Energy-saving method and apparatus, and computer-readable storage medium

By autonomously predicting resource demands and performing energy-saving operations through network equipment, the problem of low energy-saving efficiency in existing technologies is solved and more efficient power conservation and resource utilization are achieved.

WO2024222212A1PCT designated stage expired Publication Date: 2024-10-31ZTE CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/080137
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-26
Filing Date
2024-03-05
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

In the existing technology, network equipment has low energy-saving efficiency and needs to interact with external energy-saving equipment, resulting in high communication overhead and long energy-saving time.

Method used

Network equipment predicts future resource needs based on its own historical business data and performs energy-saving operations on its own, including sleep processing and operating frequency adjustment, eliminating the need for communication with external devices.

Benefits of technology

It improves the energy-saving efficiency of network equipment, reduces communication overhead with external devices, saves energy-saving operation time, and reduces power consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024080137_31102024_PF_FP_ABST
    Figure CN2024080137_31102024_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed are an energy-saving method, a communication apparatus and a computer-readable storage medium. The energy-saving method comprises: acquiring service data of a network device within a first historical time period; according to the service data, predicting operation resources of the network device within a future time period; and performing an energy-saving operation on surplus resources in the network device within the future time period, wherein the surplus resources are resources in resources of the network device other than the operation resources.
Need to check novelty before this filing date? Find Prior Art

Description

Energy saving method, device, and computer-readable storage medium

[0001] This disclosure claims priority to Chinese patent application No. 202310478496.2, filed on April 26, 2023, the entire contents of which are incorporated herein by reference. Technical Field

[0002] The present disclosure relates to the field of communication technologies, and in particular to an energy-saving method, device, and computer-readable storage medium. Background Art

[0003] In order to ensure the sustainable development of mobile communication networks, relevant departments pointed out that energy saving on network equipment can effectively reduce greenhouse gas emissions, meet the basic needs of green, low-carbon, and energy conservation and emission reduction, and thus ensure the sustainable development of mobile communication networks.

[0004] Summary of the Invention

[0005] In one aspect, a method for energy conservation is provided. The method includes: obtaining service data of a network device within a first historical time period; predicting, based on the service data, operating resources of the network device within a future time period; and performing energy conservation operations on remaining resources in the network device within the future time period, wherein the remaining resources are resources of the network device other than operating resources.

[0006] In another aspect, an energy-saving device is provided. The energy-saving device includes: a communication unit and a processing unit; the communication unit is configured to obtain service data of a network device within a first historical time period; the processing unit is configured to predict, based on the service data, operating resources of the network device within a future time period; and the processing unit is further configured to perform energy-saving operations on remaining resources in the network device within the future time period; the remaining resources being resources of the network device excluding operating resources.

[0007] On the other hand, a communication node is provided, comprising: a memory and a processor; the memory and the processor are coupled; the memory is used to store a computer program; and the processor implements the energy saving method described in any of the above aspects when executing the computer program.

[0008] In yet another aspect, a communication device is provided, comprising: a processor and a memory for storing instructions executable by the processor; the processor is configured to execute the instructions so that the communication device performs the energy saving method according to any of the above aspects.

[0009] On the other hand, a computer-readable storage medium is provided, on which computer program instructions are stored. When the computer program instructions are executed by a processor, the energy-saving method described in any one of the above aspects is implemented.

[0010] In yet another aspect, a computer program product is provided, comprising computer program instructions, which implement the energy saving method described in any one of the above aspects when executed by a processor. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] To more clearly illustrate the technical solutions of the present disclosure, the following briefly introduces the drawings required for use in some embodiments of the present disclosure. Obviously, the drawings described below are only drawings of some embodiments of the present disclosure, and those skilled in the art can also derive other drawings based on these drawings.

[0012] FIG1 is a schematic structural diagram of a communication system according to some embodiments.

[0013] FIG2 is a flow chart of a method for energy saving according to some embodiments.

[0014] FIG3 is a flow chart of another energy saving method according to some embodiments.

[0015] FIG4 is a schematic structural diagram of a network device according to some embodiments.

[0016] FIG5 is a flowchart of yet another energy-saving method according to some embodiments.

[0017] FIG6 is a schematic structural diagram of a communication device according to some embodiments.

