Site diversity switching control device, site diversity switching control method, and site diversity switching control program

The site diversity switching control system uses weather forecasts to predict and optimize radio wave propagation paths in HAPS communication networks, addressing the challenges of low predictability and high costs by scheduling switches based on predicted throughput, thereby stabilizing operations and reducing equipment needs.

WO2024202040A1PCT designated stage expired Publication Date: 2024-10-03SKY PERFECT JSAT CORPORATION

Patent Information

Application Number
PCT/JP2023/013633
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

In communication networks using high altitude platform stations (HAPS), site diversity switching based on actual measurement data leads to low predictability and accuracy, frequent switching, and increased costs due to the need for real-time measurement of rainfall and radio wave quality, especially in large networks and during sudden rainfall events.

Method used

A site diversity switching control system that utilizes weather forecast information to predict rainfall attenuation and throughput, determining optimal switching schedules and paths based on predicted values, reducing the need for real-time measurement equipment and enabling flexible operation across various network scales and types.

Benefits of technology

This approach stabilizes line operation, maximizes throughput, and reduces costs by enabling proactive and efficient site diversity switching, even in complex networks, without the need for additional measurement devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023013633_03102024_PF_FP_ABST
    Figure JP2023013633_03102024_PF_FP_ABST
Patent Text Reader

Abstract

[Problem] The present invention can optimize throughput and the number of times site diversity switching is performed, can be applied flexibly regardless of the scale or type of communication network, can suppress a cost increase, and can easily handle localization or intensification of rainfall. [Solution] The present invention comprises: an attenuation amount calculation unit that calculates a rain attenuation amount for each prescribed time interval from the current time for each radio path between a first wireless station included in a non-terrestrial network and second wireless stations installed at a plurality of terrestrial positions, on the basis of weather prediction information which is for a prescribed region unit and which is from the current time to a prescribed time at prescribed time intervals; a throughput prediction unit that predicts a value relating to throughput for each prescribed time interval from the current time for each radio path, on the basis of the calculated rain attenuation amount for each prescribed time interval from the current time for each radio path; a schedule creation unit that, on the basis of the predicted value relating to the throughput for each prescribed time interval from the current time, determines a switching timing and a candidate radio path for switching from the current radio path after the prescribed time, and that creates a switching schedule for performing the determined switching; and a distribution unit that distributes the switching schedule at the current time and in advance to a candidate second wireless station to be switched.
Need to check novelty before this filing date? Find Prior Art

Description

Site diversity switching control device, site diversity switching control method, and site diversity switching control program

[0001] The present invention relates to a site diversity switching control device, a site diversity switching control method, and a site diversity switching control program suitable for a communication network using, for example, a high altitude platform station (HAPS).

[0002] 2. Description of the Related Art Communication relay devices such as high altitude platform stations (HAPS) (also called "high altitude pseudo satellites") that can float and remain in the air are known (see, for example, Patent Document 1).

[0003] The radio station installed on HAPS is located at an altitude of, for example, 20 km, and uses a millimeter wave band (38 GHz band) radio wave propagation path between it and a radio station installed on the ground. However, due to the frequency characteristics of this path, there is an issue that communication quality deteriorates significantly due to rain attenuation, which becomes a problem when used as a backhaul line that constitutes a terrestrial mobile phone network, for example.

[0004] Patent Document 2 describes a technology in which multiple gateway stations are arranged to form wireless sections of feeder links between the gateway stations and wireless relay devices, and the gateway stations simultaneously transmit and receive signals via the multiple feeder links with the wireless relay devices or switch between the feeder links. This technology generally determines whether to switch between site diversity modes using a preset threshold based on observation results (actual measurement data) of reception level quality at each site (terrestrial wireless station) (see, for example, Patent Document 3).

[0005] JP 2020-36100 A International Publication WO2019 / 135369 Specification JP 2008-109557 A

[0006] However, when the above-mentioned site diversity switching technique is adopted in a communication network using HAPS, various problems arise, as follows.

[0007] Because wireless propagation path switching is based on actual measurement data, predictability and accuracy are low, and since it is necessary to wait for sufficient radio wave quality to recover before switching back, it is difficult to maximize transmission volume during that time. As a result, optimal route switching cannot be performed in real time, and switching and switching back occurs frequently, making stable line operation difficult in some cases.

[0008] It is necessary to measure the rainfall conditions and radio wave quality at each site in real time, which increases the cost of equipment such as quality level measuring devices, and this increase in costs becomes a problem especially as the scale of the network increases.

