A semi-submersible wind power turbine platform

The semi-submersible wind power turbine platform addresses stability issues during emergency shutdowns by using gravity-fed ballast water redistribution from tanks above the waterline to counteract wind forces, enhancing stability and reducing capsizing risks.

WO2024217873A1PCT designated stage expired Publication Date: 2024-10-24BASSOE TECH AB

Patent Information

Application Number
PCT/EP2024/059073
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-21
Filing Date
2024-04-03
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

Existing semi-submersible wind power turbine platforms lack an effective solution to handle sudden dynamic motions caused by emergency shutdowns or changes in wind velocity, leading to potential loss of stability and capsizing.

Method used

The platform incorporates a ballast system with trim ballast tanks located above the even keel waterline, equipped with dump outlets and valves that allow ballast water to be dumped by gravity, enabling quick counter-heeling to maintain stability during emergency situations without the need for active pumping systems.

Benefits of technology

This solution reduces the risk of capsizing during emergency shutdowns or sudden wind changes, allowing for reduced platform size and cost, and ensures stability by redistributing ballast water to counteract wind forces effectively.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2024059073_24102024_PF_FP_ABST
    Figure EP2024059073_24102024_PF_FP_ABST
Patent Text Reader

Abstract

A semi-submersible wind power turbine platform (10, 20, 30, 40) comprising: first, second and third buoyant stabilizing columns (1, 2, 3) distributed in a horizontal plane when the platform floats on even keel; one or more elongated connection members (5, 6, 7, 8, 9) arranged to connect the first, second and third columns (1, 2, 3) to each other, and a ballast system configured to control tilt, trim and / or heel of the platform (10, 20, 30, 40) by distributing ballast water between first, second and third trim ballast tanks (11, 12, 13) arranged in the first, second and third columns (1, 2, 3), respectively, wherein a dump outlet (15, 16, 17) to a dump line (21, 22, 23) is arranged at a bottom portion of each of the first, second and third trim ballast tanks (11, 12, 13), and wherein a dump valve (24, 25, 26) is arranged in association with each of the dump lines (21, 22, 23) so that, when the dump valve (24, 25, 26) is opened, ballast water can be dumped from the corresponding trim ballast tank (11, 12, 13) by the action of gravity.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] A semi-submersible wind power turbine platform

[0002] TECHNICAL FIELD

[0003] This invention relates to a semi-submersible wind power turbine platform. In particular, the invention relates to a ballast water system of such a platform for handling of an emergency shutdown situation.

[0004] BACKGROUND OF THE INVENTION

[0005] There is a growing interest for offshore wind power, i.e. sea-based wind power stations / turbines that produce electricity. Such a wind turbine may have a fixed underwater foundation or, in particular at water depths larger than around 50-60 m, may be arranged on a floating platform anchored to the bottom.

[0006] A floating wind power turbine platform may be of a semi-submersible type comprising a semi-submersible hull structure onto which a wind turbine tower is arranged. The hull structure is typically made up of a plurality of stabilizing buoyant columns connected by submersible buoyant pontoons or other connection members. The turbine tower is typically arranged onto one of the columns. An example of a semi-submersible wind power turbine platform is disclosed in WO2021 / 219787.

[0007] Platforms of this type are large constructions. For instance, each column of a 10 MW wind power turbine platform may have a height of 30 m and the distance between the columns may be 60-80 m. The total weight of the hull structure may be more than 3000 tonnes. The turbine tower may extend up to, say, 150 m above sea level and each turbine blade may be more than 100 m long.

[0008] Floating wind power turbine platforms may be provided with a controllable ballast system for controlling draught, trim, stability, etc., of the platform. US9139266B2 discloses a semi-submersible floating wind turbine platform with ballast control and mooring system. An active ballast system moves, by means of pumps, water ballast via main beams between platform columns to keep the wind tower vertically aligned when the wind velocity varies. W02020 / 242807A1 discloses a floating wind turbine platform where a platform ballast system including pumps and piping is used to distribute ballast water between the columns to incline the platform at a target angle to optimize power production and / or reduce turbine, tower and platform loads.

[0009] Although the active ballast system of each of US9139266B2 and W02020 / 242807A1 may be useful for its intended purpose, neither of them is designed to handle fast dynamic motions of the platform that might result from a sudden change in wind velocity or direction, or from an emergency shutdown situation. There is a need for improvements in this field.

[0010] SUMMARY OF THE INVENTION

[0011] The invention concerns a semi-submersible wind power turbine platform, wherein the platform comprises: at least a first, a second and a third buoyant stabilizing column distributed in a horizontal plane when the platform floats on even keel, wherein the platform is provided, or is configured to be provided, with a wind turbine tower. The platform further comprising one or more elongated connection members arranged to connect the first, second and third columns to each other, and a ballast system configured to control tilt, trim and / or heel of the platform by distributing ballast water between first, second and third trim ballast tanks arranged in the first, second and third columns, respectively, wherein the first, second and third trim ballast tanks are arranged above an even keel waterline of the platform. A dump outlet to a dump line is arranged at a bottom portion of each of the first, second and third trim ballast tanks, and a dump valve is arranged in association with each of the dump lines so that, when the dump valve is opened, ballast water can be dumped from the corresponding trim ballast tank by the action of gravity. When operating a wind power turbine platform of the above type, the wind exerts a force onto the platform, in particular onto blades of the wind turbine tower, which, if not compensated for, causes the platform to heel, i.e. to lean towards a leeward side thereof. To compensate for the mean wind turbine overturning moment and hold the platform upright (or, for instance, in a slightly inclined position with the turbine tower pointing slightly towards the wind), ballast water may be transferred (pumped) between the trim ballast tanks, from the leeward side to the windward side of the platform. Most of the ballast water will thus typically be located in the trim ballast tank located in the column located at the windward side of the platform, which may be the column that also supports the wind turbine tower.

[0012] In case of an emergency shutdown of the turbine, for instance due to loss of contact with the electrical net, it is a common measure to immediately stop the power production and adjust the pitch of the individual turbine blades so as to align with the wind. This immediately reduces the wind pressure onto the blades and gradually lowers the rotation speed of the blades. This means that most of the wind pressure will cease almost immediately, which in turn causes the platform to heel over and lean considerably towards the windward side thereof. This significant dynamic heeling, followed by a static significantly inclined position after stabilization, may lead to loss of platform stability because a column may get entirely below the water surface, either during the dynamic moment or due to incoming waves when the platform is in the static inclined position. (A similar situation would arise if the wind suddenly stops to blow, which may not be very likely, but it illustrates the changes of the forces acting on the platform.)

[0013] The platform of this disclosure solves this problem by means of the high-level location of the trim ballast tanks (above the even keel waterline), the dump outlets, the dump lines and dump valves. When the emergency situation occurs, the dump valve of the trim ballast tank with most water (the windward tank) may be opened so that the water is allowed to quickly flow out. This causes the platform to heel towards its upright position. The dump valves of the other trim ballast tanks may be opened slightly after the first one to set the platform in the upright position (or close to the upright position as the wind pressure will not be zero but lead to some inclination towards the leeward side). All dump valves may be opened at the same time to avoid any need for having control of which trim ballast tanks contains most water. The platform will still heel towards its upright position. Since the trim ballast tanks are located above the even keel waterline, preferably at least 5 meters above, the water can be dumped by the action of gravity only, which means that no pumps or other active water-feeding equipment is needed that may malfunction or require power in an emergency situation.

