Charging system, management terminal, vehicle, charging method and program

JP7632503B2Active Publication Date: 2025-02-19ISUZU MOTORS LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023034819
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-03-07
Publication Date
2025-02-19
Estimated Expiration
2043-03-07

AI Technical Summary

Benefits of technology

【0014】 本開示によれば、複数の車両に対して、出庫予定時刻までに充電を完了することができる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007632503000001
    Figure 0007632503000001
  • Figure 0007632503000002
    Figure 0007632503000002
  • Figure 0007632503000003
    Figure 0007632503000003
Patent Text Reader

Abstract

To provide a charge system, a management terminal, a vehicle, a method for charging, and a program which can finish charging of a plurality of vehicles by the time when the vehicles are scheduled to leave.SOLUTION: The charge system includes: an acquisition unit for acquiring the scheduled leaving time of each of a plurality of vehicles and the work time for performing a predetermined work; a setting unit for setting a charge plan including a charge time and a charge timing so that charging and the predetermined work for the vehicles will be both completed by the time when the vehicles are scheduled to leave; and a control unit for controlling charging of the battery of each of the vehicles according to the charge plan.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a charging system, a management terminal, a vehicle, a charging method, and a program. [Background technology]

[0002] In recent years, against the backdrop of the need to protect the natural environment and advances in rechargeable battery technology, the electrification of passenger cars and the development of infrastructure such as the expansion of charging facilities and lower prices have progressed rapidly, and this also applies to commercial vehicles. Unlike passenger cars, when charging commercial vehicles such as buses, charging plans must be created based on power consumption predictions that take into account factors that affect electricity costs, such as the route and traffic congestion. In addition, since charging commercial vehicles requires a large amount of power, when charging multiple commercial vehicles, it is necessary to consider constraints on the amount of power supply, such as peak shifting in relation to the contracted power. Various proposals have been made regarding charging plans and operation plans for commercial vehicles that take these points into consideration.

[0003] For example, Patent Document 1 discloses an operation management device that can create an operation plan for operating a plurality of commercial vehicles without running out of power.

[0004] Furthermore, for example, Patent Document 2 discloses a charging plan creation device that includes a plan creation unit that determines a charge amount of a storage battery during a period for which a plan is to be created by using an operation plan of a commercial vehicle, and creates a charging plan by using the charge amount and a maximum charging power set by a maximum power setting unit. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2018-106745 A [Patent Document 2] Patent Publication No. 2022-118575 Summary of the Invention [Problem to be solved by the invention]

[0006] However, the traffic management device including the charging plan for commercial vehicles such as buses in Patent Document 1 is inconvenient to apply as it is to commercial vehicles such as trucks that deliver goods. This is because commercial delivery vehicles have many considerations to take into account during both daytime operating hours and nighttime charging hours that do not exist for passenger cars and buses.

[0007] Furthermore, the charging plan creation device described in Patent Document 2 does not take into consideration the appropriate operation and operation preparation of commercial delivery vehicles during daytime operating hours and nighttime charging hours.

[0008] An object of the present disclosure is to provide a charging system, a management terminal, a vehicle, a charging method, and a program that are capable of completing charging of a plurality of vehicles by a scheduled departure time. [Means for solving the problem]

[0009] In order to achieve the above object, the charging system of the present disclosure includes: The scheduled departure time of the vehicle and Regarding the vehicle after returning to the warehouse An acquisition unit for acquiring a scheduled work time; A setting unit that sets a charging plan in which a charging start time and a charging duration of the vehicle are outside the scheduled work time; A charging control means for executing charging according to the charging plan; Equipped with.

[0010] The management terminal in the present disclosure includes: A management terminal connectable to the charging system, The scheduled departure time, the target charging amount, or the scheduled work time The information includes information used when the setting unit in the charging system sets the charging plan. A functional unit presented to the charging system, or The setting unit sets In charging planning The charging start time and the charging duration outside the scheduled work time And information transmitted from the charging system, Functions obtained from the charging system Department , Equipped with.

[0011] The vehicle in the present disclosure is A vehicle that can be connected to the charging system, A battery; a communication unit that receives, from the charging system, control information for remote charging control that remotely controls charging of the battery according to the charging plan including the charging start time and the charging time outside the scheduled work time set by the setting unit in the charging system; a vehicle control unit that executes charging of the battery based on the control information received by the communication unit; a progress rate indicating a charging amount relative to a target charging amount used when the setting unit sets the charging plan; and The progress rate indicating the amount of charge compared to a full charge and Display section showing and, has.

[0012] The charging method according to the present disclosure includes: The scheduled departure time of the vehicle and Regarding the vehicle after returning to the warehouse Get the planned work time and setting a charging plan in which a charging start time and a charging duration of the vehicle are outside the scheduled work time; Charging is performed according to the charging plan.

[0013] The program in this disclosure is On the computer, The scheduled departure time of the vehicle and Regarding the vehicle after returning to the warehouse Obtaining a scheduled work time; setting a charging plan in which a charging start time and a charging duration of the vehicle are outside the scheduled work time; Executing charging according to the charging plan; Execute the command. Effect of the Invention

[0014] According to the present disclosure, charging of multiple vehicles can be completed by the scheduled departure time. [Brief description of the drawings]

[0015] [Figure 1] FIG. 1 is an overall configuration diagram of a charging system according to an embodiment of the present disclosure. [Diagram 2] FIG. 2 is a flowchart showing an example of remote charging management in the charging system according to the present embodiment. [Figure 3A]FIG. 3A is a functional block diagram showing functions of a terminal device constituting a charging system according to an embodiment of the present disclosure. [Figure 3B] FIG. 3B is a functional block diagram showing functions of a management device constituting the charging system in the embodiment of the present disclosure. [Figure 3C] FIG. 3C is a functional block diagram showing functions of a vehicle that configures a charging system according to an embodiment of the present disclosure. [Figure 4A] FIG. 4A is a schematic diagram showing an example of operation plan information input by the manager. [Figure 4B] FIG. 4B is a schematic diagram showing an example of an operation plan information table in a case where the target charge amount is set from operation plan information. [Figure 4C] FIG. 4C is a schematic diagram showing an example of the relationship between the operation plan and the target charge amount. [Diagram 5] FIG. 5 is a flowchart showing an example of a charging plan setting process. [Figure 6A] FIG. 6A is a time schedule table showing an example of a charging plan set in the fastest charging mode. [Figure 6B] FIG. 6B is a time schedule table showing an example of a charging plan set in the low voltage charging mode. [Figure 7A-1] FIG. 7A-1 is a time schedule table showing an example of a charging plan set in the variation suppression mode. [Figure 7A-2] FIG. 7A-2 is a time schedule table showing an example of the SOC in a charging plan set in the variation suppression mode. [Figure 7B-1] FIG. 7B-1 is a time schedule table showing an example of a charging plan set in the low-voltage charging mode as a comparative example. [Figure 7B-2] FIG. 7B-2 is a time schedule table showing an example of the SOC in a charging plan set in the low-voltage charging mode, which is a comparative example. [Figure 8A] FIG. 8A is a table showing an example of a charging plan. [Figure 8B]FIG. 8B is a time schedule table showing an example of a charging plan. [Figure 9A] FIG. 9A is a diagram showing an example of a message box displayed on the operation screen. [Figure 9B] FIG. 9B shows a time schedule table showing an example of a charging plan displayed in the upper part of the operation screen, and a time schedule table showing an example of SOC in the charging plan displayed in the lower part of the operation screen. [Figure 10] FIG. 10 is a list showing an example of a schedule notification. [Figure 11] FIG. 11 is a flowchart showing the remote charging control on the management device side. [Figure 12] FIG. 12 is a flowchart showing remote charging control on the vehicle side. [Figure 13] FIG. 13 is a flowchart showing a process when on / off control is performed from the management device side in remote charging control. [Figure 14] FIG. 14 is a flowchart showing reconnection after interruption in remote charging control. [Figure 15] FIG. 15 is a diagram showing an example of a charging state display. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. FIG. 1 is an overall configuration diagram of a charging system according to an embodiment of the present disclosure. The charging system CS shown in FIG. 1 includes a management device 100, a terminal device 110, a vehicle 120, and a charger 130. The vehicle 120 is, for example, a commercial vehicle such as a truck that delivers packages using a distribution center as a base. The vehicle 120 is an electric vehicle that is equipped with a battery 121 (secondary battery) and supplies power from the battery 121 to a motor 122 (see FIG. 3C) for driving. The vehicle 120 is equipped with a heater that receives power from the battery 121, and a load 123 (see FIG. 3C) such as a body. The charger 130 (external power source) is connected to the battery 121 installed in the vehicle 120 and charges the connected battery 121.