[0009] In the case of localized, sudden rainfall, such as the recent frequent occurrence of torrential downpours, the higher the frequency, the greater the amount of rain attenuation, making it difficult to keep up with the time it takes to determine and implement propagation route switching based on measured data.

[0010] The basic assumption for site diversity of the main station in a star network is to switch to a secondary station. Therefore, when applying site diversity between stations that make up a mesh network, there are multiple sites to compare for switching, which complicates the radio wave propagation path and makes application difficult.

[0011] In view of the above circumstances, an object of the present invention is to provide a site diversity switching control device, a site diversity control method, and a site diversity control program that are capable of stable line operation and maximizing throughput, are flexibly applicable regardless of the size and type of network, can suppress cost increases, and are capable of rapid site diversity switching control.

[0012] In order to achieve the above object, a site diversity switching control device according to the present invention comprises: an attenuation calculation unit that calculates rain attenuation for each predetermined time interval from the present for each radio wave propagation path between a first radio station constituting a non-terrestrial network and second radio stations installed at multiple terrestrial locations, based on weather forecast information for a predetermined area unit and at predetermined time intervals from the present for a predetermined time ahead; a throughput prediction unit that predicts a value related to throughput for each predetermined time interval from the present for each radio wave propagation path, based on the rain attenuation for each predetermined time interval from the present for each radio wave propagation path calculated by the attenuation calculation unit; a schedule creation unit that determines a candidate radio wave propagation path to be switched from the current radio wave propagation path after a predetermined time and the timing of the switch, based on the value related to throughput for each predetermined time interval from the present predicted by the throughput prediction unit, and creates a switch schedule for executing the decided switch; and a distribution unit that distributes the switch schedule created by the schedule creation unit in advance to a second radio station related to the current radio wave propagation path and to a second radio station related to the candidate radio wave propagation path to be switched to.

[0013] In the site diversity switching control device of the present invention, it is preferable that the attenuation amount calculation unit updates the weather forecast information at predetermined time intervals, the throughput prediction unit predicts a value related to the throughput at predetermined time intervals, the schedule creation unit creates the switching schedule at predetermined time intervals, and the distribution unit distributes the switching schedule in advance to a second radio station associated with the current radio wave propagation path and a second radio station associated with the switching candidate radio wave propagation path at predetermined time intervals.

[0014] In the site diversity switching control device according to the present invention, it is preferable that the throughput prediction unit predicts, based on the rain attenuation calculated by the attenuation calculation unit, values ​​related to the throughput, such as the total throughput for each of the radio wave propagation paths at each predetermined time interval, the accumulated throughput for each of the radio wave propagation paths from the present to a predetermined time in the future, the throughput increase / decrease for each of the radio wave propagation paths at each predetermined time interval, and the line state for each of the radio wave propagation paths at each predetermined time interval, and the schedule creation unit evaluates the total throughput and the accumulated throughput predicted by the throughput prediction unit with a predetermined weighting, thereby determining the candidate radio wave propagation paths to be switched to and the timing of switching, which will optimize the number of site diversity switching times and throughput between the present and a predetermined time in the future.

[0015] In the diversity switching control device of the present invention, it is preferable that the predetermined weighting is at least one of a weighting that takes into account the tendency of throughput to increase or decrease from each total throughput amount predicted by the throughput prediction unit, a weighting that takes into account a time-wise weighting that evaluates the nearer the future from the present as a larger value and the farther the future from the present as a smaller value, and a weighting that determines whether each total throughput amount predicted by the throughput prediction unit is below the line operation limit.

[0016] In the site diversity switching control device of the present invention, it is preferable that the attenuation amount calculation unit determines each of the radio wave propagation paths based on first location information including the latitude, longitude, altitude and retention range of the first radio station and second location information including the latitude, longitude and altitude of the antenna of the second radio station.

[0017] In the site diversity switching control device of the present invention, it is preferable that the schedule creation unit calculates the line quality of each of the radio wave propagation paths based on a value related to the throughput predicted by the throughput prediction unit, determines a priority of switching candidates for the radio wave propagation paths based on the calculated line quality, the second radio station switched in accordance with the switching schedule obtains the actual line quality of the radio wave propagation path, compares the estimated line quality with the actual line quality, and when the actual line quality is worse than the estimated line quality, includes information on the priority of the switching candidates for switching to the next radio wave propagation path in order of priority in the switching schedule distributed by the distribution unit.

