Facility management system, facility management method, and non-transitory computer-readable recording medium

The equipment management system improves maintenance prediction accuracy by identifying similar equipment and analyzing their maintenance histories, enabling more reliable maintenance scheduling based on environmental and operational similarities.

WO2024224634A1PCT designated stage expired Publication Date: 2024-10-31NEC CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/016953
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-28
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Existing equipment maintenance prediction methods lack accuracy, as they rely solely on cumulative operating time and parts replacement rates, leading to unreliable timing for maintenance work.

Method used

An equipment management system that identifies similar equipment operating in similar environments, acquires and analyzes maintenance history data to predict the probability of future maintenance needs, and outputs this information to an output device for accurate maintenance planning.

Benefits of technology

This approach allows for more accurate determination of when maintenance is required, enhancing the reliability of maintenance scheduling by leveraging data from similar equipment operating conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023016953_31102024_PF_FP_ABST
    Figure JP2023016953_31102024_PF_FP_ABST
Patent Text Reader

Abstract

This facility management system (1) comprises an identification unit (110), a prediction unit (120), and an output unit (130). The identification unit (110) references a storage means that stores, in association with shop facilities, operating environment information indicating the operating environment of each shop facility and maintenance history information indicating the implementation history of maintenance work for said shop facility so as to identify at least one second shop facility operating in an environment similar to the operating environment of a first shop facility. The prediction unit (120) acquires, from the storage means, first maintenance history information pertaining to the first shop facility and second maintenance history information pertaining to the at least one second shop facility. The prediction unit (120) also predicts, on the basis of the first maintenance history information and the second maintenance history information, the probability that next maintenance work for the first shop facility will occur within a prescribed period of time. The output unit (130) outputs to an output device the result of the prediction pertaining to the next maintenance work for the first shop facility.
Need to check novelty before this filing date? Find Prior Art

Description

Facility management system, facility management method, and non-transitory computer-readable recording medium

[0001] The present invention relates to a facility management system, a facility management method, and a non-transitory computer-readable recording medium.

[0002] Various equipment is used in facilities such as stores. The person who manages such equipment needs to plan appropriate maintenance work.

[0003] An example of a technology for supporting equipment maintenance work is disclosed in Patent Document 1. Patent Document 1 discloses a technology for calculating the cumulative operation time at which the replacement rate of a part of equipment to be evaluated reaches a predetermined value using the relationship between the cumulative operation period of the equipment and the part replacement rate of the equipment to be maintained, and for calculating the timing of maintenance work based on the cumulative operation time.

[0004] Japanese Patent Application Laid-Open No. 2014-164322

[0005] In the technology of the above-mentioned Patent Document 1, even if the timing of maintenance work on the target facility is predicted, there is a possibility that the accuracy of the prediction is low.

[0006] In view of the above-mentioned problems, one example of the object of the present invention is to provide an equipment management system, an equipment management method, and a non-transitory computer-readable recording medium for accurately determining when maintenance work is required for the target equipment.

[0007] According to one aspect of the present invention, there is provided an equipment management system comprising: an identification means for identifying at least one second piece of store equipment that operates in an environment similar to the operating environment of a first piece of store equipment by referring to a storage means that stores operating environment information indicating the operating environment of the store equipment and maintenance history information indicating the history of maintenance work carried out on the store equipment, in correspondence with each piece of store equipment; a prediction means for acquiring first maintenance history information regarding the first store equipment and second maintenance history information regarding the at least one piece of second store equipment from the storage means, and predicting the probability that the next maintenance work will occur for the first store equipment within a specified period based on the first maintenance history information and the second maintenance history information; and an output means for outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device.

[0008] According to one aspect of the present invention, there is provided an equipment management method including: at least one computer referring to a storage means that stores operating environment information indicating the operating environment of store equipment and maintenance history information indicating the history of maintenance work carried out on store equipment, in correspondence with each piece of store equipment, to identify at least one second piece of store equipment that operates in an environment similar to the operating environment of a first piece of store equipment; acquiring first maintenance history information regarding the first store equipment and second maintenance history information regarding the at least one piece of second store equipment from the storage means; predicting the probability that the next maintenance work will occur for the first store equipment within a specified period based on the first maintenance history information and the second maintenance history information; and outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device.

[0009] According to one aspect of the present invention, a non-transitory computer-readable recording medium is provided that stores a program that, when executed by at least one computer, causes the at least one computer to function as: an identification means that identifies at least one second piece of store equipment that operates in an environment similar to the operating environment of a first piece of store equipment by referring to a storage means that stores operating environment information indicating the operating environment of the store equipment and maintenance history information indicating the history of maintenance work carried out on the store equipment, in correspondence with each piece of store equipment; a prediction means that acquires first maintenance history information regarding the first store equipment and second maintenance history information regarding the at least one piece of second store equipment from the storage means, and predicts the probability that the next maintenance work will occur for the first store equipment within a specified period based on the first maintenance history information and the second maintenance history information; and an output means that outputs the result of the prediction regarding the next maintenance work for the first store equipment to an output device.

