Connection assembly for installing perforated pipe maintenance hole, drainage structure in tunnel including the same, connection assembly construcion method, and maintenance method of drainage structure in tunnel

The connecting assembly for perforated pipes in tunnels allows for maintenance without pavement excavation, addressing construction errors and ensuring continuous drainage functionality by facilitating internal inspection and dredging.

KR103046809B1Active Publication Date: 2026-11-10POSCO E&C CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
KR1020230124510
Authority / Receiving Office
KR · KR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-09-19
Publication Date
2026-11-10
Estimated Expiration
2043-09-19

AI Technical Summary

Technical Problem

Conventional methods for maintaining perforated pipes in tunnels require excavating the pavement, leading to traffic congestion, safety risks, and high costs, and do not allow for continuous maintenance without disrupting traffic.

Method used

A connecting assembly for installing a perforated pipe maintenance hole that enables observation and dredging without removing the pavement, incorporating a body with rotational freedom, insertion limiting elements, and angled extension portions to facilitate equipment entry and alignment.

Benefits of technology

Enables maintenance of perforated pipes without excavating the tunnel pavement, addressing construction errors, and ensuring smooth drainage by allowing internal inspection and dredging through a connecting assembly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112023103483930-PAT00003_ABST
    Figure 112023103483930-PAT00003_ABST
Patent Text Reader

Abstract

The present invention relates to a collection well provided to collect fluid flowing along a longitudinal drainage pipe extending in the longitudinal direction of the tunnel within the tunnel, and a connecting assembly for installing a perforated pipe maintenance hole installed below the pavement of the tunnel and connecting a perforated pipe extending in the longitudinal direction while spaced downward relative to the longitudinal drainage pipe. The connecting assembly comprises: a body connected to a perforated pipe having a longitudinally spaced section at both ends; a connecting unit having a branching section branching off from the body to one side; a connecting pipe extending outside the collection well from a perforated section formed in the collection well; and a connecting pipe extending between the branching section and the connecting pipe, wherein the connecting pipe may extend with a downward slope from the end of the connecting pipe to the end of the branching section of the connecting unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to a connecting assembly for installing a perforated pipe maintenance hole, a drainage structure inside a tunnel including the same, a construction method of the connecting assembly, and a maintenance method of the drainage structure inside a tunnel. Background Technology

[0002] Generally, groundwater seeping from beneath the pavement within a tunnel is drained and collected through perforated pipes. However, since conventionally installed perforated pipes are designed to be permanently buried, there was a structural problem in that the pavement had to be excavated to inspect or re-construct the pipes when water flow and drainage functions deteriorated due to blockage, collapse, or contamination by foreign substances.

[0003] Recently, due to the construction of undersea tunnels or the increase in groundwater seepage during localized heavy rainfall, the flow capacity of perforated pipes is exceeded, resulting in phenomena such as water seeping through the tunnel pavement. This is causing social problems, including psychological anxiety caused by road surface slippage for vehicles traveling through the tunnel and tunnel flooding.

[0004] While issues requiring maintenance of perforated pipes can be resolved through methods such as reconstructing existing facilities, continuous maintenance of already installed pipes is not feasible, and maintenance must be carried out using repetitive and conventional methods. Of course, maintaining perforated pipes within existing tunnels using conventional methods occupies a portion of the road, necessitating traffic control and inevitably causing severe traffic congestion. Furthermore, since the work of excavating the tunnel pavement and reburying the pipes for maintenance is performed within an existing road, it carries an inherent risk of serious accidents regarding traffic safety. Additionally, the installation of perforated pipes incurs significant costs due to the generation of various types of noise, vibration, and waste.

[0005] Accordingly, a structure is required that allows for the maintenance and improvement of the function of the perforated pipe and enables repair by making it possible to observe the internal condition of the perforated pipe or dredge the perforated pipe without removing the tunnel pavement.

[0006] The technology forming the background of the present invention is disclosed in Korean Registered Patent No. 10-0402805. The problem to be solved

[0007] The present invention aims to solve the problems of the aforementioned conventional technology. The present invention provides a connecting assembly for installing a perforated pipe maintenance hole that allows for the observation of the internal condition of the perforated pipe or dredging of the perforated pipe without removing the pavement of the tunnel, thereby enabling the maintenance and improvement of the function of the perforated pipe, a drainage structure inside the tunnel including the same, a construction method of the connecting assembly, and a method for maintaining the drainage structure inside the tunnel.

[0008] In addition, the present invention aims to provide a connection assembly for installing a perforated pipe maintenance hole and a construction method thereof, which can respond to construction errors occurring during the installation of a drainage structure inside a tunnel and prevent the connection unit from detaching from the perforated pipe when the connection unit is rotated and aligned in response to the construction error.

[0009] In addition, the present invention aims to provide a connecting assembly capable of easily forming a perforation in the side wall of a sump and a method for constructing the same.

[0010] In addition, the present invention aims to provide a connecting assembly and a construction method thereof that facilitates the entry of maintenance equipment and the securing of workspace from a sump.

[0011] In addition, the present invention aims to provide a drainage structure within a tunnel and a method for maintaining the drainage structure within a tunnel, which enables observation of the internal condition of the perforated pipe or dredging of the perforated pipe without excavating the tunnel pavement.

[0012] However, the technical problems that the embodiments of the present invention aim to solve are not limited to the technical problems described above, and other technical problems may exist. means of solving the problem

[0013] As a technical means for achieving the above-mentioned technical problem, a connection assembly for installing a perforated pipe maintenance hole according to one embodiment of the present invention comprises: a body connected to a perforated pipe having longitudinally spaced sections at both ends; a connection unit having a branch section branching off from one side of the body; a connecting pipe extending from a perforated section formed in the sump to the outside of the sump; and a connecting pipe extending between the branch section and the connecting pipe, wherein the connecting pipe may extend with a downward slope from the end of the connecting pipe to the end of the branch section of the connection unit.

