Edge frame preparation method and middle frame preparation method

The frame of the fastening structure is formed by heating and softening metal raw materials and using extrusion molding plastic molding method. The fastening structure is connected with the adapter, and the problem of complex preparation steps of the frame and the middle frame in the prior art is solved, and the rapid Efficient mass production.

WO2024234742A1PCT designated stage expired Publication Date: 2024-11-21DONGGUAN GOOD VIEW TECH CO LTD
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/075210
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-17
Filing Date
2024-02-01
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

In the prior art, the preparation steps of the border and middle frame are complicated, which makes it difficult to improve production efficiency.

Method used

After the metal raw materials are heated and softened, the frame is formed at one time by extrusion molding plastic molding to form a fastening structure, and connected to the adapter through the fastening structure to form a middle frame, simplifying the processing steps and improving efficiency.

Benefits of technology

It realizes fast and efficient production of borders and middle frames, is suitable for large-scale production, simplifies processing processes and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024075210_21112024_PF_FP_ABST
    Figure CN2024075210_21112024_PF_FP_ABST
Patent Text Reader

Abstract

An edge frame preparation method, comprising the following steps: material preparation: preparing a metal raw material; softening: softening the metal raw material by means of a heating device; obtaining an edge frame blank: using an extrusion molding / plastic molding method to preliminarily mold the softened metal material, so that the metal material is molded into a preset shape, and forming a fastening structure suitable for connection to an adapter piece to thereby obtain an edge frame blank; and obtaining an edge frame: performing secondary treatment on the edge frame blank and then performing segmentation to obtain an edge frame, or performing segmentation on the edge frame blank and then performing secondary treatment to obtain an edge frame. According to the edge frame preparation method, an edge frame blank is formed by one-time plastic molding by means of a plastic molding device, so that the edge frame preparation method has simple machining steps and high machining efficiency, and is suitable for large-batch rapid production. Also provided is a middle frame preparation method, comprising the following steps: manufacturing an edge frame by using the edge frame preparation method; and connecting an adapter piece to the edge frame by means of a fastening structure to form a middle frame.
Need to check novelty before this filing date? Find Prior Art

Description

Method for preparing frame and middle frame Technical Field

[0001] The present application relates to the technical field of electronic equipment, and in particular to a method for preparing a frame and a middle frame. Background Art

[0002] With the continuous development of mobile terminal technology, the application of electronic devices such as smart phones, PDAs, and smart watches has become extremely common and has become an important part of people's work and life. The casing of an electronic device (such as a mobile phone) generally consists of three parts: a panel, a middle frame, and a bottom plate. The panel and the bottom plate are both installed on the middle frame, and the bottom plate is arranged on the side of the middle frame opposite to the panel, so that the panel, middle frame, and bottom plate together form a roughly closed structure.

[0003] A midframe typically consists of a frame and adapters connected to it (such as a midplane for mounting circuit boards and related electronic components). Among various frame materials, metal is widely used due to its wear resistance, ease of heat dissipation, and ability to create a high-end impression.

[0004] In the initial design, the middle frame is often molded from plastic in one go, or the frame is set to plastic and embedded with metal material for secondary molding. This is because the middle frame needs to withstand external bending forces, and plastic materials can withstand less bending forces and are easily bent by external forces, causing damage to the panel and thus affecting usage. Technical issues

[0005] To overcome these issues, existing methods for manufacturing the middle frame include using CNC machining to produce a metal frame, then combining the metal frame with a prefabricated middle plate (e.g., stamping or die-casting) through in-mold molding. Alternatively, the entire middle frame is manufactured from a single metal blank through CNC machining, or the metal frame and middle plate are combined through riveting, welding, or screw fastening, followed by in-mold molding to form the final metal middle frame. These methods are complex and difficult to improve production efficiency. Technical Solutions

[0006] The embodiments of the present application provide a method for preparing a frame and a middle frame, which is used to solve the problem in the prior art that the preparation steps of the frame and the middle frame are relatively complicated and the production efficiency is difficult to improve.