[0010] According to one aspect of the present invention, a manager can determine the accuracy of the prediction results regarding the maintenance work of the target facility.

[0011] FIG. 1 is a diagram illustrating an overview of the functional configuration of a facility management system according to a first embodiment. FIG. 2 is a diagram illustrating an example of the system configuration of a facility management system. FIG. 3 is a diagram illustrating an example of information stored in a database according to a second embodiment. FIG. 4 is a diagram illustrating an example of the hardware configuration of a computer that realizes an information processing device. FIG. 5 is a flowchart illustrating an example of processing executed by an information processing device according to a second embodiment. FIG. 6 is a diagram illustrating an example of a screen output to an output device by an output unit. FIG. 7 is a diagram illustrating an example of a screen output to an output device by an output unit. FIG. 8 is a diagram illustrating an example of the operation of the output unit when a selection operation on the screen is received.

[0012] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In all drawings, similar components are designated by similar reference numerals, and descriptions thereof will be omitted where appropriate. Furthermore, unless otherwise specified, each block in each block diagram represents a functional configuration, not a hardware configuration. Furthermore, when elements such as blocks in a diagram are linked by arrows, the direction of the arrows is merely intended to make the flow of information easier to understand. In this case, the direction of the arrows does not limit the direction of communication (one-way communication / two-way communication) unless otherwise specified.

[0013] In the following description, "acquisition" includes at least one of the following: a device retrieving data or information stored in another device or storage medium (active acquisition), and a device inputting data or information output from another device (passive acquisition). Examples of active acquisition include making a request or inquiry to another device and receiving a reply, and accessing and reading information from another device or storage medium. Examples of passive acquisition include receiving information that is distributed (or transmitted, push notification, etc.). Furthermore, "acquisition" may also mean selecting and acquiring data or information from received data or information, or selecting and receiving distributed data or information. Hereinafter, embodiments of the present invention will be described with reference to the drawings. In all drawings, similar components are designated by similar reference numerals, and descriptions thereof will be omitted where appropriate.

[0014] 1 is a diagram illustrating an overview of the functional configuration of an equipment management system 1 according to a first embodiment. As shown in the diagram, the equipment management system 1 is configured to include at least an identification unit 110, a prediction unit 120, and an output unit 130.

[0015] The identification unit 110 refers to information in a storage unit (not shown) to identify at least one other store facility (second store facility) that operates in an environment similar to the operating environment of the target store facility (first store facility). For convenience, in the following description, the "target store facility" and "other store facility" are also referred to as the "target store facility" and "similar store facility," respectively. The storage unit stores operating environment information and maintenance history information in association with each store facility. Here, "operating environment information" refers to information indicating the operating environment of the store facility (e.g., the temperature and humidity in the space where the store facility is located). Furthermore, "maintenance history information" refers to information indicating the history of maintenance work performed on the store facility. The identification unit 110 can identify at least one other store facility that operates in an environment similar to the operating environment of the target store facility as similar store facility by referring to the operating environment information of each store facility stored in the storage unit.

[0016] The prediction unit 120 predicts the probability that the next maintenance work will occur for the target store equipment within a predetermined period based on the maintenance history information for the target store equipment (first maintenance history information) and the maintenance history information for at least one similar store equipment (second maintenance history information). The prediction unit 120 can acquire the maintenance history information for the target store equipment and the maintenance history information for at least one similar store equipment from the storage unit.

[0017] The output unit 130 outputs information indicating the results of the prediction made by the prediction unit 120 regarding the next maintenance work for the target store equipment to an output device (not shown).

[0018] According to the equipment management system 1 of this embodiment, the probability of the next maintenance work occurring for the target store equipment is predicted using maintenance history information for similar store equipment operating in an environment similar to that of the target store equipment. Information indicating the results of the prediction regarding the next maintenance work for the target store equipment is then output to an output device (e.g., a display on a user terminal). In other words, an equipment management system and an equipment management method are provided that enable a manager to accurately determine when maintenance work will be required for the target store equipment. Furthermore, as will be understood from the description of the second embodiment described below, a non-transitory computer-readable recording medium is provided that stores a program for implementing the functions of the equipment management system, which is a means for solving the above problem, on at least one computer.

[0019] Hereinafter, a detailed example of the facility management system 1 according to another embodiment will be described.

