Underground excavation method capable of digging through the underground and removing soil continuously

The method addresses debris accumulation and friction issues in underground excavation by using a tunneler with a head unit, pusher, and injection pipe to enhance workability and stability, achieving efficient and cost-effective tunneling.

KR103046398B1Active Publication Date: 2026-11-11US ENGINEERING CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
KR1020260132192
Authority / Receiving Office
KR · KR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2026-07-17
Publication Date
2026-11-11
Estimated Expiration
2046-07-17

AI Technical Summary

Technical Problem

Conventional underground excavation methods face challenges such as accumulation of excavation debris, increased frictional resistance, and difficulty in maintaining accurate height, leading to decreased workability and operational stability, especially in long-distance and sharp-curve tunneling.

Method used

An underground excavation method involving a tunneler with a head unit for horizontal movement and direction control, a pusher for forward propulsion, a soil removal pipe, and an injection pipe for high-pressure mixing and spraying of soil additives, which reduces friction and facilitates continuous excavation and soil removal.

Benefits of technology

The method enhances workability and operational stability by reducing frictional resistance and preventing solid soil from decreasing rotational force, enabling efficient continuous excavation and soil removal, thereby shortening construction time and reducing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112026087468027-PAT00001_ABST
    Figure 112026087468027-PAT00001_ABST
Patent Text Reader

Abstract

The present invention aims to provide an underground excavation method capable of continuous underground excavation and soil removal, which not only increases the workability of excavation and soil removal but also simultaneously provides shortening of construction time, simplicity, and economic efficiency, by connecting a thrust pipe that forms a conduit and transmits the thrust force of a jack located at the rear to advance a front tunneling machine when excavating a small-diameter pipe, and injecting a mixture of soil and a mixture of excavated soil at high pressure forward of the head section to fill the space between the lead body and the ground or between the thrust pipe and the ground, and allowing the soil generated by the excavation of the head section to discharge the soil accumulated inside the lead body and at the rear through a discharge pipe. The method comprises the step (S10) of installing the control device (400) on the ground and installing the press-in machine (30) and the tunneling machine (100) inside the launching vertical shaft (20); The method is characterized by including the following steps: driving the above-mentioned tunneling machine (100) to excavate the ground and simultaneously discharge the excavated soil and crushed rocks to the surface, and pushing the above-mentioned tunneling machine (100) forward in a horizontal direction using the above-mentioned indenter (30); repeatedly inserting and installing a propulsion pipe (200) between the above-mentioned tunneling machine (100) and the indenter (30) as the above-mentioned tunneling machine (100) advances (S30); and lifting and recovering the above-mentioned tunneling machine (100) and the indenter (30) when the above-mentioned tunneling machine (100) reaches a vertical shaft (S40).
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to an underground excavation method capable of continuous underground excavation and soil removal. More specifically, the invention aims to provide an underground excavation method capable of continuous underground excavation and soil removal that not only increases the workability of excavation and soil removal but also simultaneously provides shortened construction time, convenience, and economic efficiency. This is achieved by transmitting the thrust force of a jack located at the rear to advance a front tunneler during small-diameter pipe excavation, connecting a thrust pipe that forms a conduit, and injecting a mixture of soil and soil at high pressure forward of the head section to fill the space between the lead body and the ground or between the thrust pipe and the ground, and allowing the soil generated by the excavation of the head section to be discharged through the soil removal pipe accumulated within the lead body or at the rear. Background Technology

[0002] Construction methods for forming underground utility tunnels for subways, urban infrastructure such as water and sewage systems, and telecommunication lines include the shield method, the semi-shield method, and the combined semi-shield method. The shield method involves excavating a tunnel by moving underground while rotating a cutter head. In this shield method, the shield machine advances by extending a shield cylinder installed on the main body, and tunnels are constructed by repeatedly installing segments in the space formed at the rear. In other words, the shield cylinder pushes the rear segments forward. Because the shield cylinder advancing the shield machine moves together from the rear, this method allows for easy directional correction underground, offering the advantage of enabling the excavation of sharp curves with small radii of curvature.

[0003] Furthermore, the semi-shield method is an excavation technique that involves a repetitive process in which a shield machine is propelled by a semi-shield cylinder fixed to the rear end of a vertical shaft, and a thrust pipe is installed between the retracted semi-shield cylinder and the shield machine to advance together by pushing the semi-shield cylinder. Compared to the shield method, this method offers faster tunneling speeds and a simpler initial tunneling process, which can shorten the construction period for short distances.

[0004] Furthermore, the composite semi-shield method utilizes only the advantages of the aforementioned methods. By employing the semi-shield method for the initial stages and straight sections to enable the excavation of long-distance or sharp-curve tunnels, and the shield method for the sharp-curve sections or the latter part of the long-distance section, it eliminates the processes required in the initial stages of the conventional shield method and allows for excavation under various conditions, such as long-distance and sharp-curve sections, thereby overcoming the problems associated with conventional tunnel excavation methods.