[0007] According to a first aspect, an embodiment of the present application provides a method for preparing a frame, comprising the following steps:

[0008] Taking materials: taking metal raw materials;

[0009] Softening: Softening the metal raw material using a heating device;

[0010] Obtaining a frame blank: Preliminarily shaping the softened metal material using an extrusion plastic forming method, so that the metal material is formed into a preset shape and a fastening structure for connecting with an adapter is formed, thereby obtaining a frame blank;

[0011] Obtaining a frame: the frame blank is subjected to secondary processing and then divided to obtain a frame, or the frame blank is divided and then subjected to secondary processing to obtain a frame.

[0012] As a further optional solution of the frame preparation method, obtaining the frame blank includes the following steps:

[0013] The softened metal material is extruded into a sheet-shaped frame blank with the fastening structure by using an extrusion plastic forming method;

[0014] The obtaining of the frame comprises the following steps:

[0015] Bending the sheet-shaped frame blank to form a frame structure, and subjecting the frame blank frame structure to secondary processing and then dividing it to obtain the frame; or

[0016] The sheet-shaped frame blank is divided and then bent to form a frame structure monomer, and the frame structure monomer is subjected to secondary processing to obtain the frame.

[0017] As a further optional solution of the frame preparation method, the frame blank is subjected to secondary processing, including:

[0018] Processing the frame blank so that at least one of the size or surface smoothness of the frame blank meets the requirements; and / or

[0019] A mounting structure functional structure is processed on the frame blank, and the mounting structure functional structure can be used in the subsequent production process of electronic equipment.

[0020] As a further optional solution of the frame preparation method, the frame preparation method further includes the following steps:

[0021] Surface treatment: The frame is subjected to surface treatment so that the surface performance of the frame meets the requirements.

[0022] As a further optional solution of the frame preparation method, the fastening structure is configured as a dovetail groove.

[0023] According to the second aspect, an embodiment of the present application further provides a method for preparing a middle frame, which includes the following steps:

[0024] Prepare a frame: manufacture a frame using the frame preparation method described in any of the above embodiments;

[0025] Preparing the middle frame: connecting the adapter to the frame through the fastening structure to form the middle frame.

[0026] As a further optional solution of the middle frame preparation method, connecting the adapter to the frame through the fastening structure includes:

[0027] The adapter is connected to the frame in a die-casting manner, so that the frame and the adapter are connected at least at the fastening structure.

[0028] As a further optional solution of the middle frame preparation method, connecting the adapter to the frame through the fastening structure includes:

[0029] The adapter is connected to the frame by welding, so that the frame and the adapter are connected at least at the fastening structure.

[0030] As a further optional solution of the middle frame preparation method, connecting the adapter to the frame through the fastening structure includes:

[0031] The adapter is connected to the frame by in-mold injection molding, so that the frame and the adapter are connected at least at the fastening structure.

[0032] As a further optional solution of the middle frame preparation method, the middle frame preparation method further includes the following steps:

[0033] After the adapter is connected to the frame by the fastening structure to form a middle frame, the middle frame is processed by CNC and / or the middle frame is surface-treated. Beneficial effects

[0034] Implementing the embodiments of this application will have the following beneficial effects:

[0035] The frame preparation method heats and softens the metal material, and then uses plastic forming equipment to plastically form the overall shape of the frame in one step. A fastening structure is formed during the plastic forming process. The processing steps are relatively simple, the processing efficiency is high, and it is suitable for large-scale rapid production.

[0036] The middle frame preparation method utilizes the aforementioned frame preparation method, and therefore also has the advantages of simple steps, high processing efficiency, and suitability for large-scale rapid production. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0038] in:

[0039] FIG1 is a flow chart of a method for preparing a frame according to an embodiment of the present application;

[0040] FIG2 is a flow chart of a method for preparing a frame in another embodiment of the present application;

[0041] FIG3 is a flow chart of a method for preparing a middle frame in one embodiment of the present application;

[0042] FIG4 is a flow chart of a method for preparing a middle frame in another embodiment of the present application;

[0043] FIG5 is a flow chart of a method for preparing a middle frame in yet another embodiment of the present application. Modes for Carrying Out the Invention

[0044] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.

