Failure analysis assistance system and failure analysis assistance method

The failure analysis support system addresses the challenge of analyzing control system abnormalities by guiding on-site maintenance with a structured approach to safely and efficiently investigate causes, prioritizing tasks and reducing safety risks, enhancing the efficiency and safety of on-site confirmation work in control systems.

WO2024225124A1PCT designated stage expired Publication Date: 2024-10-31HITACHI LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/015210
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2024-04-17
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

In control systems, especially in distribution warehouses, on-site maintenance personnel face challenges in efficiently and safely analyzing abnormalities due to limited measurement data, which can include equipment failures and security-related causes like cyber attacks, leading to increased safety risks and reduced efficiency in cause analysis.

Method used

A failure analysis support system that collects device monitoring data, detects abnormalities, estimates causes, analyzes safety impacts, and derives a confirmation work list to guide on-site maintenance personnel safely and efficiently investigate the cause, prioritizing tasks and reducing safety risks through safety measures and optimal execution order.

Benefits of technology

Enables on-site maintenance personnel to perform safe and efficient cause analysis by deriving necessary work, calculating task priorities, and notifying on-site personnel, thus reducing safety and security risks during on-site confirmation work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024015210_31102024_PF_FP_ABST
    Figure JP2024015210_31102024_PF_FP_ABST
Patent Text Reader

Abstract

According to the present invention, a failure analysis assistance system that assists failure analysis of a control system that comprises one or more apparatuses has an monitoring input unit that collects apparatus monitoring data related to the operating states of the apparatuses and accumulates the apparatus monitoring data at an apparatus monitoring log database, an abnormality detection unit that monitors the apparatus monitoring data to detect abnormalities at the control system, a cause inference unit that infers causes on the basis of detected abnormalities at the control system and an abnormality cause database that stores abnormalities at the control system in association with causes inferred from the abnormalities, a safety analysis unit that uses a system abnormal operation database that stores abnormalities at the control system in association with common cause events that have inferred causes as common causes, the working state of the control system, and safety effects that indicate the effects on the safety of work areas that arise in association with abnormalities at the apparatuses to analyze the effects on the safety of work for verifying inferred causes, a verification work derivation unit that uses inferred causes and common cause events to search for verification work that corresponds to the inferred causes and the common cause events from a verification work database that stores verification work that lists work for investigating whether inferred causes are actual causes in association with work areas at which the verification work is performed and derives the results of the search as a verification work list, and a verification work evaluation unit that evaluates the safety of verification work on the basis of the analysis results for the effects on safety and the verification work included in the verification work list and outputs a verification work list that reflects the results of the evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Fault analysis support system and fault analysis support method

[0001] The present invention relates to a fault analysis support system and a fault analysis support method for a control system.

[0002] There has been active development of technologies related to monitoring devices to streamline responses to incidents that occur in control systems. Because it takes time for on-site maintenance personnel who use the control system to analyze the incidents alone, monitoring devices monitor the system and instruct on-site maintenance personnel on how to respond, thereby improving efficiency.

[0003] The following Patent Document 1 discloses a technology in which a system monitoring device receives abnormality data from a control system, analyzes how to deal with the problem, and instructs on-site maintenance personnel on how to deal with the problem. Also, the following Patent Document 2 discloses a technology in which a monitoring system collects data from a control system and analyzes whether the cause of an incident is a cyber attack.

[0004] JP 2018-185712 A JP 2021-111003 A

[0005] A logistics warehouse system is composed of a control system that controls each device in the warehouse and a fault analysis support system that measures the operation data of each device and monitors the operating status of the entire control system or each device.

[0006] When an abnormality occurs in a control system, the measurement data uploaded to the fault analysis support system may not be sufficient to analyze the status of the control system.In addition, in order for on-site maintenance personnel to analyze the cause at the warehouse where the abnormality occurred, confirmation work such as collecting data such as operation logs and appearances of various devices may be required.

[0007] The causes of control system anomalies are not limited to equipment failures due to aging or other factors, but also include security-related causes such as cyberattacks and malware infections. When security issues are the cause, anomalies may occur simultaneously in multiple devices, increasing safety risks during on-site inspection work. In addition, while the confirmation work for cause analysis involves acquiring various data and operating devices, valid data may not be acquired depending on the order in which tasks are performed, which creates the issue of reducing the efficiency of cause analysis.

[0008] An object of the present invention is to provide a technique that enables on-site maintenance personnel to safely and efficiently carry out on-site inspection work when an abnormality is detected in a control system.

[0009] The fault analysis support system according to the present invention is a fault analysis support system that supports fault analysis of a control system consisting of one or more devices, and includes a monitoring input unit that collects device monitoring data related to the operating status of the devices and stores it in a device monitoring log database, an abnormality detection unit that monitors the device monitoring data to detect abnormalities in the control system, an abnormality cause database that stores abnormalities in the control system and causes inferred from the abnormalities in association with each other, a cause estimation unit that estimates a cause based on a detected abnormality in the control system, and a system abnormality database that stores, in association with each other, the abnormality of the control system, a common cause event having the inferred cause as a common cause, the operating status of the control system, and a safety impact that indicates an impact on safety in a work area caused by an abnormality in the device. The system is configured as a failure analysis support system characterized by having: a safety analysis unit that uses an operation database to analyze the impact on safety of the work to confirm the estimated cause; a confirmation work derivation unit that uses the estimated cause and the common cause event to search for confirmation works that correspond to the estimated cause and the common cause event from a confirmation work database that stores confirmation works that are listed to investigate whether the estimated cause is the true cause and the work area where the confirmation work is performed, in association with each other, and derives the search results as a confirmation work list; and a confirmation work evaluation unit that evaluates the safety of the confirmation work based on the analysis results of the impact on safety and the confirmation works included in the confirmation work list, and outputs the confirmation work list that reflects the evaluation results.

[0010] According to the present invention, when an abnormality in a control system is detected, an on-site maintenance worker can safely and efficiently carry out on-site confirmation work.