[0018] FIG7 is a schematic structural diagram of another communication device according to some embodiments. DETAILED DESCRIPTION

[0019] To help those skilled in the art better understand the technical solutions of the embodiments of the present disclosure, the technical solutions of the present disclosure will be clearly and completely described below in conjunction with the drawings in the present disclosure. Obviously, the embodiments described are only some of the embodiments of the present disclosure, not all of them. Based on the embodiments of the present disclosure, all other embodiments obtained by those of ordinary skill in the art without making any creative efforts shall fall within the scope of protection of the present disclosure.

[0020] It should be noted that in this disclosure, words such as "exemplarily" or "for example" are used to indicate examples, illustrations, or descriptions. Any embodiment or design described in this disclosure as "exemplary" or "for example" should not be construed as being preferred or advantageous over other embodiments or designs. Rather, the use of words such as "exemplarily" or "for example" is intended to present the relevant concepts in a concrete manner.

[0021] In the following, the terms "first," "second," etc. are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the number of technical features indicated. Therefore, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of such features.

[0022] In the description of this disclosure, unless otherwise specified, " / " means "or." For example, A / B can mean A or B. "And / or" herein is merely a description of an association relationship between associated objects, indicating that three possible relationships exist. For example, "A and / or B" can mean: only A, only B, and both A and B. Furthermore, "at least one" means one or more, and "a plurality" means two or more.

[0023] To ensure the sustainable development of mobile communication networks, relevant departments have stated that green and low-carbon development will become a fundamental requirement for mobile communication networks. With the rapid development of technologies such as digital-intelligence convergence, space-ground integration, and virtual reality, mobile communication networks are also placing higher demands on green and low-carbon development. Since energy conservation in network equipment can effectively reduce greenhouse gas emissions, meeting the fundamental requirements of green and low-carbon development and energy conservation and emission reduction, thereby ensuring the sustainable development of mobile communication networks, how to reduce energy consumption in network equipment has become a pressing issue for those skilled in the art.

[0024] Currently, energy conservation is primarily achieved through interaction between network devices and other energy-saving devices. Specifically, network devices can transmit their operational data to the energy-saving devices. Based on the operational data, the energy-saving devices configure energy-saving instructions for the network devices and transmit these instructions to the network devices. Based on these instructions, the network devices perform energy-saving operations to achieve energy conservation. As can be seen from the above, the current process for energy conservation in network devices is relatively cumbersome, requiring multi-hop forwarding between the network devices and other energy-saving devices to achieve energy conservation. This results in low energy conservation efficiency for network devices.

[0025] In the embodiment of the present disclosure, the network device performs energy-saving operations on its own resources based on the historical business data of the network device. There is no need to obtain business data from external devices, and there is no need for external devices to provide energy-saving operation instructions to the network device. This can save the communication overhead with external devices during the energy-saving process of the network device, and compared with communicating with external devices, the time consumed by internal communication is shorter, which can save the time of energy-saving operations and thereby improve the energy-saving efficiency of the network device.

[0026] The technical solution provided by the embodiments of the present disclosure can be applied to various communication systems, for example, using the fifth generation mobile communication technology (5 thgeneration mobile communication technology, 5G) new radio (NR) communication system, future evolution system or multiple communication convergence system, etc.

[0027] For example, a schematic structural diagram of a communication system provided by an embodiment of the present disclosure is shown in Figure 1. The communication system may include at least one network device 101. Figure 1 only shows three network devices 101.

[0028] The network device 101 is used to predict the operating resources of the network device in a future time period based on the service data of the network device in a first historical time period, and perform energy-saving operations on the remaining resources in the network device in the future time period.

[0029] The remaining resources are the resources of the network device excluding the operating resources.

[0030] In one example, the network device 101 can be a terminal device with wireless communication capabilities, which can be deployed on land, including indoors or outdoors, handheld or vehicle-mounted; it can also be deployed on the water surface (such as ships, etc.); it can also be deployed in the air (for example, on airplanes, balloons, and satellites, etc.).

[0031] In another example, the network device 101 may also be a device with wireless transceiver functionality or a chip or chip system that can be provided in the device. The network device 101 includes, but is not limited to, a small base station, a wireless access point, a transmission receive point (TRP), a transmission point (TP), a macro base station, a relay base station, and any other access node.

[0032] In another example, the network device 101 can also be a core network device, which includes at least one of the following: a policy and charging enforcement function (PCEF), a policy and charging rules function (PCRF), a user plane function (UPF), and a session management function (SMF).

