Work machine

The system automatically selects the appropriate priority pump for hydraulic excavators by using a controller to classify operating load patterns and adjust priority pump data, addressing the challenge of varying load conditions and operator burden in hydraulic excavators.

WO2024202356A1PCT designated stage expired Publication Date: 2024-10-03HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/047037
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-28
Filing Date
2023-12-27
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

In working machines like hydraulic excavators, determining the appropriate priority pump for hydraulic actuators is challenging due to varying load pressure conditions and operations, placing a heavy burden on operators and complicating the selection process as the number of hydraulic actuators increases.

Method used

A system comprising multiple hydraulic pumps, directional control valves, pump merging valves, load pressure sensors, and a controller that classifies operating load patterns and adjusts priority pump data based on actual and estimated optimization indices to automatically determine the appropriate priority pump for each hydraulic actuator.

Benefits of technology

This solution allows for the automatic determination of appropriate priority pumps for hydraulic actuators in various situations, reducing operator burden and improving fuel efficiency and workability by optimizing pressure oil supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023047037_03102024_PF_FP_ABST
    Figure JP2023047037_03102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided is a work machine comprising: a first hydraulic actuator that uses a plurality of hydraulic pumps as hydraulic sources; a plurality of pump merging valves that control the flow rate of pressure oil supplied from the plurality of hydraulic pumps to the first hydraulic actuator; a second hydraulic actuator that shares the hydraulic sources with the first hydraulic actuator; and a controller that controls the plurality of pump merging valves. The controller stores priority pump data defining a priority pump corresponding to the first hydraulic actuator for each operation load pattern, controls the plurality of pump merging valves while identifying the priority pump on the basis of the priority pump data according to the operation load pattern at the time when the first operation device is operated, and updates the priority pump data by learning from operation signals of the first and second operation devices and the load pressure of the first hydraulic actuator. This makes it possible to determine an appropriate priority pump for each hydraulic actuator in various scenes regardless of judgement by an operator.
Need to check novelty before this filing date? Find Prior Art

Description

Work machinery

[0001] The present invention relates to a work machine such as a hydraulic excavator.

[0002] Some work machines, such as hydraulic excavators, are equipped with multiple hydraulic pumps and configured to supply pressurized oil from the multiple hydraulic pumps to the same hydraulic actuator. In this type of work machine, pressurized oil is supplied to each hydraulic actuator from a hydraulic pump that is pre-set to have the highest priority (hereinafter referred to as a priority pump). If the supply flow rate is insufficient relative to a target flow rate, the shortage is made up for by oil discharged from other hydraulic pumps. The priority pump is typically set for each hydraulic actuator, taking into account factors such as its operating frequency, the frequency of use in combined operations with other hydraulic actuators, and the workload. If hardware such as the opening characteristics of the control valve and the hydraulic circuit are adjusted according to the priority pump setting for each hydraulic actuator, the correspondence between the hydraulic actuator and the priority pump cannot be easily changed.

[0003] In response to this, a system is known in which multiple modes with different correspondences between hydraulic actuators and priority pumps are prepared in advance, and the correspondences between hydraulic actuators and priority pumps can be changed by arbitrarily selecting a mode (see Patent Document 1).

[0004] Japanese Patent Application Laid-Open No. 2021-110406

[0005] However, the technology described in Patent Document 1 involves an operator selecting any mode from a number of pre-prepared modes to change the priority pump, which poses the following problems:

[0006] First, work machines perform a wide variety of tasks, and the load pressure conditions of hydraulic actuators vary greatly depending on the work site and situation, even when performing the same operation. Therefore, the appropriate priority pump for each hydraulic actuator may differ even between cases where similar operations are expected. As a result, the operator must determine and select the appropriate mode so that the relationship between each hydraulic actuator and the priority pump is appropriate for each task, which places a heavy burden on the operator.

[0007] Furthermore, as the number of hydraulic actuators that use a plurality of hydraulic pumps as pressure oil supply sources increases, setting an appropriate priority pump for each hydraulic actuator becomes more complicated, and determining the mode itself becomes more difficult.

[0008] An object of the present invention is to provide a work machine that can determine an appropriate priority pump for each hydraulic actuator in various situations without relying on the judgment of the operator.

[0009] In order to achieve the above object, the present invention provides a working machine comprising a plurality of hydraulic pumps, a first hydraulic actuator using the plurality of hydraulic pumps as hydraulic pressure sources, a directional control valve for controlling the flow of pressure oil to the first hydraulic actuator, a plurality of pump junction valves for controlling the supply flow rates of pressure oil from the plurality of hydraulic pumps to the first hydraulic actuator, a first operating device for operating the directional control valve, a load pressure sensor for detecting the load pressure of the first hydraulic actuator, a second hydraulic actuator that can share a hydraulic pressure source with the first hydraulic actuator, a second operating device for operating the second hydraulic actuator, and a controller for controlling the plurality of pump junction valves, wherein the controller stores priority pump data that specifies a priority pump that is selected from the plurality of hydraulic pumps in accordance with operation of the first operating device and that supplies pressure oil preferentially to the first hydraulic actuator for each operating load pattern classified by operation patterns of the first hydraulic actuator and the second hydraulic actuator and a load pattern of a hydraulic circuit of the first hydraulic actuator, and and a second function relating to learning of priority pump data, wherein when the first operating device is operated, the first function controls the plurality of pump junction valves based on the operation pattern corresponding to a first operating signal input in response to operation of the first operating device and a second operating signal input in response to operation of the second operating device, the load pattern corresponding to the load pressure input from the load pressure sensor, and the priority pump data, and the second function accumulates performance data of the first operating signal, the second operating signal, and the load pressure, and calculates, based on the performance data, an actual value of a predetermined optimization index that is set in advance for operation of the first operating device under implementation conditions in which pressure oil is preferentially supplied to the first hydraulic actuator from the priority pump, and calculates, based on the performance data, an estimated value of the optimization index for operation of the first operating device under hypothetical conditions in which pressure oil is preferentially supplied to the first hydraulic actuator from a non-priority pump that is a hydraulic pump other than the priority pump, compares the actual value with the estimated value, and if the estimated value is better than the actual value, updates the priority pump data to reflect the hypothetical conditions.

[0010] According to the present invention, it is possible to determine an appropriate priority pump for each hydraulic actuator in various situations without relying on the judgment of the operator.

[0011] FIG. 4 is a diagram showing an example of priority pump data; FIG. 5 is a diagram showing actual and estimated values ​​of integral values ​​of branch throttling loss for the period from time T5 to time T8 in FIG. 4;

[0012] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

[0013] 1. Work Machine Figure 1 is a side view of a hydraulic excavator, which is an example of a work machine according to an embodiment of the present invention. In this embodiment, a hydraulic excavator with a bucket 23 attached as an attachment to the tip of a work implement 20 (front work machine) will be described as an example of a work machine. However, the present invention can also be applied to hydraulic excavators with attachments other than a bucket, or other types of work machines such as wheel loaders and bulldozers. In this specification, the front of the operator's cab 16 (the left side in Figure 1) is defined as the front of the hydraulic excavator (strictly speaking, the front of the rotating bed 12).

[0014] The hydraulic excavator shown in the drawing includes a vehicle body 10 and a working device 20. The vehicle body 10 includes a running body 11 and a revolving body 12.

[0015] In this embodiment, the traveling body 11 is equipped with left and right crawler-type traveling devices 13 having endless track tracks, and travels by driving the left and right traveling devices 13 respectively by left and right traveling motors 14. Hydraulic motors are used as the traveling motors 14.

[0016] The rotating body 12 is mounted on the upper part of the running body 11 via a swing device 15 so as to be able to swing. The swing device 15, which connects the running body 11 and the rotating body 12, includes a swing motor 34 ( FIG. 2 ), and the rotating body 12 is driven by the swing motor 34 to swing around a central axis that is vertical to the running body 11. A hydraulic motor is used for the swing motor 34. A cab 16 in which an operator sits is provided at the front of the rotating body 12 (on the front left side in this embodiment). A machine room 17 that houses hydraulic pumps 40 a, 40 b ( FIG. 2 ) and the like is mounted behind the cab 16 of the rotating body 12, and a counterweight 18 that balances the weight of the working device 20 is mounted at the rear end.