[0011] 1 is a diagram showing a state in which a fault analysis support system according to an embodiment of the present invention is connected to equipment in a logistics warehouse or information terminal equipment of a field maintenance worker via a communication network. FIG. 1 is a configuration diagram of a fault analysis support system according to an embodiment. FIG. 2 is a diagram showing an example of an equipment monitoring log database. FIG. 3 is a diagram showing an example of an abnormality cause database. FIG. 4 is a diagram showing an example of a system abnormal operation database. FIG. 5 is a diagram showing an example of a confirmation work database. FIG. 6 is a diagram showing an example of a safety measure database. FIG. 7 is a flowchart explaining the processing flow from when the fault analysis support system detects an abnormality in a control system to when it evaluates the safety of a work area in a logistics warehouse. FIG. 8 is a flowchart explaining the processing flow from when the fault analysis support system derives the confirmation work contents necessary for cause investigation to when it determines the execution order. FIG. 9 is a flowchart showing the processing flow from when a confirmation work list created by the fault analysis support system is displayed on a screen display unit viewed by a field maintenance worker, to when, based on the results of the confirmation work, the field maintenance worker analyzes the cause and re-creates the confirmation work list until the cause can be investigated. FIG. 10 is a diagram showing an example of a display of a confirmation work list on a screen display unit. FIG. 11 is a diagram showing an example of a hardware configuration of the fault analysis support system. FIG. 12 is a diagram showing an example of a field confirmation work list. FIG. 13 is a diagram showing an example of a field confirmation work list (after performing steps ST502 and ST503). FIG. 10 is a diagram showing an example of a site confirmation work list (after steps ST505 and ST506 are performed).

[0012] Hereinafter, embodiments of the present invention will be described with reference to the drawings. The examples are illustrative for explaining the present invention, and appropriate omissions and simplifications have been made for clarity of explanation. The present invention can be implemented in various other forms. Unless otherwise specified, each component may be singular or plural. The position, size, shape, range, etc. of each component shown in the drawings may not represent the actual position, size, shape, range, etc., in order to facilitate understanding of the invention. Therefore, the present invention is not necessarily limited to the position, size, shape, range, etc. disclosed in the drawings.

[0013] Although various types of information may be described using expressions such as "table," "list," and "queue" as examples, the various types of information may also be expressed using data structures other than these. For example, various types of information such as "XX table," "XX list," and "XX queue" may also be expressed as "XX information." When describing identification information, expressions such as "identification information," "identifier," "name," "ID," and "number" are used, but these are interchangeable.

[0014] When there are multiple components with the same or similar functions, they may be described using the same reference numeral with different subscripts. When there is no need to distinguish between these multiple components, the subscripts may be omitted.

[0015] In the embodiments, processing performed by executing a program may be described. Here, a computer executes the program using a processor (e.g., a CPU or a GPU) and performs processing defined by the program using storage resources (e.g., memory) and interface devices (e.g., communication ports). Therefore, the entity performing the processing by executing the program may be the processor. Similarly, the entity performing the processing by executing the program may be a controller, device, system, computer, or node having a processor. The entity performing the processing by executing the program may be any computing unit, and may include a dedicated circuit that performs specific processing. Here, the dedicated circuit may be, for example, an FPGA (Field Programmable Gate Array), an ASIC (Application Specific Integrated Circuit), or a CPLD (Complex Programmable Logic Device).

[0016] A program may be installed on a computer from a program source. The program source may be, for example, a program distribution server or a computer-readable storage medium. When the program source is a program distribution server, the program distribution server may include a processor and storage resources for storing the program to be distributed, and the processor of the program distribution server may distribute the program to be distributed to other computers. In addition, in the embodiments, two or more programs may be realized as one program, or one program may be realized as two or more programs.

[0017] <FIG. 1: Overview of a logistics warehouse system> FIG. 1 is a diagram showing how a fault analysis support system 20, which is one embodiment of the present invention, communicates with equipment in a logistics warehouse facility or with an information terminal device 80 of a field maintenance worker 10 via a communication network 70.

[0018] The communication network 70 is a data communication path using a communication protocol such as EtherCAT or Modbus. The logistics warehouse is also equipped with equipment such as an automatic transport device 30, an automatic transport device 40, a robot arm 50, and a conveyor device 60 that transports, loads, unloads, processes, and so on, for example, packages.

[0019] The fault analysis support system 20 is positioned as one of the subsystems provided in the WMS (Warehouse Management System) that manages the warehousing and shipping of goods in the logistics warehouse system 1000 and the WES (Warehouse Execution System) that controls the facilities and handles communication between devices.

[0020] Like the WES, the failure analysis support system 20 monitors the operating status of the control system 200, and when a failure occurs, performs analysis to determine the cause and provides information to the field maintenance personnel 10.

[0021] <Problem description> When an abnormality occurs in the control system 200, the measurement data uploaded to the fault analysis support system 20 is limited, and therefore, in some cases, confirmation work such as collecting data such as operation logs and appearances of various devices at the location where the abnormality occurred is required for the on-site maintenance worker 10 to analyze the cause.

[0022] The causes of abnormalities in the control system 200 are not limited to equipment failures due to aging or the like, but also include security-related causes such as cyber attacks and malware infections.

[0023] When such security issues are the cause, abnormalities may occur in multiple devices at the same time, which can increase safety risks during on-site inspection work.

[0024] Furthermore, the work of confirming the cause of a problem involves acquiring various data and operating equipment, but depending on the order in which the work is performed, it may not be possible to acquire valid data, which reduces the efficiency of the cause of the problem.

[0025] <Solution> Therefore, the failure analysis support system 20 in an embodiment of the present invention derives the tasks required to investigate the cause when an abnormality is detected in the control system 200, and enables on-site maintenance personnel to safely and efficiently analyze the cause based on the analysis results of the safety of each task and the dependencies between tasks. Furthermore, the system supports system failure analysis by calculating the priority of tasks and notifying the on-site maintenance personnel 10. By analyzing the cause of the failure in a remote environment, the system enables the on-site maintenance personnel 10 to efficiently perform the tasks required to investigate the cause on-site while reducing safety and security risks.

[0026] <Fig. 2: Configuration diagram of fault analysis system> Fig. 2 is a configuration diagram of a fault analysis support system 20 according to this embodiment. The fault analysis support system 20 according to this embodiment has a monitoring input unit 202, an abnormality detection unit 203, a cause estimation unit 204, a safety analysis unit 205, a confirmation work derivation unit 206, a confirmation work evaluation unit 207, a monitoring output unit 208, a device monitoring log database 210, an abnormality cause database 211, a system abnormal operation database 212, a confirmation work database 213, and a safety measure database 214. The screen display unit 701 is a display device such as a display of the information terminal device 80.

[0027] The abnormality detection unit 203 monitors equipment monitoring data including the operation logs of each control device 201 that constitutes the control system 200 and the system operation status indicating whether the control system 200 is operating, as well as on-site confirmation data obtained by the on-site maintenance worker 10 during confirmation work, to detect abnormalities (referred to as observed events) in the control system 200.

