Water treatment plant operation support system and water treatment plant operation support method
Patent Information
- Application Number
- JP2023520285
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-12-06
- Filing Date
- 2022-12-06
- Publication Date
- 2024-11-06
- Estimated Expiration
- 2042-12-06
AI Technical Summary
【0007】 本願に開示される水処理場運転支援システムおよび水処理場運転支援方法によれば、水処理場の運転に関して経験の浅いユーザであっても、最適な運転条件を選択することができる。
Abstract
Description
[Technical Field]
[0001] The present application relates to a water treatment plant operation support system and a water treatment plant operation support method. [Background technology]
[0002] Conventionally, there has been an operation management system for a sewage treatment plant that performs water quality simulations based on state quantities at the sewage treatment plant, and that includes an input / output unit for inputting the operating conditions of the sewage treatment plant, a data storage unit for storing state quantities sent from the sewage treatment plant, a water quality prediction unit that has a built-in water quality simulator and performs water quality simulations based on the state quantities from the data storage unit and the operating conditions from the input / output unit, and a parameter input unit that inputs parameters of the water quality simulator to the water quality prediction unit, and outputs the results of the water quality simulation created by the water quality prediction unit to the input / output unit. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Laid-Open No. 2006-95440 Summary of the Invention [Problem to be solved by the invention]
[0004] With regard to the operation of water treatment plants including sewage treatment plants as in the conventional technology described above, operation support technologies have been proposed that aim to move away from operation monitoring based on the know-how of skilled operators. Here, there is no single pattern of operating conditions for water treatment plants, including sewage treatment plants and water purification plants. Operators must select the conditions they deem optimal from a variety of operating conditions, taking into consideration multiple factors such as fluctuations in inflow load, weather, and the impact of treatment plant equipment shutdowns. Therefore, it is difficult for an inexperienced user to select the optimum driving conditions from among various patterns of driving conditions.
[0005] The present application discloses technology for solving the above-mentioned problems, and aims to provide a water treatment plant operation support system and a water treatment plant operation support method that enable even users with little experience in operating water treatment plants to select optimal operating conditions. [Means for solving the problem]
[0006] The water treatment plant operation support system disclosed in the present application comprises: A water treatment plant operation support system that supports the operation of a water treatment plant, a data storage unit that stores a state quantity indicating the state of the water treatment plant transmitted from the water treatment plant; a period input section for inputting a period for which a simulation is to be performed; an operating condition selection unit that selects at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting unit that calculates a control target value corresponding to the operating condition selected by the operating condition selection unit; a simulation unit that performs a simulation to predict at least one of the plurality of state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target value calculated by the control target value setting unit; transition information indicating a transition of the state quantity during the period inputted to the period input unit Simulation results of the simulation unit as and an output unit for outputting the signal. The water treatment plant operation support system disclosed in the present application comprises: A water treatment plant operation support system that supports the operation of a water treatment plant, a data storage unit that stores a state quantity indicating the state of the water treatment plant transmitted from the water treatment plant; a period input section for inputting a period for which a simulation is to be performed; a control target value input unit for inputting a control target value related to the operation of the water treatment plant; an operating condition display unit that displays at least one operating condition among a plurality of operating conditions that corresponds to the control target value inputted by the control target value input unit; a simulation unit that performs a simulation regarding the operation of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target values input by the control target value input unit; transition information indicating a transition of the state quantity during the period inputted to the period input unit Simulation results of the simulation unit as and an output unit for outputting the signal. The water treatment plant operation support method disclosed in the present application comprises: A water treatment plant operation support method for supporting the operation of a water treatment plant, comprising: a data accumulation step of accumulating a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; a period input step of inputting a period for which a simulation is to be performed; an operating condition selection step of selecting at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting step of calculating a control target value corresponding to the operating condition selected in the operating condition selection step; a simulation step of performing a simulation to predict at least one of the plurality of state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation step and the control target value calculated in the control target value setting step; transition information indicating the transition of the state quantity during the period input in the period input step Simulation results of the simulation step as and an output step for outputting the image. The water treatment plant operation support method disclosed in the present application comprises: A water treatment plant operation support method for supporting the operation of a water treatment plant, comprising: a data accumulation step of accumulating a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; a period input step of inputting a period for which a simulation is to be performed; a control target value input step of inputting a control target value related to the operation of the water treatment plant; an operating condition display step of displaying at least one operating condition among a plurality of operating conditions corresponding to the control target value inputted in the control target value input step; a simulation step of performing a simulation regarding the operation of the water treatment plant based on the state quantities accumulated in the data accumulation step and the control target values input in the control target value input step; transition information indicating the transition of the state quantity during the period input in the period input step Simulation results of the simulation step as and an output step for outputting the image. [Effects of the Invention]
[0007] According to the water treatment plant operation support system and water treatment plant operation support method disclosed in the present application, even a user with little experience in operating a water treatment plant can select optimal operating conditions. [Brief explanation of the drawings]
[0008] [Figure 1] 1 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to a first embodiment. [Figure 2] FIG. 4 is a diagram showing an example of a screen of an operating condition selection unit according to the first embodiment. [Figure 3] 4 is a diagram showing an example of setting a control target value by a control target value setting unit according to the first embodiment; FIG. [Figure 4] FIG. 4 is a diagram showing an example of a water quality simulation result displayed on the output unit according to the first embodiment. [Figure 5] 3 is a diagram showing an operation flow of the water treatment plant operation support system according to the first embodiment. FIG. [Figure 6] FIG. 10 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to a second embodiment. [Figure 7] FIG. 10 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to a third embodiment. [Figure 8] FIG. 10 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to a fourth embodiment. [Figure 9] 1 is a diagram illustrating an example of the hardware configuration of a water treatment plant operation support system according to an embodiment. DETAILED DESCRIPTION OF THE INVENTION
[0009] Preferred embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings. The present disclosure is not limited to the following description and may be modified as appropriate without departing from the spirit and scope of the present disclosure. In this specification and drawings, components having substantially the same functions are designated by the same reference numerals, and redundant description will be omitted. In the drawings, the diagrams showing the system configuration and the shapes of components merely show the schematic configuration and shapes of the system and components. The relative sizes and relative positions of the components shown in the drawings do not necessarily accurately represent the size relationships and positional relationships between the actual components. In the following embodiments, a sewage treatment plant is used as an example of a water treatment plant, but the technology disclosed in this application is applicable to water treatment plants in general, including water purification plants and sewage treatment plants.
