Apparatus, rock drilling rig and drilling method

The device addresses the challenge of collision prevention in rock excavation by using teaching procedures and existing sensors to generate collision-free travel paths for rock drilling units, ensuring safe and efficient excavation in underground tunnels.

JP7669577B2Active Publication Date: 2025-04-28SANDVIK MINING & CONSTR OY
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2024143131
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2023-09-01
Filing Date
2024-08-23
Publication Date
2025-04-28
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

Current rock excavation and bolting solutions in underground tunnels face challenges in preventing collisions during the drilling of borehole patterns, which can lead to delays and potential damage.

Method used

The device provides position control data for controlling the positioning of a rock drilling unit by utilizing teaching procedures to detect collision-free travel paths, using existing sensors in the rock drilling rig to collect sensing data about the manually controlled movement of the rock drilling unit.

Benefits of technology

This solution enables the rock drilling unit to move along defined, collision-free paths, preventing impacts with the rock surface and other obstacles, thereby reducing delays and ensuring safe and efficient excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007669577000001
    Figure 0007669577000001
  • Figure 0007669577000002
    Figure 0007669577000002
  • Figure 0007669577000003
    Figure 0007669577000003
Patent Text Reader

Abstract

To provide position control data for controlling positioning of a rock drilling unit of a rock drilling rig for drilling a cross borehole pattern in an underground tunnel.SOLUTION: An apparatus (A) includes a teaching feature part (33) for collecting data about manually controlled movements at locations of a borehole pattern, thereby detecting a collision-free movement path (19). The data about the taught collision-free movement path (19) is implemented when controlling a rock drilling unit during the actual drilling phase.SELECTED DRAWING: Figure 8
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an apparatus for providing position control data for controlling the positioning of a rock drilling unit of a rock drilling rig for drilling a transverse borehole pattern in an underground tunnel or space.

[0002] The present invention further relates to a rock drilling rig and method.

[0003] The field of the invention is more clearly defined in the preambles of the independent claims. [Background technology]

[0004] Different types of rock drilling rigs are used in underground mines and construction sites. The rock drilling rigs are provided with one or more drilling booms, and a rock drilling unit is located at the distal end of the boom to drill a borehole. The purpose of drilling a hole in the rock can be to form a blast hole for detaching the rock material by blasting, or the borehole can be drilled to reinforce the rock surface by fitting rock bolts or other reinforcements inside the drilled hole. Typical underground tunnels in which the drilling and bolting measures are carried out are narrow, so that a collision risk exists. Current rock drilling and bolting solutions have been shown to include several drawbacks, especially with regard to collision investigations. Summary of the Invention

[0005] SUMMARY OF THE PRESENT EMBODIMENT It is an object of the present invention to provide a new and improved apparatus, rock excavation rig and method for providing collision free positioning data.

[0006] The device according to the invention is characterised by the characterising features of the first independent device claim.

[0007] The rock drilling rig according to the invention is characterised by the characterising features of the second independent equipment claim.

[0008] The method according to the invention is characterised by the features and steps characterising the independent method claims.

[0009] The idea of ​​the disclosed solution is that the device provides position control data for controlling the positioning of a rock drilling unit for drilling a cross borehole pattern in an underground tunnel. The device utilizes a teaching procedure for providing data about a manually controlled movement in the location of the borehole pattern to be drilled. The objective is to detect a collision-free movement path. The data about the taught movement path can be implemented when controlling the rock drilling unit during the actual drilling phase.

[0010] The strategy of teaching and generating collision-free travel paths is a preliminary phase that is performed before the actual rock excavation and other strategies that follow are initiated.

[0011] In other words, the disclosed apparatus comprises at least one control unit to which sensory data about a position and an orientation of a rock drilling unit is provided. The apparatus is provided with a teaching feature, and the apparatus is configured to collect sensory data about a manually controlled movement of the rock drilling unit in a borehole pattern to be drilled, the rock drilling unit moving along a movement path at a distance from physical obstacles to be drilled located in the borehole pattern. The apparatus is configured to generate a collision-free movement path in response to the collected sensory data.