[0028] The cause estimation unit 204 estimates the cause based on the abnormality detected by the abnormality detection unit 203 (the estimated cause is referred to as the estimated cause), and derives events that occur with the estimated cause as a common cause (referred to as a common cause event).

[0029] The safety analysis unit 205 analyzes the impact on safety of observed events, presumed causes, and common cause events.

[0030] The confirmation task deriving unit 206 derives the confirmation tasks that the field maintenance personnel 101 must perform to investigate the occurrence of the event, and creates a confirmation task list.

[0031] The verification work evaluation unit 207 evaluates the safety of each verification work content based on the result of the impact analysis on safety and each verification work content, and outputs a verification work safety evaluation result. The verification work evaluation unit 207 also outputs a feasibility evaluation result of the verification work. Furthermore, the verification work evaluation unit 207 outputs a verification work safety evaluation result after the countermeasures have been taken and a feasibility evaluation result of the verification work after the countermeasures have been taken.

[0032] 3A to 3E are diagrams showing examples of databases used for analyzing system failures by the failure analysis support system 20 according to this embodiment. The diagrams show the data items and data contents of the databases (device monitoring log database 210, abnormality cause database 211, system abnormal operation database 212, confirmation work database 213, and safety measure database 214) shown in the configuration of the failure analysis support system 20 in FIG.

[0033] FIG. 3A is a diagram showing an example of the equipment monitoring log database 210. The equipment monitoring log database 210 is used by the fault analysis support system 20 to store data from the logistics warehouse site. The equipment monitoring log database 210 stores equipment monitoring data, including operation logs of each control device 201 constituting the control system 200 and a system operating status indicating whether the control system 200 is operating, as well as field confirmation data acquired by the field maintenance personnel 10 during confirmation work. For example, the database is configured with information such as the target collection date, the target device, and a sender for identifying whether the data was sent from the device or collected by the field maintenance personnel 10. In practice, in addition to this information, the entities of the above-mentioned equipment monitoring data and field confirmation data are stored in association with this information.

[0034] 3A, for example, the collection date "YYYY year MM month DD day" indicating the timing when the data was acquired, the target device "Device A" indicating the target from which the data was acquired, and the sender "Device A" indicating the location of the target from which the data was acquired are stored in association with each other, and further, the data entities acquired during monitoring are associated with these pieces of information and stored as device monitoring data. As with the device monitoring data, the data entities acquired during on-site confirmation data are also stored in association with each of these items.

[0035] 3B is a diagram showing an example of the abnormality cause database 211. The abnormality cause database 211 is used by the cause estimation unit 204 to estimate the cause of a detected abnormality in the control system 200. The abnormality cause database 211 contains information on observed events and causes (estimated causes) estimated from the observed events.

[0036] In FIG. 3B, for example, "no response from device A" is stored as an observed event of a device, and "cybersecurity attack" and "failure of device A" are stored in association with each other as the presumed causes of the observed event.

[0037] 3C is a diagram showing an example of the system abnormal operation database 212. The system abnormal operation database 212 is used by the safety analysis unit 205 to investigate further events that may occur due to the same cause. The system abnormal operation database 212 contains information such as the above-mentioned observed events and common cause events, information on the system operation status indicating whether the control system 200 is operating, and safety impact information indicating the impact on safety of work areas in the logistics warehouse that occurs due to an abnormality in the control system 200.

[0038] 3C shows, for example, when "no response from device A" is observed as an observed event and the system operation status is "all operational," events that are causally related to the observed event "no response from device A," i.e., possible behaviors, include "abnormal operation of device A," "abnormal operation of device B," and "abnormal operation of device C." Furthermore, among these behaviors, when "abnormal operation of device A" or "abnormal operation of device B" occurs, there is no impact on safety, whereas when "abnormal operation of device C" occurs, there is concern about an increased safety risk in work area 1 (for example, the danger of work in work area 1 due to a collision with device C under control system 200 increases above a certain level).

[0039] 3D is a diagram showing an example of the confirmation task database 213. The confirmation task derivation unit 206 uses the confirmation task database 213 to derive on-site confirmation tasks for analyzing the true cause of a system abnormality. The confirmation task database 213 includes information such as the above-mentioned presumed causes and common cause events, confirmation tasks that list tasks for investigating whether the presumed causes are the true cause, the work area where the confirmation task is performed, the work procedure for the confirmation task, the equipment used for the confirmation task, the data collected in the confirmation task, and the dependency relationship between the confirmation task and other confirmation tasks.

[0040] 3D shows that, for example, if a "cybersecurity attack" is inferred as the presumed cause and "abnormal operation of device A" is derived as the common cause event, the operation log of device A is collected in work area 1 as a confirmation task to determine whether the presumed cause is the true cause. This confirmation task is performed using a USB memory and an information terminal device 80 that serves as the operation terminal for device A. The procedure involves first connecting the USB memory to device A and saving the operation log of device A dated DD (month MM, year YYYY). Furthermore, this confirmation task is constrained to be performed before the restart of device A due to its dependency on other confirmation tasks.

[0041] FIG. 3E is a diagram showing an example of the safety measures database 214. The safety measures database 214 is used by the verification task evaluation unit 207 to investigate countermeasures for reducing the risk of verification tasks with high safety risks. The safety measures database 214 includes information on the verification tasks described above, countermeasures for reducing the safety risks of the verification tasks, and the expected effects. Examples of safety measures include rearranging the execution order of multiple verification tasks stored in the verification task list, moving equipment (e.g., equipment A, equipment C) operated in the verification task, and suspending operation of equipment with high safety risks or the control system 200 including the equipment based on the results of a safety impact analysis. Furthermore, the effects of these measures include information on changes in risk, such as changing a safety risk from "high" to "low." The verification task evaluation unit 207 reduces safety risks by performing at least one of these measures.

[0042] FIG. 3E shows that, for example, as a safety measure for the confirmation work of collecting the operation log of device A, measures are required to stop the abnormal operation of device C and reduce the safety risk in work area 1.

[0043] The equipment monitoring log database 210 is configured by accumulating data collected from the control system 200. The data for each of the other databases (210 to 214) shown in Figures 3A to 3E is prepared based on the results of a prior analysis of the safety of the control system 200 and the logistics warehouse site configuration, such as events to be observed in advance and their presumed causes, events that may occur due to common causes, and their impact on safety.