[0033] It should be noted that Figure 1 is only an exemplary framework diagram. The number of nodes and the names of the various devices included in Figure 1 are not restricted. In addition to the functional nodes shown in Figure 1, the communication system may also include other nodes, and this disclosure does not impose any restrictions on this.

[0034] The application scenarios of the embodiments of the present disclosure are not limited. The system architecture and business scenarios described in the embodiments of the present disclosure are intended to more clearly illustrate the technical solutions of the embodiments of the present disclosure and do not constitute a limitation on the technical solutions provided by the embodiments of the present disclosure. It is known to those skilled in the art that with the evolution of network architecture and the emergence of new business scenarios, the technical solutions provided by the embodiments of the present disclosure are also applicable to similar technical problems.

[0035] FIG2 is a flow chart of an energy-saving method provided by an embodiment of the present disclosure. As shown in FIG2 , the method may include S201 - S203 .

[0036] S201: A network device obtains service data of the network device in a first historical time period.

[0037] As an example, the first historical time period may be the last five hours before the current moment. The above is only an exemplary description of the first historical time period. The first historical time period may also be other time periods (for example, the last seven hours before the current moment), and this disclosure does not impose any limitation on this.

[0038] In some embodiments, the service data includes at least one of the following: throughput, network device load, number of service requests, and service duration. The above is only an exemplary description of service data, and the above service data may also include other data (e.g., traffic), and this disclosure does not impose any restrictions on this.

[0039] S202: The network device predicts the operating resources of the network device in a future time period based on the service data.

[0040] In one implementation method, the implementation process of the above S202 can be: the network device can input the above business data into the computing power demand prediction model obtained by preset training, obtain the computing power demand required by the network device in the future time period, and determine the operating resources required by the network device in the future time period based on the above computing power demand.

[0041] As an example, the computing power requirement can be used to represent the network processing capacity required by the network device in a future time period. The unit of the computing power requirement can be hash / second (hash / s).

[0042] In conjunction with the above example, the network device may determine the operating resources required for the network device in a future time period based on the computing power requirement as follows: the network device may determine the computing power corresponding to each resource, and based on the computing power requirement and the computing power corresponding to each resource, determine the quantity of resources required by the network device in the future time period. Based on the quantity of resources required by the network device in the future time period, the network device determines the operating resources required for the network device in the future time period from all of the network device's resources.

[0043] In some examples, the duration corresponding to the above-mentioned future time period may be equal to the duration corresponding to the first historical time period. For example, the above-mentioned future time period is the last 5 hours after the current moment, and the first historical time period is the last 5 hours before the current moment.

[0044] The duration corresponding to the above-mentioned future time period may not be equal to the duration corresponding to the first historical time period. For example, the above-mentioned future time period is 7 hours after the current time, and the first historical time period is 3 hours before the current time.

[0045] In some embodiments, the resource includes at least one of: a central processing unit (CPU), a graphics processing unit (GPU), a network processing unit (NPU), and a data processing unit (DPU).

[0046] It should be noted that the above is only an exemplary description of resources, and the above resources may also include other resources, and this disclosure does not impose any restrictions on this.

[0047] S203: The network device performs energy-saving operations on the remaining resources in the network device in a future time period.

[0048] The remaining resources are the resources of the network device excluding the operating resources.

[0049] In some embodiments, the implementation process of the above S203 may be: the network device puts the remaining resources into hibernation within a future time period.

[0050] In other embodiments, the implementation process of S203 may be: the network device adjusts the current operating frequency of the remaining resources to a preset operating frequency within a future time period, where the preset operating frequency is lower than the current operating frequency.

[0051] In conjunction with the above embodiment, the network device can prioritize adjusting the operating frequency of the remaining resources. After the network device adjusts the operating frequency of the remaining resources, if there are still idle resources in the currently running resources of the network device, the network device can put the remaining resources into hibernation, thereby avoiding resource waste and improving resource utilization.

[0052] It is easy to understand that by performing energy-saving operations on the remaining resources in the network equipment in the future period, a large amount of electricity expenses can be saved, which helps to reduce the construction cost of the network equipment and increase the investment value of the network equipment.

