Control device, control method, and working machine

The control device addresses the challenge of automatically determining the turning direction for working machines by using a turning direction setting unit and sensors, enhancing efficiency and preventing collisions, thus improving the operation of machines like hydraulic excavators.

WO2024202978A1PCT designated stage expired Publication Date: 2024-10-03KOMATSU LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/008056
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2024-03-04
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing control devices for working machines with revolving bodies struggle to automatically determine the correct turning direction between loading and excavation positions, leading to inefficiencies and potential collisions with obstacles.

Method used

A control device with a turning direction setting unit that uses sensors and reference points to automatically determine the optimal turning direction for the revolving body, avoiding interference with obstacles and ensuring precise movement to target positions.

Benefits of technology

Enhances usability and efficiency in automatic turning operations by accurately determining the turning direction, preventing collisions, and improving the overall operation of working machines like hydraulic excavators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024008056_03102024_PF_FP_ABST
    Figure JP2024008056_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This control device is for a working machine which is provided with: a revolving body that revolves about a revolving center; and a work implement that has a work tool and is attached to the revolving body. The control device is provided with a revolving direction setting unit that sets a revolving direction in which the revolving body revolves in order to move the work tool to a target position.
Need to check novelty before this filing date? Find Prior Art

Description

Control device, control method and work machine

[0001] This application claims priority to Japanese Patent Application No. 2023-056910, filed on March 31, 2023, the contents of which are incorporated herein by reference.

[0002] Patent Document 1 describes a control device for a loading machine having a rotating body and a work implement, which is capable of automating the movement of the work implement between a loading position and an excavation position.

[0003] Japanese Patent Application Publication No. 2020-41352

[0004] As described in a modification of Patent Document 1, the control device described in Patent Document 1 can combine manual loading and excavation operations with automation of the rotation of the rotating body and the movement of the work implement between the loading position and the excavation position. However, after the loading or excavation operation is completed, it is not easy to determine the left or right direction of the rotating body to rotate toward the excavation position or the loading position.

[0005] The present disclosure has been made in consideration of the above circumstances, and aims to provide a control device, a control method, and a work machine that can automatically determine the direction in which a rotating body rotates.

[0006] One aspect of the present disclosure is a control device for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a working tool and is attached to the rotating body, and the control device includes a rotation direction setting unit that sets the rotation direction in which the rotating body rotates in order to move the working tool to a target position.

[0007] Another aspect of the present disclosure is a control method for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a working tool and is attached to the rotating body, the control method including a step of setting a rotation direction in which the rotating body rotates in order to move the working tool to a target position.

[0008] Furthermore, one aspect of the present disclosure is a work machine comprising a rotating body that rotates around a rotation center, a work machine having a working implement attached to the rotating body, and a control device that controls the rotating body and the work implement, wherein the control device comprises a rotation direction setting unit that sets the rotation direction in which the rotating body rotates in order to move the working implement to a target position.

[0009] According to the control device, control method, and work machine of the present disclosure, it is possible to automatically determine the direction in which the rotating body rotates.

[0010] FIG. 1 is a schematic diagram illustrating a configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram illustrating a configuration of the interior of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram illustrating an example configuration of a control system according to an embodiment of the present disclosure. FIG. 4 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 5 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 6 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 7 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 8 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 1 is a schematic diagram for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 2 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIG. 3 is a schematic diagram for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 4 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIG. 5 is a schematic diagram for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 6 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIG. 7 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure.10 is a flowchart illustrating an example of the operation of a control device according to an embodiment of the present disclosure.

[0011] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. Note that the same or corresponding components in each drawing will be designated by the same reference numerals, and descriptions thereof will be omitted as appropriate. FIG. 1 is a schematic diagram showing the configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram showing the internal configuration of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram showing an example configuration of a control system according to an embodiment of the present disclosure. FIGS. 4 to 11 are schematic diagrams for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 12 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIGS. 15, 22, 24, 26, and 28 to 31 are flowcharts showing an example operation of a control device according to an embodiment of the present disclosure. FIGS. 13, 14, 16 to 21, 23, 25, and 27 are schematic diagrams for explaining an example operation of a control device according to an embodiment of the present disclosure.

[0012] (Configuration of work machine 100) Figure 1 shows the configuration of a work machine 100 according to an embodiment of the present disclosure. The work machine 100 operates at a construction site and works on a construction target such as earth and sand. The work machine 100 according to an embodiment of the present disclosure is, for example, a hydraulic excavator. However, the work machine according to the present disclosure is not limited to any work machine provided that it is equipped with a rotating body and a work implement, and may be, for example, another work machine such as a face shovel or a rope shovel. The work machine 100 includes a traveling body 110, a rotating body 120, a work implement 130, and a cab 140.

[0013] The running body 110 supports the work machine 100 so that it can travel. The running body 110 is equipped with two tracks 111 provided on the left and right, and two travel motors 112 for driving each track 111. The rotating body 120 is supported on the running body 110 so that it can rotate about a rotation center.

[0014] The work implement 130 is hydraulically driven. The work implement 130 is supported on the front part of the revolving unit 120 so that it can be driven in the vertical direction. The cab 140 is a space where an operator sits and operates the work machine 100. The cab 140 is provided on the left front part of the revolving unit 120. In this embodiment, as shown in FIG. 1 , the up-down direction (Z direction), left-right direction (Y direction), and front-to-back direction (X direction) are defined with the revolving unit 120 as the reference. In this embodiment, this coordinate system is called the excavator coordinate system. Furthermore, the part of the revolving unit 120 to which the work implement 130 is attached is called the front part. Furthermore, with respect to the revolving unit 120, the opposite part from the front part is called the rear part, the left part is called the left part, and the right part is called the right part.

[0015] (Configuration of the Swing Unit 120) The swing unit 120 includes an engine 121, a hydraulic pump 122, an EPC (Electromagnetic Proportional Control) valve 123-1, a main valve 123-2, a swing motor 124, and a fuel injection device 125. The engine 121 is a prime mover that drives the hydraulic pump 122. The engine 121 is an example of a power source. A starter 1211 is provided on the engine 121. The engine 121 is started by rotation of the starter 1211. The EPC valve 123-1 controls the hydraulic oil flowing to the main valve 123-2 based on an operation command signal output by the control device 61.

[0016] The hydraulic pump 122 is a variable displacement pump driven by the engine 121. The hydraulic pump 122 supplies hydraulic oil to each actuator via a main valve 123-2. Each actuator includes a boom cylinder 131C, an arm cylinder 132C, a bucket cylinder 133C, a travel motor 112, and a swing motor 124. The main valve 123-2 controls the flow rate of hydraulic oil supplied from the hydraulic pump 122.

[0017] The swing motor 124 is driven by hydraulic oil supplied from the hydraulic pump 122 via a main valve 123-2, and causes the swing body 120 to swing around a swing axis 120C (center of swing). The fuel injection device 125 injects fuel into the engine 121.