[0017] The charger 130 is installed, for example, in a distribution center. The number of chargers 130 installed in the distribution center corresponds to the number of vehicles 120 to be charged. FIG. 1 shows a charger 130a corresponding to vehicle 120a, and a charger 130b corresponding to vehicle 120b. Note that the charger 130 is, for example, a known charging station, and therefore a description thereof is omitted. In the following description, a vehicle to be charged is referred to as a "target vehicle" or simply as a "vehicle." Also, connecting a battery mounted on a vehicle to a charger may be simply referred to as "connecting a vehicle to a charger."

[0018] The charging system CS shown in FIG. 1 is a system that sets a charging plan based on operation plan information, and remotely controls charging from the charger 130 to the battery 121 according to the set charging plan. FIG. 2 is a flowchart showing the procedure of remote charging management. In the remote charging management shown in FIG. 2, operation plan information of the vehicle 120 is input in step S201, a charging plan is set using the input operation plan information in step S202, and charging control is performed based on the set charging plan in step S203. In the following description, the charging plan may be referred to as a "charging schedule" or simply as a "schedule." In this description, the steps S201, S202, and S203 are shown to be executed consecutively, but each step may be executed discontinuously in time.

[0019] <Terminal Device 110> The terminal device 110 is a mobile information terminal such as a laptop computer or a tablet terminal, and inputs operation plan information. The terminal device 110 corresponds to a "management terminal" in the present disclosure. The terminal device 110 transmits the operation plan information to the management device 100 via a network such as the Internet.

[0020] Fig. 3A is a functional block diagram showing the functions of terminal device 110. Terminal device 110 functions as a communication unit 111, a control unit 112, a storage unit 113, an operation unit 114, and a display unit 115. In Fig. 3A, arrows indicate main data flows, and there may be data flows not shown in Fig. 3A.

[0021] (Communication section 111) The communication unit 111 has a communication function for connecting to a network. The communication unit 111 transmits and receives various information to and from the management device 100 via the network. The various information includes, for example, operation plan information and charging plan information.

[0022] (Operation unit 114) The operation unit 114 is an input device such as a keyboard, a mouse, or a touch pad. An operation manager (hereinafter simply referred to as "manager") inputs operation plan information by operating the operation unit 114. The operation unit 114 corresponds to the "reception unit" of the present disclosure.

[0023] FIG. 4A is a schematic diagram showing an example of operation plan information input by the manager. The operation plan information shown in FIG. 4A is operation plan information for each of vehicle A (120a), vehicle B (120b), vehicle C (120c), and vehicle D (120d). The operation plan information includes a return (scheduled) time, a next scheduled departure time, a scheduled work time (hr), a target charge amount (%), and a time when charging can start. The target charge amount (%) is set from operation plan information other than the target charge amount. Note that the operation plan information shown in FIG. 4 is reference information that serves as a reference when the management device 100 sets a charging plan. Therefore, the operation plan information may include a scheduled driving route, a scheduled driving distance (scheduled driving distance), a scheduled driving time, and cargo contents in addition to the above-mentioned return (scheduled) time.

[0024] The return (scheduled) times for vehicle A, vehicle B, vehicle C and vehicle D are "17:00", "17:30", "22:00", and "16:00", respectively. The next departure times for vehicle A, vehicle B, vehicle C and vehicle D are "6:00", "7:00", "7:00", and "7:00", respectively. The scheduled work hours (hr) for vehicle A, vehicle B, vehicle C and vehicle D are "2", "1", "1", and "1", respectively.

[0025] The target charging amounts (%) of vehicle A, vehicle B, vehicle C, and vehicle D are "100", "80", "80", and "70", respectively. The times at which charging can be started of vehicle A, vehicle B, vehicle C, and vehicle D are "22:00", "22:00", "22:00", and "22:00", respectively.

[0026] FIG. 4B is a schematic diagram showing an example of an operation plan information table. The operation plan information shown in FIG. 4B includes the (scheduled) return time, the next scheduled departure time, the scheduled work time (hr), and the time when charging can start, similar to the operation plan information shown in FIG. 4A. In addition to these pieces of information, the operation plan information shown in FIG. 4B includes the scheduled operation distance (km). The scheduled operation distances of vehicle A, vehicle B, vehicle C, and vehicle D are "100", "50", "50", and "40", respectively. The numerical values ​​shown in FIG. 4A and FIG. 4B are merely examples, and are naturally not limited to the above numerical values, and can be arbitrarily set by the operation manager, etc.

[0027] (Storage unit 113) The memory unit 113 includes a ROM (Read Only Memory) that stores the BIOS (Basic Input Output System) of the computer that realizes the terminal device 110, a RAM (Random Access Memory) that serves as the working area of ​​the terminal device 110, an OS (Operating System), application programs, and a HDD that stores data referenced when the application programs are executed.

[0028] (Display section 115) The display unit 115 is, for example, a liquid crystal display or an organic EL display. The operation plan information input by the operation unit 114 is displayed on the display unit 115. The display unit 115 may be provided outside the terminal device 110 as a device separate from the terminal device 110. For example, the terminal device 110 may be a desktop computer having an external monitor as the display unit 115. In this case, the terminal device 110 has a display control unit that displays an image on the external display unit 115 instead of the display unit 115. For example, when the terminal device 110 is a notebook computer, the terminal device 110 may have an external monitor as the display unit 115 connected to the notebook computer.

[0029] (Control unit 112) The control unit 112 is a processor such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit) in the terminal device 110, and executes an application program stored in the storage unit 113. The control unit 112 executes the application program to store operation plan information inputted by the operation unit 114 in the storage unit 113. The control unit 112 displays the operation plan information on the display unit 115. The control unit 112 controls the communication unit 111 so that the operation plan information is sent to the management device 100.

[0030] <Management device 100> Next, the configuration of management device 100 will be described with reference to FIG. 3B. The management device 100 sets a charging plan based on operation plan information transmitted from the terminal device 110. The management device 100 is a server that provides services and functions between the terminal device 110 and the vehicle 120. When the terminal device 110 or the like sends a request to the management device 100 using a Uniform Resource Locator (URL), data corresponding to the URL is sent from the management device 100 to the terminal device 110 or the like as a response.

[0031] The management device 100 may be configured by a single device (server) or may be configured by multiple devices (servers). The multiple servers include a web server, an application server, and a database server. The web server is, for example, a server that returns a result corresponding to a request to the terminal device 110 or the like. The application server is a server that executes and processes an application in response to a request received from the web server and returns the processing result to the web server. When data access is required, the application server requests a request from a database server. The database server is a server that reads and writes a database in response to a request from the application server and returns the required data to the application server. FIG. 1 shows the storage unit 103, which is a database. In the following description, the management device 100 may be called a "server."

[0032] FIG. 3B is a functional block showing the functions of a management device 100 (server). The management device 100 functions as a communication unit 101, a control unit 102, and a storage unit 103. In FIG. 3B, arrows show main data flows, and there may be data flows not shown in FIG. 3B. In FIG. 3B, each functional block shows a configuration in function units, not a configuration in hardware (device) units. Therefore, the functional blocks shown in FIG. 3B may be implemented in a single device (server), or may be implemented separately in multiple devices. Data may be exchanged between functional blocks via any means, such as a data bus.

[0033] (Communication unit 101) The communication unit 101 has a communication function for connecting to an external network such as the Internet. The communication unit 101 transmits and receives various information between the terminal device 110 and the vehicle 120 via the network. The various information includes operation plan information. The operation plan information transmitted from the terminal device 110 is stored in the storage unit 103.

[0034] (Storage unit 103) The storage unit 103 has a database (see FIG. 1) that can read and write various information. The database is configured with one or more HDDs (Hard Disk Drives), SSDs (Solid State Drives), or the like.

[0035] The memory unit 103 includes a ROM (Read Only Memory) that stores the BIOS (Basic Input Output System) of the computer that realizes the management device 100, a RAM (Random Access Memory) that serves as the working area of ​​the management device 100, an OS (Operating System), application programs, and a HDD that stores data referenced when the application programs are executed.

[0036] The memory unit 103 stores relationship information indicating the relationship between the operation plan and the target charge amount. Fig. 4C is a schematic diagram showing an example of the relationship between the operation plan and the target charge amount. The relationship information shown in Fig. 4C is categorized according to the outside air temperature (average), the planned travel distance (km), and the type of vehicle 120. In Fig. 4C, the type of vehicle 120 that is not equipped with a body is represented as "none", the type of work vehicle that is equipped with a body is represented as "work", and the type of vehicle that is equipped with a refrigeration equipment is represented as "refrigeration".