[0044] <Figure 4: Safety Risk Assessment Flowchart> Figure 4 is a flowchart explaining the processing flow from when the fault analysis support system 20 detects an abnormality in the control system 200, infers the cause, and evaluates events that may occur due to the cause and the safety of the work area in the logistics warehouse due to those events. Each step in Figure 4 will be explained below.

[0045] (Figure 4: Step ST401) Detection of abnormalities in the control system The abnormality detection unit 203 monitors the equipment monitoring data received by the monitoring input unit 202, which includes the operation logs of each control device 201 that constitutes the control system 200 and the system operation status indicating whether the control system 200 is operating, and detects abnormalities in the control system 200.

[0046] (FIG. 4: Step ST402) Cause Estimation The cause estimation unit 204 estimates possible causes based on the abnormality detected by the abnormality detection unit 203. The estimated cause (estimated cause) is output. This will be explained in detail below.

[0047] When the cause estimation unit 204 receives equipment monitoring data including an observed event and a system operating status from the anomaly detection unit 203, it searches the anomaly cause database 211 for an estimated cause of the anomaly using the system operating status and the observed event as conditions. The cause estimation unit 204 determines a cause that meets the search conditions as an estimated cause that may have caused the observed event. For example, if the control system 200 is operating normally but device A is unresponsive, the cause estimation unit 204 reads the equipment monitoring data included in the device monitoring log database 210 shown in FIG. 3A and references the anomaly cause database 211 shown in FIG. 3B to output "cybersecurity attack" or "device A failure" as the estimated cause of the observed event.

[0048] (FIG. 4: Step ST403) Identifying Common Cause Events The cause estimation unit 204 derives events (referred to as common cause events) other than the observed events that may occur due to the estimated causes. This will be explained in detail below.

[0049] The cause estimation unit 204 searches for events other than the observed event in the anomaly cause database 211 using the estimated cause estimated in step ST402 and the system operating status as conditions. The cause estimation unit 204 determines the cause that meets the search conditions as the estimated cause that may have caused the observed event.

[0050] For example, consider a case where the cause estimation unit 204 detects a communication anomaly between the equipment of the control system 200 and the fault analysis support system 20, indicating that the operating status of the equipment cannot be monitored (no response from equipment A), as an observed event. In this case, possible presumed causes include not only equipment failure due to aging or other factors, but also security-related causes such as cyberattacks and malware infections. While the observed event is a communication anomaly with the equipment, common cause events include an operational anomaly due to equipment failure or unintended operation due to security factors. In FIG. 3B , for example, if "cybersecurity attack" and "failure of equipment A" are determined as presumed causes for equipment A, which is the observation target, in ST402, a "cybersecurity attack," similar to that of equipment A, is stored as the presumed cause for equipment B, which is a device other than the target device. Therefore, the cause estimation unit 204 derives "cybersecurity attack" as the common cause event for equipment A and equipment B. The cause estimation unit 204 outputs the observed event (no response from device A), the common cause event (cybersecurity attack), and the system operating status (all control systems 200 are in a normal state). If the same information is stored for device C in the anomaly cause database 211, the cause estimation unit 204 outputs "cybersecurity attack" as the common cause event for devices A to C, and outputs the system operating status (all control systems 200 are in a normal state).

[0051] (FIG. 4: Step ST404) Analysis of Impact on Safety The safety analysis unit 205 analyzes the impact on safety of the estimated causes estimated in ST402 and the common cause events derived in ST403. This will be explained in detail below.

[0052] The safety analysis unit 205 receives information on observed events, common cause events, and system operating status from the cause estimation unit 204, and uses this information to search for impacts on safety on work areas within the logistics warehouse from the system abnormal operation database 212. The safety analysis unit 205 evaluates the safety of each work area using search results that correspond to the content of each piece of information.

[0053] Examples of impacts on safety include changes in the level of danger in specific areas within a logistics warehouse, or the presence or absence of such changes. Specifically, transport equipment moving through work area 1 may perform unintended operations due to observed events or common cause events, potentially colliding with or harming equipment or workers in work area 1. Taking such cases into consideration, the system abnormal operation database 212 evaluates the safety of the work area as "increased safety risk in work area 1" (i.e., there is an impact that reduces safety). Therefore, in the case of an observed event (no response from device A), a common cause event (in this example, abnormal operation of device C), and the system operating status (all control systems 200 are in a normal state), the safety analysis unit 205 outputs a safety impact of "increased safety risk in work area 1" corresponding to this information. Although not illustrated here, the case where the common cause event is a "cybersecurity attack" is also defined in the system abnormal operation database 212.

[0054] Through the above processing flow, the fault analysis support system 20 detects an abnormality in the control system 200 in the logistics warehouse, and then the fault analysis support system 20 estimates the cause of the abnormality and analyzes events that occur due to a common cause, and performs a safety assessment of the work area in the logistics warehouse that changes depending on the abnormality detected as an observed event and the common cause event.

[0055] <FIG. 5: Flowchart from deriving confirmation tasks to determining the execution order of the confirmation tasks> FIG. 5 is a flowchart illustrating the flow of processing performed by the fault analysis support system 20 from deriving the contents of the confirmation tasks required for cause investigation to determining the execution order.

[0056] (FIG. 5: Step ST501) Deriving Confirmation Work Necessary for Cause Investigation The confirmation work deriving unit 206 derives confirmation work for the field maintenance worker 10 that is necessary to investigate whether the estimated cause is the true cause.

[0057] The confirmation work derivation unit 206 references the confirmation work database 213 and outputs a confirmation work list for investigating the occurrence status and occurrence process of the presumed causes, observed events, and common cause events output in each process from step ST401 to step ST404. Based on the confirmation work list output by the confirmation work derivation unit 206, the field maintenance worker 10 performs confirmation work such as checking device logs, communication logs between devices, visual appearance conditions, conducting diagnostic tests, and collecting data.

[0058] For example, if the observed event is a communication abnormality, the confirmation task derivation unit 206 derives a confirmation task list, such as collecting communication logs between devices, diagnosing a communication interface failure, or collecting operation logs of devices that are unable to communicate.

[0059] Information on presumed causes, observed events, common cause events, and the necessary confirmation tasks are contained in the confirmation task database 213. The confirmation task derivation unit 206 uses the input information on presumed causes, observed events, and common cause events to search the confirmation task database 213 for confirmation tasks stored in association with the presumed causes and common cause events. The matching search results are compiled into a list and output as a confirmation task list.