[0020] Second Embodiment Fig. 2 is a diagram illustrating an example of the system configuration of an equipment management system 1. The equipment management system 1 illustrated in Fig. 2 includes an information processing device 10, sensors 20, and a database 30. The information processing device 10, sensors 20, and database 30 are connected to one another via a network 40. Note that the configuration of the equipment management system 1 is not limited to the example shown in this figure. For example, the database 30 may be constructed in a storage area inside the information processing device 10.

[0021] The sensors 20 are installed inside or near each piece of store equipment. The type of sensors 20 is not particularly limited as long as they are capable of generating information indicating the operating environment of the store equipment. For example, the sensors 20 may be sensors that measure the temperature and humidity of the space in which the store equipment is installed, or sensors that measure the amount of particles (such as dust) or oil floating in the space. In this case, the sensors 20 can generate information indicating measurement results related to at least one of the temperature, humidity, amount of suspended particles, and amount of oil in the space in which the store equipment is operating. Specific examples of store equipment include, but are not limited to, refrigerators, air conditioners, fryers, warming devices, and cafe machines.

[0022] The database 30 stores operating environment information and maintenance history information in association with each piece of store equipment. The operating environment information is generated by the sensors 20 described above. The generated operating status information is transmitted to the database 30 via the network 40 along with information identifying the corresponding piece of store equipment. The maintenance history information is generated, for example, in response to input from a terminal (not shown) used by a worker when performing maintenance work on the store equipment. The generated maintenance history information is transmitted to the database 30 via the network 40 along with information identifying the corresponding piece of store equipment. The database 30 can store, for example, operating environment information and maintenance history information in association with each piece of store equipment using the information identifying the store equipment. The database 30 is configured, for example, as shown in FIG. 3. FIG. 3 is a diagram illustrating an example of information stored in the database 30 of the second embodiment. In the example of FIG. 3, information identifying the store equipment (equipment ID), operating environment information, and maintenance history information are included in one record of the database 30.

[0023] The information processing device 10 is a device that includes at least the above-mentioned specifying unit 110, predicting unit 120, and output unit 130.

[0024] FIG. 4 is a diagram illustrating an example of the hardware configuration of a computer 1000 that realizes the information processing device 10.

[0025] The computer 1000 has a bus 1010 , a processor 1020 , a memory 1030 , a storage device 1040 , an input / output interface 1050 , and a network interface 1060 .

[0026] The bus 1010 is a data transmission path for transmitting and receiving data among the processor 1020, memory 1030, storage device 1040, input / output interface 1050, and network interface 1060. However, the method of connecting the processor 1020 and the like to each other is not limited to bus connection.

[0027] The processor 1020 is a central processing unit (CPU) or a graphics processing unit (GPU).

[0028] The memory 1030 is a main storage device realized by a random access memory (RAM) or the like.

[0029] The storage device 1040 is an auxiliary storage device realized by a hard disk drive (HDD), a solid state drive (SSD), a memory card, a read only memory (ROM), etc. The storage device 1040 stores at least program modules that realize the functions of the equipment management system 1 described above (the identification unit 110, the prediction unit 120, and the output unit 130). The storage device 1040 may also function as the database 30.

[0030] The processor 1020 loads a program module read from the storage device 1040 onto the memory 1030 and executes the program module, thereby realizing the function corresponding to the program module. For example, the processor 1020 reads a program module corresponding to the identification unit 110 onto the memory 1030 and executes it, thereby realizing the function of the identification unit 110 described in this disclosure. Similarly, the processor 1020 reads a program module corresponding to the prediction unit 120 onto the memory 1030 and executes it, thereby realizing the function of the prediction unit 120 described in this disclosure. Similarly, the processor 1020 reads a program module corresponding to the output unit 130 onto the memory 1030 and executes it, thereby realizing the function of the output unit 130 described in this disclosure. This operation of the processor 1020 is common to each embodiment included in this disclosure.

[0031] The above-described program modules may be recorded on a recording medium other than the storage device 1040. The recording medium on which the program modules are recorded includes any non-transitory, tangible medium usable by the computer 1000. The recording medium on which the program modules are recorded may have embedded therein program code that is readable by the computer 1000 (processor 1020).

[0032] The input / output interface 1050 is an interface for connecting the computer 1000 to various input / output devices.

[0033] The network interface 1060 is an interface for connecting the computer 1000 to a network. This network includes, for example, a local area network (LAN) and a wide area network (WAN). The network interface 1060 connects the computer 1000 (information processing device 10) to various networks via a wireless or wired connection. The computer 1000 (information processing device 10) can communicate with, for example, a database 30 via the network interface 1060. Furthermore, if the database 30 is built inside the computer 1000 (information processing device 10), the computer 1000 (information processing device 10) can communicate with sensors 20 via the network 40.