[0014] The dump lines may have a diameter of at least 400 mm, preferably 600 mm or more to facilitate a quick water-flow out of the trim tanks. The dump valves may be of a screw down swing check valve type.

[0015] The dump valves are preferably of a fast acting type, either opened by the water pressure in the trim tank above (release of swing valve) or operated by accumulated compressed air. The control and opening of the dump valves should preferably be powered by an independent power system (e.g. battery power) that continues to function after loss of contact with the electrical net.

[0016] The volume of each trim ballast tank is preferably such that the whole volume of ballast water required and used for trimming purposes can be held in one of the trim ballast tanks.

[0017] In variants of the platform of this disclosure, the dump lines simply lead the water overboard, out to the surrounding sea, e.g. via a dump outlet arranged on a side of the stabilizing column at or below a bottom of the trim ballast tank. The trim ballast tanks may then be refilled by pumping up water from the sea. In other variants, the dump lines lead the water to dump tanks arranged in the platform. This is further described below. It should here be noted that in variants of the platform where the dump lines lead to dump tanks arranged below the trim tanks, it is not necessary that the trim ballast tanks are located above the even keel waterline.

[0018] An advantage of the platform of this disclosure is that it reduces the risk for platform capsizing when the wind turbine is subject to an emergency shutdown or other event leading to a sudden change in wind load. A further advantage is that it allows for making the platform smaller and / or making the columns shorter, which reduces the costs for manufacturing the platform..

[0019] The platform may also be provided with a conventional passive ballast system comprising separate ballast tanks (i.e. other tanks than the trim ballast tanks) used to set the platform at correct draught and at an initial even keel (i.e. when no wind load is acting onto the platform). This passive ballast system may be interconnected with the active trim ballast system mentioned above and, for instance, use the same pumps for different purposes.

[0020] The platform may include further buoyant stabilizing columns that may or may not be provided with further trim ballast tanks. The platform may also include other columns or supports. The first, second and third buoyant stabilizing columns are distributed in the horizontal plane like corners of a triangle, typically an equilateral or an isosceles triangle. If the platform comprises a fourth column provided with a trim ballast tank, the four columns may be distributed in the horizontal plane like corners of a rectangle, such as a square. Other variants are also possible. The stabilizing columns typically extend in a substantially vertical direction but may alternatively be inclined in relation to the vertical direction.

[0021] In some examples, a non-return valve is arranged in association with the dump line so that water is prevented from flowing into the trim ballast tank via the corresponding dump line. The non-return valve may be a separate component but a preferred variant is that the dump valve is provided with an integral non-return function, such as a screw down swing check valve. The expression that a non-return valve is arranged in association with the dump line thus includes a variant where the dump valve is provided with an integral non-retum function.

[0022] In some examples, the ballast system further comprises one or more dump tanks arranged at a lower horizontal level than the trim ballast tanks, wherein each dump line is connected to the one or more dump tanks so that ballast water dumped from the trim ballast tanks can flow into the one or more dump tanks. Such a dump tank should in general be located as low as possible in the platform and preferably with its top located at a lower level than the bottom of the trim ballast tanks. As mentioned above, when the platform is equipped with such dump tanks it is not necessary that the trim ballast tanks are located above the even keel waterline. However, it is generally an advantage to arrange the trim ballast tanks above the even keel waterline also if the ballast water is to be dumped to dump tanks (and not overboard).

[0023] An advantage of using dump tanks is that all ballast water can be kept onboard the platform during a dumping procedure. This means in turn that no overboard connections are needed so there is no risk that water by mistake flows into the platform via such connections. Further, dumping of the trim ballast tanks does not alter the draught of the platform. A further advantage of using dump tanks is that it provides for enhancing the counter-heeling effect by directing the dumped water in a suitable way to different dump tanks distributed in the platform.

[0024] Dumping water into one or more such dump tanks lowers the centre of gravity of the platform which may be helpful for certain platforms in an emergency situation of the type discussed above. Further, water dumped into the dump tanks may be pumped back to the trim ballast tanks. A ballast system including one or more dump tanks may be designed in different ways. In one example the dump tanks form separate units connected to a corresponding trim ballast tank. The volume of the dump tank may be smaller than that of the corresponding trim ballast tank so that surplus amounts of dumped water are led out to the surrounding sea. However, the ballast system may be designed in a more sophisticated way. Such systems are further described below.

[0025] In some examples, the ballast system comprises first, second and third dump tanks, each of said dump tanks being arranged in association with a corresponding trim ballast tank. The dump tanks may be arranged below the corresponding trim ballast tank in the corresponding column or in pontoontype connection member(s), or partly in both column and connection member. In this way first, second and third dump sets are formed, each set comprising a trim ballast tank, a dump line and a dump tank.

[0026] In some examples, the ballast system further comprises an interconnecting dump piping system that provides a fluid communication between first, second and third dump sets, wherein each dump set comprises a trim ballast tank, a dump line and a dump tank. Such an interconnecting dump piping system may be designed in different ways but a common advantage is that it provides for leading dumped water from a trim ballast tank to be emptied not only to the dump tank associated with that trim ballast tank but also (and in some cases even directly without passing through the nearest dump tank) to a dump tank located at another or opposite side of the platform. This provides for a more efficient counter-heeling of the platform compared to leading the dumped water overboard, out to the surrounding sea.

[0027] In some examples, at least one of the dump lines, preferably each dump line, comprises a direct flow line arranged between the corresponding trim ballast tank and the dump tank associated with that trim ballast tank so that ballast water dumped from the trim ballast tank flows to the associated dump tank without passing the interconnecting dump piping system. In some examples, at least one of the dump lines, preferably each dump line, comprises an indirect flow line arranged between the corresponding trim ballast tank and the interconnecting dump piping system so that ballast water dumped from the trim ballast tank flows to the interconnecting dump piping system without passing the associated dump tank.

[0028] Any specific dump line may thus go directly to the dump tank, directly to the interconnecting dump piping system (i.e. indirectly to one or more of the dump tanks), or be branched with a first branch being connected directly to the corresponding dump tank and a second branch bypassing the corresponding dump tank and instead connecting the dump line indirectly to the dump tanks via the interconnecting dump piping system. Typically, all dump lines of the platform are arranged in a similar way.

[0029] In some examples, an interconnection valve is arranged in the interconnecting dump piping system in association with each of the dump tanks. Such a valve is useful for controlling the flow between the dump tanks. For instance, such a valve can be used to direct ballast water dumped from a first trim ballast tank towards and into another dump tank at an opposite side of the platform to speed-up the counter-heeling effect.

[0030] In some examples, the interconnection valve is arranged between the dump tank and a point at which the indirect flow line connects to the interconnecting dump piping system.