[0045] The embodiments of the present application provide a method for preparing a frame and a middle frame, which is used to solve the problem in the prior art that the preparation steps of the frame and the middle frame are relatively complicated and the production efficiency is difficult to improve.

[0046] In the embodiment of the present application, referring to FIG. 1 and FIG. 2 , the frame preparation method includes:

[0047] Material collection: Collecting metal raw materials. The metal material collected in this step can be at least one of metal bars, metal tubes, or metal ingots. Since metal bars, metal tubes, or metal ingots are base materials, they are easy to obtain and suitable for large-scale processing.

[0048] Softening: Softening the metal using heating equipment. This step doesn't involve heating the metal completely until it melts. Instead, it involves heating the metal bar, tube, or ingot to a formable state that allows for bending or extrusion during subsequent processing.

[0049] Obtaining a frame blank: Using a plastic forming method to preliminarily shape the softened metal material, so that the metal material is formed into a preset shape and a fastening structure for connecting with an adapter is formed, thereby obtaining a frame blank.

[0050] In the step of obtaining the frame blank, the plastic forming method refers to a process in which the shape of the metal material is changed by applying tension and / or pressure without cutting the softened metal material, including but not limited to extrusion forming, stamping, forging, rolling, drawing, etc. In practice, extrusion forming is preferred.

[0051] The advantages of extrusion molding are that it can improve the overall quality of the product, can produce products with various cross-sectional shapes, has great production flexibility, simple process flow and less equipment investment.

[0052] Based on the extrusion molding process, the types of metal materials that can be selected include but are not limited to: aluminum and its alloys, copper and its alloys, zinc and its alloys, nickel-copper alloys, tool steel, alloy tool steel, high-speed steel, titanium alloy and stainless steel.

[0053] In specific applications, in more common cases, the preset shape of the metal material after forming is generally a frame with a rectangular cross-section, which is suitable for devices with a rectangular appearance, such as square dials of mobile phones and electronic watches. However, as the usage scenarios and needs change, the metal material can also be processed into frames with other cross-sectional shapes, such as circular, elliptical, triangular, polygonal, teardrop-shaped, etc.; and the frame can be a closed structure (such as directly extruded from a metal tube or metal ingot), or an open structure (such as extruded from a long strip of metal material into a sheet and then cut and / or bent), that is, there is a disconnected gap on the frame. If subsequent usage requirements are met, the gap can remain open. Of course, the gap can also be connected by welding, gluing, or clamping the frame ends on both sides of the gap to close the gap. An intermediate element can also be added at the gap to connect the two ends of the metal material to close the gap. In this solution, a fastening structure formed at the end of the frame can be provided to facilitate connection with the intermediate element.

[0054] Obtaining the frame: The frame blank is processed twice to obtain the frame.

[0055] The frame preparation method provided in the embodiment of the present application can make adaptive changes based on the different thicknesses of the obtained metal raw materials in actual implementation, and can include two situations.

[0056] A common situation is that the thickness of a certain metal material obtained is greater than the thickness of the frame, so that the metal material has the ability to be divided into multiple frames. In other words, multiple frames can be obtained by dividing the metal material or dividing the frame blank.

[0057] More specifically, there are three orders of segmentation. The first is that after obtaining the metal material, the metal material is cut to obtain a plurality of segments, so that the thickness of the segments is equal to or approximately equal to (can be further trimmed in subsequent processes) the thickness of the frame to be obtained, and then the frame blank and the frame obtaining process are performed; the second is that after obtaining the frame blank, the frame blank is segmented to obtain a plurality of segments, so that the thickness of the segments is equal to or approximately equal to the thickness of the frame, and then the segments are subjected to secondary processing (when the thickness of the segments is approximately equal to the thickness of the frame, the secondary processing at least includes processing the thickness of the segments) to obtain the frame; the third is that after obtaining the frame blank, the frame blank is first subjected to secondary processing, and then the frame blank that has undergone secondary processing is segmented to directly obtain the frame.