[0060] For example, the confirmation task derivation unit 206 searches the confirmation task database 213 for a confirmation task list for investigating the true cause of (1) a cybersecurity attack and (2) a failure of device A, which are stored as presumed causes. In this search, the record 301 is searched. An example of the search result is shown in the on-site confirmation task list 901 in FIG. 9 .

[0061] FIG. 9 is a diagram showing an example of an on-site confirmation work list 901. As shown in FIG. 9, the on-site confirmation work list 901 associates an order indicating the order in which the confirmation work is to be performed, a status indicating the implementation status of the confirmation work, and the same items as those in the confirmation work database 213 described above, as well as items indicating the safety risk when performing the confirmation work and the feasibility indicating whether the confirmation work can be performed in light of the safety risk. The order, status, safety risk, and feasibility items described above are recorded in subsequent processing. The list obtained by the above search corresponds to record 9011 of the on-site confirmation work list 901. In FIG. 9, the above lists are output for all of the estimated causes, observed events, and common cause events output in each processing from step ST401 to step ST404 in FIG. 4 (a total of four records).

[0062] (FIG. 5: Step ST502) Evaluating Safety of Confirmation Work The confirmation work evaluation unit 207 evaluates the safety of each confirmation work included in the confirmation work list derived in step ST501.

[0063] The confirmation work evaluation unit 207 searches the confirmation work database 213 for the work area of ​​each confirmation work included in the confirmation work list. The confirmation work evaluation unit 207 compares the work area found by this search with the safety evaluation result of each work area evaluated in step ST404, evaluates the safety of each confirmation work, and outputs the evaluation result as the confirmation work safety evaluation result.

[0064] For example, the confirmation task evaluation unit 207 identifies the confirmation task "Device A operation log collection" in the on-site confirmation task list 901 shown in FIG. 9 and the task area "Task area 1" corresponding to the confirmation task in the confirmation task database 213 shown in FIG. 3D. The confirmation task evaluation unit 207 compares the confirmation task "Device A operation log collection" with the safety impact "Increased safety risk in task area 1" output in ST404, and evaluates that performing the confirmation task in task area 1 will have the impact of increasing the safety risk. While the confirmation task "Device A operation log collection" has been described here, the same applies to other confirmation tasks. That is, if the confirmation task in the on-site confirmation task list 901 shown in FIG. 9 is "Device C operation log collection" and the safety impact "Increased safety risk in task area 1" is output in ST404, the confirmation task evaluation unit 207 evaluates that performing the confirmation task in task area 1 will have the impact of increasing the safety risk, just as in the case of the confirmation task "Device A operation log collection."

[0065] The confirmation work evaluation unit 207 sets safety standards in advance and evaluates the safety risk. For example, three levels of "high, medium, and low" are set as the criteria for determining the level of safety risk, with "high" representing a level that could harm people, "medium" representing a level that could hit something but not break it, and "low" representing a level that would not have an impact on the outside. If the level required for safety in work area 1 is a predetermined high level of safety risk that could harm people, the confirmation work evaluation unit 207 evaluates the safety risk of the confirmation work as "the confirmation work in work area 1 has a high safety risk."

[0066] (FIG. 5: Step ST503) Evaluating Feasibility of Confirmation Work Before Countermeasures Are Taken The confirmation work evaluation unit 207 evaluates the feasibility of each confirmation work using the confirmation work safety evaluation result, which is the processing result of step ST502.

[0067] The confirmation work evaluation unit 207 evaluates the feasibility of the confirmation work by setting criteria in advance for determining whether the confirmation work can be performed. For example, if the safety risk described in step ST502 is expressed in three levels of "high, medium, and low," the confirmation work is evaluated as "feasible" if the safety risk is "medium" or "low," and as "not feasible" otherwise. The evaluation result of feasibility is output as the evaluation result of the feasibility of the confirmation work.

[0068] An example of an on-site confirmation work list created when steps ST502 and ST503 are performed is shown in Fig. 10. In Fig. 10, it can be seen that the processing of steps ST502 and ST503 is performed, whereby the safety risk and feasibility items are evaluated, and the results of the evaluation are written and reflected in the confirmation work list, which is output.

[0069] For example, among the confirmation tasks identified in the on-site confirmation task list 901, it can be determined that the confirmation task in task area 1 poses an increased safety risk for task area 1 based on the data on common cause events and safety impacts in the system abnormal operation database 303. Therefore, the confirmation task evaluation unit 207 evaluates the safety risk as "high." On the other hand, using the same approach, the confirmation task evaluation unit 207 evaluates the safety risk of other tasks to be performed in task area 2 as "low." Furthermore, the confirmation task evaluation unit 207 refers to the criteria in step ST503 and evaluates the feasibility of tasks with a "high" safety risk as "not feasible," creating an on-site confirmation task list 1001 for which no safety measures are to be taken.

[0070] (Figure 5: Step ST504) Setting and re-evaluating safety measures The confirmation work evaluation unit 207 sets safety measures for confirmation work that is determined to be "unfeasible" in the feasibility evaluation result of the confirmation work, which is the processing result of step ST503, and re-evaluates the safety risk and feasibility.

[0071] The confirmation work evaluation unit 207 searches the safety measures database 214 for safety measures for the confirmation work that has been evaluated as having a high safety risk and being unfeasible, based on the confirmation work safety evaluation result output in step ST502 and the confirmation work feasibility evaluation result output in step ST503, and selects effective measures.The confirmation work evaluation unit 207 then reevaluates the safety risk caused by the measures and outputs the result as the confirmation work safety evaluation result after the measures have been taken.Furthermore, it reevaluates feasibility based on the reevaluated safety risk, and outputs the result as the feasibility evaluation result for the confirmation work after the measures have been taken.

[0072] For example, the confirmation task evaluation unit 207 evaluates the confirmation task "collect device A operation log" in task area 1 as having a safety risk of "high" and a feasibility of "not feasible." Therefore, the safety measure database 214 shown in Fig. 3E is referenced, and the safety measure corresponding to the confirmation task "collect device A operation log" is selected as "stop abnormal operation of device C and reduce the safety risk in task area 1."

[0073] When the on-site maintenance worker 10 checks the safety measures and performs "stopping the abnormal operation of device C," the confirmation work evaluation unit 207 again performs steps ST502 and ST503. At this time, in ST502, the safety evaluation results of each work area evaluated in step ST404 are again referenced. In this reference, the confirmation work evaluation unit 207 requests the safety analysis unit 205 to perform step ST404 again. In accordance with this request, the safety analysis unit 205 performs an impact analysis on safety at the current time. In this example, since the on-site maintenance worker 10 checks the safety measures and performs "stopping the abnormal operation of device C," the "abnormal operation of device C" has been eliminated as a common cause event. Therefore, the safety analysis unit 205 returns a result of "none" as the safety impact to the confirmation work evaluation unit 207.