[0031] In an example where there is no direct flow line between the trim ballast tank and its associated dump tank, i.e. where the dump line bypasses the dump tank and connects to the interconnecting dump piping system, the interconnection valve at that dump tank preferably includes a non-return function (or a separate non-return valve is installed in association with the interconnection valve) so that water that has already flowed into the dump tank cannot flow out and into the interconnecting dump piping system. That is, the dumped water is prevented from flowing uncontrolled between different dump tanks, which could lead to negative stability effects. However, when there is such a direct flow line between the trim ballast tank and its associated dump tank, irrespective of whether there is an indirect flow line bypassing the dump tank or not, the interconnection valve at that dump tank preferably does not include a non-return function. This will be described further below.

[0032] In some examples, the dump tank is provided with an air vent pipe extending vertically above the corresponding trim ballast tank. Besides allowing air to escape the dump tank to allow water to enter, the air vent pipe can be involved in such a way that when the dump tank is filled and water in the air vent pipe reach above the current level of water in the corresponding trim ballast tank, the remaining water in the corresponding trim ballast tank in the down-heeling corner of the platform will instead flow into the interconnecting dump piping system and into any of the other dump tanks in the (upwards heeling) corners with lower water level than nominal. This is further described below.

[0033] In some examples, the total volume of ballast water contained in the trim ballast tanks is substantially the same or larger, preferably only slightly larger, than the total volume of the dump tanks. That is, when all water in the trim ballast tanks is dumped into the dump tanks, these become completely filled. Further, the dump tanks may have the same volume so that the platform obtains substantially even keel when all dump tanks are filled (and no external loads act on platform). The dump tanks do not necessarily have to have the same size, and all dump tanks do not necessarily have to be filled after a dumping event. It is an advantage though if the platform is designed so that the water is evenly distributed among the dump tanks after a dumping event so that the platform obtains substantially even keel when the water is distributed. In some examples, the dump tanks are located below the even keel waterline of the platform.

[0034] The interconnecting dump piping system may be at least partly arranged in the one or more elongated connection members connecting the columns. For instance, pipes that connect dump tanks and / or dump lines may be arranged in connection members in the form of pontoon structures or other connection structures arranged between lower parts of the columns.

[0035] In some examples, the volume of each of the trim ballast tanks is substantially the same or larger than the total volume of ballast water contained in the trim ballast tanks. All this ballast water may then be contained in one of the trim ballast tanks for maximum ballast counterheeling leverage.

[0036] In some examples, the one or more elongated connection members connecting the columns comprises first and second submersible buoyant pontoon structures extending in a substantially horizontal direction. Such connection members are typically connected to a lower part of the columns and are submerged when the platform floats on even keel. Connection members between the lower parts of the columns may alternatively be nonbuoyant structures.

[0037] In some examples, the first, second and third buoyant stabilizing columns are distributed like corners of a triangle in the horizontal plane. Typical examples include an equilateral triangle where the wind turbine tower is located onto one of the first, second and third buoyant stabilizing columns or at a centre point of the platform inside of the three columns, or an isosceles triangle with the wind turbine tower arranged onto the column opposite to the base of the triangle. Also if the platform comprises four or more buoyant stabilizing columns provided with trim ballast tanks, dump lines, etc., three of these four or more columns are distributed like corners of a triangle in the horizontal plane, although in such a case the triangle may not be an equilateral or isosceles triangle. When there are four or more buoyant stabilizing columns, the wind turbine tower may be located onto one of these columns or on a support structure arranged at a centre point of the platform inside of the four or more columns.

[0038] In some examples, at least one of the dump valves is a screw down swing check valve. The dump valves should be reliable and provide for quick opening; it should preferably take less than 20 seconds, more preferable less than 10 seconds to open a dump valve. Screw down swing check valves are suitable for being used as dump valves. However, other types of valves may be used, such as butterfly valves, with or without associated non-return function.

[0039] In some examples, the ballast system comprises an interconnecting ballast piping and pump system arranged to transfer ballast water between the trim ballast tanks. This system is used during normal operation of the platform to compensate for the wind load and set the platform upright or at a suitable heel angle.

[0040] In some examples, the interconnecting ballast piping and pump system is further arranged to transfer ballast water from the dump tanks to the trim ballast tanks.

[0041] The interconnecting ballast piping and pump system typically comprises one or more pumps and valves, and some pipes and valves forming part of the interconnecting dump piping system may also form part of the interconnecting ballast piping and pump system.

[0042] In some examples, the first, second and third trim ballast tanks are arranged at least 5 m above the even keel waterline of the platform. This means that the bottom of the trim ballast tanks is located at least 5 m above the even keel waterline. The trim ballast tanks may be located at a higher level depending on the general design of the platform. The vertical position of the trim ballast tanks may be related to a maximum expected static or dynamic expected heeling angle during an emergency stop. At this expected maximum heeling angle, the trim ballast tanks should be located above the sea level if the water is to be dumped overboard and, if the platform is provided with dump tanks, the trim ballast tanks should be located so that the bottom of the trim ballast tanks are above the top of any dump tanks. The speed of the flow of dumped water can generally be increased by increasing the vertical distance between the trim ballast tank and the sea level or dump tank.

[0043] In some examples, at least one of the trim ballast tanks is provided with a level sensor arranged to indicate a content of ballast water in that trim ballast tank. Although not necessary for less sophisticated dumping procedures, knowledge about the water content in the trim ballast tanks can be used for controlling the dumping procedure. Preferably, all trim ballast tanks are provided with such a level sensor. Information on water content in the different trim ballast tanks can, for instance, be used to determine which trim ballast tank contains most water (typically the tank at the windward side, which weigh down the platform when the wind turbine has been emergency stopped) and then open the dump valve of that trim ballast tank before opening the dump valves of the other trim ballast tanks. Information on water levels in trim ballast tanks can also be used to control valves in the interconnecting dump piping system during the dumping procedure.

[0044] In some examples, the platform comprises or is connected to control circuitry configured to control the flow of ballast water. This means it is configured to, for instance, control one or more of the following: dump valves, valves included in the interconnecting dump piping system, and pumps and valves included in the interconnecting ballast piping and pump system. The control circuit may be arranged to receive information from the trim ballast tank level sensor and other sensors. The control circuitry may be or form part of a central control unit configured to control also other parts of the platform, such as the wind turbine, pitch degree of turbine blades, etc.

[0045] The invention also concerns a method for operating a semi-submersible wind power turbine platform of the above type, wherein ballast water is present in at least one of the trim ballast tanks and wherein all dump valves are closed, the method comprising: opening the dump valve of at least one of the trim ballast tanks where ballast water is present.

[0046] In some examples the method further comprises: opening all dump valves. All dump valves may be opened simultaneously.

[0047] In some examples, the method comprises: determining whether an event has occurred or is about to occur that is likely to result in a fast dynamic motion of the platform that suitably is counteracted by opening at least one of the dump valves, wherein, if it is determined that such an event has occurred or is about to occur, this step functions as a trigger step for opening at least one of the dump valve(s).

[0048] The invention also concerns a semi-submersible wind power turbine platform, wherein the platform comprises: at least a first, a second and a third buoyant stabilizing column distributed in a horizontal plane when the platform floats on even keel; wherein the platform is provided, or is configured to be provided, with a wind turbine tower; one or more elongated connection members arranged to connect the first, second and third columns to each other, and a ballast system configured to control tilt, trim and / or heel of the platform by distributing ballast water between first, second and third trim ballast tanks arranged in the first, second and third columns, respectively, wherein a dump outlet to a dump line is arranged at a bottom portion of each of the first, second and third trim ballast tanks, wherein a dump valve is arranged in association with each of the dump lines so that, when the dump valve is opened, ballast water can be dumped from the corresponding trim ballast tank by the action of gravity, and wherein the ballast system further comprises one or more dump tanks arranged at a lower horizontal level than the trim ballast tanks, wherein each dump line is connected to the one or more dump tanks so that ballast water dumped from the trim ballast tanks can flow into the one or more dump tanks.

