Prestressed Steel Pile with Remote PS Anchorage and its Construction Method

The remote tensioning method for prestressed steel piles addresses inefficiencies in conventional methods by concentrating prestress between active and dead anchors, improving buckling resistance and reducing deflection, thus enhancing structural stability and constructability.

KR103046541B1Active Publication Date: 2026-11-11윤태양
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
KR1020250179314
Authority / Receiving Office
KR · KR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2025-11-24
Publication Date
2026-11-11
Estimated Expiration
2045-11-24

AI Technical Summary

Technical Problem

Conventional methods for prestressing H-beam piles in earth retaining structures face challenges such as complex manufacturing and construction processes, reduced economic efficiency, and decreased buckling performance due to inefficient prestress distribution, especially when piles exceed transportable lengths, leading to structural weaknesses and increased deflection.

Method used

A remote tensioning method for prestressed steel piles that introduces tension at a dummy anchor at the top of the H-beam, concentrating prestress between an active anchor and a dead anchor near the center, using a dummy anchor for tensioning and a dead anchor for fixation, with an active anchor supported by an anchor fixing plate, and bracing to prevent buckling.

Benefits of technology

This method improves buckling resistance and reduces upper deflection by intensively applying prestress where needed, enhancing structural stability and constructability, while allowing for efficient beam connection and anchor reuse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112025131559487-PAT00005_ABST
    Figure 112025131559487-PAT00005_ABST
Patent Text Reader

Abstract

The present invention relates to a remote tensioning type prestressed steel pile and a method for constructing an earth retaining pile using the same. The present invention comprises: an H-beam having a predetermined length; a plurality of PS steel wires for introducing prestress into the H-beam; a dummy anchor installed at the top of the H-beam to guide the PS steel wires during tensioning and removed after the introduction of tension force is completed; a dead anchor positioned at the bottom of the H-beam to fix the bottom of the PS steel wires by means of a wedge; and an active anchor installed on the H-beam to be located between the dummy anchor and the dead anchor and configured to anchor the PS steel wires by means of a wedge; wherein the tensioning of the PS steel wires is performed at the dummy anchor, but the prestress is introduced in the section between the active anchor and the dead anchor. In this invention, since prestress is introduced intensively only in the section between the active anchor installed below the dummy anchor and the dead anchor installed at the bottom of the H-beam, the effective buckling length of the pile is substantially shortened compared to the conventional method, and consequently, the buckling resistance is significantly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to a prestressed steel pile for earth retaining used in earth retaining construction, underground structure excavation construction, etc., and in particular, to a prestressed steel pile of a remote tensioning type that can remotely implement tensioning by performing tensioning of PS steel wires at a dummy anchor installed at the top of an H-beam exposed to the ground, and introducing prestressing force only to the active anchor and dead anchor sections located near the center of the underground H-beam, and a method for constructing an earth retaining pile using the same. Background Technology

[0002] In order to introduce prestress in conventional H-beam piles for earth retaining, a side anchorage method has typically been used, in which upper and lower anchorages are installed on the side of the H-beam flange. However, this method requires installing an anchor plate on the side of the flange and machining a large number (approximately 20) of bolt holes to fasten anchor bolts, which has resulted in complex manufacturing and construction processes, low economic efficiency, and significantly reduced on-site constructability.

[0003] In addition, although the lower anchorage can be installed in the center as well as at the bottom of the beam in the lateral anchorage method, it was difficult to concentrate prestress in more effective locations (e.g., near the point where the maximum moment occurs) during actual construction. In particular, in the lateral anchorage method, the upper and lower anchorages are effectively located near both ends of the H-beam, so when prestress is introduced, the entire length of the pile has a long free length, which causes a problem in that the buckling performance, which is inversely proportional to the square of the length, decreases rapidly.

[0004] Meanwhile, since piles for earth retaining walls often exceed the typical transportable steel length (about 12 m), upper and lower H-beams must be joined at the site. However, conventional lateral anchorage methods have problems where both constructability and structural safety are reduced because it is difficult to stably introduce prestress due to interference between these beam joints and the limited boreholes.