[0010] Embodiment 1 FIG. 1 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to the first embodiment. A water treatment plant 100 according to the first embodiment includes a biological reactor 1, a blower 2, and a sensor 3. A water treatment plant operation support system 110 according to the first embodiment includes a data accumulation unit 4, a parameter adjustment unit 5, an input / output unit 6, a data extraction unit 8, a control target value setting unit 9, and a simulation unit 10, and the input / output unit 6 has an operating condition selection unit 7 and an output unit 11. The water treatment plant and the water treatment plant operation support system according to the first embodiment will be described in detail below.
[0011] Activated sludge is stored inside the biological reactor 1 of the water treatment plant 100. Air supplied from the blower 2 passes through a pipe 2a and is supplied into the biological reactor 1. The blower 2 and the pipe 2a do not necessarily have to be one, and multiple blowers 2 and pipes 2a may be provided depending on the structure and size of the biological reactor 1.
[0012] The sensors 3 are sensors for measuring state quantities of the water treatment plant 100, and are installed at multiple locations within the water treatment plant 100. The sensors 3 include various types of sensors for measuring the state of the water treatment plant 100, such as a flow meter, an air flow meter, a thermometer, a DO (Dissolved oxygen) meter, a pH meter, an ORP (Oxidation Reduction Potential) meter, an MLSS (Mixed Liquor Suspended Solids) meter, a BOD (Biochemical Oxygen Demand) meter, a COD (Chemical Oxygen Demand) meter, an NADH (Nicotinamide-Adenine Dinucleotide) meter, an ammonia nitrogen concentration meter, a total nitrogen concentration meter, a total phosphorus concentration meter, a polyphosphate phosphorus concentration meter, and a chlorine concentration meter.
[0013] Data on a plurality of state quantities measured by the sensors 3 of the water treatment plant 100 is transmitted to the data storage unit 4 of the water treatment plant operation support system 110 via a signal line 3a.
[0014] The data storage unit 4 of the water treatment plant operation support system 110 stores data on a plurality of state quantities measured by the sensor 3 and transmitted via a signal line 3a. The larger the amount of data stored, the more desirable it is, and data covering periods ranging from less than one day to several years can be stored.
[0015] The parameter adjustment unit 5 receives past state quantity data stored in the data storage unit 4 via the signal line 4a and adjusts the parameters of the simulator built into the simulation unit 10 so that the simulation unit 10 can reproduce the past state quantity data.
[0016] The input / output unit 6 includes an operating condition selection unit 7 and an output unit 11, and is a device through which a user inputs operating conditions and checks simulation results. The input / output unit 6 includes, for example, a personal computer, a touch panel, a tablet, a smartphone, etc.
[0017] In the operating condition selection unit 7, the user selects a desired condition from a plurality of operating conditions set in advance. The operating condition selection unit 7 is selected by the user via the input / output unit 6. 2 shows an example of a screen of the operating condition selection unit 7 displayed on the input / output unit 6. In the operating condition selection unit 7, the user inputs a period for which the user wants to perform a simulation using the water treatment plant operation support system 110 according to the first embodiment. In the example of FIG. 2, the period from April 1st, 0:00 to April 2nd, 0:00 is entered as the period for which the simulation is desired to be performed.
[0018] Furthermore, in the operating condition selection unit 7, a plurality of operating conditions are set in advance for a plurality of items that are operating indicators for the water treatment plant 100, and the user selects from among these the desired operating conditions under which the simulation is to be performed. In the example of Figure 2, the operational indices for the water treatment plant are the pumping rate, aeration rate, and returned sludge rate, and multiple operational conditions (three in this example) are set for each operational indices. The user selects the operational conditions they wish to simulate for each operational indices. 2 are just examples, and examples of operational indices in a typical sewage treatment plant include the pumping rate, aeration rate, returned sludge rate, nitrification liquid circulation rate, excess sludge extraction rate, coagulant injection rate, number of operating pumps, number of operating fans, bypass flow rate, and incinerator temperature. However, because the operational indices vary widely depending on the plant configuration of each sewage treatment plant, they can be changed, increased, or decreased as appropriate. For example, in a sewage treatment plant that uses the anaerobic-anoxic-oxic (A2O) process, the pumping rate, aeration rate, returned sludge rate, and nitrification liquid circulation rate may be set to be selectable in the operating condition selection unit 7.
