Fully automated rubber seal ring production line and its automated production method
By designing a fully automatic rubber seal ring production line, the problems of low production efficiency and single product specifications in the existing technology are solved, and the fully automated process from raw materials to finished products is realized, and the production efficiency and product quality are improved.
Patent Information
- Application Number
- JP2023192906
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2023-01-09
- Filing Date
- 2023-11-13
- Publication Date
- 2025-04-30
- Estimated Expiration
- 2043-11-13
AI Technical Summary
In the prior art, the rubber seal ring production line lacks fully automated production technology, resulting in low production efficiency and single product specifications.
A fully automatic rubber sealing ring production line has been designed, including an annular forming area, a mold hot pressing area, a deserted area, a two-stage hot pressing area, an online inspection area, a packaging marking area and a control room. The production line adopts a three-dimensional warehouse system, multi-layer roller shutter storage, automated transmission equipment and intelligent inspection equipment to realize a fully automated process from raw materials to finished products.
It realizes full automation of the rubber seal ring production process, improves production efficiency and product quality, and can produce seal rings of multiple specifications at the same time, improving the flexibility and automation level of the production line.
Smart Images

Figure 0007670381000001 
Figure 0007670381000002 
Figure 0007670381000003
Abstract
Description
[Technical field]
[0001] The present invention relates to the field of rubber production, in particular to a fully automatic rubber seal ring production line and its automatic production method. [Background technology]
[0002] Rubber sealing ring is a sealing product with a wide range of applications, which is manufactured by inserting a rubber blank into a corresponding mold, pressurizing and heating it, removing the mold parting burr, and then further heating and two-stage vulcanization. As is well known in the industry, the production of rubber sealing ring using the molding vulcanization process mainly includes several or all of the following processes: blank refining, ring molding, molding vulcanization, burr removal, two-stage vulcanization, finished product inspection, and packaging marking. In the prior art, some processes have already realized automatic production, such as the molding vulcanization process fully automatic rubber seal ring molding vulcanization production technology provided in "rubber product automatic molding vulcanization system and method" with authorized publication number CN112959568B, the burr removal process rubber seal ring automatic burr removal technology provided in "rubber seal ring high-precision automated burr removal device and removal method" with authorized publication number CN114055686A, and the two-stage vulcanization process rubber seal ring automatic two-stage vulcanization technology provided in "rubber product automatic two-stage vulcanization system based on seven-axis robot" with authorized publication number CN214724259U. The rubber seal ring production process corresponding to the above technologies has the characteristics of high automation level and production efficiency, but they are all for a single production process and do not have the useful technical effect of achieving full automation of the entire rubber seal ring production process. In the prior art, there are several automation technologies for other rubber products.For example, the fully automatic Mylar rubber dome production line provided in "Fully automatic Mylar rubber dome production line" with the authorization publication number CN105719880B, the automatic medical rubber glove production line provided in "Automatic medical rubber glove production line" with the authorization publication number CN109366828B, the automatic multi-function rubber belt grinding production line provided in "Automatic multi-function rubber transmission belt grinding production line" with the authorization publication number CN213532775U, the "Electronic RTV silicone The automatic rubber pad production line provided in the "rubber pad automatic production line" with application number CN107553800A, the automatic rubber holder production line provided in the "rubber holder automatic production line" with application publication number CN113510892A, and the automatic rubber belt processing production line provided in the "rubber belt automatic processing production line" with application number CN109483787A. Although the above technologies realize the automatic production of each rubber product, according to the public knowledge in the industry and the technical features of the corresponding patents, the above rubber product production procedures are significantly different from the rubber seal ring production procedures, and it is difficult to obtain technical suggestions for the full automatic production of the entire rubber seal ring production process. In the "rubber automatic production line and control method" with the authorized publication number CN113829575B, an automatic rubber product production procedure is provided that improves the production efficiency and equipment utilization rate of the entire production line by matching the production tact of the mold opening and closing operation and the molding vulcanization operation. Although this technology is used for the automatic production of rubber seal rings, this technology is essentially only for the molding vulcanization production process and is not related to other production processes.
[0003] At present, the full-automatic production technology for the entire rubber sealing ring production process using the molding vulcanization process has not been seen either in China or abroad. Summary of the Invention [Problem to be solved by the invention]
[0004] The present invention aims to provide a fully automated production line and an automated production method for rubber seal rings, in order to solve the technical problems that the traditional rubber seal ring full production flow technology has a low automation rate and the specifications of the produced rubber seal rings are uniform. [Means for solving the problem]
[0005] In order to solve the above technical problems, the technical means adopted in the present invention are: A fully automatic rubber seal ring production line, including: a ring forming area, a molding vulcanization area, a deburring area, a two-stage vulcanization area, an online inspection area, a packaging marking area and a control room; The ring forming area includes a blank box multi-story warehouse and a plurality of blank forming machines, the blank box multi-story warehouse further includes blank boxes, a blank box multi-story warehouse vertical load-bearing steel frame, and a blank box multi-story warehouse horizontal load-bearing steel frame, the blank boxes are installed on a load-bearing steel frame consisting of the blank box multi-story warehouse vertical load-bearing steel frame and the blank box multi-story warehouse horizontal load-bearing steel frame, a blank box multi-story warehouse four-way shuttle passage is further installed on the load-bearing steel frame consisting of the blank box multi-story warehouse vertical load-bearing steel frame and the blank box multi-story warehouse horizontal load-bearing steel frame, a blank box multi-story warehouse four-way shuttle is further installed in combination with the blank box multi-story warehouse four-way shuttle passage, and the blank box multi-story warehouse four-way shuttle is further installed on the blank box multi-story warehouse four-way shuttle. A blank box multi-story warehouse inlet stacker is installed at the entrance of the passage, a first blank box belt conveyor is further installed beside the blank box multi-story warehouse inlet stacker, a first blank box transfer mechanism is further installed in combination with the first blank box belt conveyor, a blank box multi-story warehouse outlet stacker is further installed at the exit of the blank box multi-story warehouse four-way shuttle passage, a blank box multi-story warehouse outlet passage used in combination with the blank box multi-story warehouse is installed beside the blank box multi-story warehouse outlet stacker, the multiple blank forming machines are installed in parallel beside the blank box multi-story warehouse, and a second blank box belt conveyor used in combination with the blank box multi-story warehouse is further installed jointly on the other side of the multiple blank forming machines, The molding curing area includes a mold multi-storey, a production multi-storey and an assembly unit, the mold multi-storey is divided into a plurality of layers with the same structure, each layer is provided with a plurality of horizontal first mold multi-storey roller groups, a plurality of vertical second mold multi-storey roller groups and one third mold multi-storey roller group, the second mold multi-storey roller group and the first mold multi-storey roller group jointly constitute a plurality of mold multi-storey mold storage sections, a first belt conveyor steering rod is respectively installed at the entrances and exits of the mold multi-storey mold storage sections, a second belt conveyor steering rod is further installed at each transfer section between the second mold multi-storey roller group and the third mold multi-storey roller group, the assembly unit includes a first transfer robot, a third blank box belt conveyor used in combination is installed beside the first transfer robot, a third blank box transfer tank used in combination with the third blank box belt conveyor is further installed on the third blank box belt conveyor, and a third photoelectric sensor is further installed on the third blank box belt conveyor, the third blank box belt conveyor is further installed on the third blank box belt conveyor, A second mold belt conveyor is further installed on the conveyor at a different height perpendicular to the ground direction, a mold sorting baffle is installed on the second mold belt conveyor, a mold barcode reader is further installed on the second mold belt conveyor, a mold multi-story warehouse input stacker is further installed at the outlet of the second mold belt conveyor, a mold multi-story warehouse output stacker is further installed at a position corresponding to the mold multi-story warehouse input stacker, and the mold multi-story warehouse input stacker and the mold multi-story warehouse output stacker are connected through a third mold multi-story warehouse roller group, The production multi-storey includes a fifth blank box belt conveyor, a third belt conveyor steering rod, a molding vulcanization production unit, a molding vulcanization multi-storey vertical load-bearing steel frame, a molding vulcanization multi-storey horizontal load-bearing steel frame, a ground rail of a second transfer robot, a second transfer robot, a fourth photoelectric sensor, a fifth photoelectric sensor and a sixth photoelectric sensor, and a plurality of the molding vulcanization multi-storey vertical load-bearing steel frames and a plurality of the molding vulcanization multi-storey horizontal load-bearing steel frames constitute one molding vulcanization multi-storey rack;The molding vulcanization multi-level warehouse rack is divided into a plurality of layers in a direction perpendicular to the ground, and a plurality of molding vulcanization production units are stored in each layer; a ground rail of a second transfer robot is installed between the molding vulcanization multi-level warehouse racks; a second transfer robot is installed in combination with the ground rail of the second transfer robot; a fourth photoelectric sensor, a fifth photoelectric sensor and a sixth photoelectric sensor are respectively installed at positions adjacent to the ground rail of the second transfer robot of the fifth blank box belt conveyor; and a steering rod of the third belt conveyor is installed at the connection between the fifth blank box belt conveyor and the third blank box belt conveyor; the deburring area includes a sixth blank box belt conveyor, a deburring machine base, a fourth blank box transfer tank, a third blank box transfer mechanism, a plurality of deburring machines, a seventh photoelectric sensor, a third platform lifting mechanism, blank boxes, and a deburring machine support rod, the deburring machine support rod is installed below the deburring machine base, a deburring machine is installed above the deburring machine base, one side of the deburring machine is the fifth blank box belt conveyor, the other side of the deburring machine is installed the sixth blank box belt conveyor, a third platform lifting mechanism and a third blank box transfer mechanism are installed in front of the deburring machine, the fourth blank box transfer tank is installed on the sixth blank box belt conveyor, the seventh photoelectric sensor is installed on the fifth blank box belt conveyor, the blank boxes are attached to the deburring machines, the plurality of deburring machines share one fifth blank box belt conveyor and share one sixth blank box belt conveyor; The two-stage vulcanization area includes a rubber ring tray arrangement robot, a rubber ring tray, a fourth blank box transfer mechanism, a third transfer robot, a two-stage vulcanization area oven frame temporary placement area, a ground rail of the third transfer robot, an oven and an oven holder. The rubber ring tray is combined with and installed by the rubber ring tray arrangement robot. A fourth blank box transfer mechanism is installed beside the rubber ring tray arrangement robot. The ground rail of the third transfer robot is installed on the fourth blank box transfer mechanism. The third transfer robot is combined with and installed on the ground rail of the third transfer robot. A two-stage vulcanization area oven frame temporary placement area is further installed on the ground rail of the third transfer robot. A number of the ovens are installed on both sides of the ground rail of the third transfer robot through the oven holder, and are divided into two layers, upper and lower. The ground rail of the third transfer robot and the third transfer robot are used in combination to transport the installed oven frame into and out of the oven; The online inspection area includes a rubber ring automatic detector supply passage, a rubber ring automatic detector pass rubber ring discharge passage, a rubber ring automatic detector fail rubber ring discharge passage and a rubber ring automatic detector, the rubber ring automatic detector supply passage, the rubber ring automatic detector pass rubber ring discharge passage and the rubber ring automatic detector fail rubber ring discharge passage are respectively connected to the rubber ring automatic detector, and the other end of the rubber ring automatic detector supply passage is connected to a rubber ring tray arrangement robot, the packaging marking area includes a rejected rubber ring supply passage in the packaging marking area, a accepted rubber ring supply passage in the packaging marking area, a rejected rubber ring packaging marking machine, a accepted rubber ring packaging marking machine, a rejected rubber ring discharge passage in the packaging marking area, and a accepted rubber ring discharge passage in the packaging marking area, one end of the rejected rubber ring supply passage in the packaging marking area is connected to the rejected rubber ring discharge passage of the automatic rubber ring detection machine and the other end is connected to the rejected rubber ring packaging marking machine, the rejected rubber ring discharge passage in the packaging marking area is connected to the rejected rubber ring packaging marking machine, the accepted rubber ring supply passage in the packaging marking area is connected to the accepted rubber ring discharge passage of the automatic rubber ring detection machine and the other end is connected to the accepted rubber ring packaging marking machine, and the accepted rubber ring discharge passage in the packaging marking area is connected to the accepted rubber ring packaging marking machine.
[0006] Optionally or preferably, the blank box further includes a blank box barrel, a plurality of the blank box barrels are arranged in parallel on one side in the blank box, a heat insulating area is arranged beside the blank box barrel, a mold storage section is arranged above the heat insulating area, a blank box mold clamping groove is further arranged above the heat insulating area, a barrel upper edge is arranged at the top of the blank box barrel, a barrel stop edge is arranged along the bottom of the outer side of the barrel upper edge, a barrel side edge vertical groove and a barrel positioning rod are further arranged on the inner side wall of the blank box barrel, a barrel seat is further arranged at the bottom of the blank box barrel, a barrel seat lifting auxiliary hole is further arranged in the barrel seat, a barrel positioning rod lateral fixing rod is further arranged below the barrel seat, and a barrel positioning rod upper connecting rod and a barrel positioning rod bottom connecting rod are respectively arranged at the upper end and the lower end of the barrel positioning rod.
[0007] Optionally or preferably, the first blank box transfer mechanism further includes a base for a first blank box transfer mechanism, the base for the first blank box transfer mechanism is installed on a side of the first blank box belt conveyor close to the blank box multi-storey warehouse, the base for the first blank box transfer mechanism further includes a Z-axis slide table for the first blank box transfer mechanism and a Y-axis slide table lead screw for the first blank box transfer mechanism, the Y-axis slide table motor for the first blank box transfer mechanism is installed on the Y-axis slide table lead screw for the first blank box transfer mechanism, the clamping cylinder and a first blank box transfer tank for the first blank box transfer mechanism are further installed on the base for the first blank box transfer mechanism, a first photoelectric sensor is further installed on the first blank box belt conveyor, and the second blank box transfer mechanism includes a second Z-axis of a second blank box transfer mechanism installed on a blank forming machine base. a slide table lead screw and a first Z-axis screw of a second blank box transfer mechanism, a second Z-axis slide table motor of the second blank box transfer mechanism and a first Z-axis slide table motor of the second blank box transfer mechanism are respectively installed on the upper ends of the second Z-axis slide table lead screw of the second blank box transfer mechanism and the first Z-axis screw of the second blank box transfer mechanism, the second Z-axis slide table lead screw of the second blank box transfer mechanism and the first Z-axis screw of the second blank box transfer mechanism are connected via the installed X-axis lead screw of the second blank box transfer mechanism, an X-axis slider of the second blank box transfer mechanism and a cylinder of the second blank box transfer mechanism are further installed on the X-axis lead screw of the second blank box transfer mechanism, and the third blank box transfer mechanism includes a first Z-axis slide table lead screw of the third blank box transfer mechanism and a second Z-axis slide table lead screw of the third blank box transfer mechanism,The first Z-axis slide table lead screw of the third blank box transfer mechanism and the second Z-axis slide table lead screw of the third blank box transfer mechanism are respectively installed on a deburring machine base, the first Z-axis slide table lead screw of the third blank box transfer mechanism and the second Z-axis slide table lead screw of the third blank box transfer mechanism are connected via the X-axis slide table lead screw of the installed third blank box transfer mechanism, an X-axis slide table connection block of the third blank box transfer mechanism and a cylinder of the third blank box transfer mechanism are installed on the X-axis slide table lead screw of the third blank box transfer mechanism, an X-axis slide table motor of the third blank box transfer mechanism is installed on one end of the X-axis slide table lead screw of the third blank box transfer mechanism, a second Z-axis slide table motor of the third blank box transfer mechanism is installed on the upper end of the second Z-axis slide table lead screw of the third blank box transfer mechanism, a first Z-axis slide table motor of a third blank box transfer mechanism is installed on the upper end of a first Z-axis slide table lead screw of the box transfer mechanism; the fourth blank box transfer mechanism includes a base of a fourth blank box transfer mechanism, a first Z-axis lead screw of the fourth blank box transfer mechanism and a fourth pedestal lifting mechanism are respectively installed on the upper part of the base of the fourth blank box transfer mechanism; one end of the first Z-axis lead screw of the fourth blank box transfer mechanism and the second Z-axis lead screw of the fourth blank box transfer mechanism are both installed on the base of the fourth blank box transfer mechanism, and the first Z-axis slide table motor of the fourth blank box transfer mechanism and the second Z-axis slide table motor of the fourth blank box transfer mechanism are respectively installed on the other end; the first Z-axis lead screw of the fourth blank box transfer mechanism and the second Z-axis lead screw of the fourth blank box transfer mechanism are connected via the X-axis slide table lead screw of the installed fourth blank box transfer mechanism;An X-axis slide table motor of the fourth blank box transfer mechanism is provided at one end of the X-axis slide table lead screw of the fourth blank box transfer mechanism, a cylinder of the fourth blank box transfer mechanism is further provided at the X-axis slide table lead screw of the fourth blank box transfer mechanism, and an eighth photoelectric sensor is installed on the sixth blank box belt conveyor.