[0017] The working device 20 is an articulated working arm for performing work such as excavating earth and sand, and is connected to the front of the revolving unit 12 (to the right of the cab 16 in this embodiment). The working device 20 includes a boom 21, an arm 22, and a bucket 23. The boom 21 is connected to a base frame of the revolving unit 12, called a revolving frame, by a pin and rotates up and down relative to the revolving unit 12 as a boom cylinder 31 extends and retracts. Both ends of the boom cylinder 31 are rotatably connected to the boom 21 and the revolving unit 12. The arm 22 is connected to the tip of the boom 21 by a pin and rotates back and forth relative to the boom 21 as an arm cylinder 32 extends and retracts. Both ends of the arm cylinder 32 are rotatably connected to the arm 22 and the boom 21. The bucket 23 is connected to the tip of the arm 22 by a pin and rotates relative to the arm 22 as a bucket cylinder 33 extends and retracts. The base end of the bucket cylinder 33 is connected to the arm 22, and the tip end is connected to the bucket 23 via a link. The boom cylinder 31, arm cylinder 32, and bucket cylinder 33 that drive the work device 20 are hydraulic actuators. The bucket 23 is an attachment that can be replaced with another attachment, such as a grapple or a crusher.

[0018] 2. Hydraulic System Figure 2 is a hydraulic circuit diagram of the essential parts of the hydraulic system installed in the hydraulic excavator of Figure 1. Figure 2 shows only the circuits that drive the boom cylinder 31, arm cylinder 32, bucket cylinder 33, and swing motor 34.

[0019] The hydraulic system shown in FIG. 2 includes a plurality of (two in this embodiment) hydraulic pumps 40a, 40b, a pilot pump 40c, a control valve V, operation devices 61-64, load pressure sensors 71a, 71b, 72a, 72b, 73a, 73b, 74a, 74b, pump pressure sensors 80a, 80b, and a controller 100.

[0020] 2-1. Hydraulic Pumps The hydraulic pumps 40a, 40b are hydraulic sources for the hydraulic actuators mounted on the hydraulic excavator, such as the boom cylinder 31, arm cylinder 32, bucket cylinder 33, and swing motor 34. They draw hydraulic oil from a hydraulic oil tank T and discharge pressurized oil to drive these hydraulic actuators. These hydraulic pumps 40a, 40b are driven by a prime mover 45. While FIG. 2 illustrates an engine (internal combustion engine) as the prime mover 45, an electric motor may also be used as the prime mover 45. The hydraulic pumps 40a, 40b may be fixed displacement pumps, but this embodiment illustrates a case where a variable displacement pump is used. While FIG. 2 illustrates a hydraulic system equipped with two hydraulic pumps 40a, 40b, the hydraulic system may be equipped with three or more hydraulic pumps.

[0021] The pressure oil discharged from the hydraulic pump 40a flows through a pump line PLa, which is the discharge pipe of the hydraulic pump 40a, and is supplied to each hydraulic actuator, such as the boom cylinder 31, the arm cylinder 32, the bucket cylinder 33, and the swing motor 34, via a control valve V. Accordingly, return oil discharged from each hydraulic actuator flows into a tank line TL via the control valve V and returns to the hydraulic oil tank T. The pump line PLa and the tank line TL are connected via a bleed-off valve 43a. If the discharge flow rate of the hydraulic pump 40a exceeds the total target flow rate of the hydraulic actuators connected to the pump line PLa, the excess flow is bypassed from the pump line PLa to the tank line TL via the bleed-off valve 43a. Although not shown, the pump line PLa and the tank line TL are connected via a relief valve that regulates the maximum pressure of the pump line PLa.

[0022] Similarly, pressure oil discharged from the hydraulic pump 40b flows through a pump line PLb, which is the discharge pipe of the hydraulic pump 40b, and is supplied to each hydraulic actuator, such as the boom cylinder 31, the arm cylinder 32, the bucket cylinder 33, and the swing motor 34, via a control valve V. Accordingly, return oil discharged from each hydraulic actuator flows into a tank line TL via the control valve V and returns to the hydraulic oil tank T. The pump line PLb and the tank line TL are connected via a bleed-off valve 43b. If the discharge flow rate of the hydraulic pump 40b exceeds the total target flow rate of the hydraulic actuators connected to the pump line PLb, the excess amount is bypassed from the pump line PLb to the tank line TL via the bleed-off valve 43b. Although not shown, the pump line PLb and the tank line TL are connected via a relief valve that regulates the maximum pressure of the pump line PLb.

[0023] In this embodiment, a hydraulic circuit for the boom cylinder 31, a hydraulic circuit for the arm cylinder 32, a hydraulic circuit for the bucket cylinder 33, and a hydraulic circuit for the swing motor 34 are connected in parallel to the pump lines PLa and PLb, respectively.

[0024] 2-2. Pilot Pump The pilot pump 40c is a fixed displacement pump that outputs a primary pressure (source pressure) of the pilot pressure that drives the hydraulically driven control valves included in the control valve V, such as the directional control valves 41-43 and pump junction valves 51a, 51b, 52a, 52b, 53a, 53b, 54a, and 54b (described later). This pilot pump 40c is driven by the prime mover 45, just like the hydraulic pumps 40a and 40b. However, the pilot pump 40c may be driven by a power source other than the prime mover 45.

[0025] A pilot primary pressure line PLc, which is the discharge pipe of the pilot pump 40c, is connected to solenoid valves 81, 81a, and 81b that generate pilot pressure (pilot secondary pressure). The solenoid valves 81, 81a, and 81b are electromagnetically driven proportional pressure reducing valves and are driven by command signals from the controller 100. The solenoid valve 81 is a valve that generates pilot pressure to drive a directional control valve 41 (described below) for driving the boom. The solenoid valve 81 reduces the discharge pressure (pilot primary pressure) of the pilot pump 40c to generate pilot secondary pressure and outputs it to a pilot oil chamber of the directional control valve 41 via a pilot secondary pressure line 82. The pilot oil chamber (pilot secondary pressure line 82) of the directional control valve 41 is connected to the pilot primary pressure line PLc and a hydraulic oil tank T at a ratio determined by the solenoid valve 81.

[0026] Similarly, solenoid valve 81a is a valve that generates pilot pressure to drive pump junction valve 51a (described later), and solenoid valve 81b is a valve that generates pilot pressure to drive pump junction valve 51b (described later), and they reduce the discharge pressure (pilot primary pressure) of pilot pump 40c to generate pilot secondary pressure, which is output to pilot oil chambers of pump junction valves 51a, 51b via pilot secondary pressure lines 82a, 82b. The pilot oil chambers (pilot secondary pressure lines 82a, 82b) of pump junction valves 51a, 51b are connected to pilot primary pressure line PLc and hydraulic oil tank T in proportions determined by solenoid valves 81a, 81b, respectively.

[0027] In order to avoid complicating the hydraulic circuit diagram, FIG. 2 shows only three solenoid valves 81 a, 81 a, 81 b that control the hydraulic circuit of the boom cylinder 31, but the hydraulic circuits of the other hydraulic actuators, such as the arm cylinder 32, bucket cylinder 33, and swing motor 34, are also provided with the necessary solenoid valves as appropriate.

[0028] 2-3. Control Valve The control valve V is a control valve unit including various control valves that control the flow rate, direction, and supply source of pressure oil supplied to each hydraulic actuator, such as the boom cylinder 31, arm cylinder 32, bucket cylinder 33, and swing motor 34. The control valves included in this control valve V are shown in FIG. 2 as directional control valves 41-44, pump junction valves 51a, 51b, 52a, 52b, 53a, 53b, 54a, and 54b, and bleed-off valves 43a and 43b. These control valves are electrohydraulic displacement-controlled spool valves driven by pilot pressure generated by solenoid valves (e.g., solenoid valves 81, 81a, and 81b). The directional control valves 41-44 play a role in controlling the flow (direction and flow rate) of pressure oil to the boom cylinder 31, arm cylinder 32, bucket cylinder 33, and swing motor 34. The pump junction valves 51a, 51b, 52a, 52b, 53a, 53b, 54a, and 54b serve to control the supply flow rates (supply ratios) of pressure oil from the hydraulic pumps 40a and 40b to the corresponding hydraulic actuators. The bleed-off valves 43a and 43b serve to discharge excess flow in the pump lines PLa and PLb to the tank line TL.

[0029] 2-3a. Directional Control Valve The directional control valve 41 for the boom cylinder 31 is driven by pilot pressure input from the solenoid valve 81 to its pilot oil chamber and the restoring force of a spring acting on the spool from the opposite side of the pilot oil chamber, and controls the supply and discharge of pressure oil to and from the boom cylinder 31. In this embodiment, FIG. 2 illustrates a directional control valve 41 having a pilot oil chamber on only one side of the spool, but a directional control valve 41 having pilot oil chambers on both sides of the spool can also be used. In this case, another solenoid valve is required in addition to the solenoid valve 81. The ports of the directional control valve 41 are connected to the combined pump line 41L (the combined line of pump lines PLa and PLb) and the tank line TL, as well as the bottom-side oil chamber and rod-side oil chamber of the boom cylinder 31. When the combined pump line 41L is connected to the bottom-side oil chamber by the directional control valve 41, the boom cylinder 31 extends, causing the boom 21 to perform a boom-raising operation. Conversely, when the directional control valve 41 connects the confluence pump line 41L to the rod-side oil chamber, the boom cylinder 31 contracts, causing the boom 21 to boom-down. In the neutral position, the connection between the boom cylinder 31 and the confluence pump line 41L and the tank line TL is cut off, and the boom cylinder 31 stops.