[0019] The data extraction unit 8 extracts data for the period desired by the user that was input in the operating condition selection unit 7 from the data storage unit 4 via the signal line 4b. If the period input in the operating condition selection unit 7 is earlier than the period stored in the data storage unit 4, or if it is later than the period stored in the data storage unit 4, data that matches the characteristics of the period input in the operating condition selection unit 7 (weekday / holiday, rainfall, season, etc.) may be searched for in the data storage unit 4 and a data set created instead.
[0020] The control target value setting unit 9 receives the operating conditions selected by the user in the operating condition selection unit 7 via the signal line 7a, calculates the control target value required to achieve the operating conditions selected by the user, and inputs it to the simulation unit 10. 3 is a diagram showing an example of setting the control target values in the control target value setting unit 9. Assuming that the pumping rate is set to "two-unit operation," the aeration rate is set to "low," and the returned sludge rate is set to "high" in the operating condition selection unit 7 as shown in FIG. 2, the control target value setting unit 9 sets specific numerical values for the pumping rate, DO target value, and returned sludge ratio as control target values corresponding to each operating condition. For example, when the aeration rate is selected to be "low" in the operating condition selection unit 7, the control target value setting unit 9 sets the DO target value to 0.5 mg / L, and when the aeration rate is selected to be "medium," the DO target value is set to a value greater than 0.5 mg / L (for example, 1 mg / L).
[0021] The operating conditions selected by the operating condition selection unit 7 can be converted into specific control target values by the control target value setting unit 9 by pre-assigning control target values corresponding to each operating condition based on the knowledge of an experienced operator, or by using a method utilizing artificial intelligence (hereinafter referred to as "AI"). For example, by utilizing AI clustering technology, the AI can classify past state quantity data obtained by experienced operators and automatically calculate control target values corresponding to one-unit / two-unit / three-unit operation of the pumping rate and low / medium / high aeration rate or return sludge rate, as shown in FIG. 3. By using a method utilizing AI, even when an inexperienced user uses the water treatment plant operation support system of this embodiment, the control target values can be automatically calculated to approximate the operation of an experienced operator.
[0022] Furthermore, the relationship between the operating conditions and the corresponding control target values does not need to be constant at all times, and it is desirable to change it as appropriate depending on seasonal changes, the operating status of the sewage treatment plant, and the like.
[0023] Figure 3 shows an example of a sewage treatment plant that uses DO control to control the aeration rate and influent flow rate multiplier control to control the return sludge rate. A wide variety of aeration rate control methods are used by sewage treatment plants, including DO control, constant aeration rate control, influent flow rate multiplier control, and feedback control based on the state variables in the biological reactor 1. Similarly, return sludge rate control methods include constant flow rate control in addition to influent flow rate multiplier control. Furthermore, the control methods for each of the operational indicators listed above vary depending on the sewage treatment plant, and the target items and values for control change accordingly. For example, in a sewage treatment plant that controls the aeration rate by multiplying the influent flow rate and constant flow rate control, the target aeration rate control value in Figure 3 would be the aeration rate multiplier rather than the DO target value, and the target return sludge rate control value would be the return sludge flow rate rather than the return sludge multiplier.
[0024] The simulation unit 10 has a built-in water quality prediction simulator and performs a water quality simulation based on the parameters transmitted from the parameter adjustment unit 5 via signal line 5a, the state quantity data for the period desired by the user transmitted from the data extraction unit 8 via signal line 8a, and the control target value transmitted from the control target value setting unit 9 via signal line 9a. In the example of FIG. 3, the simulation unit 10 simulates the pumping amount to be 1000 m in accordance with the control target value set by the control target value setting unit 9. 3 A water quality simulation is performed when the sewage treatment plant is operated so that the DO in biological reactor 1 is 0.5 mg / L and the return sludge ratio is 2 times.
[0025] The water quality prediction simulator built into the simulation unit 10 simulates multiple water quality items desired by the user for the water in the biological reactor 1 or the water discharged from the biological reactor 1. Typical water quality items include DO, pH, ORP, MLSS, BOD, COD, NADH, ammonia nitrogen concentration, total nitrogen concentration, total phosphorus concentration, polyphosphate phosphorus concentration, and chlorine concentration. The water quality prediction simulator may take any form as long as it can simulate the water quality items desired by the user, such as the activated sludge model proposed by the IWA (International Water Association), machine learning, deep learning, AI such as a genetic algorithm, or a mathematical formula based on empirical rules.
[0026] The output unit 11 outputs the water quality simulation results sent from the simulation unit 10 via the signal line 10a onto a screen or the like so that the user can check them. 4 shows an example of the water quality simulation results displayed on the output unit 11. When the COD, TN (Total Nitrogen), and TP (Total Phosphorus) of water discharged from the biological reactor 1 are output to the output unit 11, the COD, TN, and TP data for the period entered by the user in the operating condition selection unit 7 are output on the screen as a trend graph. The data output format does not necessarily have to be a trend graph, and the data can be displayed in any format desired by the user, such as outputting data values in a table format or outputting average values for a period.
[0027] The operation flow of the water treatment plant operation support system according to the first embodiment will be described with reference to FIG. The operational flow of the water treatment plant operation support system 110 includes six steps, steps ST1 to ST6. In step ST1, the user inputs operating conditions into the operating condition selection unit 7. Thereafter, the operation flow proceeds to steps ST2 to ST4. Here, steps ST2 to ST4 are independent steps, and therefore can be operated in parallel as shown in FIG. 5. This can shorten the operation time of the water treatment plant operation support system 110. However, it is not necessary to operate steps ST2 to ST4 in parallel, and the same results can be obtained even if two or more steps out of steps ST2 to ST4 are operated sequentially.
