Determining Integrated Production Metrics

The system integrates production metrics from various machines on a bulk mining project to provide a unified measure of work site plan completion, addressing the challenge of comparing disparate metrics and enhancing operational efficiency.

JP7682170B2Active Publication Date: 2025-05-23CATERPILLAR INC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2022519589
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-10-01
Filing Date
2020-09-30
Publication Date
2025-05-23
Estimated Expiration
2040-09-30

AI Technical Summary

Technical Problem

Existing systems struggle to provide an integrated view of production metrics across multiple machines operating on a bulk mining project, making it difficult to assess overall work site plan completion and identify underperforming machines.

Method used

A system and method that utilize a controller to receive and integrate production metrics from different machines, assigning tasks based on machine capacity, and calculating an integrated production metric to indicate the percentage of work site plan completion.

Benefits of technology

Enables effective monitoring and reporting of work site plan progress, allowing for the identification of underperforming machines and improving operational efficiency by providing a unified, comparable metric for production across diverse machine types.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007682170000006
    Figure 0007682170000006
  • Figure 0007682170000007
    Figure 0007682170000007
  • Figure 0007682170000008
    Figure 0007682170000008
Patent Text Reader

Abstract

The method includes sending instructions to a first machine to perform a first task defined by the shop floor plan and sending instructions to a second machine to perform a second task defined by the shop floor plan, the second task being different from the first task. A first production metric is received from a first sensor associated with the first machine during performance of the first task, and a second production metric is received from a second sensor associated with the second machine during performance of the second task, the second production metric being different from the first production metric. A percent completion of the shop floor plan is defined based on an integrated production metric determined at least in part based on the first production metric and the second production metric.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a system and method for creating and presenting integrated production metrics among multiple machines operating within a worksite on a bulk mining project defined by a worksite plan. More specifically, the present disclosure relates to a system and method including multiple machines performing different tasks and reporting different production metrics based on the machine's capabilities and capabilities, and a controller that can receive the different production metrics and create an integrated production metric to indicate a percentage or level of completion of an overall worksite plan. [Background technology]

[0002] Haul trucks, wheel loaders, skid steer loaders, dozers, and other machines are often used to perform various operations at work sites. These mining, loading, transporting, material leveling, grading, and compacting units, among other types of machines, are used to excavate and prepare areas of ground for further development and construction. For example, one or more hydraulic excavators may be used to remove layers of material, such as soil, gravel, concrete, asphalt, or other materials, that make up part of the work surface at the work site. In some examples, an articulated dolly or highway truck may be used as a transport unit to move the material excavated by the hydraulic excavator to or from the work site. Additionally, in some examples, a track-type tractor (TTT) may be used to create the elevation, slope, and grade of the material along the surface of the work site. Still further, a soil compactor acting as a compaction unit may be used to compact the material to a desired density. In some examples, a finish grading may be applied to the material throughout the work site. The process of using the machines described above may be referred to herein as mass mining. In the above example, the machines may be controlled (e.g., manually by an operator, semi-autonomously, fully autonomously, among other operating modes) to traverse the surface of the work site in performing multiple operations associated with the work site plan. Each type of machine used in mass mining may report different types of production metrics. However, these different production metrics for different machines are not useful for reporting the overall completion rate or level of completion of a work site plan in which machines complete multiple different tasks. Furthermore, because different machines report different production metrics, it may be difficult to gain insight into which machines in a work site are performing below expectations within the overall work site plan. This is because the different production metrics are considered to be non-comparable or incomparable metrics and therefore not substantially comparable.

[0003] An exemplary system for using location and loading monitoring to track truck loads of material is described in U.S. Patent Application Publication No. 2019 / 080525 (hereinafter '525). In particular, '525 describes a mobile machine including a load-carrying mechanism configured to carry a load of material during operation of the mobile machine at a work site. As described in '525, material and machine movement is tracked to estimate the completion of work site operations. Output from the machines in the system includes an indication of the amount of material moved, including dump and dig cycles, the amount of material leaving and / or added to the work site, and the amount of material stockpile movement. However, '525 does not describe a system configured to determine the degree to which work site operations are completed based on integrated production metrics that may measure productivity across different types of machines.

[0004] SUMMARY OF THE DISCLOSURE Exemplary embodiments of the present disclosure are directed to overcoming the deficiencies discussed above. Summary of the Invention

[0005] In an exemplary embodiment of the present disclosure, a method includes receiving, with a controller, a work site plan to be executed at a work site by at least a first machine and a second machine, and assigning, with the controller, the first machine and the second machine to execute the work site plan based on a first capacity of the first machine and a second capacity of the second machine. A first sensor of the first machine determines a parameter indicative of a first production metric during performance of a first task, and a second sensor of the second machine determines a parameter indicative of a second production metric different from the first production metric during performance of a second task different from the first task. The method also includes receiving, with the controller, first machine telematics data corresponding to the first task and associating the first telematics data with the first production metric from a first machine within the segmented portion of the work site. The method also includes receiving, with the controller, second machine telematics data corresponding to a second task and associating the second telematics data with a second production metric from a second machine within the segmented portion of the work site. The method further includes defining, with the controller, a percentage of completion of the work shop plan based on an integrated production metric, the integrated production metric being determined based on the first production metric and the second production metric. Still further, the method includes presenting, with the controller, an indication of the percentage of completion of the work shop plan based on the integrated production metric on a user interface.

[0006] In another exemplary embodiment of the present disclosure, a system includes a controller, a first machine operable at the work site, a second machine operable at the work site, and a communications network configured to transmit signals between the controller and the first and second machines. The controller is configured to receive a parameter indicative of a first production metric from a first sensor associated with the first machine during performance of a first task defined by the work site plan. The controller is also configured to receive a parameter indicative of a second production metric from a second sensor associated with the second machine during performance of a second task, the second task being different from the first task and the second production metric being different from the first production metric. Further still, the controller presents on a user interface a level of completion of the work site plan based on the integrated production metric, the integrated production metric being defined by at least one user input used to create the work site plan, at least one dimension of a first material movement device of the first machine, at least one dimension of a second material movement device of the second machine, position data obtained from the first machine during performance of the first task, and position data obtained from the second machine during performance of the second task.

[0007] In yet another exemplary embodiment of the present disclosure, a system includes a controller configured to receive a work site plan to be executed by at least a first machine and a second machine located at the work site, and to send instructions to the first machine to perform a first task defined by the work site plan and to send instructions to the second machine to perform a second task defined by the work site plan, the second task being different from the first task. The controller is also configured to receive a first production metric from a first sensor associated with the first machine during performance of the first task and a second production metric from a second sensor associated with the second machine during performance of the second task, the second production metric being different from the first production metric. The controller is also configured to define a percentage of completion of the work site plan based on an integrated production metric, the integrated production metric being determined at least in part based on the first production metric, the second production metric, a first dimension of a material movement element of the first machine, and a second dimension of a material movement element of the second machine. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a schematic diagram of a system according to an exemplary embodiment of the present disclosure. [Diagram 2] FIG. 2 is a flow chart illustrating an example method associated with the system shown in FIG. [Diagram 3] FIG. 3 is a flow chart illustrating an example method associated with the systems and methods shown in FIGS. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Whenever possible, the same reference numbers will be used throughout the drawings to refer to the same or similar parts. With reference to FIG. 1, an exemplary system 100 may include one or more machines operating at a work site 112 to perform various tasks. For example, the system 100 may include one or more excavation machines 102, one or more loading machines 104, one or more hauling machines 106, one or more compaction machines 105, one or more soil preparation machines 107, and / or other types of machines used in construction, mining, building, paving, excavation, and / or other operations at the work site 112. Each of the machines described herein may communicate with each other and / or with a local or remote control system 120 by one or more central stations 108. The central stations 108 may facilitate wireless communication between the machines described herein and / or between such machines and, for example, system controllers 122 of the control systems 120, for purposes of transmitting and / or receiving operational data and / or instructions.

[0010] An excavating machine 102 may refer to any machine that reduces material at a worksite 112 for purposes of subsequent operations (i.e., blasting, loading, hauling, and / or other operations). Examples of excavating machines 102 may include shovels, backhoes, dozers, boring machines, trenchers, and draglines, among other types of excavating machines. Multiple excavating machines 102 may coexist within a common area of ​​the worksite 112 and may perform similar functions. For example, one or more of the excavating machines may move soil, sand, minerals, gravel, concrete, asphalt, overburden, and / or other materials that comprise at least a portion of the work surface 110 of the worksite 112. As such, under normal conditions, similar coexisting excavating machines 102 may perform approximately the same in terms of productivity and efficiency when exposed to similar site conditions.