[0012] The advantage of the disclosed solution is that collisions of the rock-excavation unit with rock surfaces and other physical obstacles can be prevented when the rock-excavation unit moves during the actual excavation according to a defined collision-free movement path. The disclosed reserve function takes only a little extra time, which does not cause a significant delay for the actual rock excavation.

[0013] A further advantage is that the disclosed solution does not require any separate specific sensing devices such as spatial sensors. Instead, the disclosed solution implements sensing data collected by existing sensors located on the boom joints and rock drilling units of the rock drilling rig. Thereby, the solution can be simple, durable and inexpensive.

[0014] According to one embodiment, the manual movement or teaching is a collision-free movement aspect, where the rock drilling unit moves in the plane of the borehole pattern to be drilled.

[0015] As used herein, rock drilling rig refers to rock bolter and long hole drilling rigs that are both equipped with rock drilling units and are used to drill borehole patterns transversely into a tunnel.

[0016] According to one embodiment, the borehole pattern is a rock bolting pattern for providing rock bolts or cable bolts reinforcing the rock surface limiting the tunnel. The device is therefore for assisting drilling of boreholes for rock bolts and cable bolts. The rock drilling rig can therefore be a rock or cable bolter, in which at least one bolting head is provided with a rock drilling unit and a means for feeding the rock bolts or the rock support cable. In this case, the collision-free movement path generated comprises avoiding collisions of the entire bolting head, which comprises the rock drilling unit and the bolt or cable feeding device. When the grout is fed into the drilled hole together with the rock bolts or cable bolts, the collision-free movement path can also comprise avoiding collisions of the grout feeding device and elements. However, it can also be considered that not only the grout feeding means but also the rock bolt magazine and the cable bolt feeding and cutting device are part of the bolting head.

[0017] According to one embodiment, the borehole pattern is a production start borehole pattern, also known as a long hole pattern, in which the boreholes are filled with explosives after cutting is completed and blasted to remove rock material.

[0018] According to one embodiment, the physical obstacles limiting the collision-free movement path of the rock-excavation unit may include the realized tunnel contour, i.e. rock surfaces such as the walls, ceiling and floor of the tunnel.

[0019] In addition to this, there may be limiting rock surfaces not only across the tunnel but also along its length.

[0020] Physical obstacles may also include possible infrastructure located in the tunnel, which may include, for example, air ducts, water pipes, hoses, electrical cables, and possible other structures and elements.

[0021] Additionally, physical obstacles may include the structure of the rock drilling rig itself. A collision-free travel path includes avoiding collisions with the boom carrying the rock drilling unit or with other booms of the rock drilling rig. Collisions with the transport equipment of the rock drilling rig are also avoided.

[0022] Thus, teaching a collision-free travel path may include avoiding all kinds of physical obstacles that pose a collision risk in the borehole pattern being drilled.

[0023] According to one embodiment the device is part of a control unit of a rock drilling rig.

[0024] Alternatively, the apparatus may be a separate device and located outside the rock drilling rig, so that the apparatus may be a server or an external control device that communicates with a control unit of the rock drilling rig.

[0025] According to one embodiment, the device is configured to survey the position of at least one selected point of the rock drilling unit and generate a collision-free movement path for the at least one selected point. In other words, the device calculates a collision-free movement path for the selected point based on the collected sensory data and input data on the dimensions and kinematics of the rock drilling unit. The device can calculate a collision-free movement path for any point in the rock drilling unit.

[0026] An alternative is to select virtual or calculated points to be surveyed when determining the collision-free travel path, so that the selected points may be outside the physical structure of the rock excavation unit or boom.

[0027] According to one embodiment, the at least one selected point may be, for example, the bit of a rock excavation tool or the front end of a feed beam.

[0028] Alternatively, the selected point may be the rear end of the feed beam, where there may be a risk of collision with the floor or bottom of the tunnel. Additionally, any other point deemed to be critical for collisions may be selected as the point to be monitored.