[0018] (Configuration of work machine 130) The work machine 130 includes a boom 131, an arm 132, a bucket 133 as a work tool, a boom cylinder 131C, an arm cylinder 132C, and a bucket cylinder 133C. The boom cylinder 131C, the arm cylinder 132C, and the bucket cylinder 133C are included in the cylinder 130C shown in Fig. 3. In addition to the bucket 133, examples of work tools that are attachments include a slope bucket, a tiltrotator, a quick coupler, a grapple, a magnet, and a breaker.

[0019] The base end of the boom 131 is attached to the revolving unit 120 via a boom pin. The arm 132 connects the boom 131 and the bucket 133. The base end of the arm 132 is attached to the tip of the boom 131 via an arm pin. The bucket 133 includes a blade for excavating earth and sand and a storage section for storing the excavated earth. The base end of the bucket 133 is attached to the tip of the arm 132 via a bucket pin 133P.

[0020] The boom cylinder 131C is a hydraulic cylinder for operating the boom 131. A base end of the boom cylinder 131C is attached to the revolving unit 120. A tip end of the boom cylinder 131C is attached to the boom 131. The arm cylinder 132C is a hydraulic cylinder for driving the arm 132. A base end of the arm cylinder 132C is attached to the boom 131. A tip end of the arm cylinder 132C is attached to the arm 132. The bucket cylinder 133C is a hydraulic cylinder for driving the bucket 133. A base end of the bucket cylinder 133C is attached to the arm 132. A tip end of the bucket cylinder 133C is attached to a link member connected to the bucket 133.

[0021] 2 shows the internal configuration of the driver's cab 140 according to the embodiment of the present disclosure. Inside the driver's cab 140, a driver's seat 142, an operating device 143, and the like are provided.

[0022] The operation device 143 is a device that is manually operated by the operator to drive the traveling body 110, the revolving body 120, and the work implement 130, set and change various settings, and provide information to the operator. The operation device 143 is composed of, for example, levers, switches, and pedals. The operation device 143 includes a left operation lever 143LO, a right operation lever 143RO, a left foot pedal 143LF, a right foot pedal 143RF, a left travel lever 143LT, a right travel lever 143RT, and a display input device 143D. Various switches, such as push button switches, rocker switches, and toggle switches, may be used as the switches. Furthermore, the switches may be located within an operable range by the operator. The switches are located in the cab 140 or near the driver's seat in a remote control room or the like. For example, the switches may be located on a console to the side of the driver's seat 142 or on a transmitter that outputs operation commands to the work machine 100 from outside the work machine 100.

[0023] The left operating lever 143LO is provided on the left side of the driver's seat 142. The right operating lever 143RO is provided on the right side of the driver's seat 142.

[0024] The left operation lever 143LO is an operation mechanism for performing the swing operation of the revolving unit 120 and the excavation / dump operation of the arm 132. Specifically, when the operator of the work machine 100 tilts the left operation lever 143LO forward, the arm 132 performs a dump operation. When the operator of the work machine 100 tilts the left operation lever 143LO rearward, the arm 132 performs an excavation operation. When the operator of the work machine 100 tilts the left operation lever 143LO to the right, the revolving unit 120 swings to the right. When the operator of the work machine 100 tilts the left operation lever 143LO to the left, the revolving unit 120 swings to the left. Note that in other embodiments, the revolving unit 120 may swing to the right or left when the left operation lever 143LO is tilted forward or backward, and the arm 132 may perform an excavation or dump operation when the left operation lever 143LO is tilted left or right. The left operation lever 143LO is provided with an operation switch 1433. The operation switch 1433 may be disposed so as to be located near the operator seated in the driver's seat 142. The operation switch 1433 is provided above or to the side of the left operation lever 143LO.

[0025] The right operating lever 143RO is an operating mechanism for performing the excavation / dumping operation of the bucket 133 and the raising / lowering operation of the boom 131. Specifically, when the operator of the work machine 100 tilts the right operating lever 143RO forward, the boom 131 is lowered. When the operator of the work machine 100 tilts the right operating lever 143RO rearward, the boom 131 is raised. When the operator of the work machine 100 tilts the right operating lever 143RO to the right, the bucket 133 is dumped. When the operator of the work machine 100 tilts the right operating lever 143RO to the left, the bucket 133 is excavated. Note that in other embodiments, when the right operating lever 143RO is tilted forward or backward, the bucket 133 may be dumped or excavated, and when the right operating lever 143RO is tilted left or right, the boom 131 may be raised or lowered. The right operation lever 143RO is provided with operation switches 1431 and 1432, for example. In this embodiment, the operation switch 1431 is set to function as a teaching switch, and the operation switch 1432 is set to function as an automatic start switch (hereinafter, each switch will be referred to as the teaching switch 1431 and the automatic start switch 1432 (or simply as the "switch")). The operation switches 1431 and 1432 are provided on the top or side of the right operation lever 143RO. The teaching switch and the automatic start switch are examples of switches for automatic control. For example, when the automatic start switch 1432 is turned ON, the automatic start switch 1432 outputs an instruction signal to start an automatic operation. The switch is not limited to starting an automatic operation, and may output any signal related to the automatic operation, such as a signal to stop an automatic operation. For example, the switch function may be assigned not only to automatic control of loading swing and return swing, but also to automatic control such as automatic earth removal, which automatically performs an earth removal operation using the bucket 133, or automatic excavation, which automatically performs an excavation operation. For example, automatic excavation, loading swing, return swing, and automatic soil removal may be assigned to two or more switches, respectively. Also, multiple switches may be provided on one operating lever, or the operating levers may be divided into multiple operating levers, with one or multiple switches provided on each operating lever.

[0026] The left foot pedal 143LF is located on the left side of the floor in front of the driver's seat 142. The right foot pedal 143RF is located on the right side of the floor in front of the driver's seat 142. The left travel lever 143LT is pivotally supported by the left foot pedal 143LF, and is configured so that tilting the left travel lever 143LT and pushing down the left foot pedal 143LF are linked. The right travel lever 143RT is pivotally supported by the right foot pedal 143RF, and is configured so that tilting the right travel lever 143RT and pushing down the right foot pedal 143RF are linked.

[0027] The left foot pedal 143LF and left travel lever 143LT correspond to the rotational drive of the left crawler belt of the running body 110. Specifically, when the operator of the work machine 100 pushes the left foot pedal 143LF or the left travel lever 143LT forward, the left crawler belt rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the left foot pedal 143LF or the left travel lever 143LT backward, the left crawler belt rotates in the reverse direction.

[0028] The right foot pedal 143RF and the right travel lever 143RT correspond to the rotational drive of the right crawler of the running body 110. Specifically, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right travel lever 143RT forward, the right crawler rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right travel lever 143RT backward, the right crawler rotates in the reverse direction.

[0029] The display / input device 143D is a device that combines a display device and a sensor that detects touch operations on the display screen. For example, an operator can use the display / input device 143D to set or change various setting values. For example, in the display / input device 143D, the display device having a display unit and the input unit that accepts operator operations may be separate units.

[0030] (Sensors, etc.) As shown in Fig. 3, the control system 60 of the work machine 100 includes a control device 61, an operation device 143, etc., and various sensors. Note that in Fig. 3, the hydraulic system circuit is indicated by a thick line. In the example shown in Fig. 3, the control system 60 includes an attitude angle sensor 151, a GNSS (Global Navigation Satellite System) sensor 152, and an IMU (Inertial Measurement Unit) 153.

