Double-robot collaborative assembly system and method for large wing skeleton

Through the dual-robot collaborative assembly system, industrial robots, grasping mechanisms and laser trackers are used to achieve efficient and automated assembly of large-scale aircraft wing frames, solving the problems of low efficiency and unstable quality in traditional assembly methods and adapting to a variety of models rapid development needs.

WO2024199008A1PCT designated stage expired Publication Date: 2024-10-03AVIC XIAN AIRCRAFT IND GRP CO LTD

Patent Information

Application Number
PCT/CN2024/082451
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-24
Filing Date
2024-03-19
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The traditional aircraft assembly method relies on frame-type tooling, which results in low assembly efficiency, unstable quality, and poor flexibility of the tooling, making it unable to quickly adapt to the needs of new models.

Method used

Design a dual-robot collaborative assembly system for large airfoil-like skeletons, using the first and second industrial robots, grabbing mechanisms, T-Probe, laser trackers and host computers to work together to achieve high-precision positioning and handling of parts , realizing rapid switching and automated assembly through quick-change mechanisms and pneumatic connections.

Benefits of technology

It realizes fully automated assembly without special tooling, improves assembly efficiency and quality, can quickly adapt to the assembly of different types of airfoil frame components, and reduces manual participation and tooling costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024082451_03102024_PF_FP_ABST
    Figure CN2024082451_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A double-robot collaborative assembly system for a large wing skeleton, relating to the field of robot assembly in aircraft assembly, and comprising a first assembly unit, a second assembly unit, a coordinate fixture (3), a part holder (8), and a superordinate computer. The first assembly unit comprises a first industrial robot (1) and a first grabbing mechanism arranged at the tail end of a support arm of the first industrial robot (1), and the second assembly unit comprises a second industrial robot (5) and a second grabbing mechanism arranged at the tail end of a support arm of the second industrial robot (5); in a process of carrying a spar (2), the first industrial robot (1) and the second industrial robot (5) need to respectively grab two ends of the spar (2); a laser tracker (10) is provided to adjust the pose of the first grabbing mechanism and the pose of the second grabbing mechanism in real time in the process of carrying the spar (2), thereby ensuring that the spar (2) is carried onto the coordinate fixture (3) without deformation. Locating and assembly tasks for wing skeleton assemblies can be completed without a special fixture, no manual intervention is required, and fully-automatic assembly is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

A dual-robot collaborative assembly system and method for large wing-like skeletons Technical Field

[0001] The present application relates to the field of robotic assembly in aircraft assembly, and in particular to a dual-robot collaborative assembly system and method for large wing-like skeletons. Background Art

[0002] In recent years, with the development of new aircraft and aircraft production lines, robotic equipment has increasingly been used in aircraft component assembly processes for tasks such as hole making and gluing. To continuously and comprehensively improve the level of aircraft assembly automation and achieve breakthroughs in advanced robotic assembly positioning and key technologies for efficient connection, it is necessary to conduct research on multi-robot assembly application technologies based on robotic hole making and gluing applications. This includes research on the design and usage parameters of collaborative robots, research on multi-robot synchronous high-precision positioning and measurement technologies, and research on reconfigurable flexible robot assembly technologies.

[0003] During the assembly of aircraft products, fixed process assembly is widely used to assist in product positioning and connection. The supporting preparation cycle of process assembly generally exceeds 1 / 3 of the total product production and assembly cycle, and is an important link affecting product development efficiency. Therefore, it is of great significance to carry out research on multi-robot collaborative assembly of aircraft products and reconfigurable flexible assembly technology of aviation products.

[0004] At present, the reconfigurable and flexible assembly technology in domestic aircraft assembly technology research is mainly designed based on traditional process equipment locators, pallets and other structures. The reconstruction of the positioning point layout scheme is achieved by developing movable pallets, and the three-way attitude adjustment positioning terminal structure is developed to achieve flexible product assembly. The main object relied on by the research institute is still the physical tooling.

[0005] Traditional aircraft assembly mainly relies on frame-type tooling. After workers check the parts, they assemble them on the tooling according to the requirements of the assembly instructions (mounting, positioning, adjusting, drilling holes, and connecting). However, the aircraft has many skeleton parts and high installation precision is required. The traditional aircraft assembly method has a high degree of manual participation, unstable assembly quality, and low assembly efficiency. At the same time, the tooling is not flexible. Each component uses a dedicated assembly tool, which is expensive and cannot be extended to other models and components, seriously affecting the development progress of the aircraft. Therefore, it is necessary to adopt flexible assembly methods through automated assembly equipment to improve assembly quality and efficiency and meet the needs of rapid development of new models.

[0006] Summary of the Invention

[0007] The purpose of this application is to provide a dual-robot collaborative assembly system and method for large wing-type skeletons, so as to solve the problem in the prior art that aircraft assembly uses frame-type tooling, resulting in low assembly efficiency and unstable assembly quality.

[0008] The technical solution of the present application is: a dual-robot collaborative assembly system for large-scale airfoil skeletons, comprising a first assembly unit, a second assembly unit, a three-coordinate tooling, a parts placement rack, and a host computer; the first assembly unit and the second assembly unit are arranged side by side between the three-coordinate tooling and the parts placement rack, the first assembly unit comprises a first industrial robot and a first gripping mechanism disposed at the end of the first industrial robot's support arm, and the second assembly unit comprises a second industrial robot and a second gripping mechanism disposed at the end of the second industrial robot's support arm;

[0009] The first gripping mechanism and the second gripping mechanism are capable of clamping parts in the parts placement rack, and the first gripping mechanism and the second gripping mechanism are both provided with a T-Probe. A laser tracker is provided on one side of the three-coordinate tooling. The host computer can obtain the position of the T-Probe in real time and control the movement of the first industrial robot and the second industrial robot according to the position of the T-Probe.

[0010] The host computer is electrically connected to the laser tracker, the first assembly unit, the second assembly unit and the three-coordinate tooling. The host computer can determine the relative position between the first grasping mechanism and the second grasping mechanism based on the data collected by the T-Probe on the first grasping mechanism and the second grasping mechanism, and confirm the next action.

[0011] Preferably, the first gripping mechanism and the second gripping mechanism each include a quick-change mechanism, a first end effector, and a second end effector; the quick-change mechanism can be connected to flanges on the first industrial robot and the second industrial robot; the first end effector and the second end effector can respectively clamp different parts in the parts placement rack;

[0012] The quick-change mechanism can be pneumatically connected to the first end effector and the second end effector respectively. When the quick-change mechanism is inserted into the first end effector or the second end effector, the connection part between the quick-change mechanism and the first end effector or the second end effector is inflated to control the quick-change mechanism and the first end effector or the second end effector to be fixed to each other; the connection part between the quick-change mechanism and the first end effector or the second end effector is deflated to control the quick-change mechanism and the first end effector or the second end effector to separate from each other.