[0037] As shown in FIG. 4C, when the outside air temperature (average) is less than 15 degrees (<15°C), when the planned driving distance is 30km or less (≦30km), the power usage (target charge amount) of "none", "work", and "refrigerated" is 60%, 80%, and 90%, respectively. When the planned driving distance is 30km or more and less than 50km (30-50km), the power usage (target charge amount) of "none", "work", and "refrigerated" is 80%, 90%, and 100%, respectively. When the planned driving distance is 50km or more and less than 70km (50-70km), the power usage (target charge amount) of "none", "work", and "refrigerated" is 100%, 100%, and 100%, respectively. When the planned driving distance is 70km or more (≧70km), the power usage (target charge amount) of "none", "work", and "refrigerated" is 100%, 100%, and 100%, respectively.

[0038] As shown in FIG. 4C, when the outside temperature (average) is 15 degrees or more and 25 degrees or less (15°C to 25°C), when the planned driving distance is 30 km or less (≦30 km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 50%, 70%, and 80%, respectively. When the planned driving distance is 30 km or more and less than 50 km (30 to 50 km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 70%, 80%, and 90%, respectively. When the planned driving distance is 50 km or more and less than 70 km (50 to 70 km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 90%, 100%, and 100%, respectively. When the planned driving distance is 70 km or more (≧70 km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 100%, 100%, and 100%, respectively.

[0039] As shown in FIG. 4C, when the outside air temperature (average) exceeds 25 degrees (>25°C), and the planned travel distance is 30km or less (≦30km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 60%, 80%, and 90%, respectively. When the planned travel distance is 30km or more and less than 50km (30-50km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 80%, 90%, and 100%, respectively. When the planned travel distance is 50km or more and less than 70km (50-70km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 100%, 100%, and 100%, respectively. When the planned travel distance is 70km or more (≧70km), the power usage (target charge amount) of "None", "Work", and "Refrigeration" is 100%, 100%, and 100%, respectively. As can be seen from the relationship information shown in FIG. 4C, the target charge amount is high according to the length of the planned travel distance. Also, the target charge amount is high according to the magnitude of the electric power used by the body. When the outside air temperature is lower than a predetermined temperature range or higher than the predetermined temperature range, the power consumption of the air conditioner is high, so the target charge amount is high. Here, the predetermined temperature range is a temperature range corresponding to a so-called optimum temperature where the air conditioner is used at a low level. In either case, when a certain margin is taken into consideration, the target charge amount is set to 100% from the predetermined threshold. Therefore, the target charge amount is set based on the planned travel distance, the magnitude of the electric power used by the body, the outside air temperature, and a certain margin.

[0040] (Control unit 102) The control unit 102 is a processor such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit) in the management device 100, and functions as an acquisition unit 104 and a setting unit 105 by executing an application program stored in the storage unit 103. The management device 100 shown in FIG. 3B is an example of a single device. However, the management device 100 may be realized by, for example, multiple processors, memory, and other computing resources. In this case, each unit constituting the control unit 102 is realized by at least one of multiple different processors executing a program.

[0041] (Acquisition part 104) The acquisition unit 104 acquires the operation plan information shown in FIG. 4B and the relationship information shown in FIG. 4C stored in the storage unit 103.

[0042] (Setting unit 105) The setting unit 105 sets a charging plan (schedule) based on charging parameters, SOC (State Of Charge), and operation plan information (target charging amount, scheduled departure time, scheduled work time). Here, the charging parameters include the time when charging can start, charging equipment information, and contracted power. Also, SOC may be called "remaining capacity" or "charging rate."

[0043] Fig. 5 is a flowchart showing an example of a charging plan setting process. The flow shown in Fig. 5 is started by an instruction to start execution of an application program. In the following explanation, it is assumed that the CPU in the management device 100 executes the functions of the setting unit 105. Note that the charging parameters, the SOC (remaining capacity), and the operation plan information are stored in the storage unit 103 in advance.

[0044] First, in step S501, the CPU acquires charging parameters from the storage unit 103.

[0045] Next, in step S502, the CPU acquires the latest SOC of the target vehicle from the storage unit 103.

[0046] Next, in step S503, the CPU acquires from the storage unit 103 the operation plan information, which is the target charge amount of the target vehicle, the scheduled departure time, and the scheduled work time.

[0047] Next, in step S504, the CPU creates a charging plan.

[0048] Next, in step S505, the CPU determines whether the outgoing time is later than the scheduled outgoing time. If the outgoing time is later than the scheduled outgoing time (step S505: YES), the process proceeds to step S509. If the outgoing time is not later than the scheduled outgoing time (step S505: NO), the process proceeds to step S506.

[0049] In step S506, the CPU displays the charging plan on the display unit 115. This causes the charging plan to be notified to the manager (schedule notification). The manager can check the notified charging plan. The charging plan may be displayed on a display unit (not shown) in the management device 100.

[0050] Next, in step S507, the CPU determines whether or not an OK input has been made. If an OK input has been made (step S507: YES), the process proceeds to step S508. If an OK input has not been made (step S507: NO), this flow ends.

[0051] In step S508, the CPU confirms the charging plan, after which the flow ends.

[0052] In step S509, the CPU displays information (error information) indicating the vehicle that cannot be charged to the target charge amount by the scheduled departure time on the display unit 115. This notifies the manager of the error information (error notification).

[0053] In step S510, the CPU determines whether to update the operation plan or the target charging amount. If the operation plan or the target charging amount is to be updated (step S510: YES), the process returns to before step S501. As a result, the CPU resets the charging plan based on the updated operation plan and the target charging amount. If the operation plan or the target charging amount is not to be updated (step S510: NO), the process transitions to step S506.

[0054] <Details on setting charging plans> Next, the details of setting a charging plan will be described. The CPU calculates the amount of power required to charge the vehicle 120 (required amount of power) from the target charge amount and the remaining capacity (SOC) (step S1).

[0055] The CPU calculates the required charging time by dividing the required amount of power by the charging power of the corresponding charger 130 (see FIG. 1) (step S2). The charging power of the charger 130 indicates the power that the charger 130 can charge per unit time.

[0056] The CPU adds the required charging time and the scheduled work time together, and stores the added time as the time required to complete charging of the vehicle 120 (step S3).

[0057] The CPU performs the process shown in steps S1 to S3 for each vehicle 120.

[0058] The CPU sets charging timings for the multiple vehicles 120 according to a setting mode of the charging plan (described later) (step S4).

[0059] If the time obtained by adding the above-mentioned time from the time when charging can start exceeds the scheduled departure time, the CPU sets an error flag (step S5). If the error flag is set, it is determined in S505 that the departure time is later than the scheduled departure time.

[0060] <Fastest charging mode, low voltage charging mode, variation suppression mode> In this manner, the CPU (setting unit 105) in the management device 100 sets a charging plan based on the charging parameters, the SOC, and the operation plan information. As shown in step S4, the CPU sets the charging plan according to the setting mode of the charging plan.

[0061] The administrator may select in advance a method for setting the charging plan from among a plurality of modes (priority modes). Note that the present disclosure is not limited to this, and the administrator may select a desired charging plan from among the charging plans set in each of the plurality of modes. In this embodiment, the plurality of modes include a "fastest charging mode", a "low-voltage charging mode", and a "variation suppression mode".

[0062] The fastest charging mode sets the charging period so that all vehicles are charged to the target charge amount in the shortest time possible. The fastest charging mode is a mode in which the charging period is set as close as possible to the beginning as long as the total charging power per unit time is equal to or less than a threshold value.

[0063] The low-voltage charging mode is a mode in which the charging period is set so that the total charging power per unit time is minimized during the period until charging is completed.

[0064] In the variation suppression mode, charging is switched so as to reduce the variation in SOC between target vehicles (the variation between vehicles is suppressed, and the difference in the amount of charge between vehicles is reduced even if the departure time is earlier). Note that the present disclosure is not limited to this, and the charging period may be set to give priority (so that charging is completed earlier) to a specific type of vehicle among multiple vehicles, taking into consideration the characteristics of each vehicle.