[0005] As such, when excavation is carried out using conventional excavation methods, excavation debris accumulates in overholes formed by drilling larger than the diameter of the main body, and the rapid increase in frictional resistance makes it difficult to proceed with smooth excavation. Furthermore, when using the segment method, it is difficult to maintain the height accurately, and jamming occurs, making it impossible to carry out precisely planned construction. Specifically, excavation debris accumulated on the lower part and outer perimeter of the semi-shield machine alters the normal position of the semi-shield machine, preventing it from excavating along a designated path and causing it to excavate in the wrong direction. As the excavation site becomes longer, this phenomenon occurs more frequently, resulting in the problem of making medium- and long-distance construction difficult. Prior art literature

[0006] Republic of Korea Registered Patent No. 10-1847190 (Registration Date: April 3, 2018) Republic of Korea Registered Patent No. 10-2649134 (Registration Date: March 14, 2024) The problem to be solved

[0007] The present invention has been devised to solve the aforementioned problems. The main objective of the present invention is to provide an underground excavation method capable of continuous underground excavation and soil removal, which involves pushing the soil removed during small-diameter tunnel excavation to the rear of the lead body and injecting a mixture of soil removed on the ground at high pressure toward the front of the tunneler's head to fill the space between the lead body and the ground or between the propulsion pipe and the ground, while simultaneously reducing frictional resistance with the excavation surface of the head and preventing solid soil from causing a decrease in rotational force of the head, thereby increasing the workability of the head, and facilitating the discharge of soil accumulated inside or at the rear of the lead body, thereby significantly improving work efficiency and operational stability of the tunneler.

[0008] Another objective of the present invention is to provide an underground excavation method capable of continuous underground excavation and soil removal, which improves economic efficiency by simultaneously performing continuous processes of excavation and soil removal, thereby shortening the construction period and reducing construction costs. means of solving the problem

[0009] An embodiment of the present invention for achieving the above objective is an underground excavation method capable of continuous underground excavation and soil removal, comprising: a excavating machine in which a head unit mounted on a face plate at the front end of a cylindrical lead body is disposed to control horizontal movement of the ground and change of direction of the lead body, and a control unit disposed at the rear end of the lead body to control the excavation; a pusher that pushes the excavating machine forward; a control device that controls the operation of the excavating machine and the pusher; a soil removal pipe located at the rear end of the lead body connected to an external soil removal facility to suck and discharge soil; a plurality of thrust pipes having the same diameter as the lead body of the excavating machine; and an injection pipe connected to an additive injection device externally that mixes soil and additives and sprays at high pressure toward the center of the head unit of the lead body.

[0010] A step of installing the above-mentioned control device on the ground and installing the above-mentioned indenter and tunneler inside the vertical shaft;

[0011] A step of driving the above-mentioned tunneling machine to excavate the ground while simultaneously discharging excavated soil and crushed rocks to the surface, and pushing the above-mentioned tunneling machine in a horizontal direction to advance it using the above-mentioned indenter;

[0012] A step of repeatedly inserting and installing a thrust pipe between the tunneler and the presser as the tunneler advances;

[0013] The present invention provides an underground excavation method capable of continuous underground excavation and soil removal, comprising the step of lifting and recovering the tunneling machine and the indenter when the tunneling machine reaches the vertical shaft.

[0015] Meanwhile, the present invention provides an underground excavation method capable of continuous underground excavation and soil removal, which further includes a step in which, during the soil removal process in the above-mentioned excavation stage, high-concentration soil accumulates within the lead body and a high-pressure signal due to pressure increase is generated by a soil pressure gauge provided at the bottom of the lead body, thereby spraying water forward of the head unit through a water supply pipe, one end of which is connected to a water storage tank on the ground adjacent to the launching vertical shaft and the other end of which is located at the center of the head unit.

[0017] Meanwhile, the present invention provides an underground excavation method capable of continuous underground excavation and soil removal, which further includes a step in which, during the above-mentioned excavation stage, protruding reaction parts are arranged radially on the outer circumference of the rear of the lead body, the outer surface of which is a horizontal plane and has a sharp protrusion formed on the front surface, and high-concentration soil is moved between the reaction parts and the reaction parts, and the soil is sucked in through a soil suction port located at the rear of the lead body for the reaction parts and introduced into a soil removal storage unit. Effects of the invention