[0018] A site diversity switching control method according to the present invention includes: calculating rain attenuation for each predetermined time interval from the present for each radio wave propagation path between a first radio station constituting a non-terrestrial network and second radio stations installed at multiple terrestrial locations, based on weather forecast information for a predetermined area unit and at predetermined time intervals from the present for a predetermined time ahead; predicting a value related to throughput for each radio wave propagation path for each predetermined time interval from the present, based on the calculated rain attenuation for each radio wave propagation path for each predetermined time interval from the present; determining a candidate radio wave propagation path to be switched from the current radio wave propagation path after a predetermined time and the timing of the switch, based on the predicted value related to throughput for each predetermined time interval from the present; creating a switch schedule for executing the determined switch; distributing the created switch schedule in advance to the second radio station related to the current radio wave propagation path and the second radio station related to the candidate radio wave propagation path to be switched to; and having received the switch schedule, the second radio station related to the current radio wave propagation path and the second radio station related to the candidate radio wave propagation path to be switched to execute site diversity switch according to the switch schedule.

[0019] A site diversity switching control program according to the present invention causes a computer to execute the following steps: calculating rain attenuation for each predetermined time interval from the present for each radio wave propagation path between a first radio station constituting a non-terrestrial network and second radio stations installed at multiple terrestrial locations, based on weather forecast information for a predetermined area unit and for a predetermined time ahead at predetermined time intervals from the present; predicting a value related to throughput for each radio wave propagation path for each predetermined time interval from the present, based on the calculated rain attenuation for each radio wave propagation path for each predetermined time interval from the present; determining a candidate radio wave propagation path to be switched from the current radio wave propagation path after a predetermined time and the timing of the switch, based on the predicted value related to throughput for each predetermined time interval from the present, and creating a switch schedule for executing the decided switch; and distributing the created switch schedule in advance to a second radio station related to the current radio wave propagation path and a second radio station related to the candidate radio wave propagation path to be switched to.

[0020] The site diversity switching control according to the present invention enables stable line operation and maximization of throughput, is flexibly applicable regardless of the size or type of network, can suppress cost increases, and enables rapid site diversity switching control.

[0021] Fig. 4 is a diagram showing the configuration of a communication network using HAPS according to one embodiment of the present invention. Fig. 5 is a diagram for explaining switching of diversity routes in a communication network according to one embodiment of the present invention. Fig. 6 is a diagram showing the configuration of the ground side of a communication network according to one embodiment of the present invention. Fig. 7 is a block diagram showing the configuration of a site diversity switching control device according to one embodiment of the present invention. Fig. 8 is a flowchart showing the operation of the site diversity switching control device shown in Fig. 4. Fig. 9 is a diagram showing the relationship between high-resolution precipitation nowcast adopted in the site diversity switching control device according to one embodiment of the present invention and radio wave propagation paths.

[0022] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the embodiment, the present invention will be described in terms of a lower concept that embodies the technical idea of ​​the present invention in order to facilitate understanding and implementation of the present invention, but the present invention is not limited to this.

[0023] FIG. 1 is a diagram showing the configuration of a communication network using HAPS according to an embodiment of the present invention.

[0024] The communication network shown in Figure 1 includes a high altitude platform station (HAPS) 1 (also called a "high altitude pseudo satellite" or "stratospheric platform") as a first radio station constituting a non-terrestrial network. The HAPS 1 is located in an airspace at a predetermined altitude and forms a three-dimensional cell (three-dimensional area) 2 in a cell formation target airspace at the predetermined altitude, forming a coverage area 4 in a predetermined region where communication is possible via a radio wave propagation path 3.

[0025] HAPS1 is a relay communication station mounted on a solar plane, a floating body controlled autonomously or externally to float or fly in a high-altitude airspace (floating airspace) 100 km or less above ground or sea level, typically at an altitude of 20 km. Therefore, one coverage area 4 of HAPS1 is relatively narrow compared to other non-terrestrial networks. HAPS1 may also be a relay communication station mounted on another floating body such as an airship.

[0026] A plurality of sites 5 serving as second radio stations, three sites 5 in this example, are installed at a plurality of positions on the ground (including over the sea) within the coverage area 4 formed by the HAPS 1. For example, the sites 5 control the directional beam of their own antennas to track the HAPS 1 moving in the air, and radio wave propagation paths 3 are formed between the HAPS 1 and each of these sites 5. For example, the HAPS 1 may control the directional beam of its antenna to track the coverage area 4 or the site 5 as it moves in the air.

[0027] In this embodiment, the HAPS 1 floats at an altitude of about 20 km, has a coverage area radius of about 50 km, and forms a radio wave propagation path 3 between the HAPS 1 and the site 5 using the millimeter wave band (38 GHz band).