[0008] Optionally or preferably, the blank forming machine includes a blank forming machine base, a blank tray, a blank strip guide device, a blank pick mechanism, a blank forming table, a second blank box transfer mechanism, a first base lift mechanism, a blank box, a second blank box belt conveyor, a second blank box transfer tank, a second photoelectric sensor, a blank forming machine support rod, a blank strip cutter and a blank clamping claw, and a blank forming machine support rod is installed on the lower bottom surface of the blank forming machine base, and a blank forming table, a second blank box belt conveyor, a blank strip guide device, a blank tray, a second blank box transfer mechanism, a second blank box belt conveyor and a first base lift mechanism are further installed on the blank forming machine base, a blank strip cutter, a blank clamping claw and a blank pick mechanism are installed on the blank forming table, and the blank strip guide device includes a blank strip guide device mounting seat attached to the blank forming machine base and two upper and lower blank strip guides located thereon. the blank tray includes a blank tray body, a blank tray rotating shaft, and a blank tray mounting seat, the blank tray is mounted on a blank forming machine base via the blank tray mounting seat and assisted in rotation by a blank tray motor installed thereon, a rubber blank strip extruded by a high pressure extruder is further wound around the blank tray, a second blank box transfer tank is installed on the second blank box belt conveyor and a second photoelectric sensor is further installed on the second blank box belt conveyor, the first platform lifting mechanism includes a first platform lifting mechanism motor, a first platform lifting mechanism lead screw, and a first platform lifting mechanism connecting rod, one end of the first platform lifting mechanism lead screw is installed on the blank forming machine base and the other end of the first platform lifting mechanism motor is installed thereon and a first platform lifting mechanism connecting rod is installed thereon, the first platform lifting mechanism connecting rod is driven by the first platform lifting mechanism lead screw to move up and down in a direction perpendicular to the ground, the blank picking mechanism includes a blank picking mechanism Z-axis lead screw,The Z-axis lead screw of the blank pick mechanism is installed at one end on the blank forming machine base, and the Z-axis motor of the blank pick mechanism is installed at the other end. The Z-axis lead screw of the blank pick mechanism is installed with the X-axis lead screw of the blank pick mechanism and the Y-axis slide table of the blank pick mechanism. The X-axis connecting mechanism of the blank pick mechanism is installed at one end of the X-axis lead screw of the blank pick mechanism, and the X-axis connecting mechanism of the blank pick mechanism is further installed with a blank pick mechanism cylinder. The X-axis motor of the blank pick mechanism is installed at the other end of the X-axis lead screw of the blank pick mechanism, and the fourth platform lifting mechanism and the first platform lifting mechanism have the same structure, which will not be described in detail here.
[0009] Optionally or preferably, the molding vulcanization production unit includes a molding vulcanization production unit outer frame and a mold, the molding vulcanization production unit outer frame has a rectangular parallelepiped structure, a molding vulcanizer is installed in the molding vulcanization production unit outer frame, a molding vulcanization production unit control box is installed on one side of the molding vulcanizer, a first loading and unloading mechanism is installed on the other side, a second platform lifting mechanism is installed at the front of the molding vulcanization production unit outer frame, the molding vulcanizer includes a molding vulcanizer C-type base, the molding vulcanizer C-type base is installed on the bottom plate of the molding vulcanization production unit outer frame and provides mechanical structural support for the molding vulcanizer, a molding vulcanizer driving shaft is further installed on the upper part of the molding vulcanizer C-type base, the molding vulcanizer driving shaft moves up and down along a Z-axis perpendicular to the ground direction, a first electromagnetic adsorption device, a first insulation layer and a first heating plate are respectively installed from top to bottom, and a vulcanization insulation layer is installed on the outer edge of the first heating plate. a plate is further installed, and a second heating plate, a second insulating layer and a second electromagnetic adsorption device are respectively installed from bottom to top at the bottom of the C-type base of the molding vulcanizer; the first loading and unloading mechanism includes a Z-axis lead screw of the first loading and unloading mechanism and a Y-axis slide table of the first loading and unloading mechanism, one end of the Z-axis lead screw of the first loading and unloading mechanism is installed on the bottom plate of the outer frame of the molding vulcanization production unit, and the other end of the Z-axis motor of the first loading and unloading mechanism is installed on the Y-axis slide table of the first loading and unloading mechanism, a cylinder connection block of the first loading and unloading mechanism is installed on the cylinder connection block of the first loading and unloading mechanism, and a cylinder rotation assembly of the first loading and unloading mechanism is installed on the cylinder connection block of the first loading and unloading mechanism, and the cylinder of the first loading and unloading mechanism is divided into a cylinder upper part of the first loading and unloading mechanism and a cylinder lower part of the first loading and unloading mechanism;The upper cylinder of the first loading and unloading mechanism and the lower cylinder of the first loading and unloading mechanism are connected to a gas source respectively, and are controlled by corresponding barometers. The second platform lifting mechanism and the first platform lifting mechanism have the same structure, and will not be described in detail here.
[0010] Optionally or preferably, the deburring machine includes a deburring machine outer frame, a second loading and unloading mechanism and a deburring mechanism, the second loading and unloading mechanism includes a deburring machine clamping and removing end, a Y-axis slide table of the second loading and unloading mechanism, a Z-axis motor of the second loading and unloading mechanism and a Z-axis lead screw of the second loading and unloading mechanism, the deburring machine clamping and removing end includes a deburring machine deburring head, a first force sensor, a deburring machine clamping and removing end connector and a deburring machine cylinder. The deburring head of the deburring machine is connected at one end to a first force sensor, and at the other end, a 45° inclined friction surface and a 90° inclined friction surface are successively installed. The first force sensor is connected at one end to the deburring head of the deburring machine, and at the other end, to a deburring machine clamping and removing end connector. The deburring machine clamping and removing end connector is respectively connected to the first force sensor, the deburring machine cylinder, and the Y-axis slide table of the second loading and unloading mechanism. The deburring machine cylinder is connected to the deburring machine clamping and removing end connector. The lower part of the deburring machine outer frame is connected to the deburring machine outer frame. The second loading and unloading mechanism is provided with a Y-axis slide table, a Y-axis motor of the second loading and unloading mechanism and a Y-axis lead screw of the second loading and unloading mechanism, one end of the Z-axis lead screw of the second loading and unloading mechanism is installed on the deburring machine base and the other end of the Z-axis motor of the second loading and unloading mechanism, and the deburring mechanism is provided with an X-axis slide table of the deburring machine, The deburring machine includes a deburring machine rubber ring rotating motor and a deburring machine deburring table, the X-axis slide table of the deburring machine is composed of a deburring machine rubber ring pulling hook, a deburring machine rubber ring pulling guide block, a second force sensor, a deburring machine X-axis slide table connecting block, a deburring machine X-axis slide table lead screw and a deburring machine X-axis slide table motor, one side of the second force sensor is connected to the deburring machine rubber ring pulling hook through a horizontal rod and the other side is connected to the deburring machine X-axis slide table connecting block,The connecting block of the X-axis slide table of the deburring machine is connected to the second force sensor on one side and to the lead screw of the X-axis slide table of the deburring machine on the other side, and the connecting force is used to slide the second force sensor through the lead screw of the X-axis slide table of the deburring machine, and finally to drive the rubber ring tension hook of the deburring machine to tension the rubber ring.
[0011] Optionally or preferably, the rubber ring tray placement robot includes a rubber ring tray placement robot outer frame, a rubber ring tray placement robot pneumatic rod, a rubber ring tray placement robot cylinder, a rubber ring tray placement robot base and a rubber ring tray placement robot support rod, the rubber ring tray placement robot outer frame is installed on the rubber ring tray placement robot base, and a plurality of rubber ring tray placement robot pneumatic rods forming the same included angle are all connected at one end to the rubber ring tray placement robot outer frame and at the other end to the rubber ring tray placement robot cylinder, and a rubber ring tray is further installed above the rubber ring tray placement robot base for placing the rubber rings placed by the rubber ring tray placement robot, and the rubber ring tray is subjected to rubber ring tray identification. a barcode for indicating the position of the tray placement robot in the oven frame; a rubber ring tray placement robot support rod for providing mechanical support and height adjustment for the tray placement robot is installed below the rubber ring tray placement robot base; the oven frame is composed of an oven frame holder, an oven frame hook and a rubber ring tray, and is used to accommodate different rubber ring trays and is used in combination with an oven; the oven is composed of an oven door, an oven body, an oven door guide rail and an oven door hook, the oven door is driven by a motor installed in the oven to be opened and closed along the oven door guide rail, and the oven frame hook in the oven frame is used in combination with the oven door hook.
[0012] Optionally or preferably, the rubber ring automatic detector includes a pass rubber ring outlet, a fail rubber ring outlet, a rubber ring detection plate motor, a rubber ring separation mechanism, a fail rubber ring nozzle, a fail rubber ring inlet, a pass rubber ring nozzle, a pass rubber ring inlet, a rubber ring detection plate, and a rubber ring automatic detector base, and a rubber ring automatic detector outer frame is provided at the center of the upper part of the rubber ring automatic detector base, and a rubber ring automatic detector outer frame is further provided around the periphery, and a rubber ring automatic detector support rod is provided at the lower part, and a first detection station, a second detection station, a third detection station, a fourth detection station, and a fifth detection station are further provided at the upper part of the rubber ring automatic detector base, and further, the fifth detection station includes a Z-axis slide table lead screw of the fifth detection station and a Z-axis detection head of the fifth detection station, and the fifth detection station is provided at the upper part of the rubber ring automatic detector base. The Z-axis slide table lead screw of the output station has one end installed on the rubber ring automatic detector base, and the Z-axis slide table motor of the fifth detector station is provided at the other end. A detection head connection block of the fifth detector station is provided in the middle. One side of the Z-axis detection head of the fifth detector station is connected to the detection head connection block of the fifth detector station, and a detection camera of the fifth detector station is provided at the bottom. A power supply for the fifth detector station is further provided below the detection camera of the fifth detector station. The power supply for the fifth detector station is located below the rubber ring detection plate. A pass rubber ring nozzle and a fail rubber ring nozzle are provided at the upper part of the rubber ring detection plate near the supply passage of the rubber ring automatic detector, for blowing air into the rubber rings to send pass or fail rubber rings to the pass rubber ring inlet or fail rubber ring inlet, respectively.
[0013] Optionally or preferably, the rejected rubber ring packaging marking machine includes a packaging bag barrel, a packaging bag barrel rotating shaft, a first packaging bag, a rubber ring receiving barrel, a ninth photoelectric sensor, a packaging marking machine supporting rod, a packaging bag guide tube, a marking device, a packaging bag lateral heat sealing machine, a second packaging bag, a barcode marking, a rubber ring and a packaging bag longitudinal heat sealing machine, the lower part of the packaging marking machine supporting rod is placed on the ground, and a packaging bag barrel is provided on the upper part via the packaging bag barrel rotating shaft, and the first packaging bag is wound around the packaging bag barrel. A roll-shaped thin film is wound at its lower part by a packaging bag guide tube to form a thin film tube with one open end. The open side end of the first packaging bag is heat-sealed by a packaging bag vertical heat-sealing machine, and the lower end is sealed twice by a packaging bag horizontal heat-sealing machine before and after accommodating a rubber ring. The rubber ring is supplied from the rejected rubber ring supply passage of the packaging marking unit, passes through a rubber ring receiving barrel, and falls into a second packaging bag whose lower end and side end are sealed. While falling, it is counted by a ninth photoelectric sensor, and the second packaging bag is marked by a marking device.
[0014] A method for automatically producing a rubber seal ring based on a fully automatic rubber seal ring production line, comprising: S1, the production line management staff issues a production command in the control room, and the blank box multi-story warehouse four-way shuttle transports the blank box in the blank box multi-story warehouse to the blank box multi-story warehouse output stacker via the blank box multi-story warehouse four-way shuttle passage, and then transports the blank box to the operation area of the first transfer robot via the blank box multi-story warehouse output passage, and establishes a correspondence between the production command and the barcode on the blank box; S2, the first transfer robot sandwiches the blank box in the blank box multi-level warehouse four-way shuttle and transfers it into the second blank box transfer tank, and the blank box multi-level warehouse four-way shuttle returns to the blank box multi-level warehouse; S3, the second blank box transfer tank carries the blank box and conveys it along the second blank box belt conveyor to a blank forming machine which produces blank rings of corresponding material grades; S4, the second blank box transfer mechanism is turned on, and the blank box is clamped and taken out of the second blank box transfer tank, and the connecting rod of the first base lifting mechanism is inserted into the barrel base lifting auxiliary hole to be attached to the first base lifting mechanism; S5, lifting the connecting rod of the first base lifting mechanism close to the blank forming machine until the barrel base reaches the highest position; S6, after the installation of the blank box is completed, the blank forming machine operates, and the blank pick mechanism cylinder clamps the blank strip while pulling it forward until the blank clamping claw clamps the front end of the blank strip; S7, the blank pick mechanism cylinder releases the blank strip, and the blank strip guide device guide pulley conveys the blank strip forward until the required blank strip length is formed according to the required blank ring specification; S8, the blank pick mechanism cylinder clamps the blank strip, and the blank strip cutter operates to cut the blank strip; S9, the blank pick mechanism cylinder bends the blank strip into a ring shape under the action of the blank pick mechanism, and the blank pick mechanism cylinder and the blank clamping claws extrude both ends of the blank strip to complete blank ring formation; S10, the blank clamping claws are released, and the blank pick mechanism cylinder places the blank ring on the barrel base where the blank box has been raised, and then the barrel base is driven by the connecting rod of the first base lifting mechanism to move slightly downward, so that the vertical height position of the next blank ring on the barrel base is close to that of the previous blank ring; S11, repeating S6 to S10 until the blank ring is filled in the barrel; S12: clamping the blank box in a second blank box transfer tank by a second blank box transfer mechanism, and transporting the second blank box transfer tank to an operating area of a first transfer robot by a second blank box belt conveyor; S13, the first transfer robot holds the blank box and transfers it from the second blank box transfer tank to the third blank box transfer tank, identifies the barcode on the blank box, and sends a mold command to the mold multi-level warehouse; S14, the molds in the corresponding mold storage sections in the mold storage are transported to the mold storage output stacker by the first mold storage roller group, the second mold storage roller group, and the third mold storage roller group under the action of the first belt conveyor steering rod and the second belt conveyor steering rod; S15, the corresponding mold is raised and lowered to the operating position of the first transfer robot by the mold multi-level warehouse delivery stacker, and the first transfer robot clamps the corresponding mold in the blank box mold cavity of the blank box; S16, the third blank box transfer tank is conveyed by the third blank box belt conveyor to the molding vulcanization area, and is conveyed to the corresponding second transfer robot operating area under the action of the third belt conveyor steering rod and the fifth blank box belt conveyor; S17, the second transfer robot clamps the blank box and takes it out of the third blank box transfer tank, and installs it in the second base lifting mechanism of the idle molding vulcanization production unit by inserting the connecting rod of the second base lifting mechanism into the barrel base lifting auxiliary hole; S18, the second transfer robot attaches the mold in the blank box to the molding vulcanizer, and the barrel base of the second base lifting mechanism that is away from the molding vulcanizer is lifted to the highest position by the second base lifting mechanism; S19, the first electromagnetic adsorption device and the second electromagnetic adsorption device of the molding vulcanizer are operated to adsorb the upper mold and the lower mold respectively; S20, the molding vulcanizer biasing shaft of the molding vulcanizer moves upward to separate the upper mold and the lower mold; S21, the first loading and unloading mechanism sucks the blank ring from the barrel that accommodates the blank ring of the blank box into the lower mold, and then the molding vulcanizer biasing shaft moves downward; S22, the first heating plate and the second heating plate are operated to start molding vulcanization for the blank ring; S23, after the molding vulcanization is completed, the molding vulcanizer biasing shaft moves upward, and the first loading and unloading mechanism cylinder of the first loading and unloading mechanism moves between the upper mold and the lower mold; S24, the molding vulcanizer biasing shaft moves upward until the upper mold, the lower mold and the cylinder of the first loading and unloading mechanism are in close contact with each other; S25, the cylinder of the first loading and unloading mechanism operates to adsorb the rubber ring in the mold, and according to the data of the sensor, it is determined that the rubber ring adsorption position is at the upper part of the cylinder of the first loading and unloading mechanism or the lower part of the cylinder of the first loading and unloading mechanism; S26, the molding vulcanizer biasing shaft moves upward, and the first loading and unloading mechanism transfers the rubber ring to the finished rubber ring barrel of the blank box; S27, the finished rubber ring barrel base is driven by the second base lifting mechanism to move slightly downward, so that the vertical height position of the next rubber ring on the barrel base is close to that of the previous rubber ring; S28, repeating steps S19 to S27 until all the blank rings are molded and vulcanized and are accommodated in the finished rubber ring barrel one by one; S29, until the upper mold and the lower mold approach each