[0018] The underground excavation method according to the present invention, which enables continuous underground excavation and soil removal operations, has the effect of significantly improving work efficiency and operational stability of the excavator, as well as increasing the workability of the head part, by injecting a mixture of soil removed on the surface at high pressure toward the front of the head part of the excavator to fill the space between the lead body and the ground or between the propulsion pipe and the ground, while simultaneously reducing frictional resistance with the excavation surface of the head part and preventing solid soil from causing a decrease in the rotational force of the head part. Brief explanation of the drawing

[0019] FIG. 1 is a flowchart illustrating an underground excavation method capable of continuous underground excavation and soil removal according to an embodiment of the present invention. FIG. 2 is a cross-sectional view of the excavation process of an underground excavation method capable of continuous underground excavation and soil removal according to an embodiment of the present invention. FIG. 3 is an example diagram of a process for installing a disassembled tunneling machine in an underground excavation method capable of continuous underground tunneling and soil removal according to an embodiment of the present invention. FIG. 4 is an example process diagram of a tunneling machine configured with an underground excavation method capable of continuous underground tunneling and soil removal according to an embodiment of the present invention. FIG. 5 is a front view (a) of the lead body of the tunneling machine and a cross-sectional view of part AA in an underground excavation method capable of continuous underground tunneling and soil removal according to an embodiment of the present invention. FIG. 6 is a structural diagram of a leading body having a reaction disc formed thereon in an underground excavation method capable of continuous underground excavation and soil removal according to an embodiment of the present invention. FIG. 7 is a cross-sectional view of a soil removal guidance channel formed on the outer circumference of the rear end of a lead body in an underground excavation method capable of continuous underground excavation and soil removal according to an embodiment of the present invention. Specific details for implementing the invention

[0020] Embodiments that enable a person skilled in the art to easily practice the present invention are described in detail below with reference to the attached drawings. However, in describing the operating principles of preferred embodiments of the present invention in detail, if it is determined that a specific description of related known functions or configurations may unnecessarily obscure the essence of the present invention, such detailed description is omitted.

[0021] In addition, the same reference numerals are used for parts having similar functions and operations throughout the drawings. Throughout the specification, when a part is described as being connected to another part, this includes not only cases where they are directly connected, but also cases where they are indirectly connected with other elements in between. Furthermore, unless specifically stated otherwise, the inclusion of a certain component does not exclude other components but implies that additional components may be included.

[0022] In addition, any limitations or additions to an embodiment in this specification may apply not only to a specific embodiment but also to other embodiments.

[0023] In addition, throughout the description and claims of the present invention, anything indicated in the singular includes cases where it is plural unless otherwise noted.

[0024] An embodiment of the present invention is an underground excavation method capable of continuous underground excavation and soil removal, comprising: a drilling machine (100) that excavates by having a head portion (110) mounted on a face plate at the front end of a cylindrical lead body (120) and a control body (140) connected and arranged at the rear end of the lead body (120) to control horizontal movement of the ground and change of direction of the lead body (120); a pusher (30) that pushes the drilling machine (100) forward; a control device (400) that controls the operation of the drilling machine (100) and the pusher (30); a soil removal pipe (123) located at the rear end of the lead body (120) and connected to a soil removal facility (500) located externally to suck and discharge soil; and a plurality of propulsion pipes (200) having the same pipe diameter as the lead body (120) of the drilling machine (100). Using an injection pipe (600) connected to an injection device (700) that mixes soil and additives externally and sprays at high pressure into the center of the head portion (110) of the lead body (120),

[0025] Step (S10) of installing the above control device (400) on the ground and installing the above pressurizer (30) and the drilling machine (100) inside the vertical shaft (20);

[0026] Step (S20) of driving the above-mentioned tunneling machine (100) to excavate the ground and simultaneously discharge the excavated soil and crushed rocks to the surface, and pushing the above-mentioned tunneling machine (100) forward in a horizontal direction with the above-mentioned indenter (30);

[0027] Step (S30) of repeatedly inserting and installing a propulsion pipe (200) between the tunneling machine (100) and the insertion machine (30) as the tunneling machine (100) advances;

[0028] A method for underground excavation capable of continuous underground excavation and soil removal is provided, comprising the step (S40) of lifting and recovering the tunneling machine (100) and the press-in machine (30) when the tunneling machine (100) reaches the vertical shaft.

[0030] First, as shown in FIGS. 2 to 4, the tunneling machine (100) is a device for horizontally excavating the ground, having a head portion (110) formed on the face plate of the front end of a cylindrical lead body (120) with first and second rotating bodies (110a) (110b) mounted thereon.

[0031] Inside the above-mentioned cylindrical lead body (110), there is provided an electric motor for driving the head part (110), a direction correction jack (160) for controlling the excavation direction, and a pressure pump (122) for sucking in and pumping soil generated during excavation, and as needed, a soil pressure gauge for measuring the pressure of the soil discharge pipe (123) that discharges soil by the pressure pump (122), a position information sensor for determining the position of the lead body (120), etc., can be installed.