[0005] Furthermore, conventional prestressing methods have various structural problems, such as the upper anchorage transmitting prestress across the entire length of the pile; since this introduces unnecessary compressive force to the upper part of the pile rather than below the center where the maximum moment is generated by the applied earth pressure, it not only weakens the resistance performance of the beam itself but also increases the risk of buckling and fails to sufficiently control the upper deflection of the pile. Prior art literature

[0006] Registered Patent Publication No. 10-2162467 (2020.09.25) The problem to be solved

[0007] The objective of the present invention is to provide a remotely tensioned prestressed steel pile and a method for constructing an earth retaining pile using the same, which enables remote tensioning at the dummy anchor at the top of the steel pile and allows for the intensive introduction of prestressing in the section between the active anchor and the dead anchor where the maximum moment occurs, thereby significantly improving buckling resistance performance, resulting in a higher prestressing effect than conventional methods, and more effectively reducing upper deflection caused by earth pressure, while also serving as both a beam connection and an anchor. means of solving the problem

[0008] A remote tensioning type prestressed steel pile (A) according to the present invention comprises: an H-beam (10) having a predetermined length; a plurality of PS steel wires (20) for introducing prestress into the H-beam (10); a dummy anchor (30) installed at the top of the H-beam (10) to guide the PS steel wires during tensioning work and removed after the introduction of tension force is completed; a dead anchor (40) positioned at the bottom of the H-beam (10) to fix the bottom of the PS steel wires (20) by means of a wedge (410); and an active anchor (50) installed on the H-beam (10) to be positioned between the dummy anchor (30) and the dead anchor (40) and configured to anchor the PS steel wires (20) by having a wedge (510). The tensioning work of the PS steel wires (20) is performed at the dummy anchor (30), but prestress is introduced only in the section between the active anchor (50) and the dead anchor (40).

[0009] Additionally, the active anchor (50) is supported by an anchor fixing plate (550) that is fixedly installed on the inner surface (101a) of the flange of the H-beam, and the anchor fixing plate (550) is provided with one or more stiffeners (551), and the active anchor (50) is integrally fixed to the upper end of the stiffener (551).

[0010] Furthermore, the anchor fixing plate (550) is installed to connect the inner flange surfaces (101a, 101a') of the upper and lower H-beams (10, 10') so that the upper H-beam (10) and the lower H-beam (10') divided vertically are interconnected.

[0011] In addition, the active anchor (50) comprises: a wedge (510) for anchoring the PS steel wire (20); an anchor block (520) having a wedge hole (521) into which the wedge (510) is received; and an upper stopper plate (530) fixedly installed on the top of the anchor block (520) and having a hole (531) for the PS steel wire that is smaller than the outer diameter of the wedge (510) so as not to move upward when the PS steel wire (20) is tensioned.

[0012] Additionally, the active fixing device (50) further includes a spring washer (540) which is provided on the upper part of the anchor block (520) to be positioned between the upper stopper plate (530) and the wedge (510), and which presses the wedge (510) against the wedge hole (521) by a compressive force after the tension of the PS steel wire (20) is released.

[0013] And, at the upper and lower ends of the H-beam (10), a stiffener (103) for supporting the dummy anchor (30) and dead anchor (40) is integrally provided on the web (102).

[0014] Meanwhile, a pile structure for earth retaining formed by inserting a prestressed steel pile (A) of the remote tensioning method according to the present invention into a bore hole comprises: an H-beam (10) having a predetermined length; a plurality of PS steel wires (20) for introducing prestress into the H-beam (10); a dummy anchor (30) installed at the top of the H-beam (10) to guide the PS steel wires during tensioning work and removed after the introduction of tension force is completed; a dead anchor (40) positioned at the bottom of the H-beam (10) to fix the bottom of the PS steel wires (20) by means of a wedge (410); and an active anchor (50) installed on the H-beam (10) to be positioned between the dummy anchor (30) and the dead anchor (40), and configured to anchor the PS steel wires (20) by having a wedge (510). Bracing (60) is provided, which is positioned on both sides of the web (102) of the H-beam (10) exposed above the ground and is fixed to the ground by a fixing rod (610) to prevent buckling of the H-beam (10) when tension is introduced.

[0015] Meanwhile, in a method for constructing a pile for earth retaining using a prestressed steel pile (A); an H-beam preparation step (S10) in which a dead anchor (40) and an active anchor (50) are respectively installed on an H-beam (10) of a predetermined length on the ground and a plurality of PS steel wires (20) are bound together to connect the dead anchor (40) and the active anchor (50); an H-beam insertion step (S20) in which the H-beam (10) is inserted into a bore hole; and a PS steel wire tensioning step (S30) in which a dummy anchor (30) is installed on the upper end of the H-beam (10) and the PS steel wires (20) are tensioned upward from the dummy anchor (30). and a prestress introduction step (S40) in which the tension applied to the PS steel wire (20) is released so that the wedge (510) of the active anchor (50) is pressed against the anchor block (520) by the compressive force of the PS steel wire (20), thereby introducing prestress into the section between the active anchor (50) and the dead anchor (40).