[0065] Next, the charging period set for each of the target vehicle A, the target vehicle B, and the target vehicle C when each of the multiple modes is selected as the priority mode will be described with reference to Figs. 6A, 6B, and 7A-1. The threshold value of the total power of the charging power per unit time is "30kw". The target charging amount of the target vehicle A is "50kwh", the target charging amount of the target vehicle B is "80kwh", and the target charging amount of the target vehicle C is "30kwh". In each of Figs. 6A to 7A-1, the horizontal axis indicates time, and the vertical axis indicates power consumption (kW). The charging time and power consumption of the target vehicle A are indicated by hatching that slopes diagonally upward to the right. The charging time and power consumption of the target vehicle B are indicated by hatching that slopes diagonally downward to the right. The charging time and power consumption of the target vehicle C are indicated by hatching that slopes diagonally upward to the right and is set at intervals wider than the intervals of the hatching of the target vehicle A. For ease of explanation, the target charge amount set for target vehicle A, target vehicle B, and target vehicle C is commonly set to 100%, and the scheduled departure time is commonly set to 6:00. Also, the battery charge amount (SOC) of each target vehicle before the start of charging is assumed to be 50% for target vehicle A, 20% for target vehicle B, and 60% for target vehicle C.

[0066] (Fastest charging mode) FIG. 6A is a time schedule table showing an example of a charging plan set in the fastest charging mode. As shown in FIG. 6A, when the fastest charging mode is selected as the priority mode, the charging time in which all vehicles are charged to the target charge amount in the shortest time is 8 hours. Note that there is a time period during the charging time (8 hours) when the total charging power per unit time reaches the threshold value of "30 kW." In FIG. 6A, the threshold value is shown by a solid line drawn at the position of the power consumption "30 kW."

[0067] (Low voltage charging mode) FIG. 6B is a time schedule table showing an example of a charging plan set by the low-voltage charging mode. As shown in FIG. 6B, when the low-voltage charging mode is selected as the priority mode, it is possible to suppress the total charging power per unit time to "20 kW". The shortest charging time for all vehicles to be charged to the target charging amount is 13 hours. In FIG. 6B, the threshold value is shown by a solid line drawn at the position of the power consumption "30 kW". Also, the total power is shown by a dashed line drawn at the position of the power consumption "20 kW".

[0068] (Variation suppression mode) Fig. 7A-1 is a time schedule table showing an example of a charging plan set in the variation suppression mode. As shown in Fig. 7A-1, when the variation suppression mode is selected as the priority mode, it becomes possible to complete charging up to the target charging amount for the target vehicles B and C at "5:00". Also, it becomes possible to complete charging up to the target charging amount for the target vehicle A at "6:00".

[0069] FIG. 7A-2 is a time schedule table showing an example of SOC in a charging plan set by the variation suppression mode. The horizontal axis of FIG. 7A-2 shows time, and the vertical axis shows SOC (%). As shown in FIG. 7A-2, at the charging start time "17:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 50%, 20%, and 60%, respectively, and the maximum SOC variation between the vehicles is 40% (=60%-20%). After charging starts, the SOC variation between the vehicles becomes smaller. For example, at the time "19:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 50%, 30%, and 60%, respectively, and the maximum SOC variation between the vehicles is 30% (=60%-30%). At "20:00", the SOCs of target vehicle A, target vehicle B and target vehicle C are 50%, 40% and 60%, respectively, and the maximum SOC variation between the vehicles is 20% (=60%-40%). At "21:00", the SOCs of target vehicle A, target vehicle B and target vehicle C are 50%, 60% and 60%, respectively, and the maximum SOC variation between the vehicles is 10% (=60%-50%). At "23:00", the SOCs of target vehicle A, target vehicle B and target vehicle C are the same at 60%, and the SOC variation between the vehicles is 0%. As described above, after charging begins, the SOC variation between the vehicles becomes small.

[0070] Even six hours after the start of charging, the variation in SOC between the vehicles is kept small. For example, at "0:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 70%, 60%, and 70%, respectively, and the variation in SOC between the vehicles is 10% (=70%-60%), and at "1:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 70%, 70%, and 80%, respectively, and the variation in SOC between the vehicles is 10% (=80%-70%). At "2:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are all the same at 80%, and the variation in SOC between the vehicles is 0%. At "3:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 90%, 80%, and 90%, respectively, and the maximum SOC variation between the vehicles is 10% (=90%-80%). At "4:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 90%, 90%, and 100%, respectively, and the maximum SOC variation between the vehicles is 10% (=100%-90%). At "5:00", the SOCs of target vehicle A, target vehicle B, and target vehicle C are 90%, 100%, and 100%, respectively, and the maximum SOC variation between the vehicles is 10% (=100%-90%). At the time "6:00", the SOC of target vehicle A, target vehicle B, and target vehicle C are 100, 100%, and 100%, respectively, and the SOC variation between the vehicles is 0%. As described above, even six hours after the start of charging, the SOC variation between the vehicles is kept within 10%.

[0071] (Comparative Example) Next, a case where the low-voltage charging mode is selected as the priority mode will be described in comparison with a case where the variation suppression mode is selected. Fig. 7B-1 is a time schedule table showing an example of a charging plan set in a low-voltage charging mode as a comparative example. The time schedule table shown in Fig. 7B-1 is the same as the time schedule table shown in Fig. 6B. Therefore, a description of the time schedule table shown in Fig. 7B-1 will be omitted.

[0072] Fig. 7B-2 is a time schedule table showing an example of SOC in a charging plan set by the low-voltage charging mode, which is a comparative example. The horizontal axis of Fig. 7B-2 shows time, and the vertical axis shows SOC (%). As shown in Fig. 7B-2, at the charging start time of "17:00", the SOC of target vehicle A, target vehicle B, and target vehicle C are 50%, 20%, and 60%, respectively, and the maximum SOC variation between the vehicles is 40% (=60%-20%). The SOC variation between the vehicles at the charging start time when the low-voltage charging mode is selected is the same as when the variation suppression mode is selected (see Fig. 7A-2).

[0073] When the low-voltage charging mode is selected, at the time of “2:00”, the SOC of target vehicle A, target vehicle B, and target vehicle C are 60%, 100%, and 60%, respectively, and the SOC variation between the vehicles is a maximum of 40% (=100%-60%).

[0074] In contrast, when the variation suppression mode is selected, at the time “2:00”, the SOC of target vehicle A, target vehicle B, and target vehicle C are all identical at 80%, and the variation in SOC between the vehicles is 0% (see FIG. 7A-2).

[0075] At the time of "2:00", when the low-voltage charging mode is selected, the SOC is about 60%, whereas when the variation suppression mode is selected, the SOC is about 80%. Also, when the low-voltage charging mode is selected, the SOC variation between vehicles is a maximum of 40%, whereas when the variation suppression mode is selected, the SOC variation between vehicles is 0%. Therefore, when the suppression mode is selected, it is possible to align the SOC compared to when the low-voltage charging mode is selected. For example, even if a power outage occurs, all vehicles will be charged to the same extent.

[0076] When the low-voltage charging mode is selected, at the time "6:00", the SOC of target vehicle A, target vehicle B, and target vehicle C are 100%, 100%, and 80%, respectively, and the maximum SOC variation between the vehicles is 20% (=100%-80%). In other words, when the low-voltage charging mode is selected, the target vehicles are sequentially fully charged.

[0077] In contrast, when the variation suppression mode is selected, at "6:00", the SOC of target vehicle A, target vehicle B, and target vehicle C are 100, 100%, and 100%, respectively, and the variation in SOC between the vehicles is 0%. When the variation suppression mode is selected, the time difference for the target vehicles to become fully charged can be kept small.

[0078] <Error information> As described above, the CPU (setting unit 105) in the management device 100 sets the charging plan based on the charging parameters (charging start possible time, charging equipment information, contract power), SOC, operation plan information (target charging amount, scheduled departure time, scheduled work time), and the priority mode. The CPU also sets the charging plan according to the priority mode. However, in the set charging plan, there may be a vehicle that cannot be charged to reach the target charging amount by the scheduled departure time. The cause of the existence of such a vehicle is, for example, when a large number of vehicles are the target vehicles or when the SOC of the target vehicles is low. In the following description, information indicating a vehicle that cannot be charged to reach the target charging amount by the scheduled departure time is simply referred to as "error information." For example, this is the case when it is determined that S505 shown in FIG. 5 is Yes. At this time, the process proceeds to S509, and the error information is notified to the administrator (plan error notification). Details of the error information and the error notification are described below.

