal ("1") is input to the Δ-side lead side determination unit. For example, when the power conversion device is installed, a signal of a preset level is input to each of the lead side determination units on the Y side and Δ side that determines by actual measurement whether the converters of valves U1-Z1 or the converters of valves U2-Z2 are lead side.
[0077] An active signal ("1") is input to the in-phase BPP determination unit (in FIG. 9, indicated as in-phase BPP) 353 when the Y-side phase and the Δ-side phase set as BPP phases by the BPP command are the same phase. When the Y-side phase and the Δ-side phase are different phases, an inactive signal ("0") is input. In this embodiment, the BPP control unit 350 generates a BPP command immediately upon input of a high-speed restart command, and outputs it simultaneously to the Y-side and the Δ-side. The BPP control unit 350 is preset to the phase fired immediately before the timing at which the BPP command was generated, or the phase fired one phase before the timing at which the BPP command was generated.
[0078] The XOR circuit (indicated as XOR in FIG. 9) 355 receives signals output from the leading side determination unit 352 and the in-phase BPP determination unit 353. The XOR circuit 355 is an arithmetic circuit that performs a logical operation of an exclusive OR and outputs a signal. The exclusive OR outputs a signal "0" when both inputs are "1" or when both inputs are "0". The exclusive OR outputs a signal "1" when one input is "1" and the other is "0". In other words, the XOR circuit 355 outputs an inactive signal "0" when the voltage phase of the Y side is leading the Δ side ("1") and the phases set as the BPP phase by the BPP command are the same ("1"), and outputs an inactive signal "0" when the voltage phase of the Y side is lagging the Δ side ("0") and the phases set as the BPP phases are different ("0"). In other cases, the XOR circuit 355 outputs an active signal "1".
[0079] The output of the XOR circuit 355 is input to the AND circuit 354. In addition, the output of the XOR circuit 355 is input to the inverter circuit 356 and logically inverted.
[0080] The output of the AND circuit 354 and the output of the inverter circuit 356 are input to an OR circuit 357, which outputs a DEB command.
[0081] With this logical configuration, the Y side is the leading side, and even if the BPP phases are the same or different, gate pulses can be output so that phases having a phase difference of 30° are fired in sequence by the DEB command. Also, even if the Y side is the lagging side, and even if the BPP phases are the same or different, gate pulses can be output so that phases having a phase difference of 30° are fired in sequence by the DEB command.
[0082] The operation of the power conversion device of this embodiment will be described. FIG. 10 is an example of a timing chart for explaining the operation of the power conversion device of this embodiment. FIG. 10 shows the state of gate pulses output when the Y side is the leading side and the Δ side is the lagging side, as in the other embodiments described above. As shown in Fig. 10, when the control unit 350 determines that a fast restart command has been issued at θ61, it immediately generates a fast restart BPP command. In this example, as in the case described in relation to Fig. 6(b), on the Y side, the U1 phase that was fired immediately before the Z1 phase that was fired immediately before θ61 is set as the BPP phase, and the BPP control unit 350 outputs a gate pulse so that it is fired together with the X1 phase. On the Δ side, the Y2 phase that was fired immediately before the U2 phase that was fired immediately before θ61 is set as the BPP phase, and the other BPP control units output a gate pulse so that the V2 phase is fired together with the Y2 phase.
[0083] The BPP control unit 350 judges that the BPP phase of the Y side and the BPP phase of the Δ phase are different phases, and "0" is input to the in-phase BPP input unit 353 on the Y side. Also, since the Y side is the leading side, "1" is input to the leading side judgment unit 352 on the Y side. Therefore, one input of the OR circuit 357 becomes "0", and since the other side DEB input unit 351 is in the initial state of "0", the output of the judgment unit on the Y side of the BPP control unit 350 is initially "0". The judgment unit on the Y side outputs an active DEB command ("1") by inputting "1" output by the judgment unit on the Δ side to the other side DEB input 351.
[0084] Here, in the Δ side judgment portion, the input to the lead side judgment section is "0" and the input to the in-phase BPP judgment section is also "0", so the output of the XOR circuit 355 is "0". Therefore, one input of the OR circuit becomes "1" regardless of the other input, and the other BPP control circuit can output a DEB command.
[0085] Specifically, the restart condition is satisfied at θ62, the Δ side generates a DEB command at θ63, and the control device outputs a gate pulse to fire the V2 phase and the Z2 phase.
[0086] At θ63, the Y-side BPP control unit 350 inputs the DEB command "1" output by the Δ-side BPP control unit to the other-side DEB input unit 351. Since both inputs to the AND circuit 354 of the BPP control unit 350 are "1", the BPP control unit 350 outputs "1" as the Y-side DEB command. Since the timing for firing the X1 phase arrives 30° later at θ64, the BPP control unit 350 outputs a gate pulse to fire the X1 phase and V1 phase at θ64.