[0028] In step ST2, the parameter adjusting unit 5 adjusts the parameters of the simulation unit 10 so that the past state quantity data stored in the data storage unit 4 can be reproduced.
[0029] In step ST3, the data extraction unit 8 extracts data for the period desired by the user, which is input in the operating condition selection unit 7, from the data accumulation unit 4.
[0030] In step ST4, the control target value setting unit 9 calculates the control target value required to achieve the operating conditions selected by the user in the operating condition selection unit 7, and inputs it to the simulation unit .
[0031] In step ST5, the simulation unit 10 performs a water quality simulation based on the parameters sent from the parameter adjustment unit 5, the state quantity data sent from the data extraction unit 8, and the control target value sent from the control target value setting unit 9.
[0032] In step ST6, the output unit 11 outputs the water quality simulation results.
[0033] After steps ST1 to ST6 are completed, if the user inputs different operating conditions in the operating condition selection unit 7, steps ST1 to ST6 are repeated again. This allows the user to repeatedly check the simulation results for multiple operating conditions, thereby understanding the effect of changing the operating conditions on water quality and searching for optimal operating conditions.
[0034] With the above configuration and flow, even a user with little experience in monitoring the operation of the water treatment plant 100 can easily perform water quality simulations for multiple operating conditions by simply selecting the desired condition from the operating conditions previously set in the operating condition selection unit 7, as the control target value setting unit 9 automatically sets the control target value for the simulation. Furthermore, users can check the results of water quality simulations when operating conditions are changed, allowing them to search for and determine the optimal operating conditions and then operate the actual water treatment plant.
[0035] As described above, according to the first embodiment, A water treatment plant operation support system that supports the operation of a water treatment plant, a data storage unit that stores a state quantity indicating the state of the water treatment plant transmitted from the water treatment plant; an operating condition selection unit that selects at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting unit that calculates a control target value corresponding to the operating condition selected by the operating condition selection unit; a simulation unit that performs a simulation to predict at least one of the plurality of state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target value calculated by the control target value setting unit; The output unit outputs the simulation result of the simulation unit. Even a user with little experience in operating a water treatment plant can select the optimum operating conditions.
[0036] Also, there is provided a water treatment plant operation support method for supporting the operation of a water treatment plant, comprising: a data accumulation step of accumulating a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; an operating condition selection step of selecting at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting step of calculating a control target value corresponding to the operating condition selected in the operating condition selection step; a simulation step of performing a simulation to predict at least one of the plurality of state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation step and the control target value calculated in the control target value setting step; and an output step for outputting the simulation results of the simulation step. Even a user with little experience in operating a water treatment plant can select the optimum operating conditions.
[0037] Further, the operating condition selection unit is configured to set a plurality of operating conditions for each of a plurality of items that are operating indicators, and to select at least one operating condition from the plurality of operating conditions for each of the items. Even a user with little experience in operating a water treatment plant can easily select the operating conditions.
[0038] Furthermore, when calculating the control target value corresponding to the operating condition, the control target value setting unit either calculates the control target value based on a value previously assigned to each operating condition based on the knowledge of an experienced operator, or calculates the control target value based on past state quantity data obtained by operating the plant by an experienced operator and classified by AI (Artificial Intelligence). The control target value can be calculated so as to approximate the operation of an experienced operator.
[0039] The water treatment plant also includes a biological reactor storing activated sludge, The simulation unit simulates at least one of the water quality in the biological reaction tank and the water quality of the water discharged from the biological reaction tank. Even users with little experience in operating water treatment plants can simulate water quality close to that of an experienced operator.
[0040] Embodiment 2 FIG. 6 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to the second embodiment. A water treatment plant 100A according to the second embodiment includes a biological reaction tank 1, a blower 2, a sensor 3, and a sedimentation tank 12. A water treatment plant operation support system 110A according to the second embodiment includes a data accumulation unit 4, a parameter adjustment unit 5, an input / output unit 6, a data extraction unit 8, a control target value setting unit 9, a simulation unit 10, and an output unit 11, and the input / output unit 6 has an operating condition selection unit 7 and an output unit 11. The following describes in detail the water treatment plant and the water treatment plant operation support system according to the second embodiment, focusing on the differences from the first embodiment.
[0041] The water treatment plant 100A of the second embodiment includes a settling tank 12 in addition to the configuration of the first embodiment. The settling tank 12 is a tank into which water flows from the biological reactor 1, where solids such as activated sludge are allowed to settle, and a supernatant liquid is obtained.
[0042] The sensors 3 are sensors for measuring the state of the water treatment plant, and are installed at a plurality of locations in the water treatment plant 100A, including the settling tank 12. Sensor 3 includes various types of sensors for measuring the status of water treatment plant 100A, such as flow meters, air flow meters, thermometers, DO (DISSOLVEDOXYGEN: dissolved oxygen concentration) meters, pH meters, ORP (Oxidation Reduction Potential) meters, MLSS (Mixed Liquor Suspended Solids: activated sludge suspended solids) meters, BOD (Biochemical Oxygen Demand) meters, COD (Chemical Oxygen Demand) meters, NADH (Nicotinamide-Adenine Dinucleotide: reduced nicotinamide adenine dinucleotide) meters, ammonia nitrogen concentration meters, total nitrogen concentration meters, total phosphorus concentration meters, polyphosphate phosphorus concentration meters, chlorine concentration meters, sludge interface meters, etc.