[0079] Next, the error information will be described with reference to Fig. 8A and Fig. 8B. Fig. 8A is a list (charging plan table) showing an example of a charging plan. Fig. 8A shows "charging start possible time", "scheduled departure time", "target charging rate", "latest SOC", "charge amount", "charging rate", "charging start time", and "charging end time", which are charging plan information for each of target vehicle A, target vehicle B, target vehicle C, target vehicle D, target vehicle E, and target vehicle F. Here, the "charging start time" and "charging end time" are times according to the charging plan. Therefore, the "charging start time" is the scheduled charging start time. Furthermore, the "charging end time" is the scheduled charging end time.

[0080] In this embodiment, in the charging system CS, remote charging control is performed according to a list of charging plans (charging plan table) shown in Fig. 8A. The charging plan may include, in addition to the above-mentioned "time when charging can be started", a charging time, a time when the charger 130 and the battery 121 are connected (scheduled connection time), a charging error occurrence condition, an interruption time of a vehicle scheduled to be interrupted, and the like.

[0081] There are cases where charging of a vehicle that is being charged based on a charging plan is interrupted. For example, this may be the case when the charger 130 and the battery 121 are not connected, when the on-board equipment (mounted equipment) mounted on the target vehicle is performing a predetermined operation, or when a predetermined time is scheduled to intervene between charging times. A vehicle that has a predetermined time intervene between charging times is called a "vehicle scheduled to be interrupted." The predetermined time may include, for example, a scheduled work time.

[0082] As shown in FIG. 8A, for example, for target vehicle A, the charging start time is “18:00”, the scheduled departure time is “7:00”, the target charging rate is “100% (100 kWh)”, the latest SOC is “10% (50 kWh)”, the charging amount is “50 kWh”, the charging rate is “10 kW”, the charging start time is “18:00”, and the charging end time is “3:00”.

[0083] For example, for target vehicle B, the charging start time is "18:00", the scheduled departure time is "7:00", the target charging rate is "100% (100 kWh)", the latest SOC is "20% (20 kWh)", the charging amount is "80 kWh", the charging rate is "10 kW", the charging start time is "21:00", and the charging end time is "5:00".

[0084] For example, for target vehicle C, the charging start time is "18:00", the scheduled departure time is "6:00", the target charging rate is "100% (100 kWh)", the latest SOC is "20% (20 kWh)", the charging amount is "40 kWh", the charging rate is "10 kW", the charging start time is "3:00", and the charging end time is "11:00".

[0085] For example, for target vehicle D, the charging start time is "18:00", the scheduled departure time is "7:00", the target charging rate is "100% (100 kWh)", the latest SOC is "10% (50 kWh)", the charging amount is "50 kWh", the charging rate is "10 kW", the charging start time is "19:00", and the charging end time is "4:00".

[0086] For example, for target vehicle E, the charging start time is "18:00", the scheduled departure time is "6:00", the target charging rate is "100% (100 kWh)", the latest SOC is "10% (20 kWh)", the charging amount is "80 kWh", the charging rate is "10 kW", the charging start time is "20:00", and the charging end time is "5:00".

[0087] For example, for target vehicle F, the charging start time is "18:00", the scheduled departure time is "7:00", the target charging rate is "100% (100 kWh)", the latest SOC is "20% (50 kWh)", the charging amount is "40 kWh", the charging rate is "10 kW", the charging start time is "4:00", and the charging end time is "13:00".

[0088] As shown in FIG. 8A, the charging end time "11:00" for the target vehicle C is later than the scheduled departure time "6:00". The charging end time "13:00" for the target vehicle F is later than the scheduled departure time "7:00". As a result, the target vehicles C and F are vehicles for which charging is not completed by the scheduled departure time. The charging end times for the target vehicles C and F are displayed in a display form different from the charging end times for the other target vehicles for which charging is completed by the scheduled departure time. The display form is, for example, a display effect such as color, thickness, character size, cell display color, or blinking. For example, the font representing the charging end time for the target vehicles C and F is displayed in "red". Note that, by displaying the font representing the charging end time in "red", the manager can visually recognize information (error information) indicating the vehicle that cannot be charged to reach the target charge amount by the scheduled departure time.

[0089] FIG. 8B is a time schedule table showing an example of a charging plan. The horizontal axis of FIG. 8B shows time, and the vertical axis shows power consumption (kW). The charging time and power consumption of the target vehicle A are shown by hatching that slopes diagonally upward to the right. The charging time and power consumption of the target vehicle B are shown by hatching that slopes diagonally downward to the right. The charging time and power consumption of the target vehicle C are shown by hatching that slopes diagonally upward to the right and with wider intervals than the hatching of the target vehicle A. The charging time and power consumption of the target vehicle D are shown by hatching that slopes diagonally downward to the right and with wider intervals than the hatching of the target vehicle B. The charging time and power consumption of the target vehicle E are shown by hatching with a crosshatch. The charging time and power consumption of the target vehicle F are shown by hatching with a crosshatch that is coarser than the crosshatch of the target vehicle E. A "vertical line" is displayed at the position of the scheduled departure time.

[0090] As shown in FIG. 8B, the charging end time "13:00" for target vehicle F is later than the scheduled departure time "7:00". As a result, target vehicle F is a vehicle for which charging will not be completed by the scheduled departure time. In addition, the charging end time "11:00" for target vehicle C is later than the scheduled departure time "6:00". As a result, target vehicle C is a vehicle for which charging will not be completed by the scheduled departure time. Note that the manager can visually confirm information (error information) indicating a vehicle that cannot be charged to the target charge amount by the scheduled departure time, as the position of the hatching indicating the charging time and power consumption exceeds the position of the charging end time indicated by the "vertical line".

[0091] As described above, by displaying the font representing the charging end time in "red" in the list of charging plans (charging plan table) illustrated in FIG. 8A and by displaying a "vertical line" at the position of the scheduled departure time in the time schedule table of the charging plans illustrated in FIG. 8B, the manager can visually recognize that the target vehicle is a vehicle that will not be completely charged by the scheduled departure time.

[0092] Incidentally, when there is a vehicle that will not be fully charged by the scheduled departure time, the manager needs to select a countermeasure, such as checking the charging plan or changing the charging plan. For this purpose, it is preferable to more reliably notify the manager of information (error information) indicating the vehicle that will not be fully charged by the scheduled departure time. It is also preferable to notify the manager of selection information indicating the selection of the countermeasure.

[0093] When there is a vehicle whose charging has not been completed by the scheduled departure time, the CPU in the management device 100 transmits error information to the terminal device 110. The CPU in the terminal device 110 displays the error information on the operation screen of the display unit 115. In addition, the CPU displays selection information on the operation screen.

[0094] <Error notification, selection information> 9A is a diagram showing an example of a message box displayed on the operation screen. The CPU of the terminal device 110 displays a message saying "Charging will not be completed by the scheduled departure time. Do you want to change the charging parameters?" on the operation screen (S509, error notification).

[0095] Furthermore, the CPU in the terminal device 110 displays a plurality of selection buttons (selection information) on the operation screen. Specifically, the CPU displays the selection buttons "Yes", "No", and "Check charging plan" on the operation screen. When the selection button "Yes" is pressed, the CPU in the terminal device 110 returns the process to input of charging parameters (S510 Yes). When the selection button "No" is pressed, the CPU shifts the process to reconfiguring the charging plan (S510 No). When the selection button "Check charging plan" is pressed, the CPU displays the charging plan on the operation screen of the display unit 115. Note that the CPU may superimpose the selection button "Check charging plan" and the charging plan on the operation screen.

[0096] (The charging plan displayed on the operation screen when the selection button "Check charging plan" is pressed) Fig. 9B shows a time schedule table showing an example of a charging plan displayed at the top of the operation screen, and a time schedule table showing an example of SOC in the charging plan displayed at the bottom of the operation screen. The time schedule table of the charging plan shown in Fig. 9B is the same as the time schedule table of the charging plan shown in Fig. 8A, so its description is omitted. Also, the time schedule table of SOC shown in Fig. 9B is the same as the time schedule table of SOC shown in Fig. 8B, so its description is omitted.

[0097] When the selection button “check charging plan” is pressed, the CPU in the terminal device 110 displays a time schedule table of the charging plan and a time schedule table of the SOC on the operation screen of the display unit 115.

[0098] Furthermore, the CPU in the terminal device 110 displays a "Back" operation button on the operation screen on which the time schedule table of the charging plan and the like are displayed. When the operation button "Back" is pressed, the CPU returns the process and displays a plurality of selection buttons (selection information) on the operation screen of the display unit 115.