[0087] In this way, in the power conversion device of this embodiment, even if different phases are in the BPP state in the Y-side valve and the Δ-side valve, the DEB command is generated first, and then the phase that is adjacent to 30° to be fired can be fired. Therefore, the power conversion device of this embodiment can be stably restarted even in a high-speed restart sequence.
[0088] According to the embodiment described above, it is possible to realize a power conversion device that can be restarted stably and quickly.
[0089] Although several embodiments of the present invention have been described above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included within the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. In addition, the above-mentioned embodiments can be implemented in combination with each other. [Explanation of symbols]
[0090] 1 AC circuit, 2 DC circuit, 10 power conversion device, 20 power converter, 22, 24 transformer, 26 thyristor valve, 40 control device, 50, 250, 350 BPP control unit
Claims
1. a power converter connected between the three-phase AC circuit and the DC circuit; A control device for controlling the power converter; Equipped with The power converter includes a 12-phase converter including a first 6-phase thyristor valve, a second 6-phase thyristor valve connected in series with the first 6-phase thyristor valve, a first transformer connected between the three-phase AC circuit and the first 6-phase thyristor valve, and a second transformer connected between the three-phase AC circuit and the second 6-phase thyristor valve, the second transformer having a secondary winding configured such that a voltage phase shifted by 30° from a voltage appearing in a secondary winding of the first transformer appears, The control device has a restart sequence that is activated in response to an accident occurring in the three-phase AC circuit and restarts the power converter without gate blocking, and when the restart sequence is activated, the control device makes the phases connected in series among the phases of the first six-phase thyristor valve conductive to set a bypass pair state, and makes the phases connected in series among the phases of the second six-phase thyristor valve conductive to set a bypass pair state, A power conversion device in which a phase to be set in a bypass pair state in the first six-phase thyristor valve is the same as a phase to be set in a bypass pair state in the second six-phase thyristor valve, and is preset.
2. a power converter connected between the three-phase AC circuit and the DC circuit; A control device for controlling the power converter; Equipped with The power converter includes a 12-phase converter including a first 6-phase thyristor valve, a second 6-phase thyristor valve connected in series with the first 6-phase thyristor valve, a first transformer connected between the three-phase AC circuit and the first 6-phase thyristor valve, and a second transformer connected between the three-phase AC circuit and the second 6-phase thyristor valve, the second transformer having a secondary winding configured such that a voltage phase that appears in a secondary winding of the first transformer is different from a voltage phase that appears in the secondary winding by 30°, The control device has a restart sequence that is activated in response to an accident occurring in the three-phase AC circuit and restarts the power converter without gate blocking, and after inputting a command to activate the restart sequence, at a preset timing, the control device makes the phases connected in series among the phases of the first six-phase thyristor valve conductive to set them in a bypass pair state, determines the phases to be set in the bypass pair state in the first six-phase thyristor valve, and then determines the same phase as the phase set in the bypass pair state of the first six-phase thyristor valve, as the phase to be set in the bypass pair state of the second six-phase thyristor valve.
3. a power converter connected between the three-phase AC circuit and the DC circuit; A control device for controlling the power converter; Equipped with The power converter includes a 12-phase converter including a first 6-phase thyristor valve, a second 6-phase thyristor valve connected in series with the first 6-phase thyristor valve, a first transformer connected between the three-phase AC circuit and the first 6-phase thyristor valve, and a second transformer connected between the three-phase AC circuit and the second 6-phase thyristor valve, the second transformer having a secondary winding configured such that a voltage phase shifted by 30° from a voltage appearing in a secondary winding of the first transformer appears, the control device has a restart sequence which is activated in response to an accident occurring in the three-phase AC circuit and restarts the power converter without gate blocking, and at a predetermined timing after inputting a command to activate the restart sequence, makes the phases connected in series among the phases of the first six-phase thyristor valve conductive to set a bypass pair state, and at the predetermined timing, makes the phases connected in series among the phases of the second six-phase thyristor valve conductive to set a bypass pair state, and thereafter, when a condition for restarting the power converter is satisfied, starts the start-up of the first six-phase thyristor valve and starts the start-up of the second six-phase thyristor valve; the control device determines the timing to start the startup of the first six-phase thyristor valve and the timing to start the startup of the second six-phase thyristor valve, based on whether the timing to start the startup of the first six-phase thyristor valve is before or after the startup of the second six-phase thyristor valve and whether a phase set in a bypass pair state of the first six-phase thyristor valve is the same as or different from a phase set in a bypass pair state of the second six-phase thyristor valve.
Citation Information
Patent Citations
JP1975085835A
Protective system for converter station
JP1979054234A
Method and apparatus for protection of ac / Dc converter
JP1996047257A
Ac-dc converting system
JP1996289551A
Ac-DC converting device and control method for same