[0034] Furthermore, the computer 1000 is connected to necessary devices via an input / output interface 1050 or a network interface 1060. The "necessary devices" referred to here are not particularly limited, but include, for example, input devices such as operation buttons, a keyboard, a touch panel, and a mouse, and output devices such as a display, a speaker, a microphone, and a printer.

[0035] FIG. 5 is a flowchart illustrating a process executed by the information processing device 10 according to the second embodiment.

[0036] First, the identification unit 110 identifies the target store equipment (step S102). For example, an input operation to designate the specific store equipment is performed on a terminal device (not shown) used by the store manager. In response to this input operation, information that can identify the designated store equipment (e.g., an identifier assigned to each store equipment) is transmitted to the identification unit 110. The identification unit 110 can identify the target store equipment based on the acquired information such as the identifier of the store equipment.

[0037] Next, the identification unit 110 identifies at least one similar store equipment (step S104). The identification unit 110 searches the database 30 based on the information capable of identifying the target store equipment acquired in step S102, and acquires operating environment information for the target store equipment. The identification unit 110 then uses the operating environment information for the target store equipment to search the database 30 for other store devices operating in an environment similar to that of the target store equipment. If the identification unit 110 finds a record storing operating environment information similar to that of the target store equipment, it acquires the identifier (equipment ID) of the store equipment stored in that record.

[0038] The identifying unit 110 can, for example, calculate a value according to the degree of overlap of the output values ​​of the sensors 20 included in each piece of operating environment information, and determine whether or not each piece of operating environment information is similar based on the calculated value. The criteria by which the identifying unit 110 determines whether something is "similar" or "dissimilar" are determined based on, for example, the request of the system user, and are stored in advance in a storage area such as the storage device 1040.

[0039] For example, assume that the information shown in FIG. 3 is stored in the database 30, and in step S102, a store facility with facility ID "#0001" is identified as the target store facility. In this case, the identification unit 110 uses the operating environment information (outdoor temperature: 16-18°C, humidity: 45-50%) stored for the identified target store facility to search the database 30 for other store facility operating in a similar environment. In this example, the store facility with facility ID "#0002" and the store facility with facility ID "#0004" are operating in environments relatively similar to the environment of the target store facility. In this case, the identification unit 110 identifies the store facility with facility ID "#0002" and the store facility with facility ID "#0004" as similar store facility based on the degree of similarity of the operating environments indicated by the operating environment information for each store facility.

[0040] Once the identification unit 110 has identified the target store equipment and at least one similar store equipment, the prediction unit 120 acquires the maintenance history information of the target store equipment and the maintenance history information of the similar store equipment from the database 30 (step S106). In the specific example shown above, the prediction unit 120 acquires the maintenance history information stored for the store equipment with equipment ID "#0001" as the "maintenance history information of the target store equipment." The prediction unit 120 also acquires the maintenance history information of the store equipment with equipment ID "#0002" and the maintenance history information of the store equipment with equipment ID "#0004" as the "maintenance history information of the similar store equipment."

[0041] The prediction unit 120 then predicts the probability that the next maintenance work will be performed on the target store equipment within a predetermined period (step S108). For example, the prediction unit 120 predicts the probability that the next maintenance work will be performed on the target store equipment within a predetermined period using the total number of store equipment identified as similar store equipment and the maintenance work interval calculated from the maintenance history information of each similar store equipment.

[0042] Here, the predetermined period may be determined based on a fixed period of time, such as six months or one year, or may be determined based on the unit period of the store equipment maintenance plan (e.g., business year). In the former case, a fixed period starting from the most recent maintenance date and time identified from the maintenance history information of the target store equipment is determined as the predetermined period. In the latter case, the unit period of the maintenance plan is used as is as the predetermined period. In the latter case, the period from the most recent maintenance date and time identified from the maintenance history information of the target store equipment to the final date and time of the unit period of the maintenance plan may be determined as the predetermined period.

[0043] As one example, the prediction unit 120 may predict how the probability that maintenance work will be required changes over time during a unit period of the maintenance plan. As another example, the prediction unit 120 may divide the unit period of the maintenance plan into multiple sections and predict the probability that the next maintenance work will occur for each of the multiple sections. For example, the prediction unit 120 divides the unit period of the maintenance plan (a period of one business year) into the first to fourth quarters (1Q to 4Q). Then, the prediction unit 120 predicts the probability that the next maintenance work will occur for the target store equipment for each quarter using maintenance history information of similar store equipment.