[0013] Preferably, the quick-change mechanism includes a main frame and an industrial camera, the main frame is a U-shaped structure, the T-Probe and the industrial camera are respectively arranged on both sides of the outer wall of the main frame, the T-Probe can feedback the laser emitted by the laser tracker, and the industrial camera can take pictures of the parts in the parts placement rack; the outer side of the middle part of the quick-change mechanism is connected to the flange of the first industrial robot and the second industrial robot, and the inner side of the middle part is provided with a pneumatic connecting platform, the first end effector and the second end effector can be mounted on the pneumatic connecting platform, and the side wall of the quick-change mechanism is provided with a pneumatic interface connected to the inside of the pneumatic connecting platform.

[0014] Preferably, the first end effector is capable of grabbing the beam in the parts placement rack, and the first end effector includes a first housing, a clamping claw, a vacuum suction cup, and a laser displacement sensor. One end of the first end effector is provided with a first pneumatic groove that cooperates with the pneumatic connection platform. The first end effector is provided with multiple groups of first positioning columns around the first pneumatic groove, and the quick-change mechanism is correspondingly provided with multiple groups of positioning grooves that can cooperate with the first positioning columns.

[0015] There are multiple groups of vacuum suction cups, and the multiple groups of vacuum suction cups are arranged at the end of the first shell away from the first pneumatic groove. The clamping claws are arranged on the side wall of the first shell close to the end of the vacuum suction cup. The laser displacement sensor is arranged at the end of the first shell close to the vacuum suction cup, and the laser displacement sensor is electrically connected to the upper computer.

[0016] Preferably, the second end effector includes a second shell, a first zero-point locator and a second positioning column, one end of the second shell is provided with a second pneumatic groove that cooperates with the pneumatic connecting platform, the first zero-point locator is arranged in the second shell and can grab the rib, and the second positioning column is arranged at one end of the second shell close to the second pneumatic groove.

[0017] Preferably, it further comprises a first adapter and a second adapter, and the parts in the parts placement rack include beams and ribs; the first adapter is an inverted T-shaped structure, the longitudinal plate of the inverted T-shaped structure is provided with a circular hole that can be connected to the web of the beam, and the transverse plate of the inverted T-shaped structure is provided with a first short pin that can be connected to the three-coordinate tooling;

[0018] The second adapter is a flat plate structure. A step pin that can be connected to the rib is connected to one side wall of the second adapter, and a second short pin that can be connected to the second end effector is provided on the other side wall.

[0019] Preferably, there are three groups of three-coordinate tooling and the three groups of three-coordinate tooling are arranged side by side. The three-coordinate tooling includes a bracket and an assembly table provided on the bracket. The bracket is arranged vertically and a target seat is provided on the bracket. The assembly table is detachably connected to the top of the bracket, and a second zero point locator is provided on the assembly table.

[0020] Preferably, it also includes a first end placement rack and a second end placement rack, there are two groups of the first end placement rack and the second end placement rack, and the two groups of the first end placement rack and the second end placement rack are respectively arranged corresponding to the first industrial robot and the second industrial robot, the first end placement rack can carry and position the first end effector, the second end placement rack can carry and position the second end effector, and the ends of the first industrial robot and the second industrial robot can move to the adjacent first end placement rack or second end placement rack to grasp the first end effector or the second end effector.

[0021] As a specific embodiment, a dual-robot collaborative assembly method for a large-scale airfoil skeleton adopts the collaborative assembly system described above, including:

[0022] Open four characteristic holes at both ends of the selected beam, connect the web of the beam to the first adapter, and place it on the parts rack; connect the positioning holes of the rib to the step pins of the second adapter, and place it on the parts rack;

[0023] Installing a quick-change mechanism on the first industrial robot and the second industrial robot, moving the arm of the first industrial robot to a first end placement rack, and pneumatically connecting the quick-change mechanism to the first end effector; moving the arm of the second industrial robot to another first end placement rack, and pneumatically connecting the quick-change mechanism on the second industrial robot to the first end effector on the other first end placement rack;

[0024] Controlling the first and second industrial robots to drive the two sets of first end effectors to move above the ends of the beam, respectively. Using two sets of industrial cameras, take photos of the four characteristic holes at each end of the beam. Based on the photo results, calculate the coordinates of the centers of the eight characteristic holes of the beam, determine the angle of the beam on the parts placement rack, and adjust the angle of the bottom plane of the first end effector according to the angle of the beam.

[0025] The laser displacement sensor measures the distance and angle between the bottom plane of the first end effector and the beam web. The first industrial robot and the second industrial robot then adjust the posture of the first end effector based on the distance and angle between the bottom plane of the first end effector and the beam web, controlling the bottom plane of the first end effector to be parallel to the outer surface of the beam web. The first end effector is then controlled to move downward. The laser displacement sensor obtains the distance between the first end effector and the beam web in real time. When it is determined that the distance between the first end effector and the beam web meets the set requirements, the vacuum suction cup under the first end effector is controlled to activate the adsorption function to adsorb and fix the beam, and the clamping claw is controlled to fall to grasp the beam.

[0026] Before transporting, the T-Probe is controlled to obtain the relative posture relationship between the first and second industrial robots, and the posture relationship data is transmitted to the host computer. In the host computer, the two groups of first end effectors are linked to each other through the Roboteam software package. The distance and relative angle between the two groups of first end effectors are kept constant in real time through the Roboteam software package, and the first industrial robot is controlled to actively adjust the posture of the first end effector for the next action. The second industrial robot follows the first industrial robot and synchronously adjusts the posture of the other first end effector for the next action. The beam is transported from the part placement rack to the three-coordinate tooling without deformation. The second zero point locator on the three-coordinate tooling grasps the first short pin on the beam to fix the beam.