[0014] Additionally, according to one embodiment of the present invention, at least one end of the body has an outer diameter that is inserted into the interior of the perforated pipe, and an insertion limiting element that limits the body from being inserted into the interior of the perforated pipe by more than a set length may be formed at a portion spaced apart by a predetermined length from at least one end.

[0015] In addition, according to one embodiment of the present invention, the connecting unit is provided to have a degree of rotational freedom with respect to a rotation axis extending longitudinally through the center of the body, and the length from the insertion limiting element to one end of the body can be set to a length that prevents the body from detaching from the perforated pipe when the connecting unit rotates, taking into account the error in forming the perforation part of the sump.

[0016] In addition, according to one embodiment of the present invention, the connecting pipe comprises a first extension portion connected to the sump; and a second extension portion extending parallel to the connecting pipe and connected to the first extension portion, wherein the extension direction of the first extension portion and the extension direction of the second extension portion may have an angle set considering the convenience of forming a perforation in the sump.

[0017] In addition, according to one embodiment of the present invention, the connecting pipe may be extended parallel to the connecting pipe from the perforated section to the connecting pipe side end, taking into consideration the ease of introducing maintenance equipment from the perforated section into the perforated pipe through the connecting assembly.

[0018] Additionally, a drainage structure within a tunnel according to one embodiment of the present invention comprises: a sump provided to collect fluid flowing along a longitudinal drainage pipe extended in the longitudinal direction of the tunnel within the tunnel; a perforated pipe installed below the pavement of the tunnel and extending in the longitudinal direction while having a longitudinally spaced section spaced downward from the longitudinal drainage pipe; and a connecting assembly, wherein the connecting assembly may have a diameter that allows for the insertion of maintenance equipment from the sump to the perforated pipe through the connecting assembly.

[0019] In addition, according to one embodiment of the present invention, the perforation portion is positioned on one side in the longitudinal direction with respect to the longitudinal midpoint of the sump, with consideration for securing space for entry of maintenance equipment or maintenance work through the perforation portion, and the one side in the longitudinal direction may be set in a direction corresponding to the downward slope direction in which the connecting pipe extends from the end of the joint pipe among the two longitudinal sides.

[0020] In addition, according to one embodiment of the present invention, the sump may include a blocking member configured to selectively block a substance with a particle size greater than a preset size from passing through the perforation portion inside the sump.

[0021] In addition, a construction method for a connection assembly for installing a perforated pipe maintenance hole according to one embodiment of the present invention comprises the step of installing a connection assembly that connects a collection well and a perforated pipe, wherein the collection well is installed to collect fluid flowing along a longitudinal drainage pipe extended in the longitudinal direction of the tunnel within the tunnel, and the perforated pipe is installed below the pavement of the tunnel and extends in the longitudinal direction while having a longitudinally spaced section spaced downward from the longitudinal drainage pipe. The step of installing the connection assembly may include the step of connecting a connection unit having a body extending between two ends and a branch branch branching from the body to one side to the perforated pipe; the step of installing the connecting pipe such that one end of the connecting pipe is received in a perforated section formed in the collection well; and the step of connecting the branch and the connecting pipe through the connecting pipe.

[0022] In addition, according to one embodiment of the present invention, prior to the step of connecting the branch section and the joint section through the connecting pipe, the method may further include the step of aligning the branch section and the joint section by rotating the connecting unit around a rotation axis extending longitudinally through the center of the body, taking into account the error in forming the perforation of the sump.

[0023] In addition, a method for maintaining a drainage structure inside a tunnel according to one embodiment of the present invention comprises: (a) a step of introducing maintenance equipment from the inside of the sump through the perforated section and through the connecting assembly into the perforated pipe; and (b) a step of performing maintenance work using the maintenance equipment, wherein in step (b), the maintenance work may be to obtain internal information of the perforated pipe through the first maintenance equipment to check the blockage-related condition of the perforated pipe, or to dredge the perforated pipe through the second maintenance equipment.

[0024] The means for solving the problem described above are merely exemplary and should not be interpreted as intended to limit the present invention. In addition to the exemplary embodiments described above, additional embodiments may exist in the drawings and the detailed description of the invention. Effects of the invention

[0025] According to the means for solving the problem of the present invention described above, the present invention can provide a connecting assembly for installing a perforated pipe maintenance hole that can maintain and improve the function of the perforated pipe by enabling observation of the internal condition of the perforated pipe or dredging of the perforated pipe without removing the pavement of the tunnel.

[0026] In addition, the present invention can address construction errors that occur during the installation of drainage structures inside a tunnel, and has the effect of preventing the connecting unit from detaching from the perforated pipe when the connecting unit is rotated and aligned in response to the construction error.

[0027] In addition, the present invention aims to provide a connecting assembly that can easily form a perforation in the side wall of a sump.

[0028] In addition, this facility provides the advantageous effect of facilitating the entry of maintenance equipment and securing workspace from the sump.

[0029] In addition, the present invention has the effect of providing a drainage structure inside a tunnel and a method for maintaining the drainage structure inside a tunnel, which enables observation of the internal condition of the perforated pipe or dredging of the perforated pipe without excavating the tunnel pavement.