other and are in close contact with each other, the molding vulcanizer biasing shaft moves downward, the first electromagnetic suction device and the second electromagnetic suction device stop working, and the second platform lifting mechanism lowers all the barrel platforms on both sides of the blank box to their lowest positions; S30, the molding vulcanizer biasing shaft moves upward, and the transfer robot clamps the mold and puts it into the blank box mold cavity of the blank box, and clamps the blank box and puts it into the third blank box transfer tank; S31, the third blank box transfer tank is transported to a deburring area by a fifth blank box belt conveyor, and the third blank box transfer mechanism takes out the blank box in the third blank box transfer tank, and installs it in the third base lifting mechanism by inserting the connecting rod of the third base lifting mechanism into the barrel base lifting auxiliary hole; S32, the third base lifting mechanism lifts the barrel base on the blank barrel side of the blank box to the highest position; S33, the third blank box transfer mechanism clamps the rubber ring of the finished product barrel side of the blank box on the deburring machine deburring stand, and positions the rotating shaft of the deburring machine rubber ring rotating motor and the deburring machine rubber ring pulling hook in the rubber ring; S34, the X-axis slide table of the deburring machine operates to tighten the rubber ring, and the tightening degree is controlled by the second force sensor; S35, the deburring machine rubber ring rotating motor is operated to rotate and drive the rubber ring, the deburring machine deburring head is operated to deburr the rubber ring by its friction surface, and the removing force is controlled by the first force sensor; S36, after the deburring of the rubber ring is completed, the X-axis slide table of the deburring machine releases the rubber ring, the third blank box transfer mechanism clamps the rubber ring to the blank barrel side of the blank box, and the blank barrel base is driven by the third base lifting mechanism to move slightly downward, so that the vertical height position of the next rubber ring on the barrel base is close to that of the previous rubber ring; S37, repeating steps S29 to S36 until all the rubber rings have been deburred and are accommodated one by one in the blank barrel; S38, the third base lifting mechanism is operated to lower all the barrel bases on both sides of the blank box to their lowest positions, and the third blank box transfer mechanism is operated to clamp the blank box into the fourth blank box transfer tank; S39, the fourth blank box transfer tank conveys the blank boxes along the sixth blank box belt conveyor to the two-stage vulcanization area; S40, the fourth blank box transfer mechanism is operated, and the connecting rod of the fourth base lifting mechanism is inserted into the barrel base lifting auxiliary hole to attach the blank box and the fourth base lifting mechanism; S41, the rubber ring tray arrangement robot takes out the rubber rings one by one from the blank barrel of the blank box, arranges them on the rubber ring tray so as not to overlap each other, and establishes a relationship between the barcode on the rubber ring tray and the barcode on the blank box; S42, after all the rubber rings are arranged in the blank box, the fourth blank box transfer mechanism clamps the mold in the blank box onto the second mold belt conveyor, and transports it into the mold three-dimensional warehouse by the second mold belt conveyor; the fourth blank box transfer mechanism clamps the blank box onto the first blank box belt conveyor, and transports it into the blank box three-dimensional warehouse by the first blank box belt conveyor; S43, transferring the rubber ring tray to an oven frame by a third transfer robot, and after transferring all the rubber ring trays on which the same batch of rubber rings are arranged to the oven frame, transferring the oven frame into the oven by the third transfer robot; S44, the oven is operated to perform two-stage vulcanization on the rubber ring; S45, after the second-stage vulcanization is completed, the third transfer robot transfers the oven frame from the oven and places it in the oven frame temporary placement area of the second-stage vulcanization area, the third transfer robot places the rubber ring trays in the oven frame on the rubber ring tray placement robot base one by one, and the rubber ring tray placement robot sucks the rubber rings into the rubber ring automatic detection machine supply passage one by one; S46, the rubber rings are fed one by one through the feeding passage of the rubber ring automatic detector to the blank automatic detector for detecting the appearance quality and size, the detection information is associated with the barcode on the rubber ring tray, the acceptable rubber rings are fed into the acceptable rubber ring inlet, and are conveyed to the packaging marking area through the acceptable rubber ring discharge passage of the rubber ring automatic detector, and the unacceptable rubber rings are fed into the unacceptable rubber ring inlet, and are conveyed to the packaging marking area through the unacceptable rubber ring discharge passage of the rubber ring automatic detector; S47, packaging and marking the passed rubber rings by a passed rubber ring packaging and marking machine, and associating the marking information with the bar code on the rubber ring tray; and packaging and marking the rejected rubber rings by a rejected rubber ring packaging and marking machine, and associating the marking information with the bar code on the rubber ring tray. Effect of the Invention
[0015] Based on the above technical solutions, the embodiments of the present invention can at least achieve the following technical effects: (1) Aim for full automation of all production processes. In the fully automated rubber seal ring production technology provided in this patent, the blank box is removed from the blank box warehouse and then transported to the ring molding area, the rubber rings produced in the ring molding area are stacked one by one in the blank box, and then the blank box is transported to the mold blank box assembly unit. After the assembly of the mold and blank box is completed, they are transported as a whole to the molding vulcanization production unit, the mold in the blank box is removed and installed in the molding vulcanization production unit, the rings in the blank box are removed one by one and mold vulcanized, and the finished rubber rings after vulcanization are stacked one by one in the blank box. After the molding vulcanization of all rings is completed, the mold is removed from the molding vulcanization production unit and assembled into the blank box, the blank box is transported to the mold blank box separation unit, the mold is separated and then transported to the mold warehouse, and the remaining blank box is transported to the deburring area. The finished rubber rings in the blank box are deburred one by one in the deburring area, and the rubber rings after deburring are stacked one by one in the blank box. After all the finished rubber rings have been deburred, the blank box is transported to the two-stage vulcanization area, the finished rubber rings in the blank box are placed one by one on the oven tray, and the oven tray is transported to the oven for two-stage vulcanization. After the two-stage vulcanization is completed, the oven tray is taken out of the oven, and the rubber rings in the tray are transported one by one to the online inspection area for inspection. After the inspection is completed, they are transported one by one to the packaging and marking area for packaging and marking, completing the fully automatic production process of the entire rubber sealing ring production process.
[0016] (2) The production line can simultaneously produce rubber sealing rings of various specifications. The rubber sealing ring fully automatic production line provided in this patent mainly relies on seven universal technical settings to achieve the useful effect of simultaneously producing rubber sealing rings of various specifications on the production line. 1. Universal double barrel blank box. The double barrel blank box is a material transport carrier between different processes in the production line, and is universal for rubber sealing rings of different specifications. The technical form is that the apex of the blank ring or rubber ring is positioned at three points on the barrel base, and the apex is fixed for rubber rings of different specification dimensions, which has the useful effect of universal positioning for clamping and stacking. The places where the double barrel blank box is used include the ring molding area, molding vulcanization area, deburring area and two-stage vulcanization area, and the auxiliary lifting structure of the blank box is the same and can be universally used in the entire production line. For detailed structure, please refer to the examples in the specific embodiments. 2. Universal blank molding method. In the blank automatic forming technology used in this patent, the rubber blank is re-refined and then extruded into a continuous blank strip, and the blank strip is wound on a blank tray. When used, the length of the blank strip is calculated according to the circumference of the rubber ring, and the blank tray is controlled to discharge the blank strip of this length, so that the blank strip can be wound into a ring to form a rubber ring of the desired size. For detailed structure, please refer to the examples in the specific embodiments. 3. Universal molding vulcanization method. In the molding vulcanization manufacturing technology used in this patent, a single-cavity molding vulcanization mold is used, and the molds with different cavity sizes have the same external dimensional structure. The molding vulcanization pressure, time and temperature of the molding vulcanization manufacturing unit can be controlled and adjusted, and are applicable to sealing rings of different sizes and rubber types. For detailed structure, please refer to the examples in the specific embodiments. 4. Universal burr removal method.In the burr removal method used in this patent, two core rods are used to expand the rubber ring, one core rod fixes the rubber ring, and the other core rod is linked by the slide table module to expand the rubber ring, and the degree of expansion is controlled by a sensor connected to the slide table. The core rod linked by the slide table module is connected to a motor, and the rubber ring is expanded and then driven by the motor to rotate. After rotation, the rubber ring is deburred on the inside and outside by the burr removal core rod of the automatic deburring machine, achieving the useful effect of universally deburring the rubber ring. For detailed structure, please refer to the examples in the specific embodiments. 5. Universal two-stage vulcanization method. In the two-stage vulcanization method used in this patent, the rubber rings that have completed the two-stage vulcanization are stacked on the oven tray by the parallel robot, and then the tray is transported into the oven by the seven-axis robot. Different oven temperatures are set according to different rubber types, achieving the useful effect of universally performing two-stage vulcanization of the rubber ring. For detailed structure, please refer to the examples in the specific embodiments. 6. Universal online detection method. In the online detection method used in this patent, the CCD cameras of different workstations are used to inspect the surface of the rubber rings, and the Z-axis height of the CCD cameras is adjusted by the Z-axis slide table module to universally inspect the appearance quality and dimensions of rubber rings of different dimensions, for detailed structure, please refer to the examples in the specific embodiments. 7. Universal packaging marking. In the packaging marking method used in this patent, the rubber rings are counted by the sensor installed on the belt conveyor, packaged in universal packaging plastic sealed bags, and identification code marking on the packaging bags is completed by the code printer, for detailed structure, please refer to the examples in the specific embodiments. [Brief description of the drawings]
[0017] [Figure 1] FIG. 2 is a schematic layout diagram of a preferred rubber seal ring automatic production line provided in the present invention. [Diagram 2] FIG. 2 is a top view of a preferred blank box multi-level warehouse provided by the present invention. [Diagram 3] FIG. 2 is a side view of a preferred blank box multi-level warehouse provided by the present invention. [Figure 4] FIG. 2 is a schematic diagram of a preferred blank box multi-level warehouse transfer mechanism provided in the present invention. [Diagram 5] FIG. 1 is a schematic diagram of a preferred blank box provided by the present invention. [Figure 6] FIG. 2 is a top view of a preferred blank box provided in the present invention. [Figure 7] FIG. 1 is a schematic diagram of a preferred blank box barrel provided in the present invention. [Figure 8] FIG. 2 is a schematic diagram of a preferred barrel seat provided in the present invention. [Figure 9] FIG. 2 is a top view of a preferred blank forming machine provided in the present invention. [Figure 10] FIG. 1 is a left side view of a preferred blank forming machine provided in this invention. [Figure 11] FIG. 2 is a right side view of a preferred blank forming machine provided in this invention. [Figure 12] 1 is a preferred blank pick mechanism of a blank forming machine provided in the present invention. [Figure 13] FIG. 1 is a schematic diagram of a preferred mold provided in the present invention. [Figure 14] FIG. 2 is a schematic diagram of a preferred mold multi-level warehouse provided by the present invention. [Figure 15] FIG. 2 is a top view of a preferred molding vulcanization unit provided in the present invention. [Figure 16] FIG. 2 is a front view of a preferred molding vulcanizing unit provided in the present invention. [Figure 17] FIG. 2 is a side view of a preferred molding vulcanization unit provided in the present invention. [Figure 18] 1 is a preferred molding vulcanization unit ground rail transfer mechanism provided in the present invention. [Figure 19] FIG. 2 is a top view of a preferred molding vulcanization production unit provided in the present invention. [Figure 20] FIG. 2 is a front view of a preferred molding vulcanization production unit provided in the present invention. [Figure 21] FIG. 2 is a left side view of a preferred molding vulcanization production unit provided in the present invention. [Figure 22] FIG. 2 is a right side view of a preferred molding vulcanization production unit provided in the present invention. [Figure 23] A preferred molding vulcanization manufacturing unit loading and unloading mechanism is provided in the present invention. [Figure 24] FIG. 1 is a schematic diagram of a preferred molding vulcanization manufacturing unit molding vulcanizer provided in the present invention. [Diagram 25] FIG. 1 is a top view of a preferred deburring machine provided in the present invention. [Figure 26] FIG. 2 is a left side view of a preferred deburring machine provided in the present invention. [Figure 27] FIG. 2 is a right side view of a preferred deburring machine provided in the present invention. [Figure 28] FIG. 2 is a top view of a preferred deburring machine rubber ring tensioning mechanism provided in the present invention. [Figure 29] FIG. 2 is a side view of a preferred deburring machine rubber ring tensioning mechanism provided in the present invention. [Diagram 30] FIG. 2 is a top view of a second preferred loading / unloading mechanism provided in the present invention. [Diagram 31] FIG. 2 is a side view of a preferred deburring head provided in the present invention. [Diagram 32] FIG. 2 is a top view of a preferred two-stage vulcanization area provided by the present invention. [Diagram 33] FIG. 2 is a schematic diagram of a preferred two-stage vulcanization area rubber ring tray arrangement mechanism provided by the present invention. [Diagram 34] FIG. 2 is a top view of a preferred two-stage vulcanization area blank box loading and unloading mechanism provided in the present invention. [Diagram 35] FIG. 2 is a side view of a preferred two-stage vulcanization area blank box loading and unloading mechanism provided in the present invention. [Diagram 36] FIG. 2 is a side view of a preferred two-stage vulcanization area provided in the present invention. [Figure 37] FIG. 1 is a side view of a preferred oven provided in accordance with the present invention. [Figure 38] FIG. 2 is a side view of a preferred oven frame provided in the present invention. [Figure 39] FIG. 2 is a top view of a preferred automatic rubber ring detector provided in the present invention. [Diagram 40] FIG. 2 is a side view of a preferred automatic rubber ring detector provided in the present invention. [Diagram 41] FIG. 2 is a top view of a preferred rubber ring packaging marking unit provided in the present invention. [Diagram 42] FIG. 1 is a front view of a preferred rubber ring packaging marking machine provided in the present invention. [Diagram 43] FIG. 1 is a side view of a preferred rubber ring packaging marking machine provided in the present invention. [Diagram 44] FIG. 2 is a schematic diagram of a preferred rubber ring packaging marking machine rear bag sealing mechanism provided in the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] The present invention provides a fully automatic rubber seal ring production line, which includes a ring molding area, a molding vulcanization area, a deburring area (5), a two-stage vulcanization area (6), an online inspection area (7), a packaging marking area (8) and a control room (9); The ring forming area includes a blank box multi-story warehouse (1) and a plurality of blank forming machines (2). The blank box multi-story warehouse (1) further includes blank boxes (101), a blank box multi-story warehouse vertical load-bearing steel frame (102) and a blank box multi-story warehouse horizontal load-bearing steel frame (103). The blank boxes (101) are installed on a load-bearing steel frame consisting of the blank box multi-story warehouse vertical load-bearing steel frame (102) and the blank box multi-story warehouse horizontal load-bearing steel frame (103). A blank box multi-story warehouse four-way shuttle passage (104) is further installed on the load-bearing steel frame consisting of the blank box multi-story warehouse vertical load-bearing steel frame (102) and the blank box multi-story warehouse horizontal load-bearing steel frame (103). A blank box multi-story warehouse four-way shuttle (105) is further installed in combination with the blank box multi-story warehouse four-way shuttle passage (104). The blank box multi-story warehouse four-way shuttle (105) is further installed in combination with the blank box multi-story warehouse four-way shuttle (105). A blank box multi-story warehouse inlet stacker (106) is installed at the entrance of the passage (104), a first blank box belt conveyor (110) is further installed beside the blank box multi-story warehouse inlet stacker (106), a first blank box transfer mechanism (107) is further installed in combination with the first blank box belt conveyor (110), a blank box multi-story warehouse outlet stacker (108) is further installed at the exit of the blank box multi-story warehouse four-way shuttle passage (104), a blank box multi-story warehouse outlet passage (109) used in combination with the blank box multi-story warehouse is installed beside the blank box multi-story warehouse outlet stacker (108), the plurality of blank forming machines (2) are installed in parallel beside the blank box multi-story warehouse (1), and a second blank box belt conveyor (209) used in combination with the blank box multi-story warehouse is further installed jointly on the other side of the plurality of blank forming machines (2); The molding curing area includes a mold multi-storey (3), a production multi-storey and an assembly unit. The mold multi-storey (3) is divided into a number of layers with the same structure, and each layer is provided with a number of horizontal first mold multi-storey roller groups (307), a number of vertical second mold multi-storey roller groups (309) and a third mold multi-storey roller group (316). The second mold multi-storey roller group (309) and the first mold multi-storey roller group (307) jointly form a number of mold multi-storey mold storage sections (306). A first conveyor belt is provided at the entrance and exit of the mold multi-storey mold storage section (306). A steering rod (308) is installed in each of the assembly units, and a second belt conveyor steering rod (314) is further installed at each transfer section between the second mold three-dimensional warehouse roller group (309) and the third mold three-dimensional warehouse roller group (316). The assembly unit includes a first transfer robot (301), a third blank box belt conveyor (303) used in combination with the first transfer robot (301) is installed beside the first transfer robot (301), and a third blank box transfer belt conveyor (303) used in combination with the third blank box transfer belt conveyor (303) is installed on the third blank box transfer belt conveyor (303). A spacer tank (302) is further installed, a third photoelectric sensor (317) is further installed on the third blank box belt conveyor (303), a second mold belt conveyor (310) is further installed at a different height perpendicular to the ground direction on the third blank box belt