[0011] A loading machine 104 may refer to any machine that lifts, transports, loads, and / or removes material removed by one or more excavation machines 102. In some examples, a loading machine 104 may remove such material and transport the removed material from a first location on the work site 112 to a second location on the work site 112, or off or to the work site. Examples of loading machines 104 may include wheeled or tracked loaders, front shovels, shovels, cable shovels, and stack reclaimers, among other types of loading machines 104. One or more loading machines 104 may operate within a common area of ​​the work site 112, for example, to load the reduced material onto a transport machine 106.

[0012] Hauling machines 106 may refer to any machine that transports excavated material between different locations within the worksite 112. Examples of hauling machines 106 include articulated dollies, off-highway trucks, over-the-road dump trucks, and wheeled traction scrapers, among other types of hauling machines 106. A loaded hauling machine 106 may transport overburden from an excavation area within the worksite 112 along a haul road to various dump sites and back to the same or a different excavation area to be reloaded. Under normal conditions, similar coexisting hauling machines 106 may perform approximately the same in terms of productivity and efficiency when exposed to similar site conditions.

[0013] The compaction machine 105 may refer to any machine configured to apply stress to the work surface 110 of the work site 112 to densify the soil thereon and / or obtain an acceptable surface finish. The operation of the soil compaction machine 105 may immediately follow and / or proceed immediately to the operation of the soil preparation machine 107. In one embodiment, the compaction process may be performed using a compaction machine 105, such as a double drum compaction machine having a front drum and a back drum, which serves to propel the machine and compact the material to a suitable condition through the weight of the compaction machine, and may be used in conjunction with a drum vibrating device. Other examples of the soil compaction machine 105 may include wheeled or tracked soil compactors, vibratory soil compactors, and tandem vibratory compactors, among other types of compaction machines 105. One or more soil compaction machines 105 may work together within the work site 112 to compact the soil thereon. Completing compaction may include making multiple passes through the material with the compaction machine.

[0014] The soil preparation machine 107 may refer to any machine configured to create a flat surface by leveling material, such as soil, at the work site 112 for subsequent operations, for example, for compaction operations. Examples of soil preparation machines 107 may include scrapers, bulldozers, motor graders, or other similar machines commonly known in the art for creating a flat surface during operation. Multiple soil preparation machines 107 may coexist within a common area of ​​the work site 112 and may perform similar functions.

[0015] With continued reference to FIG. 1 , system 100 may include a control system 120 and a system controller 122 for controlling and / or coordinating various elements within system 100. In some embodiments, control system 120 and / or system controller 122 may be located at a command center (not shown) remote from work site 112. In other embodiments, system controller 122 and / or one or more components of control system 120 may be located at work site 112. Regardless of the location of the various components of control system 120, such components may be configured to facilitate communication between and provide information to excavation machine 102, loading machine 104, hauling machine 106, compaction machine 105, soil preparation machine 107, and / or other machines of system 100. In any of the embodiments described herein, the functionality of system controller 122 may be distributed such that certain operations are performed at work site 112 and other operations are performed remotely, such as at a remote command center as described above. For example, some operations of system controller 122 may occur at the work site 112, one or more excavation machines 102, one or more loading machines 104, one or more hauling machines 106, one or more compaction machines 105, or one or more soil preparation machines 107, among other locations and devices in system 100. It will be appreciated that system controller 122 may also include components of system 100, components of one or more machines located at work site 112, components of separate mobile devices such as, for example, mobile phones, tablets, and laptop computers, among other types of mobile devices, and / or control system 120.

[0016] The system controller 122 may be an electronic controller that operates in a logical fashion to perform operations, execute control algorithms, store and retrieve data and other desired operations. The system controller 122 may include and / or have access to memory, secondary storage, a processor, and any other components for executing applications. The memory and secondary storage may be in the form of read-only memory (ROM) or random access memory (RAM) or integrated circuits accessible by the controller. Various other circuits may be associated with the system controller 122, such as power supply circuits, signal conditioning circuits, driver circuits, and other types of circuits.

[0017] The system controller 122 may be a single controller or may include multiple controllers. In an embodiment in which the system controller 122 includes multiple controllers, the system controller 122 may include additional controllers associated with each of the excavation machine 102, the loading machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100, for example, configured to control various functions and / or features of the system 100. As used herein, the term "controller" is intended in its broadest sense to include one or more controllers, processors, central processing units, and / or microprocessors that may be associated with the system 100 and that may work together to control various functions and operations of the system 100. The functionality of the system controller 122, regardless of function, may be implemented in hardware and / or software. The system controller 122 may rely on one or more data maps, lookup tables, neural networks, algorithms, machine learning algorithms, and / or other components related to the operating conditions and operating environment of the system 100 that may be stored in the memory of the system controller 122. Each of the above-mentioned data maps may include a collection of data in the form of tables, graphs, and / or equations to maximize the performance and efficiency of the system 100 and its operation.

[0018] The components of control system 120 may communicate with and / or otherwise be operatively connected to any of the components of system 100 via a network 124. Network 124 may be a local area network ("LAN"), a larger network such as a wide area network ("WAN"), or a collection of networks such as the Internet. A protocol for network communication such as TCP / IP may be used to implement network 124. Although embodiments are described herein as using a network 124 such as the Internet, other distribution techniques may be implemented that transmit information via memory cards, flash memory, or other portable memory devices.

[0019] It is understood that the excavation machine 102, the loader machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100 may include a respective controller, and each of the respective controllers described herein (including the system controller 122) may communicate with and / or otherwise be operatively connected via a network 124. For example, the network 124 may comprise components of a wireless communication system of the system 100, and as part of such a wireless communication system, the excavation machine 102, the loader machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100 may include respective communication devices 126. Such communication devices 126 may be configured to enable wireless transmission of a number of signals, commands, and / or information between the system controller 122 and the respective controllers of the excavation machine 102, the loader machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100. Such communication devices 126 may also be configured to enable communication with other machines and systems remote from the work site 112. For example, such communication devices 126 may include a transmitter configured to transmit signals (e.g., via the central station 108 and via the network 124) to receivers of one or more other such communication devices 126. In such embodiments, each communication device 126 may also include a receiver configured to receive such signals (e.g., via the central station 108 and via the network 124). In some embodiments, the transmitter and receiver of a particular communication device 126 may be combined as a transceiver or other such components. In any embodiment described herein, such communication devices 126 may also enable communication (e.g., via the central station 108 and via the network 124) with one or more tablets, computers, cell phones / wireless phones, personal digital assistants, mobile devices, or other electronic devices 128 located at and / or remote from the work site 112.Such electronic devices 128 may include, for example, a cell phone and / or tablet of a project manager (e.g., a site supervisor) who oversees day-to-day operations at the work site 112 or a non-line-of-sight (NLOS) location relative to the work site 112. As used herein and in the appended claims, the term "non-line-of-sight (NLOS)" is meant to be broadly understood as any location relative to the work site 112 that is obstructed by a physical object such that electromagnetic waves cannot propagate between that location and the work site 112.

[0020] The network 124, the communication device 126, and / or other components of the wireless communication system described above may implement or utilize any desired system or protocol, including any of a number of communication standards. The desired protocol enables communication between the system controller 122, one or more of the communication devices 126, and / or any other desired machines or components of the system 100. Examples of wireless communication systems or protocols that may be used by the system 100 described herein include wireless personal area networks such as Bluetooth RTM (e.g., IEEE 802.15), local area networks such as IEEE 802.11b or 802.11g, cellular networks, or any other system or protocol for data transfer. Other wireless communication systems and configurations are contemplated. In some examples, wireless communications may be sent and received directly between the control system 120 and the machines of the system 100 (e.g., the excavation machine 102, the loading machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, etc.) or between such machines. In other instances, communications may be routed automatically without the need for retransmission by remote personnel.

[0021] In an exemplary embodiment, one or more of the machines of the system 100 (e.g., the excavation machine 102, the loading machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and other machines described herein) may include a position sensor 130 configured to determine a position, speed, heading, and / or orientation of the respective machine. In such an embodiment, the communication device 126 of each machine may be configured to generate and / or transmit signals indicative of such determined position, speed, heading, orientation, distance, and / or area covered to, for example, the system controller 122 and / or each other machine of the system 100. In some examples, the position sensor 130 of each machine may include and / or include components of a Global Navigation Satellite System (GNSS) or a Global Positioning System (GPS). Alternatively, a Universal Total Station (UTS) may be utilized to identify the respective positions of the machines. In an exemplary embodiment, one or more of the position sensors 130 described herein may comprise a GPS receiver, transmitter, transceiver, laser prism, and / or other such devices, and the position sensor 130 may be in communication with one or more GPS satellites 132 and / or UTS to determine the position of each of the machines to which the position sensor 130 is connected continuously, substantially continuously, or at various time intervals. One or more additional machines of the system 100 may also be in communication with one or more GPS satellites 132 and / or UTS, and such GPS satellites 132 and / or UTS may be configured to determine the position of each of such additional machines. In any of the examples described herein, the position, speed, heading, orientation, and / or other parameters of the machines determined by each position sensor 130 may be used by the system controller 122 and / or other components of the system 100 to coordinate the activities of the excavation machine 102, the loading machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other components of the system 100.