[0027] Move the first industrial robot and the second industrial robot to the first end placement rack, remove the first end effector, and then move them to the second end placement rack, and connect the second end effector through the quick change mechanism;

[0028] Controlling the first and second industrial robots to drive the second end effector to move above the rib on the parts placement rack, using an industrial camera to capture an image of the connection between the second adapter and the rib, using the obtained image to detect the point to be grasped of the second adapter for rough positioning; moving the arms of the first and second industrial robots to move the second end effector above the point to be grasped of the second adapter, capturing the second adapter again, accurately locating the point to be grasped, and determining the coordinates of the rib and the position of the rib on the parts placement rack;

[0029] The first industrial robot and the second industrial robot adjust the posture of the second end effector according to the posture of the rib on the parts placement rack and move downward. After reaching the corresponding posture, the second zero point locator opens, locks the second short pin on the second adapter, and grabs the rib;

[0030] The first and second industrial robots move the ribs, using the T-Probe on the quick-change mechanism to obtain the actual absolute position of the second end effector in real time. The error between the actual absolute position and the theoretical position is calculated, and the first and second industrial robots are guided to move until the error is within the set required range, and the ribs are moved to the theoretical position on the beam.

[0031] For the rib transported to the theoretical position, the first industrial robot and the second industrial robot position and press one side of the rib and make holes and connect the other side until the rib is fixed to the beam.

[0032] Preferably, the specific method for the first industrial robot and the second industrial robot to transport the beam is:

[0033] A three-dimensional space coordinate system is established with the base coordinate point of the first industrial robot as the origin, wherein the YOZ plane passes through the first industrial robot and the second industrial robot. Path planning is performed by the host computer. First, the two groups of first end effectors are adjusted to the two initial handling points corresponding to the YOZ plane, and handling is started. The postures of the first industrial robot and the second industrial robot are obtained in real time using T-Probe. The host computer determines the next action of the first industrial robot and the second industrial robot according to the path planning. At the same time, the relative posture of the two groups of first end effectors 4 is controlled to remain unchanged through the Roboteam software package, and the actual posture of the first end effector on the first industrial robot is obtained at regular intervals to determine whether the posture of the first end effector on the first industrial robot is consistent with the theoretical posture at that position. If not, the posture of the first end effector is adjusted according to the deviation between the theoretical posture and the actual posture until it is adjusted to the theoretical position, and the handling is continued according to the current path planning until the beam is transported to the three-coordinate tooling.

[0034] The present application discloses a dual-robot collaborative assembly system for large wing-type skeletons, comprising a first assembly unit, a second assembly unit, a three-coordinate tooling, a parts placement rack and a host computer; the first assembly unit comprises a first industrial robot and a first grasping mechanism located at the end of a first industrial support arm, and the second assembly unit comprises a second industrial robot and a second grasping mechanism located at the end of a second industrial support arm; during the transportation of the beam, the first industrial robot and the second industrial robot need to grasp the two ends of the beam respectively; a laser tracker is provided to obtain the position and posture of the first grasping mechanism and the second grasping mechanism in real time, and the position and posture of the first grasping mechanism and the second grasping mechanism can be adjusted in real time during the transportation of the beam to ensure that the beam is transported to the three-coordinate tooling without deformation; the positioning and assembly tasks of the wing skeleton components can be completed without special tooling, without manual participation, and fully automatic assembly can be achieved, and it can quickly switch to other models or wing skeleton components for use, which can realize the rapid development of new models. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions provided by this application, the following is a brief introduction to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of this application.

[0036] Figure 1 is a schematic diagram of the overall structure of this application;

[0037] FIG2 is a schematic diagram of the exploded structure of the first industrial robot, the quick-change mechanism, and the first end effector of the present application;

[0038] Figure 3 is a schematic diagram of the quick-change mechanism structure of this application;

[0039] FIG4 is a schematic structural diagram of the first end effector of the present application;

[0040] FIG5 is a schematic diagram of a second end effector mechanism of the present application;

[0041] FIG6 is a schematic structural diagram of the first adapter of the present application;

[0042] FIG7 is a schematic structural diagram of the second adapter of the present application;

[0043] FIG8 is a schematic diagram of the support structure of the present application.

[0044] 1. First industrial robot; 2. Beam; 3. Three-coordinate tooling; 4. First end effector; 5. Second industrial robot; 6. Second end effector; 7. Rib; 8. Parts placement rack; 9. Second end effector; 10. Laser tracker; 11. First adapter; 12. Second adapter; 13. Quick-change mechanism; 14. T-Probe; 15. Industrial camera; 16. Clamping claw; 17. Laser displacement sensor; 18. Vacuum suction cup; 19. First zero point locator; 20. First end effector; 21. Pneumatic connecting table; 22. Second positioning column; 23. First short pin; 24. Second short pin; 25. Bracket. DETAILED DESCRIPTION

[0045] In order to make the purpose, technical solutions and advantages of the implementation of this application clearer, the technical solutions in the embodiments of this application will be described in more detail below in conjunction with the drawings in the embodiments of this application.

[0046] A dual-robot collaborative assembly system for large-scale wing-like frameworks, as shown in Figure 1, comprises a first assembly unit, a second assembly unit, a three-dimensional coordinate fixture 3, a parts rack 8, and a host computer. The parts rack 8 holds two components: a beam 2 and a rib 7. In this embodiment, the beam 2 is a C-shaped structure, and the rib 7 is adapted to fit within it.

[0047] The first and second assembly units are arranged side by side between the three-coordinate tooling 3 and the parts placement rack 8. Both the first and second assembly units can be controlled independently. The first assembly unit includes a first industrial robot 1 and a first gripping mechanism located at the end of the arm of the first industrial robot 1. The second assembly unit includes a second industrial robot 5 and a second gripping mechanism located at the end of the arm of the second industrial robot 5. The first and second industrial robots 1 and 5 are both robots with six degrees of freedom, and the position of the first and second gripping mechanisms can be adjusted arbitrarily.

[0048] The first and second gripping mechanisms are capable of gripping parts within the parts rack 8. Both are equipped with a T-Probe 14. A laser tracker 10 is located on one side of the three-dimensional coordinate fixture 3. The host computer can obtain the position of the T-Probe 14 in real time and control the movements of the first and second industrial robots 1 and 5 based on the position of the T-Probe 14. The laser tracker 10 locates the T-Probe 14 in real time, enabling the position and posture of the first and second gripping mechanisms to be determined. The T-Probe 14 and laser tracker 10 form a complete set of equipment.

[0049] The host computer is electrically connected to the laser tracker 10, the first assembly unit, the second assembly unit and the three-coordinate tooling 3. The host computer can determine the relative position between the first gripping mechanism and the second gripping mechanism based on the data collected by the T-Probe 14 on the first gripping mechanism and the second gripping mechanism, and confirm the next action.