[0030] However, the effects achieved by the embodiments of the present invention are not limited to the technical problems described above, and other effects may exist. Brief explanation of the drawing

[0031] FIG. 1 is a cross-sectional view schematically illustrating a drainage structure (1) inside a tunnel according to one embodiment of the present invention. FIG. 2 is a schematic plan view illustrating a drainage structure (1) inside a tunnel according to one embodiment of the present invention. FIG. 3 is a schematic perspective view illustrating a drainage structure (1) inside a tunnel according to one embodiment of the present invention. FIG. 4 is a schematic drawing of a drainage structure (1) inside a tunnel according to one embodiment of the present invention, viewed from above. Figure 5 is an enlarged view of part A of Figure 4. Figure 6 is an enlarged view of part B of Figure 4. FIG. 7 is a drawing showing a connecting tube (44) according to another embodiment of the present invention provided in part B of FIG. 4. FIG. 8 is a schematic drawing of a drainage structure (1) inside a tunnel according to one embodiment of the present invention, viewed from one side. FIG. 9 is a flowchart of a construction method for a connection assembly for installing a perforated pipe maintenance hole according to one embodiment of the present invention. FIG. 10 is a flowchart of a method for maintaining a drainage structure inside a tunnel according to one embodiment of the present invention. Specific details for implementing the invention

[0032] Embodiments of the present invention are described below with reference to the attached drawings to enable those skilled in the art to easily implement the invention. However, the present invention may be embodied in various different forms and is not limited to the embodiments described herein. Furthermore, in order to clearly explain the present invention in the drawings, parts unrelated to the explanation have been omitted, and similar parts throughout the specification are denoted by similar reference numerals.

[0033] Throughout the entire specification, when a part is described as being "connected" to another part, this includes not only cases where they are "directly connected," but also cases where they are "indirectly connected" or "electrically connected" with other elements interposed between them.

[0034] Throughout the entire specification, when a component is described as being located "on," "on top," "on top," "under," "on bottom," or "on bottom" of another component, this includes not only cases where the component is in contact with the other component but also cases where another component exists between the two components.

[0035] Throughout this specification, when a part is described as "comprising" a certain component, this means that, unless specifically stated otherwise, it does not exclude other components but may include additional components.

[0036] Terms such as "First~" and "Second~" may be used to indicate the same or substantially identical compositions in a different order, and may be interpreted as substantially the same composition as one that does not indicate "First", "Second", etc.

[0037] In addition, terms related to direction or position (upper side, upper surface, lower side, etc.) in the description of the embodiments of the present invention are established based on the arrangement state of each component shown in the drawings.

[0038] Hereinafter, a connection assembly (40) for installing a perforated pipe maintenance hole according to one embodiment of the present invention, a drainage structure (1) inside a tunnel including the same, and a construction method (S) for the connection assembly for installing a perforated pipe maintenance hole will be described.

[0039] A drainage structure (1) inside a tunnel according to one embodiment of the present invention may be provided inside a tunnel (10) and may include a longitudinal drainage channel (20), a perforated pipe (30), and a connecting assembly (40, hereinafter referred to as a connecting assembly) for installing a perforated pipe maintenance hole.

[0040] First, referring to FIG. 1, the tunnel (10) may include a base concrete (11) poured on bedrock, a lining concrete (13) poured on the inner side of the base concrete (11), a waterproof membrane (12) located between the base concrete and the lining concrete to guide infiltrated water to the lower part of the tunnel, and a perforated pipe (14) having a plurality of holes formed so that water flowing along the waterproof membrane (12) can pass through. Additionally, the tunnel (10) may include a transverse drainage pipe (16) connected at predetermined intervals to the perforated pipe (14), and a utility tunnel (18) capable of collecting and discharging sewage inside the tunnel and rainwater flowing into the tunnel. The transverse drainage pipe (16) may be connected to a longitudinal drainage channel (20) to discharge water to the outside of the tunnel.

[0041] Accordingly, water penetrating into the tunnel through the bedrock flows down along the waterproof membrane (12) and enters the perforated pipe (14), and the water that enters can be discharged outside the tunnel after flowing into the longitudinal drainage channel (20) through the transverse drainage pipe (16).

[0042] Referring to FIGS. 1 to 3, the longitudinal drainage channel (20) is connected to a plurality of transverse drainage pipes (16) spaced apart at predetermined intervals and T-shaped connecting pipes, etc., to receive water from the transverse drainage pipes (16), and extends in the longitudinal direction in which the tunnel extends to discharge water to the outside of the tunnel. At this time, the longitudinal direction can be understood as the 3 o'clock to 9 o'clock direction in FIG. 2 and the 2 o'clock to 8 o'clock direction in FIG. 3. The longitudinal drainage channel (20) may include a longitudinal drainage pipe (21) and a water collection well (23).

[0043] The longitudinal drain pipe (21) may receive water from the transverse drain pipe (16) which extends in the transverse direction (which can be understood as the 3 o'clock to 9 o'clock direction in FIG. 1) and may extend along the longitudinal direction of the tunnel to the outside of the tunnel to discharge water to the outside. For example, the longitudinal drain pipe (21) may be a spiral-shaped pipe to enhance adhesion, but is not limited thereto.

[0044] A water collection well (23) may be provided to collect water flowing along a longitudinal drainage pipe. The water collection well (23) may have a predetermined volume to collect water inside. The water collection well (23) may have an opening formed on the upper side to allow inspection of its interior, and the opening may be closed normally through a cover or the like, and opened when necessary, such as for maintenance of the drainage structure inside the tunnel. However, the shape of the water collection well (23) is not limited to this.

[0045] The sumps (23) may be arranged in multiple numbers at predetermined intervals, and adjacent sumps (23) may be connected by a longitudinal drainage pipe (21). For example, the sumps may be arranged at intervals of 50m along the longitudinal drainage pipe (21).

[0046] A perforation (231) may be formed on one side of the sump (23) for connecting a connecting assembly (40) according to one embodiment of the present invention. In one embodiment, the perforation (231) may be formed on a side wall formed on one side of the sump (23) in the transverse direction. The end of the connecting pipe (43) may be connected to the sump through the perforation (231), and a portion of the connecting pipe (43) protruding into the sump may be cut off, and the space between the perforation (231) and the end of the connecting pipe (43) may be filled with mortar or the like to finish the area.