[0049] In a platform according to above, i.e. with dump tanks arranged below the trim ballast tanks, it is not needed that the trim ballast tanks are arranged above the even keel waterline of the platform. What is said previously about the platform with trim tanks arranged above the even keel waterline holds in general also for the platform according to above.

[0050] BRIEF DESCRIPTION OF DRAWINGS

[0051] In the description of the invention given below reference is made to the following figure, in which:

[0052] Figure 1 shows a first embodiment of a semi-submersible wind power turbine platform according to this disclosure.

[0053] Figure 2 shows a second embodiment of a semi-submersible wind power turbine platform according to this disclosure.

[0054] Figure 3 shows a third embodiment of a semi-submersible wind power turbine platform according to this disclosure.

[0055] Figure 4 shows a fourth embodiment of a semi-submersible wind power turbine platform according to this disclosure.

[0056] Figures 5-11 show, in a series of schematic two-dimensional side views, the function of the platform according to figure 1 . Figures 12-15 show, in a series of schematic two-dimensional side views, the function of the platform according to figure 2.

[0057] Figures 16-21 show, in a series of schematic two-dimensional side views, the function of the platform according to figure 4.

[0058] DESCRIPTION OF EXAMPLE EMBODIMENTS OF THE INVENTION

[0059] Figure 1 shows a first embodiment of a semi-submersible wind power turbine platform 10 comprising first, second and third buoyant stabilizing columns 1 , 2, 3 connected at their lower parts by elongated submersible pontoon structures 5, 6, 9 and connected at their upper parts by bracings 7, 8. The pontoon structures 5, 6, 9 form a A-shape in the horizontal plane and the columns 1 , 2, 3 are distributed in the horizontal plane at the corners of the A- shape. The columns 1 , 2, 3 extends in a substantially vertical direction when the platform 10 floats on even keel (see figure 5). The third pontoon 9 that connects the second and third columns 2, 3 has in this platform example a smaller height (depth) and is positioned at a lower level than the first and second pontoon structures 5, 6. The first column 1 is configured to be provided with a wind turbine tower 4 (see figure 5).

[0060] The platform 10 further comprises a ballast system configured to control tilt or trim of the platform 10 by distributing ballast water. The ballast system comprises first, second and third trim ballast tanks 11 , 12, 13 arranged more than 5 meters above an even keel platform waterline 14 (see figure 5) in the first, second and third columns 1 , 2, 3, respectively.

[0061] A dump outlet 15, 16, 17 to a dump line 21 , 22, 23 is arranged at a bottom portion of each of the first, second and third trim ballast tanks 11 , 12, 13. A dump valve 24, 25, 26 is arranged in association with each of the dump lines 21 , 22, 23 so that, when the dump valve 24, 25, 26 is opened, ballast water can be dumped from the corresponding trim ballast tank 11 , 12, 13 by the action of gravity. In the example of figure 1 , the water is dumped overboard into the surrounding sea.

[0062] The dump valves 24, 25, 26 are in the form of screw down swing check valves with integral non-return function, and they are adapted so as to open fully within 10 seconds. The dump lines 21 , 22, 23 are made up of pipes having an inner diameter of at least 600 mm to provide for a high mass flow rate of dumped water. The use of swing-check valves (non-return valves) hinders, in case of large dynamic tilt and / or high waves passing, that water flows backwards from the surrounding sea into the trim tanks.

[0063] The ballast system further comprises an interconnecting ballast piping and pump system 35 (see figure 5) arranged to transfer ballast water between the trim ballast tanks 11 , 12, 13. The volume of each of the trim ballast tanks 11 , 12, 13 is substantially the same as the total volume of ballast water contained in the trim ballast tanks 11 , 12, 13 so that all ballast water may be located in one trim tank, which then is full, while the other trim tanks are substantially empty.

[0064] The trim ballast tanks 11 , 12, 13 are in the examples shown here provided with a level sensor 18 (see figure 5) arranged to indicate the content of ballast water in the corresponding trim ballast tank.

[0065] The platform 10 is further provided with a control system (not shown) configured to control the platform, including controlling valves and pumps so as to control the flow of ballast water, controlling the tilt of the platform, etc.

[0066] An example of the use of the ballast system and dumping function of the platform 10 is described in relation to figures 5-11 .

[0067] Figure 2 shows a second embodiment of a semi-submersible wind power turbine platform 20. The general design of the platform 20 of figure 2 is similar as the platform 10 of figure 1 , but there are differences in the dump system.

[0068] As shown in figure 2, the ballast system now further comprises first, second and third dump tanks 31 , 32, 33 arranged in association with, and at a lower horizontal level than, a corresponding trim ballast tank 11 , 12, 13. The dump tanks 31 , 32, 33 are located at a bottom part of the corresponding column 1 , 2, 3 below the even keel waterline 14 and almost straight below the corresponding trim ballast tank 11 , 12, 13. This forms three “dump sets”, where each dump set comprises a trim ballast tank 11 , 12, 13, a dump line 21 , 22, 23 and a dump tank 31 , 32, 33.

[0069] The ballast system further comprises an interconnecting dump piping system 34 that provides a fluid communication between the three dump sets. In this case the interconnecting dump piping system 34 is arranged in the first and second pontoon structures 5, 6 and also in the bottom portion of the first, second and third columns 1 , 2, 3. Besides pipes, the interconnecting dump piping system 34 comprises closed / open-controllable interconnection valves 41 , 42, 43 arranged in each flow line between the dump tank 31 , 32, 33 and the interconnecting dump piping system 34. In the example shown in figure 2, these valves 41 , 42, 43 have an integral non-return function and they are arranged to (when open) allow flow from the interconnecting dump piping system 34 to the dump tank 31 , 32, 33 but to prevent flow in the opposite direction (i.e. out of the dump tank).

[0070] As shown in figure 2, each dump line 21 , 22, 23 is in this example directly connected to the interconnecting dump piping system 34 and indirectly to the dump tanks 31 , 32, 33 via flow lines provided with the interconnection valves 41 , 42, 42. Thus, by controlling opening / closing of the dump valves and the interconnecting valves, ballast water dumped from any of the trim ballast tanks 11 , 12, 13 can flow into any of the dump tanks 31 , 32, 33. The dump lines 21 , 22, 23 of figure 2 correspond to the indirect flow lines 21 b, 22b, 23b shown in figure 4.

[0071] An example of the use of the ballast system and dumping function of the platform 20 is described in relation to figures 12-15.

[0072] Figure 3 shows a third embodiment of a semi-submersible wind power turbine platform 30, which in principle is very similar to the platform 20 shown in figure 2. What differs from figure 2 is that the interconnecting dump piping system 34 is arranged also in the third pontoon structure 9 that connects the second and third columns 2, 3. Ballast water may thus flow directly between the dump sets of the second and third columns 2, 3. In the example shown in figure 3, the third pontoon structure 9 has a similar height / thickness as the first and second pontoons 5, 6 and it is also positioned at the same level. The ballast system and dump function of the platform 30 exemplified in figure 3 work in principle in the same way as the ballast system and dump function of the platform 20 exemplified in figure 2.