[0044] For example, let's say the most recent maintenance work on a target store equipment was carried out at the end of the last fiscal year. Also, let's say the following 10 pieces of store equipment have been identified as similar store equipment to the target store equipment: - Store equipment A → Maintenance work interval: 10 months - Store equipment B → Maintenance work interval: 4 months - Store equipment C → Maintenance work interval: 7 months - Store equipment D → Maintenance work interval: 4 months - Store equipment E → Maintenance work interval: 6 months - Store equipment F → Maintenance work interval: 5 months - Store equipment G → Maintenance work interval: 3 months - Store equipment H → Maintenance work interval: 2 months - Store equipment I → Maintenance work interval: 8 months - Store equipment J → Maintenance work interval: 9 months

[0045] Among the ten similar store equipment, two similar store equipment, "Store Equipment G" and "Store Equipment H," have undergone maintenance work by the first quarter. In this case, the prediction unit 120 calculates "20%," which is the proportion of these store equipment to the total number of similar store equipment, as the first probability that maintenance work will occur for the target store equipment by the first quarter. Similarly, the prediction unit 120 predicts a second probability that maintenance work will occur for the target store equipment by the second quarter, a third probability that maintenance work will occur for the target store equipment by the third quarter, and a fourth probability that maintenance work will occur for the target store equipment by the fourth quarter. In this case, the prediction unit 120 can predict the second probability, the third probability, and the fourth probability as "60%, "90%, and "100%, respectively." In this way, the prediction unit 120 can time-series predict the probability that maintenance work will occur for the target store equipment during the unit period of the maintenance plan.

[0046] The prediction unit 120 may also predict the probability that maintenance work will occur at the target store for each of the periods from Q1 to Q4. As in the previous example, the prediction unit 120 can calculate a first probability that maintenance work will occur for the target store equipment in the Q1 period as "2 / 10 x 100 = 20%." The prediction unit 120 can also calculate a second probability that maintenance work will occur for the target store equipment in the Q2 period as "4 / 10 x 100 = 40%." The prediction unit 120 can also calculate a third probability that maintenance work will occur for the target store equipment in the Q3 period as "3 / 10 x 100 = 30%." The prediction unit 120 can also calculate a fourth probability that maintenance work will occur for the target store equipment in the Q4 period as "1 / 10 x 100 = 10%." In this way, the prediction unit 120 can predict the probability of maintenance work occurring for the target store equipment for each of the multiple periods included in the unit period of the maintenance plan.

[0047] Then, the output unit 130 outputs the result of the prediction by the prediction unit 120 to an output device (step S110).

[0048] As described above, it is assumed that the prediction unit 120 predicts "how the probability that maintenance work will be required changes over time during the unit period of the maintenance plan." In this case, the output unit 130 outputs a screen such as that illustrated in FIG. 6 to the output device as a prediction result. FIG. 6 is a diagram showing an example of a screen output to the output device by the output unit 130. The screen illustrated in FIG. 6 uses a line graph to show how the probability of maintenance work occurring for the target store equipment changes over time. The screen illustrated in this figure allows the manager to easily understand the probability that maintenance work will be required by a certain point in time within the unit period of the maintenance plan.

[0049] As another example, suppose the prediction unit 120 predicts the probability that maintenance work will occur at the target store for each of multiple intervals (e.g., Q1 to Q4) included in the unit period of the maintenance plan. In this case, the output unit 130 outputs a screen such as that illustrated in FIG. 7 to the output device as a prediction result. FIG. 7 is a diagram showing an example of a screen output to the output device by the output unit 130. The screen illustrated in FIG. 7 uses a bar graph to show the probability that maintenance work will occur for the target store equipment in each interval. Using the screen illustrated in this figure, the manager can easily understand at what point within a specified period maintenance work is likely to be required.

[0050] In this embodiment, information indicating the probability that the next maintenance work will be required for the target store equipment is generated and output based on information on similar store equipment identified for the target store equipment. This information allows the manager to determine the accuracy of the prediction result regarding the timing when maintenance work will be required for the target store equipment.

[0051] Modification of the Second Embodiment The identification unit 110 may be configured to narrow down similar store equipment using attributes of the target store equipment. For example, the identification unit 110 may be configured to further use individual information about the target store equipment to narrow down at least one similar store equipment. Although not particularly limited, the "individual information about the target store equipment" includes manufacturer information, model number, year of manufacture, and number of years in operation. Narrowing down similar store equipment using common elements such as manufacturer, model, and operating time (number of years) can be expected to improve the accuracy of prediction results regarding maintenance work for the target store equipment.