[0022] The GPS satellites 132 and / or UTS may be used to receive machine data from the excavation machine 102, the loader machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100. Additionally, the GPS satellites 132 and / or UTS may be used to transmit that machine data to the system controller 122 or other data processing devices or systems in the system 100. The machine data may include, for example, production metrics from the excavation machine 102, the loader machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines performing operations in the work site 112 of the system 100 according to a work site plan provided by the system controller 122 or another source.

[0023] The machine data may be machine telematics data, including, for example, the location of the machine, usage data defining the method, location, duration, and function of the machine, machine specifications, machine health, and other telematics data. Telematics, as used herein, refers to the complete measurement, transmission, and reception of data defining the value of a quantity over a distance by electrical conversion means, such as a wired or wireless communication network, including network 124. Additionally, in one embodiment, the telematics data may also include a unique identifier for each of the machines 102, 104, 105, 106, 107. In one embodiment, the telematics data may include data representing the level of completion of tasks assigned to each machine in the work site plan, and may be represented using the amount of material, such as soil 118, interacted by the machines 102, 104, 105, 106, 107. For example, the excavation machine 102 may reduce soil 118, e.g., for purposes of loading the soil onto the transport machine 106 by the loading machine 104 for removal from or transport to the work site 112. In doing so, each sensor 130, controller 136, and communication device 126 associated with the machines 102, 104, 105, 106, 107 may record, among other machine telematics data, the volume (e.g., cubic meters (m)) reduced by the excavation machine 102. 3The excavation machine 102 may detect, measure, process and forward, for example to the system controller 122, data representative of the amount of soil 118 in terms of weight (tons) or mass (e.g., metric tons (t)), the area of ​​the worksite 112 covered by the excavation machine 102, and the elevation or “lift thickness” of the working surface 110 of the worksite 112. Additionally, the machine data may include any data defining the operation of the machines 102, 104, 105, 106, 107. For example, the machine data may include data such as distance traveled, area of ​​the worksite covered or traveled, volume, mass or weight extracted, transported and / or deposited, machine operating time, fuel utilized by the machine, sensory information obtained from sensors within the machine, a unique identifier for each of the machines, the type of each of the machines, and other machine data, location related parameters such as region, district, area, etc.

[0024] Similarly, the loading machine 104 may load material, such as soil 118, onto the transport machine 106 and record the area (e.g., cubic meters (m)), among other machine telematics data. 3 )) or mass (e.g., metric tons (t)) of material may be reported to the system controller 122 as the respective sensors 130, controllers 136, and communication devices 126 associated with the machines 102, 104, 105, 106, and 107 detect, measure, process, and transmit machine telematics data. Additionally, the area (e.g., m) moved within an area by the hauling machine 106, among other machine telematics data, may be reported to the system controller 122 as the respective sensors 130, controllers 136, and communication devices 126 associated with the machines 102, 104, 105, 106, and 107 detect, measure, process, and transmit machine telematics data. 3 ) or mass (e.g., t) of material, as well as the distance traveled by the transport machine 106, may be detected, measured, processed, and transmitted to the system controller 122 using sensors 130, controllers 136, and communication devices 126 associated with the machines 102, 104, 105, 106, 107. With respect to the compaction machine 105, the distance traveled by the transport machine 106, as well as the amount of material, in square meters (m 2) and the lift layer thickness of the work surface 110 of the work site 112 may be reported to the system controller 122 using the sensors 130, controller 136, and communication device 126 associated with the compaction machine 105. Additionally, the amount of material moved within an area (e.g., m 3 ) or mass (e.g., t), and the square meters (m 2 ) may be detected, measured, processed, and transmitted to the system controller 122 by sensors 130, controllers 136, and communications devices 126 associated with the soil preparation machine 107.

[0025] Further, in one embodiment, the telematics data may include parameters related to the operation of the associated machines 102, 104, 105, 106, 107, such as, for example, the speed, heading, position of the machines 102, 104, 105, 106, 107, or any other telematic sensory information associated with the machines 102, 104, 105, 106, 107.

[0026] Thus, as described above, each of the machines 102, 104, 105, 106, 107 may telemetrically report different types of production metrics. A user may measure truck loads delivered by the machines 102, 104, 105, 106, 107 and / or the final grade of the worksite 112 (e.g., via land clearing, manual survey, or drone flight) to measure progress across a worksite plan, such as a bulk mining project utilizing multiple different machines 102, 104, 105, 106, 107. These two data points (i.e., truck loads and final grade of the worksite 112) may not provide sufficient insight into a worksite plan, such as a bulk mining project, to pinpoint underperforming machines 102, 104, 105, 106, 107 within the worksite plan. Other progress measurements may be used for each individual task within the worksite plan, but are difficult to relate to upstream or downstream tasks or steps within the worksite plan. The different production metrics for the different machines 102, 104, 105, 106, 107 described herein may make it difficult to report on the overall completion level of a work site plan in which the machines complete multiple different tasks. Furthermore, because the different machines 102, 104, 105, 106, 107 report different production metrics, it may be difficult to gain insight into which machines in a work site are underperforming within the overall work site plan, as described above. This is because comparing different production metrics may be difficult to do practically because they are considered to be non-comparable or incomparable metrics. These production metrics may be presented on a user interface, such as that provided by the display of the electronic device 128 in the system 100. However, even with the display of these production metrics, a user, such as a supervisor, manager, crew, or other individual associated with the work site plan, may have difficulty understanding each individual production metric as they relate to other production metrics of the machines or the overall work site plan.

[0027] In the embodiments described herein, the machines 102, 104, 105, 106, 107 may report an integrated production metric, or machine data used to create an integrated production metric. Data transmitted from the machines 102, 104, 105, 106, 107 may be processed, for example, by the system controller 122 on one or more data maps, lookup tables, neural networks, algorithms, machine learning algorithms, and / or other components to obtain an integrated production metric. The integrated production metric is directly comparable between the machines 102, 104, 105, 106, 107 despite differences in the tasks performed by the individual machines and their respective individual production metrics. This integrated production metric may be used to measure the overall progress of the work site plan progress, as well as the efficiency of the system 100 and the efficiency of the individual machines 102, 104, 105, 106, 107 operating to complete tasks within the work site plan.

[0028] Additionally, in one embodiment, the system controller 122 of the system 100 may use integrated production metrics to track progress without knowing the entire shop floor plan. 3 Without knowing the total goal, 3 may be reported to the system controller 122 from the machines 102, 104, 105, 106, 107 as they load, transport, level, and compact the worksite 112. A representation of this tracked volume may be presented to a user, for example, on a display of the electronic device 128. Additionally, the system controller 122 of the system 100 may report to a user the task-by-task progress of each individual machine 102, 104, 105, 106, 107. For example, the system controller 122 may report to a user the progress of each individual machine 102, 104, 105, 106, 107 as 120,000 yd 3 was loaded by the loading machine 104, but 80,000yd 3was compacted by the compaction machine 105. By presenting the user with production metrics per machine, the user can understand how efficiently each of the machines 102, 104, 105, 106, 107 is performing.

[0029] In one embodiment, integrated production metrics may be calculated by the system controller 122 as the machine data is received from the machines 102, 104, 105, 106, 107. The machine data may be requested by the system controller 122 or may be passively received by the system controller 122 such that the machines 102, 104, 105, 106, 107 transmit the machine data continuously or periodically. In one embodiment, the machines 102, 104, 105, 106, 107 transmit the machine data to the system controller 122 via the machines' respective communication devices 126 through the central station 108 and the network 124.

[0030] In one embodiment, the integrated production metrics may be calculated at least in part based on data entered by a user during the initial creation of the work site plan, machine data received telemetrically from the machines 102, 104, 105, 106, 107, machine dimensions, and combinations thereof. Data entered by a user may include, for example, data related to materials interacting with the work site 112, including, for example, soil 118, material characteristics and properties, lift thickness defined as the desired elevation of the work surface 110 of the work site 112, a schedule of targets or objectives for completing multiple tasks within the work site plan and / or overall work site plan, the total area of ​​the work surface 110 and / or work site 112, and haul distance defined by the distance the transport machine 106 moves material to and / or from the work site 112, for example, among other user inputs.