[0028] Site diversity switching control normally involves switching to another site 5 on a wireless propagation path 3, as indicated by arrow 6 in the figure, to avoid rain attenuation when rain is falling on the wireless propagation path 3 of the site 5 currently forming the wireless propagation path 3 with the HAPS 1, as shown in the figure. However, the site diversity switching control of this embodiment typically involves predicting near-future fluctuations in throughput due to the amount of rain attenuation on each wireless propagation path 3, and switching sites 5 in advance to optimize throughput and the number of switching operations.

[0029] 1, three sites 5 exist for one HAPS 1, but there may be one or more sites 5 for each of multiple HAPS 1. Links between multiple HAPS 1 may be formed using optical wireless communication dedicated to the communication function between them, or the directivity of an antenna for forming a radio wave propagation path between the HAPS 1 and the site 5 may be changed so that it is between the HAPS 1 and used each time.

[0030] For example, as shown in FIG. 2, one or more sites 5 may exist for each of a plurality of HAPS 1.

[0031] 2, for route 3a as the feeder link radio wave propagation path 3, the number of diversity routes increases by passing through adjacent HAPS 1, as in routes 3b, 3c, and 3d. For route 3e as the service link radio wave propagation path 3, a diversity route can also be configured via a HAPS 1 that can cover the coverage area 4, as in route 3f.

[0032] When link 3L is formed by changing the directivity of the antenna for forming the radio wave propagation path between the above-mentioned HAPS1 so that it is between the HAPS1, etc., and link 3L is used each time, for example, the beam of HAPS1 in the center of the figure that was used on route 3a can be redirected to HAPS1 on the right in the figure, and communication with HAPS1 on the right in the figure can be established, and then route 3c or 3d can be switched to.

[0033] FIG. 3 is a diagram showing the configuration of the ground side of a communication network according to an embodiment of the present invention.

[0034] 3, each site 5 is connected via an intranet 7, and each site 5 is connected to a cloud server 8 via the Internet 9. A site diversity switching control device 10 is implemented in the cloud server 8. The connections between each site 5 may be via the Internet 9, and these connections are not limited to the Internet 9, the intranet 7, or the like.

[0035] FIG. 4 is a block diagram showing the configuration of the site diversity switching control device 10.

[0036] As shown in FIG. 4, the site diversity switching control device 10 includes an attenuation amount calculation unit 11, a throughput prediction unit 12, a schedule creation unit 13, and a distribution unit 14.

[0037] The attenuation calculation unit 11 calculates the rain attenuation for each predetermined time interval on each radio wave propagation path 3 between the HAPS 1 and each site 5, based on weather forecast information for each predetermined area and for a predetermined time period from the present to the future. As this weather forecast information, a high-resolution precipitation nowcast, which will be described later, can typically be used.

[0038] High-resolution precipitation nowcasts are available for a fee via the Internet9. In Japan, the Japan Meteorological Agency uses weather radar observation data to cover land and coastal areas nationwide at a resolution of 250m, and provides precipitation distribution forecast information for the next 30 minutes at 5-minute intervals from the present, updated every 5 minutes.

[0039] The attenuation calculation unit 11 calculates the time progression of rainfall for each radio wave propagation path 3 between HAPS 1 and each site 5 from this high-resolution precipitation nowcast, and calculates the predicted rain attenuation for each radio wave propagation path 3 at predetermined time intervals from the present based on this calculation result.

[0040] The throughput prediction unit 12 predicts values ​​relating to the throughput of each radio wave propagation path 3 at predetermined time intervals from the present based on the rain attenuation calculated by the attenuation calculation unit 11 for each radio wave propagation path 3 at predetermined time intervals from the present.

[0041] For example, the throughput prediction unit 12 calculates the predicted interval throughput amount for the radio wave propagation path 3 between HAPS1 and each of these sites 5 at 5-minute intervals from the present based on the rain attenuation calculated by the attenuation calculation unit 11, and accumulates the total throughput amount for the next 30 minutes, the increase or decrease in throughput for each radio wave propagation path 3 every 5 minutes, the number of times the line is down or the SNR falls below the operational limit (for example, below the required SNR which is the operationally acceptable lower limit), and accumulates the total throughput amount.

[0042] These link status values ​​are weighted in the time direction to determine which ground station link to use at the current time will enable stable operation of the line (with fewer switching times) and maximize throughput for the next 30 minutes.Weighting in the time direction means that the closer the time from the present to the future, the higher the evaluation, and the further the time from the present to the future, the lower the evaluation.