[0016] And, the method for constructing a pile for earth retaining according to the present invention further includes a pile anchor removal step (S50) for removing the pile anchor (30). Effects of the invention

[0017] The present invention can intensively introduce prestress in the section between the active anchor installed below the dummy anchor of an H-beam where the maximum moment occurs and the dead anchor installed at the bottom using a remote tensioning method.

[0018] In particular, the effective buckling length of the pile is substantially shortened compared to the conventional method, and consequently, the buckling resistance performance is improved, which can significantly enhance the prestressing effect.

[0019] In addition, since the prestressing moment acts in the opposite direction to the deflection occurring at the top of the pile, the upper deflection is effectively reduced, and the moment generated by earth pressure can be reduced more significantly, thereby improving the structural stability of the entire pile.

[0020] More specifically, the present invention is a remote tensioning method that safely performs tensioning work on the ground through an upper dummy anchor and concentrates the actual prestress on the active and dead anchor sections located in the center, thereby having the effect of significantly improving constructability and safety.

[0021] In addition, the present invention allows the active anchor to be integrally fixed to the inner surface of the flange of an H-beam or the beam connection part via an anchor fixing plate, so that even when length joints of steel piles are required, the anchor does not interfere with the H-beam connection part, and the anchor can also serve as a connection part, thereby increasing construction efficiency. Brief explanation of the drawing

[0022] FIG. 1 is an exemplary diagram showing the configuration of a prestressed steel pile according to the present invention. FIG. 2 is an exemplary diagram showing the side configuration of a prestressed steel pile according to the present invention. FIG. 3 is an exemplary diagram showing the basic configuration of a dummy anchor and a dead anchor according to the present invention. FIG. 4 is an exemplary diagram showing the configuration of an active fixing device according to the present invention. FIG. 5 is an exemplary diagram showing the installation state of an active fixing device according to the present invention. FIG. 6 is an example diagram showing the detailed configuration of FIG. 5. FIG. 7 is an exemplary diagram showing the bracing installation process according to the present invention. FIG. 8 is a block diagram showing a construction method according to the present invention. Specific details for implementing the invention

[0023] The main purpose of the present invention is to provide a remote tensioning type prestressed steel pile and a method for constructing a pile for earth retaining using the same, which can significantly improve buckling resistance performance, reduce upper deflection, and more effectively introduce prestress to an H-beam (10) by ensuring that prestressing force is not transmitted to the upper part of the steel pile (A) even when tensioning is performed remotely at the dummy anchor (30) at the top of the steel pile (A), and that prestress is concentrated and introduced in the section between the active anchor (50) and the dead anchor (40) mounted in the center of the steel pile (A).

[0024] First, referring to FIGS. 1 and FIGS. 2, the prestressed steel pile (A) of the present invention is implemented as a remote tensioning method (Remote PS System) in which tension is applied to the PS steel wire (20) at a dummy anchor (30) installed at the top of the H-beam (10), and the prestress is introduced intensively only in the section between the active anchor (50) and the dead anchor (40) placed on the H-beam (10). Meanwhile, the dead anchor (40) is mounted at the bottom of the H-beam (10), and the active anchor (50) is installed to be located between the dummy anchor (30) and the dead anchor (40).

[0025] The above dummy anchor (30) is structured to be mountable and detachable on the top of the H-beam (10) for tensioning the PS steel wire (20), is mounted on the top of the H-beam (10) when tensioning the PS steel wire (20), and is detached from the H-beam after tensioning is completed.

[0026] For example, with reference to FIG. 3, the dummy anchor (30) may include a support plate (310) supported on the top of the H-beam, a guide block (320) integrally formed on one side of the support plate (310) and having a guide hole (321) through which a PS steel wire (20) passes, and a catch support (330) integrally formed on the other side of the support plate (310) and having a fitting groove (331) so that the flange (101) of the H-beam is fitted and supported.

[0027] On the other hand, the above dead anchor (40) is installed at the bottom of the H-beam (10) and performs the final anchoring function for the bottom part of the PS steel wire (20).

