Vertical crusher
A system for monitoring seal condition in vertical crushers using grease pressure detection maintains lubricant retention and seal integrity by providing and recovering grease, addressing the issue of lubricant ejection in existing methods.
Patent Information
- Application Number
- JP2022208280
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-12-26
- Publication Date
- 2026-11-11
- Estimated Expiration
- 2042-12-26
AI Technical Summary
Existing methods for determining the state of seals in vertical pulverizers, such as using compressed air, can cause lubricant ejection, making it impossible to maintain lubricant retention and monitor seal condition effectively.
A system comprising a supply unit to provide grease to the seals, a recovery unit to recover used grease, and a controller to determine seal condition based on pressure detection, ensuring lubricant retention while monitoring seal state.
Enables continuous monitoring of seal condition in vertical crushers by using grease pressure detection, maintaining lubricant retention and preventing seal wear or damage.
Smart Images

Figure 0007947976000001 
Figure 0007947976000002 
Figure 0007947976000003
Abstract
Description
Technical Field
[0001] The present invention relates to a system capable of determining the state of a seal used for, for example, a roller of a vertical pulverizer.
Background Art
[0002] The vertical pulverizer pulverizes raw materials such as coal, oil coke, limestone, blast furnace slag, electric furnace slag, cement raw materials, and chemicals as raw materials. In the vertical pulverizer, after the raw material falls onto a rotating table in the mill, it is conveyed to the outer periphery of the table by centrifugal force, and is bitten between the roller and the table and pulverized by the roller pressurized by a hydraulic cylinder arranged on the outer periphery of the table. At this time, the roller does not rotate on its own, that is, does not spin, but is driven to rotate by the rotation of the table. Therefore, the roller is rotatably attached to the main shaft via a bearing.
[0003] When the operation of the vertical pulverizer is continued, dust is generated in the vertical pulverizer as the raw material is pulverized. Therefore, a seal is provided around the main shaft to prevent dust from entering the bearing that supports the roller in a freely rotatable manner and to prevent lubricating oil from leaking to the outside of the roller. Grease is supplied to this seal to ensure its sealing performance. However, the state of the seal cannot be confirmed unless the vertical pulverizer is disassembled. This is the same not only during the operation of the vertical pulverizer but also when the pulverizer is stopped. Therefore, if the state of the seal during operation, such as wear or chipping, can be grasped, it can contribute to the sound operation of the vertical pulverizer.
[0004] Patent Document 1 discloses a technique for determining the wear state of a dust seal based on the pressure change amount of an annular space in maintenance work for the dust seal of a gyratory crusher. That is, Patent Document 1 introduces compressed air as a method for confirming the state of the seal.
Prior Art Documents
Patent Documents
[0005] [Patent Document 1] Japanese Patent Publication No. 2022-085078 [Overview of the project] [Problems that the invention aims to solve]
[0006] However, introducing compressed air may cause the grease, which is a lubricant necessary to ensure the seal's performance, to be ejected from the desired area by the compressed air, making it impossible to maintain the lubricant's retention. Therefore, the present invention aims to provide a vertical crusher that can maintain the lubricant retention state while allowing the seal condition to be monitored during operation. [Means for solving the problem]
[0007] The vertical crusher of the present invention comprises a rotating table, a crushing roller having a roller that rolls in contact with the rotating table, a cylindrical main shaft that rotatably supports the roller, and a seal provided around the main shaft, and a seal state determination system for determining the state of the seal. The seal condition determination system comprises a supply unit that supplies grease to the seal and a recovery unit that recovers the grease supplied to the seal. The recovery unit includes a pressure gauge for detecting the pressure of the grease passing through the recovery unit, and a controller for determining the seal condition based on the operating pressure detected by the pressure gauge.
[0008] In the vertical crusher of the present invention, the recovery section preferably includes a recovery pipe through which grease passes from upstream to downstream on the seal side, a filter provided in the middle of the recovery pipe, a pressure gauge for detecting the pressure of the grease inside the recovery pipe upstream of the filter, and a flow sight provided in the recovery pipe upstream of the filter.
[0009] In the vertical crusher of the present invention, the supply unit preferably comprises a supply-side storage tank for storing grease, a supply pump that sucks grease from the supply-side storage tank and pumps the grease toward the seal based on the controller settings, and a supply pipe through which the grease pumped by the supply pump from the supply-side storage tank toward the seal passes. The controller will shut down if the operating pressure exceeds a predetermined upper pressure limit or falls below a predetermined lower pressure limit. Assuming there is a problem with the seal, the time interval at which the supply pump pumps grease will be shortened.
[0010] In the vertical crusher of the present invention, preferably, a plurality of crushing rollers are provided, and in the recovery section, the controller determines the state of the seals provided on each of the plurality of crushing rollers.
[0011] In the vertical crusher of the present invention, preferably, a plurality of crushing rollers are provided, and in the supply section, the supply piping is branched via a distribution valve to correspond to the plurality of crushing rollers. [Effects of the Invention]
[0012] According to the vertical crusher of the present invention, the state of the seal can be determined using grease G, which is inevitably used in vertical crushers, so the state of the seal can be determined while maintaining the retention of the lubricant. [Brief explanation of the drawing]
[0013] [Figure 1] This is a diagram showing the schematic configuration of a vertical crusher according to an embodiment. [Figure 2] This diagram shows the configuration of a seal condition determination system attached to a vertical crusher according to an embodiment. [Figure 3] This is a partial cross-sectional view showing the configuration of the roller in the sealing state determination system according to the embodiment. [Figure 4] This diagram shows the configuration of the controller according to the embodiment. [Figure 5]This is a diagram showing a display example of the seal state determination result in the embodiment. [Figure 6] This is a diagram showing another display example of the seal state determination result in the embodiment. [Figure 7] This is a flowchart showing the determination procedure in the seal state determination system. [Mode for Carrying Out the Invention]
[0014] Hereinafter, the vertical crusher 1 according to the embodiment will be described with reference to the accompanying drawings. The vertical crusher 1 determines the seal state by detecting the state of grease G as a lubricant supplied to the seals of the crushing rollers 8A, 8B of the vertical crusher 1, in particular the pressure of the grease G.