[0029] According to one embodiment, the device is configured to investigate the positions of at least two selected points placed at opposite points of the rock drilling unit and to generate collision-free movement paths for the selected points.

[0030] According to one embodiment, when the rock drilling unit is part of the bolting head of a rock bolter, one or more points in the bolt feeder may also be selected for collision investigation.

[0031] According to one embodiment, the device is configured to investigate the orientation of the rock drilling unit in addition to the selected position at the location of the at least one point and is configured to generate a collision-free movement path and orientation for the at least one selected point.

[0032] According to one embodiment, the apparatus is configured to implement the generated collision-free movement path to generate control commands for automatic coarse positioning of the rock drilling unit in the plane of the borehole pattern to defined locations of the boreholes of the borehole pattern.

[0033] Stated another way, the coarse positioning movement may include pointing the rock drilling unit to a defined orientation of the borehole of the borehole pattern. The location data may include position data of the borehole start point in addition to the orientation data.

[0034] After the rock drilling unit has been coarsely positioned and oriented towards the start of the borehole, fine positioning is initiated. The rock drilling unit moves in a feed direction towards the start until the drilling bit or structure of the rock drilling unit contacts the rock surface. Typically, the rock drilling unit is supported against the rock surface. The fine positioning movement can be performed at low speed or under operator control.

[0035] According to one embodiment, the device is provided with a pre-designed drilling plan for a borehole pattern. Thus, the device is configured to control the automated coarse positioning of the rock drilling rig according to the provided drilling plan. The drilling plan may comprise at least the start and end point coordinates of the borehole. If needed, the control unit can calculate the orientation angle and the length of the borehole.

[0036] The drilling plan needs to be guided to drill a borehole pattern before the actual drilling starts. In the guidance, the drilling plan is connected to the current drilling site. The realized tunnel contour and physical obstacles in the realized tunnel contour can be investigated using the disclosed teaching aspects at the same time as the guidance process is performed. The simultaneous execution of the two processes, i.e., guidance and collision-free travel path search, saves the time required for preliminary measures.

[0037] According to one embodiment, the control unit of the apparatus or rock drilling rig is provided with design features that assist the operator to define parameters for drilling the borehole pattern, so that it is possible to semi-automatically design the borehole pattern, for example on a display device of the rock drilling rig.

[0038] According to one embodiment, it is possible to move the drilling unit somewhere inside the taught and generated primary collision-free movement path. Therefore, there can be secondary collision-free movement paths at a tolerance distance from the primary movement path. In this way, extra distance from physical obstacles can be defined for the entire movement path or only in selected sections of the movement path. However, when the rock drilling unit moves along the defined primary collision-free movement path, it is placed close to the rock surface and a fine positioning strategy towards the start of the borehole is quickly performed.

[0039] According to one embodiment, the device is further provided with sensory data on the manually controlled movement of the rock drilling unit in the transverse direction of the plane of the borehole fan and in the transverse distance from the physical obstacle, whereby the generated collision-free movement path has a three-dimensional configuration. In other words, there may be a physical obstacle protruding in the longitudinal direction of the tunnel at the location of the borehole fan. Therefore, when teaching a safe movement path, the rock drilling unit cannot move only in the plane of the borehole fan, but also needs to move in the transverse direction when following the transverse obstacle. Therefore, the generated collision-free movement path has a third dimension in the transverse direction to the plane of the borehole fan. The collision-free movement path is mostly in the plane, but may include a deviation area at the location of the transverse object.

[0040] According to one embodiment, the apparatus is configured to provide data on a realized tunnel contour of the tunnel in response to the collected sensory data. In other words, aspects of the teachings provide approximate sensory data on the rock surface in the borehole fan, which can be used to generate an approximation of the realized tunnel contour. A comparison can be performed between the realized tunnel contour and the designed tunnel contour, the results of which can be used, for example, to investigate how successful the rock excavation was and the nature of the excavated rock.

[0041] The rock excavation unit does not contact the rock surface during teaching of the collision-free travel path, so the sensed data of the tunnel contour is an approximation and not an exact tunnel contour.