[0031] The attitude angle sensor 151 includes a boom attitude angle sensor, an arm attitude angle sensor, and a bucket attitude angle sensor. The boom attitude angle sensor measures the attitude angle of the boom 131. The arm attitude angle sensor measures the attitude angle of the arm 132. The bucket attitude angle sensor measures the attitude angle of the bucket 133.

[0032] The GNSS sensor 152 calculates the position of the revolving unit 120 and the azimuth in which the revolving unit 120 faces. The GNSS sensor 152 includes two receivers 161 and 162 (see FIG. 1 ) that receive positioning signals from artificial satellites that make up the GNSS. The two receivers 161 and 162 are installed at different positions on the revolving unit 120. The GNSS sensor 152 detects the position of a representative point of the revolving unit 120 in the site coordinate system (the origin of the excavator coordinate system) based on the positioning signals received by the receivers 161 and 162. The GNSS sensor 152 uses the positioning signals received by the two receivers 161 and 162 to calculate the azimuth in which the revolving unit 120 faces as the relationship between the installation position of one receiver and the installation position of the other receiver. The azimuth angle (also called the vehicle azimuth angle) of the rotating body 120 is the front direction (X direction) of the rotating body 120 and is equal to the horizontal component of the extension direction of the straight line extending from the boom 131 of the work implement 130 to the bucket 133.

[0033] The IMU 153 measures the acceleration and angular velocity of the rotating unit 120, and detects the attitude (for example, roll angle and pitch angle) of the rotating unit 120 based on the measurement results. The IMU 153 is installed on the underside of the rotating unit 120, for example.

[0034] Examples of other sensors that the work machine 100 is equipped with include a stereo camera, a LiDAR (Light Detection and Ranging) device, and a laser scanner. These sensors are installed, for example, so that their detection direction faces forward of the cab 140 of the work machine 100. These sensors identify the three-dimensional position of an object in a coordinate system based on the position of each sensor. These sensors may be installed on either the left or right side of the work machine 100, or on both sides, so that they face to the side of the work machine 100.

[0035] The work machine 100 is also equipped with, for example, a short-range communication device for performing vehicle-to-vehicle communication with other nearby vehicles, a mobile communication device for connecting to a remote server, and the like.

[0036] (Basic Operation of the Control Device) First, with reference to FIGS. 4 to 11 , the basic operation of the control device 61 according to an embodiment of the present disclosure will be described. In this embodiment, the swing operation of automatically raising the boom 131 while the bucket 133 is swung from a state in which the bucket 133 is positioned outside the loading target due to excavation of the excavation target to a direction facing the loading target and moving it to a discharge point is referred to as a "loading swing." Furthermore, the swing operation of automatically lowering the boom 131 while the bucket 133 is swung from a state in which the bucket 133 is positioned above the loading target due to loading to a predetermined direction and moving it to the excavation start point is referred to as a "return swing." The discharge point is a target point for the loading swing, and is set, for example, at the loading platform of a dump truck, which is a transport vehicle, or the inlet of a land improvement machine, hopper, or the like. Dump trucks, land improvement machines, hoppers, and the like are examples of loading targets. However, the target point is not limited to these, and the destination of excavated soil or sand to be moved to another ground surface can also be set as a discharge point. In the present disclosure, the unloading point is an example of a first target point (hereinafter also referred to as a loading swing target point TLP) corresponding to a target position for unloading a load stored in the bucket 133 or the like. The excavation start point is a target point for automatic return operation after unloading is completed, and is set, for example, as a point for starting excavation. In the present disclosure, the excavation start point is an example of a second target point (hereinafter also referred to as a return swing target point TRP) corresponding to a target position for loading a load for excavating an excavation target with the bucket 133 or the like. Note that in the present embodiment, the unloading point (loading swing target point TLP), the excavation start point (return swing target point TRP), and the interference avoidance point described below are collectively referred to as reference points. In the present embodiment, the part of the work machine 100 that corresponds to the reference point is the bucket pin 133P. The control device 61 uses the position and orientation of each reference point as target values ​​and controls the position of the bucket pin 133P. Furthermore, the cargo turning target point TLP and the return turning target point TRP are collectively referred to as the target points.

[0037] Figure 4 schematically shows a series of steps in manual excavation, loading swing, manual earth removal, and return swing. First, as shown in the upper left of Figure 4, the operator manually excavates the work machine 100 and loads earth and sand or other cargo into the bucket 133. When the operator then operates the automatic start switch 1432, loading swing begins as shown in the upper right of Figure 4, and a combined operation of the work implement 130 and the rotating body 120 is automatically performed to move the bucket 133 (bucket pin 133P) to the loading swing target point TLP. At the loading swing target point TLP, the operator manually removes earth and sand from the bucket 133 as shown in the lower right of Figure 4. After the soil discharge is completed, when the operator presses the automatic start switch 1432, return rotation begins as shown in the lower left of Figure 4, and a combined operation of the work implement 130 and the rotating body 120 is automatically performed to move the bucket 133 (bucket pin 133P) to the return rotation target point TRP.

[0038] 2 and 3, one automatic start switch 1432 is used in common for loading swing and return swing, but two or more switches may be used. For example, two independent automatic start switches may be provided, with the automatic start switch for loading swing being the automatic start switch 1432 shown in FIG. 2 (hereinafter also referred to as the loading swing automatic start switch 1432) and the automatic start switch for return swing being the automatic start switch 1433 shown in FIG. 2 (hereinafter also referred to as the return swing automatic start switch 1433). The switches may be provided in such a way that they can be set arbitrarily by the operator, for example.

[0039] Next, the interference avoidance point EVP will be described with reference to Figure 5. Figure 5 schematically shows the positional relationship between the work machine 100 and a dump truck 200 onto which earth and sand or other cargo is to be loaded. The dump truck 200 is equipped with a cab 201, a loading platform 202, and a tailgate 203. Figure 5 shows an example of a loading swing operation. By operating the automatic start switch 1432, the work machine 100 moves the bucket 133 (133a) located at the automatic swing start point (SP) to the loading swing target point (TLP) via the interference avoidance point (EVP). The posture of the bucket 133 (133b) upon reaching the loading swing target point (TLP) is the hoarding posture (in this embodiment, this is the posture in which the load excavated from the excavation target is stored in the bucket 133, and is also referred to as the loading posture). Here, the operator sets the attitude of the bucket 133 to a dump attitude (in this embodiment, this is a load unloading attitude in which all of the load contained in the bucket 133 can be unloaded, also referred to as a load unloading attitude) (bucket 133 (133c)) and performs the soil unloading operation. Here, the interference avoidance point (EVP) is a point (position information) that represents the boundary of an area set so that the bucket 133 does not collide with the bed 202 of the dump truck 200, etc. For example, the interference avoidance point (EVP) is a point that sets a position or a direction in which the rotating unit 120 faces so that the bucket 133 does not collide with the bed 202 of the dump truck 200, etc. In this embodiment, only the rotation operation of the rotating unit 120 is performed on the unloading point side (load rotation target point TLP side) of this boundary. The interference avoidance point (EVP) can be set, for example, based on teaching in which the operator actually operates the work implement to set the direction in which the rotating unit 120 faces and the attitude of the work implement 130. At this time, as shown in FIG. 5 , for example, the interference avoidance point (EVP) is set with a certain margin in the vertical and horizontal directions from the interference avoidance point (teaching position) registered by the operator. The automatic swing start point (SP) is the position of the bucket pin 133P at the start of loading swing or return swing, and is the position when the operator operates the automatic start switch 1432. In the following, the automatic swing start point (SP) is also referred to as the start point. The automatic swing start point (SP) may be a specific position of the work implement 130 at the start of loading swing or return swing, and may be, for example, the left or right end of the bucket 133, the cutting edge, or the like.