conveyor (303), a mold arrangement baffle (311) is installed on the second mold belt conveyor (310), a mold barcode reader (312) is further installed on the second mold belt conveyor (310), and a mold solid barcode reader (313) is further installed on the outlet of the second mold belt conveyor (310). A warehouse receiving stacker (313) is further installed, and a mold multi-storey delivery stacker (304) is further installed at a position corresponding to the mold multi-storey receiving stacker (313). The mold multi-storey receiving stacker (313) and the mold multi-storey delivery stacker (304) are connected through a third mold multi-storey roller group (316). The production multi-storey includes a fifth blank box belt conveyor (401), a third belt conveyor steering rod (402), a molding vulcanization production unit (403), a molding vulcanization multi-storey vertical load-bearing steel frame (404),The molding vulcanization multi-story warehouse includes a horizontal load-bearing steel frame (405), a ground rail (406) of a second transfer robot, a second transfer robot (407), a fourth photoelectric sensor (408), a fifth photoelectric sensor (409) and a sixth photoelectric sensor (410). A plurality of the molding vulcanization multi-story warehouse vertical load-bearing steel frames (404) and a plurality of the molding vulcanization multi-story warehouse horizontal load-bearing steel frames (405) constitute a molding vulcanization multi-story warehouse rack. The molding vulcanization multi-story warehouse rack is divided into a plurality of layers in a direction perpendicular to the ground, and a plurality of molding vulcanization production units (403) are stored in each layer. The molding vulcanization multi-story warehouse rack a ground rail (406) for a second transfer robot is installed between the fifth blank box belt conveyor (401) and the third blank box belt conveyor (303); a ground rail (406) for a second transfer robot is installed between the fifth blank box belt conveyor (401) and the third blank box belt conveyor (303); a fourth photoelectric sensor (408), a fifth photoelectric sensor (409) and a sixth photoelectric sensor (410) are installed at positions adjacent to the ground rail (406) for the second transfer robot on the fifth blank box belt conveyor (401); and a steering rod (402) for the third belt conveyor is installed at a connection between the fifth blank box belt conveyor (401) and the third blank box belt conveyor (303). The deburring area (5) includes a sixth blank box belt conveyor (501), a deburring machine base (502), a fourth blank box transfer tank (503), a third blank box transfer mechanism (504), a number of deburring machines (505), a seventh photoelectric sensor (506), a third platform lifting mechanism (507), blank boxes (101), and a deburring machine support rod (509), the deburring machine support rod (509) is installed below the deburring machine base (502), and the deburring machine (505) is installed above the deburring machine base (502), one side of the deburring machine (505) is the fifth blank box belt conveyor (401), and the deburring machine (505) a sixth blank box belt conveyor (501) is installed on the other side of the deburring machine (505), a third platform lifting mechanism (507) and a third blank box transfer mechanism (504) are installed in front of the deburring machine (505), the fourth blank box transfer tank (503) is installed on the sixth blank box belt conveyor (501), the seventh photoelectric sensor (506) is installed on the fifth blank box belt conveyor (401), the blank box (101) is attached to the deburring machine (505), the multiple deburring machines (505) share one fifth blank box belt conveyor (401) and one sixth blank box belt conveyor (501), The second-stage vulcanization area (6) includes a rubber ring tray arrangement robot (601), a rubber ring tray (602), a fourth blank box transfer mechanism (603), a third transfer robot (604), a second-stage vulcanization area oven frame temporary placement area (605), a ground rail (606) of the third transfer robot, an oven (607) and an oven holder (608). The rubber ring tray (602) is combined with and attached to the rubber ring tray arrangement robot (601). A fourth blank box transfer mechanism (603) is installed beside the rubber ring tray arrangement robot (601). The fourth blank box transfer mechanism (603) is connected to the ground rail of the third transfer robot. A third transfer robot (604) is installed in combination with the ground rail (606) of the third transfer robot, and a two-stage vulcanization area oven frame temporary placement area (605) is further installed on the ground rail (606) of the third transfer robot. A plurality of ovens (607) are installed on both sides of the ground rail (606) of the third transfer robot via the oven holders (608) and are divided into two layers, an upper layer and an lower layer. The ground rail (606) of the third transfer robot and the third transfer robot (604) are used in combination to load and unload the installed oven frame (6075) into and from the oven (607). The online inspection area (7) includes a rubber ring automatic detector supply passage (712), a rubber ring automatic detector pass rubber ring discharge passage (707), a rubber ring automatic detector fail rubber ring discharge passage (717) and a rubber ring automatic detector, the rubber ring automatic detector supply passage (712), the rubber ring automatic detector pass rubber ring discharge passage (707) and the rubber ring automatic detector fail rubber ring discharge passage (717) are connected to the rubber ring automatic detector, respectively, and the other end of the rubber ring automatic detector supply passage (712) is connected to a rubber ring tray arrangement robot (601), The packaging marking area (8) includes a packaging marking area rejected rubber ring supply passage (801), a packaging marking area accepted rubber ring supply passage (802), a packaging marking machine for rejected rubber rings (803), a packaging marking machine for accepted rubber rings (804), a packaging marking area rejected rubber ring discharge passage (805), and a packaging marking area accepted rubber ring discharge passage (806). The packaging marking area rejected rubber ring supply passage (801) is connected at one end to a rubber ring automatic detector rejected rubber ring discharge passage (717). The other end is connected to a packaging marking machine for rejected rubber rings (803), the packaging marking area's rejected rubber ring discharge passage (805) is connected to the packaging marking machine for rejected rubber rings (803), the packaging marking area's accepted rubber ring supply passage (802) has one end connected to the automatic rubber ring detector's accepted rubber ring discharge passage (707) and the other end connected to the packaging marking machine for accepted rubber rings (804), and the packaging marking area's accepted rubber ring discharge passage (806) is connected to the packaging marking machine for accepted rubber rings (804).
[0019] As an optional embodiment, the blank box (101) further includes a blank box barrel (1011), a plurality of the blank box barrels (1011) are arranged in parallel on one side of the blank box (101), a heat insulating area (1014) is arranged beside the blank box barrel (1011), a mold storage section (1013) is arranged above the heat insulating area (1014), a blank box mold clamping groove (1012) is further arranged above the heat insulating area (1014), a barrel upper edge (10111) is arranged on the top of the blank box barrel (1011), and a barrel stop edge (10111) is arranged along the bottom outside the barrel upper edge (10111). 2) is installed, a barrel side edge vertical groove (10113) and a barrel positioning rod (10114) are further installed on the inner side wall of the blank box barrel (1011), a barrel base (10115) is further installed at the bottom of the blank box barrel (1011), a barrel base lifting auxiliary hole (10116) is further installed in the barrel base (10115), a barrel positioning rod lateral fixing rod (10119) is further installed under the barrel base (10115), and a barrel positioning rod upper connecting rod (10117) and a barrel positioning rod bottom connecting rod (10118) are respectively installed at the upper and lower ends of the barrel positioning rod (10114).
[0020] As an optional embodiment, the first blank box transfer mechanism (107) further includes a base (1071) of the first blank box transfer mechanism, the base (1071) of the first blank box transfer mechanism being installed on a side of the first blank box belt conveyor (110) close to the blank box multi-storey warehouse (1), a Z-axis slide table (1072) of the first blank box transfer mechanism and a Y-axis slide table lead screw (1074) of the first blank box transfer mechanism are further installed on the base of the first blank box transfer mechanism (1071), a Y-axis slide table motor (1073) of the first blank box transfer mechanism is installed on the Y-axis slide table lead screw (1074) of the first blank box transfer mechanism, a clamping cylinder (1075) of the first blank box transfer mechanism and a first blank box transfer tank (1076) are further installed on the base (1071) of the first blank box transfer mechanism, a first photoelectric sensor (1077) is further installed on the rank box belt conveyor (110); the second blank box transfer mechanism (206) includes a second Z-axis slide table lead screw (2065) of the second blank box transfer mechanism and a first Z-axis screw (2063) of the second blank box transfer mechanism, which are installed on the blank forming machine base (201); a second Z-axis slide table motor (2064) of the second blank box transfer mechanism and a first Z-axis slide table motor (2061) of the second blank box transfer mechanism are installed on upper ends of the second Z-axis slide table lead screw (2065) of the second blank box transfer mechanism and the first Z-axis screw (2063) of the second blank box transfer mechanism, respectively; the second Z-axis slide table lead screw (2065) of the second blank box transfer mechanism and the first Z-axis screw (2063) of the second blank box transfer mechanism are connected via the installed X-axis lead screw (2062) of the second blank box transfer mechanism;The X-axis slider (2066) of the second blank box transfer mechanism and the cylinder (2067) of the second blank box transfer mechanism are further installed on the X-axis lead screw (2062) of the second blank box transfer mechanism, and the third blank box transfer mechanism (504) includes a first Z-axis slide table lead screw (5042) of the third blank box transfer mechanism and a second Z-axis slide table lead screw (5048) of the third blank box transfer mechanism, the first Z-axis slide table lead screw (5042) of the third blank box transfer mechanism and the second Z-axis slide table lead screw (5048) of the third blank box transfer mechanism are respectively installed on the deburring machine base (502), and the first Z-axis slide table lead screw (5042) of the third blank box transfer mechanism and the second Z-axis slide table lead screw (5048) of the third blank box transfer mechanism are connected to each other via the X-axis slide table lead screw (5043) of the third blank box transfer mechanism. an X-axis slide table connection block (5044) of the third blank box transfer mechanism and a cylinder (5045) of the third blank box transfer mechanism are installed on an X-axis slide table lead screw (5043) of the third blank box transfer mechanism; an X-axis slide table motor (5047) of the third blank box transfer mechanism is installed on one end of the X-axis slide table lead screw (5043) of the third blank box transfer mechanism; a second Z-axis slide table motor (5046) of the third blank box transfer mechanism is installed on an upper end of a second Z-axis slide table lead screw (5048) of the third blank box transfer mechanism; a first Z-axis slide table motor (5041) of the third blank box transfer mechanism is installed on an upper end of a first Z-axis slide table lead screw (5042) of the third blank box transfer mechanism; and the fourth blank box transfer mechanism (603) includes a base (60301) of a fourth blank box transfer mechanism;A first Z-axis lead screw (60308) and a fourth base lifting mechanism (60304) of the fourth blank box transfer mechanism are respectively installed on the upper part of the base (60301) of the fourth blank box transfer mechanism, one end of the first Z-axis lead screw (60308) of the fourth blank box transfer mechanism and the second Z-axis lead screw (60310) of the fourth blank box transfer mechanism are both installed on the base (60301) of the fourth blank box transfer mechanism, and a first Z-axis slide table motor (60303) of the fourth blank box transfer mechanism and a second Z-axis slide table motor (60307) of the fourth blank box transfer mechanism are respectively installed on the other end, The first Z-axis lead screw (60308) of the mechanism and the second Z-axis lead screw (60310) of the fourth blank box transfer mechanism are connected via the X-axis slide table lead screw (60302) of the attached fourth blank box transfer mechanism, an X-axis slide table motor (60305) of the fourth blank box transfer mechanism is provided at one end of the X-axis slide table lead screw (60302) of the fourth blank box transfer mechanism, a cylinder (60306) of the fourth blank box transfer mechanism is further provided on the X-axis slide table lead screw (60302) of the fourth blank box transfer mechanism, and an eighth photoelectric sensor (60311) is installed on the sixth blank box belt conveyor (501).
[0021] In an optional embodiment, the blank forming machine (2) includes a blank forming machine base (201), a blank tray (202), a blank strip guide device (203), a blank pick mechanism (204), a blank forming table (205), a second blank box transfer mechanism (206), a first base lifting mechanism (207), a blank box (208), a second blank box belt conveyor (209), a second blank box transfer tank (210), a second photoelectric sensor (211), a blank forming machine support rod (212), a blank forming machine support rod (213), a blank forming machine support rod (214), a blank forming machine support rod (215), a blank forming machine support rod (216), a blank forming machine support rod (217), a blank forming machine support rod (218), a blank forming machine support rod (219), a blank forming machine support rod (220), a blank forming machine support rod (221), a blank forming machine support rod (222), a blank forming machine support rod (223), a blank forming machine support rod (224), a blank forming machine support rod (225), a blank forming machine support rod (226), a blank forming machine support rod (227), a blank forming machine support rod (228), a blank forming machine support rod (229), a blank forming machine support rod (230), a blank forming machine support rod (231), a blank forming machine support rod (232), a blank forming machine support rod (233), a blank forming machine support rod (234), a blank forming machine support rod (235), a blank forming machine support rod (236), a blank forming machine support rod (237), a blank forming machine support rod (238), a blank forming machine support rod (239 ... The blank forming machine base (201) includes a blank strip cutter (213) and a blank clamping claw (214). A blank forming machine support rod (212) is installed on the lower surface of the blank forming machine base (201). The blank forming machine base (201) further includes a blank forming table (205), a second blank box belt conveyor (209), a blank strip guide device (203), a blank tray (202), a second blank box transfer mechanism (206), a second blank box belt conveyor (209) and a first base lifting mechanism (207). a blank strip cutter (213), blank clamping claws (214) and a blank pick mechanism (204) are installed on the blank forming table (205); the blank strip guide device (203) is composed of a blank strip guide device mounting seat (2031) mounted on the blank forming machine base (201) and two blank strip guide device guide pulleys (2032) located on the blank forming machine base (201); the blank tray (202) includes a blank tray body (2022), a blank tray rotation shaft (2023) and a blank tray mounting seat (2024); the blank tray (202) is mounted on the blank forming machine base (201) via the blank tray mounting seat (2024) and its rotation is assisted by a blank tray motor (2021); a rubber blank strip (2025) extruded by a high-pressure extruder is further wound around the blank tray (202); a second blank box transfer tank (210) is installed on the second blank box belt conveyor (209) and used in combination therewith;a second photoelectric sensor (211) is further installed on the second blank box belt conveyor (209); the first base lifting mechanism (207) includes a first base lifting mechanism motor (2071), a first base lifting mechanism lead screw (2072) and a first base lifting mechanism connecting rod (2073), one end of the first base lifting mechanism lead screw (2072) is installed on the blank forming machine base (201) and the other end of the first base lifting mechanism motor (2071) is installed on the first base lifting mechanism connecting rod (2073), the first base lifting mechanism connecting rod (2073) is driven by the first base lifting mechanism lead screw (2072) to move up and down in a direction perpendicular to the ground; the blank pick mechanism (204) includes a blank pick mechanism Z-axis lead screw (2042), and the blank pick mechanism Z-axis lead screw (2042) is connected to the blank pick mechanism Z-axis lead screw (2042). One end of the shaft lead screw (2042) is installed on the blank forming machine base (201), and the Z-axis motor (2041) of the blank pick mechanism is installed on the other end. The X-axis lead screw (2045) of the blank pick mechanism and the Y-axis slide table (2047) of the blank pick mechanism are installed on the Z-axis lead screw (2042) of the blank pick mechanism. The X-axis connection mechanism (2043) of the blank pick mechanism is installed on one end of the X-axis lead screw (2045) of the blank pick mechanism, and a blank pick mechanism cylinder is further installed on the X-axis connection mechanism (2043) of the blank pick mechanism. The X-axis motor (2046) of the blank pick mechanism is installed on the other end of the X-axis lead screw (2045) of the blank pick mechanism, and the fourth base lifting mechanism (60304) and the first base lifting mechanism (207) have the same structure.
[0022] In an optional embodiment, the molding vulcanization production unit (403) includes a molding vulcanization production unit outer frame (4031) and a mold (4035), the molding vulcanization production unit outer frame (4031) has a rectangular parallelepiped structure, a molding vulcanizer (4034) is installed in the molding vulcanization production unit outer frame (4031), a molding vulcanization production unit control box (4032) is installed on one side of the molding vulcanizer (4034), and a first loading and unloading device (4035) is installed on the other side. A second platform lifting mechanism (4033) is installed at the front of the molding vulcanization production unit outer frame (4031). The molding vulcanizer (4034) includes a molding vulcanizer C-type base (40342). The molding vulcanizer C-type base (40342) is installed on the bottom plate of the molding vulcanization production unit outer frame (4031) and provides mechanical structural support for the molding vulcanizer (4034). A molding vulcanizer C-type base (40342) is installed on the top of the molding vulcanizer C-type base (40342). The molding vulcanizer driving shaft (40341) is further provided, and the molding vulcanizer driving shaft (40341) moves up and down along the Z-axis perpendicular to the ground direction. A first electromagnetic adsorption device (40343), a first insulating layer (40344) and a first heating plate (40345) are provided from top to bottom, respectively. A vulcanization insulating plate (40346) is further provided on the outer edge of the heating plate (40345). A second heating plate (40347), a second insulating layer (40348) and a second electromagnetic adsorption device are provided from bottom to top under the lower part of the molding vulcanizer C-type base (40342). The first loading and unloading mechanism (4036) includes a Z-axis lead screw (40362) of the first loading and unloading mechanism and a Y-axis slide table (40363) of the first loading and unloading mechanism, one end of the Z-axis lead screw (40362) of the first loading and unloading mechanism is installed on the bottom plate of the molding vulcanization manufacturing unit outer frame (4031) and the other end of the Z-axis motor (40361) of the first loading and unloading mechanism is installed,The Y-axis slide table (40363) of the first loading and unloading mechanism is provided with a cylinder connection block (40364) of the first loading and unloading mechanism, and the cylinder rotation assembly (40367) of the first loading and unloading mechanism is provided on the cylinder connection block (40364) of the first loading and unloading mechanism. The cylinder of the first loading and unloading mechanism is divided into an upper cylinder (40365) of the first loading and unloading mechanism and a lower cylinder (40366) of the first loading and unloading mechanism. The upper cylinder (40365) of the first loading and unloading mechanism and the lower cylinder (40366) of the first loading and unloading mechanism are individually connected to a gas source and are controlled by corresponding barometers, and the second base lifting mechanism (4033) and the first base lifting mechanism (207) have the same structure.