[0074] The confirmation work evaluation unit 207 performs step ST502 in accordance with the safety evaluation received from the safety analysis unit 205, and evaluates that if the confirmation work "Device A operation log collection" is performed in work area 1, the safety risk will be reduced to a certain extent and the level will be "low." Furthermore, the confirmation work evaluation unit 207 performs step ST503 and evaluates the confirmation work as "feasible" in accordance with the above-mentioned criteria. In this example, the confirmation work "Device A operation log collection" in work area 1 is reevaluated as having a safety risk of "low" and a feasibility of "feasible."

[0075] (FIG. 5: Step ST505) Analyzing Dependencies Between Confirmation Tasks In the processes up to this point, the confirmation task evaluation unit 207 has evaluated the safety risk and feasibility of each confirmation task included in the on-site confirmation task list 901, and has further re-evaluated it. In the next process, the confirmation task evaluation unit 207 examines the dependencies between each confirmation task included in the confirmation task list. Using the confirmation task database 213 shown in FIG. 3D, the confirmation task evaluation unit 207 examines the work procedure indicating the specific work content of each confirmation task and the impact on other tasks.

[0076] From the perspective of dependency among verification tasks, it is important to consider whether the order in which verification tasks are performed will interfere with other verification tasks, or whether they can be performed if the order is changed. Another important point is whether the data to be collected by a verification task will be changed or deleted by other verification tasks. A specific example of dependency is, "Other verification tasks involve reboots and test operations. These reboots and test operations may change or delete data in memory. Therefore, it is necessary to collect data in memory before these reboots and test operations."

[0077] The confirmation work evaluation unit 207 refers to the item "Dependency with other confirmation work" stored in the confirmation work database 213 shown in FIG. 3D and analyzes the contents of that item, and also reads and analyzes the contents of all of the "Work Procedure" items for each confirmation work. From the results of these analyses, the confirmation work evaluation unit 207 determines the chronological order of each work procedure, thereby determining the precedence relationship of each confirmation work. The confirmation work evaluation unit 207 checks the dependency relationships as described above and outputs the results as dependency relationship check results.

[0078] (FIG. 5: Step ST506) Determining the Execution Order of Confirmation Works The confirmation work evaluation unit 207 determines the execution order of each confirmation work for which the feasibility evaluation and dependency check have been performed. The confirmation work evaluation unit 207 uses the basic criteria for selecting priority as follows: highly evaluate work that has a low risk in terms of safety, is feasible, and has no dependency with other work, or that should precede other work in terms of dependency, and selects from these work.

[0079] The following method is an example of determining the execution order. First, the confirmation task evaluation unit 207 (1) selects, as the tasks to be executed with priority, tasks that do not have dependencies on other tasks from among the confirmation tasks that do not require safety measures, have low safety risks, and have been evaluated as "feasible" for feasibility. Next, the confirmation task evaluation unit 207 (2) selects, as the tasks to be executed in order of priority in terms of dependencies from among the tasks that have been evaluated as "feasible" for feasibility after safety measures have been implemented and safety risks have been reduced. The confirmation tasks selected in (2) are confirmation tasks whose safety risks and feasibility have been reevaluated in steps ST502 and ST503 described above.

[0080] FIG. 11 shows an example of a site confirmation task list created when steps ST505 and ST506 are performed. For example, the confirmation task evaluation unit 207 identifies a confirmation task that poses a high safety risk and is therefore not feasible. For the identified confirmation task, the confirmation task evaluation unit 207 adds a procedure to stop the operation of device C based on the safety measures in the safety measures database 214 to ensure the safety of work area 1, which is a factor in increasing the safety risk. In FIG. 11 , "(1) Operation Stopped for Safety Measures" is added to the record with the order "2." Adding this procedure reduces the safety risk in work area 1, making all tasks executable. In other words, when reevaluating the safety risk and feasibility described in step ST504, a site confirmation task list 1101 such as that shown in FIG. 11 is output. The field maintenance worker 10 refers to this list and performs the procedure for the confirmation task (in this case, for device C, the procedure "(1) Operation Stopped for Safety Measures" of the confirmation task "Fault Diagnosis and Log Collection for Device C"). As a result, the safety risk of other confirmation tasks performed in work area 1 (in this example, confirmation tasks in orders "3" and "4") becomes "low" and the feasibility becomes "feasible."

[0081] In this example, the confirmation work evaluation unit 207 prioritizes log collection for device B, which has no execution dependency (order 1), and then performs fault diagnosis and log collection for device C, including safety measures procedures (order 2). Furthermore, when collecting logs for device A, the confirmation work evaluation unit 207 performs operation log collection for device A before the restart, due to the dependency of collecting logs before the restart of device A (order 3). Finally, the confirmation work evaluation unit 207 performs operation log collection after the restart of device A (order 4).

[0082] <Figure 6: Flowchart from screen output of confirmation work to re-analysis based on confirmation results> Figure 6 is a diagram showing a flowchart from when the confirmation work list created as described above is displayed on the screen display unit 701 of the information terminal device 80, to when the confirmation work list is recreated based on the results of the confirmation work by the on-site maintenance worker 10.

[0083] (FIG. 6: Step ST601) Screen Display of Confirmation Work The monitoring output unit 208 receives the confirmation work list including the execution order, which is the output of step ST506, and sends the confirmation work list to the screen display unit 701 of the information terminal 80. The screen display unit 701 displays the confirmation work list to the field maintenance worker 10.

[0084] <Fig. 7: Display example of confirmation work list on screen display unit> Fig. 7 is a diagram showing an example of a confirmation work list displayed on the screen display unit 701. The items displayed on the screen display unit 701 include some or all of the items in the on-site confirmation work list described using Figs. 9 to 11.