[0028] The above dead anchor (40) may be formed with a basic structure identical to that of the dummy anchor (30) and is installed facing each other at the upper and lower ends of the H-beam. That is, as shown in FIG. 3, the above dead anchor (40) may include a support plate (410), a guide block (420), and a catch support (430). However, while the above dummy anchor (30) is configured to perform only the tensioning operation of the PS steel wire without being equipped with a wedge for anchoring the PS steel wire (20), the above dead anchor (40) differs in that, as shown in FIG. 1 (a), a wedge (440) for anchoring the PS steel wire (20) is inserted into a guide hole (421) formed in the guide block (420). That is, the above dead anchor (40) includes a wedge (410) for anchoring the PS steel wire (20) as an essential component.

[0029] Additionally, the guide hole (421) of the dead fixing member (40) is configured in a tapered shape so that the wedge (440) can be inserted in close contact, whereas, the guide hole (321) of the dummy fixing member (30) can be formed in a straight shape as well as a tapered shape so that the PS steel wire (20) can simply pass through.

[0030] In addition, the dummy anchor (30) and dead anchor (40) may be configured such that two are installed separately on the left and right sides of one flange (101) centered on the web (102) of the H-beam (10), or they may be configured as an integrated structure in which two guide blocks (320, 420) and two catch supports (330, 430) are symmetrically formed on one support plate (310, 410). It is preferable that the dummy anchor (30) and dead anchor (40) be configured as an integrated structure in which two guide blocks (320, 420) and two catch supports (330, 430) are symmetrically formed on one support plate (310, 410), as illustrated in FIGS. 1 to 3.

[0031] Additionally, the dummy anchor (30) and dead anchor (40) may be installed to be supported by each stiffener (103) integrally provided at the upper and lower ends of the web (102) of the H-beam (10), as shown in (b) of FIG. 1. That is, it is preferable that the dummy anchor (30) and dead anchor (40) be installed so that each support plate (310, 410) is simultaneously supported by the flange (101), web (102), and stiffener (103) of the H-beam (10).

[0032] The above active anchor (50) is intended to anchor the PS steel wire (20) to one side of the lower part of the dummy anchor (30), and performs the function of concentrating the prestress in the section between the active anchor (50) and the dead anchor (40) when the PS steel wire (20) is tensioned.

[0033] The above active anchor (50) includes a wedge (510) for anchoring a PS steel wire, an anchor block (520) having a wedge hole (521) into which the wedge is inserted, and an upper stopper plate (530) that closes the top of the anchor block (520) so that the wedge (510) does not deviate or move upward during the tensioning process of the PS steel wire (20).

[0034] The wedge (510) is intended to fix the PS steel wire (20) at a predetermined position, and the wedge hole (521) that accommodates it is formed inside the anchor block (520).

[0035] Additionally, the upper stopper plate (530) is fixed in a manner that covers the top of the anchor block (520), and the stopper plate (530) is provided with a PS wire hole (531) through which a PS wire (20) passes. At this time, the PS wire hole (531) is formed with a diameter smaller than the outer diameter of the wedge (510), so that only the PS wire (20) can pass through and the wedge (510) cannot pass through, thereby preventing the wedge (510) from moving upward through the PS wire hole (531).

[0036] Meanwhile, as shown in FIG. 4, the anchor block (520) may be provided with an internal space (S) that communicates with the wedge hole (521). The internal space (S) provides a clearance space for the wedge (510) to move upward when the PS steel wire (20) is tensioned. Additionally, since the upper end of the internal space (S) is closed by an upper stopper plate (530), the wedge (510) is restricted from moving further upward by the stopper plate (530).

[0037] When the tension force is released after the tension on the PS steel wire (20) is completed in the active anchor (50) configured in this way, the wedge (510) is strongly pressed against the inner surface of the wedge hole (521) by the compressive force due to the elastic restoring force of the PS steel wire (20), and thereby the wedge (510) is firmly fixed within the wedge hole (521) of the anchor block (520), so that the anchoring of the PS steel wire (20) is stably maintained.

[0038] Additionally, referring to FIG. 4, the active anchor (50) may further include a spring washer (540) installed between the upper stopper plate (530) and the wedge (510). That is, the spring washer (540) is placed within the internal space (S) of the anchor block (520).

[0039] The above spring washer (540) is compressed and deformed by the wedge (510) while tensioning the PS steel wire (20), and when tension is released, it acts to push the wedge (510) further toward the wedge hole (521) by means of elastic restoring force.