[0040] Figure 6 shows an example of the swing angle and the height position of the bucket pin 133P during loading swing. The horizontal axis represents the swing angle, and the vertical axis represents the bucket pin height. In Figure 6, the swing angle of the automatic swing start point (SP) is shown as the start angle, the swing angle of the interference avoidance point (EVP) as the interference avoidance point angle, and the swing angle of the loading swing target point (TLP) as the target angle. Also, the height of the automatic swing start point (SP) is shown as the start height, the height of the interference avoidance point EVP as the interference avoidance point height, and the height of the loading swing target point (TLP) as the target height. The interference area between the bucket 133 and the dump truck 200 is shown shaded. In the example shown in Fig. 6 , until the bucket pin 133P reaches the interference avoidance point (EVP) from the automatic swing start point (SP), control of the swing unit 120 and control of raising the boom 131 of the work implement 130 are executed in a combined manner, so that the height of the bucket pin 133P reaches the interference start point height before the swing angle reaches the interference avoidance point angle. After the bucket pin 133P reaches the interference avoidance point (EVP), the swing angle reaches the target angle through independent control of the swing unit 120. In Fig. 6 , the start height of the automatic swing start point (SP) in loading swing is lower than the target height of the loading swing target point (TLP), but, for example, the start height of the automatic swing start point (SP) may be higher than at least one of the target height of the loading swing target point (TLP) and the height of the interference avoidance point (EVP). In this case, until the bucket pin 133P reaches the loading rotation target point (TLP) or the interference avoidance point (EVP) from the automatic rotation start point (SP), control of the rotating body 120 and control of lowering the boom 131 of the work machine 130 are performed in combination.

[0041] 7 and 8 show examples of the swing angle and the height of the bucket pin 133P during a return swing. FIG. 7 shows an example in which the height of the automatic swing start point (SP) is equal to the height of the interference avoidance point (EVP), while FIG. 8 shows an example in which the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). In the example shown in FIG. 7 , the height of the bucket pin 133P is maintained at the start height until the bucket pin 133P reaches the interference avoidance point (EVP), and the bucket pin 133P is moved by independent control of the rotating unit 120 so that the swing angle reaches the interference avoidance point angle from the start angle. After the bucket pin 133P reaches the interference avoidance point (EVP), the swing control of the rotating unit 120 and the lowering control of the boom 131 of the work implement 130 are executed in combination, so that the bucket pin 133P reaches the target height and target angle. 8 , the work implement 130 is first independently controlled by raising the boom 131 until the height of the bucket pin 133P reaches the interference avoidance point height. After the height of the bucket pin 133P reaches the interference avoidance point height, the height of the bucket pin 133P is maintained at the interference avoidance point height until the bucket pin 133P reaches the interference avoidance point (EVP), and the swing angle is moved from the start angle to the interference avoidance point angle by independently controlling the rotating unit 120. After the bucket pin 133P reaches the interference avoidance point (EVP), the control of the rotating unit 120 and the lowering control of the boom 131 of the work implement 130 are executed in combination, so that the bucket pin 133P reaches the target height and target angle. Note that in this embodiment, during the return swing, the attitude of the work implement 130 is controlled to be the target attitude by the time the bucket pin 133P reaches the target angle and target height. 7 and 8 , the start height of the automatic rotation start point (SP) in the return swing is higher than the target height of the return swing target point (TRP), but, for example, the start height of the automatic rotation start point (SP) may be lower than at least one of the target height of the return swing target point (TRP) or the height of the interference avoidance point (EVP). In this case, until the bucket pin 133P reaches the return swing target point (TRP) or the interference avoidance point (EVP) from the automatic rotation start point (SP), control of the rotating unit 120 and control of raising the boom 131 of the work implement 130 are executed in a combined manner.

[0042] Fig. 9 is a perspective view showing an example of operation during loading swing. Note that a dump truck 200, which is a transport vehicle, is equipped with a covolane (scatter prevention device) 204 and a hinge 205 in addition to a gate 203. The covolane 204 and the hinge 205 are examples of obstructions. In the example shown in Fig. 9, the trajectory of the bucket pin 133P extends from the automatic swing start point (SP) to the interference avoidance point (EVP) by the operation of both the work implement 130 and the swing unit 120 (hereinafter referred to as combined operation), and continues from the interference avoidance point (EVP) to the loading swing target point (TLP) by the independent operation of the swing unit 120.

[0043] FIG. 10 is a perspective view showing an example of operation during a return swing. In the example shown in FIG. 10, the height of the automatic swing start point (SP) is higher than the height of the interference avoidance point (EVP). Furthermore, the positions of the automatic swing start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, interference with the loading target is ensured based on a vertical plane (interference avoidance vertical plane (VS)) that includes the swing axis 120C of the swing unit 120 and the interference avoidance point (EVP). In this embodiment, the interference avoidance vertical plane (VS) and the interference avoidance plane (HS), which will be described later, are collectively referred to as the interference avoidance plane. In this example, the trajectory of the bucket pin 133P extends by the independent movement of the rotating body 120 from the automatic rotation starting point (SP) until the bucket pin 133P passes through the interference avoidance vertical plane (VS), and after passing through the interference avoidance vertical plane (VS), the trajectory continues to the return rotation target point (TRP) by the combined movement of the work machine 130 and the rotating body 120.

[0044] FIG. 11 is a perspective view illustrating an example of operation during a return swing. In the example illustrated in FIG. 11 , the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). Furthermore, the positions of the automatic swing start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, the work implement 130 is controlled based on a horizontal plane (interference avoidance plane (HS)) that includes the interference avoidance point (EVP) until the height of the bucket pin 133P becomes equal to or higher than the interference avoidance plane (HS). Thereafter, similar to the example illustrated in FIG. 10 , interference with the loading target is ensured based on the interference avoidance vertical plane (VS). In this example, the trajectory of the bucket pin 133P rises from the automatic rotation starting point (SP) until it reaches the interference avoidance plane (HS), and then extends by the independent movement of the rotating body 120 until it passes through the interference avoidance vertical plane (VS), and after passing through the interference avoidance vertical plane (VS), it continues to the return rotation target point (TRP) by the combined movement of the work machine 130 and the rotating body 120.