[0031] The machine dimensions used to calculate the integrated production metric may include any dimension of the machines 102, 104, 105, 106, 107, such as, for example, the blade width of the loading machine 104 or the soil preparation machine 107, for example, the drum width of the compaction machine 105, for example, the dump bed volume of the transport machine 106, and for example, the bucket volume of the excavation machine 102, among other machine dimensions. Additionally, in one embodiment, position data determined by the position sensors 130 of each machine 102, 104, 105, 106, 107 may be transmitted to the system controller 122 via the communications device 126, the central station 108, and the network 124 for inclusion of this data as part of the machine dimensions. The machine dimensions may be used by the system controller 122 to develop and estimate the integrated production metric.

[0032] The machine data may be received telemetrically from the machines 102, 104, 105, 106, 107 by the system controller 122. In particular, the machines 102, 104, 105, 106, 107 may transmit the machine data to the system controller 122 via the communication device 126, the central station 108, and the network 124.

[0033] The integrated production metrics include an "area at lift" estimate. In one embodiment, area at lift may be defined as the compacted volume of material per transport unit. In this embodiment, volume is measured in cubic meters (m 3) the volume of the soil 118. The transporting machine 106 may be identified and used as a transport unit. In one example, the volume may be determined based on the shrinkage and expansion properties of a material, such as the soil 118, which may expand in the presence of a fluid, such as water, and may contract or shrink as the fluid leaves the soil 118. The shrinkage and expansion properties of the material may change throughout a work site planning task where different machines 102, 104, 105, 106, 107 interact with the material, such as the soil 118. It may prove difficult to estimate the intermediate volume of the soil 118 because the shrinkage and expansion of the soil 118 may change with each instance of interaction between the machines 102, 104, 105, 106, 107 and the soil 118. Thus, the system 100 may measure a compacted volume, where the volume of the soil 118 or other material is measured in place after it has been compacted on the work site 112. Therefore, measurements of any intermediate uncompacted, soft soil 118 may not be taken in order to eliminate inaccurate measurements from current systems and processes.

[0034] In another example, the area at the lift may be defined as a lift thickness, which includes the depth of material, such as soil 118, that is compacted along the surface of the work site 112. In this example, the elevation of the work surface may be measured as a lift thickness, which may be defined as the depth of material, such as soil 118, that is spread and compacted to a desired compaction level at the work site 112. In one example, after compaction, the lift thickness may be measured and another amount of material may be added to form the next layer on the work surface 110 of the work site 112. Multiple lifts may be constructed on the final surface.

[0035] In yet another example, the area at lift may be a combination of the above two examples, where the area at lift (defined as the compacted volume of material per transport unit) and the lift thickness are considered in calculating the area at lift as an integrated production metric. In this example, both the volume of compacted soil 118 at the work surface 110 of the work site 112 and the elevation of the work surface 110 of the work site 112 may be measured to obtain an integrated production metric. Thus, an estimate of the compacted area for a given lift transported per truck may be calculated by considering the lift thickness, the size (or payload) of the truck, and the material properties.

[0036] In practice, the area at lift may be realized when material is added to the work surface 110 of the work site 112 by a combination of the excavator 102, loader 104, and hauler 106. The hauler 106 and grader 107 may spread the material along the work surface 110 of the work site 112. The compaction machine 105 may then compact the material to a desired density. This process of transporting, spreading, and compacting the material may equate to one "lift," and an integrated production metric may be measured after each lift. In another example, the system controller 122 may calculate and report the volume of material per each task. For example, 120,000 yd. 3 material was loaded and transported to the work site by the excavation machine 102, the loading machine 104, and the transport machine 106, and 80,000 yd. 3 It may be reported that the material was compacted using the soil preparation machine 107 and the compaction machine 105.

[0037] In one example, an estimate of the integrated production metric may also be determined by considering the truck loads or payloads generated by the excavation machine 102, the loader 104, and the transport machine 106 as a metric applied to the work performed by the soil preparation machine 107 and the compaction machine 105. Thus, rather than basing an estimate of the work site plan or the completion of multiple tasks across the work site plan for material compaction volume and lift thickness, the integrated production metric may be determined based on the amount, mass, or weight of material excavated, loaded, or transported by the excavation machine 102, the loader 104, and the transport machine 106, for example. This amount of material transported may be applied to the operation of the soil preparation machine 107 and the compaction machine 105, such that the level of completion of the tasks in the work site plan, or the level of completion of the entire work site plan by the soil preparation machine 107 and the compaction machine 105, may be based on the amount of material transported.

[0038] In the embodiment described herein, the aggregate production metric or "area at lift" may be correlated to volume measurements at each sub-process or task in the overall shop floor plan. In this embodiment, the production metrics may be aggregated at three different levels, including an individual machine level, where each individual machine 102, 104, 105, 106, 107 aggregates its production metrics, a subsystem level, and a shop floor level, where the production metrics from all machines 102, 104, 105, 106, 107 are aggregated, where the subsystem level may include any machine 102, 104, 105, 106, 107 or groups of machines in the system, and the shop floor level may include all machines 102, 104, 105, 106, 107 collectively. Aggregating the production metrics into a single data set may improve processing time and reduce the amount of data transmitted between the machines 102, 104, 105, 106, 107 and the system controller 122. Thus, the aggregation of production metrics results in more effective and efficient use of computing resources throughout the system 100 .

[0039] For a subsystem level of production metric aggregation, in one embodiment, production metrics may be collected by the system controller 122 and / or reported by the machines 102, 104, 105, 106, 107 in an aggregate. In these embodiments, multiple loading machines 104 may all share common tasks and / or operations, for example, and the machine data reported by the loading machines 104 may be aggregated as a single production metric. Additionally, machines 102, 104, 105, 106, 107 performing the same task may collectively report the aggregated production metric as a single production metric.

[0040] Further still, machines 102, 104, 105, 106, 107 that may report the same production metric may collectively report the aggregated production metric as a single production metric even though the machines 102, 104, 105, 106, 107 may perform different tasks. In this example, the production metrics of the excavating machine 102 and the loading machine 104 may be aggregated together before or after transmitting the telematics data to the system controller 122. This is because the production metric of the excavating machine 102 and the loading machine 104 may be a metric of the volume or mass of material moved by their respective work tools 140 (e.g., buckets) regardless of the dimensions of the work tools 140.

[0041] In any embodiment described herein, the system controller 122 may be configured to generate a user interface (UI) (not shown) that includes information indicating, among other things, the level or percentage of completion of tasks within a work site plan and / or the level or percentage of completion of the overall work site plan. Additionally, in one embodiment, the UI may display the integrated production metrics and / or other metrics in a graphical format. The UI may show the production metrics in a graph of red, yellow, and green colors, with red indicating a relatively lower percentage of completion of the tasks and / or overall work site plan compared to yellow, and yellow indicating a relatively lower percentage of completion of the tasks and / or overall work site plan compared to green. Other forms and methods of graphically depicting the level of completion of the tasks and / or overall work site plan are contemplated herein. Overall, the UI allows a user to easily understand how the tasks and / or overall work site plan are progressing. In one embodiment, the UI may be presented and interactively rendered to a user to select portions within the UI to drill down to levels within the work site plan to determine efficiency within a task and identify specific groups of machines 102, 104, 105, 106, 107 or individual machines that are or are not functioning efficiently as expected or intended.

[0042] In any embodiment described herein, such UIs may be generated by controller 136 in machines 102, 104, 105, 106, 107 and provided to, for example, electronic device 128 (e.g., via network 124), a display of machines 102, 104, 105, 106, 107, system controller 122 (e.g., via network 124), and / or one or more components of system 100 for display. Additionally or alternatively, such user interfaces may be generated by system controller 122 and provided to, for example, electronic device 128 (e.g., via network 124), a display of machines 102, 104, 105, 106, 107, and / or one or more components of system 100 for display.

[0043] In any of the examples described herein, one or more of the excavation machine 102, the loader 104, the transport machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100 may be manually controlled, semi-autonomously controlled, and / or fully autonomously controlled. In examples where the excavation machine 102, the loader 104, the transport machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100 are operating under autonomous or semi-autonomous control, the speed, steering, positioning / movement of the work tool, and / or other functions of such machines may be automatically or semi-automatically controlled based, at least in part, on the determined movement parameters and / or position of the work tool as described herein.