[0030] Like the directional control valve 41 for the boom cylinder 31, the directional control valve 42 for the arm cylinder 32, the directional control valve 43 for the bucket cylinder 33, and the directional control valve 44 for the swing motor 34 are also driven by pilot pressure and the restoring force of a spring. Of course, directional control valves 42-44 with pilot oil chambers on both sides of the spool can also be used. Each port of the directional control valves 42-44 is connected to the combined pump lines 42L-44L, the tank line TL, and two ports of the corresponding hydraulic actuator. When the combined pump line 42L is connected to the bottom-side oil chamber by the directional control valve 42, the arm cylinder 32 extends, causing the arm 22 to perform a crowding motion. Conversely, when the combined pump line 42L is connected to the rod-side oil chamber by the directional control valve 42, the arm cylinder 32 retracts, causing the arm 22 to perform a dumping motion. When the directional control valve 42 returns to its neutral position, the arm cylinder 32 stops. Similarly, the supply direction of pressure oil is switched by the directional control valves 43, 44, whereby the bucket cylinder 33 and the swing motor 34 are operated or stopped.

[0031] 2-3b. Pump Confluence Valve The first pump junction valve 51a for the boom cylinder 31 is driven by pilot pressure input from the solenoid valve 81a to its pilot oil chamber and by the restoring force of a spring acting on the spool from the opposite side of the pilot oil chamber. The pump line PLa of the hydraulic pump 40a is connected to the input port of the pump junction valve 51a, and the above-mentioned confluence pump line 41L is connected to the output port. When the pump junction valve 51a opens, oil discharged from the hydraulic pump 40a flows into the confluence pump line 41L at a flow rate corresponding to the opening of the pump junction valve 51a. Similarly, the second pump junction valve 51b for the boom cylinder 31 is driven by pilot pressure from the solenoid valve 81b and the restoring force of a spring. The pump line PLb of the hydraulic pump 40b is connected to the input port of the pump junction valve 51b, and the above-mentioned confluence pump line 41L is connected to the output port. When the pump junction valve 51b opens, the oil discharged from the hydraulic pump 40b flows into the junction pump line 41L at a flow rate corresponding to the opening of the pump junction valve 51b. In this way, the pump junction valves 51a and 51b control the source of the pressure oil supplied to the boom cylinder 31 via the junction pump line 41L.

[0032] The pump junction valves 52a, 52b for the arm cylinder 32, the pump junction valves 53a, 53b for the bucket cylinder 33, and the pump junction valves 54a, 54b for the swing motor 34 have the same drive methods and functions as the pump junction valves 51a, 51b for the boom cylinder 31. The pump junction valves 52a, 52b control the supply source of pressure oil supplied to the arm cylinder 32 via the junction pump line 42L. The pump junction valves 53a, 53b control the supply source of pressure oil supplied to the bucket cylinder 33 via the junction pump line 43L. The pump junction valves 54a, 54b control the supply source of pressure oil supplied to the swing motor 34 via the junction pump line 44L.

[0033] 2-3c. Bleed-off valve The bleed-off valve 43a is driven by the pilot pressure input to its pilot oil chamber from the solenoid valve 83a (Figure 3) and the restoring force of a spring acting on the spool from the opposite side of the pilot oil chamber. The pump line PLa of the hydraulic pump 40a is connected to the input port of the bleed-off valve 43a, and the tank line TL is connected to the output port. When the bleed-off valve 43a opens, a flow rate corresponding to its opening is discharged from the pump line PLa to the tank line TL.

[0034] Like the bleed-off valve 43a, the bleed-off valve 43b is driven by the pilot pressure input to its pilot oil chamber from the solenoid valve 83b (Figure 3) and the restoring force of a spring. The input port of the bleed-off valve 43b is connected to the pump line PLb of the hydraulic pump 40b, and the output port is connected to the tank line TL. When the bleed-off valve 43b opens, a flow rate corresponding to the opening degree is discharged from the pump line PLb to the tank line TL.

[0035] 2-4. Operating Devices The operating devices 61-64 are operating devices that operate the directional control valves 41-44, and therefore the corresponding hydraulic actuators, respectively, and are installed inside the operator's cab 16. In FIG. 2, the operating devices 61-64 are illustrated as one unit. The operating device 61 is an operating lever device for boom operation that operates the boom cylinder 31. The operating device 62 is an operating lever device for arm operation that operates the arm cylinder 32. The operating device 63 is an operating lever device for bucket operation that operates the bucket cylinder 33. The operating device 64 is an operating lever device for swing operation that operates the swing motor 34. Although not shown in FIG. 2, when other hydraulic actuators are to be operated on the hydraulic excavator, operating devices for operating those hydraulic actuators are provided.

[0036] In this embodiment, the operating devices 61-64 are electric lever devices that detect the direction and amount of lever operation with sensors and output an operation signal (electrical signal) corresponding to the lever operation to the controller 100. When the operating devices 61-64 are operated, a command signal corresponding to the operation signal is output from the controller 100 to the solenoid valves 81-84, the directional control valves 41-44 are driven according to the pilot pressure output from the solenoid valves 81-84, and the boom cylinder 31, arm cylinder 32, bucket cylinder 33, and swing motor 34 operate according to the operation.

[0037] However, the operating devices 61-64 may also be of a pilot-operated type in which a pilot valve is operated by a lever. When the operating devices 61-64 are of a pilot-operated type, the discharge pressure of the pilot pump 40c is reduced by the pilot valve to generate a pilot pressure (hydraulic signal), which drives the directional control valves 41-44 and operates the boom cylinder 31, arm cylinder 32, bucket cylinder 33, and swing motor 34. In this case, the pilot pressure output from the pilot valve or the lever operation amount is detected by a sensor, and the sensor output (electrical signal) is output to the controller 100 as an operation signal corresponding to the lever operation.

[0038] The load pressure sensors 71a, 71b, 72a, 72b, 73a, 73b, 74a, and 74b are pressure sensors that detect the load pressure of the corresponding hydraulic actuator among the boom cylinder 31, the arm cylinder 32, the bucket cylinder 33, and the swing motor 34.

[0039] The load pressure sensors 71a and 71b are for the boom cylinder 31. The pressure in the rod-side oil chamber of the boom cylinder 31 is detected by the load pressure sensor 71a, and the pressure in the bottom-side oil chamber is detected by the load pressure sensor 71b, and these are output to the controller 100 as the load pressure of the boom cylinder 31.

[0040] The load pressure sensors 72a and 72b are for the arm cylinder 32. The pressure in the rod-side oil chamber of the arm cylinder 32 is detected by the load pressure sensor 72a, and the pressure in the bottom-side oil chamber is detected by the load pressure sensor 72b, and these are output to the controller 100 as the load pressure of the arm cylinder 32.

[0041] The load pressure sensors 73a and 73b are for the bucket cylinder 33. The pressure in the rod-side oil chamber of the bucket cylinder 33 is detected by the load pressure sensor 73a, and the pressure in the bottom-side oil chamber is detected by the load pressure sensor 73b, and these are output to the controller 100 as the load pressure of the bucket cylinder 33.

[0042] The load pressure sensors 74a and 74b are for the swing motor 34. The pressure at one hydraulic port of the swing motor 34 is detected by the load pressure sensor 74a, and the pressure at the other hydraulic port is detected by the load pressure sensor 74b, and these are output to the controller 100 as the load pressure of the swing motor 34.

[0043] The pump pressure sensors 80a, 80b are pressure sensors that detect the pump discharge pressure of the hydraulic pumps 40a, 40b. The pump pressure sensor 80a is provided on the pump line PLa of the hydraulic pump 40a, and detects the pump discharge pressure of the hydraulic pump 40a and outputs the detected pressure to the controller 100. The pump pressure sensor 80b is provided on the pump line PLb of the hydraulic pump 40b, and detects the pump discharge pressure of the hydraulic pump 40b and outputs the detected pressure to the controller 100.