[0050] When assembling the beam 2 and the rib 7, the beam 2 or the rib 7 is first grasped by the first grasping mechanism and the second grasping mechanism to the first industrial robot 1 and the second industrial robot 5, and then the beam 2 and the rib 7 are respectively transported to the three-coordinate tooling 3 through the coordinated cooperation of the first industrial robot 1 and the second industrial robot 5, and the assembly of the beam 2 and the rib 7 is completed on the three-coordinate tooling 3.

[0051] During the transportation of beam 2, the first industrial robot 1 and the second industrial robot 5 need to grasp the two ends of beam 2 respectively; since the position of the beam 2 grasped by the first industrial robot 1 and the second industrial robot 5 is fixed, the positions of the two grasping points on beam 2 need to be kept unchanged in real time during the transportation process. In this way, the support arms of the first industrial robot 1 and the second industrial robot 5 need to continuously adjust their postures according to different positions to ensure that beam 2 does not deform. This application obtains the postures of the first grasping mechanism and the second grasping mechanism in real time by setting a laser tracker 10 and a laser displacement sensor 17, so that the postures of the first grasping mechanism and the second grasping mechanism can be adjusted in real time during the transportation of beam 2 to ensure that beam 2 is transported to the three-coordinate tooling 3 without deformation.

[0052] During the transportation process of rib 7, the first industrial robot 1 and the second industrial robot 5 respectively grasp one rib 7, and the laser tracker 10 is used to measure the position of the first grasping mechanism and the second grasping mechanism in real time to ensure that the position reached by the rib 7 part is consistent with the theoretical position, thereby improving the assembly quality.

[0053] In this way, the positioning and assembly tasks of the wing skeleton components can be completed without special tooling, without human intervention, and fully automatic assembly can be achieved. It can also be quickly switched to other models or wing skeleton components for use, enabling the rapid development of new models.

[0054] As shown in Figures 2-5, preferably, the first grasping mechanism and the second grasping mechanism both include a quick-change mechanism 13, a first end effector 4 and a second end effector 6; the quick-change mechanism 13 can be connected to the flanges on the first industrial robot 1 and the second industrial robot 5; the first end effector 4 can clamp the beam 2, and the second end effector 6 can clamp the rib 7.

[0055] Before transportation, the quick-change mechanism 13 is first connected to the flanges on the first industrial robot 1 and the second industrial robot 5. Then, as needed, when the beam 2 needs to be grasped, the quick-change mechanism 13 is controlled to be pneumatically connected to the first end effector 4, as shown in Figure 2. When the rib 7 needs to be grasped, the quick-change mechanism 13 is controlled to be pneumatically connected to the second end effector 6.

[0056] The quick-change mechanism 13 can be pneumatically connected to the first end effector 4 and the second end effector 6 respectively. When the quick-change mechanism 13 is inserted into the first end effector 4 or the second end effector 6, the connection part between the quick-change mechanism 13 and the first end effector 4 or the second end effector 6 is inflated to control the quick-change mechanism 13 and the first end effector 4 or the second end effector 6 to be fixed to each other; the connection part between the quick-change mechanism 13 and the first end effector 4 or the second end effector 6 is deflated to control the quick-change mechanism 13 and the first end effector 4 or the second end effector 6 to be separated from each other.

[0057] Through pneumatic connection, quick disassembly and quick assembly between the quick-change mechanism 13 and the first end effector 4 or the second end effector 6 can be achieved more conveniently. During quick disassembly or quick assembly, it is only necessary to align and assemble according to the connection parts, and then inflate or deflate them. No manual participation is required, thereby ensuring assembly efficiency and quality.

[0058] Preferably, as shown in Figure 3, the quick-change mechanism 13 also includes a main frame and an industrial camera 15. The main frame is a U-shaped structure, and the T-Probe 14 and the industrial camera 15 are respectively arranged on both sides of the outer wall of the main frame. The T-Probe 14 can feedback the laser emitted by the laser tracker 10, and the industrial camera 15 can take pictures of the parts in the part placement rack 8; the middle outer side of the quick-change mechanism 13 is connected to the flange of the first industrial robot 1 and the second industrial robot 5, and the middle inner side is provided with a pneumatic connecting platform 21, the first end effector 4 and the second end effector 6 can be mounted on the pneumatic connecting platform 21, and the side wall of the quick-change mechanism 13 is provided with a pneumatic interface connected to the inside of the pneumatic connecting platform 21.

[0059] T-Probe 14 is a laser position sensor that is used in conjunction with laser tracker 10. By exchanging information with laser tracker 10, it can determine the actual absolute position and angle of first end effector 4 and second end effector 6. Industrial camera 15 can determine the pose of the part by photographing the part and then processing it through the host computer. Pneumatic connection platform 21 is used to connect the first end effector 4 or the second end effector 6 during inflation and to release the first end effector 4 and the second end effector 6 during deflation. The pneumatic interface is used to inflate and deflate the pneumatic connection platform 21 and is connected to equipment such as air pumps and air stations.

[0060] Preferably, the first end effector 4 is capable of grabbing the beam 2 in the part placement rack 8. As shown in FIG4 , the first end effector 4 includes a first housing, a clamping claw 16, a vacuum suction cup 18, and a laser displacement sensor 17. One end of the first end effector 4 is provided with a first pneumatic groove that cooperates with the pneumatic connection platform 21. The first end effector 4 is provided with multiple groups of first positioning columns around the first pneumatic groove, and the quick-change mechanism 13 is correspondingly provided with multiple groups of positioning grooves that can cooperate with the first positioning columns.

[0061] There are multiple groups of vacuum suction cups 18, and the multiple groups of vacuum suction cups 18 are arranged at the end of the first shell away from the first pneumatic groove. The claws 16 are arranged on the side wall of the first shell close to the vacuum suction cup 18. The laser displacement sensor 17 is arranged at the end of the first shell close to the vacuum suction cup 18. The laser displacement sensor 17 is electrically connected to the upper computer. The laser displacement sensor 17 can measure the distance between the first end effector 4 and the web of the beam 2 and the angle of the web of the beam.

[0062] Ball bearings are mounted on the pneumatic connection platform 21. When inflated, the balls move radially outward, abutting against the inner wall of the first pneumatic groove to form a fixed connection. When deflating, the balls retract into the pneumatic connection platform 21, separating from the first pneumatic groove. This design is prior art and will not be described in detail. However, this connection method employed in this application enables accurate and quick assembly and disassembly of the first end effector 4 from the quick-release mechanism.

[0063] Since the ball bearing cannot achieve circumferential positioning, the present application provides a first positioning column to achieve circumferential fixation of the first end effector 4 to prevent it from rotating.

