BIM model rapid splitting method and system
Through the integration of decision tree classification and K-mean clustering, the BIM model is processed and optimized and split, which solves the problems of low processing efficiency and insufficient data fusion in the existing technology, and realizes efficient BIM model splitting Collaborating with cross-professionals has improved the efficiency and accuracy of architectural design and construction.
Patent Information
- Application Number
- PCT/CN2024/111332
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-12-06
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-21
AI Technical Summary
When the prior art processes large and complex BIM models, the processing efficiency is low, the data fusion depth is insufficient, and it is difficult to achieve cross-professional collaboration and data correlation, resulting in insufficient efficiency and accuracy in design, construction and operation and maintenance.
The integrated decision tree classification algorithm and K-mean clustering are used for data hierarchy processing, combined with heuristic rules and predicate logic for optimization and splitting, and the incremental change detection and data compression algorithm are used to pass the data integrity checksum network. Topological analysis identifies component dependence, and finally uses data fusion and integration algorithms to complete the rapid split of the BIM model.
It improves the efficiency and accuracy of BIM model processing, realizes in-depth data correlation and analysis in multi-professional integration, improves the fluency and automation of cross-professional cooperation, and significantly improves processing efficiency and data fusion depth.
Smart Images

Figure CN2024111332_21112024_PF_FP_ABST
Abstract
Description
A BIM model rapid splitting method and system Technical Field
[0001] The present invention relates to the technical field of building information modeling, and in particular to a method and system for quickly splitting a BIM model. Background Art
[0002] Building Information Modeling is a digital technology-based solution for the construction industry. It uses 3D modeling software and other related technologies to create and manage digital representations of the physical and functional characteristics of construction projects. BIM technology involves the entire process of design, construction, and operation and maintenance of construction projects, including the integration of multiple disciplines such as architecture, structure, electrical, and piping. It supports decision-making, improves design efficiency, optimizes construction and operation and maintenance processes, and enhances collaboration and communication among project stakeholders.
[0003] The purpose of the BIM model rapid splitting method is to improve the processing efficiency and accuracy of complex BIM models. By quickly splitting large and complex BIM models into smaller, easier-to-manage and analyze parts, it makes the building design and construction process more efficient and accurate. This method can reduce the need for manual operations, reduce errors, and improve the efficiency of overall project management. Usually, this BIM model rapid splitting method is implemented by applying advanced computer vision technology and deep learning algorithms. For example, it uses convolutional neural networks to analyze and process BIM models to achieve accurate identification and classification of different components in the model. In addition, the method combines object detection and semantic segmentation technology to accurately distinguish building elements such as walls, floor slabs, pipes, etc. The application of this technology not only improves the speed of model processing, but also improves the accuracy and efficiency of the splitting process.
[0004] Traditional BIM model processing methods are difficult to process efficiently when faced with large and complex BIM models, especially when the amount of data increases significantly. The data processing capabilities are relatively limited, resulting in low collaboration and communication efficiency throughout the design, construction and operation and maintenance processes. In terms of multi-disciplinary integration, such as the comprehensive processing of architecture, structure, electrical, piping and other fields, data association and analysis have not been fully realized, which to a certain extent limits the fluency of cross-disciplinary collaboration. At the same time, it is difficult to quickly identify and classify different components in the model. Although existing technologies provide a solid foundation for BIM model processing, there is still room for further improvement in processing efficiency, data fusion depth and degree of automation. Summary of the Invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a BIM model rapid splitting method and system.
[0006] In order to achieve the above object, the present invention adopts the following technical solution: a BIM model rapid splitting method, comprising the following steps:
[0007] S1: Based on the building element types and functional requirements, an integrated decision tree classification algorithm and K-means clustering are used to hierarchically process the BIM model data and classify them by type, function, and project stage to generate a hierarchical data structure;
[0008] S2: Based on the hierarchical data structure, a data optimization algorithm based on heuristic rules is used to implement differentiated processing for the primary and secondary regions, optimize the splitting process, and generate an optimized splitting plan;
[0009] S3: Based on the optimized splitting plan, a splitting engine based on predicate logic is used to perform logical reasoning and select a splitting path to generate a logical splitting path;
[0010] S4: Based on the logical splitting path, an incremental change detection algorithm is used to update the changed parts of the model to generate updated split data;
[0011] S5: Based on the updated split data, using a data compression and optimization algorithm, perform data streamlining processing to generate streamlined split data;
[0012] S6: Based on the streamlined split data, using data integrity verification technology to optimize data quality and generate quality verification data;
[0013] S7: Based on the quality verification data, using network topology analysis technology to identify the interdependencies between components and generate a component association analysis report;
[0014] S8: Based on the component association analysis report, a data fusion and integration algorithm is used to integrate the results of the hierarchical data structure, optimized splitting plan, logical splitting path, updated splitting data, streamlined splitting data and quality verification data to complete the BIM model splitting and generate a split BIM model.
