System and method to authenticate production, storage and distribution of hydrogen

The system addresses the challenge of authenticating green hydrogen production, storage, and distribution by using a network of data collection and processing devices with AI and machine learning to ensure real-time, tamper-proof tracking and certification of green hydrogen, enhancing transparency and trustworthiness.

WO2024231872A1PCT designated stage expired Publication Date: 2024-11-14C BALAJI +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/IB2024/054515
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-11
Filing Date
2024-05-09
Publication Date
2024-11-14

AI Technical Summary

Technical Problem

Current methods for authenticating green hydrogen production, storage, and distribution lack real-time, tamper-proof, and transparent mechanisms, making it difficult to ensure that hydrogen produced is genuinely green and trustworthy.

Method used

A system comprising a data collection and processing device and a remote data processing unit that communicates with electrolyzers, storage units, and distribution units to determine the quantum of green power used, green hydrogen produced, stored, and distributed, utilizing advanced metering infrastructure, AI-based modeling, and machine learning algorithms for real-time authentication and certification.

Benefits of technology

Ensures real-time authenticity and transparency in green hydrogen production, storage, and distribution, preventing adulteration and 'green washing' by providing a tamper-proof and trustworthy system for tracking and verifying green hydrogen credentials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IB2024054515_14112024_PF_FP_ABST
    Figure IB2024054515_14112024_PF_FP_ABST
Patent Text Reader

Abstract

A system (100) to authenticating production, storage and distribution of hydrogen is disclosed. The system comprises a data collection and processing device (114) comprising a first processor (200). The data collection and processing device (114) communicates with an electrolyzer (130), external storage units (136) and distribution units (124). The system (100) comprises remote data, processing unit (112) comprising a second processor (300). The data collection and processing device (114) in coordination with the remote data processing unit (112) is configured to determine quantum of green power utilized by the electrolyzer (130), quantum of green hydrogen produced by the electrolyzer (130), quantum of green hydrogen stored in the external storage units (136) and quantum of green hydrogen distributed from die one or more external storage units (136) to die one or more distribution units (124).
Need to check novelty before this filing date? Find Prior Art

Description

SYSTEM AND METHOD TO AUTHENTICATE PRODUCTION, STORAGE AND DISTRIBUTION OF HYDROGENBACKGROUND

[0001] Unless otherwise indicated herein, the materials described in this section are not prior art to the claims in this application and are not admitted to being prior art by inclusion in this section.Field of the invention:

[0002] The subject matter in general relates to green hydrogen production systems. More particularly, but not exclusively, the subject matter relates to authenticating production of green hydrogen.Discussion of the related art:

[0003] The importance of transitioning from conventional energy resources to renewable energy sources is becoming clearer to consumers as they are becoming more aware of their impact on the environment. Green energy is one of the remarkable solutions to greater sustainability in the power grid as it has succeeded to provide the highest environmental benefit as it includes power produced by renewable energy resources. Among green-energy options, green hydrogen is gaining significance for being one of the potential clean energies that could be used as an alternative to fossil fuels. The green hydrogen has ability to generate minimal greenhouse emissions or net-zero emissions. Electrolysis is one of the conventional technologies available to generate hydrogen. When the electrolysis process is powered by green power which is the power generated by renewable energy, then the hydrogen generated is categorized into “Green hydrogen”.

[0004] Over the years several entities have shown keen interest in production of green hydrogen by setting up captive green power generation units to run large scale electrolyzers. However, the initial capital investment required in setting up such green power generation units is restrictive, especially for small and medium-sized enterprises. To avoid the huge capital investment, the companies who wish to generate green hydrogen can use the power from the grid by showing proof for green energy purchase matching the grid consumption. Green hydrogen generating plants can also work on a hybrid model with simultaneous usage of captive renewable energy and the grid. Given the energy options available to produce green hydrogen, complexities arise in determining whether the hydrogen produced is green hydrogen or not.

[0005] Conventionally available standard auditing methods are elaborate, documentationdriven and are not real time during production and often not resilient to tampering and “Green Washing”. For instance, in the patent application numbered US20210405603A1, an apparatus for generating an operation plan for different types of hydrogen generation including the green hydrogen is disclosed. The operation plan is configured to be generated based on a prediction of hydrogen demand amount of each type of the hydrogen and, the storage and distribution of the generated hydrogen to respective destinations are executed as a part of the operation plan. The apparatus lacks technology-based authentication of production of green hydrogen.

[0006] Therefore, there is a need for a technique that can provide “real time” authenticity that the claimed green hydrogen is green, and all the information shared in the system is trustworthy, transparent and tamper proof.SUMMARY

[0007] In an aspect, a system to authenticate production, storage and distribution of hydrogen is disclosed. The system comprises a data collection and processing device and a remote data processing unit. The data collection and processing device comprises a first processor. The data collection and processing device is configured to communicate with an electrolyzer, one or more external storage units and one or more distribution units. The remote data processing unit comprises a second processor. The remote data processing unit is configured to wirelessly communicate with the data collection and processing device. The data collection and processing device in coordination with the remote data processing unit is configured to determine quantum of green power utilized by the electrolyzer, quantum of green hydrogen produced by the electrolyzer, quantum of green hydrogen stored in one or more external storage units, and quantum of green hydrogen distributed from the one or more external storage units to the one or more distribution units.BRIEF DESCRIPTION OF DIAGRAMS

[0008] This disclosure is illustrated by way of example and not limitation in the accompanying figures. Elements illustrated in the figures are not necessarily drawn to scale, in which like references indicate similar elements and in which:

[0009] FIG. 1A illustrated a system 100 to authenticate production, storage and distribution of hydrogen, in accordance with embodiment;

[0010] FIG. IB illustrates another schematic diagram of the system 100 for authenticating production, storage and distribution of green hydrogen, in accordance with another embodiment;

[0011] FIG. 2 illustrates a block diagram of a data collection and processing device 114, in accordance with an embodiment;

[0012] FIG. 3 illustrates a block diagram of a remote data processing unit 112, in accordance with an embodiment;

[0013] FIG. 4A illustrates data blocks in the remote data processing unit 112, corresponding to various green hydrogen producers, green hydrogen distributers and green hydrogen consumers, in accordance with an embodiment;

[0014] FIG. 4B illustrates data blocks to facilitate various green hydrogen producers to adhere to standards while producing the green hydrogen, in accordance with an embodiment;

[0015] FIGs 5A-5B depicts flowcharts illustrating computation of power used for green hydrogen production, in accordance with an embodiment;

[0016] FIG. 5C depicts a flowchart illustrating how green power credits are accounted and updated in the unique green vault account for a respective green hydrogen producer, in accordance with an embodiment;

[0017] FIG. 6 illustrates a schematic diagram 600 to produce and monitor green hydrogen, in accordance with an embodiment;

[0018] FIG. 7A-7B depict flowcharts illustrating how hydrogen gas production for consumed power is accounted by considering the ratios between the power consumed and H2 produced, in accordance with an embodiment;

[0019] FIG. 8 depict a block diagram 800 illustrating one or more external storage units 136A-136C, in accordance with an embodiment;

[0020] FIGs. 9A-9B depicts a flowchart 900 illustrating how the hydrogen stored in the external storage units 136A-136C is in fact produced by the electrolyzer 130, in accordance with an embodiment;

[0021] FIG. 10 illustrates a schematic diagram of a distribution unit 124, in accordance with an embodiment

[0022] FIG. 11 illustrates an establishment of a communication link between the green hydrogen sender device and the green hydrogen receiving device / end user 1010, in accordance with an embodiment;

[0023] FIGs. 12A-12C depict a flowchart 1200 to illustrate monitoring distribution of green hydrogen from the green hydrogen sender device to the transportable storage system 1008, in accordance with an embodiment; and

[0024] FIG. 13 illustrates issuance of the green hydrogen certificate to the green hydrogen producers IT module 104, in accordance with an embodiment.DETAILED DESCRIPTION OF THE INVENTION

[0025] The following detailed description includes references to the accompanying drawings, which form part of the detailed description. The drawings show illustrations in accordance with example embodiments. These example embodiments are described in enough detail to enable those skilled in the art to practice the present subject matter. However, it may be apparent to one with ordinary skill in the art that the present invention may be practised without these specific details. In other instances, well-known methods, procedures and components have not been described in detail so as not to unnecessarily obscure aspects of the embodiments. The embodiments can be combined, other embodiments can be utilized, or structural and logical changes can be made without departing from the scope of the invention. The following detailed description is, therefore, not to be taken in a limiting sense.

[0026] In this document, the terms “a” or “an” are used, as is common in patent documents, to include one or more than one. In this document, the term “or” is used to refer to a nonexclusive “or”, such that “A or B” includes “A but not B”, “B but not A”, and “A and B”, unless otherwise indicated.

[0027] Referring to the figures, and more particularly to FIG. 1A, a system 100 to authenticate production, storage and distribution of hydrogen is disclosed in accordance with an embodiment. The system 100 may comprise third-party entities such as an advanced metering infrastructure (AMI) IT module 102, a green hydrogen (GH) producer information technology (IT) module(s) 104, a GH consumer IT module(s) 106, government agencies IT module(s) 108 and green power dealer IT module 110.