[0047] The perforated pipe (30) can collect and discharge groundwater seeping from underground. The perforated pipe (30) is installed below the pavement of the tunnel and can be extended in the longitudinal direction while being spaced downward relative to the longitudinal drainage pipe (21). Referring to FIG. 1, the perforated pipe (30) can be spaced downward relative to the longitudinal drainage pipe (21) or the longitudinal drainage channel (20) and inward in the transverse direction of the tunnel (9 o'clock direction in FIG. 1). To guide water toward the perforated pipe (30), the area around the perforated pipe (30) can be recessed to a predetermined depth and extended in the longitudinal direction, and aggregate can be filled on the outside of the perforated pipe. The perforated pipe (30) has a plurality of holes formed on its surface so that water can flow in from the outside to the inside.

[0048] Referring to FIG. 3, the perforated pipe (30) may have a longitudinal spacing section. As described below, the body (41) of a connecting assembly according to one embodiment of the present invention may be disposed in the longitudinal spacing section formed between the two perforated pipes (30). Depending on the construction site, the perforated pipe (30) may be cut to form a longitudinal spacing distance, or replaced with another perforated pipe (30) having a suitable length.

[0049] Referring to FIGS. 1 to 3, a connecting assembly (40) according to one embodiment of the present invention may be provided to connect the sump (23) and the perforated pipe (30). The connecting assembly (40) may form a maintenance hole between the sump (23) and the perforated pipe (30) so that maintenance equipment can enter the perforated pipe (30) from inside the sump (23) through the connecting assembly (40). Through this, maintenance of the perforated pipe, such as checking the internal condition of the perforated pipe (30) or dredging inflows, can be easily performed without excavating the tunnel pavement, thereby increasing the service life of the drainage structure inside the tunnel and enabling performance improvement, and furthermore, ensuring and maintaining a smooth drainage system. The connecting assembly may be installed to connect the sump (23) and the perforated pipe (30) at each point where the sump (23) is placed. That is, the connecting assembly (40) can be installed in a one-to-one correspondence with the sump. However, in some cases, one may be installed for each of the multiple sumps arranged along the longitudinal direction to connect the sump (23) and the perforated pipe (30). The connecting assembly (40) may include a connecting unit (41), a joining pipe (43), and a connecting pipe (45).

[0050] Referring to FIGS. 3 and 4, the connecting unit (41) may be positioned in a longitudinally spaced section between the perforated pipes (30), with both ends connected to the perforated pipes, and branched from a longitudinally extended portion toward one side of the sump to perform the connection between the sump (23) and the perforated pipes (30). The connecting unit (41) may include a body (411) and a branching portion (413).

[0051] The body (411) has a tubular shape extending in the longitudinal direction and can be configured so that both ends are connected to perforated pipes having longitudinally spaced sections. That is, the body (411) is positioned in the longitudinally spaced section between the perforated pipes (30), and both ends can be connected to the perforated pipes (30) on both longitudinal sides of the body (411).

[0052] In one embodiment, at least one end of the body (411) may have an outer diameter that is inserted into the interior of the perforated pipe (30). Preferably, both ends of the body (411) may have an outer diameter that is inserted into the interior of the perforated pipe (30). For example, the inner diameter of the perforated pipe (30) may be 300 mm, and the outer diameter of the end of the body (411) may be formed to be 292 mm. It will be understood by a person skilled in the art that the perforated pipe (30) and the end of the body (411) may have a diameter different from the described diameter. Furthermore, although in one embodiment of the present invention, both ends of the body (411) are described as being inserted into the interior of the perforated pipe (30), both ends of the body (411) may be formed to accommodate the longitudinal end of the perforated pipe (30) inside. In this case, the inner diameter of the end of the body (411) can be formed to be slightly larger than the outer diameter of the end of the perforated tube (30).

[0053] In one embodiment, the body (411) may have an insertion limiting element (411a) formed therein to limit the body from being inserted into the perforated pipe for a length greater than a set length. The insertion limiting element (411a) may be formed at a portion spaced a predetermined length from the end of the body inserted into the perforated pipe (30). The insertion limiting element (411a) may be a ring-shaped step protruding outward from the outer surface of the body. However, the insertion limiting element (411a) may have a shape protruding inward from the inner surface of the body (411).

[0054] In this embodiment, regarding the connection between the body (411) and the perforated pipe (30), it has been described that both ends of the body (411) are inserted into the perforated pipe (30); however, the connection between the branch section (413) and the connecting pipe (45) or the connection between the joining pipe (43) and the connecting pipe (45) can also be performed in the same or similar manner. That is, regarding the connection between the connecting unit (41) and the connecting pipe (45), the connection between the connecting unit (41) and the perforated pipe (30), and the connection between the connecting pipe (45) and the joining pipe (43), at least one of the connections may be restricted from insertion exceeding a set length by an insertion limiting element formed on at least one of the components of the connection target. Here, the insertion limiting element may be formed to protrude outward from an outer surface spaced a predetermined length from at least one end of the connection target, or formed to protrude inward from an inner surface spaced a predetermined length from the end. In this way, the insertion limiting element (411a) may be provided in the connecting pipe (45) or the perforated pipe (30), and the insertion limiting element (411a) is not limited to protruding outward from the outer surface of the configuration performing the connection, but may also be formed as a step protruding inward from the inner surface. In this case, the connection target can be understood to refer to the two configurations forming each connection.