[0043] The schedule creation unit 13 determines a candidate radio wave propagation path 3 to be switched from the current radio wave propagation path 3 after a predetermined time period and the timing of the switch based on the values ​​related to throughput at predetermined time intervals from the present predicted by the throughput prediction unit 12, and creates a switch schedule for executing the determined switch.

[0044] The distribution unit 14 distributes the switching schedule created by the schedule creation unit 13 in advance to the site 5 related to the current radio wave propagation path 3 and the site 5 related to the candidate radio wave propagation path 3 to be switched to. The current site 5 and the candidate site 5 that have received the switching schedule perform site diversity in accordance with the switching schedule.

[0045] When high-resolution precipitation nowcasts are used as weather forecast information, it is preferable to determine whether to switch between site diversity systems every five minutes, since the high-resolution precipitation nowcasts are updated every five minutes. That is, the attenuation calculation unit 11 calculates the change in rain attenuation every five minutes, the throughput prediction unit 12, the schedule creation unit 13, and the distribution unit 14 transmit a switching schedule every five minutes, and the current site 5 and the candidate sites 5 for switching to the current site 5 execute site diversity according to the switching schedule.

[0046] Next, the operation of the site diversity switching control in the communication network configured as above will be described below. Fig. 5 is a flowchart showing the operation of the site diversity switching control device 10.

[0047] The attenuation amount calculation unit 11 of the site diversity switching control device 10 acquires location information such as the latitude, longitude, altitude, and retention range of HAPS 1 (step 401), and acquires location information such as the latitude, longitude, and altitude of the antenna at site 5 (step 402). This allows for understanding the three-dimensional positional relationship between HAPS 1 and the multiple sites 5. Here, the location information for HAPS 1 is acquired from, for example, current position information (e.g., GPS position information) and position control information (e.g., flight schedule information) obtained from HAPS 1 itself, and the location information for the antenna at site 5 is acquired from, for example, position information (e.g., GPS position information) obtained from site 5 itself.

[0048] The attenuation calculation unit 11 identifies the mesh corresponding to the high-resolution precipitation nowcast data based on the location information of HAPS 1 and the location information of the antenna at site 5 (step 403), and acquires the mesh data of the high-resolution precipitation nowcast data via the Internet 9 (step 404). As the high-resolution precipitation nowcast data, the mesh data of the actual analysis value (0 minute) and the forecast value (5 minutes later, 10 minutes later, ... 30 minutes later) is acquired. This makes it possible to acquire high-resolution precipitation nowcast data for the positional relationship between HAPS 1 and site 5, i.e., weather forecast information (every 5 minutes, up to 30 minutes ahead).

[0049] The attenuation calculation unit 11 calculates the rain attenuation (0 minutes, 5 minutes, 10 minutes, ... 30 minutes) on the radio wave propagation path 3 based on the corresponding mesh data of the high-resolution precipitation nowcast data (step 405).

[0050] When calculating the amount of rain attenuation, for example, as shown in Figure 6, if HAPS1 and site 5 on the corresponding mesh data of the high-resolution precipitation nowcast data have the positional relationship shown in the figure, the raindrop layer height is also taken into consideration, and propagation paths above the raindrop layer height are distinguished from propagation paths below the raindrop layer height, and the rain attenuation is calculated assuming that propagation paths below the raindrop layer height are attenuated by rain and that propagation paths above the raindrop layer height are not attenuated by rain.

[0051] The rain attenuation amount of the radio wave propagation path 3 can be calculated using a recommendation for calculating the rain attenuation amount of the radio wave propagation path using a rain attenuation estimation method according to ITU-R Rec. 618-13 (Propagation data and prediction methods required for the design of Earth-space telecommunication systems), for example. ITU-R Rec. 618-13 is disclosed at https: / / www.itu.int / dms_pubrec / itu-r / rec / p / R-REC-P.618-13-201712-I!!PDF-E.pdf.

[0052] The throughput prediction unit predicts the following based on the rain attenuation of the radio wave propagation path 3 calculated by the attenuation calculation unit 11 (step 406).

[0053] (1) The total throughput of each radio wave propagation path 3 every 5 minutes, that is, the total throughput of each radio wave propagation path 3 after 0 minutes, 5 minutes, 10 minutes, ... 30 minutes

[0054] (2) The cumulative throughput of each radio wave propagation path 3 for the next 30 minutes

[0055] (3) The increase or decrease in throughput of each radio wave propagation path 3 every 5 minutes, that is, the increase or decrease in throughput of each radio wave propagation path 3 after 5 minutes, 10 minutes, ..., 25 minutes.