[0073] Figure 4 shows a third embodiment of a semi-submersible wind power turbine platform 40. What differs from the example of figure 3 is that each dump line 21 , 22, 23 is branched and contains, besides the indirect flow line 21 b, 22b, 23b (as in figure 3), also a direct flow line 21 a, 22a, 23a arranged between the corresponding trim ballast tank 11 , 12, 13 and the dump tank 31 , 32, 33 associated with that trim ballast tank so that ballast water dumped from the trim ballast tank can flow to the associated dump tank without passing the interconnecting dump piping system 34.

[0074] A further difference of the example of figure 4 compared to figure 3 is that the open / closed-controllable interconnection valves, which are denoted 41 a, 42a, 43a in figure 4, are not of the non-return type but intended to be controlled in open or closed position as will be described below in relation to figures 16- 21. In the example platforms 20, 30, 40 described above, the total volume of ballast water contained in the trim ballast tanks 11 , 12, 13 is substantially the same as the total volume of the dump tanks 31 , 32, 33. Accordingly, if all ballast water is dumped, all dump tanks 31 , 32, 33 will be filled and all trim ballast tanks 11 , 12, 13 will be empty. A slightly larger total volume of ballast water might be used to ascertain that all dump tanks will be filled and in that way prevent any free surface effect allowing water to flow between the dump tanks. Further, all dump tanks have substantially the same volume so when all dump tanks are filled the mass of ballast water is evenly distributed over the dump tanks.

[0075] As shown in figures12-21 , each dump tank 31 , 32, 33 is provided with an air vent pipe 19 extending vertically above the corresponding trim ballast tank 11 , 12, 13. Also the trim ballast tanks are arranged with air vent pipes to allow air to flow into the tanks when water is flowing out.

[0076] Figures 5-11 show, in a series of schematic two-dimensional side views, how the ballast system and dump function of the platform 10 shown in figure 1 may work.

[0077] Figure 5 shows the platform 10 floating on even keel with no particular forces or loads acting onto the platform 10. Line 1 indicates the water surface and also the even keel waterline of the platform 10 when floating on even keel (as in figure 5). The column to the right represents both the second and the third column 2, 3. The dump valves 24, 25, 26 are closed. The ballast water is evenly distributed between the trim ballast tanks 11 , 12, 13.

[0078] Figure 6 shows a strong wind force 50 acting onto the platform 10, mostly onto the wind turbine tower 4 and its blades 4a, on a left (windward) side of the platform 10. This causes the platform 10 to heel towards the right (leeward) side. Figure 7 shows the interconnecting ballast piping and pump system 35 pumping ballast water from the second and third trim ballast tanks 12, 13 to the first trim ballast tank 11 located in the first column 1 at the windward side of the platform 10. This reduces the heel as indicated by arrow 51 .

[0079] Figure 8 shows the platform 10 when re-set on even keel as in figure 5 where the first trim ballast tank 11 have been almost filled so as to compensate for the wind force 50.

[0080] Figure 9 shows the situation when the wind turbine has been subject to a sudden emergency shutdown including measures (such as adjustment of the pitch of the individual turbine blades 4a) to reduce the wind pressure onto the wind turbine tower 4 and thus onto the platform 10. Thus, the strong wind force 50 no longer acts onto the platform 10 (only a much weaker wind force), which causes the platform 10 to heel significantly towards the windward side because of the large amount of water contained in the first trim ballast tank 11 . The dump valves 24, 25, 26 has not yet been opened in figure 9.

[0081] Figure 10 shows the situation when the dump valves 24, 25, 26 are open and ballast water from the trim ballast tanks are dumped through dump lines 21 , 22, 23 out to the surrounding sea. All dump valves may be opened at the same time when starting the dumping procedure. Alternatively, one may make use of the level sensors 18 and start opening the dump valve associated with the trim ballast tank that contains the largest amount of water, which in the example shown here would be the first trim ballast tank 11. Another possibility is to use a heel sensor or similar and select which dump valve to open based on which trim ballast tank is located at the lowest level. A trigger for starting the dumping process may be a control signal generated by a platform control system, for example if detecting loss of connection with the electrical grid, or wind turbine control system as a response to the emergency shutdown event.

[0082] Figure 11 shows the situation when all ballast water has been dumped to the sea and the platform 10 has assumed a slightly inclined position because of some, but not a strong, wind force acting onto the platform 10. The trim ballast tanks 11 , 12, 13 may be refilled by sea water. This may be carried out by a separate ballast refilling system or by adapting the interconnecting ballast piping and pump system 35 so as to be capable of pumping fresh sea water to the trim ballast tanks.

[0083] Figures 12-15 show, in a series of schematic two-dimensional side views, how the ballast system and dump function of the platform 20 shown in figure 2 may work. The platform 30 shown in figure 3 works in a similar way.

[0084] Figure 12 shows the platform 20 floating on even keel with no particular forces or loads acting onto the platform 10. Line 14 indicates the water surface and also the even keel waterline of the platform 20 when floating on even keel. The column to the right represents both the second and the third column 2, 3. All dump valves 24, 25, 26 and non-return interconnection valves 41 , 42, 43 are closed. The ballast water is evenly distributed between the trim ballast tanks 11 , 12, 13. The interconnecting ballast piping and pump system 35 is in this case arranged to, after the dumping procedure, transfer ballast water from the dump tanks 31 , 32, 33 back to the trim ballast tanks 11 , 12, 13. All trim ballast tanks 11 , 12, 13 and all dump tanks 31 , 32, 33 are in this case provided with a level sensor 18. All dump tanks 31 , 32, 33 are provided with an air vent pipe 19.

[0085] The initial steps where the platform 20 is exposed to a strong wind force 50 and where the amount of ballast water in the windward trim ballast tank 11 is increased to compensate for the wind force are similar to what is shown in figures 6-8 for the platform 10 of figure 1 . Figure 13 shows the situation corresponding to figure 9 when the wind turbine has been subject to a sudden emergency shutdown (or the strong wind has suddenly stopped to blow), which causes the platform 20 to heel significantly towards the windward side because of the large amount of water contained in the first trim ballast tank 11. In figure 13, the first dump valve 24 has been opened, because signals from level sensors 18 have indicated that the first trim ballast tank 11 contains the largest amount / highest level of water, while second and third dump valves 25, 26 has not yet been opened. Also the interconnection valves 42, 43 at second and third dump tanks 32, 33 has been opened. Ballast water dumped from the first trim ballast tank 11 thus flows through dump line 21 and interconnecting dump piping system 34 into second and third dump tanks 32, 33.

[0086] When the water level in the second and third dump tanks 32, 33 has reached above a certain level, and / or when the water level in the first trim ballast tank 11 has fallen below a certain level, also the second and third dump valves 25, 26 are opened as well as the first interconnection valve 41 . This is the situation shown in figure 14. Remaining ballast water in the trim ballast tanks 11 , 12, 13 can now flow into any of the dump tanks 31 , 32, 33. The major part of the remaining ballast water will flow into the first dump tank 31 as it was empty until the corresponding interconnection valve 41 was opened.