[0032] The head portion (110) is a component mounted on the front plate of the lead body (120) to excavate the ground, and can be configured and arranged in various forms. However, a first rotating body (110a) in the shape of a hemisphere or pointed, arranged in a plurality of cylindrical shapes on the outer circumference of the face plate, and a second rotating body (110b) in the shape of a hemisphere or pointed, arranged in a plurality of cylindrical shapes on the inner circumference of the face plate, are each provided along an axis and configured to rotate axially so that the inside and outside of the excavation hole are crushed simultaneously. In particular, it has a double crushing structure in which the soil crushed on the outside of the excavation hole by the first rotating body (110a) is crushed again by the second rotating body (110b).

[0033] And, the above-mentioned leading body (120) is divided into a front part (120a) on the front side and a rear part (120b) on the rear side, and the front part (120a) is configured with a direction control jack (160), etc., and the connecting part (120b) has a structure that is separated and coupled with the front part (120a) with a pressure pump (122) inside and a soil inlet (121) on the outer side formed by being configured, and the control body (140) is configured with control devices to perform power generation and control of the first and second rotating bodies (110a) (110b) of the head part (110) and power generation and control of the direction control jack (160), etc., and the reaction plate part (130) described later may be provided on the front outer side of the front part (120).

[0035] And, as shown in FIG. 2, the inserter (30) is equipment that pushes the tunneling machine (100) forward and inserts the propulsion pipe (200), and the inserter (30) is installed to be in contact with one side wall of the launching vertical shaft (20) and is structured to push the tunneling machine (100) to the opposite side of the wall.

[0036] Although detailed drawings are not shown, the above-described press-in machine (30) may be configured to include a vertically erected reaction plate, a propulsion support connected at a right angle in a horizontal direction to the bottom of the reaction plate, a plurality of propulsion jacks installed horizontally on the reaction plate to apply pressure in a forward direction, and a propulsion plate connected to move back and forth together with the propulsion jacks to form an opposing surface spaced apart from the reaction plate. In this case, the lead body (120) of the tunneling machine (100) is first mounted on the propulsion support, and the rear end of the lead body (120) of the tunneling machine (100) is installed to be in contact with the propulsion plate. When the propulsion jacks apply pressure in a forward direction while supported on the reaction plate, the propulsion plate moves forward and pushes the tunneling machine (100) to drive it. Subsequently, the control body (140) is connected to the rear end of the lead body (120) to press-in the machine in the manner described above.

[0038] And, as shown in FIGS. 2 and 4, the control device (400) is a device that controls the operation of the tunneling machine (100) and the insertion machine (30), and the control device (400) is installed on the ground so that the operation of the tunneling machine (100) and the insertion machine (30) can be operated automatically or manually.

[0040] And, as shown in FIG. 2, the soil removal facility (500) is a facility that separates, recovers, purifies, and supplies the removed soil. In the supply of slurry or slurry, the slurry supply facility or the soil removal supply facility is additionally installed to prevent ground subsidence when excavating clay soil and supplies slurry or slurry to the excavation surface. The above-mentioned slurry supply facility and soil removal supply facility can both be installed on the ground where the launching vertical shaft (20) is located. At this time, the slurry or slurry is supplied through the injection pipe (600), and the supply of slurry or slurry can be selected and controlled according to the form of the ground being excavated, such as bedrock or gravel.

[0041] The above-mentioned slurry supply facility is configured such that an injection pipe (600) is connected within the leading body (120) of the above-mentioned tunneling machine (100) and the end of the injection pipe (600) is positioned at the tip of the head section (110), and the injection pipe (600) connected from the ground is connected into the interior of the tunneling machine to supply slurry to the tip of the above-mentioned tunneling machine (100), and a slurry tank (not shown) in the soil removal facility (500) is included to supply slurry to the injection pipe (600). That is, the slurry stored in the slurry tank installed on the ground is injected into the excavation surface through the injection pipe (600).

[0042] In addition, the soil removal supply facility mixes the soil excavated by the tunneling machine (100) with water to form a slurry, which is then injected or sprayed forward of the leading body (120). The facility is configured to include an injection pipe (600) connected to a hose extending from the ground to supply the slurry to the leading end of the tunneling machine (100), and a soil removal tank (not shown) that supplies the slurry to the injection pipe (600) in the soil removal facility (500). That is, the slurry stored in the soil removal tank installed on the ground is injected into the excavation surface through the injection pipe (600), thereby supporting the excavation hole by compressing the inner surface of the excavation hole to a predetermined thickness.