[0028] In an embodiment, the AMI IT module 102 may be associated with various electricity distribution companies (DISCOMs) that may facilitate electricity connection from various power generators to different locations. The AMI IT module 102 may be configured to provide a platform for an advanced metering infrastructure (AMI) to login and use the system 100. The AMI may be a billing system for various electricity distribution companies (DISCOMs).

[0029] In an embodiment, the GH producer IT module(s) 104 may be associated with an organization involved in production of hydrogen. There may be different types of hydrogen such as blue, grey and green. In the current context, production, storage and distribution of “green” hydrogen may be of prime importance.

[0030] In an embodiment, the GH consumer IT module(s) 106 may be configured for users who may utilize green hydrogen produced by the green hydrogen producers.

[0031] In an embodiment, the government agencies IT module 108 may be a cloud-basedsystem configured to govern or monitor, issuance of permissions to produce green hydrogen, transport, store and distribute green hydrogen. The government agencies IT module 108 may provide a platform to government and quasi government agencies, and certification agencies to login into portal for information exchange and, enable one or more features related to statutory forms. The instant facility may enable the government agencies IT module 108 to set policies for different operating units of the system 100 to ensure the operating units adhere to the policies, so that green hydrogen certificates can be issued accordingly.

[0032] In an embodiment, the green power dealer IT module 108 may be associated with entities involved in dealing green power credits.

[0033] In an embodiment, the system 100 may comprise a remote data processing unit 112 configured to communicate with the third-party entities. The system 100 may further comprise a data collection and processing device 114 configured to communicate with the remote data processing unit 112. The remote data processing unit 112 may also be an information technology (IT) module hosted on the cloud.

[0034] In an embodiment, the remote data processing unit 112 may be a cloud based authenticating system configured to offer a cloud-based platform, infrastructure, application and storage devices to manage deploy and run software applications. The remote data processing unit 112 may be configured to coordinate with the entities of the system 100 to ensure their proper functioning. The remote data processing unit 112 may act as a conduit between the AMI IT module 102, GH producer IT module(s) 104, the GH consumer IT module(s) 106, the government agencies IT module(s) 108 and the green power dealer IT module(s) 110.

[0035] In an embodiment, the remote data processing unit 112 may be configured to communicate with the data collection and processing device 114. The data collection and processing device 114 may be a hardware unit that may be located in a place where hydrogen production process may be carried out. The data collection and processing device 114 in coordination with the remote data processing unit 112 may be configured to authenticate that the power utilized to produce green hydrogen is one hundred percent based on “green” power or green power credits, and the produced green hydrogen is free from adulteration till it reaches end users.

[0036] In an embodiment, there may be multiple data collection and processing devices 114 available in the hydrogen production location such that each of the data collection and processing device 114 is assigned one electrolyzer to monitor. It may be noted that, nonelectrolysis methods may also utilize the system 100 to produce, monitor and distribute greenhydrogen to meet standards.

[0037] In an embodiment, the data collection and processing device 114 may comprise an inbuilt sub meter. The sub -meter may be configured to derive electricity reading from the electrolyzer involved in hydrogen production.

[0038] In an embodiment, the data collection and processing device 114 may be in communication with one or more hardware units such as the GH (green hydrogen) quantifying unit(s) 120 and the distribution unit (s) 124. The data collection and processing device 114 may be configured to monitor flow of produced green hydrogen gas from the electrolyzer to the GH quantifying unit(s) 120 and the distribution unit (s) 124. Additionally, the quantifying units 120 may be configured to monitor pressure and temperature of the produced hydrogen gas by the electrolyzer 130.

[0039] In an embodiment, the data collection and processing device 114 may further be configured to read power from the renewable power meter 116. The renewable power may be obtained from one or more external renewable sources of power or “green energy” such as solar energy, tidal energy and wind energy, among others.

[0040] In an embodiment, the data collection and processing device 114 may be configured to read power from a total net submeter 118. The total net submeter 118 may be configured to read instantaneous bi-directional power from a main electricity meter 126 (shown in FIG. IB). The main electricity meter 126 may be configured to measure the power rating of the devices in the hydrogen production location. The main electricity meter 126 may be powered and controlled by main electricity distribution companies (DISCOMs). Further, the total net submeter 118 may be configured immediately after the main electricity meter 126 to replicate the power readings from the DISCOMs main meter, as there is no direct access to the electricity meter associated with the DISCOM.

[0041] In an embodiment, the data collection and processing device 114 may be associated with support system sub meter(s) 122 that may be configured to read power consumed by various sub-systems of the hydrogen production facility.

[0042] Now referring to FIG. IB, yet another schematic diagram of the system 100 for authenticating production, storage and distribution of green hydrogen is illustrated, in accordance with an embodiment.

[0043] In an embodiment, the total net submeter 118 may be connected to the main electricity meter 126 to instantaneously read power from the main electricity meter 126. The power data may be communicated to the data collection and processing device 114. A bus bar 138 may be configured to connect the total net submeter 118 to the data collection andprocessing device 114. The total net submeter 118 may be configured between the bus bar 138 and the main electricity meter 126.

[0044] In an embodiment, the renewable power meter 116 may be connected to the data collection and processing device 114 via the bus bar 138. The renewable power meter 116 may measure renewable power from on-site renewable energy sources 134. A grid-tie inverter 132 may be configured to convert power obtained from the on-site renewable energy sources 134 to AC power. The renewable power meter 116 may be configured between the grid tie inverter 132 and the bus bar 138.

[0045] In an embodiment, the data collection and communication device 114 may be connected to the electrolyzer 130. The electrolyzer 130 may comprise a quantifier 120A. The quantifier 120A may be a flow sensing device or flow metering device configured to measure flow rate of produced hydrogen being fed into an internal buffer storage (discussed later), which may be provided in the electrolyzer 130.

[0046] In an embodiment, at the exit of the electrolyzer 130, for example at the exit of internal buffer storage of the electrolyzer 130, a quantifier 120B may be connected. The quantifier 120B be a flow sensing device or flow metering device configured to measure flow rate of hydrogen exiting from the electrolyzer 130. The flow rate of hydrogen exiting from the electrolyzer 130 may be measured by the quantifier 120B and may be communicated to the data collection and processing device 114 in real time.

[0047] In an embodiment, a quantifier 120C may be configured to monitor the flow rate of hydrogen entering the external storage unit 136. The flow rate and quantity from the quantifier 120C may be communicated to the data collection and processing device 114 in real-time.

[0048] In an embodiment, when there are one or more external storage units 136 available, such that, the quantifier 120C may be configured at inlet of each of the external storage unit 136 in order to monitor the flow of hydrogen into the respective external storage units 136 from the internal buffer storage device of the electrolyzer 130.

[0049] In an embodiment, at the exit of the external storage unit 136, a quantifier 120D may be connected to monitor the flow of green hydrogen exiting the external storage unit 136. The exited hydrogen may be fed to a distribution unit 124A or 124B.

[0050] In an embodiment, a distribution unit 124 A may be configured to enable dispensation of hydrogen at the hydrogen producer’s location for internal consumption. Alternatively, or additionally, a distribution unit 124B may be configured to enable dispensation of green hydrogen to remote locations.

[0051] Referring to FIG. 2, a block diagram of the data collection and processing device114 is illustrated, in accordance with an embodiment. The data collection and processing device 114 may comprise a first processor 200, a first intelligence module 202, a fingerprint sensor 204, input / output devices 206, an in- built sub meter 208, a DC parameter reader 210, a GPS module 212, a first communication module 214, a rechargeable battery 216 and an AC-DC power supply 218.

[0052] In an embodiment, the first processor 200 may be implemented as appropriate in hardware, computer-executable instructions, firmware, or combinations thereof. Computerexecutable instruction or firmware implementations of the first processor 200 may include computer-executable or machine-executable instructions written in any suitable programming language to perform the various functions described. Further, the first processor 200 may execute instructions, provided by the various entities of the data collection and processing device 114.

[0053] In an embodiment, the first intelligence module 202 may be an Al based modelling system that may be trained with machine learning algorithms to make logical decisions based on available data. The data may be received from the one or more entities of the system 100.

[0054] In an embodiment, the fingerprint sensor 204 may be a conventional sensor that may be configured to capture a digital image of a fingerprint pattern that may be utilized to biometrically authenticate end users to grant access.

[0055] In an embodiment, the input / output devices 206 may provide interfaces for inputting devices such as keypad, touch screen, mouse, and stylus among other input devices, and outputting devices such as such as speakers, printer, and additional displays, among others. In addition, the input / output devices 206 may include additional hardware peripherals such as digital input and output signals, analog signals, and touch / non touch screen-based displays.

[0056] In an embodiment, the in-built submeter 208 may be configured to track and read electricity consumed by the electrolyzer 130 to produce hydrogen.

[0057] In an embodiment, the in-built submeter 208 may be configured at the peripherals of the electrolyzer 130 to track and read electricity consumed by the electrolyzer 130 to produce hydrogen.

[0058] In an embodiment, the DC parameters reader 216 may be configured to read one or more DC characteristics of devices such as the electrolyzer 130.