[0015] [Overall Configuration of Vertical Crusher 1: Figure 1] As shown in Figure 1, the vertical crusher 1 according to the present embodiment includes, as power sources, for example, a rotary table motor 2 provided on the side of a speed reducer 4, and a rotor motor 3 to be described later. The speed reducer 4 reduces the rotational force from the rotary table motor 2 and transmits it to the rotary table 5.
[0016] Further, the vertical crusher 1 is provided with the rotary table 5 which is disposed on the speed reducer 4 and is rotationally driven by the rotary table motor 2 via the speed reducer 4, and a plurality of, here two, crushing rollers 8A, 8B capable of rolling on the rotary table 5 following the rotation of the rotary table 5. The vertical crusher 1 is equipped with a separator 30 having a rotating rotor 31 which is a rotating part as a classification mechanism disposed above the rotary table 5. The rotor motor 3 rotationally drives the rotating rotor 31 of the separator 30. Although the separator 30 of the present embodiment is configured to include the rotating rotor 31 which is the rotating part and fixed blades 32, a configuration in which the separator 30 itself rotates without the fixed blades 32 may be adopted.
[0017] The vertical pulverizer 1 includes a controller 18 that controls the operations of the rotary table motor 2 and the rotor motor 3. By controlling the operations of the rotary table motor 2 and the rotor motor 3, the controller 18 freely controls the rotation speed and rotational velocity of the rotary table 5 and the rotary rotor 31. In addition, the vertical pulverizer 1 is provided with a casing 10 that houses the above-described constituent elements including the rotary table motor 2 and the rotor motor 3 inside.
[0018] Inside the casing 10, there are provided an annular short-pass prevention plate 40 that extends to a position slightly inward and above the upper end of the rotary rotor 31 of the separator 30 and is located below the product outlet 29, and a seal plate 41 formed to extend slightly downward from the short-pass prevention plate 40 toward the side of the rotary rotor 31. The short-pass prevention plate 40 suppresses the airflow wraparound and short-pass flow of the gas flowing upward from below from the separator 30 to the product outlet 29.
[0019] The rotary table 5 shown in partial cross-section in Figure 1 includes a circular central region 5A in plan view and an annular roller rolling region 5B surrounding the same. Above the central region 5A of the rotary table 5, a cylindrical chute 6 extending vertically from the upper part of the vertical pulverizer 1 toward the center of the rotary table 5 is provided. New raw material to be pulverized is supplied to the chute 6 from above.
[0020] On the outer peripheral side of the chute 6, a funnel-shaped cone 7 for supplying internally circulated raw material (powder and granules) is provided. The lower ends of the chute 6 and the cone 7 are arranged, for example, so as to form the same plane respectively. Therefore, the new raw material and the internally circulated raw material are stably supplied to the upper surface of the central region 5A of the rotary table 5 via the chute 6 and the cone 7. Each raw material supplied onto the central region 5A of the rotary table 5 is guided to the roller rolling region 5B by the rotational force of the rotary table 5.
[0021] Furthermore, the vertical crusher 1 is equipped with a plurality of crushing rollers 8A, 8B that can roll on the roller rolling area 5B of the rotary table 5 in accordance with the rotation of the rotary table 5. The two crushing rollers 8A and 8B are positioned, for example, to bisect the roller rolling area 5B in the circumferential direction. An auxiliary roller, not shown in the illustration, may be positioned between the crushing rollers 8A and 8B to bisect the roller rolling area in the circumferential direction. The number of crushing rollers is not limited to two, but can be, for example, three, four, or six. The same applies to the auxiliary roller.
[0022] Each of the crushing rollers 8A and 8B is connected to, for example, the piston rod 11A of a hydraulic cylinder 11 via arms 9A and 9B of a pressurizing device that are pivotably mounted on the casing 10 by an axis. By operating the hydraulic cylinder 11 as a pressurizing device, the crushing rollers 8A and 8B can be pressed against the roller rolling area 5B of the rotary table 5, thereby applying crushing force to the raw material layer.
[0023] The grinding rollers 8A and 8B are mainly used to finely grind the raw material, while the auxiliary rollers are mainly used to degas the raw material layer. The raw material is supplied onto the central region 5A of the rotary table 5 and then to the roller rolling region 5B. In this roller rolling region 5B, the raw material passes between the rotary table 5 and the grinding rollers 8A and 8B and the auxiliary rollers, and is then blocked by a dam ring 12 that is positioned around the outer edge of the rotary table 5. The dam ring 12 is configured, for example, to have an adjustable height.
[0024] An annular passage 13, which serves as the gas blow-up section, is formed between the outer circumference of the rotary table 5 and the casing 10. The casing 10 is provided with a gas introduction duct 14 for introducing gas from an externally located exhaust fan into the annular passage 13. Furthermore, the casing 10 is provided with a lower extraction duct 15 for extracting raw materials that have fallen into the annular passage 13 without being sufficiently crushed.