[0043] The water treatment plant operation support system 110A of embodiment 2, like embodiment 1, comprises a data accumulation unit 4, a parameter adjustment unit 5, an input / output unit 6, an operating condition selection unit 7, a data extraction unit 8, a control target value setting unit 9, and a simulation unit 10, and the input / output unit 6 has an operating condition selection unit 7 and an output unit 11.
[0044] The simulation unit 10 of the second embodiment has a built-in simulator for predicting the sludge interface height. The simulation unit 10 performs a simulation for predicting the sludge interface height in the settling tank 12 based on the parameters transmitted from the parameter adjustment unit 5 via the signal line 5a, the state quantity data for a period desired by the user transmitted from the data extraction unit 8 via the signal line 8a, and the control target value transmitted from the control target value setting unit 9 via the signal line 9a. Here, the sludge interface refers to the boundary between the settled solids and the supernatant liquid in the settling tank 12, and the distance from the bottom of the settling tank 12 to the sludge interface is the sludge interface height. The sludge interface height prediction simulator may be in any form as long as it can simulate the sludge interface height in the settling tank 12, such as the Vesilind model, which is a physical model that mathematically describes the settling phenomenon of activated sludge, AI such as machine learning, deep learning, or genetic algorithms, or mathematical formulas based on empirical rules.
[0045] The output unit 11 outputs the simulation result of the sludge interface height transmitted from the simulation unit 10 via the signal line 10a onto a screen or the like so that the user can check it. The other components and operation flow are the same as those in the first embodiment.
[0046] In the second embodiment, the simulation unit 10 simulates the sludge interface height in the settling tank 12. The sludge interface height is an important monitoring item for stable operation of a sewage treatment plant. If the sludge interface height exceeds the height of the settling tank 12, solids such as activated sludge will flow into the effluent, significantly deteriorating the quality of the effluent. Furthermore, because activated sludge plays a role in purifying pollutants, if activated sludge flows out of the settling tank 12, subsequent biological treatment will become difficult. In particular, if the amount of water flowing into the biological reactor 1 increases significantly, such as during rainy weather, the retention time required for solids to settle in the settling tank 12 may not be secured, and the sludge interface height may rise.
[0047] It is often difficult for an inexperienced user to perform operation monitoring under such circumstances, but in the second embodiment, with the configuration and operation flow described above, even a user with little experience in operation monitoring of a water treatment plant can easily simulate the sludge interface height for a plurality of operating conditions, simply by selecting the desired condition from the operating conditions set in advance in the operating condition selection unit 7, as the control target value setting unit 9 automatically sets the control target value for the simulation. Furthermore, by allowing the user to check the simulation results of the sludge interface height when the operating conditions are changed, the user can search for and determine the optimal operating conditions and operate the actual water treatment plant.
[0048] As described above, according to the second embodiment, the same effects as those of the first embodiment can be achieved, and also: The water treatment plant includes at least a settling tank for settling activated sludge solids and obtaining a supernatant liquid; The simulation unit is configured to simulate at least the height of the sludge interface in the settling tank, Even users with little experience in operating water treatment plants can perform simulations of sludge interface heights similar to those of experienced operators.
[0049] Embodiment 3 FIG. 7 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to the third embodiment. A water treatment plant 100B according to the third embodiment includes a biological reaction tank 1, a blower 2, a sensor 3, a storage unit 13, and a pump 14. A water treatment plant operation support system 110B according to the third embodiment includes a data accumulation unit 4, a parameter adjustment unit 5, an input / output unit 6, a data extraction unit 8, a control target value setting unit 9, and a simulation unit 10. The input / output unit 6 has an operating condition selection unit 7 and an output unit 11. The following describes in detail the water treatment plant and the water treatment plant operation support system according to embodiment 3. The following description will focus on the differences from embodiments 1 and 2.
[0050] The water treatment plant 100B of the third embodiment includes a reservoir 13 and a pump 14 in addition to the configuration of the first embodiment.
[0051] The storage section 13 is a section that has the function of temporarily storing water before it flows into the biological reactor 1 in order to adjust the amount of water flowing into the biological reactor 1. In a typical sewage treatment plant, the inflow conduit or pump well corresponds to the storage section 13, but the storage section 13 is not limited to the inflow conduit or pump well as long as it has the above-mentioned function.
[0052] Pump 14 is a pump that draws up (pumps) the water stored in storage section 13 and flows into biological reaction tank 1, and the water in storage section 13 flows into biological reaction tank 1 via pipe 14a.
[0053] Sensor 3 is a sensor for measuring the state of water treatment plant 100B, and is installed in multiple locations within water treatment plant 100B, including the piping for water flowing into storage section 13 and piping 14a, which is the piping for water flowing from storage section 13 to biological reaction tank 1. Sensor 3 includes various types of sensors for measuring the condition of water treatment plants, such as flow meters, air flow meters, thermometers, DO (Dissolved Oxygen: dissolved oxygen concentration) meters, pH meters, ORP (Oxidation Reduction Potential) meters, MLSS (Mixed Liquor Suspended Solids: activated sludge suspended solids) meters, BOD (Biochemical Oxygen Demand) meters, COD (Chemical Oxygen Demand) meters, NADH (Nicotinamide-Adenine Dinucleotide: reduced nicotinamide adenine dinucleotide) meters, ammonia nitrogen concentration meters, total nitrogen concentration meters, total phosphorus concentration meters, polyphosphate phosphorus concentration meters, chlorine concentration meters, etc.