[0099] <Schedule Notification> The error information and the like have been described above. Next, a schedule notification (S506) in which the CPU in the terminal device 110 displays a predetermined screen on the operation screen of the display unit 115 when the CPU in the management device 100 transmits the charging plan information to the terminal device 110 will be described.

[0100] 10 is a diagram showing an example of a schedule notification. The CPU in the terminal device 110 displays a list of charging plans (charging plan table) in the upper part of the operation screen, and displays a schedule table of the charging plans and a schedule table of the SOC in the lower part of the operation screen.

[0101] FIG. 10 shows the charging plan information for each of target vehicles A, B, and C, including “time when charging can start,” “scheduled time of departure,” “target charging rate,” “latest SOC,” “charge amount,” “charging rate,” “charging start time,” and “charging end time.”

[0102] For example, for target vehicle A, the charging start time is "18:00", the scheduled departure time is "7:00", the target charging rate is "100% (100 kWh)", the latest SOC is "10% (50 kWh)", the charging amount is "50 kWh", the charging rate is "10 kW", the charging start time is "1:00", and the charging end time is "6:00".

[0103] For example, for target vehicle B, the charging start time is "18:00", the scheduled departure time is "7:00", the target charging rate is "100% (100 kWh)", the latest SOC is "20% (20 kWh)", the charging amount is "80 kWh", the charging rate is "10 kW", the charging start time is "18:00", and the charging end time is "2:00".

[0104] For example, for target vehicle C, the charging start time is "18:00", the scheduled departure time is "7:00", the target charging rate is "100% (100 kWh)", the latest SOC is "60% (60 kWh)", the charging amount is "40 kWh", the charging rate is "10 kW", the charging start time is "4:00", and the charging end time is "7:00".

[0105] As shown in the above charging plan table (schedule), the charging end time "6:00" for target vehicle A is not later than the scheduled departure time "7:00", and is not later than the charging end time "2:00" and the scheduled departure time "7:00" for target vehicle B, and the charging end time "7:00" for target vehicle C is not later than the scheduled departure time "7:00". Therefore, in the above schedule notification, since there are no vehicles that will not be fully charged by the scheduled departure time, information (error information) indicating vehicles that cannot be charged to the target charge amount by the scheduled departure time is not displayed.

[0106] The schedule table of the charging plan shown in FIG. 10 indicates that the charging of each of the vehicles (target vehicle A, target vehicle B, and target vehicle C) will end before the scheduled departure time "7:00."

[0107] Moreover, the SOC schedule shown in FIG. 10 indicates that the SOC of each of all vehicles will reach the target charging rate before the scheduled departure time "7:00."

[0108] Moreover, the CPU in the terminal device 110 displays selection buttons for "Define charging plan", "Edit charging plan", and "Edit charging parameters" on the operation screen on which the time schedule table of the charging plan and the like are displayed.

[0109] When the selection button "confirm charging plan" is pressed, the CPU in the terminal device 110 determines that the manager has approved the charging plan and confirms the charging plan (schedule).

[0110] When the selection button "Edit charging plan" is pressed, the CPU in the terminal device 110 enables editing of the charging plan (target charging rate, charging amount, etc.).

[0111] When the selection button "Edit charging parameters" is pressed, the CPU in the terminal device 110 enables editing of the charging parameters (charging start time, charging facility information, and contracted power).

[0112] <Vehicle 120> Next, the configuration of vehicle 120 will be described with reference to FIG. 3C. The vehicle 120 includes a motor 122, a load 123, an ignition switch 124, a communication unit 125, a relay circuit 126, a battery management unit 127, and a vehicle control unit 128 (Vehicle Control Unit: VCU). The battery management unit 127 and the vehicle control unit 128 are included in a control unit 129. The motor 122 is connected to the relay circuit 126 via the ignition switch 124. The load 123 includes a heater and a body.

[0113] (Communications Department 125) The communication unit 125 has a communication function for connecting to a network. The communication unit 125 transmits and receives various information to and from the management device 100 via the network. The various information includes, for example, charging plan information, target vehicle information, charger connection information indicating connection / disconnection between the charger 130 and the battery 121, and on / off information of the ignition switch 124.

[0114] The communication unit 125 also transmits and receives information to and from the terminal device 110 via the network. The information includes, for example, charging stop information and error information.

[0115] (Relay circuit 126) The relay circuit 126 is composed of a charge relay, a motor relay, a heater relay, a body relay, a battery relay, etc. The charge relay connects / disconnects a high-voltage line connecting the battery 121 and the charger 130. The motor relay connects / disconnects a high-voltage line connecting the battery 121 and the motor 122. The heater relay connects / disconnects a high-voltage line connecting the battery 121 and a heater which is one of the loads 123. The body relay connects / disconnects a high-voltage line connecting the battery 121 and the body which is one of the loads 123. The battery relay connects / disconnects a high-voltage line connecting the battery 121 and each of the charge relay, the motor relay, the heater relay, and the body relay.

[0116] (Battery management unit 127) The battery management unit 127 has a function of controlling the relay circuit 126 based on the state of the battery 121 (temperature, voltage, etc.), the state of the motor 122, the state of the heater, and various information from the vehicle control unit 128. The battery management unit 127 controls each of the charge relay, the motor relay, the heater relay, the body relay, and the battery relay.

[0117] (Vehicle control unit 128) The vehicle control unit 128 has a function of determining the state of the vehicle 120 and performing control to maintain the vehicle 120 in an optimal state.

[0118] Vehicle control unit 128 (VCU) is a processor such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit), and executes application programs stored in an internal storage unit (RAM, ROM, etc.). Specifically, vehicle control unit 128 controls relay circuit 128 via battery management unit 127. Vehicle control unit 128 also controls charger 130 so that the charging power for charging battery 121 becomes a predetermined power.

[0119] Note that the functional blocks of the battery management unit 127 and the vehicle control unit 128 are not hardware (device) units, but functional units. Therefore, the functional blocks shown in FIG. 3C may be implemented in a single device, or may be implemented separately in multiple devices. When each function is implemented in multiple devices, each function may be implemented in each device, or may be implemented in a combination of any two devices and another device. In addition, data may be exchanged between the functional blocks via any means, such as a data bus or a controller area network (CAN bus). In this embodiment, the functions of the battery management unit 127 and the vehicle control unit 128 are described as being executed by one processor (CPU).

[0120] The management device 100 (server), the terminal device 110, and the vehicle 120 that configure the charging system CS have been described above. By configuring the charging system CS as described above, the charging system CS can set a charging plan (schedule) and remotely control charging from the charger 130 to the battery 121 in accordance with the set charging plan (schedule) (remote charging control).

[0121] <Remote charging control on the management device 100 side> Next, the remote charging control will be described. In the following description, first, the remote charging control on the management device 100 side will be described. Next, the remote charging control on the vehicle 120 side will be described.

[0122] 11 is a flowchart showing remote charging control on the management device 100 side. This flow is started, for example, when the management device 100 receives information (for example, charger connection information) from the vehicle 120. Note that the description will be given assuming that the charging parameters, SOC, operation plan information, and priority mode are stored in advance in the storage unit 103. In the following description, the description will be given assuming that the control unit 102 in the management device 100 executes each function of the management device 100.

[0123] First, in step S1110, the control unit 102 reads the charging plan from the storage unit 103.

[0124] Next, in step S1120, the control unit 102 transmits information indicating the charging start time to the target vehicle.

[0125] Next, in step S1130, the control unit 102 determines whether or not charging stop information has been received from the vehicle 120. The charging stop information is information indicating the charging state of the vehicle 120, and is information indicating that charging of the vehicle 120 from the charger is not being performed. If the charging stop information has been received (step S1130: YES), the process proceeds to step S1140. If the charging stop information has not been received (step S1130: NO), the process proceeds to step S1160.

[0126] In step S1140, the control unit 102 determines whether the current time is within the charging period. If the current time is within the charging period (step S1140: YES), the process proceeds to step S1150. If the current time is not within the charging period (step S1140: NO), the process proceeds to step S1160.

[0127] Next, in step S1150, the control unit 102 determines whether or not the absolute value of the difference between the current time and the scheduled charging end time exceeds a threshold value (Th). If the absolute value exceeds the threshold value (Th) (step S1150: YES), the process proceeds to step S1170. If the absolute value does not exceed the threshold value (Th) (step S1150: NO), the process proceeds to step S1160. The processes from step S1130 to step S1150 are for determining whether the charging of the vehicle 120 is stopped and is appropriate for the charging plan. If the charging of the vehicle 120 is stopped and the time is not within the charging period in the charging plan, the control unit 102 determines that the operation is normal, and if the time is within the charging period, the control unit 102 determines that an abnormality may have occurred. If it is determined that an abnormality may have occurred and the time difference between the scheduled charging end time and the current time is shorter than a predetermined threshold value, the control unit 102 determines that the charging has ended earlier than the scheduled charging end time and that there is no abnormality. If the time difference is longer than a predetermined threshold, it is assumed that some kind of abnormality may have occurred, and the process proceeds to notifying the administrator (S1170).