[0025] Inside the casing 10, above the casing, a separator 30 is positioned in the inner region of the cone 7, surrounding the chute 6. The separator 30 is operated by a rotary rotor 31 having rotating blades, which rotates together with a rotating cylinder 3B that rotates, for example, by a rotor motor 3 and a belt 3A, thereby classifying the raw material (powder and granules) crushed by the rotary table 5 and crushing rollers 8A, 8B, etc., into a product (fine powder) of a predetermined particle size. In addition, a fixed blade 32 is provided at the top of the cone 7, at a corresponding position on the outer circumference side of the rotary rotor 31 of the separator 30, that is, at a position slightly away from the rotary rotor 31.
[0026] Then, from the product outlet 29 located above the casing 10, the finely ground powder, which has been blown upward by the gas flow and passed through the separator 30 (fixed blades 32 and rotating rotor 31), is removed as the product.
[0027] [Seal condition determination system 50: Figures 2 and 3] The vertical crusher 1 is equipped with a seal condition determination system 50 that determines the condition of seals S1 and S2 provided on each of the multiple crushing rollers 8A and 8B. The seal condition determination system 50 determines the condition of seals S1 and S2 based on the pressure measured on a high-viscosity lubricant, such as grease G, supplied for the purpose of lubricating the seals S1 and S2 provided on the crushing rollers 8A and 8B. The configuration of the seal condition determination system 50 will be described below with reference to Figure 2, and then the seals S1 and S2 attached to each of the crushing rollers 8A and 8B will be described with reference to Figure 3.
[0028] The seal condition determination system 50 includes a supply unit 60 that supplies grease G to two crushing rollers 8A and 8B, and a recovery unit 70 that recovers the grease G discharged from the crushing rollers 8A and 8B.
[0029] Grease G refers to a lubricant that has been made semi-solid or solid by dispersing a thickener in a liquid base oil (lubricating oil). The base oil can be broadly classified into refined mineral oil, synthetic lubricating oil, and mixtures thereof. The thickener is a substance that disperses colloidally in the base oil to make it semi-solid or solid, and is broadly classified into metal soap type and non-soap type. In addition to the base oil and thickener, grease G may also contain additives that provide special properties. Examples of additives include antioxidants, extreme pressure agents, metal deactivators, and solid lubricants.
[0030] Grease G is typically applied to sliding surfaces where it is difficult to maintain a lubricating film with liquid lubricating oil due to the movement of the surfaces to be lubricated. Grease G deteriorates during use due to contamination by foreign matter and temperature increases, so periodic replacement is necessary. Therefore, in this embodiment, at the grease G supply points of the crushing rollers 8A and 8B, new grease G is injected by the supply unit 60, while the old grease G that has been used is pushed out and recovered by the recovery unit 70.
[0031] [Supply unit 60: Figure 2] The supply unit 60 comprises, in order, a supply-side storage tank 61 for storing grease G from the upstream side, a supply pump 63 for sucking the grease G stored in the supply-side storage tank 61 and supplying it to the crushing rollers 8A and 8B, and a distribution valve 65 for distributing the grease G supplied from the supply pump 63 to the crushing rollers 8A and 8B. The supply unit 60 includes a supply pipe 67 for supplying grease G to the crushing rollers 8A and 8B. The supply pipe 67 includes a first supply pipe 67A connecting the supply-side storage tank 61 and the supply pump 63, and a second supply pipe 67B connecting the supply pump 63 and the distribution valve 65. The supply pipe 67 also includes a third branch pipe 67C1 connecting the distribution valve 65 and the crushing roller 8A, and a third branch pipe 67C2 connecting the distribution valve 65 and the crushing roller 8B. Furthermore, the supply pipe 67 includes a fourth supply pipe 67D connecting the distribution valve 65 and the supply-side storage tank 61. Although one supply pipe 67 is shown here as an example, two or more supply pipes 67 may be provided if a large amount of grease G is required to be supplied.
[0032] In the supply unit 60, the supply pump 63 continuously or intermittently draws grease G from the supply-side storage tank 61 via the first supply pipe 67A, according to the instructions of the controller 18. The drawn grease G is supplied to the distribution valve 65 via the second supply pipe 67B. The grease G supplied to the distribution valve 65 is distributed, for example, evenly by the distribution valve 65, and each of the distributed grease G is supplied to the crushing rollers 8A and 8B through the third branch pipe 67C1 and the third branch pipe 67C2. The upstream and downstream in the supply unit 60 are determined by the direction in which the supplied grease G passes. The upstream and downstream in the recovery unit 70 are defined similarly.
[0033] In the supply section 60, the distribution valve 65 is merely a preferred configuration, and the second supply pipe 67B may be simply distributed to the bifurcated third branch pipe 67C1 and third branch pipe 67C2 without the distribution valve 65. However, if there is a difference in the amount of grease G required for each of the crushing rollers 8A and 8B, it is necessary to distribute an amount of grease G corresponding to this difference to the third branch pipe 67C1 and third branch pipe 67C2, so it is preferable to provide the distribution valve 65.