[0040] Accordingly, the internal space (S) of the anchor block (520) is formed to provide sufficient clearance so that the wedge (510) can move upward within a predetermined range during the tensioning process of the PS steel wire (20), and the optionally provided spring washer (540) can perform compression and restoration operations.

[0041] The active anchor (50) configured as described above is fixedly supported on the anchor fixing plate (550) and installed on the H-beam. At this time, the anchor fixing plate (550) may be provided with one or more stiffeners (551) as needed, and it is preferable that the active anchor (50) be fixed integrally so as to be supported on the upper end of the stiffener (551). In addition, the active anchor (50) is fixedly installed integrally on the anchor fixing plate (550) in the factory by means such as welding.

[0042] The anchor fixing plate (550) can be installed on the inner surface of a single H-beam flange (101) as shown in FIG. 1. In addition, since the total length of the pile is typically formed to be 12 m or more due to the characteristics of the pile for earth retaining, and thus transportation constraints arise, the upper H-beam (10) and the lower H-beam (10') are joined vertically at the site.

[0043] The above anchor fixing plate (550) can be implemented in a structure that is connected across the inner flange (101a) of the upper H-beam (10) and the inner flange (101a') of the lower H-beam (10'), as shown in FIGS. 5 and 6. In this configuration, the active anchor (50) can be attached simultaneously via the anchor fixing plate (550) during the connection process of the upper and lower H-beams (10, 10') without a separate process for attaching the active anchor (50) to the H-beam (10), so the construction procedure is simplified and economic efficiency can be greatly improved.

[0044] FIGS. 5(a) and FIGS. 6(a) show a structure in which upper and lower H-beams (10, 10') of the same size are vertically connected by an anchor fixing plate (550), FIGS. 5(b) and FIGS. 6(b) show a structure in which upper and lower H-beams (10, 10') of different sizes are vertically connected by an anchor fixing plate (550).

[0045] In particular, since the maximum bending moment in a self-supporting earth retaining pile generally occurs at the midpoint of the length of the H-beam (10), that is, around the 3 / 4 point, it is structurally very advantageous to place an active anchor (50) on the anchor fixing plate (550) connecting the upper and lower H-beams (10, 10'). With this arrangement, not only is the buckling resistance performance of the beam significantly improved when prestress is introduced, but an excellent effect can also be obtained in controlling the upper deflection.

[0046] In addition, the anchor fixing plate (550) with the active anchor (50) integrated therein can be bolted to both the upper and lower H-beams (10, 10') at the site, and if such a bolting method is applied, on-site welding work can be omitted. Furthermore, it is also possible to manufacture the anchor fixing plate (550) with the active anchor (50) integrated therein by welding it to the lower H-beam (10') at the factory, transport it to the site, and then bolt it to the upper H-beam (10) at the site, and in this case, on-site welding work can also be omitted.

[0047] In this way, the anchor fixing plate (550) not only has the function of fixing and supporting the active anchor (50), but also simultaneously has the function of a connecting plate that connects the upper and lower H-beams (10, 10') to each other, so there is no need to additionally install a separate bracket or reinforcement plate for installing the active anchor (50). Furthermore, the bolt fastening method allows for easy disassembly of the active anchor (50) even when the H-beam needs to be pulled out and reused in a subsequent process, thus enabling recyclability.

[0048] In this way, when the active anchor (50) is placed in the area near the center, the effective anchoring length where prestress is applied becomes shorter than the total length of the H-beam, so the effective buckling length (KL) of the beam is reduced to less than half when prestressing is introduced.

[0049] Accordingly, the buckling load of the beam (P E As shown in Equation 1 below, the value increases by approximately four times in inverse proportion to the square of the effective length (KL). Therefore, even for H-beams with the same cross-section and elastic modulus, the prestressing effect can be further enhanced by adjusting the installation position of the active anchor to near the center, thereby effectively overcoming the buckling limit that appeared in the conventional method.

[0050] [Mathematical Formula 1]

[0051] Furthermore, in the case of self-supporting earth retaining piles, it is common for significant deflection to occur at the top of the pile, and there was a limitation in that large H-beams with high rigidity had to be used to resolve this. However, as in the present invention, if prestress is concentrated in the central or lower portion of the H-beam rather than the upper portion, the magnitude of the deflection at the top of the beam caused by the prestress can be increased. Since this deflection acts in the opposite direction to the deflection caused by earth pressure, the overall deflection can be controlled more effectively through this offsetting effect.