[0055] The branch portion (413) may branch off from the body (411) to one side. The branch portion (413) may have a tubular shape extending to one side rather than in the longitudinal direction from a middle part of the body (411). One end of the branch portion (413) may be connected to a connecting pipe (45). The connection between the branch portion (413) and the connecting pipe (45) may follow the coupling described above, or may be achieved through screw coupling by forming screw threads on the outer surface of the branch portion and the inner surface of the connecting pipe. In addition, the branch portion (413) and the connecting pipe (45) may be connected by other methods.

[0056] In one embodiment, the connecting unit (41) may have a degree of rotational freedom with respect to a rotation axis (Y) that extends longitudinally through the center of the body (411). That is, the connecting unit (41) may rotate while the body (411) is connected to the perforated pipe (30). By rotating the connecting unit (41), the direction of the branching section (413) can be adjusted, and as described later, the branching section (413) and the connecting pipe (43) can be aligned to connect the connecting pipe (45) between the branching section (413) and the connecting pipe (43).

[0057] In one embodiment, the length from the end of the body (411) to the insertion limiting element (411a) can be set to a length that prevents the body (411) from detaching from the perforated pipe when the connecting unit (41) rotates, taking into account the error in forming the perforation (231) of the sump (23). The perforation (231) is formed by drilling the side wall of the sump (23), but the perforation (231) may be formed at a different location than designed, and the drilling direction toward which the perforation (231) faces may also be a different direction than designed. At this time, to compensate for the error in forming the perforation, a connecting pipe (43) is connected to the perforation (231), and the connecting unit (41) is rotated so that one end of the connecting unit (41) or branching part (413) of the connecting pipe (43) and one end of the connecting pipe of the branching part (413) are aligned side by side. In this process, if the length of the body (411) inserted into the perforated pipe (30) is short, the body (411) may detach from the perforated pipe (30) as the connecting unit (41) rotates around a rotation axis (Y) that extends longitudinally through the center of the body. Therefore, in one embodiment of the present invention, the length from the end of the body (411) to the insertion limiting element (411a) is sufficiently set so that the body (411) can be prevented from detaching even when the connecting unit (41) is rotated while the body (411) is connected to the perforated pipe (30).

[0058] Referring to FIGS. 4 and 6, the connecting pipe (43) may extend from a hole formed in the sump to the outside of the sump. One end (431a) of the connecting pipe (43) on the sump side may be received in the hole (231). When connecting the connecting pipe (43) to the sump, the part of the connecting pipe protruding into the sump (23) may be cut off, and the space between the hole (231) and the one end (431a) on the sump side may be filled with mortar or the like to fix the connecting pipe (43) to the sump. One end of the connecting pipe (43) on the connecting unit (41) side may be connected to a connecting pipe (45), and the connection method may be as described above or follow other conventional pipe connection methods.

[0059] A connecting pipe (43) according to one embodiment illustrated in FIGS. 4 and 6 may include a first extension portion (431) connected to a sump (23) and a second extension portion (433) that extends parallel to the connecting pipe and is connected to the first extension portion. The extension direction (A1) of the first extension portion (431) and the extension direction (A2) of the second extension portion (433) may have a predetermined angle (a) set to facilitate the formation of a perforation in the sump. The predetermined angle (a) may be 90 degrees or more. In one embodiment, the angle (a) may be 135 degrees. In the corresponding embodiment, the connecting pipe (43) may be a curved pipe. As can be seen in FIG. 3, the connecting assembly (40) of the present invention may extend obliquely in an inclined direction between the sump (23) and the perforated pipe (30).

[0060] Meanwhile, when forming a hole (231) in the sump, the hole (231) is formed in the normal direction of the sump side wall rather than in an oblique direction following the extension direction of the connecting assembly (40), thereby making it easier to form the hole (231) during the work to form a drainage structure inside the tunnel. That is, the hole (231) can be formed in a transverse direction perpendicular to the side wall. In one embodiment, the extension direction (A1) of the first extension part (431) may have a predetermined angle with respect to the normal direction of the side wall of the sump (23). At this time, the predetermined angle may be set so that maintenance equipment can easily enter in the direction in which the connecting assembly extends downward from inside the sump (23). A part of the first extension part (431) protruding into the sump (23) may be cut off. However, the extension direction (A1) of the first extension part (431) may be parallel to the normal direction of the side wall of the sump (23). The extension direction (A2) of the second extension part (433) may be parallel to the extension direction of the connecting pipe (45).

[0061] According to another embodiment of the present invention illustrated in FIG. 7, the connecting pipe (44) may have a pipe shape that extends in a straight line. The connecting pipe (44) may extend parallel to the connecting pipe (45) from the perforated section (231) to the connecting pipe side end, considering ease of entry from the perforated section into the perforated pipe through the connecting assembly. According to this embodiment, the perforated section (231) may be formed obliquely in the direction in which the connecting pipe (45) extends, rather than in the normal direction of the side wall of the sump (23). Since the connecting pipe (44) is provided in a straight shape rather than a curved pipe, maintenance equipment entering through the perforated section (23) can more easily pass through the connecting pipe (44) and enter the perforated pipe (30). The end (44a) of the connecting pipe (44) may be parallel to the side wall of the sump (231) where the perforated section (231) is formed. According to another embodiment of the present invention, the extension direction (A3) of the connecting pipe (44) may be parallel to the extension direction of the connecting pipe (45) and may have a predetermined angle rather than being parallel to the normal direction of the side wall of the sump (23).

[0062] Referring again to FIG. 3, the connecting pipe (45) has a pipe shape that extends between the branching section (413) and the connecting pipes (43, 44), and can substantially connect the connecting unit (41) and the connecting pipes (43, 44). The connecting pipe (45) can extend with a downward slope from the end of the connecting pipe to the end of the branching section of the connecting unit. At this time, the connecting pipe (45) can extend downward while also extending with a slope in the transverse and longitudinal directions.