[0056] (4) The number of times that each radio wave propagation path 3 experiences line disconnection or falls below the operational limit (for example, below the required SNR, which is the operationally acceptable lower limit) every 5 minutes, and the total throughput amount are calculated, i.e., the number of times that each radio wave propagation path 3 experiences line disconnection or falls below the operational limit after 0 minutes, 5 minutes, 10 minutes, ... 30 minutes, and the total throughput amount are calculated. The operations of steps 401 to 406 above are performed for each radio wave propagation path 3, and the operations of steps 401 to 406 are performed for the radio wave propagation path 3 of each site 5 in addition to the radio wave propagation path 3 of the main line. Once the above estimations (1) to (4) have been made for all radio wave propagation paths 3 (step 407), the schedule creation unit 13 creates a switching schedule including the priorities of the switching candidates (step 408).

[0057] By predicting the rain attenuation and throughput of the radio wave propagation path 3 for each radio wave propagation path 3 rather than for all radio wave propagation paths 3 at once, it is possible to flexibly respond to increases, decreases, or changes in the number of radio wave propagation paths 3.

[0058] The schedule creation unit 13 evaluates the total throughput ((1) above) and the integrated throughput ((2) above) predicted by the throughput prediction unit 12 with a predetermined weighting, thereby determining candidate radio wave propagation paths 3 to be switched to and the timing of switching that will optimize the number of site diversity switching operations and the throughput for the next 30 minutes from the present. Here, the predetermined weighting is at least one of a weighting that takes into account the tendency of throughput to increase or decrease from each total throughput amount predicted by the throughput prediction unit 12, a weighting that takes into account a time-axis weighting that evaluates a throughput that is closer to the present and a time-axis weighting that evaluates a throughput that is further from the present less than the line operation limit, and a weighting that indicates whether each total throughput amount predicted by the throughput prediction unit 12 is equal to or less than the line operation limit. The priority of candidate radio wave propagation paths 3 to be switched is determined based on the calculated line quality by calculating the line quality of each radio wave propagation path 3 based on the value related to the throughput predicted by the throughput prediction unit 12.

[0059] The priority of the switching candidate for the radio wave propagation path 3 is information on the priority of the switching candidate, which is used when the site 5 switched in accordance with the switching schedule obtains the actual line quality of the radio wave propagation path 3, compares the estimated line quality with the actual line quality, and, if the actual line quality is worse than the estimated line quality, switches to the next radio wave propagation path 3 in order of priority. The information on the priority of the switching candidate is included in the switching schedule distributed by the distribution unit 14.

[0060] The creation of the switching schedule by the schedule creation unit 13 may be configured to improve the accuracy of the schedule creation operation status based on the total throughput (above (1)), the accumulated throughput (above (2)), the throughput increase / decrease (above (3)), and the line status (above (4)) through machine learning using AI.

[0061] The distribution unit 14 distributes the switching schedule created by the schedule creation unit 13 to the site 5 of the main line as well as to the sites 5 that are candidates for diversity switching (step 409).

[0062] The current site 5 and the candidate site 5 that have received the switching schedule perform site diversity switching according to the switching schedule (step 410).

[0063] The above operations of steps 401 to 411 are executed every 5 minutes when the high-resolution precipitation nowcast data is updated (step 412).

[0064] Here, when a site 5 that has become a switching candidate based on the switching schedule forms a radio wave propagation path 3 with the HAPS 1, it obtains the line quality as an actual measurement of the radio wave propagation path 3, compares the estimated line quality with the actual line quality, and if the actual line quality is worse than the estimated line quality, notifies the site 5. The site 5 that becomes the next candidate according to the order of priority receives this and executes switching control to form a radio wave propagation path 3 with the HAPS 1. Thereafter, similar acquisition of the actual line quality is performed. Switching the site 5 according to the order of priority is merely an example, and other configurations are of course acceptable. The actual measurement values ​​of the radio wave propagation path 3 may be rainfall observation results or radio wave quality measured in real time. The actual measurement values ​​of the radio wave propagation path 3 may be used to improve accuracy by real-time correction of the predicted throughput calculation algorithm in the throughput prediction unit, or to optimize the diversity switching timing.

[0065] According to the site diversity switching control of the above embodiment, high-resolution precipitation nowcast, which is information on highly accurate real-time rainfall and future rainfall forecasts on a nationwide 250-meter mesh obtained by precipitation radars installed throughout Japan, is utilized to execute site diversity by making active switching decisions based on predictions, rather than passive switching decisions based on observations. In other words, it is possible to schedule site 5 switching using near-future weather forecast information, rather than switching sites 5 based on actual observation data, and it is possible to realize site diversity switching that can respond to sudden rainfall such as rainfall along the radio wave propagation path 3 or sudden heavy rain.