[0085] (FIG. 6: Step ST602) Confirmation Work and Upload to the Failure Analysis Support System The field maintenance worker 10 checks the confirmation work list displayed on the screen display unit 209 and understands the confirmation work required for cause analysis. The field maintenance worker 10 performs the confirmation work in the order of the confirmation work displayed on the screen display unit 701. In response to an operation from the field maintenance worker 10, the screen display unit 701 of the information terminal device 80 uploads work result data (referred to as field confirmation data) acquired from the devices and systems in connection with the performed confirmation work to the failure analysis support system 20. For example, in response to an operation from the field maintenance worker 10, the screen display unit 701 acquires log data of device A. The field maintenance worker 10 connects a recording medium such as a USB memory to device A, and the control device 201 connected to device A transmits the log data of device A to the monitoring input unit 202 of the failure analysis support system 20 and records it in the USB memory. The monitoring input unit 202 records the transmitted log data in the device monitoring log database 210 of the failure analysis support system 20 .

[0086] When the log data is acquired and one confirmation task is completed, the screen display unit 209 rewrites the status of the task in the confirmation task list from "not yet performed" to "completed." The screen display unit 209 can perform this rewriting by receiving input from the field maintenance worker 10 indicating that all tasks included in the task procedures in the field confirmation task list have been performed. Note that the status may also be updated by the field maintenance worker 10 manually operating the field confirmation task list when the data is uploaded. The screen display unit 209 recreates a new field confirmation task list consisting of confirmation tasks other than the confirmation tasks whose updated status has been set to "completed" from the field confirmation task list with the updated status, and displays this on the screen. This allows the field maintenance worker 10 to be presented with a new field confirmation task list that includes only incomplete confirmation tasks, excluding completed confirmation tasks.

[0087] (FIG. 6: Step ST603) Cause Analysis Using Confirmation Data and Reanalysis of Confirmation Work The fault analysis support system 20 performs cause analysis using the transmitted log data. The fault analysis support system 20 checks the occurrence status of common cause events and confirms the accuracy of the estimated cause. Depending on whether or not a common cause event has occurred, it narrows down the possible estimated causes and limits the confirmation work content. In other words, by newly storing the transmitted log data in the equipment monitoring log database 210, the fault analysis support system 20 can execute each process from FIG. 4 onwards, such as control system anomaly detection, cause estimation, and investigation of the root cause, based on the log obtained as a result of the completed confirmation work. The log includes equipment monitoring data including the operation log of the control device 201 and the system operating status of the control system 200, as well as on-site confirmation data obtained by the on-site maintenance worker 10 during the confirmation work.

[0088] 8 shows an example of the hardware configuration of the failure analysis support system 20. The basic configuration of the failure analysis support system 20 includes a CPU (Central Processing Unit) 801 that executes programs and the like, a ROM (Read Only Memory) 802 that records programs, tables, program data, and the like that implement each function, a volatile RAM (Random Access Memory) 803 that saves information such as files, storage 804 that records databases, and the like, an input device 805 that serves as an interface for human operation input, and the like, a display device 806 that displays an operation screen, data, and the like, and a network interface 807 that communicates with the control system 200.

[0089] Each functional unit of the CPU 801 can be configured using a circuit device that implements that function, or can be configured by the CPU 801 executing software that implements that function.

[0090] The control device 201 and the information terminal device 80 may also be configured by the computer shown in FIG.

[0091] <Summary> By executing the processes from the control system anomaly detection in step ST401 to the confirmation work screen display in step ST601, when an anomaly in the control system is detected, on-site maintenance personnel can safely and efficiently perform on-site confirmation work. Furthermore, by repeatedly executing the processes from the control system anomaly detection in step ST401 to the reanalysis in step ST603, it becomes possible to proceed with the confirmation work and cause investigation while maintaining safety and taking into consideration the dependencies between the confirmation work.

[0092] As described above, according to the fault analysis support system of this embodiment, when an abnormality in a control system is detected, the on-site inspection work required to investigate the cause is derived, and safety measures and work priorities for carrying out the inspection work safely and efficiently are notified to the on-site maintenance personnel, thereby enabling the on-site maintenance personnel to carry out the on-site inspection work safely and efficiently.

[0093] For example, as explained using steps ST501 to ST503 in FIG. 5 , a fault analysis support system 20 that supports fault analysis of a control system 200 consisting of one or a plurality of devices includes a monitoring input unit 202 that collects device monitoring data related to the operating states of the devices and accumulates it in a device monitoring log database 210, an abnormality detection unit 203 that monitors the device monitoring data and detects an abnormality in the control system, an abnormality cause database 211 that associates and stores an abnormality in the control system with a cause estimated from the abnormality, a cause estimation unit 204 that estimates a cause based on the detected abnormality in the control system, and a system abnormality operation database that associates and stores the abnormality in the control system, a common cause event having the estimated cause as a common cause, the operating state of the control system, and a safety impact that indicates an impact on safety in a work area caused by an abnormality in the device. The control system has a safety analysis unit 205 that uses a database 212 to analyze the impact on safety of the work to confirm the estimated cause; a confirmation work derivation unit 206 that uses the estimated cause and the common cause event to search for confirmation work that corresponds to the estimated cause and the common cause event from a confirmation work database 213 that stores confirmation work lists made up of work to investigate whether the estimated cause is the true cause, in association with the work area where the confirmation work is to be performed, and derives the search results as a confirmation work list; and a confirmation work evaluation unit 207 that evaluates the safety of the confirmation work based on the analysis results of the impact on safety and the confirmation work included in the confirmation work list, and outputs the confirmation work list reflecting the evaluation results, thereby enabling on-site maintenance personnel to carry out on-site confirmation work safely and efficiently when an abnormality in the control system is detected.

[0094] 5, the confirmation work database stores the dependency relationships between the confirmation work and other confirmation works, and the confirmation work evaluation unit checks the dependency relationships between the confirmation works included in the confirmation work list and assigns a higher priority to the confirmation work that should precede the other confirmation works in terms of the dependency relationships. This allows the on-site maintenance personnel to efficiently perform on-site confirmation work without having to be conscious of the work order.

[0095] 5, the confirmation work evaluation unit searches the safety measures for confirmation work with high safety risks from the safety measures database 214, which associates the confirmation work with the safety measures for reducing the safety risks of the confirmation work, evaluates the effect of reducing the safety risk using the safety measures corresponding to the search results, and re-evaluates the feasibility of the confirmation work after the safety measures have been implemented. This makes it possible to carry out on-site confirmation work based on the evaluation when the safety measures have been implemented.

[0096] Furthermore, the confirmation work evaluation unit reduces the safety risk by taking at least one of the following safety measures: changing the execution order of the multiple confirmation works, moving the equipment operated in the confirmation work, and suspending operation of equipment with a high safety risk or the control system including that equipment. This makes it possible to reduce safety risks based on these measures.