[0034] [Recovery unit 70: Figure 2] The recovery unit 70 includes, in order, a flow sight 71 that allows visual observation of the characteristics of the grease G recovered from the crushing rollers 8A and 8B, and a pressure detection unit 73 that detects the pressure of the grease G that has passed through the flow sight 71 and outputs the detection result. Downstream of the pressure detection unit 73, the recovery unit 70 includes a filter 75 that removes dust from the grease G, and a recovery-side storage tank 77 that stores the grease G from which the dust has been removed by passing through the filter 75. The recovery unit 70 includes a recovery pipe 79 for recovering grease G from the crushing rollers 8A and 8B. The recovery pipe 79 includes a first recovery pipe 79A connecting the crushing rollers 8A and 8B to the flow site 71, a second recovery pipe 79B connecting the flow site 71 to the filter 75, and a third recovery pipe 79C connecting the filter 75 to the recovery-side storage tank 77.
[0035] In the recovery section 70, the flow sight 71, also called a sight glass, is a device that allows visual observation of the flow velocity, flow rate, and other conditions of the grease G passing through the first recovery pipe 79A to the second recovery pipe 79B. By installing the flow sight 71, the color of the grease G and the degree of dust mixing can be checked and its condition observed visually.
[0036] The filter 75 removes dust that gets mixed into the grease G recovered from the crushing rollers 8A and 8B. The removed dust remains as a blockage upstream of the filter 75, creating resistance as the grease G passes through the filter 75. Therefore, as the amount of dust accumulated on the filter 75 increases, this resistance increases, and the pressure of the grease G inside the second recovery pipe 79B upstream of the filter 75 increases. For example, the pressure of the grease G in the pressure detection region Ap inside the second recovery pipe 79B in its initial state, when the filter 75 is not clogged with dust, may become higher than the initial pressure Pi due to the dust blockage. On the other hand, the pressure of the grease G may also become lower than the initial pressure Pi. For example, if the lubricating oil L supplied to the rolling bearings 83, 83 gets mixed into the grease G, the viscosity of the grease G will decrease. As described above, by providing the filter 75, the pressure in the pressure detection area Ap (operating pressure Pd) during operation of the vertical crusher 1 may fluctuate due to the mixing of dust and / or lubricating oil into the grease G. Therefore, the vertical crusher 1 is equipped with a pressure detection unit 73 to detect the trend of the operating pressure Pd and take action according to the detection result. This point will be discussed in more detail in the description of the controller 18.
[0037] The type of filter 75 is not limited as long as it can remove dust; for example, metal mesh, resin mesh, etc., can be used. The mesh opening and opening ratio of these meshes are arbitrary as long as they can capture the dust that may be generated in the crushing rollers 8A and 8B.
[0038] The pressure detection unit 73 continuously detects the initial pressure Pi and operating pressure Pd in the pressure detection area Ap from the time the vertical crusher 1 starts operation, and converts and generates the detected pressure into an electrical signal, which is then transmitted to the controller 18. The generated electrical signal of the pressure is hereinafter referred to as the detected pressure data. The controller 18 determines the state of the seals S1 and S2 based on the detected pressure data obtained from the pressure detection unit 73. This pressure detection unit 73 is a pressure gauge with a built-in amplifier circuit that transmits the detected pressure of fluids such as gases and liquids as a standardized instrumentation signal (DC 4-20mA and DC 1-5V). Known pressure gauges such as Bourdon tube pressure gauges and diaphragm pressure gauges are widely applicable.
[0039] [Structure of the crushing roller 8: Figure 3] Next, referring to Figure 3, we will describe a configuration in which grease G is supplied to the crushing rollers 8A and 8B by the supply unit 60 and recovered by the recovery unit 70. Since the crushing rollers 8A and 8B have the same configuration, we will describe the crushing roller 8A here. The crushing roller 8A comprises a roller 81 having a frustoconical shape that can roll in accordance with the rotation of the rotary table 5, a cylindrical main shaft 82 that rotatably supports the roller 81, and rolling bearings 83, 83 interposed between the roller 81 and the main shaft 82. The crushing roller 8 is configured such that the roller 81 can roll in accordance with the rotation of the rotary table 5 because the rolling bearings 83, 83 are interposed between the main shaft 82, which is fixed to the casing 10, and the roller 81.
[0040] The main shaft 82 is provided with a grease G supply passage 82A connected to a supply pipe 67 and a recovery passage 82B connected to a recovery pipe 79. In a preferred example, the supply passage 82A and the recovery passage 82B are provided at positions symmetrical to each other with respect to the central axis C. The supply passage 82A is provided on the upper side in the vertical direction H, and the recovery passage 82B is provided on the lower side in the vertical direction H.
[0041] The supply passage 82A comprises an axial supply passage 82A1 provided parallel to the central axis C, and a radial supply passage 82A2 connected to the end of the axial supply passage 82A1 and formed upward in the vertical direction H. The upper end of the radial supply passage 82A2 opens to the outer circumferential surface of the main shaft 82 in the figure. This opening constitutes the grease G supply port 82A3. The supply port 82A3 opens inside the seal chamber 84, between seal S1 and seal S2. The grease G supplied from the supply piping 67 passes sequentially through the axial supply passage 82A1, the radial supply passage 82A2, and the supply port 82A3, and is supplied inside the seal chamber 84, between seal S1 and seal S2.
[0042] The recovery passage 82B comprises an axial recovery passage 82B1 provided parallel to the central axis C, and a radial recovery passage 82B2 connected to the end of the axial recovery passage 82B1 and formed toward the lower side in the vertical direction H. The lower end of the radial recovery passage 82B2 opens to the outer circumferential surface of the main shaft 82 in the figure. This opening is located inside the seal chamber 84, between seal S1 and seal S2, which will be described later. The grease G stored between seal S1 and seal S2 is pushed out into the radial recovery passage 82B2 by the newly supplied grease G from the supply passage 82A. In conjunction with this extrusion, the grease G that had remained in the axial recovery passage 82B1 is pushed toward the recovery pipe 79. When this extrusion of grease G is repeated, the recovered grease G passes through the flow site 71 and filter 75 to the recovery side storage tank 77.