[0045] 3 , the control device 61 can be configured using a computer such as a microcontroller, and includes an automatic swing control unit 62, a memory unit 63, and an operation command switching unit 64 as a functional configuration formed by a combination of hardware such as a computer, computer peripheral devices and peripheral circuits, and software such as a program executed by the computer. The automatic swing control unit 62 also includes an information input / output unit 621, a reference point setting unit 622, a swing direction setting unit 623, a start instruction receiving unit 624, an operation command switching control unit 625, and an operation command signal generating unit 626. The memory unit 63 also stores information 631 indicating the target work implement attitude and vehicle body azimuth angle (earth unloading point, interference avoidance point, excavation start point), etc.

[0046] The automatic swing control unit 62 generates an operation command signal (automatic) and outputs it to the EPC valve 123-1 via the operation command switching unit 64, thereby driving the swing body 120 and the work machine 130.

[0047] Predetermined information output by the operation device 143, the attitude angle sensor 151, the GNSS sensor 152, the IMU 153, etc. is input to the information input / output unit 621. The information input / output unit 621 outputs predetermined display information to the display input device 143D.

[0048] The reference point setting unit 622 sets a loading swing target point TLP (earth unloading point), a return swing target point TRP (excavation start point), and an interference avoidance point (EVP). In this embodiment, these reference points can be set by the operator teaching, or by creating a three-dimensional map or the like as described in Patent Document 1 and setting the reference points based on the created three-dimensional map. The setting method can be, for example, freely selected by the operator. Here, an example in which the reference points are set by the operator teaching will be described. The reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the excavation start point. The operator operates the operation device 143 to move the bucket 133 to the excavation start point and inputs a completion of movement to the excavation start point into the display input device 143D. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the interference avoidance point. The operator operates the operation device 143 to move the bucket 133 to the interference avoidance point and inputs into the display input device 143D the completion of movement to the interference avoidance point. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the discharge point. The operator operates the operation device 143 to move the bucket 133 to the discharge point and inputs into the display input device 143D the completion of movement to the discharge point.

[0049] The reference point setting unit 622 displays an instruction to move to the reference point on the display input device 143D. Furthermore, the reference point setting unit 622 stores information, such as the position and attitude of the work implement 130 acquired based on the excavator coordinate system at each reference point and the swing angle of the swing unit 120, as information 631 in the storage unit 63 based on the operator's input operation on the display input device 143D and information input to the information input / output unit 621. The reference point setting unit 622 can change the setting of the reference point at any timing. That is, for example, the reference point setting unit 622 can set the loading swing target point TLP (earth unloading point), the return swing target point TRP (excavation start point), and the interference avoidance point EVP once before executing automatic swing, and then change the loading swing target point TLP, the return swing target point TRP, and the interference avoidance point EVP at any timing (e.g., during work). In this case, fine adjustment of the reference point can be performed as appropriate. For example, fine adjustments can be made as appropriate to the load turning target point TLP (earth unloading point) and the return turning target point TRP (digging start point).

[0050] The swing direction setting unit 623 sets the swing direction of the work implement 130 (swing body 120) for moving the bucket 133 to the target position. The swing direction setting unit 623 sets the swing direction in loading swing control (first swing control) and return swing control (second swing control) based on, for example, the positional relationship between the loading target and the work machine 100.

[0051] The swing direction setting unit 623 sets the swing direction, for example, in a direction that leads the bucket 133 across the interference avoidance point (EVP) to a loading swing target point TLP (first target point) corresponding to the unloading position (target position for unloading) or a return swing target point TRP (second target point) corresponding to the excavation start position (target position for loading). FIG. 12 shows an example of the operation of the swing direction setting unit 623 in this case. The process shown in FIG. 12 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 12 is started, the swing direction setting unit 623 first acquires the target angle described with reference to FIG. 6 or FIG. 7 (step S101). Next, the swing direction setting unit 623 acquires the interference avoidance point angle (step S102). Next, the swing direction setting unit 623 determines whether the target angle is reached across the interference avoidance point angle when the work machine 130 (the rotating unit 120) turns left (step S103). If the target angle is reached across the interference avoidance point angle when the work machine 130 (the rotating unit 120) turns left (step S103: YES), the swing direction setting unit 623 sets the swing direction to a left swing (step S104) and ends the processing shown in Fig. 12. If the target angle is not reached across the interference avoidance point angle when the work machine 130 (the rotating unit 120) turns left (step S103: NO), the swing direction setting unit 623 sets the swing direction to a right swing (step S105) and ends the processing shown in Fig. 12. Fig. 13 shows an example in which the swing direction is set to a left swing. Fig. 14 shows an example in which the swing direction is set to a right swing. In this case, the loading swing or return swing is performed in the direction of the taught interference avoidance point, so it is possible to prevent the situation where it becomes unclear in which direction the work machine 130 (swivel unit 120) should swing when swinging nearly 180 degrees, for example. In other words, it is possible to set a reference point in the direction in which the work machine 130 (swivel unit 120) is desired to swing, and then swing the work machine 130 (swivel unit 120) toward the reference point.

[0052] Furthermore, for example, when the target (loading target) for unloading (loading, soil removal, etc.) is a dump truck 200 and there is a possibility that the cab 201 of the dump truck 200 will interfere with the bucket 133, the swing direction setting unit 623 sets the swing direction in a direction in which interference between the cab 201 of the dump truck 200 and the bucket 133 will not occur. The direction in which interference will not occur is a direction in which the bucket 133 and the cab 201 of the dump truck 200 do not overlap when the dump truck 200 (transport vehicle) is viewed from above. For example, the swing direction setting unit 623 sets the swing direction in a direction in which the bucket 133 does not pass above the cab 201 when the dump truck 200 is viewed from above. FIG. 15 shows an example of the operation of the swing direction setting unit 623 in this case. 15 is an example of operation that is based on the premise that the work machine 100 and the dump truck 200, which is the loading target of the work machine 100, are in a generally parallel state (the X direction (the fore-and-aft direction of the work machine 100) and vector b (the fore-and-aft direction of the dump truck 200), which will be described later, are generally parallel). In this case, "approximately parallel" means being within a predetermined angle range from parallel. The processing shown in FIG. 15 is started when the automatic start switch 1432 is operated. When the processing shown in FIG. 15 is started, the turning direction setting unit 623 acquires position information of the discharge point P0 and the position coordinates of the four truck contour points P1 to P4 shown in FIG. 16 or 17, based on the excavator coordinate system (step S201). The position coordinates of the four truck contour points P1 to P4 can be acquired, for example, by vehicle-to-vehicle communication, or by using external sensors such as a LiDAR device, radar scanner, or camera provided on the work machine 100. Next, the swing direction setting unit 623 calculates a vector (vector a) connecting the origin (swing axis 120C) of the excavator coordinate system and the earth unloading point P0 (step S202). Next, the swing direction setting unit 623 calculates a vector (vector b) of the X-axis of the truck coordinate system (step S203). The truck coordinate system is a coordinate system based on the position and orientation of the dump truck 200. Furthermore, the direction in which vector b faces is the direction from the bed 202 to the cab 201, when the cab 201 side of the dump truck 200 is defined as the front and the bed 202 side is defined as the rear.Next, the turning direction setting unit 623 determines whether the angle formed by vector a and vector b in a plan view from above is greater than 0 degrees (step S204). If the angle formed by vector a and vector b is greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to a right turn (step S205) and ends the processing shown in FIG. 15. If the angle formed by vector a and vector b is not greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to a left turn (step S206) and ends the processing shown in FIG. 15. In the example shown in FIG. 16, the angle formed is greater than 0, so the turning direction is set to the right. In the example shown in FIG. 17, the angle formed is not greater than 0, so the turning direction is set to the left. In this case, the work implement 130 can approach from the rear side of the bed 202 of the dump truck 200, which is preferable compared to the case where the work implement 130 passes above the cab 201. Note that when the angle between vector a and vector b is near 0 degrees within a predetermined range from a preset 0 degree (see FIG. 18 ), automatic turning may be performed in a direction that results in the minimum turning angle. Furthermore, when the angle between vector a and vector b is −180 degrees (i.e., the cab 201 of the dump truck 200 faces the work machine 100) or within a predetermined range from −180 degrees (see FIGS. 19 and 20 ), the turning direction is not determined and automatic turning is not activated. In this case, a notification that the position or posture of the bucket 133 is inappropriate is displayed on the display / input device 143D for a predetermined period of time, for example, by outputting a display or sound. However, as shown in FIG. 21 , when the cab 201 of the dump truck 200 is not facing the work machine 100, the work implement 130 may be able to turn, and in such cases, automatic turning may be enabled.