[0044] 2-7. Overview of Hydraulic System Operation An overview of the hydraulic system will be explained using the example of operating the boom cylinder 31. When the operation device 61 is operated, the solenoid valve 81 is controlled by the controller 100 in accordance with the operation of the operation device 61, and the solenoid valve 81 is pilot operated to drive the directional control valve 41 in accordance with the operation, thereby operating the boom cylinder 31. As a result, the boom 21 moves in a direction corresponding to the operation direction of the operation device 61, at a speed corresponding to the amount of operation of the operation device 61.

[0045] At that time, controller 100 controls pump junction valves 51a, 51b in accordance with the operation pattern of operating devices 61-64, the load pressure of boom cylinder 31, and the pump discharge pressure pattern of hydraulic pumps 40a, 40b, to switch the supply source of pressure oil to boom cylinder 31. Depending on the open / close states of pump junction valves 51a, 51b, there are cases where pressure oil is supplied to boom cylinder 31 only from hydraulic pump 40a of hydraulic pumps 40a, 40b, and cases where pressure oil is supplied to boom cylinder 31 only from hydraulic pump 40b. There are also cases where pressure oil is supplied to boom cylinder 31 from both hydraulic pumps 40a, 40b. Control of pump junction valves 51a, 51b, etc. will be described later.

[0046] In addition, when the flow rate through the pump lines PLa, PLb is greater than the flow rate required by the hydraulic actuators, the controller 100 controls the bleed-off valves 43a, 43b, and excess pressure oil is bypassed from the pump lines PLa, PLb to the tank line TL.

[0047] The operation of the arm cylinder 32 when other operating devices, for example, the operating device 62, is operated is similar to that described above.

[0048] 3. Controller Figure 3 is a functional block diagram showing the main parts of the controller 100. In Figure 3, functions related to boom operation are displayed, but arm operation, bucket operation, swing operation, or operation of other hydraulic actuators can also be represented in a similar functional block diagram by replacing the relationship between the operation and the target actuator.

[0049] The controller 100 is a control device configured to include at least one on-board computer mounted on the hydraulic excavator, and in addition to the above-mentioned function of controlling the directional control valves 41-44 etc. in response to the operation of the operating devices 61-64 etc. (directional control valve control unit 111 in FIG. 3), it has a function of controlling the pump junction valves 51a, 51b, 52a, 52b, 53a, 53b, 54a, 54b in response to the operation signals of the operating devices 61-64, the load pressures of the hydraulic actuators etc. (pump junction valve control unit 114). The controller 100 also has a function of controlling the bleed-off valves 43a, 43b in response to the operation of the operating devices 61-64 etc. (bleed-off valve control unit 112).

[0050] The controller 100 sequentially receives inputs of operation signals corresponding to the operation of the operation devices such as the operation devices 61-64, a mode selection signal from the mode selection dial 48, load pressures from the load pressure sensors 71a, 71b, 72a, 72b, 73a, 73b, 74a, 74b, and pump discharge pressures from the pump pressure sensors 80a, 80b while the hydraulic excavator is in operation.

[0051] The mode selection dial 48 is an operating device implemented in the hydraulic excavator for switching between work modes such as a work volume priority mode and a fuel efficiency priority mode, and is installed in the operator's cab 16 where the operator sits. The mode selection dial 48 includes a sensor that detects the selected position of the dial, and outputs the work mode detected by this sensor to the controller 100.

[0052] The "work volume priority mode" is a work mode in which, when a target flow rate according to a first operating device (described later) exceeds the supplyable flow rate from a priority pump (described later), the shortage of the supplyable flow rate relative to the target flow rate is compensated for by the supply flow rate from a non-priority pump. In the work volume priority mode, the control valve V is controlled so that the maximum target flow rate is supplied to the total required flow rate of the hydraulic actuators currently in operation without exceeding the sum of the dischargeable flow rates of the hydraulic pumps 40a, 40b at that time. In this mode, when the supplyable flow rate from a hydraulic pump (e.g., hydraulic pump 40a) designated as a priority pump (described later) is insufficient for the target flow rate of a first hydraulic actuator (e.g., boom cylinder 31), the shortage is compensated for by the non-priority pump (described later).

[0053] The "fuel efficiency priority mode" is a work mode in which, when a target flow rate corresponding to a first operating device (described later) exceeds the supplyable flow rate from a priority pump (described later), the target flow rate corresponding to the first operating device is limited by the supplyable flow rate. On the other hand, in the fuel efficiency priority mode, the flow rate supplied to each hydraulic actuator is limited compared to the work volume priority mode, but branch throttling loss is suppressed. In this mode, when the supplyable flow rate of the corresponding priority pump is insufficient for the target flow rate of each hydraulic actuator currently in operation, the target flow rate of the hydraulic actuator is limited by the supplyable flow rate of the priority pump, and the pump merging valve is controlled to prevent merging of pressure oil from non-priority pumps.

[0054] The "first operating device" is one of the operating devices related to the operation of hydraulic actuators, such as the operating devices 61-64, and is an operating device that operates a first hydraulic actuator (described later). In the example of FIG. 3, the operating device 61 for boom operation is the first operating device. For example, with regard to arm operation, the operating device 62 for arm operation is the first operating device.

[0055] In this embodiment, with regard to the control of the pump junction valve, operation signals of operation devices other than the corresponding operation device (first operation device) are also taken into consideration for identifying the operation pattern. Therefore, for convenience, operation devices other than the first operation device are referred to as "second operation devices." In the example of Figure 3, operation devices 62-64 for arm operation, bucket operation, and swing operation are displayed as second operation devices.

[0056] The "priority pump" is a pump that is selected from among a plurality of hydraulic pumps (i.e., hydraulic pumps 40a and 40b in this embodiment) that serve as hydraulic pressure sources for the hydraulic actuators, and that supplies pressurized oil to the first hydraulic actuator on a priority basis.

[0057] The "first hydraulic actuator" is a hydraulic actuator corresponding to the first operating device, and is a hydraulic actuator that uses multiple hydraulic pumps (hydraulic pumps 40a, 40b) as hydraulic pressure sources. In the example of Figure 3, the boom cylinder 31 is the first hydraulic actuator. For example, in the case of arm operation, the arm cylinder 32 is the first hydraulic actuator.

[0058] Among the hydraulic actuators mounted on the hydraulic excavator, a hydraulic actuator other than the first hydraulic actuator that can share a hydraulic power source with the first hydraulic actuator in terms of the circuit will be referred to as a "second hydraulic actuator." The second hydraulic actuator does not necessarily have to be a hydraulic actuator that uses multiple hydraulic pumps as its hydraulic power source, but uses at least one hydraulic pump as its hydraulic power source. In the example of FIG. 3 , the arm cylinder 32, bucket cylinder 33, and swing motor 34 are second hydraulic actuators. In the example of FIG. 3 , the boom cylinder 31 is the first hydraulic actuator, but becomes the second hydraulic actuator during arm operation. The second hydraulic actuator corresponds to the second operating device. In other words, the second operating device is an operating device that operates the second hydraulic actuator, i.e., a hydraulic actuator that can share a hydraulic power source with the first hydraulic actuator, and an operating device for a hydraulic actuator that cannot share a hydraulic power source with the first hydraulic actuator in terms of the circuit may be excluded from the second operating device.

[0059] The "non-priority pump" refers to a hydraulic pump other than the priority pump among the multiple hydraulic pumps (hydraulic pumps 40a and 40b in this embodiment) that serve as hydraulic pressure sources for the hydraulic actuators. When the target flow rate cannot be supplied to the first hydraulic actuator by the priority pump alone, the oil discharged from the non-priority pump is combined with the flow rate supplied to the first hydraulic actuator. In this embodiment, since there are two hydraulic pumps, one of the hydraulic pumps 40a and 40b is necessarily the priority pump, and the other of the hydraulic pumps 40a and 40b is the non-priority pump. However, when there are three or more hydraulic pumps, one of the hydraulic pumps is the priority pump and the other multiple hydraulic pumps are non-priority pumps. When the flow rate that the priority pump can supply is insufficient for the target flow rate of the first hydraulic actuator, the flow rate is supplemented by one or more non-priority pumps.

[0060] As shown in Fig. 3, the controller 100 includes a required flow rate calculation unit 101, a work mode detection unit 102, a dischargeable flow rate calculation unit 103, and a valve control unit 110. The required flow rate calculation unit 101, the work mode detection unit 102, the dischargeable flow rate calculation unit 103, and the valve control unit 110 are functions of the controller 100, and may be realized virtually by software or by hardware such as electronic circuits. As mentioned above, Fig. 3 is a functional block diagram showing boom operation, and the description of Fig. 3 will focus on boom operation. The following description of boom operation can also be applied to the operation of other hydraulic actuators.