[0052] [Mathematical Formula 2]

[0053] In other words, the deflection (△BA) caused by the prestressing moment can be expressed by Equation 2 above; assuming that a prestressing moment (M) of the same magnitude acts only on the upper 1 / 2 section of the beam, the magnitude of the deflection is (E: elastic modulus), whereas if the moment acts only on the lower 1 / 2 section of the beam, the deflection is This results in an increase of up to about three times. This is because, although the upper and lower rotation angles generated by the same upper and lower tension force are the same, the deflection caused by the tension force concentrated in the lower part induces additional rotation while maintaining the rotation angle (θ) already generated in the upper 1 / 2 section.

[0054] Since this increased deflection acts in the opposite direction to the deflection caused by earth pressure, it consequently has the effect of significantly reducing the total deflection caused by earth pressure.

[0055] In addition, if an active anchor (50) is installed near the center to apply a larger prestressing moment below the center of the H-beam (10), the resulting prestressing moment acts in the opposite direction to the bending moment caused by earth pressure, so it is offset from the moment caused by earth pressure, and the overall moment of the beam is significantly reduced.

[0056] In this way, by installing anchors to enable remote tensioning from the ground and concentrating prestress on the lower part of the H-beam, a much larger axial force can be applied than with conventional prestressing. This not only improves the performance of the beam itself but also provides excellent control over the beam's upper deflection.

[0057] Meanwhile, the earth retaining pile structure formed by inserting a prestressed steel pile (A) of the remote tensioning method according to the present invention into a drilled hole is formed by inserting the aforementioned steel pile (A) into a drilled hole in the ground, placing a pair of bracing (60) on both sides of the web (102) of the H-beam (10) exposed above the ground, and fixing it to the ground with a fixing rod (610) penetrating the bracing (60) so as to prevent buckling of the H-beam (10) when tension force is introduced.

[0058] Afterward, when the tensioning of the PS steel wire (20) is completed, the pile anchor (30) can be separated, and the remaining members can all be buried, and it is preferable that the bracing (60) is also separated and recycled after tensioning. Accordingly, the pile structure for earth retaining defined in the present invention can be defined as a state in which a steel pile (A) is embedded in a drilled hole before tensioning the PS steel wire.

[0059] FIG. 8 illustrates a block diagram showing a construction method according to the present invention. The construction method for a pile for earth retaining according to the present invention is for applying a prestressed steel pile (A) configured to intensively introduce prestress below the central part of an H-beam (10) to the site, and includes an H-beam preparation step (S10), an H-beam embedment step (S20), a PS steel wire tensioning step (S30), and a prestress introduction step (S40).

[0060] First, the H-beam preparation step (S10) involves installing a dead anchor (40) and an active anchor (50) on an H-beam (10) of a predetermined length on the ground, and arranging a plurality of PS steel wires (20) by feeding them into the H-beam (10) to connect the two anchors (40, 50). In this process, the PS steel wires (20) are arranged to be fed upward from the lower dead anchor (40) and pass through the active anchor (50).

[0061] At this time, the H-beam preparation step (S10) includes a PS steel wire installation step (S15), and the PS steel wire installation step (S15) may include a PS steel wire insertion step (S151), a wedge insertion step (S152), and an upper stopper plate coupling step (S153).

[0062] The above PS steel wire insertion step (S151) is a step of installing a dead anchor (40) at the bottom of the H-beam (10), inserting the PS steel wire (20) into the dead anchor (40) from the bottom of the H-beam (10) in an upward direction, and securing the bottom of the PS steel wire (20) to the dead anchor (40) by tensioning it from the top.

[0063] Subsequently, the wedge insertion step (S152) is a step of inserting a wedge (510) into one side of the PS steel wire (20) and pushing the wedge (510) into the wedge hole (521) inside the anchor block (520) of the active fixing device (50).

[0064] Finally, the upper stopper plate joining step (S153) is the step of joining the upper stopper plate (530) to the top of the anchor block (520) into which the wedge (510) is inserted using a bolt (B).

[0065] The upper stopper plate coupling step (S153) above can be performed by inserting a spring washer (540) so as to be placed between the wedge (51) and the upper stopper plate (530), and then bolting the upper stopper plate (530) to the top of the anchor block (520). The spring washer (540) is compressed during the bolting process of the upper stopper plate (530) and stores elastic force, and subsequently, when the tension of the PS steel wire (20) is released, it performs the function of pushing the wedge (510) downward by its elastic restoring force to more strongly adhere to the inner surface of the wedge hole (521) of the anchor block (520).