[0042] According to one embodiment, the apparatus is configured to present an approximation of the realized and designed tunnel contours on a display device. Of course, the taught collision-free travel path can also be displayed.

[0043] According to an embodiment, the disclosed solution also relates to a rock drilling rig for drilling a transverse borehole pattern in a rock surface of an underground tunnel. The rock drilling rig comprises a mobile transport device, at least one boom, at least one rock drilling unit supported on the at least one boom and comprising at least a feed beam and a rock drilling machine movably mounted on the feed beam, a sensing device for generating sensory data on the movement of the boom and the rock drilling unit, and a control unit for controlling the operation of the rock drilling rig. The control unit of the rock drilling rig is provided with data on a collision-free movement path in the borehole pattern to be drilled and is configured to implement the collision-free movement path in the position control of the rock drilling unit. The collision-free movement path is generated with an apparatus according to the features and embodiments disclosed herein.

[0044] According to one embodiment, the rock drilling rig is a bolting rig comprising a bolting head supported on a boom, which in addition to the rock drilling unit comprises at least a rock bolt or a cable feeder.

[0045] According to an embodiment, the disclosed solution also relates to a method for drilling a transverse borehole pattern in a rock surface of an underground longitudinal tunnel, the method comprising: drilling boreholes of the borehole pattern with a rock drilling rig comprising at least one rock drilling unit, performing a preliminary detection of physical obstacles in the borehole pattern before starting drilling of the boreholes of the borehole pattern, detecting the physical obstacles in the borehole pattern by moving the rock drilling unit under the control of an operator adjacent to a physical object comprising at least an inner surface of the tunnel, thereby teaching a collision-free movement path, storing the detected collision-free movement path and utilizing the stored collision-free movement path in the position control of the rock drilling unit when drilling the boreholes.

[0046] According to one embodiment, the method further comprises moving the rock drilling unit at a distance from the physical obstacle, whereby detection of the physical obstacle is non-contact.

[0047] According to one embodiment, the method further comprises performing a continuous manual movement of the rock drilling unit for detection of physical obstacles.

[0048] According to one embodiment, the method further comprises, when detecting a physical obstacle, selecting at least one point of the rock drilling unit to be investigated, storing a movement of the at least one selected point as a collision-free movement path, and monitoring during the drilling movement of the selected at least one point with respect to the stored collision-free movement path.

[0049] The embodiments disclosed above can be combined to form a suitable solution having the required embodiment of the above features.

[0050] Some embodiments are explained in more detail in the accompanying drawings. [Brief description of the drawings]

[0051] [Figure 1] FIG. 1 is a schematic side view of a rock drilling rig provided with a drilling unit for drilling a borehole pattern in the rock surface of a tunnel or corresponding underground space. [Diagram 2] FIG. 2 is a schematic diagram of a borehole pattern with several boreholes in the transverse direction of the tunnel. [Diagram 3] FIG. 1 is a schematic diagram showing typical types of borehole patterns. [Figure 4] FIG. 2 is a schematic diagram showing a teaching process in which a rock excavation unit is manually moved near a realized rock surface. [Diagram 5] FIG. 13 is a schematic diagram of the manual teaching process in which the rock excavation unit together with the bolting head moves inside the tunnel contour. [Figure 6]FIG. 2 is a schematic side view of a rock drilling rig and possible physical obstacles in addition to the rock face of the tunnel. [Figure 7] FIG. 13 is a schematic top view showing a physical obstacle protruding along the length of the tunnel and its effect on the generated collision-free travel path. [Figure 8] FIG. 2 is a schematic diagram showing some features and connections of an apparatus for implementing the disclosed solution. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0052] For clarity, the figures show some embodiments of the disclosed solutions in a simplified manner, in which like reference numbers identify similar elements.