[0052] The output unit 130 may be configured to output not only information about the target store equipment but also information about similar store equipment. For example, the output unit 130 may output, for example, in list format, information about the operating environment and maintenance history of each piece of store equipment identified as similar store equipment on the screens illustrated in FIGS. 6 and 7 . The manager can use the information about similar store equipment further displayed on the screen as additional information for judging the accuracy of the prediction results. Furthermore, the output unit 130 may output only information about similar equipment related to the selected location when a selection operation is received on the screen, for example, as illustrated in FIG. 8 . FIG. 8 illustrates the operation of the output unit 130 when a selection operation is received on the screen. When a selection operation is performed on the screen as illustrated in FIG. 8 , the output unit 130 identifies similar store equipment corresponding to the information about 3Q based on the position of the selected graph. Then, the output unit 130 further outputs information about the operating environment and maintenance history of the identified similar store equipment on the screen, as illustrated in FIG. 8 . This prevents the amount of information on the screen from increasing and making it difficult to see the necessary information.

[0053] Third Embodiment This embodiment has the same configuration as any of the above-described embodiments, except for the points described below.

[0054] The equipment management system 1 of this embodiment has the same functional configuration as the above-described embodiments (e.g., the configuration in FIG. 1 ). The prediction unit 120 of this embodiment is configured to further predict when the next maintenance work will be required for the target store equipment based on the maintenance history information of the target store equipment (first maintenance history information) and the maintenance history information of similar store equipment (second maintenance history information).

[0055] First, the prediction unit 120 calculates the frequency of maintenance work (maintenance interval) for each similar store equipment based on the maintenance history information of at least one similar store equipment identified by the identification unit 110. For example, assume that the information shown in FIG. 3 is stored in the database 30. Also assume that a store equipment with equipment ID "#0001" is identified as the target store equipment. In this case, the identification unit 110 identifies a store equipment with equipment ID "#0002" and a store equipment with equipment ID "#0004" as similar store equipment. In this case, the prediction unit 120 calculates the maintenance interval for the store equipment with equipment ID "#0002" to be "6 months." Similarly, the prediction unit 120 calculates the maintenance interval for the store equipment with equipment ID "#0004" to be "5 months and 20 days" based on the maintenance history information for the store equipment with equipment ID "#0004."

[0056] The prediction unit 120 then predicts when the next maintenance work will occur for the target store equipment based on the maintenance intervals calculated for each similar store equipment and the maintenance history information for the target store equipment. For example, the prediction unit 120 identifies the most recent maintenance date and time for the target store equipment as "May 1, 2022" based on the maintenance history information for store equipment with equipment ID "#0001." The prediction unit 120 then predicts the start of the period when the next maintenance work will occur for the target store equipment as "October 21, 2022" based on the most recent maintenance date and time for the target store equipment and the maintenance interval for store equipment with equipment ID "#0004." Similarly, the prediction unit 120 predicts the end of the period when the next maintenance work will occur for the target store equipment as "November 1, 2022" based on the most recent maintenance date and time for the target store equipment and the maintenance interval for store equipment with equipment ID "#0002." As a result, the prediction unit 120 obtains the period from "October 21, 2022" to "November 1, 2022" as the time when the next maintenance work will occur for the target store equipment. In addition, the prediction unit 120 may, for example, calculate a statistical value (average value, median value, etc.) of the maintenance intervals calculated for similar store equipment, and use the statistical value to predict the time when the next maintenance work will occur for the target store equipment.

[0057] In this embodiment, the output unit 130 further outputs information on the timing of the next maintenance work to be performed on the target store equipment to the output device. For example, the output unit 130 reads out pre-prepared calendar data and identifies the date and time corresponding to the predicted time on the calendar data. The output unit 130 then visualizes the timing of the next maintenance work to be performed on the target store equipment by adding a predetermined mark to the location of the identified date and time or by highlighting the location of the identified date and time. This makes it easier for the manager to consider the timing of performing maintenance work on the target store equipment.

[0058] Although the embodiments of the present invention have been described above with reference to the drawings, these are merely examples of the present invention, and various configurations other than those described above can also be adopted.

[0059] In addition, although the flowcharts used in the above description show multiple steps (processes) in a sequential order, the order of steps executed in each embodiment is not limited to the order shown. In each embodiment, the order of the steps shown in the drawings can be changed as long as it does not cause any problems in terms of content. Furthermore, the above-described embodiments can be combined as long as the content is not contradictory.