[0061] The required flow rate calculation unit 101 calculates the required flow rate of the boom cylinder 31, which is the first hydraulic actuator to be operated, based on an operation signal (first operation signal) input in response to operation of the operation device 61 (first operation device). The required flow rate of the boom cylinder 31 is calculated from a target speed of the boom cylinder 31 that corresponds to the amount of lever operation of the operation device 61, for example.

[0062] 3-2. Work Mode Detector The work mode detector 102 detects the work mode based on the operation signal of the mode selection dial 48. In this embodiment, either the work volume priority mode or the fuel economy priority mode is detected alternatively.

[0063] The dischargeable flow rate calculation unit 103 calculates the dischargeable flow rate of each of the hydraulic pumps 40a, 40b based on the pump discharge pressure detected by the pump pressure sensors 80a, 80b. For example, for each of the hydraulic pumps 40a, 40b, the maximum flow rate that can be discharged without exceeding a torque limit value set for each is calculated as the dischargeable flow rate based on the pump discharge pressure.

[0064] The valve control unit 110 receives the required flow rate of the boom cylinder 31 calculated by the required flow rate calculation unit 101, the work mode detected by the work mode detection unit 102, the dischargeable flow rate of the hydraulic pumps 40a, 40b calculated by the dischargeable flow rate calculation unit 103, the operation signals of the operation devices 61-64, the pump discharge pressures of the hydraulic pumps 40a, 40b detected by the pump pressure sensors 80a, 80b, and the load pressure of the boom cylinder 31 detected by the load pressure sensors 71a, 71b, calculates command values ​​(excitation current values) for the solenoid valves 81, 81a, 81b, 83a, 83b, and outputs command signals (excitation currents) to those solenoid valves.

[0065] Specifically, the valve control unit 110 includes a directional control valve control unit 111, a bleed-off valve control unit 112, a priority pump storage unit 113, a pump junction valve control unit 114, and a priority pump learning unit 115. With regard to the control of the pump junction valves, the controller 100 has a first function related to operational control of the pump junction valves 51a, 51b... and a second function related to learning priority pump data (described below). The pump junction valve control unit 114 corresponds to the first function, and the priority pump learning unit 115 corresponds to the second function.

[0066] The directional control valve control unit 111 calculates, based on the operation signal from the boom operation device 61, which of the bottom-side oil chamber and the rod-side oil chamber of the boom cylinder 31 should be connected to the merging pump line 41L, and at what opening area, and outputs a command signal to the solenoid valve 81.

[0067] When there is a surplus in the discharge flow rate of each of the hydraulic pumps 40a, 40b relative to the total flow rate supplied to each hydraulic actuator such as the boom cylinder 31, the bleed-off valve control unit 112 outputs a command signal to the solenoid valves 83a, 83b for the bleed-off valves 43a, 43b so that the surplus is discharged to the tank line TL via the bleed-off valves 43a, 43b.

[0068] 3-4c. Priority Pump Storage Unit The priority pump storage unit 113 stores priority pump data (e.g., a relational database) that defines, for each operational load pattern, the priority pump that corresponds to the boom cylinder 31 (first hydraulic actuator) in accordance with the operation of the operation device 51 (first operation device). "Operation load patterns" are classified into operation patterns of the boom cylinder 31 (first hydraulic actuator) and the arm cylinder 32, etc. (second hydraulic actuators), and load patterns of the hydraulic circuit of the boom cylinder 31 (first hydraulic actuator).

[0069] FIG. 6 is an example of priority pump data. As shown in the figure, operation patterns are classified, for example, by the hydraulic actuator operating at the time when the first operation signal is input from the first operating device and the required flow rate of the first hydraulic actuator. FIG. 6 is an example of priority pump data related to the operation of the arm cylinder 32 in the workload priority mode. The operation pattern classification items include the operation order of the first hydraulic actuator (the arm cylinder 32 in the example of FIG. 6), the required flow rate of the first hydraulic actuator (also the arm cylinder 32), and the second hydraulic actuator (e.g., the boom cylinder 31) operating first. The operation order of the first hydraulic actuator and the second hydraulic actuator operating first can be identified, for example, from the second operation signal at the time when the first operation signal is input. The required flow rate of the first hydraulic actuator is calculated by the required flow rate calculation unit 101, as described above. The load pattern is classified by the load pressure of the first hydraulic actuator (the arm cylinder 32 in the example of FIG. 6) and the pump discharge pressure of the hydraulic pumps 40a and 40b at the time when the first operation signal is input.

[0070] Priority pump data such as that shown in Fig. 6 is stored in the priority pump storage unit 113 for each combination of the hydraulic actuator to be operated and the work mode. Although not shown in Fig. 6, priority pump data may be divided for each operating direction of the control device. For example, the priority pump data shown in Fig. 6 may be used for arm crowding operation in the workload priority mode, and separate priority pump data may be prepared for arm dumping operation for arm operation in the same workload priority mode.

[0071] As will be described later, the priority pump data is referenced by the controller 100 each time the control valve V is controlled in accordance with the first operation signal in conjunction with the operation of the first hydraulic actuator, and as actual data on the first operation signal, the second operation signal, the load pressure, and the pump discharge pressure is accumulated in conjunction with the operation of the hydraulic excavator, the priority pump learning unit 115 can update the data at a predetermined timing.

[0072] However, at a stage when no performance data has been accumulated, such as at the time of shipment of the hydraulic excavator or immediately after initialization of the performance data, pre-set initial data of the priority pump data is recorded in the priority pump storage unit 113. The initial data is set, for example, assuming standard use of the hydraulic excavator. Standard use can be assumed, for example, by referring to the JACMAS fuel consumption measurement mode or big data of GeS machine operation information. Under this assumption of standard use, the initial data of the priority pump data can be set from the following perspectives: a. Different priority pumps are set for two hydraulic actuators that are used frequently (for example, the hydraulic pump 40a for the boom cylinder 31 and the hydraulic pump 40b for the arm cylinder 32 are set as priority pumps). b. Different priority pumps are set for two hydraulic actuators that are frequently used in combination (for example, the hydraulic pump 40a for the bucket cylinder 33 and the hydraulic pump 40b for the arm cylinder 32 are set as priority pumps). c. A hydraulic actuator that tends to have a high load pressure band when operated in combination during a specific operation of the hydraulic actuator is not connected to the priority pump of the hydraulic actuator that frequently has a high required flow rate (for example, the boom cylinder 31 and the swing motor 34 are not connected to the same hydraulic pump during a boom-raising operation).

[0073] The same hydraulic pump is set as the priority pump for hydraulic actuators with similar load pressure bands (for example, when performing a combined operation of boom lowering and bucket dumping, the boom cylinder 31 and bucket cylinder 33 are connected to the same hydraulic pump).

[0074] In addition, if the initial data is not set in advance, the performance data may be accumulated by switching the priority pump for each hydraulic actuator in sequence or randomly for a certain period (for example, a period until a certain number of performance data for each operation load pattern has been accumulated), and the priority pump for each operation load pattern of each hydraulic actuator may be automatically determined based on the performance data. In this case, for example, optimization index data (described later) may be calculated and recorded sequentially during the process of accumulating the performance data, and a predetermined number of optimization index data for each operation load pattern may be statistically calculated to create priority pump data. In this case, because the operation load patterns of hydraulic excavators are complex, it is desirable to average the optimization index data over a sufficient period and a sufficient number of times when stating the data.

[0075] 3-4d. Pump junction valve control unit Returning to FIG. 3, when the operating device 61 (first operating device) is operated, the pump junction valve control unit 114 controls the pump junction valves 51a and 51b based on the first operation signal input in response to the operation of the operating device 61, the second operation signal input in response to the operation of the operating devices 62-64 (second operating devices), the required flow rate of the boom cylinder 31 (first hydraulic actuator), the dischargeable flow rates of the hydraulic pumps 40a and 40b, the work mode, and the priority pump data. For example, when a boom operation signal (first operation signal) is input, the pump junction valve control unit 114 first calculates the total required flow rate of the currently operated hydraulic actuators based on the boom operation signal and the other input second operation signals. Next, the pump junction valve control unit 114 calculates a flow rate reduction ratio by dividing the sum of the dischargeable flow rates of the hydraulic pumps 40a and 40b by the total required flow rate, and then multiplies the required flow rate of the boom cylinder 31 by the flow rate reduction ratio to calculate the target flow rate to be supplied to the boom cylinder 31. The flow rate reduction ratio is a value of 1 or less, and is calculated as 1 when the total value of the dischargeable flow rates is greater than the total required flow rate. Then, the pump junction valve control unit 114 identifies the priority pump for the corresponding operating load pattern based on the operation signals of the operation devices 61-64, the load pressure of the boom cylinder 31, the pump discharge pressure, etc., and outputs command signals to the solenoid valves 81a, 81b to control the openings of the pump junction valves 51a, 51b so that the target flow rate is supplied to the boom cylinder 31 (first hydraulic actuator).