[0063] As the perforated pipe (30) is spaced downward from the perforated section (231) formed in the sump and spaced laterally, the connecting pipe (45) can be extended laterally with a downward slope.

[0064] Additionally, fluid flows in one direction in the longitudinal direction through the longitudinal drain pipe (21) and the perforated pipe (30), and the direction extending in the longitudinal direction from the end of the connecting pipe (45) on the side of the collection well (23) to the end of the connecting unit (41) may be opposite to the direction of water flow. In other words, when the connecting pipe (45) is viewed as extending upward from the side of the perforated pipe (30) to the side of the collection well (23), the direction extending in the longitudinal direction may be the same as the direction of water flow in the longitudinal drain pipe (21) and the perforated pipe (30). However, the extension direction of the connecting pipe (45) is not limited to this, and it may be extended in the opposite direction, or it may be extended downward and transversely without being extended in the longitudinal direction.

[0065] Referring to FIG. 8, the drilling section (231) may be positioned on the longitudinal side relative to the longitudinal midpoint of the sump (23). Specifically, the center (C) of the drilling section (231) may be positioned on the longitudinal side relative to the longitudinal midpoint of the sump, taking into account the entry of maintenance equipment through the drilling section or securing space for maintenance work. At this time, the longitudinal side may be set in a direction corresponding to the downward slope direction in which the connecting pipe extends from the end of the joint pipe (43, 44) among the longitudinal sides (3 o'clock to 9 o'clock direction in FIG. 8).

[0066] As described above, the connecting pipe (45) can be extended downwards and simultaneously extended with an incline in the transverse and longitudinal directions. Referring to FIG. 8, the connecting pipe (45) can be extended downwards and simultaneously extended in the longitudinal direction (9 o'clock direction). To secure more workspace on the sump side when inserting maintenance equipment, or to allow maintenance equipment to enter more easily through the drilling section (231), the drilling section can be formed offset toward the other longitudinal side (9 o'clock direction).

[0067] Furthermore, the sump (23) may include a blocking member (not shown) to prevent foreign substances collected in the sump from passing through the perforation (231), the connecting assembly (40), and the perforated pipe. That is, the blocking member may be provided to selectively block substances larger than a preset particle size from passing through the perforation from the inside of the sump. The blocking member may be formed as a blocking member that completely blocks the perforation (231), but it may also have a mesh structure having a predetermined grid size that prevents substances larger than a preset particle size from passing through the perforation (231) while allowing water to pass through.

[0068] In one embodiment, a blocking member may be provided to selectively open and close the perforation (231). The closing of the perforation during the opening and closing of the perforation may be understood to include the blocking member blocking the perforation so that fluid does not flow through the perforation, and having a mesh structure so that fluid can flow through the perforation. Normally, the blocking member covers the perforation (231) to prevent substances larger than a preset particle size from passing through the perforation from the inside of the sump, but can open the perforation (231) to allow the entry of maintenance equipment when performing maintenance work.

[0069] The connecting assembly (40) may have a diameter that allows for the entry or insertion of maintenance equipment. For example, if the diameter of the branching part (413), joining pipe (43), and connecting pipe (45) of the connecting unit is about 200 mm, an endoscope camera can enter, and if the diameter is about 250 mm, a vehicle camera can enter. In this way, the first maintenance equipment equipped with a camera for filming inside the perforated pipe can enter the perforated pipe (30) from inside the sump (23) through the connecting assembly (40).

[0070] Additionally, if foreign matter accumulates inside the perforated pipe, a second maintenance device for dredging the perforated pipe may enter the perforated pipe by spraying fluid or the like inside the perforated pipe. The second maintenance device can be introduced through the connecting assembly (40), and water can be sprayed in the opposite direction to the direction of introduction to draw out the foreign matter settled inside the perforated pipe to near the connecting unit (41). Afterward, the perforated pipe can be dredged by suctioning the foreign matter through the connecting assembly (40). Here, dredging can be understood as removing foreign matter accumulated inside the perforated pipe.

[0071] Hereinafter, based on the details described above, a construction method (S1) for a connecting assembly for installing a perforated pipe maintenance hole and a maintenance method (S2) for a drainage structure inside a tunnel according to another embodiment of the present invention will be described.

[0072] The construction method (S1) for a connecting assembly for installing a perforated pipe maintenance hole can be understood as constructing a connecting assembly for installing a perforated pipe maintenance hole between a sump and a perforated pipe so that the perforated pipe can be maintained without removing the pavement covering the perforated pipe when improving a drainage structure including a longitudinal drain (20) and a perforated pipe (30) already installed in the tunnel, or when a new drainage structure is constructed in the tunnel during the tunnel construction process.

[0073] Referring to FIG. 9, the construction method (S1) of the above-mentioned connecting assembly may include the step of installing a connecting assembly (40) that connects the sump (23) and the perforated pipe (30) which is installed to collect fluid flowing along a longitudinal drainage pipe extending in the longitudinal direction of the tunnel within the tunnel, and the perforated pipe (30) which is installed below the pavement of the tunnel and extends in the longitudinal direction while having a longitudinally spaced section spaced downward from the longitudinal drainage pipe (21).

[0074] The step of installing the above-mentioned connection assembly (40) may include connecting the connection unit to the perforated pipe (S11), connecting the joint pipe to the sump (S13), aligning the branch section and the joint pipe (S15), and connecting the connection unit and the joint pipe with the connection pipe (S17).

[0075] In step S11, a connecting unit (41) having a body (411) extending between both ends and a branching part (413) branching out from the body to one side can be connected to the perforated pipe (30). As described above, the body (411) can be placed in a longitudinally spaced section between the perforated pipes (30), and the end of the body (411) can be inserted into the perforated pipe (30).