[0087] Figure 15 shows the situation corresponding to figure 11 but now all ballast water has been dumped into the dump tanks 31 , 32, 33 instead of to the sea, and the interconnection valves 41 , 42, 43 have been closed. The platform 20 has assumed a slightly inclined position because of some, but not a strong, wind force acting onto the platform 20. The trim ballast tanks 11 , 12, 13 may now be refilled by the interconnecting ballast piping and pump system 35 which can pump water back from dump tanks to trim ballast tanks (after closing of dump valves 24, 25, 26). Figures 16-21 show, in a series of schematic two-dimensional side views, how the ballast system and dump function of the platform 40 shown in figure 4 may work.

[0088] Figure 16 shows the platform 40 floating on even keel with no particular forces or loads acting onto the platform 40. Line 14 again indicates the water surface and also the even keel waterline of the platform 40 when floating on even keel. The column to the right represents both the second and the third column 2, 3. All dump valves 24, 25, 26 and interconnection valves 41 a, 42a, 43a are closed. The ballast water is evenly distributed between the trim ballast tanks 11 , 12, 13. The interconnecting ballast piping and pump system 35 is also in this case arranged to, after the dumping procedure, transfer ballast water from the dump tanks 31 , 32, 33 back to the trim ballast tanks 11 , 12, 13. All trim ballast tanks 11 , 12, 13, but not the dump tanks 31 , 32, 33, are in this case provided with a level sensor 18. All dump tanks 31 , 32, 33 are provided with an air vent pipe 19.

[0089] Figure 17 shows a situation similar to figure 6 where a strong wind force 50 acts onto the platform 40, which causes the platform 40 to heel towards the right (leeward) side.

[0090] Figure 18 shows the interconnecting ballast piping and pump system 35 pumping ballast water from the second and third trim ballast tanks 12, 13 to the first trim ballast tank 11 located in the first column 1 at the windward side of the platform 40. This reduces the heel as indicated by arrow 51. The interconnection valves 42a, 43a associated with the second and third dump tanks 32, 33 have been opened. This is done when the water level in the corresponding trim ballast tank has fallen below a nominal (starting) level, as it has for the second and third trim ballast tank 12, 13.

[0091] The reason for opening the interconnection valve associated with a trim ballast tank where the water level has fallen below the nominal level is that the interconnection valves in this example are conventional “slow” valves that require a relatively long time, maybe 30 seconds, to open, which is too long for an emergency event. As a comparison, the dump valves 24, 25, 26 of the present disclosure are preferably operated by pressurized air and openable within a few seconds. Opening certain interconnection valves when the water level falls below the nominal level is thus a preparation measure for a possible upcoming emergency situation. The interconnection valve may be closed again, and another interconnection valve may be opened, when the ballast water is transferred between the trim ballast tanks during operation of the platform.

[0092] Figure 19 shows the platform 40 when re-set on even keel as in figure 16 where the first trim ballast tank 11 have been almost filled so as to compensate for the wind force 50.

[0093] Figure 20 shows the situation when an emergency shutdown of the wind turbine has been initiated and all dump valves 24, 25, 26 have been opened. Ballast water then flows out / down from first trim ballast tank 11 via dump line 21a into first dump tank 31 and via dump line 21 b and piping system 24 through open interconnection valves 42a and 43a into second and third dump tanks 32, 33. Ballast water also flows out / down from second and third trim ballast tanks 12, 13 via dump lines 22a and 23a into second and third dump tanks 32, 33. Exactly how the ballast water flows depends on the relative water levels in the trim ballast tanks 11 , 12, 13.

[0094] When a dump tank gets filled, water will rise through the vent pipe 19 until pressures balance (the water will not rise above the level in the trim ballast tank). When a dump tank that has its interconnection valve open is filled, i.e. the second and third dump tanks 32, 33 in figure 20, the water from the trim ballast tank that had the highest level of water, i.e. the first trim ballast tank 11 in figure 20, will flow through the direct flow line into the corresponding dump tank, i.e. via flow line 21a into dump tank 31 in figure 20. This means that closed interconnection valves, such as the valve 41a in figure 20, do not need to be opened to carry out the dumping procedure in a proper way, it is sufficient to precautionary open the interconnection valve(s) associated with a trim ballast tank where the water level has fallen below the nominal level.

[0095] Figure 21 shows the situation corresponding to figure 15 with all ballast water contained in the dump tanks 31 , 32, 33 and with the interconnection valves 41a, 42a, 43a all closed. The platform 40 has assumed a slightly inclined position because of some, but not a strong, wind force acting onto the platform 40. The trim ballast tanks 11 , 12, 13 may now be refilled by the interconnecting ballast piping and pump system 35 which can pump water back from dump tanks to trim ballast tanks.

[0096] In general, level sensors 18 for the trim ballast tanks 11 , 12, 13 are useful in all variants described above but are needed only for the method described in relation to figures 12-15, where also the dump tanks 31 , 32, 33 should be provided with level sensors for proper control of the process. Irrespective of whether the trim ballast tanks are provided with level sensors, the dumping procedure may be started by opening all dump valves simultaneously.

[0097] The invention is not limited by the embodiments and examples described above but can be modified in various ways within the scope of the claims. For instance, the connection structures that connect the lower parts of the columns need not necessarily be buoyant pontoon structures but could be other, non-buoyant structures. Further, the number of trim ballast tanks and dump tanks may be varied; there may, for instance, be two trim tanks and / or dump tanks in one or more of the columns. Further, where the platform is provided with dump tanks the trim ballast tanks may be positioned at a lower level than indicated in the figures. References in figures:

[0098] I , 2, 3 - buoyant stabilizing columns

[0099] 4 - wind turbine tower

[0100] 5, 6, 7, 8, 9 - connection members

[0101] 10, 20, 30, 40 - semi-submersible wind power turbine platform

[0102] I I , 12, 13 - trim ballast tanks

[0103] 14 - even keel waterline

[0104] 15, 16, 17 - dump outlets

[0105] 18 - level sensor

[0106] 19 - air vent pipe

[0107] 21 , 22, 23 - dump lines

[0108] 21 a - direct flow line from trim ballast tank to dump tank

[0109] 21 b - indirect flow line from trim ballast tank to dump tank

[0110] 24, 25, 26 - dump valves

[0111] 31 , 32, 33 - dump tanks

[0112] 34 - interconnecting dump piping system

[0113] 35 - interconnecting ballast piping and pump system

[0114] 41 , 42, 43 - interconnection valves (non-return)

[0115] 41a, 42a, 43a - interconnection valves

[0116] 50 - wind force / load

[0117] 51 - arrow indicating movement / rotation of platform

Claims

CLAIMS1. A semi-submersible wind power turbine platform (10, 20, 30, 40), wherein the platform comprises:- at least a first, a second and a third buoyant stabilizing column (1 , 2, 3) distributed in a horizontal plane when the platform floats on even keel; wherein the platform is provided, or is configured to be provided, with a wind turbine tower (4);- one or more elongated connection members (5, 6, 7, 8, 9) arranged to connect the first, second and third columns (1 , 2, 3) to each other, and- a ballast system configured to control tilt, trim and / or heel of the platform (10, 20, 30, 40) by distributing ballast water between first, second and third trim ballast tanks (11 , 12, 13) arranged in the first, second and third columns (1 , 2, 3), respectively, wherein the first, second and third trim ballast tanks (11 , 12, 13) are arranged above an even keel waterline (14) of the platform (10, 20, 30, 40), wherein a dump outlet (15, 16, 17) to a dump line (21 , 22, 23) is arranged at a bottom portion of each of the first, second and third trim ballast tanks (11 , 12, 13), and wherein a dump valve (24, 25, 26) is arranged in association with each of the dump lines (21 , 22, 23) so that, when the dump valve (24, 25, 26) is opened, ballast water can be dumped from the corresponding trim ballast tank (11 , 12, 13) by the action of gravity.