[0053] As an implementation, the network device sets a preset operating frequency based on historical experience. For example, the network device sets the preset operating frequency to 10 Hz. The above is only an exemplary description of the preset operating frequency. The network device can also set the preset operating frequency to 8 Hz, and this disclosure does not impose any limitation.

[0054] As another implementation, the network device determines the preset operating frequency based on the computing power requirement and the total number of network resources. For example, if the computing power requirement is 400,000 hash / s and the total number of resources is 64, the network device can set the preset operating frequency to 2 GHz.

[0055] In some embodiments, the network device may operate based on the operating resources in a future time period. It is easy to understand that after the network device determines the operating resources of the network device in the future time period, the network device may operate based on the operating resources in the future time period, thereby avoiding the problem of resource waste caused by occupying more redundant resources.

[0056] In the disclosed embodiment, the network device determines the operating resources of the network device in a future time period based on its own historical service data, and performs energy-saving operations on the remaining resources other than the operating resources in the future time period. In view of this, it can be seen that the network device of the disclosed embodiment performs energy-saving operations on its own resources based on internal data, without the need to obtain service data from an external device, nor does it require the external device to provide energy-saving operation instructions to the network device. This can save the communication overhead with the external device during the energy-saving process of the network device, and compared with communicating with the external device, the time consumed by internal communication is shorter, which can save the time of energy-saving operations and thus improve the efficiency of energy-saving of the network device.

[0057] In some embodiments, as shown in FIG3 , the computing power demand prediction model in the embodiment of the present disclosure is obtained through the following S301 - S302 training.

[0058] S301: A network device obtains a training sample.

[0059] The training samples include multiple labeled samples. The samples include service data of the network device in a second historical time period. The labels of the samples include computing power requirements of the network device in a third historical time period after the second historical time period.

[0060] In some implementations, the implementation process of the above S301 can be: the network device obtains the business data of the network device in multiple second historical time periods, and the computing power requirements of the network device in multiple third historical time periods. One second historical time period corresponds to one third historical time period. The network device verifies the consistency and integrity of the business data in the above multiple second historical time periods and the computing power requirements in multiple third historical time periods, and normalizes and normalizes the business data and computing power requirements obtained after verification. The network device combines the business data of the network device in the multiple second historical time periods and the computing power requirements of the network device in the multiple third historical time periods obtained after processing to determine multiple samples carrying labels.

[0061] It is easy to understand that the network device determines the above-mentioned multiple labeled samples based on the business data of the network device in the above-mentioned multiple second historical time periods and the computing power requirements of the network device in multiple third historical time periods obtained after inspection and processing. This can ensure that the above-mentioned multiple labeled samples meet the requirements of the initial artificial intelligence algorithm model for input data (for example, data requirements, format requirements, etc.), avoiding the problem of model training abnormalities due to input data not meeting the requirements.

[0062] S302. The network device inputs the training samples into the initial artificial intelligence algorithm model for iterative training to obtain a computing power demand prediction model.

[0063] In some implementations, the implementation process of S302 may be as follows: the network device inputs the training sample into the initial artificial intelligence algorithm model, obtains the prediction result corresponding to the training sample, and compares the prediction result corresponding to the training sample with the sample label in the training sample to obtain the accuracy of the initial artificial intelligence algorithm model. If the accuracy of the initial artificial intelligence algorithm model does not reach the preset accuracy, the network device adjusts the parameters of the initial artificial intelligence algorithm model and retests the initial artificial intelligence algorithm model obtained after the adjustment of the parameters until the accuracy of the initial artificial intelligence algorithm model reaches the preset accuracy. The network device may determine the initial artificial intelligence algorithm model at the time of the last iteration as the computing power demand prediction model.

[0064] In some examples, the artificial intelligence algorithm model may include at least one of the following: a long short-term memory (LSTM) model, an ant colony algorithm model, and a neural network model.

[0065] In the disclosed embodiment, the network device obtains a plurality of labeled samples and trains an initial artificial intelligence algorithm model based on the plurality of labeled samples to obtain a computing power demand prediction model. The network device inputs the business data of the first historical time period into the computing power demand prediction model to obtain the computing power demand of the network device in the future time period, and determines the operating resources of the network device in the future time period based on the computing power demand of the network device in the future time period. Since the computing power demand prediction model is obtained based on iterative training of the initial artificial intelligence algorithm model, the computing power demand prediction model has a high accuracy, thereby ensuring the accuracy of the operating resources predicted by the computing power demand prediction model obtained based on the training.