[0044] 1, as mentioned above, each of the excavation machine 102, the loading machine 104, the hauling machine 106, the compaction machine 105, the soil preparation machine 107, and / or other machines of the system 100 may include a controller 136 as described herein. The controller 136 may include components of a local control system, components carried on-board and / or otherwise on the respective machine 102, 104, 105, 106, 107. The controller 136 may be any embedded system within the machine 102, 104, 105, 106, 107, and thus control at least one electrical system or subsystem within the machine 102, 104, 105, 106, 107, and at least one function of the machine 102, 104, 105, 106, 107. Such a controller 136 may be generally similar or identical to the system controller 122 of the control system 120. For example, each such controller 136 may include one or more processors, memory, and / or other components described herein with respect to the system controller 122. The controllers 136 may include electronic control units (ECUs), such as, for example, electronic control modules (ECMs), powertrain control modules (PCMs), transmission control modules (TCMs), brake control modules (EBCMs), central control modules (CCMs), central timing modules (CTMs), general electronic modules (GEMs), body control modules (BCMs), suspension control modules (SCMs), and other types of ECUs of control units. The ECUs may include hardware and embedded software that assist in the operation of the machines 102, 104, 105, 106, 107.

[0045] In some embodiments, the controller 136 may be located at each one of the machines 102, 104, 105, 106, 107, or may include components located remotely from each one of the machines 102, 104, 105, 106, 107, such as at another machine in the system 100 or at a command center (not shown) as described herein. Thus, in some embodiments, the functionality of the controller 136 may be distributed such that certain functions are performed at each one of the machines 102, 104, 105, 106, 107 and other functions are performed remotely. In some embodiments, the controller 136 of a local control system onboard each machine 102, 104, 105, 106, 107 may enable autonomous and / or semi-autonomous control of the respective machine, alone or in combination with the control system 120. Additionally, a controller 136 on board each machine 102 , 104 , 105 , 106 , 107 may instruct each communication device 126 and position sensor 130 to function as described herein, for example, as directed by the system controller 122 .

[0046] With continued reference to FIG. 1 , in some embodiments, one or more of the machines 102, 104, 105, 106, 107 of the system 100 may include an implement or other work tool 140 coupled to a frame of the machine. For example, in the case of the loading machine 104, the work tool may comprise a bucket configured to hold material within an open volume or other substantially open space. The loading machine 104 may be configured to scoop, lift, and / or otherwise load material (e.g., material removed by the excavation machine 102) into the work tool 140, for example, by lowering the work tool 140 to a loading position. For example, the loading machine 104 may include one or more linkages 142 movably connected to the frame of the loading machine. The work tool 140 may be connected to such linkage 142, which may be used to lower the work tool 140 (e.g., via one or more hydraulic cylinders, electric motors, or other devices connected thereto) to a loading position where a leading edge 144 of the work tool 140 is proximate, adjacent, and / or abutting the work surface 110 and a base of the work tool 140 is disposed substantially parallel to the work surface 110. The loading machine 104 may then be controlled to advance along the surface of the work surface 110 of the work site 112 such that the work tool 140 may impinge on material, positive volume of soil 118, and / or other objects disposed on the work surface 110 to move material at least partially into the open space of the work tool 140. The linkage 142 may then be controlled to raise, pivot, and / or tilt the work tool 140 into a transport position above the work surface 110. The loading machine 104 may then be controlled to traverse the work site 112 until the loading machine 104 reaches a dump zone, a transport machine 106, and / or another location on the work site 112 designated to receive the removed material being transported by the work tool 140.Linkage 142 may then be controlled to lower, swing, and / or tilt work tool 140 to an unloading position where material held within the open space of work tool 140 may be deposited (e.g., by the force of gravity acting on the material held by work tool 140) in a dump zone, into the floor of the transport machine 106, and / or in any other desired manner. Similar to the loading machine 104, the excavation machine 102, transport machine 106, compaction machine 105, and soil preparation machine 107 may include work tools 140 and / or linkages 142 that enable the machines to perform their respective tasks described herein.

[0047] FIG. 2 is a flow chart depicting an example method 200 associated with the system 100 shown in FIG. An embodiment of the method 200 is illustrated as a collection of steps in a logical flow diagram, which represent operations that may be implemented in hardware, software, or a combination thereof. In the context of software, the steps represent computer-executable instructions stored in memory. When such instructions are executed, for example, by the system controller 122 of the control system 120, the instructions may cause the machines 102, 104, 105, 106, 107, the various components of the control system 120 (e.g., electronics 128), the controller of the excavation machine 102, the controller of the loading machine 104, the controller of the hauling machine 106, the controller of the compaction machine 105, the controller of the soil preparation machine 107, and / or other components of the system 100 to perform the recited operations. Such computer-executable instructions may include routines, programs, objects, components, data structures, etc. that perform particular functions or implement particular abstract data types. The order in which the operations are described is not intended to be construed as limiting, and any number of the described steps can be combined in any order and / or in parallel to perform the process. For purposes of discussion, and unless otherwise specified, method 200 and other methods described herein are described with reference to system 100, control system 120, controller 136 of machines 102, 104, 105, 106, 107, work site 112, and / or other items shown in FIG. 1. In particular, although any portion and / or the entirety of method 200 may be performed, alone or in combination, by system controller 122, electronics 128, controller 136 of machines 102, 104, 105, 106, 107, and / or other components of system 100, unless otherwise specified, method 200 is described below with reference to system controller 122 for ease of explanation.

[0048] 2, at 202, the system controller 122 may receive information related to one or more tasks, jobs, or other operations to be performed by the system 100 at the work site 112. The information received at 202 may include, for example, user input 202 that defines, among other things, a work site plan to be executed by one or more machines 102, 104, 105, 106, 107 of the system 100 at the work site 112. The work site plan may include, for example, instructions, locations (e.g., GPS coordinates, UTS coordinates, etc.), and / or other information identifying the perimeter and / or boundaries of at least a portion of the work surface 110 on which such operations are to be performed.

[0049] The user input 202 may also include characteristics of materials within the worksite 112. For example, the materials may include soil 118, sand, minerals, gravel, stones, rocks, boulders, concrete, asphalt, and topsoil, among other materials.

[0050] Additionally, user input 202 may include a target timeline, deadline, or goal. In one embodiment, the target timeline, deadline, or goal may be associated with multiple individual tasks within the work site plan. In one embodiment, the target timeline, deadline, or goal may be associated with the entire work site plan, defining the completion of the entire work site plan and the number of tasks within the work site plan.

[0051] The user input 202 may also include distances between locations within and outside the work site 112. The user input may further include details regarding the work surface plan, such as GPS coordinates identifying the boundaries and / or other areas of the work surface 110, the intended lift thickness, elevation grade and other characteristics of the work surface 110 of the work site 112 that are to be achieved by the work site plan, and the current elevation along the work surface 110 of the work site 112, among other data related to the work site 112. In some examples, the work site plan may include a first set of GPS coordinates and / or other information identifying the location of material, as well as a second set of GPS coordinates identifying dump zones, work zones in which one or more machines 102, 104, 105, 106, 107 are assigned or are currently working, and / or other areas within the work site 112 where work may be performed.

[0052] In some embodiments, the user input received at 202 including the work site plan may also include information indicative of the type of material to be moved (e.g., soil, sand, mineral, gravel, concrete, asphalt, topsoil, etc.), information uniquely identifying the machines 102, 104, 105, 106, 107 present at the work site 112 (e.g., one or more license plate numbers, model numbers, machine types, and / or other unique identifiers associated with each machine of the system 100 present at the work site 112), information uniquely identifying the operator of each machine (e.g., name, employer, employee ID number, experience level, and / or other information), two-dimensional and / or three-dimensional maps of the work site 112, GPS coordinates of any known imperfections or other obstructions at the work site 112 (e.g., GPS coordinates identifying the location, boundaries, and / or extent of one or more trees, bodies of water, manmade obstructions, power lines, utility lines, drainage lines, roads, sidewalks, parking lots, etc.), and / or other information associated with the system 100 and / or the work site 112.