[0064] When the beam 2 is clamped, the wall surface of the web of the beam 2 is first adsorbed by the vacuum suction cup 18, and then the claws 16 on both sides clamp the two sides, thereby achieving stable clamping of the beam 2.

[0065] In order to further prevent the deformation of the beam 2, the limit load value of the vacuum suction cup 18 is set. When the postures of the two first end effectors 4 are inconsistent, the state of each vacuum suction cup 18 changes. When the load of a vacuum suction cup 18 exceeds the limit load value, air leakage occurs, the beam 2 falls from the vacuum suction cup 18, the transportation process is suspended, and the program of the host computer needs to be re-optimized.

[0066] Preferably, as shown in Figure 5 , the second end effector 6 includes a second housing, a first zero-point locator 19, and a second locating post 22. A second pneumatic groove is provided at one end of the second housing, mating with the pneumatic connection platform 21. The first zero-point locator 19 is disposed within the second housing and is capable of gripping the rib 7. The second locating post 22 is disposed at one end of the second housing near the second pneumatic groove. The design of the second pneumatic groove is identical to that of the first pneumatic groove, and details thereof will not be repeated. The second locating post 22 is located in the same position as the first locating post and is used to achieve circumferential positioning of the second end effector 6.

[0067] When installing the rib 7 , a connecting piece with a short pin is firstly provided on the rib 7 , and then the first zero point locator 19 absorbs the short pin by vacuum suction, thereby clamping the rib 7 quickly and accurately.

[0068] In conjunction with Figures 6-7, preferably, a first adapter 11 and a second adapter 12 are further included, and the parts in the parts placement rack 8 include the beam 2 and the rib 7. The first adapter 11 is an inverted T-shaped structure, and a circular hole that can be connected to the web of the beam 2 is opened on the longitudinal plate of the inverted T-shaped structure. The beam 2 can be connected to the circular hole through a pin or bolt. The transverse plate of the inverted T-shaped structure is provided with a first short pin 23 that can be connected to the three-coordinate tooling 3. The first short pin 23 is used to fix the beam 2 to the three-coordinate tooling 3 after it is moved to the corresponding position of the three-coordinate tooling 3.

[0069] The second adapter 12 is a flat plate. A stepped pin is connected to one sidewall of the second adapter 12, capable of connecting to the rib 7. A second short pin 24 is provided on the other sidewall of the second adapter 12, capable of connecting to the second end effector 6. The stepped pin secures the second adapter 12 to the rib 7, while the second short pin 24 pneumatically connects the second adapter 12 to the second end effector 6.

[0070] In conjunction with Figure 8, preferably, there are three groups of three-coordinate tooling 3 and the three groups of three-coordinate tooling 3 are arranged side by side. The three-coordinate tooling 3 includes a bracket 25 and an assembly table provided on the bracket 25. The bracket 25 is vertically arranged and a target seat is provided on the bracket 25. The target seat can obtain and transmit the position information of the three-coordinate tooling 3 through the target ball matching the laser tracker 10.

[0071] The assembly table is connected to the top of the bracket 25 by structures such as bolts or pins. The structure on the assembly table is basically the same as the second end effector 6. A second zero-point locator is provided on the assembly table. When the second zero-point locator is inflated, the first short pin 23 on the first adapter 11 is adsorbed, so that the beam 2 can be fixed to the three-coordinate tooling 3. When the air is exhausted, the assembled beam 2 and rib 7 can be pulled out, which is more convenient to transport.

[0072] Preferably, it also includes a first end placement rack 20 and a second end placement rack 9, and there are two groups of the first end placement rack 20 and the second end placement rack 9, and the two groups of first end placement racks 20 and second end placement racks 9 are respectively arranged corresponding to the first industrial robot 1 and the second industrial robot 5. The first end placement rack 20 is provided with a boss, which can carry and position the first end effector 4; the second end placement rack 9 is provided with a boss, which can carry and position the second end effector 6. The ends of the first industrial robot 1 and the second industrial robot 5 can move to the adjacent first end placement rack 20 or second end placement rack 9 to grab the first end effector 4 or the second end effector 6.

[0073] By setting the first end placement rack 20 and the second end placement rack 9, when a certain type of end effector is needed, the end of the industrial robot can be moved to the designated end placement rack without confusion or manual intervention, which is more convenient.

[0074] An electrically controlled dust cover is provided on both the first end placement rack 20 and the second end placement rack 9. The electrically controlled dust cover is opened and closed by setting a cylinder or a motor. When it is necessary to grasp the first end actuator 4 or the second end actuator 6, the upper computer controls the electrically controlled dust cover to open; after the grasping is completed, the upper computer controls the electrically controlled dust cover to close.

[0075] As a specific real-time method, a dual-robot collaborative assembly method for large-scale wing-like skeletons is also included, which uses the above-mentioned collaborative assembly system and includes:

[0076] Step S100, Part Preparation: Open four characteristic holes at each end of the selected beam 2, connect the web of the beam 2 to the first adapter 11, and place it on the part placement rack 8, with the C-shaped opening of the beam 2 facing downward and the bottom end of the first adapter 11 facing outward for easy grasping; connect the positioning hole of the rib 7 to the stepped pin of the second adapter 12, and place it on the part placement rack 8, with the second short pin 24 on the second adapter 12 facing upward for easy grasping;

[0077] Step S200: The robots install the first end effector 4: The quick-change mechanism 13 is installed on the first industrial robot 1 and the second industrial robot 5. The arm of the first industrial robot 1 is moved to the first end placement rack 20, and the quick-change mechanism 13 is pneumatically connected to the first end effector 4. The arm of the second industrial robot 5 is moved to another first end placement rack 20, and the quick-change mechanism 13 on the second industrial robot 5 is pneumatically connected to the first end effector 4 on the other first end placement rack 20. Each first end effector 4 recognizes four characteristic holes on one side for positioning.

[0078] Step S300, posture recognition of beam 2: Control the first industrial robot 1 and the second industrial robot 5 to drive the two sets of first end effectors 4 to move above the ends of beam 2, respectively. Use two sets of industrial cameras 15 to photograph the four characteristic holes at each end of beam 2. Based on the photographic results, the coordinates of the centers of the eight characteristic holes of beam 2 are calculated, and the angle of beam 2 on the component placement rack 8 is determined. The angle of the bottom plane of the first end effectors is adjusted according to the angle of the beam.