[0058] It is worth mentioning that in the description of the previous paragraph, the second and third segmentation methods are both carried out after plastic forming, so that the effect of plastic forming can be reflected on multiple segments at one time, greatly improving production efficiency and being very suitable for large-scale production.

[0059] Another situation is that the thickness of the obtained metal material is equal to or approximately equal to the thickness of the frame. At this time, the frame can be obtained by directly performing the steps of softening, obtaining the frame blank and obtaining the frame (when the thickness of the split body is approximately equal to the thickness of the frame, the secondary processing at least includes the processing of the thickness of the split part).

[0060] It should be noted that, although the relatively vague expression “approximately equal to” appears in the aforementioned content, in this application, there is no need to make a specific limitation on the range of the difference between the thickness of the segmented piece obtained by cutting and the frame thickness. The range of the difference can be determined by the technician based on the processing capability, experience and precision requirements of the machine tool. In other words, the relatively vague expression “approximately equal to” will not cause the relevant technicians to be unable to apply the method provided in this application. In addition, since the embodiments of this application preferably use extrusion molding to perform plastic processing on the metal material, and in the process of plastic processing, in addition to applying pressure on one end of the metal material, it is often necessary to apply tension from the other end, if the thickness of the metal material is too small, the tension is often difficult to apply. Therefore, for the convenience of processing and the high efficiency of production, in practice, metal materials with a thickness greater than the thickness of the frame are preferably used.

[0061] It should be added that the frame manufactured by the present frame preparation method does not narrowly refer to a complete frame (referring to a completely enclosed structure), but also refers to a part of a complete frame, such as an edge of a complete frame, or an edge of a complete frame together with the rounded corners on one side or both sides, or a combination of two to three edges of the frame, etc. Such cases can be regarded as an extension of the concept of the aforementioned frame with a notch. During the production process, such structures can be joined in subsequent steps to form a complete frame. For example, the frame produced by the present method is actually the four separate sides of a complete frame, and the four sides are respectively fixed to the adapter (such as the middle plate) to form a complete frame; for another example, the frame produced by the present method is actually the four separate sides of a complete frame, and each of the four sides is formed with a fastening structure that can cooperate with each other, and a complete frame structure is formed by the connection between the fastening structures. When connecting, it can also be combined with processes such as die casting, injection molding and welding to form a more stable connection relationship.

[0062] The frame preparation method heats and softens the metal material, and then uses plastic forming equipment to plastically form the overall shape of the frame in one step. A fastening structure is formed during the plastic forming process. The processing steps are relatively simple, the processing efficiency is high, and it is suitable for large-scale rapid production.

[0063] In one embodiment, obtaining the frame blank comprises the following steps:

[0064] The softened metal material is extruded into a sheet-shaped frame blank with a fastening structure by using a plastic forming method;

[0065] Obtaining the bounding box involves the following steps:

[0066] The sheet-like frame blank is bent to form a frame structure, and the frame structure is subjected to secondary processing to obtain a frame.

[0067] The above steps are usually applicable to the case where the metal material is in the form of a long strip. In this case, it is difficult to obtain a frame structure that meets the size and shape requirements through direct plastic forming. Therefore, it is necessary to process the metal material into a sheet and then bend it into a frame structure. It should be noted that the bent frame structure cannot be closed directly. In this case, the above-mentioned methods, such as bonding, clamping, welding, and setting an intermediate original, can be used to close the gap, or the gap can be maintained. In some applications, for non-long strip metal materials, they can be cut into long strips first and then processed using this step.

[0068] In another embodiment, the frame blank obtained by plastic forming is a frame structure. This embodiment is more suitable for the case where the obtained metal material is in a tubular or ingot shape.

[0069] In one embodiment, the secondary processing of the frame blank includes:

[0070] The frame blank is processed to meet at least one of the requirements for size or surface smoothness; and / or functional structures are machined into the frame blank, which can be used in the subsequent production process of electronic devices. The size of the frame generally refers to one or more of its length, width, thickness, angle, and curvature; processing the surface smoothness of the frame refers to removing burrs and burrs, or grinding the surface; functional structures include but are not limited to: antenna slots, USB ports, headphone jacks, SIM card slots, side keyhole lights, and other structures that can be used in subsequent production processes.