[0076] 3-4e. Priority Pump Learning Unit The priority pump learning unit 115 performs machine learning to determine the appropriateness of priority pump data for each operational load pattern based on performance data accumulated in the memory of the controller 100 during operation, and automatically updates the priority pump data for each operational load pattern. Specifically, the priority pump learning unit 115 samples required data from the performance data for each operational load pattern, and calculates, based on the sampled performance data, an actual value of a predetermined optimization index for operation of the first operating device under actual conditions in which pressure oil is preferentially supplied from the priority pump to the first hydraulic actuator. In this embodiment, the optimization index calculated is the branch throttling loss resulting from the branching and supply of pressure oil from the same hydraulic pump to the first hydraulic actuator and another hydraulic actuator (second hydraulic actuator). At the same time, based on the sampled performance data, the priority pump learning unit 115 calculates a trial value of the optimization index for operation of the first operating device under hypothetical conditions in which pressure oil is preferentially supplied from the non-priority pump to the first hydraulic actuator. The priority pump learning unit 115 then compares the calculated actual value with the estimated value, and if the estimated value is better than the actual value, changes the priority pump data for the corresponding operation load pattern to reflect the hypothetical conditions. If the actual value is better than the estimated value, the priority pump setting is maintained without change.

[0077] The historical data used to calculate the optimization index value is sampled data from the input of the first operation signal to be evaluated to the stop of the input. Furthermore, for a certain operational load pattern, rather than comparing the optimization index for a single operation to determine the appropriateness of the priority pump, it is desirable to determine the priority pump by comparing optimization indexes calculated based on the sum or average of historical data for multiple past operations (any set number), or by comparing the optimization indexes for each of the multiple past operations and determining the hydraulic pump that has been selected as the priority pump most frequently as the priority pump. Furthermore, when the hydraulic excavator is used for special operations, for example, it is not desirable to base the priority pump determination on the obtained historical data. It is also possible to disable the function of the priority pump learning unit 115. In this case, historical data obtained while the priority pump learning unit 115 is turned off can be prevented from being used or accumulated in subsequent calculations of the optimization index.

[0078] Furthermore, when calculating a new optimization index, it is also possible to adjust the likelihood of the priority pump changing for each operating load pattern by weighting it based on the history of comparison results of the optimization index from the time the hydraulic excavator was shipped or immediately after the initialization of the performance data (for example, the number of times each hydraulic pump was selected as the priority pump), or by taking into account the trend of the most recent comparison results (for example, hydraulic pump 40a being selected as the priority pump N times in a row).

[0079] 4. Pump Confluence Valve Control Control of the pump junction valve by the controller 100 will be described using Figures 4 to 7. In the example of Figures 4 to 7, the work volume priority mode is selected, and from a non-operation state in which none of the operation devices 61-64 are operated, the following operations are performed in sequence: boom-only operation, two-combined operation of boom and swing, and four-combined operation of boom, swing, arm, and bucket, before returning to the non-operation state.

[0080] When the operating lever of the operating device 61 is operated, for example, in the boom-raising direction at time T0, the required flow rate calculation unit 101 calculates the required flow rate of the boom cylinder 31 based on the operation signal input from the operating device 61 and outputs the calculated flow rate to the valve control unit 110. At the same time, the work mode detection unit 102 detects the work volume priority mode and outputs the calculated flow rate to the valve control unit 110. In addition, the dischargeable flow rate calculation unit 103 calculates the dischargeable flow rate of the hydraulic pump 40a based on the pump discharge pressure input from the pump pressure sensor 80a and the dischargeable flow rate of the hydraulic pump 40b based on the pump discharge pressure input from the pump pressure sensor 80b, and outputs the calculated flow rates to the valve control unit 110.

[0081] As described above, the pump junction valve control unit 114 calculates a flow rate reduction ratio from the total required flow rate of the hydraulic actuators and the total dischargeable flow rate of hydraulic pumps 40a, 40b, and calculates a target flow rate to be supplied to boom cylinder 31 by multiplying the required flow rate of boom cylinder 31 by the flow rate reduction ratio. Next, the pump junction valve control unit 114 calls up, from the priority pump memory unit 113, a record of the priority pump that corresponds to the operational load pattern at the time when an operation signal was input in conjunction with the operation of the operation device 61. Assuming that the called-up priority pump is hydraulic pump 40a, the pump junction valve control unit 114 assigns the target flow rate of boom cylinder 31 to the pump junction valve 51a. At time T0, the target flow rate of boom cylinder 31 is smaller than the dischargeable flow rate of hydraulic pump 40a, so the target flow rate of boom cylinder 31 can be supplied entirely from hydraulic pump 40a, and the target flow rate of pump junction valve 51b is set to zero. As a result, the pump junction valve 51 a is controlled to open in accordance with the target flow rate, and pressure oil is supplied to the boom cylinder 31 only from the hydraulic pump 40 a via the directional control valve 41 .

[0082] When the amount of operation of the operating device 61 increases and the flow rate supplied from the hydraulic pump 40a falls short of the target flow rate at time T1, the target flow rate for the shortfall is set in the pump junction valve 51b. As a result, the pump junction valve 51b is controlled to open in accordance with the flow rate shortfall, and the pressure oil from the hydraulic pumps 40a and 40b join together and are supplied to the boom cylinder 31.

[0083] When the lever of the operating device 64 is operated at time T2, the required flow rate calculation unit 101 calculates the required flow rate of the swing motor 34 and outputs it to the valve control unit 110. The pump junction valve control unit 114 calculates the target flow rate to be supplied to the swing motor 34 using the method described above. At this time, the total required flow rate of the boom cylinder 31 and the swing motor 34 exceeds the total dischargeable flow rate of the hydraulic pumps 40a, 40b, so the flow rate reduction ratio becomes a value smaller than 1. The required flow rates of the boom cylinder 31 and the swing motor 34 are reduced by being multiplied by the flow rate subtraction ratio, and the target flow rates of the boom cylinder 31 and the swing motor 34 become smaller than the required flow rates. However, the ratio of the required flow rates of the boom cylinder 31 and the swing motor 34 is maintained.

[0084] Next, the pump junction valve control unit 114 calls up the record of the priority pump corresponding to the operational load pattern at the time of input of the operation signal related to swing from the priority pump storage unit 113. Assuming that the priority pump called for the operation of this swing motor 34 is the hydraulic pump 40b, the pump junction valve control unit 114 first allocates the target flow rate of the swing motor 34 to the pump junction valve 54b for swing. At time T2, the target flow rate of the swing motor 34 is smaller than the dischargeable flow rate of the hydraulic pump 40b, so the entire target flow rate can be supplied to the swing motor 34 from the hydraulic pump 40b, and the target flow rate of the pump junction valve 54a for swing is set to zero. As a result, the pump junction valve 54b is controlled to open according to the target flow rate, and pressure oil is supplied to the swing motor 34 only from the hydraulic pump 40b via the directional control valve 44 for swing.

[0085] Here, the bottom graph in Figure 4 shows the branch flow throttling loss. At time T2, the hydraulic pump 40b supplies flow to two hydraulic actuators: the boom cylinder 31 and the swing motor 34. Therefore, the opening area of ​​the pump junction valve 54b, which corresponds to the swing motor 34, which has a lower load pressure than the boom cylinder 31, is controlled to be small, causing a pressure loss, and thereby supplying flow rates at the target flow rates from the hydraulic pump 40b to each of the three hydraulic actuators. At this time, the product of the difference in load pressure between the boom cylinder 31 and the swing motor 34 and the flow rate supplied to the swing motor 34 becomes the branch flow throttling loss.

[0086] When the load pressure of the swing motor 34 increases at time T3, the dischargeable flow rate of the hydraulic pumps 40a, 40b decreases. As a result, the flow rate reduction ratio that is successively calculated becomes smaller, and the flow rates supplied to the boom cylinder 31 and the swing motor 34 decrease together with the target.

[0087] When the amount of boom operation by the operating device 61 decreases at time T4, the target flow rate of the boom cylinder 31 falls below the flow rate that can be supplied by the hydraulic pump 40a, and the entire target flow rate is supplied to the boom cylinder 31 from the hydraulic pump 40a.