[0053] At 204, the system controller 122 may receive machine dimensions from the machines 102, 104, 105, 106, 107 present at the work site 112. As described herein, the machine dimensions may include any dimension of the machines 102, 104, 105, 106, 107, such as, for example, a blade width of the loading machine 104 or the grading machine 107, for example, a drum width of the compaction machine 105, for example, a dump bed volume of the transport machine 106, and a bucket volume of the excavation machine 102 or the loading machine 104, among other machine dimensions. In one embodiment, the machine dimensions received at 204 may be received by the system controller 122, for example, via a user input to the system controller 122 itself or the electronic device 128. In another embodiment, the machine dimensions may be obtained by the system controller from a database within either the system controller 122 or the electronic device 128. In this example, the database of the system controller 122 or electronic device 128 may be accessed when the fleet of machines 102, 104, 105, 106, 107 is selected at 206 such that the dimensions of the selected machines 102, 104, 105, 106, 107 are obtained from the database. Additionally, in one example, at 204, position data determined by the position sensor 130 of each machine 102, 104, 105, 106, 107 may be transmitted to the system controller 122 via the communication device 126, the central station 108, and the network 124 for inclusion as part of the machine dimensions. The machine dimensions may be used by the system controller 122 to create and estimate integrated production metrics. The integrated production metrics may be used as data to support the depiction of the work site plan or the completion level of tasks within the overall work site plan in the UI as described herein.

[0054] At 206, a fleet of machines is selected. In one embodiment, the fleet is selected from the types of machines 102, 104, 105, 106, 107 described herein. The fleet may be selected autonomously by the system controller 122 based on user input and the work site plan obtained at 202 and / or 204. In this embodiment, the type of work to be performed as defined in the work site plan and the tasks defined in the work site plan may be used to select which of the machines 102, 104, 105, 106, 107 will be involved in performing tasks in the work site plan. In another embodiment, the fleet may be selected by multiple users, such as supervisors, managers, crew members, or other individuals associated with the work site plan. In this embodiment, the system controller 122 may prompt one or more of these individuals to provide such input to the system controller 122.

[0055] Once a fleet of machines 102, 104, 105, 106, 107 has been selected, the work site plan may be executed 208. Execution of the work site plan may include loading 208-1, transporting 208-2, grading 208-3, compacting 208-4, and finish grading 208-5 of material, such as soil 118, at the work site 112. Loading 208-1 of material may include using shovels, backhoes, dozers, boring machines, trenchers, draglines, wheel loaders, wheel tractors, track loaders, front shovels, cable shovels, stack reclaimers, scrapers, and / or other excavating machines 102, and loading machines 104 to excavate material, such as soil 118, and load it onto the transporting machines 106. Transporting 208-2 material may include moving material to or between distinct locations within the work site 112 using articulated dollies, off-highway trucks, over-the-road dump trucks, and wheeled track scrapers, among other types of transport machines 106. As indicated by arrow 208-6, the transport machine 106 may return to the loading machine 104 location any number of times to further load 208-1 and transport 208-2 material.

[0056] Execution of the work site plan may also include grading 208-3 of the work surface 110 of the work site 112. The grading 208-3 of the work surface 110 may be performed using track-type tractors, scrapers, bulldozers, motor graders, and other land preparation machines. Additionally, execution of the work site plan may include compacting 208-4 of material, such as soil 118, using double drum compactors, wheeled or tracked soil compactors, vibratory soil compactors, and tandem vibratory compactors, among other types of compaction machines 105. The grading 208-3 and compaction 208-4 may be performed several times in succession, as indicated by arrow 208-7, to maintain a leveled surface as the compaction 208-4 is performed.

[0057] At 208-5, finish grading may be obtained by use of scrapers, bulldozers, motor graders, or other machinery at the work surface 110. Finish grading is performed to create a flat surface by leveling material, such as soil, at the work site 112 for subsequent operations, such as additional compaction operations 208-4, or placing a paved surface or structure on the finish grading surface.

[0058] In one embodiment, each machine 102, 104, 105, 106, 107 may independently perform its respective task within the work site plan. In this embodiment, the machines 102, 104, 105, 106, 107 may continuously or periodically transmit machine data indicative of production metrics, and the system controller 122 of the system 100 may passively receive the production metrics from the machines to estimate the progress of individual tasks and / or the overall work site plan.

[0059] In one embodiment, the process performed by the machines 102, 104, 105, 106, 107 at 208 may be performed autonomously and / or semi-autonomously. In these autonomous and / or semi-autonomous scenarios, the system controller 122 may cause the machines 102, 104, 105, 106, 107 to perform their respective tasks described herein by transmitting instructions to the respective controllers 136 of the machines 102, 104, 105, 106, 107 via the network 124, the satellite 132, and / or the central station 108, and the communication devices 126 of the respective machines 102, 104, 105, 106, 107. The controllers 136 of the machines 102, 104, 105, 106, 107 may execute the instructions received from the system controller 122 to cause the machines 102, 104, 105, 106, 107 to perform the tasks defined by the instructions.

[0060] At 210, the components of the system 100 may provide machine data to the system controller 122. At 212, the system controller 122 may estimate 212 progress on the tasks defined by the work site plan and / or the overall work site plan. As described herein, the system controller 122 uses the integrated production metric to determine a level or percentage of completion of the tasks defined by the work site plan and / or the overall work site plan. The integrated production metric may be obtained from the machines 102, 104, 105, 106, 107 as machine data 210 or may be calculated or derived by the system controller 122 from the machine data 210. Also, as described herein, the integrated production metric may be based on the area at lift and the number of loads delivered. In one embodiment, the integrated production metric may be calculated or derived based on the following formula:

[0061]

number

[0062] During the ceremony,

number

number

number

[0063] In Equation 1, the lift may be determined without regard to the mass or volume of material being transported, leveled, and compacted because mass and volume may be measured inconsistently by, for example, the excavator 102, the loader 104, and the hauler 106 (i.e., as a conveying machine), the grader 107 (i.e., as a leveling machine), and the compactor 105 (i.e., as a compacting machine). Thus, a lift is considered complete once all three machines 102, 104, 105, 106, 107 have finished working on a given area. The integrated production metric may be described as area at lift and may be calculated or derived as follows:

number

[0064] In the formula, the area is the square meterage (m 2) value. In one embodiment where the production metric is integrated, the system controller 122 estimates how much compacted area each transport machine (i.e., the excavator 102, the loader 104, and / or the hauler 106) includes. However, if the production metric of interest is the number of loads of material 118 (i.e., truckloads or payloads), in another embodiment, the system controller 122 may estimate the number of loads of material 118 completed by the soil clearing machine 107 (i.e., the leveling machine) and the compaction machine 105 (i.e., the compaction machine). Thus, in the embodiments described herein, a type of metric may be assumed to be completed based on the lifts defined in Equation 1, and the integrated production metric may be calculated based on the type of metric.

[0065] To provide context for the above, in one embodiment, data from multiple machines 102, 104, 105, 106, 107 may be combined to determine the number of lifts completed. For a lift to be considered completed, three tasks must occur. First, material is transported to the work site 112. This may be accomplished via the excavator 102, the loader 104, and the hauler 106. The dump location may be near where the material is to be leveled. Second, the grading machine 107 may level the material at a depth specified by the work site plan. Third, the compaction machine 105 may compact the previously leveled material 118 to bring the material 118 to a compaction level specified in the work site plan. Compacting the material may be by multiple passes of the compaction machine 105. Thus, a "lift" may be defined as the transport, leveling, and compaction of the material. An integrated production metric that provides a common production metric between different types of machines 102, 104, 105, 106, 107 and different individual production metrics may be defined based on the number of lifts performed within a specified area of ​​the work site 112. In this manner, a user can more easily understand how different production metrics from different machines 102, 104, 105, 106, 107 that may not be practically compared due to incomparable or non-comparable metrics can be understood using the integrated production metric described herein.

[0066] In one embodiment, the system controller 122 may calculate the integrated production metric separately using both metrics of interest (i.e., area and loading) as described in the two embodiments above to obtain two separate values ​​of the integrated production metric. The system controller 122 may then use the average, arithmetic mean, mode, weighted average, or another measure of central tendency of the two separate calculations to obtain a single integrated production metric. In its calculation, the system controller 122 may rely on one or more data maps, lookup tables, neural networks, algorithms, machine learning algorithms, and / or other components related to the operating conditions and operating environment of the system 100 that may be stored in the memory of the system controller 122.

[0067] In one example, the integrated production metric may include a measure of area within a segmented portion of the work site 112, such as the work surface 110 of the work site 112, at a particular lift thickness. The lift thickness may be defined by the depth of material deposited and compacted within the segmented portion of the work site 112. In one example, the bulk earthmoving may include placing material in multiple "lifts," as described above. A lift may be defined as a specified vertical distance that is placed and compacted before additional material (i.e., an additional lift) is placed on top. To measure machine production, it may be useful to determine how many lifts have been completed or which lift the machine 102, 104, 105, 106, 107 is currently working on. In this example, this process may be applied to the grading machine 107 and the compaction machine 105, because they may be operating in the same small geographic area within the work site 112, but have completed multiple lifts.