[0053] FIG. 1 shows a rock drilling rig 1. The rock drilling rig 1 comprises a mobile transport device 2 and at least one drilling boom 3. The boom 3 is provided with a rock drilling unit 4 for drilling boreholes 5 into the rock surface 6 of an underground tunnel 7. The rock drilling unit 4 comprises a feed beam 8 and a rock drilling machine 9 movably mounted on the feed beam 8. When the rock drilling rig 1 is intended for fitting reinforcing elements 10, such as rock bolts 11, into the boreholes 5, there may be a bolting head 12 connected to the rock drilling unit 4 or there may be a separate boom with a bolting head. Alternatively, the boreholes 5 may be drilled to excavate material using drilling or blasting techniques. In either case, a borehole pattern 13 is drilled comprising several boreholes. The borehole pattern 13 may be pre-designed externally and transmitted to the control unit CU of the rock drilling rig 1 or, alternatively, an operator of the rock drilling rig 1 can design the borehole pattern 13 with the aid of the control unit CU.

[0054] The drilling boom 3 and the drilling unit 4 are provided with sensing devices SD for collecting data about the position and orientation so that the control unit CU can calculate position data of the rock drilling unit 4. Before starting the actual drilling phase of the borehole pattern 13, the rock drilling rig 1 is guided at the work site. For example, position markers 14 made on the rock surface 6 can be used for guidance purposes. In the guidance process, the designed borehole pattern 13 is linked to the actual drilling site. Furthermore, the teaching of a collision-free travel path is taught before starting the actual drilling, as disclosed herein.

[0055] The process of teaching and generating a collision-free travel path is carried out using a device A which may be part of the control unit CU of the rock drilling rig 1 or which may be located externally, for example connected to a server S.

[0056] FIG. 2 discloses a borehole pattern 13 comprising several boreholes 5 with different orientations. Typically, the boreholes 5 are located in the same plane transverse to the longitudinal direction of the tunnel. The borehole pattern 13 is sometimes called a borehole fan. The borehole pattern 13 comprises a theoretical tunnel contour 15, and the boreholes 5 can be defined as coordinates of a start point 16 and an end point 17. The start point 16 is located on the theoretical tunnel contour 15. The orientation and length of the boreholes can be determined at the base of the coordinates of the start point 16 and the end point 17.

[0057] Figure 3 discloses two different types of borehole patterns 13. The long hole pattern 13a is a production type borehole pattern for excavating rock material. The long hole pattern 13a includes blast holes where explosives are provided. The rock reinforcement pattern 13b or bolting pattern comprises several boreholes where reinforcing elements are provided to support the rock material surrounding the tunnel. The reinforcing elements can be rock bolts 11 or cable bolts 18.

[0058] Figure 4 discloses the principle of forming a collision-free movement path 19 inside the realized tunnel contour 20 where the borehole pattern 13 is to be drilled. The collision-free movement path 19 is created by moving the rock drilling unit 4 close to the rock surface of the realized tunnel contour 20 and storing this movement path for later use during the actual drilling phase. The operator of the rock drilling rig has good visibility to the realized tunnel contour 20 and can control the movement of the rock drilling unit 4 to teach a suitable collision-free movement path. The existing sensing devices of the rock drilling can be used to provide the necessary sensing data for generating position data such as coordinates to define the collision-free movement path. No separate complex sensing devices are required, whereby the solution is easy to be integrated into different existing rock drilling rigs.

[0059] As shown in FIG. 4, the realized tunnel contour 20 deviates from the theoretical tunnel contour 15. This is because the tunnel 7 is formed by excavation and blasting tunneling techniques, where rock material is blasted. Due to blasting, there is always some deviation in the shape and dimensions of the actual tunnel. Furthermore, tunnels are usually dimensioned as small as possible to minimize excavation costs. Due to these concerns, there is a potential risk of collision with the rock surface of the tunnel. The disclosed teaching features provide a solution to prevent collision with the walls 21, ceiling 22, and floor 23 of the tunnel 7. In FIG. 4, the drill bit 24 of the drilling tool moves at a close distance from the realized tunnel contour 20, i.e., from the realized rock surface at the location of the borehole pattern. However, it is possible to investigate other elements of the rock excavation unit when implementing the teaching.