[0066] In some embodiments, taking the network device 101 as a UPF as an example, a schematic diagram of the structure of a network device provided by an embodiment of the present disclosure is shown in Figure 4. The network device may include the following two modules: a micro-intelligent core module and a native function module.

[0067] The micro-intelligent core module may include: an operation situation awareness unit, a data storage unit, an artificial intelligence (AI) training unit, and an intelligent scheduling control unit. The operation situation awareness unit is used to collect business data of the above network devices.

[0068] The operation situation awareness unit is mainly used to collect business data of network equipment in real time and send the above business data to the data storage unit.

[0069] The data storage unit is mainly used to process the business data from the operation situation awareness unit (for example, consistency and integrity verification processing, standardization processing, normalization processing, etc.) so that the business data obtained after processing can meet the preset requirements of the initial artificial intelligence algorithm model in the AI ​​training unit for input data (for example, data content, data format, etc.), and is also used to maintain the local database of the data storage unit. Specifically, the business data within a time period close to the current moment is stored in the above-mentioned local database, the business data in the above-mentioned local database is continuously updated, and the previously stored business data (that is, business data that is not within a time period close to the current moment) is cleared.

[0070] The AI ​​training unit is mainly used to obtain historical business data from the data storage unit, and train the initial artificial intelligence algorithm model based on the above historical business data until the accuracy of the trained initial artificial intelligence algorithm model reaches the preset requirements, thereby obtaining a computing power demand prediction model. It is also used to send the above computing power demand prediction model to the intelligent scheduling control unit.

[0071] In some implementations, the above-mentioned AI training unit can be used only to perform training operations on the computing power demand prediction model, and not to perform training operations on other models. This can avoid other training operations from preempting resources for training operations on the computing power demand prediction model, thereby ensuring the energy-saving efficiency of network equipment.

[0072] The intelligent scheduling control unit is mainly used to input the historical business data obtained from the data storage unit side into the computing power demand prediction model obtained from the AI ​​training unit side to obtain the computing power demand of the network equipment in the future time period, and determine the operating resources of the network equipment in the future time period based on the above computing power demand. It is also used to generate energy-saving instructions based on the above operating resources, and send the above energy-saving instructions to the native function module, and is also used to send resource allocation instructions to the native function module.

[0073] In some examples, the energy-saving instructions may include a sleep instruction and a frequency reduction instruction. The sleep instruction is used to instruct the native function module to put the remaining resources (i.e., resources other than the running resources in all resources of the network device) into sleep mode within a future time period. The frequency reduction instruction is used to instruct the native function module to adjust the current operating frequency of the remaining resources (i.e., resources other than the running resources in all resources of the network device) to a preset operating frequency within a future time period.

[0074] In some embodiments, the above-mentioned intelligent scheduling control unit can be used only to determine energy-saving instructions and resource allocation instructions regarding the native functional model, and not to determine instructions regarding other modules and / or other devices. This can avoid the operation of determining other instructions preempting the resources of the operation of determining the energy-saving instructions and resource allocation instructions of the native functional model, thereby ensuring the energy-saving efficiency of the network equipment.

[0075] As an example, the resource allocation instruction is used to instruct the native function module to run based on the running resources in a future time period.

[0076] The native functional modules may include: a network communication unit, a data packet detection unit, a session management unit, a data packet forwarding unit, and an operation and maintenance management unit.

[0077] The network communication unit is mainly used to control the communication between the network device and external devices, as well as the communication between various modules within the network device.

[0078] The data packet detection unit is mainly used to detect information such as the type of the data packet.

[0079] The session management unit is mainly used to manage sessions of various devices (eg, protocol data unit (PDU) sessions).

[0080] The data packet forwarding unit is mainly used to determine the forwarding strategy corresponding to each data.

[0081] The operation and maintenance management unit is mainly used to communicate with the micro-intelligent core module and is also used to manage basic functions (for example, fault management, configuration management, accounting management, performance management, and security management (FCAPS)).

[0082] The functions of each unit in the native functional model can be understood by referring to the description in the general technology. This disclosure will not elaborate on this and will not impose any restrictions.

[0083] It should be noted that the micro-intelligent core module can be deployed as a whole in a container or virtual machine, or individually as independent processes. The individual units of the micro-intelligent core module can be deployed separately, so that a failure in any one unit will not affect the normal operation of the other units; or they can be deployed in groups, so that the individual units can be combined at will.