[0023] In an optional embodiment, the deburring machine (505) includes a deburring machine outer frame (5051), a second loading and unloading mechanism, and a deburring mechanism, the second loading and unloading mechanism includes a deburring machine clamping and removing end (5052), a Y-axis slide table (5053) of the second loading and unloading mechanism, a Z-axis motor (5054) of the second loading and unloading mechanism, and a Z-axis lead screw (5055) of the second loading and unloading mechanism, and the deburring machine clamping and removing end (5052) includes a deburring machine deburring machine outer frame (5051), a second loading and unloading mechanism and a deburring mechanism, The deburring machine includes a deburring head (50521), a first force sensor (50522), a deburring machine clamping and removing end connector (50523) and a deburring machine cylinder (50524), one end of the deburring machine deburring head (50521) is connected to the first force sensor (50522), and the other end is provided with a 45° inclined friction surface and a 90° inclined friction surface successively. The first force sensor (50522) is connected to the deburring machine deburring head (50521) at one end and the other end is connected to the deburring machine clamping and removing end connector (50523), and the deburring machine clamping and removing end connector (50523) is connected to the first force sensor (50522). The force sensor (50522), the deburring machine cylinder (50524) and the Y-axis slide table (5053) of the second loading and unloading mechanism are respectively connected, the deburring machine cylinder (50524) is connected to the deburring machine clamping and removing end connector (50523), the lower part of the deburring machine outer frame (5051) is installed on the deburring machine outer frame (5051), and except for the side that contacts the third base lifting mechanism (507), the remaining three sides and the bottom are all sealed, and the Y-axis slide table (5053) of the second loading and unloading mechanism is connected to the third base lifting mechanism (507). The second loading and unloading mechanism is composed of a Y-axis motor (50531) and a Y-axis lead screw (50532) of the second loading and unloading mechanism, one end of the Z-axis lead screw (5055) of the second loading and unloading mechanism is installed on the deburring machine base (502) and the other end is provided with the Z-axis motor (5054) of the second loading and unloading mechanism, and the deburring mechanism includes a deburring machine X-axis slide table (5056), a deburring machine rubber ring rotation motor (5057) and a deburring machine deburring stand (5058),The X-axis slide table of the deburring machine (5056) is composed of a deburring machine rubber ring tension hook (50561), a deburring machine rubber ring tension guide block (50562), a second force sensor (50563), a deburring machine X-axis slide table connection block (50564), a deburring machine X-axis slide table lead screw (50565) and a deburring machine X-axis slide table motor (50566), and one side of the second force sensor (50563) is connected to the deburring machine rubber ring tension hook (50561) via a lateral rod, The other side is connected to the X-axis slide table connection block (50564) of the deburring machine, and the X-axis slide table connection block (50564) of the deburring machine is connected to the second force sensor (50563) on one side and to the X-axis slide table lead screw (50565) of the deburring machine on the other side, and the second force sensor (50563) is slid through the X-axis slide table lead screw (50565) of the deburring machine by the connection force, and is finally used to drive the rubber ring tension hook (50561) of the deburring machine to tension the rubber ring.
[0024] In an optional embodiment, the rubber ring tray placement robot (601) includes a rubber ring tray placement robot outer frame (6011), a rubber ring tray placement robot pneumatic rod (6012), a rubber ring tray placement robot cylinder (6013), a rubber ring tray placement robot base (6014) and a rubber ring tray placement robot support rod (6015), and the rubber ring tray placement robot outer frame (6011) is installed on the rubber ring tray placement robot base (6014) and has a plurality of rubber ring trays that form the same included angle. The rubber ring tray arrangement robot pneumatic rod (6012) is connected at one end to the rubber ring tray arrangement robot outer frame (6011) and at the other end to the rubber ring tray arrangement robot cylinder (6013). A rubber ring tray (602) for placing the rubber rings arranged by the rubber ring tray arrangement robot (601) is further installed above the rubber ring tray arrangement robot base (6014). A bar code for identifying the rubber ring tray is further provided on the rubber ring tray (602). a rubber ring tray placement robot support rod (6015) for providing mechanical support and height adjustment for the tray placement robot is installed below the rubber ring tray placement robot base (6014); the oven frame (6075) is composed of an oven frame holder (60751), an oven frame hook (60752) and a rubber ring tray (602) and is used to accommodate different rubber ring trays (602) and is used in combination with an oven (607); the oven (607) is composed of an oven door (6071), an oven body (6072), an oven door guide rail (6073) and an oven door hook (6074); the oven door (6071) is driven by a motor installed in the oven (607) to be opened and closed along the oven door guide rail (6073); and the oven frame hook (60752) in the oven frame (6075) is used in combination with the oven door hook (6074).
[0025] As an optional embodiment, the automatic rubber ring detector includes a pass rubber ring outlet (708), a fail rubber ring outlet (709), a rubber ring detection plate motor (710), a rubber ring separation mechanism (711), a fail rubber ring nozzle (713), a fail rubber ring inlet (714), a pass rubber ring nozzle (715), a pass rubber ring inlet (716), a rubber ring detection plate (718), and an automatic rubber ring detector base (719), and an automatic rubber ring detector outer frame (701) is provided at the center of the upper part of the automatic rubber ring detector base (719), and a periphery of the automatic rubber ring detector base (719). The rubber ring automatic detector outer frame (701) is further provided on the side, and the rubber ring automatic detector support rod (720) is provided on the bottom. The rubber ring automatic detector base (719) is further provided with a first detection station (702), a second detection station (703), a third detection station (704), a fourth detection station (705) and a fifth detection station (706) on the top. The fifth detection station (706) is further provided with a fifth detection station Z-axis slide table lead screw (7063) and a fifth detection station Z-axis detection head (706). 4), the Z-axis slide table lead screw (7063) of the fifth detection station is installed at one end on the rubber ring automatic detection machine base (719), and the Z-axis slide table motor (7061) of the fifth detection station is installed at the other end, and the detection head connection block (7062) of the fifth detection station is installed at the middle part, and the Z-axis detection head (7064) of the fifth detection station is connected at one end to the detection head connection block (7062) of the fifth detection station, and the detection camera (7065) of the fifth detection station is installed at the lower part, and the fifth detection station A power supply (7066) for the fifth detection station is further provided below the detection camera (7065) of the fifth detection station, and the power supply (7066) for the fifth detection station is located below the rubber ring detection plate (718). At the upper part of the rubber ring detection plate (718) close to the rubber ring automatic detector supply passage (712), there are provided a pass rubber ring nozzle (715) and a fail rubber ring nozzle (713) for blowing air onto the rubber rings to send pass or fail rubber rings to the pass rubber ring inlet (716) and the fail rubber ring inlet (714), respectively.
[0026] In an optional embodiment, the rejected rubber ring packaging marking machine (803) includes a packaging bag barrel (80301), a packaging bag barrel rotating shaft (80302), a first packaging bag (80303), a rubber ring receiving barrel (80304), a ninth photoelectric sensor (80305), a packaging marking machine supporting rod (80306), a packaging bag guide tube (80307), a marking device (80308), a packaging bag horizontal heat sealing machine (80309), a second packaging bag (80310), a barcode marking (80311), a rubber ring (80312) and a packaging bag vertical heat sealing machine (80313), wherein the lower part of the packaging marking machine supporting rod (80306) is placed on the ground, and the packaging bag barrel (80301) is provided on the upper part via the packaging bag barrel rotating shaft (80302), and the first packaging bag (803 The first packaging bag (80303) is wound around a packaging bag barrel (80301) in the form of a roll-shaped thin film, the lower part of which is wound by a packaging bag guide tube (80307) to form a thin film tube with one open end. The open side end of the first packaging bag (80303) is sealed by a packaging bag vertical heat sealing machine (80313), and the lower end is sealed twice by a packaging bag horizontal heat sealing machine (80309) before and after accommodating a rubber ring (80312). The rubber ring (80312) is supplied from the rejected rubber ring supply passage (801) of the packaging marking unit, passes through a rubber ring receiving barrel (80304), and falls into a second packaging bag (80310) whose lower end and side ends are sealed. During the fall, the rubber ring is counted by a ninth photoelectric sensor (80305), and the second packaging bag (80310) is marked by a marking device (80308).
[0027] The present invention provides an automatic production method for rubber seal rings, which is realized based on a fully automatic rubber seal ring production line, comprising: S1, the production line management staff issues a production command in the control room (9), and the blank box multi-story warehouse 4-way shuttle (105) transports the blank box (101) in the blank box multi-story warehouse (1) via the blank box multi-story warehouse 4-way shuttle passage (104) to the blank box multi-story warehouse outgoing stacker (108), and then transports it via the blank box multi-story warehouse outgoing passage (109) to the operation area (301) of the first transfer robot, and establishes a correspondence between the production command and the barcode on the blank box (101); S2: the first transfer robot (301) holds the blank box (101) in the blank box multi-story warehouse four-way shuttle (105) and transfers it into the second blank box transfer tank (210), and the blank box multi-story warehouse four-way shuttle (105) returns to the blank box multi-story warehouse (1); S3, the second blank box transfer tank (210) carries the blank box (101) and conveys it along the second blank box belt conveyor (209) to a blank forming machine for producing blank rings of the corresponding material grade; S4: the second blank box transfer mechanism (206) is turned on, clamps the blank box (101) and removes it from the second blank box transfer tank (210), and attaches it to the first base lifting mechanism (207) by inserting the connecting rod (2073) of the first base lifting mechanism into the barrel base lifting auxiliary hole (10116); S5, lifting the connecting rod (2073) of the first base lifting mechanism close to the blank forming machine until the barrel base (10115) reaches the highest position; S6: after the installation of the blank box (101) is completed, the blank forming machine operates, and the blank pick mechanism cylinder (2044) clamps the blank strip (2025) while pulling it forward until the blank clamping claws (214) clamp the front end of the blank strip (2025); S7, the blank pick mechanism cylinder (2044) releases the blank strip (2025), and the blank strip guide device guide pulley (2032) conveys the blank strip (2025) forward until the required blank strip length is formed according to the required blank ring specification; S8: the blank pick mechanism cylinder (2044) clamps the blank strip (2025), and the blank strip cutter (213) operates to cut the blank strip (2025); S9: the blank pick mechanism cylinder (2044) bends the blank strip (2025) into a ring shape under the action of the blank pick mechanism (204), and extrudes both ends of the blank strip (2025) by the blank pick mechanism cylinder (2044) and the blank clamping claws (214), thereby completing blank ring formation; S10: the blank clamping jaws (214) are released, and the blank pick mechanism cylinder (2044) places the blank ring on the barrel base (10115) to which the blank box (101) has been raised, and then the barrel base (10115) is driven by the connecting rod (2073) of the first base lifting mechanism to move slightly downward, so that the vertical height position of the next blank ring on the barrel base (10115) becomes close to that of the previous blank ring; S11, repeating S6 to S10 until the blank ring is filled in the barrel; S12: clamping the blank box (101) in the second blank box transfer tank (210) by the second blank box transfer mechanism (206), and transporting the second blank box transfer tank (210) to an operating area of the first transfer robot (301) by the second blank box belt conveyor (209); S13: the first transfer robot (301) holds the blank box (101) and transfers it from the second blank box transfer tank (210) to the third blank box transfer tank, identifies the barcode on the blank box (101), and sends a mold command to the mold multi-level warehouse (3); S14: conveying the molds in the corresponding mold storage sections (306) in the mold storage (3) to the mold storage outgoing stacker (304) by the first mold storage roller group (307), the second mold storage roller group (309) and the third mold storage roller group (316) under the action of the first belt conveyor steering rod (308) and the second belt conveyor steering rod (314); S15: The corresponding mold is raised and lowered to the operating position of the first transfer robot (301) by the mold storage multi-level warehouse delivery stacker (304), and the first transfer robot (301) clamps the corresponding mold in the blank box mold cavity (1013) of the blank box (101); S16, the third blank box transfer tank (302) is transported to the molding vulcanization area (4) by the third blank box belt conveyor (303), and then transported to the corresponding operation area of the second transfer robot (407) under the action of the third belt conveyor steering rod (402) and the fifth blank box belt conveyor (401); S17: a step of clamping the blank box (101) with the second transfer robot (407) and removing it from the third blank box transfer tank (302), and installing it in the second base lifting mechanism (4033) of the idle molding vulcanization manufacturing unit (403) by inserting the connecting rod of the second base lifting mechanism (4033) into the barrel base lifting auxiliary hole (10116); S18, the second transfer robot (407) attaches the mold (4035) in the blank box (101) to the molding vulcanizer (4034), and lifts the barrel base (10115) on the side of the second base lifting mechanism (4033) that is away from the molding vulcanizer (4034) to the highest position by the second base lifting mechanism (4033); S19: the first electromagnetic suction device (40343) and the second electromagnetic suction device (40349) of the molding vulcanizer (4034) are operated to respectively suction the upper mold (40351) and the lower mold (40352); S20, the molding vulcanizer biasing shaft (40341) of the molding vulcanizer (4034) moves upward to separate the upper mold (40351) and the lower mold (40352); S21, the first loading and unloading mechanism (4036) sucks the blank ring from the barrel that accommodates the blank ring of the blank box (101) into the lower mold (40352), and then the molding vulcanizer biasing shaft (40341) moves downward; S22, the first heating plate (40345) and the second heating plate (40347) are operated to start molding vulcanization for the blank ring; S23, after the molding vulcanization is completed, the molding vulcanizer biasing shaft (40341) moves upward, and the first loading and unloading mechanism cylinder of the first loading and unloading mechanism (4036) moves between the upper mold (40351) and the lower mold (40352); S24, the molding vulcanizer biasing shaft (40341) moves upward until the upper mold (40351), the lower mold (40352) and the cylinder of the first loading and unloading mechanism are in close contact with each other; S25: the cylinder of the first loading and unloading mechanism operates to adsorb the rubber ring on the mold (4035), and according to the sensor data, it is determined that the rubber ring adsorption position is at the upper part (40365) of the cylinder of the first loading and unloading mechanism or the lower part (40366) of the cylinder of the first loading and unloading mechanism; S26, the molding vulcanizer biasing shaft (40341) moves upward, and the first loading and unloading mechanism (4036) transfers the rubber ring to the finished rubber ring barrel of the blank box (101); S27, the finished rubber ring barrel base (10115) is driven by the second base lifting mechanism (4033) to move slightly downward, so that the vertical height position of the next rubber ring on the barrel base (10115) is close to that of the previous rubber ring; S28, repeating steps S19 to S27 until all the blank rings are molded and vulcanized and are accommodated in the finished rubber ring barrel one by one; S29, until the upper mold (40351) and the lower mold (40352) approach each other and are in close contact with each other, the molding vulcanizer biasing shaft (40341) moves downward, the first electromagnetic suction device (40343) and the second electromagnetic suction device (40349) stop operating, and the second base lifting mechanism (4033) lowers all the barrel bases (10115) on both sides of the blank box (101) to their lowest positions; S30, the molding vulcanizer biasing shaft (40341) moves upward, and the second transfer robot (407) holds the mold (4035) and puts it into the blank box mold cavity (1013) of the blank box (101), and then holds the blank box (101) and puts it into the third blank box transfer tank (302); S31, the third blank box transfer tank (302) is transported to the deburring area (5) by the fifth blank box belt conveyor (401), and the third blank box transfer mechanism (504) takes out the blank box (101) in the third blank box transfer tank (302), and installs it in the third base lifting mechanism (507) by inserting the connecting rod of the third base lifting mechanism (507) into the barrel base lifting auxiliary hole (10116); S32, the third base lifting mechanism (507) lifts the barrel base (10115) on the blank barrel side of the blank box (101) to the highest position; S33, the third blank box transfer mechanism (504) clamps the rubber ring of the blank box (101) on the finished product barrel side to the deburring machine deburring stand (5058), and positions the rotating shaft of the deburring machine rubber ring rotating motor (5057) and the deburring machine rubber ring pulling hook (50561) inside the rubber ring; S34, the X-axis slide table (5056) of