[0060] In FIG. 5, the rock drilling unit 4 comprises a bolting head 12. When teaching and generating a collision-free travel path, both teaching and generating are investigated. The collision-free travel path may comprise one or more points 25a-25d that are investigated during teaching. The coordinates of the selected points may be calculated and stored to define the taught collision-free travel path. In FIG. 5, several possible locations for the points to be investigated are shown, with point 25a being placed on the drill bit 24, point 25b being placed on the front end of the rock drilling unit 4, point 25c being placed on the rear end of the rock drilling unit 4 and point 25d being placed on the bolting head 12. In association with the bolting head 12, there may be different devices, such as rock bolt magazines and injection feed means, that may be investigated when teaching a collision-free travel path, as well as devices for handling rock bolts and cables.

[0061] It is also possible that both the bolting head and the rock drilling unit are one combined mechanical structure, thereby forming a unit that is monitored when investigating the collision-free travel path.

[0062] In Figures 4 and 5, an exemplary collision-free movement path 19 is shown based on the movement path of the drill bit 24. However, the collision-free movement path 19 can be created for any other selected points or combination of several investigated points, and thereby may have a different appearance when compared to the exemplary case shown in Figures 4 and 5.

[0063] FIG. 6 discloses that in addition to the rock surfaces 6, there may be other physical obstacles in the tunnel 7 that need to be taken into account when carrying out the drilling of the borehole pattern. There may be infrastructure 26, such as ventilation ducts, arranged in the tunnel 7. The investigated physical obstacles may also include the structure of the rock drilling rig 1 itself. The collision-free travel path generated therefore includes, for example, avoiding collisions with other booms 27. Furthermore, the rock surfaces 6 of the tunnel 7 may include protruding rock surfaces 28 in the longitudinal or length direction L of the tunnel 7. It is therefore necessary to take into account when generating the collision-free travel path that not only the limiting rock surfaces 6 may be in the transverse direction T of the tunnel 7, but also the rock surfaces 28 protruding in the longitudinal direction L. In order to avoid collisions with such longitudinally protruding surfaces 28, the collision-free travel path generated may include areas 29 that deviate from the plane 30, thereby having a three-dimensional configuration, as shown in the simplified top view depiction in FIG. 7.

[0064] Fig. 8 discloses a possible set-up of the device A for generating a collision-free movement path 19 including position data such as coordinates 32 provided by executing a teach feature 33 of the device A. The device A comprises a control unit 34 provided with a processor 35 and a computer program product 36 executable on the processor 35 for calculating position control data and providing a collision-free movement path 31. The execution of the teach feature 33 includes collecting sensory data 37 from the sensing device SD when a manual control movement 38 is performed. The device A generates coordinates 32 for selected survey points and provides position control data 39 for controlling the rock drilling unit along the collision-free movement path 19. The generated position control data 39 is implemented when executing a coarse position control 40 of the rock drilling unit, i.e. when moving the rock drilling unit close to the designed borehole start point of the borehole pattern. The apparatus A may also be provided with or in communication with a user interface UI or display device for communicating to an operator of the rock drilling rig the collision-free travel path 19 and an approximation of the realized tunnel contour of the tunnel 7.

[0065] Apparatus A may be part of the control unit or control system of the rock drilling rig, or alternatively apparatus A may be a separate device arranged to communicate with the control unit of the rock drilling rig via a data communication connection or unit DC.

[0066] The drawings and the associated description are only intended to illustrate the idea of ​​the invention. In its details, the invention may vary within the scope of the claims.

Claims

1. 1. An apparatus (A) for providing position control data (39) for controlling the positioning of a rock drilling unit (4) of a rock drilling rig (1) for drilling a cross-borehole pattern (13) in an underground tunnel (7), comprising: A device (A) comprising at least one control unit (34) to which sensory data (37) on the position and orientation of said rock drilling unit (4) are provided, said device (A) is provided with teaching features (33), said device (A) being configured to collect sensory data (37) on a manually controlled movement (38) of said rock drilling unit (4) in a plane of the borehole pattern (13) to be drilled, said rock drilling unit (4) moving along a movement path at a distance from physical obstacles to be drilled placed in said borehole pattern (13); the device (A) is configured to generate a collision-free travel path (19) in response to the collected sensory data (37); said device (A) being configured to implement said generated collision-free movement path (19) in the position control of said rock excavation unit (4); The apparatus (A) is characterized by:

2. 2. The device according to claim 1, characterized in that the device (A) is configured to survey the position of at least one selected point (25a-25d) of the rock excavation unit (4) and to generate the collision-free movement path (19) for the at least one selected point (25a-25d).