[0044] And, as shown in FIG. 2, the soil discharge facility (500) is a facility that sucks up soil generated by the operation of the tunneling machine (100) and discharges it to the ground. Since the soil must be liquefied to facilitate suction and discharge, it is mixed with slurry or water sprayed or injected into the front end of the tunneling machine (100) to form clay and flows into the leading body (120). At this time, the soil is sucked up by a pressure pump (122) placed inside the leading body (120) and flows through the soil discharge pipe (123) into a soil discharge storage hop (not shown) on the ground near the launching vertical shaft for storage. In the soil discharge facility (500), a separator (not shown) for separating soil and gravel is provided in the soil discharge storage hop connected to the soil discharge pipe (123) that extends to the ground and is linked to the pressure pump (122) installed inside the leading body (120) of the tunneling machine (100). And the It may further include an above-ground sedimentation tank (not shown) that receives clay discharged through the discharge pipe (123) and settles soil and crushed rocks.

[0045] Meanwhile, the water separated from the clay in the sedimentation tank can be recycled by supplying it to the water tank. Additionally, the clay separated from the sedimentation tank separates crushed rocks and soil and separates soil and water through separators. At this time, fine soil particles among the separated soil particles are made into a slurry by adding water or additives and moved to the tip of the tunneling machine (100) through the injection pipe (600) to be injected.

[0047] And, as shown in FIG. 2, the propulsion pipe (200) remains as a tunnel or sewer pipe after excavation, and during the progress of the construction method, it is installed between the tunneling machine (100) and the insertion machine (30) and performs the role of pushing the tunneling machine (100) as the excavation progresses. Since the propulsion pipe (200) must be inserted into the excavation formed by the tunneling machine (100), it is formed with the same pipe diameter as the lead body (120) or reaction plate part (130) of the tunneling machine (100), and multiple pipes are used to be arranged and connected according to the distance between the launching vertical shaft (20) and the reaching vertical shaft.

[0049] And, as shown in FIGS. 2 and 4, a plurality of directional control jacks (160) are arranged circumferentially at equal intervals at the rear of the lead body (120) to control the extension length of the directional control jacks (160) and to pull the lead body (120) equipped with the head part (110) in the excavation direction, thereby causing the head part (110) of the lead body (120) to be pressed into the excavation surface in the ground, and the communication module continuously transmits location information or direction information to a receiver on the ground.

[0050] In addition, the direction control jack (160) can be controlled to move by changing the direction of the lead body (120) to a set curved direction instead of a control method that pulls the lead body (120) in a set direction of travel when a deviation in displacement occurs while the direction control jack (160) is moving in the excavation direction of the lead body (120).

[0052] Below, the underground excavation method for small-diameter pipes according to the present invention is described in detail as illustrated in FIG. 1.

[0053] First, the step (S10) is to install the above-mentioned control device (400) on the ground and to install the above-mentioned presser (30) and the tunneling machine (100) inside the launching vertical shaft (20). When installing the presser (30), which is configured to include a reaction plate, a propulsion support, a propulsion jack, and a propulsion plate as described above, in this step, the lead body (120) of the tunneling machine (100) is mounted on the propulsion support, and the rear end is installed to be in contact with the propulsion plate.

[0055] And, as shown in FIGS. 1 to 3, after the installation step (S10) of the tunneling machine (100), the tunneling machine (100) is driven to excavate the ground and simultaneously discharge the excavated soil and crushed rocks to the ground, and the tunneling machine (100) is pushed forward in a horizontal direction by the indenter (30) (S20). In the above step S20, when excavation work is first performed in the launching vertical shaft (20), there is a risk of ground collapse or road surface subsidence at the entrance of the excavation shaft, so a temporary wall (not shown) is installed at the entrance of the excavation shaft. The temporary wall serves as a launching shaft and also performs the role of preventing groundwater, slurry, soil, etc. generated while the excavating machine (100) proceeds with excavation work from flowing into the launching vertical shaft (20). Furthermore, the excavated soil is introduced into the interior of the lead body, and the soil is forcibly sucked in by the operation of the pressure pump (122) and moved through the soil discharge pipe (123).

[0056] And, as shown in FIG. 2, a soil storage unit (124) is disposed between the pressure pump (122) and the soil discharge pipe (123). At this time, two discharge pipes (not shown) are separately connected to the end of the soil discharge pipe (123) adjacent to the pressure pump (122). At this time, one of the two discharge pipes connected to the end of the soil discharge pipe (123) is directly connected to the pressure pump (122), while the other discharge pipe is connected to the soil storage unit (124). Soil introduced through the soil suction port (121) formed on the lower outer surface of the rear of the lead body (120) is received and stored in the soil storage unit (124). The soil is mud, which is soil with a high specific gravity among the excavated soil, moves to the rear of the lead body (120). At this time, the soil may be of high concentration, so it increases frictional force when the lead body (120) or the propulsion pipe (200) moves, thereby hindering movement. Soil is sucked in through a suction pipe (not shown) connected to a soil suction port (121) by the operation of a suction pump (not shown) placed within the lead body (120) and stored in a soil discharge storage unit (124).