2. The platform (10, 20, 30, 40) according to claim 1 , wherein a non-return valve (24, 25, 26) is arranged in association with the dump line (21 , 22, 23) so that water is prevented from flowing into the trim ballast tank (11 , 12, 13) via the corresponding dump line (21 , 22, 23).

3. The platform (10, 20, 30, 40) according to claim 1 or 2, wherein the ballast system further comprises one or more dump tanks (31 , 32, 33) arranged at alower horizontal level than the trim ballast tanks (11 , 12, 13), wherein each dump line (21 , 22, 23) is connected to the one or more dump tanks (31 , 32, 33) so that ballast water dumped from the trim ballast tanks (11 , 12, 13) can flow into the one or more dump tanks (31 , 32, 33).

4. The platform (10, 20, 30, 40) according to claim 3, wherein the ballast system comprises first, second and third dump tanks (31 , 32, 33), each of said dump tanks (31 , 32, 33) being arranged in association with a corresponding trim ballast tank (11 , 12, 13).

5. The platform (10, 20, 30, 40) according to claim 4, wherein the ballast system further comprises an interconnecting dump piping system (34) that provides a fluid communication between first, second and third dump sets, wherein each dump set comprises a trim ballast tank (11 , 12, 13), a dump line (21 , 22, 23) and a dump tank (31 , 32, 33).

6. The platform (10, 20, 30, 40) according to claim 5, wherein at least one of the dump lines, preferably each dump line, comprises a direct flow line (21a) arranged between the corresponding trim ballast tank and the dump tank associated with that trim ballast tank so that ballast water dumped from the trim ballast tank flows to the associated dump tank without passing the interconnecting dump piping system (34). . The platform (10, 20, 30, 40) according to claim 5 or 6, wherein at least one of the dump lines, preferably each dump line, comprises an indirect flow line (21 b) arranged between the corresponding trim ballast tank and the interconnecting dump piping system (34) so that ballast water dumped from the trim ballast tank flows to the interconnecting dump piping system (34) without passing the associated dump tank.

8. The platform (10, 20, 30, 40) according to any of claims 5-7, wherein an interconnection valve (41 , 41a, 42, 42a, 43, 43a) is arranged in theinterconnecting dump piping system (34) in association with each of the dump tanks.

9. The platform (10, 20, 30, 40) according to claims 7 and 8, wherein the interconnection valve (41 , 41a, 42, 42a, 43, 43a) is arranged between the dump tank and a point at which the indirect flow line (21 b) connects to the interconnecting dump piping system (34).

10. The platform (10, 20, 30, 40) according to any of claims 3-9, wherein the dump tank is provided with an air vent pipe extending vertically above the corresponding trim ballast tank.11 . The platform (10, 20, 30, 40) according to any of claims 3-10, wherein the total volume of ballast water contained in the trim ballast tanks is substantially the same or larger than the total volume of the dump tanks.

12. The platform (10, 20, 30, 40) according to any of claims 3-11 , wherein the dump tanks have substantially the same volume.

13. The platform (10, 20, 30, 40) according to any of claims 3-12, wherein the dump tanks are located below the even keel waterline of the platform.

14. The platform (10, 20, 30, 40) according to claim 5, wherein the interconnecting dump piping system (34) is at least partly arranged in the one or more elongated connection members connecting the columns.

15. The platform (10, 20, 30, 40) according to any of the above claims, wherein the dump line has a diameter of at least 400 mm, preferably 600 mm or more.

16. The platform (10, 20, 30, 40) according to any of the above claims, wherein the volume of each of the trim ballast tanks is substantially the sameor larger than the total volume of ballast water contained in the trim ballast tanks.

17. The platform (10, 20, 30, 40) according to any of the above claims, wherein the one or more elongated connection members connecting the columns comprises first and second submersible buoyant pontoon structures (5, 6, 9) extending in a substantially horizontal direction.

18. The platform (10, 20, 30, 40) according to any of the above claims, wherein the first, second and third buoyant stabilizing columns are distributed in the horizontal plane like corners of a triangle.

19. The platform (10, 20, 30, 40) according to any of the above claims, wherein at least one of the dump valves is a screw down swing check valve.

20. The platform (10, 20, 30, 40) according to any of the above claims, wherein the ballast system comprises an interconnecting ballast piping and pump system (35) arranged to transfer ballast water between the trim ballast tanks.

21. The platform (10, 20, 30, 40) according to claims 3 and 20, wherein the interconnecting ballast piping and pump system (35) is further arranged to transfer ballast water from the dump tanks to the trim ballast tanks.

22. The platform (10, 20, 30, 40) according to any of the above claims, wherein the first, second and third trim ballast tanks (11 , 12, 13) are arranged at least 5 m above the even keel waterline (14) of the platform (10, 20, 30, 40).

23. The platform (10, 20, 30, 40) according to any of the above claims, wherein at least one of the trim ballast tanks (11 , 12, 13) is provided with alevel sensor (18) arranged to indicate a content of ballast water in that trim ballast tank.

24. The platform (10, 20, 30, 40) according to any of the above claims, wherein the platform comprises or is connected to a control circuitry configured to control the flow of ballast water.

25. A method for operating a semi-submersible wind power turbine platform (10, 20, 30, 40) according to any of the above claims, wherein ballast water is present in at least one of the trim ballast tanks (11 , 12, 13) and wherein all dump valves (24, 25, 26) are closed, the method comprising:- opening the dump valve (24, 25, 26) of at least one of the trim ballast tanks (11 , 12, 13) where ballast water is present.

26. The method according to claim 25, further comprising:- opening all dump valves (24, 25, 26).

27. The method according to claim 25 or 26, the method comprising:- determining whether an event has occurred or is about to occur that is likely to result in a fast dynamic motion of the platform that suitably is counteracted by opening at least one of the dump valves (24, 25, 26), wherein, if it is determined that such an event has occurred or is about to occur, this step functions as a trigger step for opening at least one of the dump valve(s) (24, 25, 26).