the deburring machine operates to tighten the rubber ring, and the tightening degree is controlled by the second force sensor (50563); S35, the deburring machine rubber ring rotating motor (5057) operates to rotate the rubber ring, the deburring machine deburring head (50521) operates to deburr the rubber ring by its friction surface, and the removal force is controlled by the first force sensor (50522); S36: after the deburring of the rubber ring is completed, the X-axis slide table (5056) of the deburring machine releases the rubber ring, the third blank box transfer mechanism (504) clamps the rubber ring on the blank barrel side of the blank box (101), and the blank barrel base (10115) is driven by the third base lifting mechanism (504) to move slightly downward, so that the vertical height position of the next rubber ring on the barrel base (10115) is close to that of the previous rubber ring; S37, repeating steps S29 to S36 until all the rubber rings have been deburred and are accommodated one by one in the blank barrel; S38, the third base lifting mechanism (507) is operated to lower all of the barrel bases (10115) on both sides of the blank box (101) to their lowest positions, and the third blank box transfer mechanism (504) is operated to sandwich the blank box (101) in the fourth blank box transfer tank (503); S39, the fourth blank box transfer tank (503) conveys the blank box (101) along the sixth blank box belt conveyor (501) to the two-stage vulcanization area (6); S40, the fourth blank box transfer mechanism (603) operates, and attaches the blank box (101) and the fourth base lifting mechanism (60304) by inserting the connecting rod of the fourth base lifting mechanism (60304) into the barrel base lifting auxiliary hole (10116); S41, the rubber ring tray arrangement robot (601) takes out the rubber rings one by one from the blank barrel of the blank box (101), arranges them on the rubber ring tray (602) without overlapping each other, and establishes a relationship between the barcode on the rubber ring tray (602) and the barcode on the blank box (101); S42: after all the rubber rings have been placed in the blank box (101), the fourth blank box transfer mechanism (603) clamps the mold (4035) in the blank box (101) between the second mold belt conveyor (310) and transports it into the mold multi-story warehouse (3) by the second mold belt conveyor (310), and the fourth blank box transfer mechanism (603) clamps the blank box (101) between the first blank box belt conveyor (110) and transports it into the blank box multi-story warehouse (1) by the first blank box belt conveyor (110); S43: transferring the rubber ring tray (602) to the oven frame (6075) by the third transfer robot (604), transferring all the rubber ring trays (602) on which the rubber rings of the same batch are arranged to the oven frame (6075), and then transferring the oven frame (6075) into the oven (607) by the third transfer robot (604); S44, the oven (607) is operated to perform two-stage vulcanization on the rubber ring; S45: after the second-stage vulcanization is completed, the oven frame (6075) is transferred from the oven (607) by the third transfer robot (604) and placed in the oven frame temporary placement area (605) of the second-stage vulcanization area, the rubber ring trays (602) on the oven frame (6075) are placed one by one on the rubber ring tray placement robot base (6014) by the third transfer robot (604), and the rubber rings are sucked one by one into the rubber ring automatic detector supply passage (712) by the rubber ring tray placement robot (601); S46: feeding the rubber rings one by one through the rubber ring automatic detector supply passage (712) to the blank automatic detector for external quality and size detection, correlating the detection information with the barcode on the rubber ring tray (602), feeding the acceptable rubber rings to the acceptable rubber ring entrance (716) and conveying them to the packaging marking area (8) through the acceptable rubber ring discharge passage (707) of the rubber ring automatic detector, and feeding the unacceptable rubber rings to the unacceptable rubber ring entrance (714) and conveying them to the packaging marking area (8) through the unacceptable rubber ring discharge passage (717) of the rubber ring automatic detector; S47, packaging and marking the passed rubber rings by a passed rubber ring packaging and marking machine (804) and associating the marking information with the bar code on the rubber ring tray (602), and packaging and marking the rejected rubber rings by a rejected rubber ring packaging and marking machine (803) and associating the marking information with the bar code on the rubber ring tray (602). [Explanation of symbols]
[0028] 1 Blank box multi-storey warehouse, 101 blank box, 1011 blank box barrel, 10111 barrel upper edge, 10112 barrel stop edge, 10113 barrel side edge vertical groove, 10114 barrel positioning rod, 10115 barrel base, 10116 barrel base lifting auxiliary hole, 10117 barrel positioning rod upper connecting rod, 10118 barrel positioning rod bottom connecting rod, 10119 barrel positioning rod horizontal fixing rod, 1012 blank box mold clamping groove, 1013 blank box mold cavity, 1014 blank box insulation layer, 102 blank box multi-storey warehouse vertical load-bearing steel frame, 103 blank box multi-storey warehouse horizontal load-bearing steel frame, 104 blank box multi-storey warehouse four-way shuttle passage, 105 blank box multi-storey warehouse four-way shuttle, 106 blank box multi-storey warehouse storage stacker, 107 First blank box transfer mechanism, 1071, base of first blank box transfer mechanism, 1072, Z-axis slide table of first blank box transfer mechanism, 1073, Y-axis slide table motor of first blank box transfer mechanism, 1074, Y-axis slide table lead screw of first blank box transfer mechanism, 1075, clamping cylinder of first blank box transfer mechanism, 1076, first blank box transfer tank, 1077, first photoelectric sensor, 108, blank box multi-storey warehouse delivery stacker, 109, blank box multi-storey warehouse delivery passage, 110, first blank box belt conveyor, 2, blank forming area, 201, blank forming machine base, 202, blank tray, 2021, blank tray motor, 2022, blank tray main body, 2023, blank tray rotation shaft, 2024, blank tray mounting seat, 2025, blank strip, 203, blank strip guide device, 2031, blank strip guide device mounting seat, 2032 Blank strip guide device guide pulley, 204 Blank pick mechanism, 2041 Z-axis motor of blank pick mechanism, 2042 Z-axis lead screw of blank pick mechanism, 2043 X-axis connection mechanism of blank pick mechanism, 2044 Blank pick mechanism cylinder, 2045 X-axis lead screw of blank pick mechanism, 2046X-axis motor of blank pick mechanism, 2047 Y-axis slide table of blank pick mechanism, 205 Blank forming table, 206 Second blank box transfer mechanism, 2061 First Z-axis slide table motor of second blank box transfer mechanism, 2062 X-axis lead screw of second blank box transfer mechanism, 2063 First Z-axis screw of second blank box transfer mechanism, 2064 Second Z-axis slide table motor of second blank box transfer mechanism, 2065 Second Z-axis slide table lead screw of second blank box transfer mechanism, 2066 X-axis slider of second blank box transfer mechanism, 2067 Cylinder of second blank box transfer mechanism, 2068 X-axis slide table motor of second blank box transfer mechanism, 207 First base lift mechanism, 2071 Motor of first base lift mechanism, 2072 Lead screw of first base lift mechanism, 2073 Connecting rod of first base lift mechanism, 208 Blank box, 209 second blank box belt conveyor, 210 second blank box transfer tank, 211 second photoelectric sensor, 212 blank molding machine support rod, 213 blank strip cutter, 214 blank clamping jaw, 3 mold multi-storey, 301 first transfer robot, 302 third blank box transfer tank, 303 third blank box belt conveyor, 304 mold multi-storey outgoing stacker, 305 first mold belt conveyor, 306 mold multi-storey mold storage section, 307 first mold multi-storey roller group, 308 first belt conveyor steering rod, 309 second mold multi-storey roller group, 310 second mold belt conveyor, 311 mold sorting baffle, 312 mold barcode reader, 313 mold multi-storey incoming stacker, 314 second belt conveyor steering rod, 315 mold temporary placement area, 316 third mold multi-storey roller group, 317 third photoelectric sensor, 4 Molding vulcanization area, 401 Fifth blank box belt conveyor, 402 Third belt conveyor steering rod, 403 Molding vulcanization production unit, 4031 Molding vulcanization production unit outer frame, 4032 Molding vulcanization production unit control box, 4033Second base lifting mechanism, 4034 Molding vulcanizer, 40341 Molding vulcanizer biasing shaft, 40342 Molding vulcanizer C-type base, 40343 First electromagnetic suction device, 40344 First insulation layer, 40345 First heating plate, 40346 Vulcanization insulation plate, 40347 Second heating plate, 40348 Second insulation layer, 40349 Second electromagnetic suction device, 4035 Mold, 40351 Upper mold, 40352 Lower mold, 4036 First loading and unloading mechanism, 40361 Z-axis motor of first loading and unloading mechanism, 40362 Z-axis lead screw of first loading and unloading mechanism, 40363 Y-axis slide table of first loading and unloading mechanism, 40364 Cylinder connection block of first loading and unloading mechanism, 40365 Upper cylinder of the first loading and unloading mechanism, 40366 Lower cylinder of the first loading and unloading mechanism, 40367 Cylinder rotation assembly of the first loading and unloading mechanism, 302 Blank box, 404 Molding vulcanization multi-storey vertical load-bearing steel frame, 405 Molding vulcanization multi-storey horizontal load-bearing steel frame, 406 Ground rail of the second transfer robot, 407 Second transfer robot, 40701 Z-axis load-bearing beam of the second transfer robot, 40702 Motor lead screw of the second transfer robot, 40703 Motor of the second transfer robot, 40704 Base of the second transfer robot, 40705 Two-stage rotation shaft of the second transfer robot, 40706 Two-stage support arm of the second transfer robot, 40707 Grip claw of the second transfer robot, 40708 One-stage rotation shaft of the second transfer robot, 40709 First support arm of second transfer robot, 40710 Rotation axis base of second transfer robot, 40711 Rotation axis base guide road of second transfer robot, 408 Fourth photoelectric sensor, 409 Fifth photoelectric sensor, 410 Sixth photoelectric sensor, 5 Deburring area, 501 Sixth blank box belt conveyor, 502 Deburring machine base, 503 Fourth blank box transfer tank, 504 Third blank box transfer mechanism, 5041a first Z-axis slide table motor of the third blank box transfer mechanism, 5042 a first Z-axis slide table lead screw of the third blank box transfer mechanism, 5043 an X-axis slide table lead screw of the third blank box transfer mechanism, 5044 an X-axis slide table connection block of the third blank box transfer mechanism, 5045 a cylinder of the third blank box transfer mechanism, 5046 a second Z-axis slide table motor of the third blank box transfer mechanism, 5047 an X-axis slide table motor of the third blank box transfer mechanism, 5048 a second Z-axis slide table lead screw of the third blank box transfer mechanism, 505 a deburring machine, 5051 a deburring machine outer frame, 5052 a deburring machine clamping removal end, 50521 a deburring machine deburring head, 50522 a first force sensor, 50523 a deburring machine clamping removal end connector, 50524 a deburring machine cylinder, 5053 Y-axis slide table of the second loading and unloading mechanism, 50531 Y-axis motor of the second loading and unloading mechanism, 50532 Y-axis lead screw of the second loading and unloading mechanism, 5054 Z-axis motor of the second loading and unloading mechanism, 5055 Z-axis lead screw of the second loading and unloading mechanism, 5056 X-axis slide table of the deburring machine, 50561 Deburring machine rubber ring tension hook, 50562 Deburring machine rubber ring tension guide block, 50563 Second force sensor, 50564 Deburring machine X-axis slide table connection block, 50565 Deburring machine X-axis slide table lead screw, 50566 Deburring machine X-axis slide table motor, 5057 Deburring machine rubber ring rotation motor, 5058 Deburring machine deburring stand, 506 Seventh photoelectric sensor, 507 Third stand lifting mechanism, 508 Blank box, 509 Deburring machine support rod, 6 Two-stage vulcanization area, 601 Rubber ring tray arrangement robot, 6011 Rubber ring tray arrangement robot outer frame, 6012 Rubber ring tray arrangement robot pneumatic rod, 6013 Rubber ring tray arrangement robot cylinder, 6014 Rubber ring tray arrangement robot base, 6015 Rubber ring tray arrangement robot support rod, 602 Rubber ring tray, 603Fourth blank box transfer mechanism, 60301 Base of fourth blank box transfer mechanism, 60302 X-axis slide table lead screw of fourth blank box transfer mechanism, 60303 First Z-axis slide table motor of fourth blank box transfer mechanism, 60304 Fourth pedestal lift mechanism, 60305 X-axis slide table motor of fourth blank box transfer mechanism, 60305 Cylinder of fourth blank box transfer mechanism, 60306 Second Z-axis slide table motor of fourth blank box transfer mechanism, 60307 First Z-axis lead screw of fourth blank box transfer mechanism, 60308 Support rod of fourth blank box transfer mechanism, 60309 Second Z-axis lead screw of fourth blank box transfer mechanism, 60310 Eighth photoelectric sensor, 604 Third transfer robot, 605 Two-stage vulcanization area oven frame temporary placement area, 606 Third transfer robot ground rail, 607 Oven, 6071 Oven door, 6072 oven body, 6073 oven door guide rail, 6074 oven door hook, 6075 oven frame, 60751 oven frame holder, 60752 oven frame hook, 60753 rubber ring tray, 608 oven holder, 7 online detection area, 701 rubber ring automatic detection machine outer frame, 702 first detection station, 703 second detection station, 704 third detection station, 705 fourth detection station, 706 fifth detection station, 7061 fifth detection station Z-axis slide table motor, 7062 fifth detection station detection head connection block, 7063 fifth detection station Z-axis slide table lead screw, 7064 fifth detection station Z-axis detection head, 7065 fifth detection station detection camera, 7066 fifth detection station power supply, 707 fifth detection station rubber ring automatic detection machine pass rubber ring discharge passage, 708 pass rubber ring outlet, 709 Rejected rubber ring outlet, 710 rubber ring detection plate motor, 711 rubber ring separation mechanism, 7111 rubber ring separation mechanism motor, 7112 rubber ring separation mechanism rotor, 712 rubber ring automatic detection machine supply passage, 713Rejected rubber ring nozzle, 714 rejected rubber ring inlet, 715 accepted rubber ring nozzle, 716 accepted rubber ring inlet, 717 rubber ring automatic detector rejected rubber ring discharge passage, 718 rubber ring detection plate, 719 rubber ring automatic detector base, 720 rubber ring automatic detector support rod, 8 Packaging marking area, 801 Packaging marking area failed rubber ring supply passage, 802 Packaging marking area successful rubber ring supply passage, 803 Failed rubber ring packaging marking machine, 80301 Packaging bag barrel, 80302 Packaging bag barrel rotating shaft, 80303 First packaging bag, 80304 Rubber ring receiving barrel, 80305 Ninth photoelectric sensor, 80306 Packaging marking machine support rod, 80307 Packaging bag guide tube, 80308 Marking device, 80309 Packaging bag horizontal heat sealing machine, 80310 Second packaging bag, 80311 Barcode marking, 80312 Rubber ring, 80313 Packaging bag vertical heat sealing machine, 804 Passed rubber ring packaging marking machine, 805 Packaging marking area failed rubber ring discharge passage, 806 Packaging marking area successful rubber ring discharge passage, 9 Control room
Claims
1. A fully automated rubber seal ring production line, Including ring forming area, molding vulcanization area, deburring area, two-stage vulcanization area, online inspection area, packaging marking area and control room. The ring forming area includes a blank box multi-level warehouse and a plurality of blank forming machines; The blank box multi-story warehouse further includes a blank box of the blank box multi-story warehouse, a blank box multi-story warehouse vertical load-bearing steel frame, and a blank box multi-story warehouse horizontal load-bearing steel frame; The blank boxes of the blank box multi-story warehouse are installed on a load-bearing steel frame consisting of a vertical load-bearing steel frame of the blank box multi-story warehouse and a horizontal load-bearing steel frame of the blank box multi-story warehouse, The blank box multi-storey warehouse is further provided with a four-way shuttle passage on the load-bearing steel frame, which is composed of the blank box multi-storey warehouse vertical load-bearing steel frame and the blank box multi-storey warehouse horizontal load-bearing steel frame. The blank box multi-storey four-way shuttle passage is further equipped with a blank box multi-storey four-way shuttle; A blank box multi-level warehouse storage stacker is installed at the entrance of the blank box multi-level warehouse four-way shuttle passage, A first blank box belt conveyor is further installed beside the blank box multi-level warehouse receiving stacker; A first blank box transfer mechanism is further installed in combination with the first blank box belt conveyor; A blank box multi-level warehouse delivery stacker is further installed at the exit of the blank box multi-level warehouse four-way shuttle passage, A blank box multi-story warehouse delivery passage is installed next to the blank box multi-story warehouse delivery stacker, which is used in combination with the blank box multi-story warehouse delivery stacker. The plurality of blank forming machines are installed in parallel beside the blank box multi-level warehouse, A second blank box belt conveyor is further installed in combination with the other side of the blank forming machines; The molding and curing area includes a mold warehouse, a production warehouse, and an assembly unit; The mold storage is divided into multiple layers with the same structure, Each layer of the mold multi-level warehouse is provided with a plurality of horizontal first mold multi-level warehouse roller groups, a plurality of vertical second mold multi-level warehouse roller groups, and a third mold multi-level warehouse roller group; The second mold three-dimensional warehouse roller group and the first mold three-dimensional warehouse roller group jointly constitute a plurality of mold three-dimensional warehouse mold storage sections; A first conveyor belt steering rod is installed at the entrance and exit of the mold storage section of the mold storage multi-level warehouse; A second belt conveyor steering rod is further installed at each transfer portion between the second mold three-dimensional warehouse roller group and the third mold three-dimensional warehouse roller group, The assembly unit includes a first transfer robot; A third blank box belt conveyor is installed beside the first transfer robot and used in combination with the first transfer robot; The third blank box belt conveyor is further provided with a third blank box transfer tank used in combination therewith; The third blank box belt conveyor further includes a third photoelectric sensor; The third blank box belt