[0076] In step S13, a connecting pipe extending from a perforation (231) formed in the sump (23) to the outside of the sump can be installed. That is, the connecting pipe (43) can be installed so that one end of the connecting pipe (43) is received in the perforation (231) formed in the sump. During the installation process of the connecting pipe (43), the empty space between the perforation (231) and the end (431a) of the connecting pipe (43) can be filled by mortar or the like to connect the connecting pipe (43) to the sump (23).

[0077] In step S15, the branch section (413) and the connecting pipe (43) can be aligned. The alignment of the branch section and the connecting pipe can be understood as aligning the extension direction of the branch section (413) and the extension direction of a part of the connecting unit side of the connecting pipe (43) so that the branch section (413) and the connecting pipe (43) can be connected through the connecting pipe (45). In other words, it can be understood as aligning the extension direction of the branch section (413) by rotating the connecting unit (41) so that the center of the branch section (413) and the center of the part of the connecting unit side of the connecting pipe (43) are located on the same line.

[0078] During the process of installing the connecting assembly (40), an error in length or direction may occur compared to the design when forming the perforation in the sump (23). To compensate for the above error, the connecting unit (41) can be rotated around the rotation axis (Y) to align the branching part (413) and the connecting unit side end of the connecting pipe (43). At this time, as described above, even if the connecting unit (41) is rotated, the body (411) can be prevented from detaching from the perforated pipe (30) by the insertion limiting element (411a).

[0079] In step S17, the branch section and the joint section can be connected through a connecting pipe. The connection between the connecting pipe (45) and the branch section (413) or the joint section (43) is as described above.

[0080] Next, referring to FIG. 10, a method (S2) for maintaining a drainage structure inside a tunnel according to another embodiment of the present invention can maintain the perforated pipe using maintenance equipment without removing the pavement inside the tunnel covering the perforated pipe.

[0081] The maintenance method (S2) of the drainage structure inside the tunnel may include the step of introducing maintenance equipment into the perforated pipe (S21) and the step of performing maintenance work using the maintenance equipment (S23).

[0082] In the above S21 step, maintenance equipment can be introduced into the perforated pipe (30) from the inside of the sump (23) through the perforation (231) and the connecting assembly (40). At this time, the blocking member can be switched from a closed state to an open state so that the maintenance equipment can be introduced into the perforated pipe.

[0083] In the above S23 step, maintenance work can be performed using maintenance equipment.

[0084] Maintenance work using maintenance equipment may involve obtaining internal information of the perforated pipe through the first maintenance equipment to check the blockage-related status of the perforated pipe. In this case, the first maintenance equipment may be equipment equipped with a camera, such as a CCTV, capable of obtaining an internal image of the perforated pipe.

[0085] Additionally, the maintenance work may involve dredging the perforated pipe using the second maintenance equipment. After inserting the second maintenance equipment into the perforated pipe (30), fluid may be sprayed inside the perforated pipe to collect foreign matter toward the connection unit (41), and then the foreign matter may be suctioned to remove foreign matter from inside the perforated pipe or allow foreign matter inside the perforated pipe to flow outside the tunnel. At this time, the second maintenance equipment may spray fluid in various directions considering the internal conditions of the perforated pipe.

[0086] In the foregoing description, each step may be further divided into additional steps or combined into fewer steps, depending on the embodiment of the present invention. Additionally, some steps may be omitted as necessary, the order of steps may be changed, or steps may be performed simultaneously.

[0087] The foregoing description of the present invention is for illustrative purposes only, and those skilled in the art will understand that other specific forms can be easily modified without altering the technical concept or essential features of the present invention. Therefore, the embodiments described above should be understood as illustrative in all respects and not restrictive. For example, each component described as a single unit may be implemented in a distributed manner, and components described as distributed may likewise be implemented in a combined form.

[0088] The scope of the present invention is defined by the claims set forth below rather than by the detailed description above, and all modifications or variations derived from the meaning and scope of the claims and the concept of equivalents thereof should be interpreted as being included within the scope of the present invention. Explanation of the symbols

[0089] 1: Drainage structure inside the tunnel 10: Tunnel 20: Longitudinal drainage channel 21: Longitudinal drain pipe 23: Catch basin 231: Sky section 30: Perforated pipe 40: Connection assembly 41: Connection Unit 411: Body 413: Branch 43, 44: Joint tubes 45: Connector