[0059] In an embodiment, the GPS module 220 may be configured to provide GPS data of the hydrogen production facility where the data collection and processing device 114 is deployed.

[0060] In an embodiment, the first communication module 214 may be configured tocommunicate data to various entities of the system 100, specifically the remote data processing unit 112. The first communication module 214 may include a wired network, a wireless network, or a combination of wired network and wireless network. For example, the communication network may include local area network, wide area network, and metropolitan area network, among others.

[0061] In an embodiment, the rechargeable battery 216 may be a storage battery that may be charged and discharged and capable of providing power to the data collection and processing device 114, when needed.

[0062] In an embodiment, the AC-DC power supply 218 may be configured to transform AC current into a stable DC current that may be utilized to power the data collection and processing device 114.

[0001] Referring to FIG. 3, a block diagram of the remote data processing unit 112 is illustrated, in accordance with an embodiment. The remote data processing unit 112 may comprise a second processor 300, a second intelligence module 302, a registration module 304, a database 306 and a second communication module 308. The remote data processing unit 112, as discussed previously, is implemented as a cloud based application and may be configured to offer a cloud-based platform, infrastructure, application and storage devices to manage deploy and run software applications on the cloud.

[0063] In an embodiment, the second processor 300 may be implemented as appropriate in hardware, computer-executable instructions, firmware, or combinations thereof. Computerexecutable instruction or firmware implementations of the second processor 300 may include computer-executable or machine-executable instructions written in any suitable programming language to perform the various functions described. Further, the second processor 300 may execute instructions, provided by the various entities of the remote data processing unit 112. The hardware for the remote data processing unit 112 may be facilitated by cloud service providers.

[0064] In an embodiment, the second intelligence module 302 may be an Al based modelling system that may be trained with machine learning algorithms to make logical decisions based on available data. The data may be received from the data collection and processing device 114. The second intelligence module 302 may be a master Al engine on the cloud that may be configured to collect data from all the data collection and processing devices 114 associated with the hydrogen production facility and perform training of the second intelligence module 302 based on the collected data.

[0065] In an embodiment, the registration module 304 may enable various entities such asthe DISCOM, green hydrogen producers, green hydrogen consumers, government agencies, green power dealers and the data collection and processing device 114, among others, to register with the remote data processing unit 112 wirelessly via internet.

[0066] In an embodiment, the database 306 may be a digital repository that may be populated by receiving information from one or more information sources and entities. The database 306 may store at least data received from the AMI IT module 102, the green hydrogen (GH / GH2) producer information technology (IT) module(s) 104, the GH consumer IT module(s) 106, government agencies IT module(s) 108, green power dealer IT module 110 and the data collection and processing device 114, among other entities.

[0067] In an embodiment, the second communication module 308 may be configured to communicate data to various entities of the system 100. The second communication module 308 may include a wired network, a wireless network, or a combination of wired network and wireless network. For example, the communication network may include local area network, wide area network, and metropolitan area network, among others. The second communication module 308 may be a part of an internal application of the remote data processing unit 112 hosted on the cloud.

[0068] Referring now to FIG. 4A, data blocks in the remote data processing unit 112, corresponding to various green hydrogen producers is illustrated, in accordance with an embodiment. A first green hydrogen producer account 402a may be created in the remote data processing unit 112 upon registration. Upon registration, the remote data processing unit 112 may be configured to generate a unique identifier (UID) for each of the green hydrogen producers. The remote data processing unit 112 may register account details 406a of the first green hydrogen producer 402a. Further, upon registration, the remote data processing unit 112 may be configured to create a unique green vault account 408a for the first green hydrogen producer. The unique green vault account 408a may include green power credits representing amount of available green power for consumption. The first green hydrogen producer may now be facilitated to add green power credits into the unique green vault account 408a.

[0069] In an embodiment, each of the green hydrogen producer’s account 402a may be associated with at least one data collection and processing device 114. It is possible that multiple data collection and processing device 114 may be linked to a green hydrogen producer’s account 402a, when the producer operates multiple electrolyzers 130. A data block 410a may include details of the first data collection and processing device linked to the main electricity meter 126. In an embodiment, each of the data collection and processing devices 114 may be associated with the main electricity meter 126 via a unique identifier (MID) underwhich the data collection and processing device 114 may be configured to operate. The instant association may be utilized to generate billing associated with the main electricity meter 126.

[0070] In an embodiment, the green hydrogen producers 402a may be associated with a plurality of main electricity meters 126, that may be installed in different hydrogen production sites. In a scenario like this, the data collection and processing device 114 may be associated with respective main electricity meter 126 in the respective hydrogen production site.

[0071] In an embodiment, the unique green vault account 408a may be recharged with green power credits from various sources, such as green credits / power dealers or renewable power generated by the hydrogen producing entity. Additionally, the unique green vault account 408a may be a common pool of green credits topping up account for associated one or multiple main electricity meters 126 or the data collection and processing devices 114 corresponding to a given green hydrogen producer, let’s say the first green hydrogen producer 402a.

[0072] Referring to FIG. 4B, a block diagram illustrating data blocks to facilitate various green hydrogen producers to adhere to standards while producing the green hydrogen is provided, in accordance with an embodiment.

[0073] In an embodiment, as discussed above, the green power sourced from renewable sources is credited into the unique green vault account (408a, as an example) as green power credits. The green power credits may be referred to as “planned power” that may be sourced from the green power module 420 or the renewable energy meter 116 and stored in the unique green vault account 408a.

[0074] In an embodiment, in several scenarios, the standards for green hydrogen across multiple geographies may differ on the aspect of temporal matching of green power consumption with respect to green hydrogen production. The green hydrogen manufacturers may be required to be compliant across various geographies, such as those pertaining to European standards for green hydrogen. For instance, European standards may demand an hourly matching of green power consumption with respect to green hydrogen production, that may be referred to as “unplanned power”. Generally, green hydrogen manufacturers are required to have necessary recognition via an accredited auditor at the beginning of their commissioning as someone who has the necessary compliance systems in order to be able to produce batches of green hydrogen that may be considered as per a particular region / geography’s standards. The green hydrogen manufactures may be compliant to produce green hydrogen restricted to only one region. In such scenarios, the system 100 may aid the green hydrogen manufacturers to adhere to different standards and may facilitate in providing granular proof such as time stamp, source of power, distance from manufacturer etc) of greenpower generation and consumption. Such a system is crucial in the regions where green hydrogen manufacturers are partly or fully dependent on the grid for their green power requirement and grid owners may not have necessary infrastructure to be able to provide granular level proof as required by various customers across various geographical regions.

[0075] In an embodiment, the system 100 may further comprise a green source module 420, a RE- AMI module 422 (renewable source advanced metering infrastructure), a machine learning JIT (just in time) module 424.

[0076] In an embodiment, the green source module 420 may be an open access green source module configured to supply renewable green power source to the RE-AMI module 422. The green source module 420 may also be configured to supply green power in the form of green power credits to the unique green vault account 408a.

[0077] In an embodiment, the RE-AMI module 422 may be configured to extract real time renewable power / green power from an on-site renewable energy source 426 that may be third- party renewable sources or the green source module 420. The obtained green power may be supplied to the machine learning JIT module 424 on demand. The on-site renewable energy may be referred as the location where the green hydrogen may be produced by the green hydrogen producers.

[0078] In an embodiment, the machine learning JIT module 424 may create a unique escrow account for users to store the green power / green power credits received from the RE-AMI module 422 so that the green power that is extracted may be utilized by the requested consumer without any lag. As a matter of fact, the machine learning JIT module 424 may be configured to transfer the requested green power credits based on temporal matching and geographical location standard to the requested consumer in real time. The green power credits may be debited from the escrow account instead of the unique green vault account in order to meet the requested standards. The machine learning JIT module 424 may obtain green power from multiple sources and may provide the green power credits that may match the required standard.

[0079] In an embodiment, if the temporal matching holds good with the available green credits in the unique green vault account 408a, the green credits may be utilized from the unique green vault account 408a itself. If the temporal matching doesn’t hold good with the available green credits in the unique green vault account 408b, the machine learning JIT module 424 may obtain green power from multiple sources and may provide the green power that may match the required standard.

[0080] In an embodiment, the green power credits in the unique green vault account 408athat may not be utilized with respect to the requested standards, the machine learning JIT module 424 may be trained to transfer the unused green power credits in the unique green vault account 408a to another unique green vault account of the green hydrogen producer, for instance, the unique green vault account 408b. The transfer of the unused green power credits may occur to the unique green vault account 408b based on temporal matching of the intended standards.

[0081] Now referring to FIGs. 5A-5B, a flowchart illustrating computation of power used for green hydrogen production is provided, in accordance with an embodiment. The objective of the instant process is to derive exact quantum of grid power sourced from the main electricity meter 126 that may be utilized to produce green hydrogen by accounting for various parameters.

[0082] At step 502, an instantaneous reading “T” from the total net submeter 118 may be obtained and communicated to the first processor 200. The value “T” may indicate the power received from the grid.

[0083] At step 504, an instantaneous reading “G” from the in-built sub meter 208 may be obtained and communicated to the first processor 200. The value “G” may indicate the power consumed by the electrolyzer 130.