[0043] The crushing roller 8A is equipped with a seal chamber 84. The seal chamber 84 is provided to prevent dust D generated by crushing from reaching the rolling bearings 83, 83. The seal chamber 84 is also provided to prevent lubricating oil L supplied to the rolling bearings 83, 83 from leaking out of the crushing roller 8. Lubricating oil L is supplied to the rolling bearings 83, 83 as shown in the figure. The seal chamber 84 is an annular void formed in the circumferential direction of the main shaft 82, surrounding a void in which grease G is stored. Inside the seal chamber 84, seals S1 and S2 are provided spaced apart in the direction of the central axis C. Since seals S1 and S2 are provided in the circumferential direction of the main shaft 82, a grease reservoir is provided between seals S1 and S2 that is recessed compared to the tops of seals S1 and S2 and extends in the circumferential direction of the main shaft 82. The grease G supplied from the supply port 82A3 fills this grease reservoir, but when new grease G is supplied from the supply port 82A3, the old grease G that previously filled the grease reservoir passes through the recovery port 82B3, radial recovery passage 82B2, and axial recovery passage 82B1 in order to the recovery section 70 (recovery piping 79). If seals S1 and S2 become worn, damaged, or otherwise abnormal, dust D will enter the grease reservoir, and the lubricating oil L supplied to the rolling bearings 83 will seep into the grease reservoir. The lubricating oil L that seeps into the grease reservoir may leak out of the crushing roller 8 through the seal chamber 84.
[0044] [Controller 18: Figure 4] The seal state determination system 50 of the vertical crusher 1 determines the state of the seals S1 and S2 provided in the seal chamber 84 via the controller 18. The configuration of the controller 18 involved in seal state determination will be explained below with reference to Figure 4.
[0045] As shown in Figure 4, the controller 18 comprises a transmitting / receiving unit 18A, a storage unit 18B, a processing unit 18C, and an input / display unit 18D. This functional division is just one example, and the functions can be further subdivided or integrated. For example, the input / display unit 18D can be divided into a part specialized for input and a part specialized for display. The controller 18 is composed of a computer device that includes a CPU (Central Processing Unit), semiconductor memory, and a display.
[0046] [Transmit / Receive Unit 18A] The transmitting / receiving unit 18A transmits a signal to instruct the supply pump 63 to operate. The transmitting / receiving unit 18A also receives detected pressure data generated by the pressure detection unit 73. The detected pressure data received by the transmitting / receiving unit 18A is transferred to the processing unit 18C. The controller 18 controls the operation of the rotary table motor 2 and the rotor motor 3, and therefore transmits, receives, stores, and processes the data necessary for this control. However, since the purpose here is to explain the determination of the seal state, the explanation of the operation of the rotary table motor 2 and the rotor motor 3 will be omitted.
[0047] [Storage section 18B] The storage unit 18B includes a reference data storage unit 18B1 that stores data necessary for determining the seal state, and a condition data storage unit 18B2 that stores data related to the operating conditions of the supply pump 63.
[0048] [Reference data storage unit 18B1: Figure 4] The reference data storage unit 18B1 stores reference data (reference data J) used to determine whether the pressure of the grease G in the pressure detection region Ap is within the acceptable range by comparing it with the detected pressure data. This reference data J is provided to the processing unit 18C when operating the vertical crusher 1. The operating pressure Pd fluctuates from the initial pressure Pi. This fluctuation includes an increase (+ΔP) due to dust clogging of the filter 75 and a decrease (-ΔP) due to the mixing of lubricating oil L into the grease G. The reference data J is defined by the following equations (2) and (3), which add thresholds to the increase or decrease in pressure from the initial pressure Pi. Equation (2) shows the upper limit of the allowable operating pressure Pd, and equation (3) shows the lower limit of the allowable operating pressure Pd. If the operating pressure Pd falls within this range of the upper and lower pressure limits, the seals S1 and S2 are judged to be normal. If the operating pressure Pd exceeds this upper pressure limit, it is considered that there is an abnormality in the seals S1 and S2, and if it falls below the lower pressure limit, it is considered that lubricating oil L has mixed into the grease G. In other words, the reference data J is defined by equation (4).
[0049] The operating pressure Pd may increase (+ΔP) or decrease (-ΔP), but the timing of these occurrences differs. This difference in timing is based on the order in which the two seals S1 and S2 wear out, as explained below. Seals S1 and S2 are provided before and after the grease G, but normally, the seal S1, which receives dust D, wears out first, so dust D gradually mixes into the grease G from the side of seal S1. The dust D that mixes into the grease G is filtered out by the filter 75, so the pressure gradually increases (+ΔP) depending on how clogged the filter 75 becomes. If dust D continues to enter, the seal S2 corresponding to the lubricating oil L will begin to wear down. As the degree of wear progresses, the pressure will gradually decrease (-ΔP) as the lubricating oil L mixes with the grease G. When the seals S1 and S2 wear down to the point where they can no longer hold the grease G, the pressure will decrease further (-ΔP).
[0050] The above describes the case of normal wear that occurs over time, but abnormal wear can also occur in the seal S1. In this case, the operating pressure Pd decreases prematurely (-ΔP). Typically, if a large amount of dust D flows in in a short time, the seal S1 will be damaged, and the grease G between it and the seal S2 will no longer be retained, causing the operating pressure Pd to decrease rapidly (-ΔP).