[0088] Thereafter, at time T5, arm operation is performed by operating device 62, and then bucket operation is performed by operating device 63. In the same manner as described above, required flow rate calculation unit 101 calculates the required flow rate of arm cylinder 32 and the required flow rate of bucket cylinder 33 for arm operation and bucket operation, and outputs the results to valve control unit 110.

[0089] Furthermore, the pump junction valve control unit 114 calculates the target flow rate of the arm cylinder 32 using the method described above, and calls up from the priority pump storage unit 113 the record of the priority pump for the arm cylinder 32 that corresponds to the operating load pattern at time T5. As described above, the priority pump data is created in a format such as that shown in FIG. 6, for example. As the operating load pattern at time T5 corresponds to the data in the column enclosed by a thick frame in FIG. 6, the hydraulic pump 40b (pump 2 in FIG. 6) is read out as the priority pump. In accordance with this, the pump junction valve control unit 114 first assigns the target flow rate of the arm cylinder 32 to the pump junction valve 52b for the arm. As a result, the pump junction valve 52b for the arm is controlled to open in accordance with the target flow rate, and pressure oil is supplied to the arm cylinder 32 only from the hydraulic pump 40b through the directional control valve 42.

[0090] If the amount of arm operation by the operating device 62 increases between time T6 and time T7, causing a shortage in the flow rate supplied from the hydraulic pump 40b, a target flow rate for the shortage is set in the arm pump junction valve 52a. As a result, the arm pump junction valve 52a is controlled to open in accordance with the shortage in flow rate, and the pressure oil from the hydraulic pumps 40a, 40b is joined and supplied to the arm cylinder 32.

[0091] The priority pump learning unit 115 also sequentially (or at a predetermined timing thereafter) calculates actual and estimated values ​​of the shunt throttling loss. Fig. 5(a) is a schematic diagram of the calculation results of the actual value at time T6, Fig. 5(b) is a schematic diagram of the estimated value at time T6, Fig. 5(c) is a schematic diagram of the actual value at time T7, and Fig. 5(d) is a schematic diagram of the estimated value at time T7.

[0092] The actual value is calculated according to the allocation of hydraulic pumps 40a, 40b actually applied to each hydraulic actuator. At time T6, the oil discharged from hydraulic pump 40a is supplied to boom cylinder 31 and bucket cylinder 33. Therefore, the product of the difference between the load pressure of boom cylinder 31, which is the maximum load pressure on the hydraulic pump 40a side, and the load pressure of bucket cylinder 33, and the supply flow rate to bucket cylinder 33 becomes the shunt throttling loss related to the bucket.

[0093] On the other hand, at time T6, the oil discharged from the hydraulic pump 40b is supplied to the swing motor 34, the arm cylinder 32, and the bucket cylinder 33. Therefore, first, the product of the difference between the load pressure of the arm cylinder 32, which is the maximum load pressure on the hydraulic pump 40b side, and the load pressure of the swing motor 34, and the supply flow rate to the swing motor 34 becomes the branch flow throttling loss related to swing. Similarly, the branch flow throttling loss related to the bucket is also calculated.

[0094] At time T7, the actual value of the shunt throttle loss is calculated in the same manner.

[0095] The estimated value is calculated under the assumption that pressure oil is preferentially supplied from a non-priority pump to each hydraulic actuator. For example, the branch throttling loss is calculated under the assumption that the priority pump for the arm cylinder 32 is the hydraulic pump 40a.

[0096] 4 , the load pressure and operation amount (required flow rate) of the arm cylinder 32, and the load pressure of the bucket cylinder 33 are significantly different between time T6 and time T7. Therefore, the magnitude of the branch throttling loss is also significantly different between time T6 and time T7. The recorded priority pump data is a learning result based on past performance data (operation information monitoring data), and therefore reflects cases where the load pressure and operation amount (required flow rate) change during operation, as described above. As a result, it is possible to reduce the integral value of the loss until the operation command is released.

[0097] When the input of operation signals from the operation devices 61-64 stops at time T8, the priority pump learning unit 115 calculates and compares the integrals of the actual and estimated values ​​of the shunt throttling loss for each operation. For example, with respect to arm operation, actual loss data (operation information monitoring data) from time T5 to time T8 is sampled, and the integrals of the actual and estimated values ​​are calculated and compared. The results of this calculation are shown in FIG. 7. In the example of FIG. 7, the actual value is smaller and better than the estimated value. Therefore, the priority pump learning unit 115 determines that the priority pump associated with the arm cylinder 32 corresponding to the operational load pattern at time T5 for arm operation is the appropriate hydraulic pump 40b, as currently recorded, and outputs the data of the determination result to the priority pump storage unit 113. If the estimated value is better than the actual value, the hypothetical conditions are reflected in the priority pump data, and the hydraulic pump designated as the priority pump may be changed.

[0098] 5. Differences in processing depending on the work mode The above has been described for the case where the work volume priority mode is selected, but when the fuel efficiency priority mode is selected, the pump junction valve control unit 114 calculates the target flow rate of the hydraulic actuator (first hydraulic actuator) using the following method. The processing details other than the calculation of the target flow rate are the same when the work volume priority mode is selected as when the fuel efficiency priority mode is selected.

[0099] When a new operation signal (first operation signal) is input while the fuel economy priority mode is selected, the pump junction valve control unit 114 allocates the hydraulic actuators corresponding to the operation signals input at that time to the respective priority pumps in accordance with the priority pump data. The pump junction valve control unit 114 then calculates the total required flow rate of the hydraulic actuators assigned to each priority pump. Furthermore, for each priority pump, the pump junction valve control unit 114 calculates a flow rate reduction ratio by dividing the dischargeable flow rate of each priority pump by the total required flow rate of each priority pump.

[0100] Next, the flow rate reduction ratio calculated for hydraulic pump 40a is compared with the flow rate reduction ratio calculated for hydraulic pump 40b, and the smaller flow rate reduction ratio is multiplied by the required flow rate of the newly operated hydraulic actuator (first hydraulic actuator) to calculate the target flow rate for that hydraulic actuator.

[0101] By calculating the target flow rates in this manner, the target flow rates for each hydraulic actuator fall within the range of the dischargeable flow rate of the corresponding priority pump, and no shortage of flow rate is generated in the supply flow rate from the priority pump. In other words, each hydraulic actuator is driven by the supply flow rate from only its respective priority pump. Therefore, in fuel efficiency priority mode, although the supply flow rate from each hydraulic pump may be diverted to multiple hydraulic actuators, the supply flow rates to each hydraulic actuator do not merge, and divergence of the supply flow paths is suppressed more than in work volume priority mode, resulting in improved fuel efficiency due to reduced divergence throttling loss.

[0102] 6. Flowcharts The flowcharts relating to the above-described processing by the controller 100 are summarized in FIGS. 8 and 9. The processing procedures for the pump junction valve control function (first function) and the priority pump learning function (first function) by the controller 100 will be briefly summarized below. The processing in FIGS. 8 and 9 is repeatedly executed while the controller 100 is energized. For example, the processing in FIG. 8 is repeatedly executed at a predetermined cycle time, and the processing in FIG. 9 is executed each time a new operation signal is input. Furthermore, the flowcharts in FIGS. 8 and 9 represent processing relating to one lever operation. When multiple hydraulic actuators are operated in parallel, the processing in FIGS. 8 and 9 is executed in parallel for each operation.

[0103] 6-1. Pump junction valve control function (first function) Figure 8 is a flowchart showing the operation control procedure of the pump junction valve by the controller 100. The controller 100 starts the processing of Figure 8, and when a first operation signal is input, as described above, for the hydraulic actuator related to the first operation signal (first hydraulic actuator), the required flow rate calculation unit 101 calculates a required speed based on the first operation signal (step S801), and calculates a required flow rate from the required speed (step S802). The controller 100 also detects the work mode by the work mode detection unit 102 (step S803).

[0104] Thereafter, the controller 100 reads the priority pump data from the priority pump storage unit 113 using the pump junction valve control unit 114 (step S804), determines the flow rate reduction ratio using the method described above, and calculates a target flow rate from the required flow rate for the first hydraulic actuator (step S805). Thereafter, the controller 100 determines, using the pump junction valve control unit 114, whether the target flow rate for the first hydraulic actuator is equal to or less than the dischargeable flow rate of the priority pump (step S806), and if so, sets the aperture of the pump junction valve corresponding to the non-priority pump to zero to prevent the supply flow rates from merging, and controls only the pump junction valve corresponding to the priority pump in accordance with the target flow rate (steps S807 and S809). Furthermore, if the target flow rate of the first hydraulic actuator is greater than the dischargeable flow rate of the priority pump, the controller 100 sets the target flow rate for the pump junction valve corresponding to the non-priority pump to the shortage flow rate, using the pump junction valve control unit 114, to bring the supply flow rates into a state of merging, controls the pump junction valve corresponding to the priority pump in accordance with the target flow rate, and controls the pump junction valve corresponding to the non-priority pump in accordance with the shortage flow rate (steps S808 and S809).