[0084] At step 506, the first processor 200 may compute an instantaneous reading “S. The instant value “S” may be a power value with respect to subsystems. In one case, the power via the main electricity meter 126 may be utilized solely for green hydrogen production and only one data collection and processing device 114 is powered under the main electricity meter 126, and in another case, the power via the main electricity meter 126 may be utilized by several other sub systems in the plant. In any case the value “S” may be sum of all the support system sub meters, that may be equivalent to S1+S2+ . . . +Sn, where SI to Sn are sub meters measuring power utilized to store and distribute solely for green hydrogen production. That is to say, if the green hydrogen production is a part of many other activities in the hydrogen production site, then the value from the sub-meters “S” may be considered, which is based on power readings from corresponding sub-meters associated with the electrolyzer 130. Moreover, irrespective of the plant solely producing green hydrogen or any other activity, all sub meter readings are considered for computations.

[0085] At step 508, the first processor 200 may verify if there are any renewable sources R from on-site available. A step 510 may be executed, if there is unavailability of renewable power sources onsite.

[0086] At step 510, if the first processor 200 determines that there is no renewable powersource available, then the first processor 200 allocates a value R = 0.

[0087] At step 508, if the first processor 200 verifies that there is / are renewable power source available, then a step 512 may be executed.

[0088] At step 512, the first processor 200 may obtain an instantaneous reading “R” from the renewable power meter 116.

[0089] At step 514, the first processor 200 may obtain a value “GS” that may be equivalent to summation of the value “G’ and “S”, that is (G + S). The value “GS” may be utilized to determine the instantaneous power consumed for green hydrogen production associated with the data collection and processing device 114.

[0090] At step 516, the first processor 200 may obtain computed instantaneous values of R, T and GS to verify if (R >T) or (R > GS). A step 518 may be executed, if the condition (R >T) or (R > GS) is verified to be true. Further, if the condition (R >T) or (R > GS) is verified to be false, the first processor 200 may execute a step 520.

[0091] At step 518, if (R >T) or (R > GS), the first processor 200 may compute grid power consumption value (GPC) as zero, that is GPC=0.

[0092] At step 520, the first processor 200 may compute a value of GPS by following equation:GPC = (GS) - (GS * R / T)

[0093] At Step 522, the first processor 200 may communicate the computed value of GPC of step 520 to the remote data processing unit 112. The GPC component or value may be utilized to determine “grid power consumption” for the associated data collection and processing device 114 and associated sub-systems.

[0094] At step 524, the second processor 300 may receive the computed value of GPC from the data collection and processing device 114. The second processor 300 may be configured to deduct the computed GPC value from the green power credits that may be linked to the respective data collection and processing device 114.

[0095] At step 526, values of green power credits consumption and balance may be updated in the remote data processing unit 112 accordingly.

[0096] Referring to FIG. 5C, a flowchart illustrating how green power credits are accounted and updated in the unique green vault account for a respective green hydrogen producer is provided, in accordance with an embodiment.

[0097] At step 528, the remote data processing unit 112 may receive the computed GPC value (at step 522) from the data collection and processing device 114.

[0098] At step 530, the second processor 300 may be configured to store the GPC valueagainst corresponding data collection and processing device 114.

[0099] At step 532, the remote data processing unit 112 may communicate the GPC value to the DISCOM.

[0100] At step 534, the DISCOM may receive the GPC value and utilize the same for billing cycle for the main electricity meter 126 associated with respective data collection and processing device(s) 114.

[0101] Referring to FIG. 6, a schematic diagram 600 to produce and monitor green hydrogen is illustrated, in accordance with an embodiment.

[0102] In an embodiment, the electrolyzer 130 may comprise a power rectification unit 602, a water supply and monitoring unit 604, a hydrogen generator 606, first gas quantity sensor 608, a hydrogen purifier 610 and an internal buffer storage 612. The first gas quality sensor 608 may be configured to communicate with the quantifier 120A.

[0103] In an embodiment, the power rectification unit 602 may be configured to convert AC power to DC power. The hydrogen generator 606 may receive water 604 for production of hydrogen gas.

[0104] In an embodiment, the water supply and monitoring unit 604 may be configured with water quality and quantity monitoring sensors to monitor water quality and quantity consumed in order to improve the performance of the intelligence systems associated with green hydrogen production system.

[0105] In an embodiment, the first gas quality sensor 608 may be an instrument to monitor quality standards of hydrogen produced by the electrolyzer 130. The first gas quality sensor 608 may be configured with the quantifier 120A. The quantifier 120A may comprise a processing unit 620 and a communication module 622. In addition, the first gas quality sensor 608 may be configured to record the impurity levels of gas produced to arrive at an impurity signature mapped over time, that may aid in determining the actual usage of the electrolyzer 130. The instant information may further provide insight on behaviour of the electrolyzer 130 to further enhance the Al modelling systems of the data collection and processing device 114 and the remote data processing unit 112.

[0106] In an embodiment, the processing unit 620 may be implemented as appropriate in hardware, computer-executable instructions, firmware, or combinations thereof. Computerexecutable instruction or firmware implementations of the processing unit 620 may include computer-executable or machine-executable instructions written in any suitable programming language to perform the various functions described.

[0107] In an embodiment, the communication module 622 may be configured tocommunicate data to various entities of the data collection and processing device 114. The communication module 622 may include a wired network, a wireless network, or a combination of wired network and wireless network. For example, the communication network may include local area network, wide area network, and metropolitan area network, among others.

[0108] In an embodiment, once the quality of produced hydrogen at the electrolyzer 130 is verified by the first gas quality sensor 608, the first gas quality sensor 608 may send the hydrogen to the hydrogen purifier 610. The hydrogen purifier 610 may be configured to remove impurities and contaminants from hydrogen gas to produce a pure and high-quality product.

[0109] In an embodiment, the purified hydrogen may be stored in an internal buffer storage 612. The stored purified hydrogen may be fed to a second gas quality sensor 614 to recheck the quality of the purified hydrogen received from the internal buffer storage 612.

[0110] In an embodiment, the quantifier 120B may be configured to obtain a flow rate and quantity of the purified hydrogen from the second gas quality sensor 614 and may communicate the flow rate and quantity of the purified hydrogen to the data collection and communication device 114 in real time.

[0111] In an embodiment, the quantifier 120B may comprise a processing unit 624 and a communication module 626. The functionalities of the processing unit 624 and the communication module 626 may be similar to the processing unit 620 and a communication module 622 of the quantifier 120A.

[0112] In an embodiment, the second gas quality sensor 614 may further be connected to a compressor 616. The compressor 616 may be configured to increase the pressure on the purified hydrogen and decrease volume of the hydrogen gas that may be stored in one or more external storage units 136.

[0113] FIGs. 7A-7B are flowcharts illustrating how hydrogen gas production for consumed power is accounted by considering the ratios between the power consumed and H2 produced, in accordance with an embodiment.

[0114] At step 702, the data collection and processing device 114 may read AC power characteristics of the electrolyzer 130 via the in-built sub meter 208. The characteristics may include voltage and current harmonics, phase and lead / lag, among other characteristics. The AC power may be converted to DC power through the rectification unit 602 of the electrolyzer 130 (refer FIG. 6).

[0115] At step 704, the data collection and processing device 114 may be configured to check water quality and flow rate, consumption and DC characteristics such as voltage and current of the electrolyzer 130 (refer FIG. 6).

[0116] At step 706, the data collection and processing device 114 may read flow rate and flow quantity from the quantifier 120A of the electrolyzer 130.

[0117] At step 708, the first processor 200 of the data collection and processing device 114 may be configured to read and process data corresponding to the power characteristics and flow quantity using the first intelligence module 202. As a matter of fact, the data received at the steps 702, 704 and 706 may be fed to the first intelligence module 202 of the data collection and processing device 114.

[0118] At step 710, the first processor 200 may verify if the output after processing the data corresponding to the power characteristics and flow quantity is as per the expectations or not. If the condition holds true, a step 712 may be executed. If the first processor verifies that the output after processing the data corresponding to the power characteristics and flow quantity is not as expected, a step 714 may be executed.

[0119] At step 712, when the output meets the expectation, output data may be communicated to the remote data processing unit 112. The remote data processing unit 112 may log the output data and values against time stamp.

[0120] At step 714, when the output fails to meet expectation, the data corresponding to the power characteristics and flow quantity may be communicated to the second intelligence module 302 of the remote data processing unit 112.

[0121] At step 716, the second processor 300 of the remote data processing unit 112 may be configured to check if the output is meeting expectation or not. The remote data processing unit 112 may have relatively refined Al assessment module, which may be based on data processed from multiple hydrogen production units. If the output meets expectation, the second processor 300 may execute a step 718. If the output still fails to meet expectation, a step 720 is executed.

[0122] At step 718, if the output is meeting expectation, the output data may be communicated to the data collection and processing device 114 to update the first intelligence model 302 with the output data against flow and power values.

[0123] At step 720, if the output is still not meeting expectation, the remote data processing unit 112 may generate alarm to stop hydrogen production process possibly indicating malpractice or a genuine error in the system 100 that may require attention from the green hydrogen producers. It may be noted that stopping of the process may not be required each time the output is not as expected. Alternatively, each time the output is not as expected, the error count may be increased and stopping of the process may occur when the error count goes beyond a preconfigured limit. Further, stopping of the process may also factor in deviationfrom the expected output, and due to degradation in the system 100, the value may be shown as expected output, then the value may be fed to the first intelligence module 202 for further training to predict expected output.