[0051] As explained above, since the increase (+ΔP) and decrease (-ΔP) occur at different times, they almost never cancel each other out, making it impossible to detect fluctuations in the operating pressure Pd. However, to address such situations, a flow site 71 is provided to allow for visual observation.
[0052] Pu = Pi + Psu … Equation (2) Pl=Pi-Psl … Equation (3) Pi-Psl ≦ Pd ≦ Pi+Psu …Equation (4) Pd: Operating pressure Pi: Initial pressure (pressure immediately after starting operation) Pu: Upper pressure limit Pl: Lower pressure limit Psu: Threshold considering pressure increase Psl: Threshold considering pressure decrease
[0053] [Condition data storage unit 18B2: Figure 4] The condition data storage unit 18B2 stores data regarding the time intervals at which grease G is supplied to the vertical crusher 1. This supply condition data C is provided to the processing unit 18C while the vertical crusher 1 is in operation. The supply condition data C includes normal conditions Cn when seals S1 and S2 are judged to be normal, and abnormal conditions Ca when seals S1 and S2 are judged to be abnormal. However, abnormal conditions Ca include excess conditions Cau when the operating pressure Pd exceeds the upper pressure limit Pu(Pi+Psu) expressed by equation (2) above, and insufficient conditions Cal when the operating pressure Pd falls below the lower pressure limit Pl(Pi-Psl) expressed by equation (3) above. The correspondence with the reference data J is shown below.
[0054] Normal Pi-Psl ≦ Pd ≦ Pi+Psu : Cn When exceeding Pi+Psu < Pd : Cau When insufficient Pd < Pi-Psl : Cal
[0055] The supply conditions can be common to all types of pulverizing materials supplied to the vertical pulverizer 1, or they can be different conditions corresponding to each of the multiple types of pulverizing materials. Furthermore, the supply condition data C can be entered by the operator of the vertical crusher 1 via the input / display unit 18D prior to crushing. Alternatively, for example, the supply conditions for each type of raw material to be crushed may be stored in the storage unit 18B beforehand.
[0056] [Processing Unit 18C: Figure 4] Before starting operation of the vertical crusher 1, the processing unit 18C acquires reference data J from the reference data storage unit 18B1 and supply condition data C from the condition data storage unit 18B2. Furthermore, once operation of the vertical crusher 1 begins, the processing unit 18C acquires detected pressure data via the transmitting / receiving unit 18A. This completes the setup for the seal state determination system 50 to function. The processing unit 18C controls the operation of the rotary table motor 2 and the rotor motor 3, but this will not be explained further below.
[0057] The processing unit 18C drives the supply pump 63 based on the acquired supply condition data C. When the vertical crusher 1 is first started, the processing unit 18C drives the supply pump 63 at predetermined time intervals based on normal conditions Cn. The processing unit 18C also drives the supply pump 63 for a predetermined amount of time.
[0058] The processing unit 18C compares the acquired detection pressure data (initial pressure Pi, operating pressure Pd) with the reference data J. Specifically, the processing unit 18C determines whether the operating pressure Pd satisfies equation (4). The processing unit 18C drives the supply pump 63 at predetermined time intervals based on the normal conditions Cn as long as it determines that the operating pressure Pd satisfies equation (4). When the processing unit 18C determines that the operating pressure Pd does not satisfy equation (4), it switches from the normal conditions Cn to the abnormal conditions Ca and drives the supply pump 63. However, if the operating pressure Pd exceeds the upper pressure limit Pu(Pi+Psu) expressed in equation (2), the supply pump 63 is driven under the excess conditions Cau, which has a shorter time interval than the normal conditions Cn. Also, if the operating pressure Pd falls below the lower pressure limit Pl(Pi-Psl) expressed in equation (3), the supply pump 63 is driven under the insufficient conditions Cal, which has a longer time interval than the normal conditions Cn.
[0059] If the processing unit 18C determines that the operating pressure Pd does not satisfy equation (4), it can change the time interval for driving the supply pump 63 and also display this determination result on the input / display unit 18D. An example of the display of the determination result will be explained in the next section.
[0060] [Input / Display Unit 18D: Figures 4, 5, 6] The input / display unit 18D receives various conditions related to the operation of the vertical crusher 1, particularly supply condition data C. The input supply condition data C is stored in the condition data storage unit 18B2. The input / display unit 18D displays various information related to the operation of the vertical crusher 1, particularly information related to the determination made by the processing unit 18C.
[0061] Figures 5 and 6 show examples of how the judgment results are displayed. If the operating pressure Pd satisfies equation (4), as shown in Figure 5, it is displayed that the operating pressure Pd and seals S1 and S2 are normal, and that grease G is supplied at time intervals based on the normal condition Cn. If the operating pressure Pd exceeds the upper pressure limit Pu(Pi+Psu), as shown in Figure 6(a), it is displayed that there may be a problem with seals S1 and S2, and that grease G is supplied at time intervals based on the excess condition Cau. If the operating pressure Pd falls below the lower pressure limit Pl(Pi-Psl), as shown in Figure 6(b), it is displayed that the pressure has fallen below the lower pressure limit Pl(Pi-Psl), there may be a problem with seals S1 and S2, and that grease G is supplied at time intervals based on the shortage condition Cal.
[0062] The controller 18 can also generate a judgment result by sound, in addition to displaying the judgment result visually by the input / display unit 18D.