[0053] The swing direction setting unit 623 may manually set the swing direction based on, for example, an input operation by the operator via the display input device 143D. Furthermore, the swing direction setting unit 623 may set the swing direction in a direction that results in a minimum swing angle, for example, in the case of unloading soil into a hopper or onto the ground where no interfering objects are present. For example, the swing direction setting unit 623 may set the swing direction in a direction that results in a minimum swing angle to the target orientation when the bucket 133 and the cab 201 of the dump truck 200 are not overlapped when viewed from above the dump truck 200 (transport vehicle). Furthermore, the setting method may be arbitrarily selected by, for example, the operator via a touch operation on the input screen. As described above, the swing direction setting unit 623 sets the swing direction in which the swing unit 120 swings to move the bucket 133 to the target position. In this case, the turning direction setting unit 623 sets the turning direction, for example, in a direction toward the interference avoidance point EVP set by the reference point setting unit 622 for avoiding interference between the bucket 133 and the loading object. Alternatively, the turning direction setting unit 623 sets the turning direction in a direction such that the driver's cab 201 of the dump truck 200, which is the transport vehicle, and the bucket 133, which is the implement, do not overlap in a plan view from above. The turning direction setting unit 623 also sets the turning direction in a direction that results in the minimum turning angle in accordance with predetermined conditions. The turning direction setting unit 623 can also have a function of preventing the transport vehicle from turning when the front of the transport vehicle is facing the work machine 100.

[0054] When the automatic start switch 1432 is a single operation switch, and the automatic start switch 1432 (a specified operation unit) is operated, the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control (first swing control that moves the implement to a first target point corresponding to the target position for unloading) or an instruction to start return swing control (second swing control that moves the implement to a second target point corresponding to the target position for excavation). With this configuration, a command to start swing control can be given using a single operation switch.

[0055] Furthermore, in the case where the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 may perform the following processing when the automatic start switch 1432 is operated. That is, for example, as shown in FIG. 23 , when the automatic start switch 1432 is operated, if the bucket 133 is above the bed 202 or the vessel 206 of the dump truck 200 (if the implement is within a predetermined range from the first target point), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control (second swing control). When the automatic start switch 1432 is operated, if the bucket 133 is not above the bed 202 or the vessel 206 of the dump truck 200 (if the implement is not within a predetermined range from the first target point), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control (first swing control). In FIG. 23 , positions P5 and P6 are positions at the ends of the operator's cab 201. FIG. 22 shows an example of the operation of the start instruction receiving unit 624 in this case. The processing shown in FIG. 22 is started when the automatic start switch 1432 is operated. When the processing shown in FIG. 22 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S301). Next, the start instruction receiving unit 624 acquires position information of the bucket 133 (step S302). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the rotating bed 120 is facing. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S303). If the bucket 133 is above the vessel 206 (step S303: YES), the start instruction receiving unit 624 sets the swing mode (type of swing control) to return swing (step S304), and ends the processing shown in Fig. 22. If the bucket 133 is not above the vessel 206 (step S303: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S305), and ends the processing shown in Fig. 22.

[0056] Furthermore, if the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 may perform the following processing when the automatic start switch 1432 is operated. That is, for example, as shown in FIG. 25 , when the automatic start switch 1432 is operated and the bucket 133 is in the dump position (the implement is in a predetermined unloading position), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control (second swing control). When the automatic start switch 1432 is operated and the bucket 133 is in the hoisting position (the implement is in a predetermined loading position), as shown in FIG. 27 , the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control (first swing control). In this case, the swing mode can be set by the work machine 100 alone. An example of operation in this case is shown in FIGS. 24 and 26 . The dump position is the position in which the load in the bucket 133 is being discharged. The dump posture is a posture (dashed line DL in FIG. 25 ) in which the cutting edge 133T of the bucket 133 faces away from the work machine 100 rather than in a posture in which the cutting edge 133T of the bucket 133 points vertically, as shown, for example, in FIG. 25 . The hoarding posture is a posture in which a load is loaded into the bucket 133. The hoarding posture is a posture in which the cutting edge 133T of the bucket 133 faces closer to the work machine 100 rather than in a posture in which the cutting edge 133T of the bucket 133 points vertically, as shown, for example, in FIG. 27 . In this case, it is preferable that the cutting edge 133T points upward more than perpendicular to the vertical direction, as shown by dashed line DL in FIG. 27 . The posture of the bucket 133 may be corrected by the pitch angle of the work machine 100.

[0057] The process shown in FIG. 24 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 24 is started, the start instruction receiving unit 624 acquires attitude information of the bucket 133 (step S401). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump attitude (step S402). If the bucket 133 is in the dump attitude (step S402: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S403) and ends the process shown in FIG. 24. If the bucket 133 is not in the dump attitude (step S402: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S404) and ends the process shown in FIG. 24. In addition, the attitude information of the bucket 133 identified by the start instruction receiving unit 624 may be corrected by taking into account vehicle body inclination information, such as the pitch angle and roll angle of the vehicle body (traveling body 110), measured based on the vehicle body's IMU.

[0058] The process shown in Fig. 26 is started when the automatic start switch 1432 is operated. When the process shown in Fig. 26 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S501). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting posture (step S502). If the bucket 133 is in the hoisting posture (step S502: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S503) and ends the process shown in Fig. 26. If the bucket 133 is not in the hoisting posture (step S502: NO), the start instruction receiving unit 624 sets the swing mode to return swing (step S504) and ends the process shown in Fig. 26.