[0124] Referring to FIG. 8, a block diagram 800 illustrating one or more external storage units 136A-136C is provided, in accordance with an embodiment. The flow rate of hydrogen at the exit (example: hydrogen being sent from the internal buffer storage 612 in FIG. 6) of the electrolyzer 130 may be acquired by the quantifier 120B. The quantifier 120B may update the data corresponding to the flow rate of hydrogen to the data collection and processing device 114.

[0125] In an embodiment, one or more quantifiers 120C may monitor the flow rate and quantity of the hydrogen being fed into one or more external storage units 136A-136C. The flow rate and quantity data from the quantifiers 120C may be sent to the data collection and processing device 114 in real time to monitor hydrogen flow from the electrolyzer 130 to the more external storage units 136A-136C. Ideally the quantity of the hydrogen exiting the electrolyzer 130 should be equal to the quantity of the hydrogen entering the external storage units 136A-136C. This way, the system ensures that the hydrogen stored in the external storage units 136A-136C is in fact produced by the electrolyzer 130.

[0126] The method to ensure that the hydrogen stored in the external storage units 136A- 136C is in fact produced by the electrolyzer 130 is explained in greater detail while referring to FIGs. 9A-9B, in accordance with an embodiment.

[0127] At step 902, the data collection and processing device 114 may be configured to check if the hydrogen production is ongoing or not. If it is verified that, the hydrogen production process is ongoing, a step 904 may be executed. If hydrogen production process is not ongoing, the data collection and processing device 114 may be configured to recheck until the hydrogen production process may be initiated.

[0128] At step 904, the data collection and processing device 114 may be configured to check if there is / are any external storage unit(s) 136A-136C available or not. If it is verified that, there is / are at least one external storage unit available, a step 906 may be executed by the data collection and processing device 114. If it is verified that, there are no external storage unit(s) 136A-136C available, the data collection and processing device 114 may be configured to restart the monitoring process until at least one external storage unit is available. The configuration of external storage units 136A-136C may be pre-set during the hydrogen plant building stage itself. In case, there is any change in the layout of the hydrogen production plant, that is to say, if there is a requirement to add or delete external storage units 136A-136C, thedata collection and processing device 114 may be kept informed about the same by the remote data processing unit 112, so that the data collection and processing device 114 may reprogram itself based on the changed layout.

[0129] At step 906, a flow rate value QB of hydrogen at the quantifier 120B, provided at the exit of the electrolyzer 130, may be obtained by the quantifier 120B and may be communicated to the data collection and processing device 114 in real time (refer FIG. 8).

[0130] At step 908, the data collection and processing device 114 may check if there is a single external storage unit or there are multiple external storage units 136A-136C. If it is verified that a single external storage unit is present, then step 910 may be executed. If there are multiple external storage units 136A-136C, then step 912 may be executed.

[0131] At step 910, a flow rate value QC of hydrogen at the quantifier 120C, provided at the inlet of the external storage unit, may be obtained by the quantifier 120C and may be communicated to the data collection and processing device 114 in real time.

[0132] At step 912, if it is verified that there are multiple external storage units 136A-136C, the flow rate values from each of the quantifiers 120C provided at the inlet of each of the external storage units 136A-136C may be obtained. A summation of the flow rate values at each of the quantifiers 120C may be computed to arrive at the value of QC. The flow rate value QC may be communicated to the data collection and processing device 114 in real time.

[0133] At step 914, the first processor 200 of the data collection and processing device 114 may be configured to verify if the flow rate value QB at the quantifier 120B is equivalent to the flow rate value QC at the quantifier(s) 120C. If it is verified that, QB=QC, a step 916 may be executed. If it is verified that the flow rate values QA^QB, a step 918 may be executed.

[0134] At step 916, if the flow rate value QB is equivalent to the flow rate value QC, the flow rate values and storage levels are logged in the data collection and processing device 114, and it is determined that the green hydrogen is transferred from the electrolyzer 130 to the external storage units 136A-136C without any adulteration / malpractice.

[0135] At step 918, if it is verified that the flow rate values QB^QC, an alarm may be raised, and the flow rate values may be communicated to the data collection and processing device 114.

[0136] At step 920, the flow rate values may be communicated to the remote data processing unit 112.

[0137] Referring to FIG. 10, a schematic diagram of the distribution unit 124 is illustrated, in accordance with an embodiment. The distribution unit 124 may be employed in tamper proof distribution of green hydrogen that may be obtained from storage units.

[0138] In an embodiment, the distribution unit 124 may be connected to a green hydrogen sender device. The green hydrogen sender device may be the electrolyzer 130, which may have an internal buffer storage 612 (refer FIG. 6). In this case, flow rate or quantity of hydrogen sent from the electrolyzer 130 may be determined by the quantifier 120B, which is provided at the exit of the electrolyzer 130. Alternatively, the green hydrogen sender device may be one or more of the external storage units 136A-136C. In this case, flow rate or quantity of hydrogen sent from the external storage units 136A-136C may be determined by the quantifier 120D, which is provided at the exit of the respective external storage units 136A-136C. The green hydrogen sender device may be employed in transferring a requested amount of green hydrogen to the transportable storage system 1008 via the distribution unit 124.

[0139] In an embodiment, the quantifiers 120B / 120D may be identical to the distribution units 124 except for the fact that, the quantifying units 120 are configured to communicate only to the data collection and processing device 114, while the distribution units 124 are configured to communicate with both the data collection and processing device 114 and the remote data processing unit 112. Further, the flow rates reading from the quantifying units 120 may not be bi-directional flow reading, while the flow rates reading from the distribution units 124 may be bi-directional flow readings.

[0140] In an embodiment, the distribution unit 124 may comprise a bidirectional flow meter 1000, a communication module 1004, a processing unit 1002 and a control valve 1006.

[0141] In an embodiment, the bidirectional flow meter 1000 may be configured to measure the flow rate value or quantity of green hydrogen obtained from the green hydrogen sender device.

[0142] In an embodiment, the bidirectional flow meter 1000 may be connected to the processing unit 1002. The measured flow rate or quantity of hydrogen obtained from the green hydrogen sender device may be communicated to the processing unit 1002.

[0143] In an embodiment, the control valve 1006 may be configured to control gas / liquid flow as directed by the processing unit 1002.

[0144] In an embodiment, the control valve 1006 may regulate the flow of green hydrogen into the transportable storage system 1008. The transportable storage system 1008 may be configured to transfer the requested amount of green hydrogen to an end user or receiver 1010 through the bidirectional flow meter 1000 via an outlet.

[0145] In an embodiment, a communication link may be established between the green hydrogen sender device and the green hydrogen receiving device / end user 1010. The same may be illustrated in FIG. 11. It may be noted that the distribution unit 124 may be configured tocommunicate the flow rates to the data collection and processing device 114 and to the remote data processing unit 112. It may be noted that direct communication with the remote data processing unit 112 may be required in various scenarios to authenticate distribution of green hydrogen, especially when the transportable storage system 1008 transports and dispenses the hydrogen to the end user at a remote location.

[0146] Referring to FIG. 11, a hydrogen transfer system 1100 may be physically established between the green hydrogen sender device 1102 and the green hydrogen receiving system / end user 1106 via a hydrogen flowing pipeline 1104 in order to transfer a requested quantum of green hydrogen to the end user.

[0147] In an embodiment, the sender system 1102 may include a distribution unit, and likewise the receiver system 1106 may also include a distribution unit. As an example, the transportable storage system 1008 (FIG. 10) may behave as a sender system 1102 and the end user’s storage tank may behave as the receiver system 1106. Alternatively, the external storage unit of the hydrogen production facility or the electrolyzer 130 may behave as the sender system, in which case its respective quantifier may perform the function of the distribution unit, and the transportable storage system 1008 may behave as the receiver system 1106. In any case, there is a need to ensure a secure authentication between the sender and receiver at the time of transfer of the hydrogen to authenticate transfer of green hydrogen. Such an authentication process is explained in greater detail with reference to FIGs. 12A-12C.

[0148] In an embodiment, each of the distributing units 124 including the distribution unit 124A-124B, internal buffer storage 612 of the electrolyzer 130, the one or more external storage units 136A-136C and transportable storage unit 1008 may be provided a unique tank identification number that may be generated via the respective data collection and processing device 114 and remote data processing unit 112. Further, each of the quantifying units 120 including the quantifiers 120A-120D may be provided a unique identification sender number by the data collection and processing device 114, such that the unique identification sender number may be associated with the unique tank identification number. The association may be utilized to track the produced green hydrogen gas based on the output from the electrolyzer 130, and to track the green hydrogen sender device and receiver transactions, and final consumptions. Such a feature enables authentication of the storage and distribution tanks via the unique tank identification number during green hydrogen gas transfers between the sender and receiver devices and avoids malpractice since the authentication of the storage tanks is crucial for green hydrogen gas transfer. That is to say, once the quantifier(s) 120A-120D is / are detached, it may lose its association with the system 100.