[0066] Meanwhile, the above H-beam insertion step (S20) is a step of inserting the prepared H-beam (10) into the excavated bore hole and installing it at a predetermined location.

[0067] At this time, the H-beam embedment step (S20) preferably further includes a bracing installation step (S25) to prevent buckling from occurring during the introduction of prestressing in the section where the H-beam is exposed above the ground.

[0068] Referring to FIG. 7, the bracing installation step (S25) involves inserting a pair of bracing (60) on both sides of the web (102) of the H-beam exposed above the ground, and fixing each bracing (60) to the ground using a fixing rod (610) to prevent lateral buckling in the weak axis direction of the H-beam (10). For example, the bracing (60) may be formed with a C-shaped channel cross-section to have a predetermined sectional force.

[0069] As described above, when tension force is introduced, the buckling length (L) is 100% before the active anchor is activated, making the structure vulnerable to buckling load. However, when the bracing is installed, the effective buckling coefficient (K) of Equation 1 changes from free support (2.0) to simple support (1.0), so the buckling load increases fourfold, thereby allowing the required tension force to be introduced stably.

[0070] The above PS steel wire tensioning step (S30) is a step of mounting a dummy anchor (30) on the top of the H-beam and tensioning the PS steel wire (20) in an upward direction through the dummy anchor (30). At this time, the wedge (510) inside the active anchor (50) moves upward on the internal space (S) of the anchor block, and accordingly, the spring washer (540) is further compressed. In addition, since the dummy anchor (30) is a structure designed solely for tensioning work and does not include a wedge, it guides the PS steel wire (20) but does not perform the anchoring function.

[0071] The above prestress introduction step (S40) is a step of releasing the tension of the PS steel wire at the dummy anchor (30) after sufficient tension has been introduced to the PS steel wire (20). When the tension is released, a compressive force is generated by the elastic restoring force of the PS steel wire (20), causing the wedge (510) to be strongly pressed against the inner surface of the wedge hole (521) of the anchor block (520). Additionally, since an additional compressive force is generated by the elastic restoring force of the spring washer (540) placed inside the anchor block (520), the wedge (510) is pushed downward and pressed even more against the wedge hole (521). Due to this compressive force, the PS steel wire (20) is anchored only in the section between the active anchor (50) and the dead anchor (40), and the prestress is also introduced intensively only in that same section.

[0072] Additionally, the present invention may further include a dummy anchor removal step (S50) for removing a dummy anchor (30) installed on the top of the H-beam after the prestress introduction step (S40). That is, since the dummy anchor (30) is used only for tensioning work, it can be removed after the prestress introduction and recycled.

[0073] The method for constructing a pile for earth retaining using a remote tensioning type prestressed steel pile according to the present invention, which consists of such a series of steps, significantly improves buckling resistance performance and upper deflection reduction performance by selectively introducing prestress only to the middle and lower parts of the H-beam, and ensures both safety and constructability of the prestress introduction process through the interaction of the dead anchor (40), active anchor (50), and dummy anchor (30).

[0074] The present invention is not limited to the specific preferred embodiments described above, and anyone with ordinary knowledge in the art to which the invention pertains can make various modifications without departing from the essence of the invention as claimed in the claims, and such modifications will be within the scope of the claims.

[0075] Furthermore, the terms described in this invention are intended to distinguish one component from another and to aid in understanding the invention; therefore, the components of the invention are not limited by the described terms.

[0076] In addition, the components in each drawing may be depicted with exaggerated or simplified dimensions or thicknesses for the sake of ease of understanding, but the scope of protection of the present invention should not be interpreted as being limited by this. Explanation of the symbols

[0077] 10 : H-beam 20 : PS steel wire 30 : Dummy Settlement 40 : Dead Settlement 50 : Active anchorage 60 : Bracing 510: Wedge 520: Anchor Block 530: Upper stopper plate 540: Spring washer 550: Anchor fixing plate