[0054] Similar to embodiment 1, the water treatment plant operation support system 110B of embodiment 3 includes a data accumulation unit 4, a parameter adjustment unit 5, an input / output unit 6, an operating condition selection unit 7, a data extraction unit 8, a control target value setting unit 9, and a simulation unit 10, and the input / output unit 6 has an operating condition selection unit 7 and an output unit 11.
[0055] The simulation unit 10 of the third embodiment has a built-in water quality prediction simulator and a built-in water level prediction simulator for the storage unit 13. The simulation unit 10 performs a simulation to predict the water quality of the water in the biological reactor 1 or the water discharged from the biological reactor 1, and the water level of the storage unit 13, based on the parameters transmitted from the parameter adjustment unit 5 via signal line 5a, the state quantity data for a period desired by the user transmitted from the data extraction unit 8 via signal line 8a, and the control target value transmitted from the control target value setting unit 9 via signal line 9a.
[0056] The water level of storage section 13 is the distance from the bottom of storage section 13 to the surface of the water stored in storage section 13, and fluctuates depending on the balance between the amount of water flowing into storage section 13 and the amount of water pumped up by pump 14. The water level prediction simulator may take any form as long as it can simulate the water level of storage section 13, such as a physical model that describes the balance of the water volume in storage section 13, AI (Artificial Intelligence) such as machine learning, or a mathematical formula based on empirical rules.
[0057] The output unit 11 outputs the water quality simulation results transmitted from the simulation unit 10 via the signal line 10a and the water level simulation results of the storage unit 13 onto a screen or the like so that the user can check them. The other components and operation flow are the same as those in the first embodiment.
[0058] In the third embodiment, in addition to the water quality in the biological reactor 1 or the water discharged from the biological reactor 1, which is simulated by the simulation unit 10 in the first embodiment, a water level simulation of the storage unit 13 is added. By temporarily storing water in the storage unit 13, it is possible to adjust the amount of water flowing into the biological reactor 1. Therefore, the storage unit 13 has the effect of stabilizing the treatment in the biological reactor 1.
[0059] However, on the other hand, when an unusually large amount of water flows into water treatment plant 100B due to rainfall or the like, the amount of water flowing into reservoir 13 increases significantly, causing the water level in reservoir 13 to rise. If the water level in reservoir 13 exceeds the height of reservoir 13, water will overflow from reservoir 13 and water treatment plant 100B will be flooded with sewage. Therefore, water treatment plant 100B must be operated so that the water level in reservoir 13 does not exceed the height of reservoir 13.
[0060] In addition, to lower the water level in the storage section 13, it is sufficient to operate the pump 14 and increase the amount of water pumped into the biological reactor 1, but if the amount of water flowing into the biological reactor 1 increases, the pollutant load on the biological reactor 1 will increase, which may worsen the quality of the discharged water. Therefore, there is a trade-off between the water level in the reservoir 13 and the quality of the water discharged from the biological reactor 1, and it is necessary to monitor the operation of the entire water treatment plant 100B while taking both into consideration.
[0061] It is often difficult for an inexperienced user to operate and monitor the water treatment plant 100B while taking into account such complex factors, but in embodiment 3, with the configuration and operation flow described above, even an inexperienced user in operation and monitoring the water treatment plant 100B can easily simulate the water quality and the water level in the storage unit 13 for multiple operating conditions by simply selecting the desired condition from the operating conditions preset in the operating condition selection unit 7, because the control target value setting unit 9 automatically sets the control target value for the simulation. Furthermore, because the user can check the results of the water quality and the water level in the storage unit 13 when the operating conditions are changed, the user can search for and determine the operating conditions that optimize both the water quality of the water discharged from the biological reactor 1 and the water level in the storage unit 13, and then operate the actual water treatment plant.
[0062] As described above, according to the third embodiment, the same effects as those of the first and second embodiments can be achieved, and also: The water treatment plant includes a biological reaction tank that stores activated sludge and a storage tank that temporarily stores water flowing into the biological reaction tank, The simulation unit is configured to simulate at least the water level of the storage tank, Even a user with little experience in operating a water treatment plant can simulate the water level in the storage tank in a manner similar to that of an experienced operator.
[0063] Embodiment 4 FIG. 8 is a configuration diagram showing a water treatment plant and a water treatment plant operation support system according to the fourth embodiment. A water treatment plant 100C according to the fourth embodiment includes a biological reactor 1, a blower 2, and a sensor 3. A water treatment plant operation support system 110C according to the fourth embodiment includes a data accumulation unit 4, a parameter adjustment unit 5, an input / output unit 6, a data extraction unit 8, and a simulation unit 10, and the input / output unit 6 has a control target value input unit 20, an operating condition display unit 30, and an output unit 11. The following describes in detail the water treatment plant and the water treatment plant operation support system according to embodiment 4. The following description will focus on the differences from embodiments 1 to 3.
[0064] In the fourth embodiment, a control target value input unit 20 is provided in the input / output unit 6, and a user can directly input a control target value in the control target value input unit 20. The control target value input in the control target value input unit 20 is transmitted to the simulation unit 10 via a signal line 9a, and is also transmitted to the operating condition display unit 30 via a signal line 9b.