conveyor is further provided with a second mold belt conveyor at a different height perpendicular to the ground; A mold arrangement baffle is installed on the second mold belt conveyor, The second mold belt conveyor is further provided with a mold barcode reader; A mold multi-level warehouse storage stacker is further installed at the exit of the second mold belt conveyor; A mold storage stacker is further installed at a position corresponding to the mold storage stacker; The mold three-dimensional warehouse inlet stacker and the mold three-dimensional warehouse outlet stacker are connected via the third mold three-dimensional warehouse roller group, The production warehouse includes a fifth blank box belt conveyor, a third belt conveyor steering rod, a plurality of molding vulcanization production units, a plurality of molding vulcanization warehouse vertical load-bearing steel frames, a plurality of molding vulcanization warehouse horizontal load-bearing steel frames, a second transfer robot, a ground rail of the second transfer robot, a fourth photoelectric sensor, a fifth photoelectric sensor, and a sixth photoelectric sensor; The plurality of molding vulcanization multi-storey vertical load-bearing steel frames and the plurality of molding vulcanization multi-storey horizontal load-bearing steel frames constitute one molding vulcanization multi-storey rack, The molding vulcanization multi-storey rack is divided into a plurality of layers in a direction perpendicular to the ground, and each layer of the molding vulcanization multi-storey rack stores a plurality of molding vulcanization production units; The ground rail of the second transfer robot is installed between the molding vulcanization multi-level warehouse racks; The second transfer robot is installed in combination with the ground rail of the second transfer robot, The fourth photoelectric sensor, the fifth photoelectric sensor, and the sixth photoelectric sensor are respectively installed at positions of the fifth blank box belt conveyor adjacent to the ground rail of the second transfer robot, The third belt conveyor steering rod is installed at the connection portion between the fifth blank box belt conveyor and the third blank box belt conveyor; The deburring area includes a sixth blank box belt conveyor, a deburring machine base, a fourth blank box transfer tank, a third blank box transfer mechanism, a plurality of deburring machines, a seventh photoelectric sensor, a third platform lifting mechanism, blank boxes in the deburring area, and a deburring machine support rod; The deburring machine support rod is installed below the deburring machine base, The plurality of deburring machines are installed above the deburring machine base, One side of the deburring machine is the fifth blank box belt conveyor; A sixth blank box belt conveyor is provided on the other side of the deburring machine; The third base lifting mechanism and the third blank box transfer mechanism are installed in front of the deburring machine, The fourth blank box transfer tank is installed on the sixth blank box belt conveyor; The seventh photoelectric sensor is installed on the fifth blank box belt conveyor; The blank box in the deburring area is attached to the deburring machine; The plurality of deburring machines include: one fifth blank box belt conveyor is shared; Share one of the sixth blank box conveyor belts; The two-stage vulcanization area includes a rubber ring tray arrangement robot, a rubber ring tray, a fourth blank box transfer mechanism, a third transfer robot, a two-stage vulcanization area oven frame temporary placement area, a ground rail of the third transfer robot, a plurality of ovens, and an oven holder; The rubber ring tray is combined with and attached to the rubber ring tray arrangement robot; The fourth blank box transfer mechanism is installed beside the rubber ring tray arrangement robot, The ground rail of the third transfer robot is installed on the fourth blank box transfer mechanism, The third transfer robot is installed in combination with the ground rail of the third transfer robot, The second-stage vulcanization area oven frame temporary placement area is further installed on the ground rail of the third transfer robot; The plurality of ovens include: The oven holder is disposed on both sides of the ground rail of the third transfer robot, It is divided into two layers, upper and lower, The ground rail of the third transfer robot is used in combination with the third transfer robot to load and unload the installed oven frame into and from the oven; The online detection area includes: a rubber ring automatic detection machine supply passage, a rubber ring automatic detection machine pass rubber ring discharge passage, a rubber ring automatic detection machine fail rubber ring discharge passage, and a rubber ring automatic detection machine; The rubber ring automatic detector supply passage, the rubber ring automatic detector pass rubber ring discharge passage, and the rubber ring automatic detector fail rubber ring discharge passage are respectively connected to the rubber ring automatic detector, The other end of the rubber ring automatic detector supply passage is connected to the rubber ring tray arrangement robot, The packaging marking area includes a packaging marking area rejected rubber ring supply passage, a packaging marking area accepted rubber ring supply passage, a rejected rubber ring packaging marking machine, an accepted rubber ring packaging marking machine, a packaging marking area rejected rubber ring discharge passage, and a packaging marking area accepted rubber ring discharge passage, The packaging marking area rejected rubber ring supply passage is One end is connected to the discharge passage of the rubber ring automatic detector for rejected rubber rings, The other end is connected to the rejected rubber ring packaging marking machine; The packaging marking area rejected rubber ring discharge passage is connected to the rejected rubber ring packaging marking machine; The packaging marking area pass rubber ring supply passage is One end is connected to the discharge passage of the rubber ring automatic inspection machine for passing the rubber ring; The other end is connected to the qualified rubber ring packaging marking machine; The fully automatic rubber sealing ring production line is characterized in that the packaging marking area qualified rubber ring discharge passage is connected to the qualified rubber ring packaging marking machine.
2. The blank box further includes a plurality of blank box barrels; The blank box barrels are arranged in parallel on one side of the blank box, A heat insulating area is provided beside the blank box barrel; A mold storage section is provided above the heat insulating area, A blank box mold clamping groove is further installed above the heat insulating area; A barrel upper edge is provided on the upper portion of the blank box barrel; A barrel stop edge is provided along the bottom of the outer upper edge of the barrel; The inner side wall of the blank box barrel is further provided with a barrel side edge vertical groove and a barrel positioning rod; A barrel base is further installed at the bottom of the blank box barrel; The barrel base is further provided with a barrel base lifting auxiliary hole; A barrel positioning rod lateral fixing rod is further installed under the barrel base; 2. The fully automatic rubber sealing ring production line as claimed in claim 1, wherein a barrel positioning rod upper connecting rod and a barrel positioning rod bottom connecting rod are respectively installed at the upper and lower ends of the barrel positioning rod.
3. the first blank box transfer mechanism further includes a base of the first blank box transfer mechanism; The base of the first blank box transfer mechanism is installed on a side of the first blank box belt conveyor close to the blank box multi-level warehouse; The base of the first blank box transfer mechanism further includes a Z-axis slide table of the first blank box transfer mechanism and a Y-axis slide table lead screw of the first blank box transfer mechanism; The Y-axis slide table motor of the first blank box transfer mechanism is installed on the Y-axis slide table lead screw of the first blank box transfer mechanism; A clamping cylinder of the first blank box transfer mechanism and a first blank box transfer tank are further installed on the base of the first blank box transfer mechanism; The first blank box belt conveyor further includes a first photoelectric sensor; the blank forming machine includes a second blank box transfer mechanism and a blank forming machine base; The second blank box transfer mechanism includes a second blank box transfer mechanism second Z-axis slide table lead screw and a second blank box transfer mechanism first Z-axis screw; The second Z-axis slide table lead screw of the second blank box transfer mechanism and the first Z-axis screw of the second blank box transfer mechanism are installed on the blank forming machine base; a second Z-axis slide table motor of the second blank box transfer mechanism and a first Z-axis slide table motor of the second blank box transfer mechanism are respectively installed on the upper ends of the second Z-axis slide table lead screw of the second blank box transfer mechanism and the first Z-axis screw of the second blank box transfer mechanism; The second blank box transfer mechanism is provided with an X-axis lead screw of the second blank box transfer mechanism; The second Z-axis slide table lead screw of the second blank box transfer mechanism and the first Z-axis screw of the second blank box transfer mechanism are connected via the X-axis lead screw of the second blank box transfer mechanism; The X-axis lead screw of the second blank box transfer mechanism is further provided with an X-axis slider of the second blank box transfer mechanism and a cylinder of the second blank box transfer mechanism; the third blank box transfer mechanism includes a third blank box transfer mechanism first Z-axis slide table lead screw and a third blank box transfer mechanism second Z-axis slide table lead screw; The first Z-axis slide table lead screw of the third blank box transfer mechanism and the second Z-axis slide table lead screw of the third blank box transfer mechanism are respectively installed on the deburring machine base; The third blank box transfer mechanism is provided with an X-axis slide table lead screw of the third blank box transfer mechanism; the first Z-axis slide table lead screw of the third blank box transfer mechanism and the second Z-axis slide table lead screw of the third blank box transfer mechanism are connected via the X-axis slide table lead screw of the third blank box transfer mechanism; The X-axis slide table connecting block of the third blank box transfer mechanism and the cylinder of the third blank box transfer mechanism are installed on the X-axis slide table lead screw of the third blank box transfer mechanism; An X-axis slide table motor of the third blank box transfer mechanism is installed at one end of the X-axis slide table lead screw of the third blank box transfer mechanism; A second Z-axis slide table motor of the third blank box transfer mechanism is installed on the upper end of the second Z-axis slide table lead screw of the third blank box transfer mechanism; A first Z-axis slide table motor of the third blank box transfer mechanism is installed on the upper end of the first Z-axis slide table lead screw of the third blank box transfer mechanism; the fourth blank box transfer mechanism includes a fourth blank box transfer mechanism base; A first Z-axis lead screw of the fourth blank box transfer mechanism, a second Z-axis lead screw of the fourth blank box transfer mechanism, and a fourth base lifting mechanism are respectively installed on the upper part of the base of the fourth blank box transfer mechanism; one end of the first Z-axis lead screw of the fourth blank box transfer mechanism and one end of the second Z-axis lead screw of the fourth blank box transfer mechanism are both installed on the base of the fourth blank box transfer mechanism; a first Z-axis slide table motor of the fourth blank box transfer mechanism and a second Z-axis slide table motor of the fourth blank box transfer mechanism are provided at the other ends of the first Z-axis lead screw of the fourth blank box transfer mechanism and the second Z-axis lead screw of the fourth blank box transfer mechanism, respectively; The fourth blank box transfer mechanism is provided with an X-axis slide table lead screw of the fourth blank box transfer mechanism; the first Z-axis lead screw of the fourth blank box transfer mechanism and the second Z-axis lead screw of the fourth blank box transfer mechanism are connected via the X-axis slide table lead screw of the fourth blank box transfer mechanism; An X-axis slide table motor of the fourth blank box transfer mechanism is provided at one end of the X-axis slide table lead screw of the fourth blank box transfer mechanism, The X-axis slide table lead screw of the fourth blank box transfer mechanism is further provided with a cylinder of the fourth blank box transfer mechanism; 2. The fully automatic rubber sealing ring production line as claimed in claim 1, further comprising an eighth photoelectric sensor installed on the sixth blank box belt conveyor.
4. The blank forming machine includes a blank forming machine base, a blank tray, a blank strip guide device, a blank pick mechanism, a blank forming table, a second blank box transfer mechanism, a first base lifting mechanism, a blank box of the blank forming machine, the second blank box belt conveyor, a second blank box transfer tank, a second photoelectric sensor, a blank forming machine support rod, a blank strip cutter, and a blank clamping claw; The blank forming machine support rod is installed on the lower bottom surface of the blank forming machine base, The blank forming machine base is further provided with the blank forming table, the second blank box belt conveyor, the blank strip guide device, the blank tray, the second blank box transfer mechanism, the second blank box belt conveyor, and the first platform lifting mechanism; The blank strip cutter, the blank clamping claws, and the blank pick mechanism are installed on the blank forming table, The blank strip guide device is composed of a blank strip guide device mounting seat attached to the blank forming machine base and two blank strip guide device guide pulleys, one above the other, positioned thereon; The blank tray includes a blank tray body, a blank tray rotation shaft, and a blank tray mounting seat, The blank tray includes: The blank tray is attached to the blank forming machine base via the blank tray attachment seat, and the rotation is assisted by a blank tray motor installed therein; The blank tray is further wrapped with a rubber blank strip extruded by a high-pressure extruder; The second blank box belt conveyor is provided with the second blank box transfer tank used in combination therewith; The second blank box belt conveyor is further provided with the second photoelectric sensor, and the first platform lifting mechanism includes a motor of the first platform lifting mechanism, a lead screw of the first platform lifting mechanism, and a connecting rod of the first platform lifting mechanism; The lead screw of the first pedestal lifting mechanism is One end is mounted on the blank forming machine base, The motor of the first base lifting mechanism is installed at the other end, The connecting rod of the first base lifting mechanism is installed thereon, The connecting rod of the first base lifting mechanism is driven by the lead screw of the first base lifting mechanism to move up and down in a direction perpendicular to the ground; the blank pick mechanism includes a blank pick mechanism Z-axis lead screw; The Z-axis lead screw of the blank pick mechanism is One end is mounted on the blank forming machine base, The Z-axis motor of the blank pick mechanism is installed at the other end, The Z-axis lead screw of the blank pick mechanism is provided with an X-axis lead screw of the blank pick mechanism and a Y-axis slide table of the blank pick mechanism; An X-axis connection mechanism of the blank pick mechanism is installed at one end of the X-axis lead screw of the blank pick mechanism; A blank pick mechanism cylinder is further installed on the X-axis connection mechanism of the blank pick mechanism; 2. The fully automatic rubber seal ring production line according to claim 1, wherein the other end of the X-axis lead screw of the blank pick mechanism is provided with an X-axis motor of the blank pick mechanism.
5. The molding vulcanization production unit includes a molding vulcanization production unit outer frame and a mold; The molding vulcanization manufacturing unit outer frame is It has a rectangular parallelepiped structure, A molding vulcanizer is installed within the outer frame of the molding vulcanization manufacturing unit, A molding vulcanization production unit control box is installed on one side of the molding vulcanizer; A first loading / unloading mechanism is provided on the other side of the molding vulcanizer; A second base lifting mechanism is installed in the front part of the molding vulcanization manufacturing unit outer frame, The molding vulcanizer includes a molding vulcanizer C-type base, The molding vulcanizer C-type base is The molding vulcanization manufacturing unit is installed on the bottom plate of the outer frame, providing mechanical structural support for said molding vulcanizer; A molding vulcanizer biasing shaft is further provided on the upper portion of the molding vulcanizer C-type base, The molding vulcanizer biasing shaft is It moves up and down along the Z axis perpendicular to the ground. A first electromagnetic adsorption device, a first insulating layer, and a first heating plate are provided from top to bottom, respectively; A vulcanized insulating plate is further installed on the outer edge of the first heating plate; The lower part of the C-type base of the molding vulcanizer is provided with a second heating plate, a second insulating layer and a second electromagnetic adsorption device, The first loading and unloading mechanism includes a first loading and unloading mechanism Z-axis lead screw and a first loading and unloading mechanism Y-axis slide table; The Z-axis lead screw of the first loading / unloading mechanism is One end is attached to the bottom plate of the molding vulcanization manufacturing unit outer frame, The Z-axis motor of the first loading / unloading mechanism is installed at the other end, a cylinder connection block of the first loading / unloading mechanism is provided on the Y-axis slide table of the first loading / unloading mechanism; a cylinder connecting block of the first loading / unloading mechanism is provided with a cylinder rotating assembly of the first loading / unloading mechanism; the first loading / unloading mechanism includes a cylinder divided into an upper cylinder portion of the first loading / unloading mechanism and a lower cylinder portion of the first loading / unloading mechanism; 2. The fully automatic rubber sealing ring production line according to claim 1, wherein the upper cylinder part of the first loading / unloading mechanism and the lower cylinder part of the first loading / unloading mechanism are connected to a gas source separately, and their operation is controlled by a corresponding barometer.