[0063] [Crushing operation of vertical crusher 1: Figure 1] The vertical crusher 1, configured as described above, specifically performs the following crushing operations, for example. First, with the rotary table 5 rotating, new raw material is supplied from the chute 6 onto the central region 5A of the rotary table 5. The supplied new raw material is subjected to centrifugal force in the radial direction of the table due to the rotation of the rotary table 5, and moves by sliding outward on the rotary table 5. During movement, the raw material is subjected to a rotational force by the rotary table 5, and slides between itself and the rotary table 5, rotating at a speed somewhat slower than the rotation speed of the rotary table 5.
[0064] In this way, a combined force of radial and rotational forces from the rotary table 5 acts on the raw material, guiding it from the central region 5A to the roller rolling region 5B while tracing a spiral trajectory on the rotary table 5. The raw material, thus guided to the roller rolling region 5B, enters the space between the crushing rollers 8A, 8B and the auxiliary rollers and the rotary table 5 from a direction that forms a certain angle with the roller axis. In this state, it is caught, degassed and crushed, and then dammed by the dam ring 12.
[0065] Meanwhile, gases such as air and hot air from the gas introduction duct 14 are blown upwards into the casing 10 through the annular passage 13. Raw materials (powder and granules) that have passed over the dam ring 12 after crushing, raw materials that are scattered during crushing and float inside the machine, or internally circulating raw materials (powder and granules) that do not have a particularly large particle size are carried upwards by the gas flow.
[0066] The raw material blown upward is carried by the gas and rises inside the casing 10, where it is classified by the fixed blades 32 and rotating rotor 31 of the separator 30 located above the casing 10. As a result, materials of a predetermined particle size (fine powder) are discharged as product from the product outlet 29 along with the gas. At the same time, the coarse powder material falls again onto the rotating table 5 via the cone 7 as internally circulating raw material and is crushed.
[0067] Furthermore, among the raw materials that have passed over the dam ring 12, those with extremely large particle sizes, or those that are extremely heavy due to the presence of metals, etc., fall from the annular passage 13 to the bottom of the vertical pulverizer 1 and are removed to the outside through the lower outlet duct 15. The removed raw materials are returned to the chute 6 via a conveyor line (not shown) as needed and pulverized in the vertical pulverizer 1 by external circulation.
[0068] [Operation of the seal condition determination system 50: Figure 7] Next, the operation of the seal condition determination system 50 will be explained with reference to Figure 7. It should be assumed that the controller 18 has the functions and data described above. Furthermore, while the operation of one of the crushing rollers 8A or 8B will be explained here, the operations described below will be performed for each of the crushing rollers 8A and 8B.
[0069] <Operation of pressure detection unit 73> When the vertical crusher 1 starts operation, the pressure detection unit 73 detects the initial pressure Pi, and after detecting the initial pressure Pi, it detects the operating pressure Pd (Figure 7 S101). The initial pressure Pi and the operating pressure Pd are transmitted to the controller 18. Note that the initial pressure Pi is detected only at the beginning of operation of the vertical crusher 1, but the operating pressure Pd is continuously detected thereafter and transmitted to the controller 18. Note that the detection of the operating pressure Pd may be performed continuously or intermittently at time intervals.
[0070] <Controller 18 Operation> The controller 18 obtains the detected initial pressure Pi from the pressure detection unit 73 and sets the reference data J defined by equation (4) (S103). Furthermore, the controller 18 obtains the normal operating conditions Cn for the drive interval of the supply pump 63 from the condition data storage unit 18B2, and controls the operation of the supply pump 63 according to the drive interval defined by the normal operating conditions Cn (S105).
[0071] The processing unit 18C of the controller 18 acquires the operating pressure Pd and determines the state of seals S1 and S2 based on the reference data J defined in (4) (S107). Specifically, the processing unit 18C determines whether the acquired operating pressure Pd is within the range defined by the upper pressure limit Pu and the lower pressure limit Pl. If the operating pressure Pd is within the range defined by the upper pressure limit Pu and the lower pressure limit Pl, the processing unit 18C repeats the same determination for subsequent acquisitions of the operating pressure Pd (S107 Yes). If the operating pressure Pd falls outside the range defined by the upper pressure limit Pu and the lower pressure limit Pl (S107 No), the processing unit 18C determines whether the operating pressure Pd has exceeded the upper pressure limit Pu (S109 Yes) or whether the operating pressure Pd has fallen below the lower pressure limit Pl (S109 No).
[0072] If the operating pressure Pd exceeds the upper pressure limit Pu (S109 Yes), the processing unit 18C switches the drive interval of the supply pump 63 from the normal condition Cn to the excess condition Cau (S111). In this case, the excess condition Cau is maintained until the operating pressure Pd falls below the lower pressure limit Pl. If the operating pressure Pd falls below the lower pressure limit Pl (S109 No), the processing unit 18C switches the drive interval of the supply pump 63 from the normal condition Cn to the insufficient condition Cal (S113). Subsequently, the processing unit 18C controls the drive interval of the supply pump 63 according to the switched excess condition Cau or insufficient condition Cal.
[0073] [Effects of Vertical Crusher 1] The vertical crusher 1 provides the following effects: The vertical crusher 1 determines the state of seals S1 and S2 by detecting the state of the grease G supplied to the crushing rollers 8 of the vertical crusher 1, particularly the pressure of the grease G passing through the recovery pipe 79. In other words, the seal state determination system 50 allows the state of seals S1 and S2 to be determined during the operation of the vertical crusher 1 while maintaining the retention state of the grease G.