[0065] When the control target value is transmitted to the operating condition display unit 30 via the signal line 9b, the operating condition display unit 30 displays the operating condition corresponding to the control target value inputted in the control target value input unit 20. In the operating condition display unit 30, a plurality of operating conditions are set for each of a plurality of items that serve as operating indicators, and the operating conditions for each of the items corresponding to the control target values input in the control target value input unit 20 are displayed. 2 and 3 as examples, there are multiple items serving as operation indicators, such as pumping rate, aeration rate, and returned sludge rate, and for each item, multiple operating conditions are set for pumping rate, such as "single-unit operation," "two-unit operation," and "three-unit operation," multiple operating conditions are set for aeration rate, such as "low," "medium," and "high," and multiple operating conditions are set for returned sludge rate, such as "low," "medium," and "high." For example, if 1 mg / L is input as the DO target value in control target value input unit 20, the operating condition for aeration rate corresponds to "medium" rather than "low," and the screen of operating condition display unit 30 of input / output unit 6 will show that a control target value corresponding to the operating condition for aeration rate of "medium" has been input.
[0066] The simulation unit 10 performs a simulation of the operation of the water treatment plant in accordance with the control target values inputted in the control target value input unit 20. The simulation unit 10 has one or more built-in simulators among a water quality prediction simulator, a sludge interface height prediction simulator, and a water level prediction simulator. The other components and operation flows are the same as those in the first to third embodiments.
[0067] With the above-described configuration, an experienced user with extensive knowledge of operation monitoring of water treatment plants can directly input the control target value to be set in the control target value input unit 20, rather than selecting the pre-set operating conditions in the operating condition selection unit 7 of the first to third embodiments, thereby enabling a more precise simulation of the operating conditions desired by the user. Furthermore, the operating conditions corresponding to the control target values input in the control target value input unit 20 are displayed on the operating condition display unit 30, so that even an inexperienced user can easily understand the operating conditions under which the simulation is being carried out.
[0068] In the fourth embodiment, assuming that the system will be used by an experienced user with extensive knowledge of operation monitoring of water treatment plants, the system is configured so that the user can directly input the control target value to be set in the control target value input unit 20, rather than selecting a preset operating condition in the operating condition selection unit 7. In this case, however, the operating condition corresponding to the control target value input in the control target value input unit 20 is displayed in the operating condition display unit 30, so that an inexperienced user can learn under which operating condition the simulation is being carried out.
[0069] As described above, according to the fourth embodiment, A water treatment plant operation support system that supports the operation of a water treatment plant, a data storage unit that stores a state quantity indicating the state of the water treatment plant transmitted from the water treatment plant; a control target value input unit for inputting a control target value related to the operation of the water treatment plant; an operating condition display unit that displays at least one operating condition among a plurality of operating conditions that corresponds to the control target value inputted by the control target value input unit; a simulation unit that performs a simulation regarding the operation of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target values input by the control target value input unit; The output unit outputs the simulation result of the simulation unit. Even a user with little experience in operating a water treatment plant can learn the optimum operating conditions.
[0070] In addition, the operating condition display unit sets a plurality of operating conditions for each of a plurality of items that are operating indexes, and displays the respective operating conditions for each of the items that correspond to the control target values input in the control target value input unit. Even a user with little experience in operating a water treatment plant can learn the optimum operating conditions.
[0071] Also, there is provided a water treatment plant operation support method for supporting the operation of a water treatment plant, comprising: a data accumulation step of accumulating a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; a control target value input step of inputting a control target value related to the operation of the water treatment plant; an operating condition display step of displaying at least one operating condition among a plurality of operating conditions corresponding to the control target value inputted in the control target value input step; a simulation step of performing a simulation regarding the operation of the water treatment plant based on the state quantities accumulated in the data accumulation step and the control target values input in the control target value input step; and an output step for outputting the simulation results of the simulation step. Even a user with little experience in operating a water treatment plant can learn the optimum operating conditions.
[0072] The water treatment plant operation support system of the fourth embodiment may be combined with the water treatment plant operation support systems of the first to third embodiments. That is, a water treatment plant operation support system that supports the operation of a water treatment plant, a data storage unit that stores a state quantity indicating the state of the water treatment plant transmitted from the water treatment plant; an operating condition selection unit that selects at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting unit that calculates a control target value corresponding to the operating condition selected by the operating condition selection unit; a simulation unit that performs a simulation to predict at least one of the plurality of state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target value calculated by the control target value setting unit; an output unit that outputs a simulation result of the simulation unit; a control target value input unit for inputting a control target value related to the operation of the water treatment plant; an operating condition display unit that displays at least one operating condition among a plurality of operating conditions that corresponds to the control target value input by the control target value input unit, The simulation unit may be configured to perform a simulation of the operation of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target values input by the control target value input unit.
[0073] FIG. 9 is a diagram showing an example of the hardware configuration of the water treatment plant operation support systems 110, 110A, 110B, and 110C according to the first to fourth embodiments. 9, the water treatment plant operation support systems 110, 110A, 110B, and 110C each include a processing device 1000 and an input / output unit 6. The processing device 1000 is composed of a processor 1010 and a storage device 1020. The storage device 1020 includes a volatile storage device such as a random access memory and a non-volatile auxiliary storage device such as a flash memory, both of which are not shown. Note that a hard disk may be provided instead of the flash memory. The processor 1010 executes a program input from the storage device 1020. In this case, the program is input from the auxiliary storage device to the processor 1010 via the volatile storage device. The processor 1010 may also output data such as calculation results to the volatile storage device of the storage device 1020, or may store the data in the auxiliary storage device via the volatile storage device. The processor 1010 executes the calculation processes of the parameter adjustment unit 5, the data extraction unit 8, the control target value setting unit 9, and the simulation unit 10 described in the above embodiments.