6. the deburring machine includes a deburring machine outer frame, a second loading and unloading mechanism, and a deburring mechanism; The second loading and unloading mechanism includes a deburring clamping and removing end, a Y-axis slide table of the second loading and unloading mechanism, a Z-axis motor of the second loading and unloading mechanism, and a Z-axis lead screw of the second loading and unloading mechanism; The deburring machine clamping and removing end includes a deburring machine deburring head, a first force sensor, a deburring machine clamping and removing end connector, and a deburring machine cylinder; The deburring machine deburring head includes: One end is connected to the first force sensor, At the other end, a 45° inclined friction surface and a 90° inclined friction surface are installed in succession, The first force sensor is One end is connected to the deburring head of the deburring machine; The other end is connected to the deburring machine clamping removal end connector, the deburring clamping end connector is respectively connected to the first force sensor, the deburring cylinder, and the Y-axis slide table of the second loading and unloading mechanism; the deburring cylinder is coupled to the deburring clamping removal end connector; a lower portion of the deburring machine outer frame is installed on the deburring machine base; the three remaining sides of the deburring machine outer frame excluding the side in contact with the third base lifting mechanism and the bottom are all sealed; the Y-axis slide table of the second loading / unloading mechanism is composed of a Y-axis motor of the second loading / unloading mechanism and a Y-axis lead screw of the second loading / unloading mechanism; The Z-axis lead screw of the second loading / unloading mechanism is One end is mounted on the deburring machine base, The Z-axis motor of the second loading and unloading mechanism is provided at the other end, and the deburring mechanism includes an X-axis slide table of the deburring machine, a deburring machine rubber ring rotating motor, and a deburring machine deburring stand; The X-axis slide table of the deburring machine is composed of a deburring machine rubber ring tension hook, a deburring machine rubber ring tension guide block, a second force sensor, a deburring machine X-axis slide table connection block, a deburring machine X-axis slide table lead screw, and a deburring machine X-axis slide table motor; The second force sensor is One side is connected to the deburring machine rubber ring tension hook via a transverse rod; The other side is connected to the X-axis slide table connection block of the deburring machine; The X-axis slide table connection block of the deburring machine is One side is connected to the second force sensor, The other side is connected to the X-axis slide table lead screw of the deburring machine; a coupling force causes the second force sensor to slide through the X-axis slide table lead screw of the deburring machine; 2. The fully automatic rubber seal ring production line as claimed in claim 1, wherein the deburring machine is finally used to drive a rubber ring tensioning hook to tension the rubber ring.
7. The rubber ring tray placement robot includes a rubber ring tray placement robot outer frame, a plurality of rubber ring tray placement robot pneumatic rods, a rubber ring tray placement robot cylinder, a rubber ring tray placement robot base, and a rubber ring tray placement robot support rod; The rubber ring tray arrangement robot outer frame is installed on the rubber ring tray arrangement robot base; The plurality of rubber ring tray placement robot pneumatic rods are The two have the same angle. Each of them is connected at one end to the rubber ring tray arrangement robot outer frame, The other end is connected to the rubber ring tray placement robot cylinder; A rubber ring tray for placing the rubber rings arranged by the rubber ring tray arrangement robot is further installed above the rubber ring tray arrangement robot base, and a barcode for identifying the rubber ring tray is further provided on the rubber ring tray, The rubber ring tray arrangement robot support rod is installed under the rubber ring tray arrangement robot base to provide mechanical support and height adjustment for the rubber ring tray arrangement robot; The oven frame is It consists of an oven frame holder, an oven frame hook, and a rubber ring tray. Used to accommodate different rubber ring trays, Used in combination with the oven, The oven is composed of an oven door, an oven body, an oven door guide rail, and an oven door hook, The oven door is driven by a motor installed in the oven and is opened and closed along the oven door guide rail, 2. The fully automatic rubber seal ring production line as claimed in claim 1, wherein the oven frame hook on the oven frame is used in combination with the oven door hook.
8. The rubber ring automatic detector includes a pass rubber ring outlet, a fail rubber ring outlet, a rubber ring detection plate motor, a rubber ring separation mechanism, a fail rubber ring nozzle, a fail rubber ring inlet, a pass rubber ring nozzle, a pass rubber ring inlet, a rubber ring detection plate, and a rubber ring automatic detector base; The rubber ring automatic detector base includes: The outer frame of the automatic rubber ring detector is installed in the center of the upper part. An automatic rubber ring detector is also installed around the periphery. A rubber ring automatic detector support rod is provided at the bottom, A first detection station, a second detection station, a third detection station, a fourth detection station and a fifth detection station are further provided on the upper part of the rubber ring automatic detection machine base, respectively; and the fifth detection station includes a fifth detection station Z-axis slide table lead screw and a fifth detection station Z-axis detection head; The Z-axis slide table lead screw of the fifth detection station One end is mounted on the rubber ring automatic detector base, A Z-axis slide table motor of the fifth detection station is provided at the other end, a detection head connection block of the fifth detection station is provided in the middle; The Z-axis sensing head of the fifth sensing station one side is connected to the detection head connection block of the fifth detection station; A detection camera of the fifth detection station is provided at the bottom, A power source for the fifth detection station is further provided below the detection camera of the fifth detection station; the power supply of the fifth detection station is located below the rubber ring detection plate; 2. The fully automatic rubber seal ring production line according to claim 1, wherein the rubber ring detection plate is provided at an upper portion thereof near the automatic rubber ring detector supply passage with the passed rubber ring nozzle and the rejected rubber ring nozzle for blowing air onto the rubber ring to feed the passed or rejected rubber ring into the passed rubber ring inlet or the rejected rubber ring inlet, respectively.
9. The rejected rubber ring packaging marking machine includes a packaging bag barrel, a packaging bag barrel rotating shaft, a first packaging bag, a rubber ring receiving barrel, a ninth photoelectric sensor, a packaging marking machine supporting rod, a packaging bag guide tube, a marking device, a packaging bag horizontal heat sealing machine, a second packaging bag, a bar code marking, a rubber ring, and a packaging bag vertical heat sealing machine; The lower part of the packaging marking machine support rod is It is placed on the ground, The packaging bag barrel is provided on the upper portion via the packaging bag barrel rotation shaft, The first packaging bag is A roll-shaped thin film is wound around the packaging bag barrel, The lower portion is wound by the packaging bag guide tube to form a thin film tube having an open end, The open side end is sealed by the packaging bag longitudinal direction sealing machine, The bottom end is sealed twice by the packaging bag lateral heat sealing machine, before and after the rubber ring is inserted, The rubber ring is The packaging marking area is supplied from a rejected rubber ring supply passage, The rubber ring passes through the rubber ring receiving barrel and falls into the second packaging bag whose bottom end and side end are sealed, The ninth photoelectric sensor is used to count the number of pieces of the object falling.
2. The fully automatic rubber sealing ring production line according to claim 1, wherein the second packaging bag is marked by the marking device.
10. A method for automatically producing a rubber seal ring, which is realized based on the fully automatic rubber seal ring production line according to any one of claims 1 to 9, comprising: S1, a production line management staff issues a production command in the control room, and the blank box multi-story warehouse four-way shuttle transports the blank boxes in the blank box multi-story warehouse to the blank box multi-story warehouse output stacker via the blank box multi-story warehouse four-way shuttle passage in the blank box multi-story warehouse, and further transports them to the operation area of the first transfer robot via the blank box multi-story warehouse output passage, and establishes a correspondence between the production command and the barcode on the blank box in the blank box multi-story warehouse; S2, the first transfer robot holds the blank box in the blank box multi-level warehouse four-way shuttle and transfers it into a second blank box transfer tank included in the blank forming machine, and the blank box multi-level warehouse four-way shuttle returns to the blank box multi-level warehouse; S3, the second blank box transfer tank carries the blank box and conveys it along the second blank box belt conveyor to the blank forming machine which produces blank rings of the corresponding material grade; S4, the second blank box transfer mechanism included in the blank forming machine is turned on, the blank box is clamped and taken out of the second blank box transfer tank, and the connection rod of the first base lifting mechanism included in the blank forming machine is inserted into the barrel base lifting auxiliary hole included in the blank box to attach it to the first base lifting mechanism; S5: lifting the connecting rod of the first base lifting mechanism closer to the blank forming machine until a barrel base included in the blank box reaches a highest position; S6: after the installation of the blank box is completed, the blank forming machine operates, and the blank pick mechanism cylinder included in the blank forming machine clamps the blank strip while pulling it forward until the blank clamping claw included in the blank forming machine clamps the front end of the blank strip; S7, the blank pick mechanism cylinder releases the blank strip, and the blank strip guide device guide pulley included in the blank forming machine conveys the blank strip forward until the required blank strip length is formed according to the required blank ring specification; S8: the blank pick mechanism cylinder clamps the blank strip, and the blank strip cutter included in the blank forming machine operates to cut the blank strip; S9: the blank pick mechanism cylinder bends the blank strip into a ring shape under the action of the blank pick mechanism included in the blank forming machine, and the blank pick mechanism cylinder and the blank clamping claws extrude both ends of the blank strip to complete blank ring forming; S10: the blank clamping claws are released, and the blank pick mechanism cylinder places the blank ring on the barrel base where the blank box is raised, and then the barrel base is driven by the connecting rod of the first base lifting mechanism to move slightly downward, so that the vertical height position of the next blank ring on the barrel base is close to that of the previous blank ring; S11, repeating S6 to S10 until the blank ring fills the blank box barrel contained in the blank box; S12: clamping the blank box in the second blank box transfer tank by the second blank box transfer mechanism, and transporting the second blank box transfer tank to an operating area of the first transfer robot by the second blank box belt conveyor; S13, the first transfer robot holds the blank box and transfers it from the second blank box transfer tank to the third blank box transfer tank, identifies the barcode on the blank box, and sends a mold command to the mold multi-level warehouse; S14, the molds in the corresponding mold storage sections in the mold storage are transported to the mold storage outgoing stacker by the first mold storage roller group, the second mold storage roller group, and the third mold storage roller group under the action of the first belt conveyor steering rod and the second belt conveyor steering rod; S15: The corresponding mold is raised and lowered to the operating position of the first transfer robot by the mold delivery stacker of the mold multi-level warehouse, and the first transfer robot clamps the corresponding mold in the blank box mold cavity of the blank box; S16, the third blank box transfer tank is conveyed by the third blank box belt conveyor to the molding vulcanization area, and is conveyed to the corresponding operating area of the second transfer robot under the action of the third belt conveyor steering rod and the fifth blank box belt conveyor; S17: the second transfer robot holds the blank box and removes it from the third blank box transfer tank, and inserts a connecting rod of a second base lifting mechanism included in the molding vulcanization production unit into the barrel base lifting auxiliary hole to install it in the second base lifting mechanism of the idle molding vulcanization production unit; S18, the second transfer robot attaches the mold in the blank box to the molding vulcanizer included in the molding vulcanization manufacturing unit, and the barrel base on the side of the second base lifting mechanism that is away from the molding vulcanizer is lifted to the highest position by the second base lifting mechanism; S19, the first electromagnetic adsorption device and the second electromagnetic adsorption device of the molding vulcanizer are operated to adsorb the upper mold and the lower mold respectively; S20, the molding vulcanizer biasing shaft of the molding vulcanizer moves upward to separate the upper mold and the lower mold; S21, the first loading and unloading mechanism included in the molding vulcanization production unit sucks the blank ring from the barrel that accommodates the blank ring of the blank box into the lower mold, and then the molding vulcanizer biasing shaft moves downward; S22, the first heating plate and the second heating plate included in the molding vulcanization production unit are operated to start molding vulcanization for the blank ring; S23, after the molding vulcanization is completed, the molding vulcanizer biasing shaft moves upward, and the cylinder of the first loading and unloading mechanism moves between the upper mold and the lower mold; S24, the molding vulcanizer biasing shaft moves upward until the upper mold, the lower mold, and the cylinder of the first loading and unloading mechanism are in close contact with each other; S25, the cylinder of the first loading and unloading mechanism operates to adsorb a rubber ring on a mold, and according to sensor data, it is determined that the rubber ring adsorption position is at the upper part of the cylinder of the first loading and unloading mechanism or the lower part of the cylinder of the first loading and unloading mechanism; S26, the molding vulcanizer biasing shaft moves upward, and the first loading and unloading mechanism transfers the rubber ring to the finished rubber ring barrel of the blank box; S27, the finished rubber ring barrel base is driven by the second base lifting mechanism to move slightly downward, so that the vertical height position of the next rubber ring on the barrel base is close to that of the previous rubber ring; S28, repeating steps S19 to S27 until all the blank rings are molded and vulcanized and are accommodated in the finished rubber ring barrel one by one; S29, the molding vulcanizer biasing shaft moves downward until the upper mold and the lower mold approach each other and are in close contact with each other, the first electromagnetic suction device and the second electromagnetic suction device stop operating, and the second base lifting mechanism lowers all the barrel bases on both sides of the blank box to their lowest positions; S30, the molding vulcanizer biasing shaft moves upward, and the second transfer robot clamps the mold and puts it into the blank box mold cavity of the blank box, and clamps the blank box and puts it into the third blank box transfer tank; S31: the third blank box transfer tank is transported to the deburring area by the fifth blank box belt conveyor, and the third blank box transfer mechanism takes out the blank box in the third blank box transfer tank, and installs it in the third pedestal lifting mechanism by inserting the connecting rod of the third pedestal lifting mechanism into the barrel pedestal lifting auxiliary hole; S32, the third base lifting mechanism lifts the barrel base on the blank barrel side of the blank box to a highest position; S33, the third blank box transfer mechanism clamps the rubber ring of the blank box on the finished product barrel side to the deburring machine deburring stand included in the deburring machine, and positions the rotating shaft of the deburring machine rubber ring rotating motor included in the deburring machine and the deburring machine rubber ring pulling hook included in the deburring machine in the rubber ring; S34. The X-axis slide table of the deburring machine is operated to tighten the rubber ring, and the tightening degree is controlled by a second force sensor included in the deburring machine; S35, the deburring machine rubber ring rotating motor is operated to rotate and drive the rubber ring, the deburring machine deburring head is operated to deburr the rubber ring by its friction surface, and the removing force is controlled by the first force sensor included in the deburring machine; S36: after the deburring of the rubber ring is completed, the X-axis slide table of the deburring machine releases the rubber ring, the third blank box transfer mechanism clamps the rubber ring on the blank barrel side of the blank box, and the blank barrel base is driven by the third base lifting mechanism to move slightly downward, so that the vertical height position of the next rubber ring on the barrel base is close to that of the previous rubber ring; S37: repeating steps S29 to S36 until all the rubber rings have been deburred and accommodated one by one in the blank barrel; S38, the third base lifting mechanism is operated to lower all of the barrel bases on both sides of the blank box to their lowest positions, and the third blank box transfer mechanism is operated to sandwich the blank box in the fourth blank box transfer tank; S39, the fourth blank box transfer tank conveys the blank box to the two-stage vulcanization area along the sixth blank box belt conveyor; S40, the fourth blank box transfer mechanism is operated, and the blank box and the fourth base lifting mechanism are attached by inserting a connecting rod of the fourth base lifting mechanism included in the fourth blank box transfer mechanism into the barrel base lifting auxiliary hole; S41, the rubber ring tray arrangement robot takes out the rubber rings one by one from the blank barrel of the blank box, arranges them on the rubber ring tray so as not to overlap each other, and establishes a relationship between the barcode on the rubber ring tray and the barcode on the blank box; S42, after all the rubber rings in the blank box have been placed, the fourth blank box transfer mechanism clamps the mold in the blank box between the second mold belt conveyor and transports it into the mold three-dimensional warehouse by the second mold belt conveyor, and the fourth blank box transfer mechanism clamps the blank box between the first blank box belt conveyor and transports it into the blank box three-dimensional warehouse by the first blank box belt conveyor; S43: transferring the rubber ring tray to the oven frame by the third transfer robot, and after all the rubber ring trays on which the same batch of rubber rings are arranged are transferred to the oven frame, transferring the oven frame into the oven by the third transfer robot; S44, the oven is operated to perform two-stage vulcanization on the rubber ring; S45, after the second-stage vulcanization is completed, the third transfer robot transfers the oven frame from the oven and places it in the oven frame temporary placement area of the second-stage vulcanization area, the third transfer robot places the rubber ring tray in the oven frame one by one on the rubber ring tray placement robot base included in the rubber ring tray placement robot, and the rubber ring tray placement robot sucks the rubber ring into the rubber ring automatic detection machine supply passage one by one; S46, the rubber rings are fed one by one through the feeding passage of the rubber ring automatic detector to the blank automatic detector for external quality and size detection, the detection information is associated with the barcode on the rubber ring tray, the acceptable rubber rings are fed into the acceptable rubber ring inlet of the rubber ring automatic detector, and are conveyed to the packaging marking area through the acceptable rubber ring discharge passage of the rubber ring automatic detector, and the unacceptable rubber rings are fed into the unacceptable rubber ring inlet of the rubber ring automatic detector, and are conveyed to the packaging marking area through the unacceptable rubber ring discharge passage of the rubber ring automatic detector; S47. The method for automatically producing rubber sealing rings includes the steps of: packaging and marking the passed rubber rings by the passed rubber ring packaging and marking machine, and associating the marking information with the bar code on the rubber ring tray; packaging and marking the rejected rubber rings by the rejected rubber ring packaging and marking machine, and associating the marking information with the bar code on the rubber ring tray.
Citation Information
Patent Citations
Transporting and trimming system of all-steel tire
CN102700155A
Vulcanization automatic production line and production method thereof
CN108215016A
Rubber product automatic two-stage vulcanization system and method based on seven-axis robot
CN112873241A
Automatic rubber production line and control method
CN113829575A
High-precision automatic flash removing device and method for rubber sealing ring
CN114055686A