[0057] And, when the soil stored in the soil discharge storage unit (124) reaches a predetermined water level, it moves to the ground through the discharge pipe (123) via the discharge pipe connected to the soil discharge storage unit (124) by the operation of the externally positioned suction pump; at this time, the operation of the pressure pump (122) stops when the soil in the soil discharge storage unit (124) moves, and on the other hand, the soil contained in the soil discharge storage unit (124) can be manufactured into a slurry and used by supplying water as described later. At this time, an injection pipe (600) is connected to the soil discharge storage unit (124) to spray and inject the slurry in front of the head unit (110); that is, by installing a supply pipe (not shown) to mutually connect one side of the injection pipe (600) adjacent to the soil discharge storage unit (124) and the soil discharge storage unit (124), the slurry stored in the soil discharge storage unit (124) is moved to the injection pipe (600). A spray pump (not shown) is connected to a supply pipe so as to pump and spray forward of the head part (110).

[0059] And, as shown in FIGS. 1 and 2, after the step (S20) of moving the lead body (120), as the tunneling machine (100) advances, the propulsion pipe (200) is repeatedly inserted and installed between the tunneling machine (100) and the injector (30) (S30). In order to stabilize the excavation hole, slurry injection, excavation work, and propulsion work must be carried out simultaneously, and in the case of soft ground, water injection work can be carried out in parallel.

[0061] And, as shown in FIG. 1, when the tunneling machine (100) reaches the reaching vertical shaft (not shown), the tunneling machine (100) and the jacking machine (30) are lifted and recovered, and the connecting member is dismantled from the propulsion pipe (200) and lifted (S40). In the tunneling completion stage, a temporary wall (not shown) is installed at the area where the tunneling machine (100) reaches the reaching vertical shaft to prevent ground collapse or road surface sinking. The temporary wall also serves to prevent groundwater, slurry, soil, etc. from flowing into the reaching vertical shaft and collapsing when the tunneling machine (100) reaches the reaching vertical shaft, in the gap between the earth retaining cut surface and the tunneling machine.

[0063] In addition, as shown in Fig. 1, during the soil removal process in step S20, a high concentration of soil is accumulated in the lead body (120), and when a high pressure signal is generated due to a pressure increase by a soil pressure gauge provided in the lower part of the lead body (120), a step (S21) of spraying water forward of the head part (110) is further included. In order to spray water forward of the head part (110), a water supply pipe (not shown) is arranged with one end connected to a water storage tank (not shown) on the ground adjacent to the launching vertical shaft (20) and the other end located in the center of the head part (110). As water is sprayed forward of the head part (110) through the water supply pipe, the soil and water are mixed and flow into the lead body (120), thereby penetrating moisture into the soil accumulated in the lead body (120) and reducing the concentration of the soil.

[0064] The location and structure of the above-mentioned water supply pipe are positioned adjacent to the location of the injection pipe (600) described above and are placed inside the propulsion pipe (200) and the tunneling body (100).

[0065] The step of spraying water forward of the head section (110) through the water supply pipe is performed by controlling the water supply according to the amount or flow rate of the soil discharged through the soil discharge pipe (123) or the high-pressure signal generated by the increase in pressure of the soil pressure gauge. When the amount or flow rate of the soil discharged along the soil discharge pipe (123) has high viscosity, the discharge amount and flow rate decrease, and it is determined that the soil is accumulating within the lead body (120), so water is sprayed forward of the head section (110) through the water supply pipe.

[0066] Additionally, one end of the water supply pipe is connected to the soil storage unit (124), and at this time, only the water separated due to the difference in specific gravity between the soil and water stored in the soil storage unit (124) can be sprayed through the water supply pipe to the other end of the water supply pipe located on the front surface of the head unit (110).

[0068] And, as shown in FIGS. 1, 5 to 6, a step (S22) is further included in which high-concentration soil is moved to the outer circumference of the rear end of the aforementioned leading body (120) during step S20, and high-concentration soil is sucked in through the soil suction port (121) and introduced into the soil discharge storage unit (124). On the outer circumference of the rear end of the leading body (120), protruding reaction parts (125) are arranged radially, with the outer surface being a horizontal plane and a sharp projection (125-1) formed on the front end. High-concentration soil is moved between the reaction parts (125) and the reaction parts (125), and the soil is sucked in through the soil suction port (121) located at the rear end of the leading body (120) and stored in the soil discharge storage unit (124).

[0069] The above soil suction port (121) is formed to be internally connected to the lower outer circumference of the rear end of the lead body (120), that is, high-concentration soil moved through the reaction part (125) flows down to the lower outer circumference of the rear end of the lead body (120) and is sucked in by the suction force of the soil suction port (121) and stored in the soil discharge storage part (124).