[0059] Furthermore, in the case where the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 may perform the following processing when the automatic start switch 1432 is operated. That is, for example, as shown in FIG. 23 , when the automatic start switch 1432 is operated, the start instruction receiving unit 624 does not accept the operation of the automatic start switch 1432 if the bucket 133 is above the bed 202 or the vessel 206 of the dump truck 200 (even if the implement is within a predetermined range from the first target point) or if the bucket 133 is not in the dump position (if the implement is not in the predetermined unloading position). The start instruction receiving unit 624 may not accept the operation of the automatic start switch 1432 when the automatic start switch 1432 is operated if the bucket 133 is not above the bed 202 or the vessel 206 of the dump truck 200 (even if the implement is within a predetermined range from the first target point) or if the bucket 133 is not in the hoisting position (if the implement is not in the predetermined loading position). An example of operation in this case is shown in FIG.

[0060] The processing shown in Fig. 28 is started when the automatic start switch 1432 is operated. When the processing shown in Fig. 28 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S601) and acquires position and attitude information of the bucket 133 (step S602). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the revolving unit 120 faces. The start instruction receiving unit 624 can acquire information representing the positional relationship between the vessel 206 and the bucket 133 based on the position information of the work machine 100, the position information of the vessel 206 acquired in step S601, and the position and attitude information of the bucket 133 acquired in step S602. Note that the position and attitude information of the bucket 133 can be calculated based on, for example, azimuth angle information of the revolving unit 120 and attitude information of the work implement 130 (boom 131, arm 132, bucket 133). Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S603). If the bucket 133 is above the vessel 206 (step S603: YES), the start instruction receiving unit 624 determines whether the bucket 133 is in a dump position (step S604). If the bucket 133 is in a dump position (step S604: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S607) and ends the processing shown in FIG. 28. If the bucket 133 is not in a dump position (step S604: NO), the start instruction receiving unit 624 does not activate automatic swing (step S605) and notifies the display input device 143D that the position or posture of the bucket 133 is inappropriate by, for example, displaying or outputting sound for a predetermined period of time (step S606), and ends the processing shown in FIG. 28. Note that step S601 may be omitted.

[0061] If the bucket 133 is not above the vessel 206 (step S603: NO), the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting position (step S608). If the bucket 133 is in the hoisting position (step S608: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S609) and ends the processing shown in FIG. 28. If the bucket 133 is not in the hoisting position (step S608: NO), the start instruction receiving unit 624 does not activate automatic swing (step S610) and notifies the display input device 143D that the position or posture of the bucket 133 is inappropriate by, for example, displaying or outputting sound for a predetermined period of time (step S611), and ends the processing shown in FIG. 28. This configuration makes it possible to prevent automatic swing control from being executed when the position or posture of the bucket 133 is inappropriate.

[0062] Furthermore, when two operation switches are provided as automatic start switches (for example, when a loading swing automatic start switch 1432 and a return swing automatic start switch 1433 are provided), the start instruction receiving unit 624 may be configured to receive operation of the loading swing automatic start switch 1432 or the return swing automatic start switch 1433 (first operation unit or second operation unit) as an instruction to start loading swing control (first swing control) or return swing control (second swing control) only when at least one of the position and attitude of the bucket 133 satisfies a predetermined condition (only when at least one of the position and attitude of the implement satisfies a predetermined condition). In this case, if the operator mistakenly operates the loading swing automatic start switch 1432 or the return swing automatic start switch 1433, for example, it is possible to prevent the automatic swing control from starting.

[0063] For example, when the return swing automatic start switch 1433 (second operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the return swing automatic start switch 1433 as an instruction to start return swing control (second swing control) only when the bucket 133 is above the vessel 206 (only when the implement is within a predetermined range from the first target point). Alternatively, when the loading swing automatic start switch 1432 (first operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the loading swing automatic start switch 1432 as an instruction to start loading swing control (first swing control) only when the bucket 133 is not above the vessel 206 (only when the implement is not within a predetermined range from the first target point). An example of operation in this case is shown in FIG. 29 .

[0064] The process shown in FIG. 29 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 29 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S701) and acquires position information of the bucket 133 (step S702). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the swing bed 120 is facing. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S703). If the bucket 133 is above the vessel 206 (step S703: YES), the start instruction receiving unit 624 does not activate automatic swing (step S704) and notifies the display input device 143D that the position or attitude of the bucket 133 is inappropriate by, for example, displaying or outputting a sound for a predetermined period of time (step S705), and then ends the process shown in FIG. 29 . If the bucket 133 is not above the vessel 206 (step S703: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S706) and ends the processing shown in Fig. 29. Note that step S701 may not be included.

[0065] Furthermore, for example, when the loading swing automatic start switch 1432 (first operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the loading swing automatic start switch 1432 as an instruction to start loading swing control (first swing control) only when the bucket 133 is in a hoarding position (the implement is in a predetermined loading position). When the return swing automatic start switch 1433 (second operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the return swing automatic start switch 1433 as an instruction to start return swing control (second swing control) only when the bucket 133 is in a dump position (the implement is in a predetermined unloading position). An example of operation in this case is shown in FIG.

[0066] The process shown in FIG. 30 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 30 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S801). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump posture (step S802). If the bucket 133 is in the dump posture (step S802: YES), the start instruction receiving unit 624 does not activate automatic swing (step S803) and notifies the display input device 143D that the posture of the bucket 133 is inappropriate by, for example, displaying or outputting sound for a predetermined period of time (step S804), and then ends the process shown in FIG. 30. If the bucket 133 is not in the dump posture (step S802: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S805), and ends the process shown in FIG. 30.

[0067] The manner in which the above-described plurality of start instruction receiving sections 624 operate may be selected arbitrarily by the operator, for example.

[0068] The operation command switching control unit 625 controls the operation command switching unit 64 to output from the operation command switching unit 64 either an operation command signal (manual) generated in response to an operation of the operator on the operation device 143 or an operation command signal (automatic) generated by the operation command signal generating unit 626. For example, when the operation command signal generating unit 626 generates and outputs an operation command signal (automatic), the operation command switching control unit 625 selects the operation command signal (automatic) and outputs it from the operation command switching unit 64.

[0069] The operation command signal generating unit 626 is one example configuration of a control unit according to the present disclosure. The operation command signal generating unit 626 (control unit) generates and outputs an operation command signal for performing loading swing control or return swing control in response to a predetermined instruction (for example, operation of the automatic start switch 1432). The operation command signal generating unit 626 controls the movement of the bucket 133 in the loading swing control and return swing control based on, for example, the interference avoidance point EVP.

[0070] In addition, the operation command signal generating unit 626 executes loading swing control when the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control, and executes forward return swing control when the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control.

[0071] In addition, the operation command signal generating unit 626 executes loading turning control based on the loading turning target point TLP and the interference avoidance point EVP, and executes return turning control based on the return turning target point TRP and the interference avoidance vertical plane VS (interference avoidance plane) including the interference avoidance point EVP.

[0072] Furthermore, when the interference avoidance plane is an interference avoidance vertical plane VS that includes the rotation axis 120C that passes through the rotation center and the interference avoidance point EVP, the operation command signal generating unit 626 sets the height of the bucket pin 133P of the bucket 133 (the specified height of the work tool) to be equal to or higher than the height of the interference avoidance point EVP from the start of the return rotation control until the bucket pin 133P passes through the interference avoidance vertical plane VS.

[0073] In addition, the operation command signal generating unit 626 executes a combination of control of the attitude of the work implement 130 and control of the rotation of the rotating body 120 in one of the first and second areas bounded by the interference avoidance surface, and executes only control of the rotation of the rotating body 120 in the other area.