[0128] In step S1160, the control unit 102 determines whether or not error information indicating interruption of charging has been received. If error information has been received (step S1160: YES), the process proceeds to step S1170. If error information has not been received (step S1160: NO), the process proceeds to step S1191.

[0129] In step S1170, the control unit 102 transmits error information to the terminal device 110 (notification to the operations manager).

[0130] Next, in step S1180, the control unit 102 determines whether the error information is a predetermined error mode. If the error information is a predetermined error mode (step S1180: YES), the process proceeds to step S1190. If the error information is not a predetermined error mode (step S1180: NO), the process proceeds to step S1191.

[0131] In step S1190, the control unit 102 resets the charging plan.

[0132] Next, in step S1191, the control unit 102 determines whether or not charging of all the target vehicles has been completed. If charging of all the target vehicles has been completed (step S1191: YES), this flow ends. If charging of some of the target vehicles has not been completed (step S1191: NO), the process returns to before step 1130.

[0133] <Remote charging control on the vehicle 120 side> Next, the remote charging control on the vehicle 120 side will be described with reference to Fig. 12. Fig. 12 is a flow chart showing the remote charging control on the vehicle 120 side. This flow is started, for example, when the communication unit 125 in the vehicle 120 receives control information from the management device 100. In the following description, it is assumed that the battery management unit 127 and the vehicle control unit 128 of the vehicle 120 execute the remote charging control on the vehicle 120 side.

[0134] First, in step S1210, the control unit 129 receives (acquires) the charging plan from the management device 100 (server).

[0135] Next, in step S1220, control unit 129 determines whether the current time is within the charging period. If the current time is within the charging period (step S1220: YES), the process proceeds to step S1230. If the current time is not within the charging period (step S1220: NO), the process proceeds to step S1290.

[0136] In step S1230, control unit 129 determines whether or not the charger is connected, which indicates that charger 130 is connected to battery 121. If the charger is connected (step S1230: YES), the process proceeds to step S1240. If the charger is not connected (step S1230: NO), the process proceeds to step S1290.

[0137] Next, in step S1240, control unit 129 determines whether ignition switch 124 (see FIG. 3C) is off. If ignition switch 124 is off (step S1240: YES), the process proceeds to step S1250. If ignition switch 124 is not off (step S1240: NO), the process proceeds to step S1290.

[0138] In step S1250, the control unit 129 determines whether or not the battery 121 is fully charged. If the battery 121 is fully charged (step S1250: YES), the process proceeds to step S1260. If the battery 121 is not fully charged (step S1250: NO), the process proceeds to step S1291.

[0139] In step S1260, the control unit 129 transmits full charge information indicating that the battery 121 is fully charged.

[0140] Next, in step S1270, control unit 129 executes control to stop charging, and executes control to store a charging interruption flag.

[0141] Next, in step S1280, the control unit 129 executes control to transmit charging stop information to the management device.

[0142] In step S1290, control unit 129 executes control to transmit error information indicating the interruption of charging to the management device.

[0143] Next, in step S1291, control unit 129 executes control for charging, after which the process returns to before step S1220.

[0144] <Charging On / Off Control from the Management Device 100 (Server) Side> In the above-described remote charging control on the vehicle 120 side, the vehicle 120 acquires a charging plan from the management device 100 (server), and the vehicle 120 side performs on / off control of charging.

[0145] Next, a case where the management device 100 (server) performs on / off control of charging will be described with reference to Fig. 13. Fig. 13 is a flowchart showing a process where on / off control is performed from the management device in remote charging control. In the following description, it is assumed that the control unit 102 in the management device 100 (server) executes each function of the management device 100.

[0146] In step S1310, the control unit 102 reads the charging plan from the storage unit 103.

[0147] Next, in step S1320, the control unit 102 acquires target vehicle information from the charging plan. The target vehicle information is information necessary for controlling charging control for the target vehicle from the management device. For example, the target vehicle information includes identification information of the target vehicle, information indicating an address for communicating with the target vehicle, and a control code necessary for controlling charging control for the target vehicle from the management device.

[0148] Next, in step S1330, control unit 102 determines whether the current time is within the charging period of the target vehicle. If the current time is within the charging period of the target vehicle (step S1330: YES), the process proceeds to step S1340. If the current time is not within the charging period of the target vehicle (step S1330: NO), the process proceeds to step S1391.

[0149] In step S1340, the control unit 102 determines whether or not the charger is connected, which indicates that the charger 130 is connected to the battery 121. If the charger is connected (step S1340: YES), the process proceeds to step S1350. If the charger is not connected (step S1340: NO), the process proceeds to step S1380.

[0150] In step S1350, control unit 102 determines whether ignition switch 124 is off. If ignition switch 124 is off (step S1350: YES), the process proceeds to step S1360. If ignition switch 124 is not off (step S1350: NO), the process proceeds to step S1380.

[0151] In step S1360, the control unit 102 determines whether or not the battery 121 is fully charged. If the battery 121 is fully charged (step S1360: YES), the process proceeds to step S1391. If the battery 121 is not fully charged (step S1360: NO), the process proceeds to step S1370.

[0152] In step S1370, the control unit 102 transmits charging-on information indicating continuation of charging to the target vehicle, and then this flow ends.

[0153] In step S1380, control unit 102 issues an error notification (charging error notification) indicating that charging has been interrupted.

[0154] Next, in step S1390, the control unit 102 transmits charge-off information indicating that charging is interrupted to the target vehicle. The control unit 102 also stores a charge interruption flag in the storage unit 113.

[0155] In step S1391, the control unit 102 transmits charge-off information indicating the end (completion) of charging to the target vehicle, and then this flow ends.

[0156] As described above, in this flow, when charging on / off control is performed from the management device 100 (server) side, charging on information and charging off information are sequentially transmitted to the target vehicle, so that the vehicle control unit 128 of the vehicle 120, for example, can timely and appropriately control the relay circuit 126 based on the charging on information and charging off information, respectively.

[0157] <Reconnecting after an interruption> As described above, the remote charging control is performed in the charging system CS. If the connection between the charger 130 and the battery 121 is cut off during the remote charging control, the charging is interrupted.

[0158] Next, reconnection after interruption will be described with reference to Fig. 14. Fig. 14 is a flowchart showing reconnection after interruption in remote charging control. In remote charging control, vehicle control unit 128 (see Fig. 3C) monitors the connection / disconnection state between charger 130 and battery 121. In the following description, it is assumed that control unit 102 in management device 100 executes each function of management device 100. This flow is repeated a predetermined time after it is ended.

[0159] First, in step S1410, the control unit 102 acquires a connection signal indicating the connection / disconnection state between the charger 130 and the battery 121.

[0160] Next, in step S1420, control unit 102 determines whether or not charger 130 and battery 121 are connected. If charger 130 and battery 121 are connected (step S1420: YES), the process proceeds to step S1430. If charger 130 and battery 121 are not connected (step S1420: NO), the process returns to before step S1410.

[0161] In step S1430, the control unit 102 determines whether or not charging is interrupted in the remote charging control. If charging is interrupted (step S1430: YES), the process proceeds to step S1440. If charging is not interrupted (step S1430: NO), the process proceeds to step S1450.

[0162] In step S1440, the vehicle control unit 128 transmits charger connection information indicating the connection / disconnection state between the charger 130 and the battery 121 to the management device 100 (server). When the management device 100 (server) receives the charger connection information, it executes the charging plan setting (resetting of the charging plan) in step S202 and the charging control in S203 shown in Fig. 2. Then, this flow ends.

[0163] In step S1450, vehicle control unit 128 executes normal charging control without remote charging control, and then this flow ends.

[0164] <Charging status display> In the above remote charging control and normal charging control, the charging state of the battery 121 is displayed on a display unit (not shown) of the vehicle 120 (charging state display). The charging state of the battery 121 may be displayed on the display unit 115 of the terminal device 110.