[0071] The aforementioned secondary processing is typically performed using CNC machines. The advantage of using CNC machines is that they can automatically process parts according to pre-programmed processing procedures, resulting in a stable and efficient production process suitable for large-scale production. Of course, the aforementioned process can also be performed using conventional machine tools.

[0072] In one embodiment, the fastening structure is configured as a dovetail groove. The dovetail groove may be single or multiple, and may extend in different directions on the metal material. It is contemplated that the dovetail groove may be replaced with a groove body having other shapes. Preferably, the opening of the groove body should be smaller than the maximum cross-sectional dimension of the groove body cavity. This allows the groove body structure (including the dovetail groove) to retain the adapter when the adapter is subsequently connected using die-casting, thereby enhancing the stability of the connection.

[0073] In another embodiment, the fastening structure may be provided as a tenon. In this case, a dovetail groove may be correspondingly provided on the adapter to form a connection with the tenon.

[0074] In another embodiment, the fastening structure can also be set as a structure for plug-in. In this case, the adapter should be provided with a corresponding connecting structure that cooperates with the fastening structure. For example, the fastening structure is set as a connecting column, which is formed on the inner wall of the frame and extends along the thickness direction of the frame. The connecting structure on the adapter is set as a connecting groove, and the connecting column can be inserted into the connecting groove to form a connection between the adapter and the frame. On the basis of this connection, welding or bonding can be further performed to improve the stability of the connection.

[0075] It is conceivable that the above-mentioned fastening structure configurations can be combined arbitrarily to obtain more configuration solutions.

[0076] In one embodiment, the frame preparation method further includes the following steps:

[0077] Surface treatment: The frame is surface treated to ensure that its surface properties meet the requirements. Surface treatment methods include, but are not limited to, at least one of electroplating, chemical plating, thermal diffusion, anodizing, thermal spraying, low-pressure ion processing, surface alloying, magnetron sputtering, ion plating, PVD, ion oxidation, and nano-processing.

[0078] In an embodiment of the present application, the middle frame preparation method includes the following steps:

[0079] A frame is manufactured using the frame preparation method described in any of the aforementioned embodiments; and an adapter is connected to the frame via a fastening structure to form a middle frame.

[0080] The middle frame preparation method utilizes the aforementioned frame preparation method, and therefore also has the advantages of simple steps, high processing efficiency, and suitability for large-scale rapid production.

[0081] In one embodiment, referring to FIG3 , connecting the adapter to the frame via the fastening structure includes:

[0082] The adapter is connected to the frame in a die-casting manner, so that the frame and the adapter are connected at least at the fastening structure.

[0083] In another embodiment, referring to FIG4 , connecting the adapter to the frame via the fastening structure includes:

[0084] The adapter is connected to the frame by welding, so that the frame and the adapter are connected at least at the fastening structure.

[0085] In yet another embodiment, referring to FIG. 5 , connecting the adapter to the frame via the fastening structure includes connecting the adapter to the frame by in-mold injection molding, so that the frame and the adapter are connected at least at the fastening structure.

[0086] In a specific embodiment, an injection molding groove is provided on the inner wall of the frame, which constitutes a fastening mechanism. The adapter includes a main body and a clamping block protruding from the outer edge of the main body. The clamping block is provided in the injection molding groove by injection molding to fix the main body and the frame.

[0087] In some other embodiments, connecting the adapter to the frame via the fastening structure includes connecting the adapter to the frame by riveting and / or threading, so that the frame and the adapter are connected at least at the fastening structure.

[0088] The middle frame produced using this solution features a snap-in block positioned within the injection molding slot, filling the slot. The connection between the snap-in block and the injection molding slot allows the middle plate and metal frame to withstand significant shear and pullout forces, ensuring robust assembly. Compared to traditional CNC machining, die-casting, and assembly processes, this method offers a simpler and more convenient manufacturing process, resulting in less waste and higher material utilization.