[0068] The integrated production metrics may alleviate any difficulties with how to measure how many lifts have been completed using traditional machine data. High accuracy GPS data obtained from position sensor 130 may be utilized for accurate elevation data. However, even with GPS data from position sensor 130, lift thickness may be within a margin of error. The integrated production metrics derived and calculated by system controller 122 provide a means to determine progress and job site planning for all equipment working in a given area, not just machines equipped with high accuracy GPS with grade control systems.

[0069] 3 is a flow chart illustrating an example method 300 associated with the systems and methods shown in FIGS. 1 and 2. At 302, a controller, such as the processing and memory architecture of the system controller 122 of the control system 120, may receive a work site plan to be executed at a work site by at least a first machine 102, 104, 105, 106, 107 and a second machine 102, 104, 105, 106, 107. The work site plan may include any number of tasks to be executed by the machines 102, 104, 105, 106, 107 that will result in an intended change to the work surface 110 of the work site 112. As described herein, the work site plan may include a bulk mining project utilizing a number of different machines 102, 104, 105, 106, 107. A work site plan may include, for example, instructions, locations (e.g., GPS coordinates, UTS coordinates, etc.), and / or other information identifying the perimeter and / or boundaries of at least a portion of the work surface 110 where such operations or tasks are to be performed.

[0070] In one embodiment, the work site plan may be included as a user input (FIG. 2, 202) and may be entered into an electronic device 128 located at the work site 112 and / or remotely from the work site 112 or directly into the system controller 122. In another embodiment, the work site plan may be generated by the system controller 122 or other processing device based on the user input (FIG. 2, 202).

[0071] At 304, the system controller 122 may assign the first machine 102, 104, 105, 106, 107 and the second machine 102, 104, 105, 106, 107 to implement the work site plan based on a first capacity of the first machine and a second capacity of the second machine. The capacity of the machines 102, 104, 105, 106, 107 is defined by what type of machine it is (e.g., excavation machine 102, loading machine 104, hauling machine 106, compaction machine 105, soil preparation machine 107, and / or other type of machine) and associated functions. The selected machines (FIG. 2, 206) may be based, at least in part, on tasks defined in the work site plan.

[0072] A first sensor of a first machine may determine a parameter indicative of a first production metric during performance of a first task, and a second sensor of a second machine may determine a parameter indicative of a second production metric different from the first production metric during performance of a second task different from the first task. The first sensor and the second sensor may be any sensor associated with the machine 102, 104, 105, 106, 107 that may directly or indirectly detect the production metric of the machine. For example, the sensor may include a position sensor 130 that detects the position of the machine. By being able to detect the position of the machine, production metrics related to distance traveled and area covered by the machine 102, 104, 105, 106, 107 may be obtained. For example, the compaction machine 105 and / or the grading machine 107 may be used to cover the work surface 110 of the work site 112 in a sequential manner moving back and forth across what may be the entire work surface 110 to evenly grade and compact the entire work surface 110. Thus, data obtained from the position sensor 130 of the compaction machine 105 may define production metrics for the compaction machine 105.

[0073] As another example, the sensors may include weight sensors that may be included, for example, in the excavating machine 102, the loading machine 104, and / or the transporting machine 106. The weight sensors may determine a weight of material, such as soil 118, being lifted and transported by the excavating machine 102, the loading machine 104, and / or the transporting machine 106. Although two sensors are described in the above examples of machines 102, 104, 105, 106, 107 with sensors, any number of sensors may be used in each individual machine, and any number of machines may include sensors for detecting parameters indicative of their respective production metrics.

[0074] At 306, the system controller 122 may receive first machine telematics data from a first machine 102, 104, 105, 106, 107 corresponding to the first task and associate the first telematics data with a first production metric from the first machine 102, 104, 105, 106, 107 within the segmented portion of the worksite 112. The telematics data may be measured by a sensor and transmitted by a controller 136 within the machine 102, 104, 105, 106, 10 and received by the system controller 122, for example. Thus, the data received by the system controller 122 defines sensed data and is transmitted at a distance by electrical conversion means, such as a wired or wireless communication network, including the network 124. The association of the first telematics data with the first production metric may be performed using, for example, a data map, a lookup table, a neural network, an algorithm, a machine learning algorithm, and / or other components.

[0075] Similarly, at 308, the system controller 122 may receive second telematics data corresponding to a second task and associate the telematics data of the second machine with a second production metric from a second machine 102, 104, 105, 106, 107 within the segmented portion of the worksite 112. Again, the second production metric is different from the first production metric and the second task is different from the first task. Because the different production metrics cannot be substantially compared because they are considered incomparable or non-comparable, an integrated production metric may be determined by the system controller 122 using methods and algorithms described herein, including, for example, Equation 1 and Equation 2 described herein. Thus, at 310, the system controller 122 may determine a percent completion of the worksite plan based on the integrated production metric. The integrated production metric may be determined based on at least the first production metric and the second production metric as inputs. Additionally, data entered by the user during the initial creation of the shop floor plan (FIG. 2, 202) and machine dimensions (FIG. 2, block 204), along with the first production metric and the second production metric as inputs, may be used to determine the integrated production metric as described herein.

[0076] At 312, the system controller 122 can generate a user interface (UI) including a display of the completion rate of the work site plan based on integrated production measurement criteria. The UI may be presented on any output device including a display device, a printing device, or other output devices. For example, the UI may be presented on an electronic device 128 located at and / or remote from the work site 112, and / or on the UI of the system controller 122. The UI may include a graphical display and / or an alphanumeric display of the level or completion rate of the work site plan and / or the number of many tasks included in the work site plan. The work site plan may be a large-scale mining plan having a plurality of steps including, for example, excavating materials in the work site 112 using an excavating unit such as an excavating machine 102 and loading the materials onto a transporting unit such as a transporting machine 106 using a loading unit such as a loading machine 104. The work site plan may also include depositing materials at the work site 112 defined by the work site plan using a transporting unit such as a transporting machine 106. Further, the work site plan may include leveling the materials along the surface of the work site 112 using a material leveling unit such as a leveling machine 107 and compacting the materials along the surface of the work site 112 using a compacting unit such as a compacting machine 105. Still further, the work site plan may include grading the slope of the materials along the surface of the work site 112 using a grading unit such as a grading machine 107.

[0077] In one embodiment, the first production measurement criteria of the first machines 102, 104, 105, 106, 107 and the second production measurement criteria of the second machines 102, 104, 105, 106, 107 may include at least one of the mass of the materials loaded onto the transporting unit, the mass of the materials moved to the work site, the mass of the materials leveled in the work site, and the grade of the materials along the work site. In this embodiment, these production measurement criteria may be used to determine the contribution of the individual machines 102, 104, 105, 106, 107 in generating the lifts described herein.

[0078] In some examples, the first machine 102, 104, 105, 106, 107 and the second machine 102, 104, 105, 106, 107 may be the same type of machine. In this example, the first machine 102, 104, 105, 106, 107 and the second machine 102, 104, 105, 106, 107 may be characterized by the same production metric associated with the implementation of the work site plan. Thus, in this example, the method 300 of FIG. 3 may further include collectively calculating the same production metric of the same type of machines 102, 104, 105, 106, 107 as a whole. This may make calculations and decisions regarding production metrics within the lift faster and less burdensome, for example, with respect to the computing resources of the system controller 122.

[0079] In some examples, the first production metric can include at least one of a first dimension of a first material movement element of the first machine 102, 104, 105, 106, 107 and first position data obtained from the first machine 102, 104, 105, 106, 107. Additionally, the second production metric can include at least one of a second dimension of a second material movement element of the second machine 102, 104, 105, 106, 107 and second position data obtained from the second machine 102, 104, 105, 106, 107. In this example, the dimensions of the first material movement element and the second material movement element are useful for understanding the role of the machines 102, 104, 105, 106, 107 in contributing to the lift used to determine the integrated production metric.