[0066] For example, since site diversity switching control can be realized via the Internet, if each site 5 has, for example, a low-cost connection to the Internet 9, the optimum switching route can be selected from a plurality of diversity switching candidate routes with high accuracy even in a complex communication network with a large number of sites 5.

[0067] Furthermore, because the switching of Site 5 is optimized every five minutes, it is possible to flexibly respond to changes in the propagation path due to fluctuations in the location of HAPS1 and changes in the ground station link via communication between HAPS1s. Furthermore, because the switching is performed based on pre-scheduled timing, the network load is small and compatibility with mobile phone networks is high, making it possible to support large-scale networks such as mobile phone network backhaul lines.

[0068] Furthermore, there is no need for rain gauges or measuring devices for the quality level of radio waves at each site 5, and a communication network using site diversity can be constructed at low cost.

[0069] In addition, because the switching algorithm is based on throughput prediction, it can easily accommodate not only the conventional one-to-one switching destination but also one-to-n switching destination networks, and as the weather information provided in the future becomes more comprehensive, it will be possible to improve the accuracy of site diversity switching without adding any additional equipment.

[0070] The results of a simulation carried out to confirm the effects of the present invention are shown below.

[0071] Assuming that the distance between the two points (stations A and B) at site 5 is short, i.e., that the correlation between rainfall is high, and that only a time lag in the pattern of rainfall occurs (cases 1, 2, and 3), in the case of the present invention (calculated in (1) to (3) below), it can be seen that a total section throughput comparable to that of minimum rainfall diversity is obtained, a total section throughput always greater than that of existing diversity (with hysteresis characteristics), and operation can be performed with fewer switching times than minimum rainfall diversity and existing diversity (see (4) to (6) below). In other words, the present invention enables stable line operation and maximization of throughput.

[0072] Here, proactive site diversity is the site diversity of the present invention. The conditions for existing hysteresis diversity in (4) to (6) below are to switch when station A's threshold is 30%, and to return when station A's threshold exceeds 30% and is cleared n times in a row, switching back on the (n+1)th time, but if station B falls below the 30% threshold, it will forcibly return to station A. The minimum rainfall diversity in (4) to (6) below measures actual rainfall at stations A and B and switches to the station with the lowest rainfall.

[0073] (1) Calculation for Case 1

[0074]

[0075] (2) Calculation of Case 2

[0076]

[0077] (3) Calculation of Case 3

[0078]

[0079] (4) Comparison of Case 1

[0080]

[0081] (5) Comparison of Case 2

[0082]

[0083] (6) Comparison of Case 3

[0084]

[0085] The present invention is not limited to the above-described embodiments, and various modifications and applications are possible within the scope of the technical concept of the present invention, and the scope of implementation thereof also belongs to the technical scope of the present invention.

[0086] For example, the present invention is also applicable to frequency bands other than millimeter waves, such as terahertz waves and SHF waves.

[0087] The present invention is applicable to geostationary satellite communications and low-earth-orbit satellite communications, as well as to standalone systems such as terrestrial wireless (microwave) networks and NTNs (Non-Terrestrial Networks) that combine these.

[0088] The present invention also makes it possible to correct errors between predictions and actual results by using a rain gauge and a radio wave quality level measuring device in combination, thereby improving accuracy.

[0089] REFERENCE SIGNS LIST 1 HAPS (first radio station) 3 Radio wave propagation path 5 Site (second radio station) 10 Site diversity switching control device 11 Attenuation amount calculation unit 12 Throughput prediction unit 13 Schedule creation unit 14 Distribution unit

Claims

1. A site diversity switching control device comprising: an attenuation calculation unit that calculates rain attenuation for each predetermined time interval from the present for each radio wave propagation path between a first radio station constituting a non-terrestrial network and a second radio station installed at multiple terrestrial positions, based on weather forecast information for a predetermined area unit and at predetermined time intervals from the present for a predetermined time ahead; a throughput prediction unit that predicts a value related to throughput for each predetermined time interval from the present for each radio wave propagation path, based on the rain attenuation for each predetermined time interval from the present for each radio wave propagation path calculated by the attenuation calculation unit; a schedule creation unit that determines a candidate radio wave propagation path to be switched to from the current radio wave propagation path after a predetermined time and the timing of the switching, based on the value related to throughput for each predetermined time interval from the present predicted by the throughput prediction unit, and creates a switching schedule for executing the decided switching; and a distribution unit that distributes in advance the switching schedule created by the schedule creation unit to a second radio station related to the current radio wave propagation path and a second radio station related to the candidate radio wave propagation path to be switched to.