Claims

Claim 1 A remote tensioning type prestressed steel pile comprising: an H-beam (10) having a predetermined length; a plurality of PS steel wires (20) for introducing prestress into the H-beam (10); a dummy anchor (30) installed at the top of the H-beam (10) to guide the PS steel wires during tensioning work and removed after the introduction of tension force is completed; a dead anchor (40) positioned at the bottom of the H-beam (10) to fix the bottom of the PS steel wires (20) by a wedge (410); and an active anchor (50) installed on the H-beam (10) to be positioned between the dummy anchor (30) and the dead anchor (40) and configured to anchor the PS steel wires (20) by having a wedge (510); wherein the tensioning work of the PS steel wires (20) is performed at the dummy anchor (30), but prestress is introduced in the section between the active anchor (50) and the dead anchor (40). Claim 2 A remote tensioning type prestressed steel pile according to claim 1, wherein the active anchor (50) is supported by an anchor fixing plate (550) fixedly installed on the inner surface (101a) of the flange of an H-beam, and the anchor fixing plate (550) is provided with one or more stiffeners (551), and the active anchor (50) is integrally fixed to the upper end of the stiffener (551). Claim 3 A remote tensioning type prestressed steel pile characterized in that, in paragraph 2; the anchor fixing plate (550) is installed to connect the inner flange surfaces (101a, 101a') of the upper and lower H-beams (10, 10') so that the upper H-beam (10) and the lower H-beam (10') divided vertically are interconnected. Claim 4 A remote tensioning type prestressed steel pile according to any one of claims 1 to 3; wherein the active anchor (50) comprises: a wedge (510) for anchoring a PS steel wire (20); an anchor block (520) having a wedge hole (521) for receiving the wedge (510); and an upper stopper plate (530) fixedly installed on the top of the anchor block (520) and having a hole (531) for the PS steel wire that is smaller than the outer diameter of the wedge (510) so as not to move upward when the PS steel wire (20) is tensioned. Claim 5 A remote tensioning type prestressed steel pile further comprising, in claim 4, a spring washer (540) provided on the upper part of the anchor block (520) to be positioned between the upper stopper plate (530) and the wedge (510), and which presses the wedge (510) against the wedge hole (521) by a compressive force after the tension of the PS steel wire (20) is released. Claim 6 A remote tensioning type prestressed steel pile characterized in that, in any one of claims 1 to 3; a stiffener (103) for supporting the dummy anchor (30) and dead anchor (40) is integrally provided on the web (102) at the upper and lower ends of the H-beam (10). Claim 7 A pile structure for earth retaining formed by inserting a remote tensioning type prestressed steel pile (A) into a bore hole, comprising: an H-beam (10) having a predetermined length; a plurality of PS steel wires (20) for introducing prestress into the H-beam (10); a dummy anchor (30) installed at the top of the H-beam (10) to guide the PS steel wires during tensioning work and removed after the introduction of tension force is completed; a dead anchor (40) positioned at the bottom of the H-beam (10) to fix the bottom of the PS steel wires (20) by means of a wedge (410); and an active anchor (50) installed on the H-beam (10) to be positioned between the dummy anchor (30) and the dead anchor (40), and configured to anchor the PS steel wires (20) by providing a wedge (510). A pile structure for earth retaining wall, characterized by including: a pair of bracing (60) arranged on both sides of the web (102) of the H-beam (10) exposed above the ground and fixed to the ground by a fixing rod (610) to prevent buckling of the H-beam (10) when tension force is introduced. Claim 8 A method for constructing a pile for earth retaining using a prestressed steel pile (A); an H-beam preparation step (S10) in which a dead anchor (40) and an active anchor (50) are respectively installed on an H-beam (10) of a predetermined length on the ground and a plurality of PS steel wires (20) are bound together to connect the dead anchor (40) and the active anchor (50); an H-beam insertion step (S20) in which the H-beam (10) is inserted into a bore hole; and a PS steel wire tensioning step (S30) in which a dummy anchor (30) is installed on the upper end of the H-beam (10) and the PS steel wires (20) are tensioned upward from the dummy anchor (30). A method for constructing a pile for earth retaining using a prestressed steel pile, characterized by including: a prestress introduction step (S40) in which the tension applied to the PS steel wire (20) is released so that the wedge (510) of the active anchor (50) is pressed against the anchor block (520) by the compressive force of the PS steel wire (20) to introduce prestress into the section between the active anchor (50) and the dead anchor (40). Claim 9 A method for constructing a pile for earth retaining using a prestressed steel pile, characterized by further including a pile anchor removal step (S50) for removing the pile anchor (30) in claim 8.

Citation Information

Patent Citations

  • Prestressed wale and it's construction method

    KR1020210117747A

  • Pre-stressed composite pile and retaining wall using the same

    KR1020230015184A

  • Prestressed Soldier Pile Using Cap Plate

    KR1020250148248A