[0149] Referring now to FIGs. 12A-12C, a flowchart 1200 is provided to illustrate monitoring the distribution of green hydrogen from the green hydrogen sender device to the transportable storage system 1008, in accordance with an embodiment.

[0150] At step 1202, the transportable storage system 1008 or a user associated with the same may make a request to receive a quantum of green hydrogen from the green hydrogen sender device. The distribution unit 124 associated with the transportable storage system 1008 may send the request to the remote data processing unit 112.

[0151] At step 1204, the remote data processing unit 112 may be configured to send the request to the green hydrogen sender device / quantifier via the data collection and processing device 114. As a matter of fact, the data collection and processing device 114 may be a master to the quantifiers 120B and 120D. In case, the green producer is a green hydrogen sender device, the remote data processing unit 112 may obtain data regarding the quantifiers 120B and 120D through the data collection and processing device 114. In addition, if the green hydrogen sender device is not the green hydrogen producer, the green hydrogen sender device and the receiver both may communicate with the remote data processing unit 112.

[0152] In an embodiment, the green hydrogen sender device may be the internal buffer storage 612 of the electrolyzer 130, in which case the remote data processing unit 112 may be configured to send the request to the quantifier 120B provided at the exit of the electrolyzer 130. Alternatively, the green hydrogen sender device may be the external storage unit(s) 136A- 136C, in which case the remote data processing unit 112 may be configured to send the request to the quantifier 120D provided at the exit of the external storage unit(s) 136A-136C.

[0153] At step 1206, the remote data processing unit 112 may communicate with the data collection and processing device 114 to check if the green hydrogen sender device has availability to cater to the green hydrogen request or not. If it is verified that there is an availability of green hydrogen, a step 1210 is executed. If it is verified that there is unavailability of green hydrogen, a step 1208 may be executed.

[0154] At step 1208, when there is an unavailability of green hydrogen, the remote data processing unit 112 may be configured to cancel the request from the distribution unit 124.

[0155] At step 1210, when there is an availability of green hydrogen, the remote data processing unit 112 may be configured to generate a random volume signature. The random volume signature may correspond to a volume of gas / liquid that may be required to pass as per a pattern based on the random volume signature. Additionally, pressure and temperature can also be a measurement factor that may be obtained parallel to obtaining volume or flow reading of green hydrogen gas. Hence, in case, the volume signatures don’t match between the greenhydrogen sender device and the receiver, the pressure and temperature signatures may be considered to perform authentication for dispensation and consumption of the produced green hydrogen gas.

[0156] At step 1212, the remote data processing unit 112 may communicate signature pattern of the random volume signature to the green hydrogen sending device / quantifier and the distribution unit 124.

[0157] At step 1214, the green hydrogen sending device may acknowledge the signature pattern of the random volume signature received from the remote data processing unit 112.

[0158] At step 1216, in order to initiate dispensation of the requested green hydrogen, the remote data processing unit 112 may be configured to handshake with both the quantifier / green hydrogen sending device and the distribution unit 124.

[0159] At step 1218, the distribution unit 124 may open inlet valve of the bidirectional flow meter 1000 and may wait for the signature pattern of the random volume signature to begin.

[0160] At step 1220, the green hydrogen sending device / quantifier may be configured to transfer the green hydrogen out in the signature pattern proposed by the remote data processing unit 112.

[0161] At step 1222, the end user / receiver with the distribution unit 124 may start monitoring the inflow of the green hydrogen based on the signature pattern and may comprehend that the signature pattern has been initiated

[0162] At step 1224, when the flow of green hydrogen stops, the distribution unit 124 may be configured to understand that the signature pattern has ended. Further, the remote data processing unit 112 may intimate the receiver, and the green hydrogen sender device may intimate the data collection and processing device 114 that the signature dispensation is completed, and the data collection and processing device 114 may also intimate the remote data processing unit 112 about the completion of dispensation process.

[0163] At step 1226, the receiver with the distribution unit 124 may be configured to communicate the received incoming green hydrogen signature pattern to the remote data processing unit 112. The remote data processing unit 112 may be configured to verify if the signature pattern matches or not. If the remote data processing unit 112 determines that the signature pattern is matching, a step 1230 may be executed. If the remote data processing unit 112 determines that, the signature pattern is not matching, a step 1228 may be executed.

[0164] At step 1228, if the remote data processing unit 112 determines that, the signature pattern is not matching, the remote data processing unit 112 may alarm the end users to decide on next action and may send commands to the distribution unit and may also record themismatch for the purposes of authentication.

[0165] At step 1230, if the remote data processing unit 112 determines that the signature pattern is matching, the remote data processing unit 112 may send instructions to the green hydrogen sending device / quantifier via the data collection and processing device 114 (when the green hydrogen producer is the green hydrogen sender device) to finish the dispensation of the requested green hydrogen to the receiver / end user.

[0166] At step 1232, the remote data processing unit 112 may verify if the requested quantum of green hydrogen is dispensed or not. If the dispensation has been completed, a step 1234 may be executed. If the dispensation has not been completed, the process of dispensation may continue till the requested quantity is dispensed.

[0167] At step 1234, if the remote data processing unit 112 verifies that the requested quantum of green hydrogen is dispensed, the remote data processing unit 112 may record the debit of green hydrogen gas from the sender and credit the debited green hydrogen gas to the receiver. Further, the remote data processing unit 112 may cooperate with the government agencies IT module 108 to issue green hydrogen certificate for the transaction happened between the green hydrogen sender device and the receiver.

[0168] In an embodiment, as discussed previously, the remote data processing unit 112 may have provisions to allow the government bodies to connect to the system 100 via the government agencies IT module 108 to set the rules and constraints to certify the produced green hydrogen produced. These set of rules and constraints are referred to as “policy cube”. The government agencies IT module 108 may be specific to the geography of the of the particular government agency's jurisdiction. The remote data processing unit 112 may select the policy of green hydrogen certification for the various data collection and processing devices 114 as per respective geographical jurisdiction. As a matter of fact, the raw data corresponding to the green hydrogen manufacturing process may be received from the data collection and processing device 114 and may be sent to the remote data processing unit 112 to apply different “policy cubes” to determine the certification process across jurisdictions during transport or sale of green hydrogen between different jurisdictions.

[0169] FIG. 13 illustrates issuance of the green hydrogen certificate to the green hydrogen producers IT module 104, in accordance with an embodiment.

[0170] In an embodiment, the system 100 may enable the government agencies IT module 108 to assign one or more standards (policy cubes) corresponding to respective jurisdictions. The government agencies through the government agencies IT module 108 may assign the standards or policy cubes. The system 100 may enable the green hydrogen (GH) producers (thegreen hydrogen producers IT module 104) via the data collection and processing device 114 to assign the standard to adhere to for a particular batch involved in green hydrogen production. The standards, as discussed previously, may pertain to standards or policy cubes (standard cubes) associated with a particular jurisdiction. For instance, India may have certain standards and Germany may have certain standards with respect to production of the green hydrogen. The standard(s) may be assigned by the government agencies IT module 108 for issuing green hydrogen certificate to the green hydrogen producers with respect to the particular batch of hydrogen production.

[0171] In an embodiment, the remote data processing unit 112 may include a database to store data pertaining to the hydrogen production process corresponding to respective batches in which the green hydrogen has been produced.

[0172] In an embodiment, the system 100 may comprise a standard hypercube machine learning (ML) module 1300 that may be like a generative artificial intelligence driven module that may allow the government agencies to enter the standards in the form of the policy cubes. The policy cubes with respect to different jurisdictions may collectively called as “hypercube” and may be fed to the standard hypercube machine learning (ML) module 1300 as a hypercube dataset. For instance, with respect to taking India as one jurisdiction, there may be a policy cube associated with India, and likewise another policy cube may be associated with the country Germany, and likewise for other jurisdictions, respectively. The standard machine learning (ML) module 1300 may be trained to interpret one or more data points and rules in the standards cubes in the hypercube dataset and generate an authentication algorithm. The authentication algorithm may be applied to a particular batch from the available batches of raw data, that may be received from the data collection and processing unit 114 to the remote data processing unit 112 for verification and certification purposes.

[0173] In an embodiment, the standard hypercube machine learning (ML) module 1300 may be trained on sample data provided by the government agencies with a specific standard or policy cube being applied. Once the training of the standard machine learning (ML) module 1300 is completed, the corresponding standard is published by the government agency into the policy cube via the government agencies IT module 108.

[0174] In an embodiment, the data collection and processing device 114 may communicate raw data pertaining to green hydrogen production process with reference to a particular batch, to the remote data processing unit 112. Each of the batches may be associated with a corresponding batch identifier (ID). The remote data processing unit 112 may be configured to validate the raw data and store in the database.

[0175] In an embodiment, the green hydrogen producer(s) may request a certification generation module 1302 via the green hydrogen producers IT module 104 to set the requested standard for the requested batch having the batch identifier (ID).

[0176] In an embodiment, the certification generation module 1302 may retrieve all the time stamped raw data pertaining to the green hydrogen production process for the particular batch ID along with the requested standard from the green hydrogen producers IT module 104 or green hydrogen producers. The certification generation module 1302 may be configured to run the data against the requested standard’s algorithm generated by the standard machine learning module 1300.