[0084] 4 , as shown in FIG5 , an embodiment of the present disclosure provides an energy-saving method, which includes the following S501 - S510 .

[0085] S501. The native function module (for example, the operation and maintenance management unit) sends the business data of the network devices in multiple second historical time periods and the computing power requirements of the network devices in multiple third historical time periods to the operation situation awareness unit.

[0086] One second historical time period corresponds to one third historical time period.

[0087] It should be noted that the energy-saving method provided in the embodiment of the present disclosure is applied when the network device is operating normally.

[0088] In some implementations, the above-mentioned operation situation awareness unit and the native function module can communicate through the following three interfaces: an energy-saving interface, a management interface, and a service interface. The energy-saving interface is a custom interface and can be used only to transmit the business data of the network device within the first historical time period. The management interface can be used to transmit the business data of the network device within the first historical time period, and management messages supporting protocols such as the Simple Network Management Protocol (SNMP), the File Transfer Protocol (FTP), and the Secure File Transfer Protocol (SFTP). The service interface can be used to transmit the business data of the network device within the first historical time period, as well as business data.

[0089] It should be noted that since the energy-saving interface can only be used to transmit historical business data, while the management interface and service interface can be used not only to transmit historical business data but also to transmit other data, the energy-saving interface transmits historical business data faster than the management interface and service interface.

[0090] It is easy to understand that the above-mentioned operation situation awareness unit is located inside the network device and can obtain historical business data based on the internal interface of the network device (for example, energy-saving interface, management interface, and service interface). In this way, there is no need to perform multiple data forwarding and / or routing configurations with external devices to obtain historical business data, thereby eliminating the need for interaction with external devices.

[0091] S502. The operation situation awareness unit sends the business data of the network devices in the second historical time period and the computing power requirements of the network devices in the third historical time period to the data storage unit.

[0092] S503. The data storage unit performs inspection processing, normalization processing, and other operations on the business data of the network devices in multiple second historical time periods and the computing power requirements of the network devices in multiple third historical time periods, and combines the business data of the network devices in multiple second historical time periods and the computing power requirements of the network devices in multiple third historical time periods obtained after processing to obtain training samples (i.e., multiple samples carrying labels).

[0093] S504: The data storage unit sends the training samples to the AI ​​training unit.

[0094] S505. The AI ​​training unit iteratively trains the initial artificial intelligence algorithm model based on the above training samples to obtain a computing power demand prediction model.

[0095] S506. The AI ​​training unit sends the computing power demand prediction model to the intelligent scheduling unit.

[0096] S507: The data storage unit sends the service data of the network device in the first historical time period to the intelligent scheduling unit.

[0097] In some implementations, the data storage unit may periodically obtain short-term business data of network equipment from native functional modules (e.g., operation and maintenance management units) in the UPF, store short-term business data in the current period, and clean up short-term business data in historical periods.

[0098] S508. The intelligent scheduling unit inputs the service data of the network device in the first historical time period into the computing power demand prediction model to obtain the computing power demand of the network device in the future time period, and determines the operating resources based on the computing power demand.

[0099] S509: The intelligent scheduling unit sends an energy-saving operation instruction to the native function module, wherein the energy-saving operation instruction is used to instruct the native function module to perform energy-saving operations on the remaining resources in the network device within a future time period.

[0100] S510: The native function module runs based on the running resources in a future time period.

[0101] It's easy to understand that the micro-intelligent core module can focus solely on energy-saving features for network devices, rather than implementing other functions. This reduces resource overhead within the micro-intelligent core module and provides greater deployment flexibility. The micro-intelligent core module can dynamically determine the operating resources of network devices in real time, resulting in improved real-time performance.

[0102] It is understandable that, in order to realize the above functions, the energy-saving device includes hardware structures and / or software modules corresponding to the execution of each function. It should be easily appreciated by those skilled in the art that, in combination with the algorithm steps of each example described in the embodiments of the present disclosure, the present disclosure can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present disclosure.

[0103] The embodiment of the present disclosure can divide the energy-saving device into functional modules according to the above-mentioned method embodiment. For example, each functional module can be divided corresponding to each function, or two or more functions can be integrated into one functional module. The above-mentioned integrated module can be implemented in the form of hardware or software. It should be noted that the division of modules in the embodiment of the present disclosure is schematic and is only a logical function division. There may be other division methods in actual implementation. The following is an example of dividing each functional module corresponding to each function.