[0080] The method 300 of FIG. 3 may also include receiving, with the system controller 122, user input indicating at least one of a compacted volume of material per transport unit, a lift layer thickness including a depth of compacted material along a surface of the work site, and a compacted volume of material per transport unit and a lift layer thickness. In an example where the production metric of interest is the number of loads of material 118 (i.e., truck loads or payload), these machine dimensions 204 may be used by the system controller 122 in determining the integrated production metric. In this example, the system controller 122 may estimate how many loads of material 118 the soil preparation machine 107 (i.e., leveling machine) and the compaction machine 105 (i.e., compaction machine) have completed. Thus, the integrated production metric may be determined based, at least in part, on the machine dimensions 204 of the excavation machine 102, the loading machine 104, and / or the transport machine 106, which may be obtained as user input or may be stored as data in a data storage device. Additionally, the integrated production metric may be determined based, at least in part, on the compacted volume of material at the worksite 112. In this example, the production metric of interest is the number of loads (i.e., truck loads or payloads) of material 118, where the system controller 122 may estimate the number of loads of material 118 completed by the soil preparation machine 107 (i.e., the leveling machine) and the compaction machine 105 (i.e., the compaction machine). [Industrial Applicability]

[0081] This disclosure describes systems and methods for obtaining integrated production metrics across multiple machines 102, 104, 105, 106, 107 performing different tasks within a work site plan and reporting incomparable or incomparable production metrics. Such systems and methods may be used to more efficiently present the level or percentage of completion of the work site plan to a user so that the user may fully understand how efficiently the work site plan is being executed. The systems and methods coordinate the activity of one or more excavation machines 102, loading machines 104, compaction machines 105, hauling machines 106, soil preparation machines 107, and / or other components of the system 100 during the execution of the work site plan and / or other operations at the work site 112. For example, such systems and methods may enable the system controller 122 to obtain telemetrically delivered machine data and use the machine data to calculate the integrated production metrics. The system controller 122 may also present a representation of the integrated production metrics to multiple users via at least one user interface. Thus, a user can be informed and easily understand the level or percentage of completion of the work site plan and the tasks contained within the work site plan.

[0082] As a result, the disclosed systems and methods may help reduce the time and resources required to perform various operations at the work site 112 and within the work site plan by assisting the user with a more effective understanding of the progress of the various machines utilized within the work site plan. The disclosed systems and methods may also assist the user in determining which machines or groups of machines may be performing less efficiently. As a result, the disclosed systems and methods may enable the user to correct any inefficiencies, reduce the time it may take to complete the work site plan, and adhere to expected deadlines or schedules. Thus, the integrated production metrics may assist the user in understanding the completion level or percentage of the work site plan. This understanding may enable the user to execute the work site plan in an efficient manner. The disclosed systems and methods may facilitate the determination and presentation of the integrated production metrics.

[0083] Although aspects of the present disclosure have been particularly shown and described with reference to the above embodiments, it will be understood that various additional embodiments are contemplated by modifications of the disclosed machines, systems and methods without departing from the spirit and scope of the disclosed subject matter. Such embodiments should be understood to fall within the scope of the present disclosure as determined by the appended claims and any equivalents thereof.

Claims

1. 1. A method (300), comprising: receiving (302) with a controller a work site plan to be executed by at least a first machine (102, 104, 105, 106, 107) and a second machine (102, 104, 105, 106, 107) at a work site (112); allocating (304) the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107) using the controller (122) and implementing the work site plan based on capabilities of the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107); the first machine (102, 104, 105, 106, 107) collecting a first production metric while performing a first task; the second machine (102, 104, 105, 106, 107) collects a second production metric different from the first production metric while performing a second task different from the first task; receiving (306, 308) machine telematics data defining the first production metric from the first machine (102, 104, 105, 106, 107) and the second production metric from the second machine (102, 104, 105, 106, 107) within the segmented portion of the worksite (112) using the controller (122); defining (310) a percent completion of the work site plan based on an integrated production metric determined based on the first production metric and the second production metric with the controller (122); and presenting (312) with the controller (122) and on a user interface an indication of a level of completion of the work site plan based on the integrated production metrics; the first production metric of the first machine is payload; the second production metric of the second machine is area at lift; one of the first production metric and the second production metric is the integrated production metric; The method of claim 1, wherein the area at lift is determined from a completed area lift value, and the lift is determined based on a volume of compacted material at the job site.

2. the integrated production metric includes a measurement of area within the segmented portion of the work site (112) at a lift thickness of the segmented portion; The method (300) of claim 1, wherein the lift layer thickness is defined by a depth of deposited and compacted material (118) within the segmented portion of the worksite (112).

3. The work site plan, loading material (112) into a transport unit (106) using a loading unit (104); using said transport unit (106) to deposit said material (118) at said work site (112) defined by said work site plan; spreading said material (118) along a surface of said work site (112) using a material spreading unit (107); compacting said material (118) along a surface of said work site (112) using a compaction unit (105); 2. The method (300) of claim 1, wherein the method is a bulk mining project including: grading the slope of the material (118) along a surface of the work site (112) with a grading unit (107).

4. 2. The method (300) of claim 1, wherein the first production metric and the second production metric comprise at least one of a mass of material (118) loaded onto a transport unit (106), a mass of material (118) moved to the work site (112), a mass of the material (118) spread on the work site (112), and a grade of the material (118) along the work site (112).

5. said first machine (102, 104, 105, 106, 107) and said second machine (102, 104, 105, 106, 107) are the same type of machine and utilize the same production metrics associated with implementing said shop floor plan; The method (300) of claim 1, further comprising collectively calculating the same production metric for machines (102, 104, 105, 106, 107) of the same type.

6. 2. The method (300) of claim 1, wherein the first production metric and the second production metric include at least one of dimensions of material movement elements of the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107) and position data obtained from the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107).

7. 2. The method (300) of claim 1, further comprising receiving, using the controller (122), user input including materials to be applied to the work site (112) to be placed at the work site (112118), the work site plan and a target timeline for completion of the first task and the second task, a total area of ​​the work site (112), and a distance to transport the materials (118) to the work site (112).

8. The method (300) of claim 7, wherein the integrated production metric is determined based at least in part on the user input.

9. The method (300) of claim 7, wherein the integrated production metric is determined based at least in part on a compacted volume (118) of the material at the worksite (112).

10. A system (100), comprising: A controller (122); a first machine (102, 104, 105, 106, 107) operable at a work site (112); a second machine (102, 104, 105, 106, 107) operable at said work site (112); a communication network (124) configured to transmit signals between the controller (112) and the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107); The controller (122): receiving a work site plan to be executed by the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107) at the work site (112); Sending instructions to the first machine (102, 104, 105, 106, 107) to perform a first task defined by the work site plan; sending instructions to said second machine (102, 104, 105, 106, 107) to perform a second task defined by said work site plan, said second task being different from said first task; receiving a first production metric from the first machine (102, 104, 105, 106, 107) during performance of a first task; receiving a second production metric from the second machine (102, 104, 105, 106, 107) during performance of the second task, the second production metric being different from the first production metric; presenting, on a user interface, an indication of a level of completion of the work site plan based on an integrated production metric, the integrated production metric being defined by user inputs used to create the work site plan, dimensions of at least one of material movement devices of the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107), position data obtained from the first machine (102, 104, 105, 106, 107) during performance of the first task, and position data obtained from the second machine (102, 104, 105, 106, 107) during performance of the second task; the first production metric of the first machine is payload; the second production metric of the second machine is area at lift; one of the first production metric and the second production metric is the integrated production metric; The system wherein the area at lift is determined from a completed lift area value, and the lift is determined based on a volume of compacted material at the job site.

11. 11. The system (100) of claim 10, wherein the controller (122) collectively aggregates the same production metric received from the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107) associated with execution of the work site plan if the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107) measure the same production metric.

12. 11. The system (100) of claim 10, wherein the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107) include a loading unit (104) for loading material (118) onto a transport unit (106), the transport unit (106) for depositing the material (118) on the work site (112), a material leveling unit (107) for leveling the material (118) along a surface of the work site (112), a compaction unit (105) for compacting the material (118) along the surface of the work site (112), or a grading unit (107) for leveling a slope of the material (118) along the surface of the work site (112).

13. the integrated production metrics include a measurement of area within the segmented portion of the work site (112) at a lift thickness of the segmented portion; The system (100) of claim 10, wherein the lift layer thickness is defined by a depth of deposited and compacted material (118) within the segmented portion of the worksite (112).

14. The controller (122): the user inputs including material (118) to apply to the work site (112), a lift layer thickness of the material (118) to be placed at the work site (112), the work site plan and a target timeline for completion of the first task and the second task, a total area of ​​the work site (112), and a distance to transport the material (118) to the work site (112); a compacted volume of the material (118) at the work site (112); and Dimensions of material transfer elements of said first machine (102, 104, 105, 106, 107) and said second machine (102, 104, 105, 106, 107); the location data obtained from the first machine (102, 104, 105, 106, 107) and the second machine (102, 104, 105, 106, 107); the first production metric; The system (100) of claim 10, further configured to define the integrated production metric based on the second production metric.

Citation Information

Patent Citations

  • Work execution data managing system in earth work

    JP2003261928A

  • Execution management system

    JP2010073031A

  • Construction planing system

    JP2016212469A

  • Project management system for worksite including machines performing operations and method thereof

    US20170284072A1