[0074] Furthermore, the operation command signal generating unit 626 executes loading swing control when the start instruction receiving unit 624 receives operation of the loading swing automatic start switch 1432 as an instruction to start loading swing control, and executes return swing control when the start instruction receiving unit 624 receives operation of the return swing automatic start switch 1433 as an instruction to start return swing control. In this embodiment, the operation command signal generating unit 626 generates and outputs an operation command signal for moving the bucket 133, which is a working tool, to a target position. In this case, the operation command signal generating unit 626 generates and outputs an operation command signal for performing first swing control to move the bucket 133 to a first target point corresponding to the target position for unloading, or second swing control to move the bucket 133 to a second target point corresponding to the target position for loading.

[0075] FIG. 31 shows an example of the operation of the operation command signal generation unit 626. The operation shown in FIG. 31 is started when the automatic start switch 1432 is operated and the swing direction and swing mode are set. When the processing shown in FIG. 31 is started, the operation command signal generation unit 626 determines whether the swing mode is set to loading swing (step S901). If the swing mode is set to loading swing (step S901: YES), the operation command signal generation unit 626 performs combined swing control and work implement control in the set swing direction until the bucket pin 133P reaches the interference avoidance point EVP (step S902). After the bucket pin 133P passes the interference avoidance point EVP, the operation command signal generation unit 626 performs independent swing control until the bucket pin 133P reaches the loading swing target point TLP (step S903), and then ends the processing shown in FIG. 31 .

[0076] If the swing mode is not set to loading swing (step S901: NO), the operation command signal generation unit 626 determines whether the start height is equal to or greater than the interference avoidance point height (step S904). If the start height is not equal to or greater than the interference avoidance point height (step S904: NO), the operation command signal generation unit 626 independently executes work implement control until the height of the bucket pin 133P reaches the interference avoidance point height (step S907). After step 907, or if the start height is equal to or greater than the interference avoidance point height (step S904: YES), the operation command signal generation unit 626 independently executes swing control in the set swing direction until the bucket pin 133P reaches the interference avoidance vertical plane (VS) (step S905). After the bucket pin 133P passes the interference avoidance point EVP, the operation command signal generation unit 626 executes swing control and work implement control in a combined manner until the bucket pin 133P reaches the return swing target point TRP (return swing target posture) (step S906), and then ends the processing shown in FIG. 31 .

[0077] (Functions and Effects) According to this embodiment, in automatic rotation control, the rotation direction of the rotating body 120 can be automatically determined. Therefore, according to this embodiment, it is possible to improve usability in automatic rotation control.

[0078] Although the embodiments of the present invention have been described above with reference to the drawings, the specific configuration is not limited to the above-described embodiments and includes design modifications within the scope of the present invention. For example, a remote control system may be used in which the operating device 143 and part of the configuration of the control device 61 are installed in a remote location, and an operator at the remote location controls the work machine 130 and the revolving body 120 via wireless communication while viewing a monitor screen. Furthermore, part or all of the programs executed by the computer in the above-described embodiments may be distributed via a computer-readable recording medium or a communication line.

[0079] [Additional Notes] The control device 61 described in the embodiment can be understood as follows.

[0080] (1) A control device according to a first aspect of the present disclosure is a control device for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a working tool and is attached to the rotating body, and includes a rotation direction setting unit that sets the rotation direction in which the rotating body rotates in order to move the working tool to a target position.

[0081] (2) A control device according to a second aspect of the present disclosure is the control device of (1), which includes a reference point setting unit that sets an interference avoidance point to avoid interference between the implement and the loading object, and the rotation direction setting unit sets the rotation direction to a direction facing the interference avoidance point.

[0082] (3) A control device according to a third aspect of the present disclosure is a control device according to (1) or (2), wherein the rotation direction setting unit sets the rotation direction in a direction in which the driver's cab of the transport vehicle and the implement do not overlap when viewed in a plan view from above.

[0083] (4) A control device according to a fourth aspect of the present disclosure is the control device of (1) to (3), wherein the turning direction setting unit sets the turning direction to a direction that results in a minimum turning angle.

[0084] (5) A control device according to a fifth aspect of the present disclosure is a control device according to any one of (1) to (4), wherein the rotation direction setting unit does not cause the rotating body to rotate when the front of the transport vehicle faces the work machine.

[0085] (6) A control device according to a sixth aspect of the present disclosure is a control device according to any one of (1) to (5), and includes an operation command signal generation unit that generates and outputs an operation command signal for moving the work implement to a target position, and the operation command signal generation unit generates an operation command signal for performing a first rotation control for moving the work implement to a first target point corresponding to the target position for unloading, or a second rotation control for moving the work implement to a second target point corresponding to the target position for loading.

[0086] According to the control device, control method, and work machine of the present disclosure, it is possible to automatically determine the direction in which the rotating body rotates.

[0087] 100...working machine, 110...traveling body, 120...swinging body, 130...working machine, 133...bucket, 140...operator's cab, 143D...display input device, 60...control system, 61...control device, 622...reference point setting unit, 623...swing direction setting unit, 624...start instruction receiving unit, 626...operation command signal generating unit (control unit)

Claims

1. A control device for a work machine having a rotating body that rotates around a rotation center and a work implement having a working tool and attached to the rotating body, the control device including a rotation direction setting unit that sets the rotation direction in which the rotating body rotates in order to move the working tool to a target position.

2. A control device as described in claim 1, further comprising a reference point setting unit that sets an interference avoidance point to avoid interference between the implement and an object to be loaded, and the rotation direction setting unit sets the rotation direction to a direction facing the interference avoidance point.

3. The control device according to claim 1, wherein the turning direction setting unit sets the turning direction in a direction in which the driver's cab of the transport vehicle and the implement do not overlap when viewed in a plan view from above.

4. The control device according to any one of claims 1 to 3, wherein the turning direction setting unit sets the turning direction to a direction that results in a minimum turning angle.

5. The control device according to claim 4, wherein the turning direction setting unit does not cause the turning body to turn when the front of the transport vehicle faces the work machine.

6. A control device as described in claim 5, further comprising an operation command signal generating unit which generates and outputs an operation command signal for moving the working tool to a target position, wherein the operation command signal generating unit generates an operation command signal for performing a first rotation control for moving the working tool to a first target point corresponding to the target position for unloading, or a second rotation control for moving the working tool to a second target point corresponding to the target position for loading.

7. A control method for a work machine having a rotating body that rotates around a rotation center and a work implement having a working tool and attached to the rotating body, the control method including a step of setting a rotation direction in which the rotating body rotates in order to move the working tool to a target position.

8. A work machine comprising: a rotating body that rotates around a rotation center; a working machine having a working implement and attached to the rotating body; and a control device that controls the rotating body and the working implement, wherein the control device comprises a rotation direction setting unit that sets the rotation direction in which the rotating body rotates in order to move the working implement to a target position.

Citation Information

Patent Citations

  • Automatic shovel

    JP2000179008A

  • Control device and control method for loading machine

    JP2020041352A

  • Work machine

    JP2021050474A