[0079] Step S400, adsorption of beam 2: the laser displacement sensor 17 measures the distance and angle between the bottom plane of the first end effector 4 and the web of beam 2. Then, the first industrial robot 1 and the second industrial robot 5 adjust the posture of the first end effector 4 according to the distance and angle between the bottom plane of the first end effector 4 and the web of beam 2, control the bottom plane of the first end effector 4 to be parallel to the outer surface of the web of beam 2, and then control the first end effector 4 to move downward. The laser displacement sensor 17 obtains the distance between the first end effector 4 and the web of beam 2 in real time. When it is determined that the distance between the first end effector 4 and the web of beam 2 meets the set requirements, the vacuum suction cup 18 under the first end effector 4 is controlled to turn on the adsorption function to adsorb and fix the beam 2. At the same time, the claw 16 is controlled to fall to grasp the beam 2.

[0080] Step S500, collaborative transport and positioning of the beam 2: Before transport, control the T-Probe 14 to obtain the relative posture relationship between the first industrial robot 1 and the second industrial robot 5, and transmit the posture relationship data to the host computer. In the host computer, the two groups of first end effectors 4 are associated with each other through the Roboteam software package; the distance and relative angle between the two groups of first end effectors 4 are kept unchanged in real time through the Roboteam software package, and the first industrial robot 1 is controlled to actively adjust the posture of the first end effector 4 for the next action. The second industrial robot 5 follows the first industrial robot 1 and synchronously adjusts the posture of the other first end effector 4 for the next action. The beam 2 is transported from the part placement rack 8 to the three-coordinate tooling 3 without deformation. The second zero point locator on the three-coordinate tooling 3 grasps the first short pin 23 on the beam 2 to fix the beam 2;

[0081] Preferably, the specific method for the first industrial robot 1 and the second industrial robot 5 to carry the beam 2 is:

[0082] A three-dimensional space coordinate system is established with the base coordinate point of the first industrial robot 1 as the origin. The X direction is the direction of the first industrial robot 1 toward the three-coordinate tooling 3, the Y direction is the direction of the second industrial robot 5 toward the first industrial robot 1, and the Z direction is the vertical direction.

[0083] The YOZ plane passes through the first industrial robot 1 and the second industrial robot 5, and the host computer performs path planning. First, the two groups of first end effectors 4 are adjusted to the two transport initial points corresponding to the YOZ plane, and the transport is started. The T-Probe 14 is used to obtain the posture of the first industrial robot 1 and the second industrial robot 5 in real time. The host computer determines the next action of the first industrial robot 1 and the second industrial robot 5 according to the path planning. At the same time, the relative posture of the two groups of first end effectors (4) is controlled to remain unchanged through the Roboteam software package, and the actual posture of the first end effector 4 on the first industrial robot 1 is obtained at regular intervals. It is judged whether the posture of the first end effector 4 on the first industrial robot 1 is consistent with the theoretical posture at the position. If not, the posture of the two first end effectors 4 is adjusted according to the deviation between the theoretical posture and the actual posture until it is adjusted to the theoretical position, and the transport is continued according to the current path planning until the beam 2 is transported to the three-coordinate tooling 3. When the posture of the first end effector 4 on the first industrial robot 1 is adjusted, the other first end effector 4 will follow the adjustment through the Roboteam software package to achieve efficient adjustment.

[0084] In this way, the end effectors on the first industrial robot 1 and the second industrial robot 5 can be adjusted according to basically corresponding postures, and the paths of the two industrial robots are also in corresponding states, so that the first industrial robot 1 and the second industrial robot 5 can be coordinated and controlled more conveniently.

[0085] Preferably, in order to further prevent the deformation of the beam 2, a pressure sensor is provided on the first end effector 4 or the first adapter 11. The pressure sensor collects the pressure when the beam 2 is transported. When the pressure reaches a certain value, the forward transport is stopped and the postures of the two first end effectors 4 are adjusted to prevent the beam 2 from being deformed.

[0086] Step S600: Robot replaces the second end effector 6: The first industrial robot 1 and the second industrial robot 5 are moved to the first end placement rack 20, the first end effector 4 is removed, and then moved to the second end placement rack 9, and the second end effector 6 is connected via the quick change mechanism 13;

[0087] Step S700, posture recognition of rib 7: Control the first industrial robot 1 and the second industrial robot 5 to drive the second end effector 6 to move above the rib 7 on the parts storage rack 8, use the industrial camera 15 to capture an image of the connection between the second adapter 12 and the rib 7, and use the obtained image to detect the to-be-grasped point of the second adapter 12 for rough positioning; move the support arms of the first industrial robot 1 and the second industrial robot 5 to move the second end effector 6 above the to-be-grasped point of the second adapter 12, capture the second adapter 12 again, accurately locate the to-be-grasped point, and determine the coordinates of the rib 7 and the posture of the rib 7 on the parts storage rack 8;

[0088] Step S800, grasping rib 7: The first industrial robot 1 and the second industrial robot 5 adjust the position of the second end effector 6 according to the position of rib 7 on the parts placement rack 8 and move it downward. After reaching the corresponding position, the second zero point locator opens, locks the second short pin 24 on the second adapter 12, and grasps rib 7;

[0089] Step S900, transporting and positioning the rib 7: The first industrial robot 1 and the second industrial robot 5 transport the rib 7, obtain the actual absolute position of the second end effector 6 in real time via the T-Probe 14 on the quick-change mechanism 13, calculate the error between the actual absolute position and the theoretical position, and guide the first industrial robot 1 and the second industrial robot 5 to move until the error is within the set required range, and then transport the rib 7 to the theoretical position on the beam 2;

[0090] Step S1000: Hole-cutting and connecting beam 2 and rib 7: After rib 7 has been moved to its desired position, the first industrial robot 1 and the second industrial robot 5 position and press one side of rib 7 and then drill holes on the other side until rib 7 is secured to beam 2. Positioning, pressing, and drilling and connecting are basic functions of industrial robots and will not be detailed here.

[0091] By assembling the beam 2 and the rib 7 according to the above steps, a fully automatic, efficient and precise assembly of a large aircraft wing-type skeleton can be achieved. At the same time, it can be adapted to a variety of models and has a wide range of uses.

[0092] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of the present application. Therefore, the scope of protection of the present application should be based on the scope of protection of the claims.