[0105] The controller 100 repeatedly executes the above procedure at a predetermined cycle time.

[0106] 6-2. Priority Pump Learning Function (Second Function) Fig. 9 is a flowchart showing the procedure for learning priority pump data by the controller. The example in Fig. 9 illustrates a case where learning of priority pump data is executed sequentially while the hydraulic excavator is in operation, but the processing described in Fig. 9 may also be executed ex post at a predetermined timing based on performance data accumulated during operation (status monitoring data such as operation signals, load pressure, and pump discharge pressure). For example, the processing may be executed in a delayed manner when the power to the controller 100 is turned off, or at a fixed time each day or week.

[0107] 9 , when a first operation signal is input (step S901), the priority pump learning unit 115 starts sampling historical data for learning the priority pump data in relation to the input of the first operation signal, that is, the operation signals of the operation devices 61-64, the load pressure of each hydraulic actuator, the pump discharge pressure of each hydraulic pump, etc. (step S902). After that, when the input of the first operation signal that was started in step S901 stops (step S903), the controller 100 stops sampling historical data for learning the priority pump data in relation to the input of the first operation signal, by the priority pump learning unit 115 (step S904).

[0108] Thereafter, the controller 100, as described above, calculates the actual and estimated values ​​of the shunt throttling loss for the period from the start to the stop of input of the first operation signal using the priority pump learning unit 115 (steps S905 and S906), and determines whether the actual value is better than the estimated value (step S907). If the actual value is better than the estimated value, the controller 100, using the priority pump learning unit 115, determines to maintain the current setting of the priority pump data for the operating load pattern corresponding to the first operation signal input in step S901, outputs the determination result to the priority pump storage unit 113, and updates the priority pump data (steps S908 and S910). In this case, the priority pump data is not changed. On the other hand, if the estimated value is better than the actual value, the controller 100 determines, via the priority pump learning unit 115, whether to change the setting of the priority pump data for the operational load pattern corresponding to the first operation signal input in step S901, and outputs the determination result to the priority pump storage unit 113 to update the priority pump data (steps S909 and S910). In this case, the priority pump data for the corresponding operational load pattern is changed.

[0109] The controller 100 repeatedly executes the above procedure every time a new operation is input from the operation devices 61-64.

[0110] 7. Effects As described above, in this embodiment, the priority pump learning unit 115 learns and optimizes priority pump data for each operation based on performance data accumulated as the hydraulic excavator is operated, and a priority pump corresponding to the operation is automatically selected based on this priority pump data. Therefore, an appropriate priority pump can be determined each time for each hydraulic actuator in various situations without relying on the judgment of the operator. Since an appropriate priority pump is automatically selected in accordance with not only the operation pattern of the operator but also the load pattern of the hydraulic actuator, this can contribute to achieving both fuel efficiency and workability of the hydraulic excavator.

[0111] While the above describes an example in which a directional control valve is provided downstream of the pump junction valve (on the hydraulic actuator side), a configuration in which a pump junction valve is provided downstream of the directional control valve may also be adopted. For example, a configuration in which the pressure oil supplied to the hydraulic actuator from the pump line of each hydraulic pump is controlled by a respective directional control valve, and the pressure oil that has passed through each directional control valve is joined via the pump junction valve and supplied to the hydraulic actuator.

[0112] Furthermore, although an example has been described in which the branch flow throttling loss is calculated as an optimization index related to learning priority pump data, the workability of the hydraulic excavator (flow suppression time ratio), damage to or lifespan of hydraulic equipment (e.g., hydraulic pump, control valve, etc.) may also be calculated as an optimization index instead of or in addition to the branch flow throttling loss.

[0113] Furthermore, in the above embodiment, a hydraulic excavator with a bucket 23 attached as an attachment to the tip of the working device 20 (front working machine) has been described as an example of a working machine, but as described above, the present invention can also be applied to hydraulic excavators with attachments other than a bucket, or other types of working machines such as wheel loaders and bulldozers, as long as the working machine uses a hydraulic actuator with multiple hydraulic pumps as its hydraulic pressure source.

[0114] Furthermore, although a configuration using electric lever devices for the operating devices 61-64 has been described, as mentioned above, the operating devices 61-64 may be pilot-operated operating lever devices if the operating amount is input to the controller 100 as an electric signal using a pressure sensor or the like.

[0115] 32...Arm cylinder (hydraulic actuator), 33...Bucket cylinder (hydraulic actuator), 34...Swing motor (hydraulic actuator), 40a, 40b...Hydraulic pump, 31...Boom cylinder (hydraulic actuator), 41-44...Direction control valve, 51a, 51b, 52a, 52b, 53a, 53b, 54a, 54b...Pump junction valve, 61-64...Operation device, 71a, 71b, 72a, 72b, 73a, 73b, 74a, 74b...Load pressure sensor, 100...Controller

Claims

1. A work machine comprising a plurality of hydraulic pumps, a first hydraulic actuator using the plurality of hydraulic pumps as hydraulic pressure sources, a directional control valve for controlling the flow of pressurized oil to the first hydraulic actuator, a plurality of pump junction valves for controlling the respective supply flow rates of pressurized oil from the plurality of hydraulic pumps to the first hydraulic actuator, a first operating device for operating the directional control valve, a load pressure sensor for detecting the load pressure of the first hydraulic actuator, a second hydraulic actuator that can share a hydraulic pressure source with the first hydraulic actuator, a second operating device for operating the second hydraulic actuator, and a controller for controlling the plurality of pump junction valves, wherein the controller stores priority pump data defining a priority pump that is selected from the plurality of hydraulic pumps in response to the operation of the first operating device and that preferentially supplies pressurized oil to the first hydraulic actuator for each operating load pattern classified by the operating patterns of the first hydraulic actuator and the second hydraulic actuator and the load pattern of a hydraulic circuit of the first hydraulic actuator, and has a first function relating to the operation control of the plurality of pump junction valves and a second function relating to learning the priority pump data, using the first function, when the first operating device is operated, the multiple pump junction valves are controlled based on the operation pattern corresponding to a first operating signal input in response to the operation of the first operating device and a second operating signal input in response to the operation of the second operating device, the load pattern corresponding to the load pressure input from the load pressure sensor, and the priority pump data; using the second function, accumulating performance data of the first operating signal, the second operating signal, and the load pressure, calculating an actual calculation value of a predetermined optimization index that is set in advance under implementation conditions in which pressure oil is preferentially supplied to the first hydraulic actuator from the priority pump based on the performance data, calculating an estimated calculation value of the optimization index based on the performance data under virtual conditions in which pressure oil is preferentially supplied to the first hydraulic actuator from a non-priority pump, which is a hydraulic pump other than the priority pump, for the operation of the first operating device, comparing the actual calculation value with the estimated calculation value, and if the estimated calculation value is better than the actual calculation value, updating the priority pump data to reflect the virtual conditions.A working machine characterized by:

2. A work machine as described in claim 1, characterized in that the operation patterns are classified according to the required flow rates of the second hydraulic actuator and the first hydraulic actuator which are in operation at the time when the first operation signal is input.

3. A work machine as claimed in claim 2, characterized in that the load pattern is classified by the load pressure of the first hydraulic actuator as well as by the pump discharge pressures of the plurality of hydraulic pumps.

4. A work machine as described in claim 1, characterized in that the optimization index is a branch throttling loss caused by branching and supplying pressurized oil from the same hydraulic pump to the first hydraulic actuator and the second hydraulic actuator.

5. A work machine according to claim 1, characterized in that there are a plurality of second hydraulic actuators.

6. A work machine as described in claim 1, wherein the controller has a work volume priority mode in which, when the required flow rate according to the first operating device exceeds the supplyable flow rate from the priority pump, the shortfall of the supplyable flow rate relative to the required flow rate is compensated for by the supply flow rate of the non-priority pump, and a fuel efficiency priority mode in which the required flow rate is limited by the supplyable flow rate, and the controller stores the priority pump data for each of the work volume priority mode and the fuel efficiency priority mode.

Citation Information

Patent Citations

  • Oil pressure system

    JP1997079212A

  • Control device for hydraulic pump

    JP2001140806A

  • Driving device for work machine

    JP2017053383A

  • Hydraulic control system

    JP2021110406A

  • Hydraulic systems for construction machinery

    KR1020180037127A