[0177] In an embodiment, the certification generation module 1302, as a result of running the batch data through the requested standard’s algorithm may be sent to a certification storage vault module 1304 for storage and trading.

[0178] In an embodiment, if there are parts of the raw data that do not comply to the requested standard, the standard machine learning module 1300 may be trained to run the data against all the other standards that was not requested to check for matching standard. As a matter of fact, if there are matching standards, the certification generation module 1302 via the green hydrogen producers IT module 104 may provide the green hydrogen producer with an option for generating certificate for different standards for the rejected data set.

[0179] In an embodiment, if no standards are matching for a given piece of data in the batch, that portion of hydrogen is classified as non-green hydrogen, instead of green hydrogen.

[0180] The processes described above is described as a sequence of steps, this was done solely for the sake of illustration. Accordingly, it is contemplated that some steps may be added, some steps may be omitted, the order of the steps may be re-arranged, or some steps may be performed simultaneously.

[0181] The example embodiments described herein may be implemented in an operating environment comprising software installed on a computer, in hardware, or in a combination of software and hardware.

[0182] Although embodiments have been described with reference to specific example embodiments, it will be evident that various modifications and changes may be made to these embodiments without departing from the broader spirit and scope of the system and method described herein. Accordingly, the specification and drawings are to be regarded in an illustrative rather than a restrictive sense.

[0183] Many alterations and modifications of the present invention will no doubt become apparent to a person of ordinary skill in the art after having read the foregoing description. Itis to be understood that the phraseology or terminology employed herein is for the purpose of description and not of limitation. It is to be understood that the description above contains many specifications, these should not be construed as limiting the scope of the invention but as merely providing illustrations of some of the personally preferred embodiments of this invention.

Claims

CLAIMSWe claim:

1. A system (100) for authenticating production, storage and distribution of hydrogen, the system (100) comprising: a data collection and processing device (114) comprising a first processor (200), wherein the data collection and processing device (114) is configured to communicate with an electrolyzer (130), one or more external storage units (136) and one or more distribution units (124); and a remote data processing unit (112) comprising at least a second processor (300), the remote data processing unit (112) configured to wirelessly communicate with the data collection and processing device (114); wherein, the data collection and processing device (114) in coordination with the remote data processing unit (112) is configured to: determine quantum of green power utilized by the electrolyzer (130); determine quantum of green hydrogen produced by the electrolyzer (130); determine quantum of green hydrogen stored in the one or more external storage units (136); and determine quantum of green hydrogen distributed from the one or more external storage units (136) to the one or more distribution units (124).

2. The system (100) as claimed in claim 1, wherein the remote data processing unit (112) comprises a registration module (304) to enable registration of one or more entities including green hydrogen producers, wherein the second processor (300) is configured to: generate a unique identifier for each of the green hydrogen producers; create a unique green vault account (408a, 408b, 408c) for each of the green hydrogen producer upon registration, wherein the green vault account (408a, 408b, 408c) comprises green power credits, and the green power credits represents a quantum of green power available for consumption; and associate the unique green vault account (408a, 408b, 408c) with the data collection and processing device (114).

3. The system (100) as claimed in claim 1, wherein the system (100) comprises a plurality of the data collection and processing devices (114), and each of the data collection and processing devices (114) is provided a unique identification number to be associated with a mainelectricity meter (126), and each of the data collection and processing devices (114) is configured to operate under the main electricity meter (126).

4. The system (100) as claimed in claim 1, wherein the data collection and processing device (114) is associated with the electrolyzer (130), a main electricity meter (126), an in-built sub meter (208), a total net submeter (118) and a renewable power meter (116).

5. The system as (100) claimed in claim 4, wherein the first processor (200) is configured to compute grid power consumed by the electrolyzer (130), the first processor (200) configured to: derive an instantaneous grid power reading “T” from the total net submeter (118); derive an instantaneous power reading “G” from the in-built sub meter (208); derive an instantaneous power reading “S” corresponding to one or more subsystems associated with the electrolyzer (130); verify an availability of renewable power source, wherein: if it is determined that, the renewable power source is available, the first processor (200) is configured to compute instantaneous power reading “R” from the renewable power meter (116); and if it is determined that, the renewable power source is unavailable, the first processor (200) is configured to derive the instantaneous power reading as “R=0”; and derive a value “GS” by computing a summation of the value “G” and “S”.

6. The system (100) as claimed in claim 5, the first processor (200) is further configured to: verify a condition (R > T) or (R > GS), wherein: if it is determined that, the condition (R > T) or (R > GS) is true, the first processor (200) is configured to compute grid power consumption value (GPC) = 0; and if it is determined that, the condition (R > T) or (R > GS) is false, the first processor (200) is configured to compute the GPC value by an equation GPC = (GS) — (GS * R / T); and communicate the computed GPC value to the second processor (300) of the remote data processing unit (112).

7. The system (100) as claimed in claim 6, wherein the second processor (300) is configured to:create a unique green vault account (408a, 408b, 408c) for a green hydrogen producer and the green vault account (408a, 408b, 408c) comprises green power credits available for consumption; associate the unique green vault account (408a, 408b, 408c) with at least one data collection and processing device (114); deduct the computed GPC value from the unique green vault account (408a, 408b, 408c); and update the green power credits in the unique green vault account (408a, 408b, 408c).

8. The system (100) as claimed in claim 7, wherein the remote data processing unit (112) is associated with a main electricity distribution meter, wherein the remote data processing unit (112) is configured to communicate the updated green power credits to the main electricity distribution meter to update billing for a respective period for the associated data collection and processing device (114).

9. The system (100) as claimed in claim 2, wherein the remote data processing unit (112) comprises a RE- AMI module (422) and a machine learning JIT module (424), wherein the second processor (300) is configured to: create an escrow account for each green hydrogen producer, wherein the escrow account is created to store green power credits matching one or more standards; and feed the green power from at least one renewable source to the RE-AMI module (422); wherein, the machine learning JIT module (424) is trained to: extract the green power credits from the RE-AMI module (422) that matches at least a requested standard with respect to green power credits; and feed the extracted green power credits to the unique green vault account (408a, 408b, 408c) linked to the data collection and processing device (114).

10. The system (100) as claimed in claim 9, wherein the one or more standards include time stamp of produced green power, source of power, distance between the green hydrogen producers and a green power consumer, and geographical location of the green hydrogen producer.

11. The system (100) as claimed in claim 1, wherein the electrolyzer (130) comprises an internal buffer storage (612) and a first quantifying unit (120A), wherein: the internal buffer storage (612) is configured to store purified green hydrogen; and the first quantifying unit (120A) is configured to measure a flow rate of the green hydrogen.

12. The system (100) as claimed in claim 11, wherein the data collection and processing device (114) comprises an in-built sub meter (208), a DC parameter reader (210) and a first intelligence module (202), the first processor (200) is configured to: obtain power characteristics of the electrolyzer (130) through the in-built sub meter (208); verify one or more characteristics of the electrolyzer (130) through the DC parameter reader (210); read a flow rate and flow quantity of green hydrogen through the first quantifying unit (120A); and communicate the power characteristics, the flow rate and the flow quantity to the first intelligence module (202).

13. The system (100) as claimed in claim 12, wherein the first intelligence module (202) is trained to process the power characteristics, the flow rate, and the flow quantity to verify: if the processed data meets a preconfigured expectation, and if the processed data meets the preconfigured expectation, the first intelligence module (202) is trained to communicate the processed data to the remote data processing unit (112) for logging the processed data as output data against corresponding time stamp; and if the processed data fails to meet the preconfigured expectation, the processed data is communicated to the remote data processing unit (112).

14. The system (100) as claimed in claim 13, wherein the remote data processing unit (112) comprises a second intelligence module (302), the second intelligence module (302) is trained to verify: if the processed data meets the preconfigured expectation, and if the processed data meets the preconfigured expectation, the processed data is communicated to the data collection and processing device (114), wherein the first processor (200) is configured to update the processed data as the output data; if the processed data fails to meet the preconfigured expectation, and if the processed data fails to meet the preconfigured expectation, a preconfigured error count is flagged and increased by one count; and if the error count exceeds a preconfigured limit, and if the error count exceeds the preconfigured limit, the second processor (300) is configured to stop the production of green hydrogen.

15. The system (100) as claimed in claim 1, wherein the first processor (200) is configured to verify an availability of the at least one external storage unit (136A-136C), wherein: if it is verified that, there is at least one external storage unit (136A-136C) available, the data collection and processing unit (114) is configured to initiate monitoring of the hydrogen production; and if it is verified that, there is unavailability of the at least one external storage unit (136A- 136C), the data collection and processing unit (114) is configured to restart the monitoring until there is availability of the at least one external storage unit (136A-136C).

16. The system (100) as claimed in claim 11, wherein a second quantifying unit (120B) is connected to an exit point of the internal buffer storage (612) of the electrolyzer (130), and at least a third quantifying unit (120C) is connected to an entry point of at least a first external storage unit (136A), wherein the second quantifying unit (120B) is configured to: measure a second flow rate (QB) of green hydrogen exiting the electrolyzer (130) in real time; and communicate the second flow rate (QB) to the data collection and processing device (114) in real time; and the third quantifying unit (120C) is configured to: measure a third flow rate (QC) of green hydrogen entering at least the first external storage unit (136A) in real time; and communicate the third flow rate (QC) to the data collection and processing device (114) in real time.