Claims

1. A dual-robot collaborative assembly system for large wing-like skeletons, characterized by: The invention comprises a first assembly unit, a second assembly unit, a three-coordinate tooling (3), a parts placement rack (8) and a host computer; the first assembly unit and the second assembly unit are arranged side by side between the three-coordinate tooling (3) and the parts placement rack (8); the first assembly unit comprises a first industrial robot (1) and a first grasping mechanism arranged at the end of the arm of the first industrial robot (1); and the second assembly unit comprises a second industrial robot (5) and a second grasping mechanism arranged at the end of the arm of the second industrial robot (5); The first grasping mechanism and the second grasping mechanism are capable of clamping parts in a part placement rack (8), and the first grasping mechanism and the second grasping mechanism are both provided with a T-Probe (14), a laser tracker (10) is provided on one side of the three-coordinate tooling (3), and the host computer is capable of acquiring the position of the T-Probe (14) in real time and controlling the movements of the first industrial robot (1) and the second industrial robot (5) according to the position of the T-Probe (14); The host computer is electrically connected to the laser tracker (10), the first assembly unit, the second assembly unit and the three-coordinate tooling (3), and the host computer can determine the relative position between the first grasping mechanism and the second grasping mechanism based on data collected by the T-Probe (14) on the first grasping mechanism and the second grasping mechanism, and confirm the next action; The first gripping mechanism and the second gripping mechanism both comprise a quick-change mechanism (13), a first end effector (4) and a second end effector (6); the quick-change mechanism (13) can be connected to flanges on the first industrial robot (1) and the second industrial robot (5); the first end effector (4) and the second end effector (6) can respectively clamp different parts in the part placement rack (8); The quick-change mechanism (13) can be pneumatically connected to the first end effector (4) and the second end effector (6) respectively. When the quick-change mechanism (13) is inserted into the first end effector (4) or the second end effector (6), the connection between the quick-change mechanism (13) and the first end effector (4) or the second end effector (6) is inflated to control the quick-change mechanism (13) and the first end effector (4) or the second end effector (6) to be fixed to each other; the connection between the quick-change mechanism (13) and the first end effector (4) or the second end effector (6) is evacuated to control the quick-change mechanism (13) and the first end effector (4) or the second end effector (6) to be fixed to each other. The end effectors (6) are separated from each other.

2. The dual-robot collaborative assembly system for large wing-like skeletons as claimed in claim 1, characterized in that: The quick-change mechanism (13) further comprises a main frame and an industrial camera (15), wherein the main frame is in a U-shaped structure, the T-Probe (14) and the industrial camera (15) are respectively arranged on both sides of the outer wall of the main frame, the T-Probe (14) can feedback the laser emitted by the laser tracker (10), and the industrial camera (15) can take pictures of the parts in the part placement rack (8); the outer middle part of the quick-change mechanism (13) is connected to the flanges of the first industrial robot (1) and the second industrial robot (5), and the inner middle part is provided with a pneumatic connection platform (21), the first end effector (4) and the second end effector (6) can be sleeved on the pneumatic connection platform (21), and the side wall of the quick-change mechanism (13) is provided with a pneumatic interface connected to the inside of the pneumatic connection platform (21).

3. The dual-robot collaborative assembly system for large wing-like skeletons as claimed in claim 2, characterized in that: The first end effector (4) is capable of grasping the beam (2) in the part placement rack (8), the first end effector (4) comprises a first shell, a clamping claw (16), a vacuum suction cup (18) and a laser displacement sensor (17), one end of the first end effector (4) is provided with a first pneumatic groove that matches the pneumatic connection platform (21), the first end effector (4) is provided with a plurality of groups of first positioning columns around the first pneumatic groove, and the quick-change mechanism (13) is provided with a plurality of groups of positioning grooves that can match the first positioning columns; There are a total of multiple groups of vacuum suction cups (18), and the multiple groups of vacuum suction cups (18) are arranged at one end of the first shell away from the first pneumatic groove, the clamping claw (16) is arranged on the side wall of the first shell close to the end of the vacuum suction cup (18), and the laser displacement sensor (17) is arranged at one end of the first shell close to the vacuum suction cup (18), and the laser displacement sensor (17) is electrically connected to the upper computer.

4. The dual-robot collaborative assembly system for large wing-like skeletons as claimed in claim 2, characterized in that: The second end effector (6) comprises a second shell, a first zero point locator (19) and a second positioning column (22); one end of the second shell is provided with a second pneumatic groove matching with the pneumatic connection platform (21); the first zero point locator (19) is arranged in the second shell and can grasp the rib (7); the second positioning column (22) is arranged at one end of the second shell close to the second pneumatic groove.

5. The dual-robot collaborative assembly system for large wing-like skeletons as claimed in claim 1, characterized in that: It also includes a first adapter (11) and a second adapter (12), and the parts in the parts placement rack (8) include a beam (2) and a rib (7); the first adapter (11) is an inverted T-shaped structure, a circular hole capable of being connected to the web of the beam (2) is provided on the longitudinal plate of the inverted T-shaped structure, and a first short pin (23) capable of being connected to the three-coordinate tooling (3) is provided on the transverse plate of the inverted T-shaped structure; The second adapter (12) is a flat plate structure, and a step pin capable of being connected to the rib (7) is connected to one side wall of the second adapter (12), and a second short pin (24) capable of being connected to the second end effector (6) is provided on the other side wall.

6. The dual-robot collaborative assembly system for large wing-like skeletons as claimed in claim 1, characterized in that: There are three groups of three-coordinate tools (3) and the three groups of three-coordinate tools (3) are arranged side by side. The three-coordinate tools (3) include a bracket (25) and an assembly table arranged on the bracket (25). The bracket (25) is arranged vertically and a target seat is arranged on the bracket (25). The assembly table is detachably connected to the top of the bracket (25) and a second zero point locator is arranged on the assembly table.

7. The dual-robot collaborative assembly system for large wing-like skeletons as claimed in claim 1, characterized in that: The invention also comprises a first end placement rack (20) and a second end placement rack (9), wherein the first end placement rack (20) and the second end placement rack (9) each have two groups, and the two groups of the first end placement rack (20) and the second end placement rack (9) are respectively arranged corresponding to the first industrial robot (1) and the second industrial robot (5), the first end placement rack (20) can carry and position the first end effector (4), the second end placement rack (9) can carry and position the second end effector (6), and the ends of the first industrial robot (1) and the second industrial robot (5) can move to the adjacent first end placement rack (20) or second end placement rack (9) to grasp the first end effector (4) or the second end effector (6).