[0089] In one embodiment, the middle frame preparation method further includes the following steps:

[0090] After the adapter is connected to the frame using the fastening structure to form the middle frame, the middle frame is processed and / or surface treated using CNC. The CNC processing process can be referred to the previous embodiment. The surface treatment method is the same as the previous embodiment and will not be repeated here.

[0091] The surface treatment of the frame and midframe was mentioned above. In terms of process flow, surface treatment can be roughly divided into functional surface treatment and appearance surface treatment. Generally speaking, functional surface treatment should be placed before appearance surface treatment in the process flow. For example, when connecting the frame and the adapter (such as the midframe) through in-mold injection molding, the midframe and frame need to be T-treated to form a roughened layer, thereby enhancing the strength of the subsequent connection. The T-treatment in this step is a form of functional surface treatment. After the midframe and frame are connected, further appearance surface treatments such as anodizing and PVD can be performed to ensure that the product's aesthetics meet the requirements.

Claims

1. A method for preparing a frame, characterized in that: The following steps are involved: Material collection: taking metal raw materials; Softening: softening the metal raw material using a heating device; Obtaining a frame blank: Preliminarily forming the softened metal material by a plastic forming method, so that the metal material is formed into a preset shape and a fastening structure for connecting with an adapter is formed, thereby obtaining a frame blank; Obtaining a frame: The frame blank is subjected to secondary processing to obtain a frame.

2. The frame preparation method according to claim 1, characterized in that: The described acquisition of frame blank comprises the following steps: Using a plastic forming method, the softened metal material is extruded into a sheet-shaped frame blank with the fastening structure; The obtaining of the frame comprises the following steps: The sheet-shaped frame blank is bent to form a frame structure, and the frame structure is subjected to secondary processing to obtain the frame.

3. The frame preparation method according to claim 1 or 2, characterized in that: The secondary processing of the frame blank comprises: Processing the frame blank so that at least one of the size or the surface smoothness of the frame blank meets the requirements; and / or A functional structure is processed on the frame blank, and the functional structure can be used in a subsequent production process of electronic equipment.

4. The frame preparation method according to claim 1, characterized in that: The following steps are also included: Surface treatment: The frame is subjected to surface treatment so that the surface performance of the frame meets the requirements.

5. The frame preparation method according to claim 1, characterized in that: The fastening structure is configured as a dovetail groove.

6. A method for preparing a middle frame, characterized in that: The following steps are involved: Prepare a frame: manufacture a frame using the frame preparation method according to any one of claims 1 to 5; Preparing a middle frame: connecting the adapter to the frame through the fastening structure to form a middle frame.

7. The method for preparing the middle frame according to claim 6, characterized in that: Connecting the adapter to the frame through the fastening structure includes: The adapter is connected to the frame by die-casting, so that the frame and the adapter are connected at least at the fastening structure.

8. The method for preparing the middle frame according to claim 6, characterized in that: Connecting the adapter to the frame through the fastening structure includes: The adapter is connected to the frame by welding, so that the frame and the adapter are connected at least at the fastening structure.

9. The method for preparing the middle frame according to claim 6, characterized in that: Connecting the adapter to the frame through the fastening structure includes: The adapter is connected to the frame by in-mold injection molding, so that the frame and the adapter are connected at least at the fastening structure.

10. The method for preparing the middle frame according to claim 6, characterized in that: The following steps are also included: After the adapter is connected to the frame by the fastening structure to form a middle frame, the middle frame is processed by CNC and / or the middle frame is surface treated.

Citation Information

Patent Citations

  • Method and device for producing electronic product shell

    CN104476108A

  • Metal middle frame processing process, metal middle frame and electronic device

    CN106973536A

  • Middle frame device and processing technique thereof

    CN107087368A

  • Method for preparing middle frame, middle frame and electronic equipment

    CN108688055A

  • Preparation method of mobile phone middle frame with anodized surface

    CN108723720A