[0060] Some or all of the above embodiments may be described as, but are not limited to, the following supplementary notes: 1. An equipment management system comprising: an identification means for identifying at least one second piece of store equipment that operates in an environment similar to the operating environment of a first piece of store equipment by referencing a storage means that stores operating environment information indicating the operating environment of the store equipment and maintenance history information indicating the history of maintenance work carried out on the store equipment, in association with each piece of store equipment; a prediction means for acquiring first maintenance history information on the first store equipment and second maintenance history information on the at least one piece of second store equipment from the storage means, and predicting the probability that the next maintenance work will occur for the first store equipment within a predetermined period based on the first maintenance history information and the second maintenance history information; and an output means for outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device. 2. An equipment management system according to 1., wherein the prediction means further predicts when the next maintenance work will occur for the first store equipment based on the first maintenance history information and the second maintenance history information. 3. The equipment management system according to 2., wherein the prediction means, when the second maintenance history information is acquired for two or more of the second store equipment, calculates an average frequency of maintenance work based on the second maintenance history information, and predicts when the next maintenance work will occur for the first store equipment based on the average frequency of maintenance work and the first maintenance history information. 4. The equipment management system according to any one of 1. to 3., wherein the specified period is determined based on a unit period of a maintenance plan for the store equipment. 5. The equipment management system according to 4., wherein the prediction means predicts a temporal progression of the probability in the unit period, and the output means outputs the predicted result of the temporal progression of the probability to the output device. 6. The equipment management system according to 4., wherein the prediction means divides the unit period into a plurality of intervals, predicts the probability for each interval, and the output means outputs the probability predicted for each interval to the output device. 7. The equipment management system according to 1. to 6., wherein the operating environment information includes information on at least one of temperature, humidity, amount of suspended particles, and amount of oil. 10. The facility management system according to claim 9, wherein:8. The equipment management system according to any one of 1. to 7., wherein the identification means further uses individual information about the first store equipment to identify the at least one second store equipment. 9. The equipment management system according to any one of 1. to 8., wherein the output means further outputs information about the at least one second store equipment to the output device. 10. 11. An equipment management method comprising: at least one computer referring to a storage means that stores operating environment information indicating the operating environment of store equipment and maintenance history information indicating the history of maintenance work carried out on store equipment, in association with each piece of store equipment, to identify at least one second piece of store equipment that operates in an environment similar to that of a first piece of store equipment; acquiring first maintenance history information for the first store equipment and second maintenance history information for the at least one piece of second store equipment from the storage means; predicting the probability that the next maintenance work will occur for the first store equipment within a predetermined period based on the first maintenance history information and the second maintenance history information; and outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device. 12. An equipment management method according to 10., including: the at least one computer further predicting when the next maintenance work will occur for the first store equipment based on the first maintenance history information and the second maintenance history information. The equipment management method according to 11., including the at least one computer: when the second maintenance history information is acquired for two or more of the second store equipment, calculates an average frequency of maintenance work based on the second maintenance history information, and predicts when the next maintenance work will be performed for the first store equipment based on the average frequency of maintenance work and the first maintenance history information. 13. The equipment management method according to any one of 10. to 12., wherein the specified period is decided based on a unit period of a maintenance plan for store equipment. 14. The equipment management method according to 13., including the at least one computer: predicts a transition over time of the probability in the unit period, and outputs a result of the prediction of the transition over time of the probability to the output device.15. The equipment management method set forth in 13., including the at least one computer dividing the unit period into a plurality of intervals, predicting the probability for each interval, and outputting the probability predicted for each interval to the output device. 16. The equipment management method set forth in any one of 10. to 15., wherein the operating environment information includes information on at least one of temperature, humidity, amount of suspended particles, and amount of oil. 17. The equipment management method set forth in any one of 10. to 16., including the at least one computer further using individual information about the first store equipment to identify the at least one second store equipment. 18. The equipment management method set forth in any one of 10. to 17., including the at least one computer further outputting information about the at least one second store equipment to the output device. 19. 20. A non-transitory computer-readable recording medium storing a program that, when executed by at least one computer, causes the at least one computer to function as: an identification means that identifies at least one second piece of store equipment that operates in an environment similar to the operating environment of a first piece of store equipment by referencing a storage means that stores operating environment information that indicates the operating environment of the store equipment and maintenance history information that indicates the history of maintenance work carried out on the store equipment, in association with each piece of store equipment; a prediction means that acquires first maintenance history information about the first store equipment and second maintenance history information about the at least one piece of second store equipment from the storage means, and predicts the probability that the next maintenance work will occur for the first store equipment within a predetermined period based on the first maintenance history information and the second maintenance history information; and an output means that outputs the result of the prediction about the next maintenance work for the first store equipment to an output device. 21. The non-transitory computer-readable recording medium described in 19., wherein the prediction means further predicts when the next maintenance work will occur for the first store equipment based on the first maintenance history information and the second maintenance history information.21. The non-transitory computer-readable recording medium described in 20., wherein the prediction means, when the second maintenance history information is acquired for two or more of the second store equipment, calculates an average frequency of maintenance work based on the second maintenance history information, and predicts when the next maintenance work will occur for the first store equipment based on the average frequency of maintenance work and the first maintenance history information. 22. The non-transitory computer-readable recording medium described in any one of 19. to 21., wherein the specified period is determined based on a unit period of a maintenance plan for the store equipment. 23. The non-transitory computer-readable recording medium described in 22., wherein the prediction means predicts a temporal transition of the probability in the unit period, and the output means outputs the predicted result of the temporal transition of the probability to the output device. 24. The non-transitory computer-readable recording medium described in 22., wherein the prediction means divides the unit period into a plurality of intervals and predicts the probability for each interval, and the output means outputs the probability predicted for each interval to the output device. 25. The non-transitory computer-readable recording medium of any one of 19. to 24., wherein the operating environment information includes information on at least one of temperature, humidity, amount of suspended particles, and amount of oil. 26. The non-transitory computer-readable recording medium of any one of 19. to 25., wherein the identification means further uses individual information of the first store equipment to identify the at least one second store equipment. 27. The non-transitory computer-readable recording medium of any one of 19. to 26., wherein the output means further outputs information on the at least one second store equipment to the output device.