3. 2. The device (A) according to claim 1, characterized in that the device (A) is configured to implement the generated collision-free movement path (21) to generate control commands for automatic coarse positioning (40) of the rock drilling unit (4) in the plane of the borehole pattern (13) to defined locations of the boreholes (5) of the borehole pattern (13).

4. 2. The device (A) according to claim 1, characterized in that the device (A) is further provided with sensory data on the manually controlled movement (38) of the rock drilling unit (4) in a transverse direction (T) of the plane of the drilling pattern (13) and in a transverse distance from physical obstacles in the transverse direction (T), whereby the generated collision-free movement path (19) has a three-dimensional configuration.

5. 2. The device according to claim 1, characterized in that the device (A) is adapted to provide data on a realized tunnel contour (20) of the tunnel (7) depending on the received sensory data (37).

6. A rock drilling rig (1) for drilling a transverse borehole pattern (13) in a rock surface (6) of an underground tunnel (7), comprising: A movable transport device (2); At least one boom (3); at least one rock excavation unit (4) supported on said at least one boom (3) and comprising at least a feed beam (8) and a rock excavation machine (9) movably mounted on said feed beam (8); a sensing device (SD) for generating sensory data (37) on the movements of said boom (3) and said rock drilling unit (4); a control unit (CU) for controlling the operation of the rock drilling rig (1); A rock drilling rig (1) comprising: said control unit (CU) being provided with data on collision-free travel paths (31) in the borehole pattern (13) to be drilled and configured to implement said collision-free travel paths (19) in the position control of the rock drilling unit (4), The collision-free travel path (19) is generated using a device (A) according to any one of claims 1 to 5. A rock drilling rig (1).

7. 7. A rock drilling rig according to claim 6, characterised in that the rock drilling rig (1) is a bolting rig comprising a bolting head (12) supported on the boom (3), the bolting head (12) comprising at least a rock bolt or a cable feeder in addition to the rock drilling unit (4).

8. A method for drilling a transverse borehole pattern (13) in a rock face (6) of an underground longitudinal tunnel (7), comprising: A method comprising drilling boreholes (5) of said borehole pattern (13) using a rock drilling rig (1) comprising at least one rock drilling unit (4), performing a preliminary detection of physical obstacles in the borehole pattern (13) before starting the drilling of the boreholes (5) of the borehole pattern (13); - detecting said physical obstacles in said borehole pattern (13) by moving said rock drilling unit (4) under control of an operator adjacent to a physical object comprising at least an inner surface of said tunnel (7) and thereby teaching a collision-free movement path (19); storing the detected collision-free movement path (19) and using the stored collision-free movement path (19) in position control of the rock drilling unit (4) when drilling the borehole (5); A method comprising:

9. 9. The method according to claim 8, characterized in that the detection of the physical obstacle is contactless by moving the rock drilling unit (4) at a distance from the physical obstacle.

10. 9. A method according to claim 8, characterized in that for said detection of said physical obstacles, a continuous manual movement (38) of said rock-digging unit (4) is performed.

11. selecting at least one point (25a-25d) of said rock-excavation unit (4) to be surveyed when detecting said physical obstacle; storing the movement of the at least one selected point as the collision-free movement path (19); monitoring during an excavation movement of said selected at least one point (25a-25d) with respect to said stored collision-free movement path (19); The method according to claim 8, characterized in that

Citation Information

Patent Citations

  • Apparatus and method for controlling boom of mine vehicle

    EP3385494A1

  • Apparatus, method and software product for drilling sequence planning

    US20210404292A1

  • Mining vehicle and method of moving boom

    US9476256B2