[0165] Next, an example of the charge state display will be described with reference to FIG. 15. FIG. 15 is a diagram showing an example of the charge state display. FIG. 15 shows "vehicle A", "vehicle B" and "vehicle C" as target vehicles. The charge amount SOC of the battery 121 mounted on each of the target vehicles is also shown on the meter 1500. The progress rate is also shown numerically. The target charge amount is shown by an arrow "->". Here, the charge amount SOC is the absolute value of the remaining capacity of the battery 121. The progress rate is also the ratio of the current charge amount to the target charge amount set for each vehicle in the remote charge control during charging. The present disclosure is not limited to this, and the progress rate may be the ratio of the current charge amount to a full charge. Also, a numerical value indicating the ratio of the current charge amount to the target charge amount set for each vehicle in the remote charge control and a numerical value indicating the ratio of the current charge amount to a full charge may be shown side by side.

[0166] The meter 1500 indicates the charge state SOC in four stages from a completely discharged state to a fully charged state. That is, the charge state SOC is divided into four stages from the first stage, which is the lowest stage in the meter 1500, to the fourth stage, which is the highest stage. Each of the four stages in the meter 1500 has a rectangular frame. The rectangular frame of a stage is hatched to indicate that the stage is off. The rectangular frame of a stage is not hatched to indicate that the stage is on. Therefore, the four stages being lit in the order of the first stage, the second stage, the third stage, and the fourth stage indicates that the charge state SOC is increasing. For example, the first stage to the fourth stage being all off indicates that the charge state SOC is in a completely discharged state. Also, the first stage to the fourth stage being all lit indicates that the charge state SOC is in a fully charged state.

[0167] 15, in the charging state of the battery 121 in the vehicle A, the arrow 1501 indicating the target charge amount indicates a position between the second and third tiers on the meter 1500. The meter 1500 indicating the charge amount SOC has the first tier lit and the second and higher tiers unlit. The progress rate is 50%.

[0168] In the charging state of the battery 121 in the vehicle B, the arrow 1502 indicating the target charge amount indicates a position between the third and fourth rows on the meter 1500. The meter 1500 indicating the charge amount SOC has the first to third rows lit and the fourth row and above unlit. The progress rate is 100%.

[0169] In the charging state of the battery 121 in the vehicle C, the arrow 1503 indicating the target charge amount indicates a position between the third and fourth rows on the meter 1500. The meter 1500 indicating the charge amount SOC has the first and second rows lit, and the third row and above are off. The progress rate is 70%.

[0170] As described above, by displaying the charge amount SOC and the ratio of each of the target vehicles, the manager and the driver can visually confirm the charge state of the battery 121 of each of the target vehicles.

[0171] The charging system CS in the above embodiment includes an acquisition unit 104 that acquires the scheduled departure time of each of the multiple vehicles 120 and the work time for performing the specified work, a setting unit 105 that sets a charging plan including the charging time and charging timing so that both the charging of the multiple vehicles 120 and the specified work are completed by the scheduled departure time, and a control unit 102 that controls the charging of the batteries 121 of each of the multiple vehicles 120 in accordance with the charging plan.

[0172] With the above configuration, a charging plan is set based on the charging time and charging timing, and the batteries of each of the multiple vehicles are charged based on the set charging plan, making it possible to complete charging for the multiple vehicles by the scheduled departure time.

[0173] In addition, the charging system CS in this embodiment includes a notification unit that notifies the start and end times of charging and the start and end times of the predetermined work, which allows the manager to visually check the start time of charging, etc., using the operation unit 114 of the terminal device 110.

[0174] In addition, in the charging system CS in this embodiment, the work time includes the time for loading deliveries onto the vehicle or cleaning the inside and outside of the vehicle, and the setting unit 105 sets the charging time or charging timing based on the work time. Since the work time is a major element in the operation plan information, it becomes possible to accurately set the charging plan based on the work time.

[0175] In addition, in the charging system CS in this embodiment, the setting unit 105 sets the charging time or charging timing depending on the amount, weight, or type of cargo. Since the amount of cargo is a major factor in operation plan information, it becomes possible to accurately set the charging plan based on the operation time.

[0176] In addition, the charging system CS in this embodiment further includes an electricity consumption estimation unit that estimates electricity consumption depending on the driver's proficiency, the type of dwelling in the delivery area, or the presence or absence of body equipment. It becomes possible to more accurately calculate the target charging amount based on the estimated electricity consumption.

[0177] In the charging system CS according to the above embodiment, the operation plan information may include the number, weight, or type of cargo. This allows the target charging amount to be calculated more accurately since the charging amount is required according to the number of cargoes.

[0178] The operation plan information may also include the driver's proficiency and the type of dwelling in the delivery area. As a result, since the electricity cost (km / kWh) varies depending on the driver's proficiency, etc., an electricity cost estimation unit that estimates the electricity cost is provided, and it becomes possible to more accurately calculate the target charging amount based on the estimated electricity cost.

[0179] In addition, the above-mentioned embodiments are merely examples of the embodiment of the present disclosure, and the technical scope of the present disclosure should not be interpreted as being limited by them. In other words, the present disclosure can be embodied in various forms without departing from the gist or main features thereof. [Industrial Applicability]

[0180] The present disclosure is preferably used for a delivery management system equipped with a charging system that requires a plurality of vehicles to complete charging by the scheduled departure time. [Explanation of symbols]

[0181] CS Charging System 100 Management device (server) 101 Communications Department 102 Control section 103 Storage section 104 Acquisition Department 105 Setting section 110 Terminal Equipment 111 Communications Department 112 Control section 113 Storage section 114 Operation section 115 Display section 120 vehicles 120a Car A 120b Car B 120c Vehicle C 120d Vehicle D 121 Battery 122 Motor 123 Load 124 Ignition switch 125 Communications Department 126 Relay Circuit 127 Battery Management Unit 128 Vehicle control unit 130 charger

Claims

1. An acquisition unit that acquires a scheduled departure time of a vehicle and a scheduled work time for the vehicle after the vehicle returns to the warehouse; A setting unit that sets a charging plan in which a charging start time and a charging duration of the vehicle are outside the scheduled work time; A charging control means for executing charging according to the charging plan; Equipped with Charging system.

2. a notification unit that notifies the start time and end time of the charging and the start time and end time of the predetermined work, The charging system of claim 1 .

3. The scheduled work time includes time for loading deliveries onto the vehicle or cleaning the interior and exterior of the vehicle. The setting unit sets a charging time or a charging timing based on the scheduled work time. The charging system of claim 1 .

4. The setting unit sets a charging time or a charging timing depending on the amount, weight, or type of cargo of the vehicle. The charging system of claim 1 .

5. Further comprising an electricity consumption estimation unit that estimates electricity consumption according to the proficiency of a driver who drives the vehicle, the type of dwelling in the delivery area of ​​the vehicle, or the presence or absence of mounting equipment of the vehicle; The charging system of claim 1 .

6. A management terminal connectable to the charging system according to claim 1, a functional unit that presents to the charging system information including the scheduled departure time, the target charging amount, or the scheduled work time, which is used when the setting unit in the charging system sets the charging plan, or a functional unit that acquires from the charging system information including the charging start time and the charging time that are outside the scheduled work time in the charging plan set by the setting unit, which is transmitted from the charging system; Equipped with Management terminal.

7. A vehicle connectable to the charging system according to claim 1, A battery; a communication unit that receives, from the charging system, control information for remote charging control that remotely controls charging of the battery according to the charging plan including the charging start time and the charging time outside the scheduled work time set by the setting unit in the charging system; a vehicle control unit that executes charging of the battery based on the control information received by the communication unit; a display unit that displays a progress rate indicating a charging amount relative to a target charging amount used when the setting unit sets the charging plan, and a progress rate indicating a charging amount relative to a full charge; having vehicle.

8. Obtain a scheduled departure time of the vehicle and a scheduled work time for the vehicle after the vehicle returns to the depot; A charging plan is set in which a charging start time and a charging duration for each vehicle are outside the scheduled work time; Charging is performed according to the charging plan. Charging method.

9. On the computer, acquiring a scheduled departure time of the vehicle and a scheduled work time for the vehicle after the vehicle returns to the warehouse; setting a charging plan in which a charging start time and a charging duration for each vehicle are outside the scheduled work time; Executing charging according to the charging plan; A program for executing.

Citation Information

Patent Citations

  • Charge control system

    JP2012147651A

  • Electric vehicle operation management device, operation planning method, and computer program

    JP2018106745A

  • Electric vehicle

    JP2021083187A

  • Electricity consumption estimation device, electricity consumption estimation method, and electricity consumption estimation program

    JP2022027238A

  • Charging plan creating device, charging system, charging plan creating method and charging plan creating program

    JP2022118575A