Claims

Claim 1 A sump provided to collect fluid flowing along a longitudinal drainage pipe extended in the longitudinal direction of the tunnel within the tunnel; and a connecting assembly for installing a perforated pipe maintenance hole installed below the pavement of the tunnel and connecting a perforated pipe extending in the longitudinal direction while spaced downward and transversely with respect to the longitudinal drainage pipe, comprising: a connecting unit having a body connected to a perforated pipe having longitudinally spaced sections at both ends; and a branching section branching out to one side from the body; and a connecting pipe extending to the outside of the sump from a perforated section formed in the sump. and includes a connecting pipe extending between the branch section and the joint pipe, wherein the connecting pipe extends with a downward slope from the end of the joint pipe side to the end of the branch section side of the connecting unit, and both ends of the body have an outer diameter that is inserted into the interior of the perforated pipe, and the connecting unit is provided to have a degree of rotational freedom with respect to a rotation axis extending longitudinally through the center of the body while both ends of the body are inserted and connected into the interior of the perforated pipe, thereby enabling alignment including rotating the branch section and the joint pipe with respect to the rotation axis extending longitudinally through the center of the body, and an insertion limiting element that restricts the body from being inserted into the interior of the perforated pipe by more than a set length is formed at a portion spaced a predetermined length from at least one end of the body, and the length from the insertion limiting element to one end of the body is set to a length that prevents the body from detaching from the perforated pipe when aligning the branch section of the connecting unit with respect to the joint pipe connected to the perforated section, taking into account the error in forming the perforated section of the sump, and the connecting pipe is downward It is extended and simultaneously inclined in the transverse and longitudinal directions, and extends downwardly inclined from the end of the joint pipe side, the longitudinal component of the downward inclination is in the longitudinal other direction, and the branching part, the joint pipe, and the connecting pipe are provided with a diameter that allows entry or insertion of maintenance equipment.A connecting assembly, wherein the above-mentioned joint pipe is provided in a straight-extending pipe shape to facilitate entry into the above-mentioned perforated pipe through the above-mentioned perforation of the maintenance equipment, and extends parallel to the above-mentioned connecting pipe; wherein the above-mentioned perforation is formed obliquely in the direction in which the above-mentioned connecting pipe extends, rather than in the normal direction of the side wall of the above-mentioned sump, and its center is positioned on the longitudinal opposite side relative to the longitudinal midpoint of the above-mentioned sump to ensure space for entry through the above-mentioned perforation of the maintenance equipment or for maintenance work, and the direction in which fluid flows in the above-mentioned longitudinal drain pipe and the above-mentioned perforated pipe is on one longitudinal side opposite to the above-mentioned longitudinal opposite side. Claim 2 delete Claim 3 delete Claim 4 delete Claim 5 delete Claim 6 A drainage structure within a tunnel, comprising: a collection well provided to collect fluid flowing along a longitudinal drainage pipe extending in the longitudinal direction of the tunnel within the tunnel; and a perforated pipe installed below the pavement of the tunnel, having a longitudinally spaced section spaced downward from the longitudinal drainage pipe and extending in the longitudinal direction. and includes the connecting assembly of claim 1, wherein the connecting assembly has a diameter that allows the insertion of maintenance equipment from the sump through the connecting assembly into the perforated pipe, the connecting pipe extends downward and simultaneously has an inclination in the transverse and longitudinal directions, extending downwardly inclined from the end of the joint pipe, and the longitudinal component of the downward inclination is in the longitudinal opposite direction, and the branching section, the joint pipe, and the connecting pipe are provided with a diameter that allows the entry or insertion of maintenance equipment, and the joint pipe is provided in a straight pipe shape extending parallel to the connecting pipe, considering the ease of entry of the maintenance equipment into the perforated pipe through the perforation section, and the perforation section is formed obliquely in the direction in which the connecting pipe extends rather than in the normal direction of the side wall of the sump, and its center is positioned in the longitudinal opposite direction relative to the longitudinal midpoint of the sump, considering the securing of space for entry of the maintenance equipment through the perforation section or maintenance work, and fluid in the longitudinal drainage pipe and the perforated pipe A drainage structure within a tunnel, wherein the direction of flow is one longitudinal side opposite to the other longitudinal side. Claim 7 delete Claim 8 A drainage structure within a tunnel according to claim 6, wherein the sump comprises a blocking member configured to selectively block material with a particle size greater than or equal to a preset size from passing through the perforation within the sump. Claim 9 A method for constructing a connection assembly according to claim 1 for installing a perforated pipe maintenance hole, comprising the step of installing a connection assembly that connects a sump installed to collect fluid flowing along a longitudinal drainage pipe extended in the longitudinal direction of the tunnel within the tunnel, and a perforated pipe installed below the pavement of the tunnel and extending in the longitudinal direction while having a longitudinally spaced section spaced downward from the longitudinal drainage pipe, wherein the step of installing the connection assembly comprises: connecting a connection unit having a body extending between two ends and a branch branching from the body to one side to the perforated pipe; installing the joining pipe such that one end of the joining pipe is received in a perforation formed in the sump; and, considering the error in forming the perforation of the sump, aligning the branch branch and the joining pipe by rotating the connection unit around a rotation axis extending in the longitudinal direction passing through the center of the body while the two ends of the body are inserted and connected inside the perforated pipe.The method includes the step of connecting the branch section and the joint pipe through a connecting pipe, wherein the connecting pipe extends downward and simultaneously has an inclination in the transverse and longitudinal directions, extending downwardly inclined from the end of the joint pipe, the longitudinal component of the downward inclination is in the other longitudinal direction, and the direction in which fluid flows in the longitudinal drain pipe and the perforated pipe is in the one longitudinal direction opposite to the other longitudinal direction, and the branch section, the joint pipe, and the connecting pipe are provided with a diameter that allows for the entry or insertion of maintenance equipment, and in the step of installing the joint pipe, the connecting pipe is provided in a pipe shape that extends in a straight line and extends parallel to the connecting pipe, considering the ease of entry of the maintenance equipment into the perforated pipe through the perforated part, and the perforated part is formed obliquely in the direction in which the connecting pipe extends rather than in the normal direction of the side wall of the sump, and its center is positioned on the other longitudinal side relative to the midpoint of the sump, considering the securing of space for entry of the maintenance equipment through the perforated part or maintenance work. Construction method of the assembly.; Claim 10 delete Claim 11 A method for maintaining a drainage structure within a tunnel according to claim 6, comprising: (a) a step of introducing a maintenance device from the inside of the sump through the perforated section and through the connecting assembly into the perforated pipe; and (b) a step of performing a maintenance operation using the maintenance device, wherein in step (b), the maintenance operation is to obtain internal information of the perforated pipe through the first maintenance device to check the blockage-related condition of the perforated pipe, or to dredge the perforated pipe through the second maintenance device.

Citation Information

Patent Citations

  • T-shaped socket for connecting spiral seam duct andmethod for constructing conduit using the abovet-shaped socket

    KR1020060019625A

  • Repair work for branch pipe and sleeve for repair

    JP1997123280A

  • Catchment Apparatus for Tunnel

    KR101066648B1