2. A site diversity switching control device as described in claim 1, wherein the attenuation calculation unit updates the weather forecast information at predetermined time intervals, the throughput prediction unit predicts a value related to the throughput at predetermined time intervals, the schedule creation unit creates the switching schedule at predetermined time intervals, and the distribution unit distributes the switching schedule in advance to a second radio station associated with the current radio wave propagation path and a second radio station associated with the switching candidate radio wave propagation path at predetermined time intervals.

3. A site diversity switching control device as claimed in claim 1 or 2, wherein the throughput prediction unit predicts, based on the rain attenuation calculated by the attenuation calculation unit, a total throughput for each of the radio wave propagation paths at each predetermined time interval and an accumulated throughput for each of the radio wave propagation paths from the present to a predetermined time in the future as values ​​related to the throughput, and the schedule creation unit evaluates the total throughput and the accumulated throughput predicted by the throughput prediction unit with a predetermined weighting, thereby determining the candidate radio wave propagation paths to be switched to and the timing of switching that will optimize the number of site diversity switches and throughput between the present and the predetermined time in the future.

4. A site diversity switching control device as described in claim 3, wherein the predetermined weighting is at least one of a weighting that takes into account the tendency of throughput to increase or decrease from each total throughput amount predicted by the throughput prediction unit, a weighting that takes into account a time-direction weighting that evaluates the closer the time from the present to the future more highly and the further the time from the present to the future less highly, and a weighting that determines whether each total throughput amount predicted by the throughput prediction unit is below the line operation limit.

5. A site diversity switching control device as claimed in any one of claims 1 to 4, wherein the attenuation calculation unit determines each of the radio wave propagation paths based on first location information including the latitude, longitude, altitude and retention range of the first radio station and second location information including the latitude, longitude and altitude of the antenna of the second radio station.

6. A site diversity switching control device as claimed in any one of claims 1 to 5, wherein the schedule creation unit calculates the line quality of each of the radio wave propagation paths based on a value relating to the throughput predicted by the throughput prediction unit, determines a priority of switching candidates for the radio wave propagation paths based on the calculated line quality, the second radio station switched in accordance with the switching schedule obtains the actual line quality of the radio wave propagation path and compares the estimated line quality with the actual line quality, and when the actual line quality is worse than the estimated line quality, includes information on the priority of switching candidates for switching to the next radio wave propagation path in the switching schedule distributed by the distribution unit.

7. A method for controlling site diversity switching, comprising: calculating an amount of rain attenuation for each predetermined time interval from the present for each radio wave propagation path between a first radio station constituting a non-terrestrial network and second radio stations installed at multiple terrestrial positions, based on weather forecast information for a predetermined area unit and at predetermined time intervals from the present for a predetermined time ahead; predicting a value related to throughput for each of the radio wave propagation paths for each predetermined time interval from the present based on the calculated amount of rain attenuation for each of the radio wave propagation paths for each predetermined time interval from the present; determining a candidate radio wave propagation path to be switched to after a predetermined time from the current radio wave propagation path and a timing of the switching, based on the predicted value related to throughput for each predetermined time interval from the present, creating a switching schedule for executing the determined switching; distributing the created switching schedule in advance to the second radio station related to the current radio wave propagation path and the second radio station related to the candidate radio wave propagation path to be switched to; 8. A site diversity switching control program that causes a computer to execute the steps of: calculating rain attenuation for each predetermined time interval from the present for each radio wave propagation path between a first radio station that constitutes a non-terrestrial network and second radio stations installed at multiple terrestrial positions, based on weather forecast information for a predetermined area unit and at predetermined time intervals from the present for a predetermined time ahead; predicting a value related to throughput for each of the radio wave propagation paths for each predetermined time interval from the present, based on the calculated rain attenuation for each of the radio wave propagation paths for each predetermined time interval from the present; determining a candidate radio wave propagation path to be switched to from the current radio wave propagation path after a predetermined time and the timing of the switching, based on the predicted value related to throughput for each predetermined time interval from the present, and creating a switching schedule for executing the determined switching; and distributing the created switching schedule in advance to a second radio station related to the current radio wave propagation path and a second radio station related to the candidate radio wave propagation path to be switched to.

Citation Information

Patent Citations

  • Multi-feeder link configuration in haps communication system and control therefor

    WO2020202817A1

Cited By

  • Wireless communication system, communication path control device, communication path control method, and communication path control program

    WO2026100048A1