[0071] In addition, as shown in FIGS. 1 and 7, after the step (S22) of introducing and storing soil into the soil discharge storage unit, a step (S23) of sucking up the remaining soil to store the soil discharge storage unit (124) by sucking up the high-concentration soil accumulated on the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140), and to prevent the propulsion force from decreasing by increasing friction between the inner surface of the excavation hole and the outer surface of the propulsion pipe, some of the soil sucked up through the soil suction port (121) is moved to the rear end of the lead body (120), and the remaining soil suction step is further included to solve the problem.

[0072] A soil induction channel (150) is provided on both sides of the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140) in a mutually symmetrical shape. The soil induction channel (150) is formed in a shape in which the area gradually increases in the diameter direction around the perimeter of the lead body (120) or the control body (140). The end of the soil induction channel (150) with a wide area is located on the upper and lower sides of the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140), and a suction hole (151) penetrating into the interior of the lead body (120) or the control body (140) is formed to be connected to the front of the end of the soil induction channel (150) with a wide area. A suction pipe (not shown) and a suction pump (not shown) are provided in mutual connection between the suction hole (151) and the soil discharge storage unit (124), that is, by the operation of the suction pump Soil is sucked in from the suction port (151) and then fed into the soil storage unit (124) through the suction pipe.

[0073] And, the operation of the suction pump is such that when a high-pressure signal is generated due to a rise in pressure of the soil pressure gauge mounted on one side of the front of the soil induction channel (150), the suction pump operates to suck in soil through the suction hole (151).

[0074] Soil that has been moved to the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140) is guided along the front of the soil induction channel (150) and rotates in the circumferential direction, concentrating at the end of the soil induction channel (150) which has a large cross-sectional area and a wide surface area, and is sucked in through the suction hole (151) located at the end of the soil induction channel (150) which has a wide surface area.

[0076] And, as shown in FIGS. 5 and 6, the method further includes a step (S21) in which, after step S20 or before step S22 in which soil is stored in the soil storage section, the excavated high-viscosity soil moved to the outer circumference of the lead body (120) by the operation of the tunneling machine (100) is moved to the rear outer circumference of the lead body (120), so that the high-viscosity soil collides and moves to form dispersed or decomposed soil, and is then introduced through the soil suction port (121) connected to the soil suction port (121) described above, which is internally connected to one side of the rear outer circumference of the lead body (120), and is moved to the soil storage path (124) or discharged through the soil pipe (123). At this time, a cylindrical shape spaced apart from the rear outer circumference of the face plate of the tunneling machine (100) is used so that a collision occurs as the high-viscosity soil moves to the rear of the lead body. A reaction disc section (130) is mounted, and a vertical plate-shaped impact plate (131) that is larger than the length of the reaction disc (130) is arranged radially between the inner surface of the reaction disc (130) and the outer surface of the lead body (120), and at this time, the front end of the impact plate (131) is formed to extend further from the front end of the reaction disc (130).

[0077] The aforementioned high-viscosity soil is moved to the rear outer circumference by the lead body (120) and collides with the impact plate (131) of the reaction plate (130), moving into the space between the impact plates (131), and the principle of dispersing the soil, or the principle of breaking down the high-viscosity soil attached to the inner circumference of the tunneling hole by the impact plate (131) of the reaction plate (130) through the forward movement of the tunneling machine (100).

[0078] By being formed to protrude further forward from the impact plate (131), the high-viscosity soil located in front of the reaction plate (130) is preemptively impacted, thereby reducing the resistance to the forward movement of the reaction plate (130) against shear.

[0080] The present specification and drawings disclose preferred embodiments of the present invention. Although specific terms have been used, they are used merely in a general sense to facilitate the explanation of the technical content of the present invention and to aid in understanding the invention, and are not intended to limit the scope of the present invention. It is obvious to those skilled in the art that, in addition to the embodiments disclosed herein, other variations based on the technical concept of the present invention are possible. Explanation of the symbols

[0081] Tunneling machine 100 Head section 110 First rotating body 110a Second rotating body 110b Lead body 120 Front section 120a Connection part 120b Soil discharge suction port 121 Pressure pump 122 Soil removal pipe 123 Soil removal storage section 124 Reaction section 125 Protrusion 125-1 Reaction disc section 130 Impact plate 131 Control unit 140 Soil exhaust guidance channel 150 Suction port 151 Propeller 200 Control device 400 Soil removal equipment 500 Injection tube 600