[0061] REFERENCE SIGNS LIST 1 Facility management system 10 Information processing device 20 Sensors 30 Database 40 Network 110 Identification unit 120 Prediction unit 130 Output unit 1000 Computer 1010 Bus 1020 Processor 1030 Memory 1040 Storage device 1050 Input / output interface 1060 Network interface

Claims

1. An equipment management system comprising: an identification means for identifying at least one second store equipment which operates in an environment similar to that of a first store equipment by referring to a storage means which stores operating environment information indicating the operating environment of the store equipment and maintenance history information indicating the history of maintenance work carried out on the store equipment, in correspondence with each piece of store equipment; a prediction means for acquiring first maintenance history information regarding the first store equipment and second maintenance history information regarding the at least one piece of second store equipment from the storage means, and predicting the probability that the next maintenance work will occur for the first store equipment within a specified period based on the first maintenance history information and the second maintenance history information; and an output means for outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device.

2. The equipment management system according to claim 1, wherein the prediction means further predicts when the next maintenance work will occur for the first store equipment based on the first maintenance history information and the second maintenance history information.

3. The equipment management system of claim 2, wherein the prediction means, when the second maintenance history information is obtained for two or more of the second store equipment, calculates an average frequency of occurrence of maintenance work based on the second maintenance history information, and predicts the time when the next maintenance work will occur for the first store equipment based on the average frequency of occurrence of maintenance work and the first maintenance history information.

4. An equipment management system according to any one of claims 1 to 3, wherein the specified period is determined based on a unit period of a maintenance plan for store equipment.

5. The facility management system according to claim 4, wherein the prediction means predicts the time progression of the probability in the unit period, and the output means outputs the result of the prediction of the time progression of the probability to the output device.

6. The facility management system according to claim 4, wherein the prediction means divides the unit period into a plurality of intervals and predicts the probability for each interval, and the output means outputs the probability predicted for each interval to the output device.

7. An equipment management system according to any one of claims 1 to 3, wherein the operating environment information includes information regarding at least one of temperature, humidity, amount of suspended particles, and amount of oil.

8. The equipment management system according to any one of claims 1 to 3, wherein the identification means further uses individual information of the first store equipment to identify the at least one second store equipment.

9. The facility management system according to any one of claims 1 to 3, wherein the output means further outputs information relating to the at least one second store facility to the output device.

10. An equipment management method comprising: at least one computer: referring to a storage means that stores operating environment information indicating the operating environment of store equipment and maintenance history information indicating the history of maintenance work carried out on the store equipment, in correspondence with each piece of store equipment, to identify at least one second piece of store equipment that operates in an environment similar to that of a first piece of store equipment; obtaining first maintenance history information regarding the first store equipment and second maintenance history information regarding the at least one piece of second store equipment from the storage means; predicting the probability that the next maintenance work will occur for the first store equipment within a specified period based on the first maintenance history information and the second maintenance history information; and outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device.

11. A non-transitory computer-readable recording medium storing a program that, when executed by at least one computer, causes the at least one computer to function as: an identification means for identifying at least one second store equipment operating in an environment similar to that of a first store equipment by referring to a storage means that stores operating environment information indicating the operating environment of store equipment and maintenance history information indicating the history of maintenance work carried out on the store equipment, in correspondence with each piece of store equipment; a prediction means for acquiring first maintenance history information regarding the first store equipment and second maintenance history information regarding the at least one piece of second store equipment from the storage means, and predicting the probability that the next maintenance work will occur for the first store equipment within a specified period based on the first maintenance history information and the second maintenance history information; and an output means for outputting the result of the prediction regarding the next maintenance work for the first store equipment to an output device.

Citation Information

Patent Citations

  • Maintenance support method and program

    JP2005182465A

  • Maintenance work timing determination device, maintenance work timing determination system, maintenance work timing determination method and program

    JP2014164322A

  • Deterioration level predicting system and deterioration level predicting method

    JP2020102097A