[0104] In the case of dividing each functional module into corresponding functional modules, FIG6 shows a schematic structural diagram of another communication device 60, which can be used to execute the energy saving method shown in FIG2-FIG3 and FIG5. The communication device 60 shown in FIG6 may include: a communication unit 601 and a processing unit 602.

[0105] The communication unit 601 is configured to obtain service data of a network device within a first historical time period.

[0106] The processing unit 602 is configured to predict the operating resources of the network device in a future time period based on the service data.

[0107] The processing unit 602 is further configured to perform energy-saving operations on the remaining resources in the network device in a future time period; the remaining resources are resources of the network device excluding the operating resources.

[0108] In some embodiments, the service data includes at least one of the following: throughput, network device load, number of service requests, and service duration.

[0109] In some embodiments, the processing unit 602 is further configured to put the remaining resources into a dormant state within a future time period.

[0110] In some embodiments, the processing unit 602 is further configured to adjust the current operating frequency of the remaining resources to a preset operating frequency in a future time period; the preset operating frequency is lower than the current operating frequency.

[0111] In some embodiments, the processing unit 602 is also used to input business data into a computing power demand prediction model to obtain the computing power demand of the network device in a future time period; the processing unit 602 is also used to determine operating resources based on the computing power demand.

[0112] In some embodiments, the communication unit 601 is also used to obtain training samples; the training samples include multiple labeled samples, the samples include business data of the network device in the second historical time period, and the labels of the samples include the computing power requirements of the network device in the third historical time period after the second historical time period; the processing unit 602 is also used to input the training samples into the initial artificial intelligence algorithm model for iterative training to obtain a computing power requirement prediction model.

[0113] In some embodiments, the processing unit 602 is further configured to operate the network device based on the operating resources in a future time period.

[0114] In some embodiments, the resource includes at least one of the following: a central processing unit CPU, a graphics processing unit GPU, a network processing unit NPU, and a data processing unit DPU.

[0115] In specific implementations, the devices in Figure 1 may all adopt the structure shown in Figure 7, or include the components shown in Figure 7. Figure 7 is a schematic diagram of the structure of a communication device 70 provided in an embodiment of the present disclosure. As shown in Figure 7, the communication device 70 may include a processor 701, a communication circuit 702, a communication interface 703, and a memory 704. The processor 701, the memory 704, and the communication interface 703 may be connected via a communication circuit 702.

[0116] Processor 701 is a CPU, a general-purpose processor, a network processor (NP), a digital signal processor (DSP), a microprocessor, a microcontroller, a programmable logic device (PLD), or any combination thereof. Processor 701 may also be other devices with processing capabilities, such as circuits, devices, or software modules, without limitation.

[0117] The communication line 702 is used to transmit information between the components included in the communication device 70.

[0118] Communication interface 703 is used to communicate with other devices or other communication networks. Such other communication networks may be Ethernet, radio access networks (RAN), wireless local area networks (WLAN), etc. Communication interface 703 may be a module, circuit, communication interface, or any device capable of implementing communication.

[0119] The memory 704 is used to store instructions, which may be computer programs.

[0120] The memory 704 may be a read-only memory (ROM) or other type of static storage device that can store static information and / or instructions, or a random access memory (RAM) or other type of dynamic storage device that can store information and / or instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compact disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), magnetic disk storage media or other magnetic storage devices, etc., without limitation.

[0121] It should be noted that memory 704 can exist independently of processor 701 or be integrated with processor 701. Memory 704 can be used to store instructions, program code, or data. Memory 704 can be located within or outside of communication device 70, without limitation. Processor 701 is configured to execute instructions stored in memory 704 to implement the energy-saving methods provided in the following embodiments of the present disclosure.

[0122] In one example, the processor 701 may include one or more CPUs, for example, CPU0 and CPU1.

[0123] As an implementation, the communication device 70 includes multiple processors.

[0124] As an implementation, the communication device 70 further includes an output device and an input device. For example, the input device is a keyboard, a mouse, a microphone, or a joystick, and the output device is a display screen, a speaker, or the like.