[0074] In the seal condition determination system 50, the recovery unit 70 has a filter 75 in the middle of the recovery pipe 79 through which the grease G passes. When dust D contained in the grease G is collected by this filter 75, it creates resistance to the grease G passing through the filter 75, causing the pressure detected by the pressure detection unit 73 to increase. This allows the system to recognize that the seals S1 and S2 are in an abnormal state due to wear or other reasons, and that dust D has mixed into the grease G.
[0075] In the seal condition determination system 50, a single supply pump 63 provided in the supply unit 60 pumps grease G to supply new grease G to seals S1 and S2, while simultaneously pushing out the already supplied grease G for pressure detection. Therefore, the seal condition determination system 50 can use a single drive source for pressure detection, thereby reducing the manufacturing cost of the vertical crusher 1 or the grounding space of the vertical crusher 1.
[0076] In the seal condition determination system 50, if the operating pressure Pd exceeds a predetermined pressure upper limit value Pu If so, the time interval at which the supply pump 63 pumps grease G is set to be shorter than before. Alternatively, if the operating pressure Pd falls below a predetermined lower pressure limit Pl, the time interval at which the supply pump 63 pumps grease G will be changed to a shorter interval than before. long Set it up like this. Respond By supplying grease G, it is possible to delay the point at which seals S1 and S2 reach a critical state.
[0077] In addition to the above, it is possible to select or replace the configurations listed in the above embodiments, or to change them to other configurations as appropriate, as long as it does not deviate from the spirit of the present invention. The vertical crusher 1 is equipped with multiple crushing rollers 8A and 8B, and the controller 18 can determine the condition of the seals S1 and S2 provided on each of the multiple crushing rollers 8A and 8B. By doing so, it is possible to identify seals S1 and S2 that are in an undesirable condition, and to set a shorter time interval for supplying grease G to those seals S1 and S2. For example, an abnormality may be detected in the seals S1 and S2 of crushing roller 8A, but no abnormality may be detected in crushing roller 8B. In this case, the time interval for supplying grease G to the seals S1 and S2 of crushing roller 8A is shortened, but the time interval for supplying grease G to the seals S1 and S2 of crushing roller 8B remains the same. This is achieved by setting the distribution ratio by the distribution valve 65 to 1:0, for example.
[0078] Furthermore, although the embodiments show examples of combinations of grease G and lubricating oil L, the present invention can also be realized by, for example, a combination of a high-viscosity lubricating oil instead of grease G and a low-viscosity lubricating oil instead of lubricating oil L. [Explanation of symbols]
[0079] 1. Vertical crusher 2 motors for rotary tables 3. Motor for rotors 3A Belt 3B Rotating tube 4 Reducer 5 Rotating Table 5A central area 5B Roller rolling region 6 shots 7 Corn 8A, 8B Crushing Rollers 81 Laura 82 Main axis 83 Rolling bearings 84 Seal Chamber 9A, 9B Arm 10 Casing 11 Hydraulic Cylinder 11A Piston Rod 12 Damming 13. Circular Passage 14. Gas introduction duct 15 Lower outlet duct 18 controllers 29 Product outlet 30 Separators 31 Rotary Rotor 32 fixed blades 40 Short pass prevention board 41 Seal plate 47 Eccentric opening 49 Eccentric plate 50. Seal condition determination system 60 Supply section 61 Supply side storage tank 63 Supply pump 65 Distribution valve 67 Supply Piping 67A 1st supply piping 67B 2nd supply piping 67C1, 67C2 Third Branch Pipe 67D Fourth supply pipe 70 Recovery Section 71 Flowsite 73 Pressure detection unit 75 filters 77 Recovery side storage tank 79 Recovery piping 79A First Recovery Piping 79B Second Recovery Piping 79C Third recovery pipe D Dust L Lubricating oil G Grease S1, S2 seals
Claims
1. A rotating table and A crushing roller having a roller that rolls in contact with the rotating table, a cylindrical main shaft that rotatably supports the roller, and a seal provided around the main shaft, The system includes a seal condition determination system for determining the state of the seal, The seal state determination system is, A supply unit that supplies grease toward the seal, It includes a recovery unit for recovering the grease supplied to the seal, The aforementioned recovery unit is A recovery pipe through which the grease passes from upstream to downstream on the side of the seal, A filter installed in the middle of the aforementioned recovery piping, A pressure gauge for detecting the pressure of the grease inside the recovery pipe upstream of the filter, A flow site is provided in the recovery piping upstream of the filter, A vertical crusher comprising: a controller that determines the state of the seal based on the operating pressure detected by the pressure gauge;
2. The aforementioned supply unit is A supply-side storage tank for storing the aforementioned grease, A supply pump that sucks the grease from the supply-side storage tank and pumps the grease toward the seal based on the settings of the controller, The system includes a supply pipe through which the grease, which is pumped by the supply pump from the supply-side storage tank toward the seal, passes. A vertical crusher according to claim 1.
3. The system comprises multiple grinding rollers, In the aforementioned recovery unit, The controller determines the state of the seals provided on each of the plurality of crushing rollers. A vertical crusher according to claim 1.
4. The system comprises multiple grinding rollers, In the aforementioned supply unit, The supply piping is branched via a distribution valve to correspond to a plurality of the grinding rollers. The vertical crusher according to claim 2.
Citation Information
Patent Citations
Sealing structure
JP1996054066A
Crusher and monitoring method therefor
JP2019155211A
Gyratory crusher, and dust seal ring wear state estimation method
JP2022085078A