[0074] Furthermore, in the above-described embodiment, a sewage treatment plant is used as an example of a water treatment plant, but the technology disclosed in the present application is applicable to water treatment plants in general, including water purification plants and sewage treatment plants. For example, when applied to a water purification plant as a water treatment plant, the water treatment plant includes a receiving well, a coagulation basin, a sedimentation basin, a filter basin, etc., and the operation indicator items of the operation condition selection section and operation condition display section of the water treatment plant operation support system include the amount of sodium hypochlorite injected, the amount of ozone diffused, the amount of coagulant injected, etc.
[0075] Although the present application describes various exemplary embodiments and examples, the various features, aspects, and functions described in one or more embodiments are not limited to application to a particular embodiment, but may be applied to the embodiments alone or in various combinations. Therefore, countless variations not illustrated are conceivable within the scope of the technology disclosed in this application, including, for example, cases where at least one component is modified, added, or omitted, and cases where at least one component is extracted and combined with a component of another embodiment. [Explanation of symbols]
[0076] 1 Biological reactor, 2 Blower, 3 Sensor, 4 Data accumulation unit, 5 Parameter adjustment unit, 6 Input / output unit, 7 Operation condition selection unit, 8 Data extraction unit, 9 Control target value setting unit, 10 Simulation unit, 11 Output unit, 12 Sedimentation tank, 13 Storage unit, 20 Control target value input unit, 30 Operation condition display unit, 100, 100A, 100B, 100C Water treatment plant, 110, 110A, 110B, 110C Water treatment plant operation support system.
Claims
1. A water treatment plant operation support system for supporting the operation of a water treatment plant, A data storage unit that stores a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; A period input section for inputting a period for which a simulation is to be performed; an operating condition selection unit for selecting at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting unit that calculates a control target value corresponding to the operating condition selected by the operating condition selection unit; A simulation unit that performs a simulation to predict at least one of the state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation unit and the control target value calculated by the control target value setting unit; an output unit that outputs transition information indicating a transition of the state quantity during the period inputted to the period input unit as a simulation result of the simulation unit.
2. The water treatment plant operation support system of claim 1, wherein the operating condition selection unit is configured to set a plurality of operating conditions for each of a plurality of items that serve as operating indicators, and to select at least one operating condition from the plurality of operating conditions for each of the items.
3. 3. The water treatment plant operation support system according to claim 1, wherein the control target value setting unit calculates the control target value corresponding to the operating condition based on a control target value previously assigned to each of the operating conditions based on the knowledge of an experienced operator, or calculates the control target value based on past state quantity data from operations by an experienced operator classified by AI (Artificial Intelligence).
4. A water treatment plant operation support system for supporting the operation of a water treatment plant, A data storage unit that stores a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; A period input section for inputting a period for which a simulation is to be performed; A control target value input unit for inputting a control target value related to the operation of the water treatment plant; an operating condition display unit that displays at least one operating condition among a plurality of operating conditions that corresponds to the control target value inputted through the control target value input unit; a simulation unit that performs a simulation regarding the operation of the water treatment plant based on the state quantity accumulated in the data accumulation unit and the control target value inputted by the control target value input unit; an output unit that outputs transition information indicating a transition of the state quantity during the period inputted to the period input unit as a simulation result of the simulation unit.
5. The water treatment plant operation support system of claim 4, wherein the operating condition display unit sets a plurality of operating conditions for each of a plurality of items that serve as operating indicators, and displays the respective operating conditions for each of the items that correspond to the control target values inputted in the control target value input unit.
6. The water treatment plant includes a biological reactor that stores activated sludge, The water treatment plant operation support system according to claim 1 , wherein the simulation unit simulates at least one of the water quality in the biological reaction tank and the water quality of water discharged from the biological reaction tank.
7. The water treatment plant includes at least a settling tank for settling activated sludge solids and obtaining a supernatant liquid; The water treatment plant operation support system according to claim 1 , wherein the simulation unit simulates at least a sludge interface height in the settling tank.
8. The water treatment plant includes a biological reaction tank that stores activated sludge, and a storage tank that temporarily stores water flowing into the biological reaction tank. The water treatment plant operation support system according to claim 1 , wherein the simulation unit simulates at least a water level in the storage tank.
9. A water treatment plant operation support method for supporting the operation of a water treatment plant, comprising: A data accumulation step of accumulating a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; A period input step of inputting a period for which a simulation is to be performed; an operating condition selection step of selecting at least one operating condition from a plurality of operating conditions related to the operation of the water treatment plant; a control target value setting step of calculating a control target value corresponding to the operating condition selected in the operating condition selection step; A simulation process for predicting at least one of the plurality of state quantities of the water treatment plant based on the state quantities accumulated in the data accumulation process and the control target value calculated in the control target value setting process; and an output step of outputting, as a simulation result of the simulation step, transition information indicating a transition of the state quantity during the period inputted in the period input step.
10. A water treatment plant operation support method for supporting the operation of a water treatment plant, comprising: A data accumulation step of accumulating a state quantity indicating a state of the water treatment plant transmitted from the water treatment plant; A period input step of inputting a period for which a simulation is to be performed; a control target value input step of inputting a control target value related to the operation of the water treatment plant; an operating condition display step of displaying at least one operating condition among a plurality of operating conditions corresponding to the control target value inputted in the control target value input step; a simulation step of performing a simulation regarding the operation of the water treatment plant based on the state quantity accumulated in the data accumulation step and the control target value input in the control target value input step; and an output step of outputting, as a simulation result of the simulation step, transition information indicating a transition of the state quantity during the period inputted in the period input step.