28. A semi-submersible wind power turbine platform (10, 20, 30, 40), wherein the platform comprises:- at least a first, a second and a third buoyant stabilizing column (1 , 2, 3) distributed in a horizontal plane when the platform floats on even keel; wherein the platform is provided, or is configured to be provided, with a wind turbine tower (4);- one or more elongated connection members (5, 6, 7, 8, 9) arranged to connect the first, second and third columns (1 , 2, 3) to each other, and- a ballast system configured to control tilt, trim and / or heel of the platform (10, 20, 30, 40) by distributing ballast water between first, second and third trim ballast tanks (11 , 12, 13) arranged in the first, second and third columns (1 , 2, 3), respectively, wherein a dump outlet (15, 16, 17) to a dump line (21 , 22, 23) is arranged at a bottom portion of each of the first, second and third trim ballast tanks (11 , 12, 13), wherein a dump valve (24, 25, 26) is arranged in association with each of the dump lines (21 , 22, 23) so that, when the dump valve (24, 25, 26) is opened, ballast water can be dumped from the corresponding trim ballast tank (11 , 12, 13) by the action of gravity, and wherein the ballast system further comprises one or more dump tanks (31 , 32, 33) arranged at a lower horizontal level than the trim ballast tanks (11 , 12, 13), wherein each dump line (21 , 22, 23) is connected to the one or more dump tanks (31 , 32, 33) so that ballast water dumped from the trim ballast tanks (11 , 12, 13) can flow into the one or more dump tanks (31 , 32, 33).

29. The platform (10, 20, 30, 40) according to claim 28, wherein the first, second and third trim ballast tanks (11 , 12, 13) are arranged above an even keel waterline (14) of the platform (10, 20, 30, 40).

30. The platform (10, 20, 30, 40) according to claim 28 or 29, wherein a nonreturn valve (24, 25, 26) is arranged in association with the dump line (21 , 22, 23) so that water is prevented from flowing into the trim ballast tank (11 , 12, 13) via the corresponding dump line (21 , 22, 23).

31. The platform (10, 20, 30, 40) according to any of claims 28-30, wherein the ballast system comprises first, second and third dump tanks (31 , 32, 33), each of said dump tanks (31 , 32, 33) being arranged in association with a corresponding trim ballast tank (11 , 12, 13).

32. The platform (10, 20, 30, 40) according to any of claims 28-31 , wherein the ballast system further comprises an interconnecting dump piping system (34) that provides a fluid communication between first, second and third dump sets, wherein each dump set comprises a trim ballast tank (11 , 12, 13), a dump line (21 , 22, 23) and a dump tank (31 , 32, 33).

33. The platform (10, 20, 30, 40) according to claim 32, wherein at least one of the dump lines, preferably each dump line, comprises a direct flow line (21a) arranged between the corresponding trim ballast tank and the dump tank associated with that trim ballast tank so that ballast water dumped from the trim ballast tank flows to the associated dump tank without passing the interconnecting dump piping system (34).

34. The platform (10, 20, 30, 40) according to claim 32 or 33, wherein at least one of the dump lines, preferably each dump line, comprises an indirect flow line (21 b) arranged between the corresponding trim ballast tank and the interconnecting dump piping system (34) so that ballast water dumped from the trim ballast tank flows to the interconnecting dump piping system (34) without passing the associated dump tank.

35. The platform (10, 20, 30, 40) according to any of claims 32-34, wherein an interconnection valve (41 , 41a, 42, 42a, 43, 43a) is arranged in the interconnecting dump piping system (34) in association with each of the dump tanks.

36. The platform (10, 20, 30, 40) according to claims 34 and 35, wherein the interconnection valve (41 , 41a, 42, 42a, 43, 43a) is arranged between the dump tank and a point at which the indirect flow line (21 b) connects to the interconnecting dump piping system (34).

37. The platform (10, 20, 30, 40) according to any of claims 28-36, wherein the dump tank is provided with an air vent pipe extending vertically above the corresponding trim ballast tank.

38. The platform (10, 20, 30, 40) according to any of claims 28-37, wherein the total volume of ballast water contained in the trim ballast tanks is substantially the same or larger than the total volume of the dump tanks.

39. The platform (10, 20, 30, 40) according to any of claims 28-38, wherein the dump tanks have substantially the same volume.

40. The platform (10, 20, 30, 40) according to any of claims 28-39, wherein the dump tanks are located below the even keel waterline of the platform.

41. The platform (10, 20, 30, 40) according to claim 32, wherein the interconnecting dump piping system (34) is at least partly arranged in the one or more elongated connection members connecting the columns.

42. The platform (10, 20, 30, 40) according to any of claims 28-41 , wherein the dump line has a diameter of at least 400 mm, preferably 600 mm or more.

43. The platform (10, 20, 30, 40) according to any of claims 28-42, wherein the volume of each of the trim ballast tanks is substantially the same or larger than the total volume of ballast water contained in the trim ballast tanks.

44. The platform (10, 20, 30, 40) according to any of claims 28-43, wherein the one or more elongated connection members connecting the columns comprises first and second submersible buoyant pontoon structures (5, 6, 9) extending in a substantially horizontal direction.

45. The platform (10, 20, 30, 40) according to any of claims 28-44, wherein the first, second and third buoyant stabilizing columns are distributed in the horizontal plane like corners of a triangle.

46. The platform (10, 20, 30, 40) according to any of claims 28-45, wherein at least one of the dump valves is a screw down swing check valve.

47. The platform (10, 20, 30, 40) according to any of claims 28-46, wherein the ballast system comprises an interconnecting ballast piping and pump system (35) arranged to transfer ballast water between the trim ballast tanks.

48. The platform (10, 20, 30, 40) according to claim 47, wherein the interconnecting ballast piping and pump system (35) is further arranged to transfer ballast water from the dump tanks to the trim ballast tanks.

49. The platform (10, 20, 30, 40) according to claim 29, wherein the first, second and third trim ballast tanks (11 , 12, 13) are arranged at least 5 m above the even keel waterline (14) of the platform (10, 20, 30, 40).

50. The platform (10, 20, 30, 40) according to any of claims 28-49, wherein at least one of the trim ballast tanks (11 , 12, 13) is provided with a level sensor (18) arranged to indicate a content of ballast water in that trim ballast tank.

51. The platform (10, 20, 30, 40) according to any of claims 28-50, wherein the platform comprises or is connected to a control circuitry configured to control the flow of ballast water.

52. A method for operating a semi-submersible wind power turbine platform (10, 20, 30, 40) according to any of claims 28-51 , wherein ballast water is present in at least one of the trim ballast tanks (11 , 12, 13) and wherein all dump valves (24, 25, 26) are closed, the method comprising:- opening the dump valve (24, 25, 26) of at least one of the trim ballast tanks (11 , 12, 13) where ballast water is present.

53. The method according to claim 52, further comprising: - opening all dump valves (24, 25, 26).

54. The method according to claim 52 or 53, the method comprising:- determining whether an event has occurred or is about to occur that is likely to result in a fast dynamic motion of the platform that suitably is counteracted by opening at least one of the dump valves (24, 25, 26), wherein, if it is determined that such an event has occurred or is about to occur, this step functions as a trigger step for opening at least one of the dump valve(s) (24, 25, 26).

Citation Information

Patent Citations

  • Attitude control device for floating structure

    JP2005313665A

  • Floating wind turbine platform with ballast control and mooring system

    US9139266B2

  • Floating wind turbine platform controlled to optimize power production and reduce loading

    WO2020242807A1

  • Floating wind semi-submersible with t-shaped pontoon

    WO2021219787A1

Cited By

  • Isothermal compression energy storage type balanced water system for deep sea floating platform

    CN119611675A