8. A dual-robot collaborative assembly method for large wing-like skeletons, using the collaborative assembly system as described in any one of claims 1 to 7, characterized in that: include: Four characteristic holes are respectively opened at the two ends of the selected beam (2), and the web of the beam (2) is connected to the first adapter. (11) and placed on the parts placement rack (8); connecting the positioning hole of the rib (7) with the step pin of the second adapter (12) and placing them on the parts placement rack (8); A quick-change mechanism (13) is installed on a first industrial robot (1) and a second industrial robot (5); the arm of the first industrial robot (1) is moved to a first end placement rack (20), and the quick-change mechanism (13) is pneumatically connected to a first end effector (4); the arm of the second industrial robot (5) is moved to another first end placement rack (20), and the quick-change mechanism (13) on the second industrial robot (5) is pneumatically connected to a first end effector (4) on another first end placement rack (20); Controlling the first industrial robot (1) and the second industrial robot (5) to drive the two groups of first end effectors (4) to move above the two ends of the beam (2), respectively, using two groups of industrial cameras (15) to take photos of the four characteristic holes at the two ends of the beam (2), calculating the coordinates of the centers of the eight characteristic holes of the beam (2) based on the photo results, determining the angle of the beam (2) on the parts placement rack (8), and adjusting the angle of the bottom plane of the first end effector (4) based on the angle of the beam (2); The laser displacement sensor (17) measures the distance and angle between the bottom plane of the first end effector (4) and the web of the beam (2), and then the first industrial robot (1) and the second industrial robot (5) adjust the posture of the first end effector (4) according to the distance and angle between the bottom plane of the first end effector (4) and the web of the beam (2), control the bottom plane of the first end effector (4) to be parallel to the outer surface of the web of the beam (2), and then control the first end effector (4) to move downward, and the laser displacement sensor (17) obtains the distance between the first end effector (4) and the web of the beam (2) in real time. When it is determined that the distance between the first end effector (4) and the web of the beam (2) meets the set requirements, the vacuum suction cup (18) under the first end effector (4) is controlled to open the adsorption function to adsorb and fix the beam (2), and at the same time, the claw (16) is controlled to fall to grasp the beam (2); Before the handling, the T-Probe (14) is controlled to obtain the relative posture relationship between the first industrial robot (1) and the second industrial robot (5), and the posture relationship data is transmitted to the host computer. In the host computer, the two groups of first end effectors (4) are associated with each other through the Roboteam software package; the distance and relative angle between the two groups of first end effectors (4) are kept unchanged in real time through the Roboteam software package, and the first industrial robot (1) is controlled to actively adjust the posture of the first end effector (4) for the next action. The second industrial robot (5) follows the first industrial robot (1) to synchronously adjust the posture of another first end effector (4) of the next action, and transports the beam (2) from the part placement rack (8) to the three-coordinate tooling (3) without deformation, and the second zero point locator on the three-coordinate tooling (3) grabs the first short pin (23) on the beam (2) to fix the beam (2); The first industrial robot (1) and the second industrial robot (5) are moved onto a first end placement rack (20), the first end effector (4) is removed, and then they are moved onto a second end placement rack (9), and the second end effector (6) is connected via a quick-change mechanism (13); Controlling the first industrial robot (1) and the second industrial robot (5) to drive the second end effector (6) to move to above the rib (7) on the part placement rack (8), photographing an image of the connection between the second adapter (12) and the rib (7) through an industrial camera (15), detecting the point to be grasped of the second adapter (12) using the obtained image, and performing rough positioning; moving the support arms of the first industrial robot (1) and the second industrial robot (5) to move the second end effector (6) to above the point to be grasped of the second adapter (12), photographing the second adapter (12) again, accurately positioning the point to be grasped, and determining the coordinates of the rib (7) and the position and posture of the rib (7) on the part placement rack (8); The first industrial robot (1) and the second industrial robot (5) adjust the posture of the second end effector (6) according to the posture of the rib (7) on the parts placement rack (8), and move downward. After reaching the corresponding posture, the second zero point locator is opened, and the second short pin (24) on the second adapter (12) is locked to grab the rib (7); The first industrial robot (1) and the second industrial robot (5) carry the rib (7), obtain the actual absolute position of the second end effector (6) in real time through the T-Probe (14) on the quick-change mechanism (13), calculate the error between the actual absolute position and the theoretical position, and guide the first industrial robot (1) and the second industrial robot (5) to move until the error is within a set required range, and carry the rib (7) to the theoretical position on the beam (2); For the rib (7) transported to the theoretical position, the first industrial robot (1) and the second industrial robot (5) position and press one side of the rib (7) and make holes and connect the other side until the rib (7) is fixed to the beam (2).

9. The dual-robot collaborative assembly method for large wing-like skeletons as claimed in claim 8, characterized in that: The specific method for the first industrial robot (1) and the second industrial robot (5) to carry the beam (2) is: A three-dimensional space coordinate system is established with the base coordinate point of the first industrial robot (1) as the origin, wherein the YOZ plane passes through the first industrial robot (1) and the second industrial robot (5). During the transportation, the upper computer performs path planning. First, the two sets of first end effectors (4) are adjusted to two transportation initial points corresponding to the YOZ plane, and the transportation begins. The positions and postures of the first industrial robot (1) and the second industrial robot (5) are obtained in real time using a T-Probe (14). The upper computer determines the next action of the first industrial robot (1) and the second industrial robot (5) according to the path planning. The relative posture of the two groups of first end effectors (4) is controlled to remain unchanged by the Roboteam software package, and the actual posture of the first end effector (4) on the first industrial robot (1) is obtained at regular intervals to determine whether the posture of the first end effector (4) on the first industrial robot (1) is consistent with the theoretical posture at the position; if not, the posture of the first end effector (4) is adjusted according to the deviation between the theoretical posture and the actual posture until it is adjusted to the theoretical position, and the transportation is continued according to the current path planning until the beam (2) is transported to the three-coordinate tooling (3).

Citation Information

Patent Citations

  • Multitask aircraft auxiliary assembly system based on industrial robot

    CN101357687A

  • Laser tracker based combined operating test method for dual-arm robot

    CN110228067A

  • Double-mechanical-arm automatic assembling system for large block optical assembly

    CN113001142A

  • Replacement system, method and device of quick-change device, electronic equipment and storage medium

    CN113352345A

  • Manipulator quick change mechanism

    CN207874248U

Cited By

  • Hinge assembly device and method for hinge pin in non-through hole of folding hinge coupling part

    CN119734075A

  • Vacuum-maintained precise transfer device

    CN119774279A

  • Industrial robot clamp self-centering quick-change butt joint device based on laser ranging

    CN119820610A

  • Local-posture-invariable template matching, assembling and positioning method, system and equipment

    CN120070454A

  • Robot control method and system for industrial pipeline

    CN120552077A