17. The system (100) as claimed in claim 15, wherein the first processor (200) is further configured to: verify if there are multiple external storage units (136A-136C), and if it is verified that there are multiple external storage units (136A-136C), corresponding third flow rate values (QC) at each of the external storage units (136A-136C) are measured by respective third quantifying units (120C), configured at entry points of the multiple external storage units (136A-136C) in real time; compute a summation value by adding the measured third flow rate values (QC) in real time; and communicate the summation value to the data collection and processing device (114) in real time.

18. The system (100) as claimed in claim 16, wherein the first processor (200) is configured to: obtain the second flow rate value (QB) from the second quantifying unit (120B) in real time; obtain the third flow rate value (QC) from the third quantifying unit (120C) in real time; verify if the second flow rate value (QB) is equal to the third flow rate value (QC), and if the second flow rate value (QB) is equal to the third flow rate value (QC), the second flow rate value (QB) and the third flow rate value (QC) are logged into the data collection and processing device (114); verify if the second flow rate value (QB) is unequal to the third flow rate value (QC), and if the second flow rate value (QB) is unequal to the third flow rate value (QC), raise an alarm; and communicate the second flow rate value (QB) and the third flow rate value (QC) to the remote data processing unit (112).

19. The system (100) as claimed in claim 17, wherein the first processor (200) is configured to: obtain the second flow rate value (QB) from the second quantifying unit (120B) in realtime; obtain the summation value corresponding to the summation of the third flow rate values (QC) from the respective third quantifying units (120C); verify if the second flow rate value (QB) is equal to the summation value, and if the second flow rate value (QB) is equal to the summation value, the second flow rate value (QB) and the summation value are logged into the data collection and processing device (114); and verify if the second flow rate value (QB) is unequal to the summation value, and if the second flow rate value (QB) is unequal to the summation value, raise an alarm; and communicate the second flow rate value (QB) and the summation value to the remote data processing unit (112).

20. The system (100) as claimed in claim 1, wherein the one or more distribution units (124) comprise a bi-directional flow meter (1000), a processing unit (1002) and a control valve (1006), and are connected to at least a transportable storage system (1008) and a receiver (1106), wherein: the one or more distribution units (124) are configured to:communicate with the data collection and processing device (114) and the remote data processing unit (112); and connect to at least one green hydrogen sender device (1102), wherein the green hydrogen sender device (1102) includes an internal buffer storage (612) of the electrolyzer (130) and the one or more external storage units (136A-136C); the bi-directional flow meter (1000) is configured to: measure a flow rate value and quantity of green hydrogen received from the green hydrogen sender device (1102); and communicate the flow rate value and the quantity of the green hydrogen to the processing unit (1002); and the processing unit (1002) is configured to: control the control valve (1006) to regulate the flow of the green hydrogen into the transportable storage system (1008); and transfer the green hydrogen from the transportable storage system (1008) to the receiver (1106) through the bi-directional flow meter (1000).

21. The system (100) as claimed in claim 20, wherein a communication link is established between the green hydrogen sender device (1102) and the receiver (1106) via a hydrogen flowing pipeline (1104), such that green hydrogen is configured to be transferred to the receiver (1106) via the hydrogen flowing pipeline (1104).

22. The system (100) as claimed in claim 20, wherein the data collection and processing device (114) in coordination with the remote data processing unit (112) is configured to: generate a unique tank identification number for the one or more distribution units (124), the internal buffer storage (612) of the electrolyzer (130), the one or more external storage units (136A-136C) and the transportable storage system (1008); communicate with one or more quantifying units (120A-120C); generate a unique identification sender number for each of the one or more quantifying units (120A-120C); associate the unique tank identification number with the unique identification sender number; and track the green hydrogen produced by the electrolyzer (130), the green hydrogen sender device (1102) and the receiver (1106), based on the association.

23. The system (100) as claimed in claim 22, wherein to obtain a quantum of green hydrogen, the receiver (1106) makes a request to at least one distribution unit (124), wherein the at least one distribution unit (124) is configured to communicate the request to the remote data processing unit (112), the remote data processing unit (112) configured to: communicate the request to the data collection and processing device (114) to obtain information pertaining to the green hydrogen sender device(s) (1102); communicate the request to at least one green hydrogen sender device (1102); verify if the at least one green hydrogen sender device (1102) is available to cater to the request, and if the at least one green hydrogen sender device (1102) is available to cater to the request, generate a random volume signature; and verify if the at least one green hydrogen sender device (1102) is unavailable to cater to the request, and if the at least one green hydrogen sender device (1102) is unavailable to cater to the request, cancel the request from the receiver (1106).

24. The system (100) as claimed in claim 23, wherein the remote data processing unit (112) is configured to: communicate a signature pattern of the random volume signature to the at least one green hydrogen sender device (1102), wherein the at least one green hydrogen sender device (1102) is configured to acknowledge the signature pattern; and handshake with the green hydrogen sender device (1102) and the at least one distribution unit (124).

25. The system (100) as claimed in claim 23, wherein the processing unit (1102) is configured to: open the bi-directional flow meter (1000) to receive the signature pattern; enable a transfer of green hydrogen to the receiver (1106) based on the signature pattern proposed by the remote data processing unit (112); enable the receiver (1106) to monitor inflow of the green hydrogen into the at least one distribution unit (124) based on the signature pattern; and communicate with the remote data processing unit (112) to signal the completion of the inflow of the green hydrogen into the distribution unit (124), based on the signature pattern, wherein the completion of the inflow of the green hydrogen is communicated to receiver (1106), the green hydrogen sender device (1102) and the data collection and processing device (114).

26. The system (100) as claimed in claim 25, wherein the remote data processing unit (112) is configured to: receive the signature pattern from the at least one distribution unit (124); verify if the signature pattern matches, and if the signature pattern matches, the remote data processing unit (112) is configured to send instructions to the green hydrogen sender device (1102) via the data collection and processing device (114) to finish the distribution of the requested green hydrogen from the receiver (1106); and verify if the signature pattern is mismatched, and if the signature is mismatched, the alarm the receiver about the mismatch.

27. The system (100) as claimed in claim 26, wherein the remote data processing unit (112) is further configured to: verify if the requested quantum of green hydrogen is distributed, and if it is verified that the requested quantum of green hydrogen is distributed, the remote data processing unit (112) is configured to debit the requested quantity of green hydrogen from the green hydrogen sender device (1102) and credit the requested quantity to the receiver (1106) and issue a green hydrogen certificate to the green hydrogen sender device (1102) and the receiver (1106).

28. The system (100) as claimed in claim 27, wherein the remote data processing unit (112) is associated with a green hydrogen producers IT module (104), a government agencies IT module (108), a standard hypercube machine learning (ML) module (1300) and a certification generation module (1302), wherein the government agencies IT module (108) is configured to: assign standard cube(s) to a hypercube dataset, the hypercube dataset comprising a plurality of standard cubes pertaining to various jurisdictions, and the standard cubes are configured to be applied to raw data received from the green hydrogen producers IT module (104), wherein the raw data is fetched to the remote data processing unit (112) from the data collection and processing device (114); communicate the hypercube dataset to the standard hypercube machine learning (ML) module (1300), wherein the standard hypercube machine learning (ML) module (1300) is trained to interpret data points and rules in the standard cubes and generate an authentication algorithm for validation and issuance of the green hydrogen certificate; and validate the generated authentication algorithm.

29. The system as claimed in claim 28, wherein: the remote data processing unit (112) is configured to receive the raw data corresponding to a batch of green hydrogen production from the data collection and processing device (114); and the green hydrogen producers IT module (104) is configured to request the standard hypercube machine learning (ML) module (1300) to assign a standard cube for the requested batch of green hydrogen production.

30. The system as claimed in claim 29, wherein the certification generation module (1302) is configured to: retrieve the raw data corresponding to the green hydrogen production along with the requested standard cube from the green hydrogen producers IT module (104); run the raw data against the generated authentication algorithm in the standard hypercube machine learning (ML) module (1300); issue the green hydrogen certificate having the requested standard cube; and communicate the green hydrogen certificate to a certificate storage vault module (1304) for storage.

31. The system as claimed in claim 29, wherein the remote data processing unit (112) is configured to: verify, if there is at least a portion of the raw data that disqualifies to comply with the requested standard cube to be assigned, and if there is at least the portion of the raw data that disqualifies to comply with the requested standard cube, the certificate generation module (1302) is configured to run the raw data against all the standard cubes; issue the green hydrogen certificate for the disqualified raw data; and verify, if there are any matching standard cubes to be assigned to the rejected raw data, and if there is a mismatch, that raw data is classified as a non-green hydrogen.

Citation Information

Patent Citations

  • Wide-area power supply system

    EP4117142A1

  • Green power supply system and green power supply method

    US20030220720A1

  • Planning device, method for generating operation plan, method for producing hydrogen, and program

    WO2020196889A1