Claims

Claim 1 A drilling machine (100) that excavates by connecting a control body (140) to the rear of a cylindrical lead body (120) to control horizontal movement of the ground and change of direction of the lead body (120) while a head part (110) is mounted on the front face plate of the lead body (120); a pusher (30) that pushes the drilling machine (100) forward; a control device (400) that controls the operation of the drilling machine (100) and the pusher (30); a soil discharge pipe (123) located at the rear of the lead body (120) and connected to a soil discharge facility (500) located externally to suck and discharge soil; and a plurality of propulsion pipes (200) having the same diameter as the lead body (120) of the drilling machine (100). Using an injection pipe (600) connected to an injection device (700) that mixes soil and additives externally and sprays at high pressure into the center of the head portion (110) of the lead body (120); installing the control device (400) on the ground and installing the injector (30) and the tunneling machine (100) inside the launching vertical shaft (20) (S10); driving the tunneling machine (100) to excavate the ground and simultaneously discharge soil and crushed rocks to the ground, and pushing the tunneling machine (100) forward in a horizontal direction with the injector (30) (S20); during step S20, protruding reaction portions (125) are arranged radially on the rear outer circumference of the lead body (120), the outer surface of which is a horizontal plane and a sharp projection (125-1) formed on the front edge, and between the reaction portions (125) A method for underground excavation capable of continuous underground excavation and soil removal, characterized by comprising: a step (S22) of moving high-concentration soil and sucking the soil through a soil suction port (121) located at the rear of a leading body (120) for a reaction part (125) and flowing the soil into a soil removal storage part (124); a step (S30) of repeatedly inserting and installing a propulsion pipe (200) between the tunneling machine (100) and the insertion machine (30) as the tunneling machine (100) advances; and a step (S40) of lifting and recovering the tunneling machine (100) and the insertion machine (30) when the tunneling machine (100) reaches a vertical shaft. Claim 2 In claim 1, the soil is sucked in by a pressure pump (122) disposed within the lead body (120) and flows into a soil storage hopper on the ground near the launching vertical shaft through a soil discharge pipe (123) and is stored therein; a soil storage unit (124) is disposed between the pressure pump (122) and the soil discharge pipe (123); at this time, two discharge pipes are separately connected to the end of the soil discharge pipe (123) adjacent to the pressure pump (122); at this time, one of the two discharge pipes connected to the end of the soil discharge pipe (123) is directly connected to the pressure pump (122) and the other discharge pipe is connected to the soil storage unit (124); and soil flowing in through a soil suction port (121) formed on the rear lower outer surface of the lead body (120) is received and stored in the soil storage unit (124), characterized by an underground excavation capable of continuous underground excavation and soil discharge operation. Public method. Claim 3 A method for underground excavation capable of continuous underground excavation and soil removal, characterized in that, in the first step S20, when a high concentration of soil is accumulated in the lead body (120) during the soil removal process and a high-pressure signal due to pressure increase is generated by a soil pressure gauge provided at the bottom of the lead body (120), water is sprayed forward of the head part (110) through a water supply pipe, one end of which is connected to a water storage tank on the ground adjacent to the launching vertical shaft (20) and the other end of which is located at the center of the head part (110). Claim 4 delete Claim 5 In claim 1, a soil induction channel (150) is provided on both sides of the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140) in a mutually symmetrical shape to suck up high-concentration soil accumulated on the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140); the soil induction channel (150) is formed in a shape in which the area gradually widens in the radial direction around the lead body (120) or the control body (140); and the end portion with a wide area of ​​each soil induction channel (150) is located on the upper and lower sides of the outer circumference of the rear end of the lead body (120) or the outer circumference of the control body (140), and the remaining soil is sucked up through a suction hole (151) penetrating into the interior of the lead body (120) or the interior of the control body (140) on the front of the end portion with a wide area of ​​each soil induction channel (150). The invention is further characterized by including a step (S23) of sucking up remaining soil. Underground excavation method capable of continuous underground drilling and soil removal. Claim 6 In claim 1, the underground excavation method capable of continuous underground excavation and soil removal is further characterized by including a step prior to step S22, wherein a cylindrical reaction plate portion (130) is mounted spaced apart from the rear outer circumference of the face plate of the tunneling machine (100) so as to collide and disperse the excavated high-viscosity soil that has moved to the outer circumference of the lead body (120) by the operation of the tunneling machine (100), and a vertical plate-shaped impact plate (131) that is larger than the length of the reaction plate portion (130) is arranged radially between the inner circumference of the reaction plate portion (130) and the outer circumference of the lead body (120), so that the high-viscosity soil collides with the impact plate (131) and moves into the space between the impact plates (131) to form dispersed or decomposed soil.

Citation Information

Patent Citations

  • Muddy water type shield device

    JP1998082274A

  • Slurry type pipe jacking method and apparatus for use in the same

    JP2004346615A

  • pipe jacking constrution method using water jet

    KR1020140134422A