[0125] It should be noted that the communication device 70 may be a desktop computer, a portable computer, a network server, a mobile phone, a tablet computer, a wireless terminal, an embedded device, a chip system, or a device having a similar structure to that shown in FIG7 . Furthermore, the composition shown in FIG7 does not limit the various devices in FIG1 and FIG7 . In addition to the components shown in FIG7 , the various devices in FIG1 and FIG7 may include more or fewer components than shown, or combine certain components, or arrange the components differently.

[0126] In the embodiments of the present disclosure, the chip system can be composed of a chip, or can include a chip and other discrete devices. Some embodiments of the present disclosure provide a computer-readable storage medium (e.g., a non-transitory computer-readable storage medium) that stores computer program instructions. When the computer program instructions are executed on a computer, the computer executes the energy-saving method of any of the above embodiments.

[0127] For example, the computer-readable storage media may include, but are not limited to, magnetic storage devices (e.g., hard disks, floppy disks, or magnetic tapes), optical disks (e.g., compact disks (CDs), digital versatile disks (DVDs), etc.), smart cards, and flash memory devices (e.g., erasable programmable read-only memories (EPROMs), cards, sticks, or key drives, etc.). The various computer-readable storage media described in the present disclosure may represent one or more devices and / or other machine-readable storage media for storing information. The term "machine-readable storage medium" may include, but is not limited to, wireless channels and various other media capable of storing, containing, and / or carrying instructions and / or data.

[0128] An embodiment of the present disclosure provides a computer program product comprising instructions. When the computer program product is run on a computer, the computer is enabled to execute the energy-saving method described in any one of the above embodiments.

[0129] The above is only a specific embodiment of the present disclosure, but the scope of protection of the present disclosure is not limited thereto. Any changes or replacements within the technical scope disclosed in the present disclosure should be included in the scope of protection of the present disclosure. Therefore, the scope of protection of the present disclosure should be based on the scope of protection of the claims.

Claims

1. An energy saving method, applied to a network device, wherein: The method comprises: Acquire service data of the network device in a first historical time period; Predicting the operating resources of the network device in a future time period based on the business data; Perform energy-saving operations on the remaining resources in the network device within the future time period; the remaining resources are resources of the network device other than the operating resources.

2. The method according to claim 1, wherein: The service data includes at least one of the following: throughput, network equipment load, number of service requests, and service duration.

3. The method according to claim 2, wherein: The performing energy-saving operations on the remaining resources in the network device within the future time period includes: The remaining resources are put into a dormant state during the future time period.

4. The method according to claim 2, wherein: The performing energy-saving operations on the remaining resources in the network device within the future time period includes: In the future time period, the current operating frequency of the remaining resources is adjusted to a preset operating frequency; the preset operating frequency is lower than the current operating frequency.

5. The method according to any one of claims 1 to 4, wherein: The predicting, based on the service data, operating resources of the network device in a future time period includes: Inputting the service data into a computing power demand prediction model to obtain the computing power demand of the network device in the future time period; The operating resources are determined according to the computing power requirement.

6. The method according to claim 5, further comprising: Acquire training samples; the training samples include multiple samples carrying labels, the samples include service data of the network device in a second historical time period, and the labels of the samples include computing power requirements of the network device in a third historical time period after the second historical time period; The training samples are input into the initial artificial intelligence algorithm model for iterative training to obtain the computing power demand prediction model.

7. The method according to any one of claims 1 to 4, further comprising: The network device is operated based on the operating resources during the future time period.

8. The method according to any one of claims 1 to 4, wherein: The resource includes at least one of the following: a central processing unit CPU, a graphics processing unit GPU, a network processing unit NPU, and a data processing unit DPU.

9. A communication device, comprising: a processor and a memory for storing instructions executable by the processor; The processor is configured to execute the instructions so that the communication device performs the method according to any one of claims 1-8.

10. A computer-readable storage medium, wherein: The computer-readable storage medium stores computer instructions, and when the computer instructions are executed on a computer, the computer is enabled to execute the method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Energy saving method and device and computer readable storage medium

    CN118870479A

  • Network equipment energy-saving method supporting frequency-modulation and consumption reduction

    CN104052619A

  • Data processing method, computer equipment and readable storage medium

    CN113434294A

  • Cell energy-saving control method, device and equipment and readable storage medium

    CN114727370A

  • Energy saving protocol for a communication system

    WO1990010987A2