[0097] As explained using FIG. 7 etc., the system has a screen display unit 209 that displays the confirmation work list including the priority order evaluated by the confirmation work evaluation unit on the screen, so that the on-site maintenance personnel can easily understand the confirmation work that needs to be performed and the order in which to perform them.

[0098] 6 and the like, the monitoring input unit inputs data obtained in the confirmation work performed by the on-site maintenance personnel as confirmation data, and the failure analysis support system further uses the input confirmation data to perform the processes of the cause estimation unit, the safety analysis unit, the confirmation work derivation unit, and the confirmation work evaluation unit, thereby investigating the true cause of the estimated cause. This makes it possible to investigate the true cause while analyzing the estimated cause, and to conduct an investigation for the investigation.

[0099] <Regarding Modifications> The present invention is not limited to the above-described embodiments and includes various modifications. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and are not necessarily limited to those including all of the described configurations. Furthermore, it is possible to replace part of the configuration of one embodiment with the configuration of another embodiment. It is also possible to add the configuration of another embodiment to the configuration of one embodiment. Furthermore, it is possible to add, delete, or replace part of the configuration of each embodiment with another configuration.

[0100] Furthermore, the impact of the safety analysis unit on safety risks may be evaluated not only for the work area but also for each piece of equipment used in the work and each type of work.

[0101] 10...On-site maintenance worker, 20...Fault analysis support system, 30...Automatic transport device, 40...Automatic transport device, 50...Robot arm, 60...Conveyor equipment, 70...Communication network, 80...Information terminal equipment, 200...Control system, 201...Control device, 202...Monitoring input unit, 203...Abnormality detection unit, 204...Cause estimation unit, 205...Safety analysis unit, 206...Confirmation work derivation unit, 207...Confirmation work evaluation unit, 208...Monitoring output unit, 209...Screen display unit, 210...Equipment monitoring log database, 211...Abnormality cause database, 212...System abnormal operation database, 213...Confirmation work database, 214...Safety measure database, 801...CPU, 802...ROM, 803...RAM, 804...Storage, 805...Input device, 806...Display device, 807...Network interface

Claims

1. A fault analysis support system for supporting fault analysis of a control system consisting of one or more devices, comprising: a monitoring input unit that collects equipment monitoring data relating to the operating status of the devices and stores it in an equipment monitoring log database; an abnormality detection unit that monitors the equipment monitoring data to detect abnormalities in the control system; an abnormality cause database that associates and stores abnormalities in the control system with causes inferred from the abnormalities, and a cause estimation unit that estimates a cause based on a detected abnormality in the control system; a safety analysis unit that analyzes an impact on work safety to confirm the estimated cause using a system abnormality operation database that associates and stores the abnormality in the control system, a common cause event having the estimated cause as a common cause, the operating status of the control system, and a safety impact indicating an impact on safety in a work area caused by an abnormality in the equipment, a confirmation work derivation unit that uses the inferred cause and the common cause event to search for confirmation works corresponding to the inferred cause and the common cause event from a confirmation work database that stores confirmation works listed in a table of works for investigating whether the inferred cause is a true cause and the work area where the confirmation works are performed, in association with each other, and derives the search result as a confirmation work list; and a confirmation work evaluation unit that evaluates the safety of the confirmation works based on the analysis result of the impact on safety and the confirmation works included in the confirmation work list, and outputs the confirmation work list that reflects the evaluation result.

2. The fault analysis support system according to claim 1, characterized in that the confirmation task database stores the dependency between the confirmation task and other confirmation tasks, and the confirmation task evaluation unit examines the dependency between each confirmation task included in the confirmation task list and gives a high priority to a confirmation task that should take precedence in terms of the dependency.

3. The fault analysis support system described in claim 2, characterized in that the confirmation work evaluation unit searches for safety measures for confirmation works with high safety risks from a safety measures database that corresponds the confirmation works with safety measures for reducing the safety risks of the confirmation works, evaluates the effect of reducing the safety risks using the safety measures that correspond to the results of the search, and re-evaluates the feasibility of the confirmation work after the safety measures have been implemented.

4. The fault analysis support system of claim 3, characterized in that the confirmation work evaluation unit reduces the safety risk by taking at least one of the following safety measures: rearranging the execution order of the multiple confirmation works, moving equipment operated in the confirmation works, and stopping operation of equipment with a high safety risk or the control system including the equipment.

5. The failure analysis support system according to claim 2, further comprising: a screen display unit for displaying on a screen the confirmation task list including the priority order evaluated by the confirmation task evaluation unit.

6. The fault analysis support system described in claim 5, characterized in that the monitoring input unit imports data obtained from the confirmation work performed by an on-site maintenance person as confirmation data, and the fault analysis support system further uses the imported confirmation data to perform processing in each of the cause estimation unit, the safety analysis unit, the confirmation work derivation unit, and the confirmation work evaluation unit, thereby investigating the true cause of the estimated cause.

7. A method for supporting fault analysis of a control system consisting of one or more devices, comprising the steps of: collecting equipment monitoring data relating to the operating state of the devices and storing it in an equipment monitoring log database; monitoring the equipment monitoring data to detect an abnormality in the control system; inferring a cause based on the detected abnormality in the control system and an abnormality cause database that associates and stores the abnormality in the control system with a cause inferred from the abnormality; analyzing the impact on safety of work to confirm the estimated cause using a system abnormality operation database that associates and stores the abnormality in the control system, a common cause event having the estimated cause as a common cause, the operating state of the control system, and a safety impact indicating the impact on safety in the work area caused by the abnormality in the device; using the estimated cause and the common cause event, searching for a confirmation work corresponding to the estimated cause and the common cause event from a confirmation work database that associates and stores a list of confirmation works for investigating whether the estimated cause is the true cause with the work area where the confirmation work is performed, and deriving the results of the search as a confirmation work list; a failure analysis support method comprising: evaluating the safety of the confirmation tasks based on the analysis results of the impact on safety and the confirmation tasks included in the confirmation task list; and outputting the confirmation task list reflecting the results of the evaluation.

Citation Information

Patent Citations

  • Maintenance work support system

    JP1999259119A

  • Equipment management method, abnormality confirmation method and equipment management server

    JP2002189513A

  • Management task support device, management task support method, and management task support system

    JP2013092954A

  • Risk assessment measure planning system and risk assessment measure planning method

    JP2020166650A

  • Abnormality response teaching system, abnormality factor estimation method, abnormality response teaching method, and program

    WO2022102211A1