[0015] The hierarchical data structure includes data hierarchies for multiple functions such as structure, electrical, and piping. The logical splitting path specifically refers to a splitting method and sequential path derived based on a logical formula. The updated split data specifically refers to modification and update information for the changed part of the model. The streamlined split data specifically refers to a data set that has been optimized. The quality verification data specifically refers to a data set that has been tested. The component association analysis report specifically refers to a report that displays the dependencies between components and the strength of network connections.
[0016] As a further solution of the present invention, the steps of hierarchical processing of BIM model data based on building element types and functional requirements, and classification by type, function and project stage, to generate a hierarchical data structure are specifically as follows:
[0017] S101: Based on the building element types and functional requirements, a decision tree classification algorithm is used to preliminarily classify the BIM model data and generate preliminary classification data;
[0018] S102: Based on the preliminary classification data, using the K-means clustering method, functionally divide the data to generate functional classification data;
[0019] S103: Based on the function classification data, an association rule learning algorithm is used to analyze the relationship between the data and the project phase to generate project phase association data;
[0020] S104: Based on the project phase related data, data merging technology is used to integrate the data and generate a hierarchical data structure.
[0021] As a further solution of the present invention, based on the hierarchical data structure, a data optimization algorithm based on heuristic rules is adopted to implement differentiated processing for primary and secondary areas, and to optimize the splitting process. The steps for generating an optimized splitting plan are as follows:
[0022] S201: Based on the hierarchical data structure, a heuristic rule analysis algorithm is used to analyze the main area data and generate a main area processing plan;
[0023] S202: Based on the primary area treatment plan, a simplified treatment algorithm is used to analyze the secondary area and generate a secondary area treatment plan;
[0024] S203: Based on the primary area processing plan and the secondary area processing plan, a data fusion technology is used to balance the processing strategies and generate a comprehensive data processing solution;
[0025] S204: Based on the comprehensive data processing solution, a multi-objective optimization technology is used to perform differentiated data processing and generate an optimized splitting plan.
[0026] As a further solution of the present invention, based on the optimized splitting plan, a splitting engine based on predicate logic is used to perform logical reasoning and select a splitting path. The steps of generating a logical splitting path are specifically as follows:
[0027] S301: Based on the optimized splitting plan, a predicate logic algorithm is used to perform preliminary logical reasoning to generate preliminary logical reasoning results;
[0028] S302: Based on the preliminary logical reasoning result, a logic optimization technology is used to further optimize the logical structure of the split path and generate a logic optimization path result;
[0029] S303: Based on the logical optimization path result, a weighted sorting algorithm is used to sort the path options to generate a weighted sorting splitting result;
[0030] S304: Based on the weighted sorting splitting result, a path decision analysis method is used to select a suitable splitting path, and the efficiency of logical reasoning is optimized to generate a logical splitting path.
[0031] As a further solution of the present invention, based on the logical split path, an incremental change detection algorithm is used to update the changed parts of the model. The steps of generating updated split data are as follows:
[0032] S401: Based on the logical split path, using incremental change detection technology, identify and update the changed parts in the model to generate preliminary update data;
[0033] S402: Based on the preliminary update data, a data synchronization protocol is adopted to maintain data consistency and generate synchronized update data;
[0034] S403: Based on the synchronously updated data, using a difference query technology in the database, processing data differences to generate differentiated update data;
[0035] S404: Based on the differentially updated data, a data merging algorithm is used to integrate the data to generate updated split data.
[0036] As a further solution of the present invention, based on the updated split data, data compression and optimization algorithms are used to perform data streamlining processing, and the steps of generating streamlined split data are specifically as follows:
[0037] S501: Based on the updated split data, compression coding technology is used to reduce the data volume and generate preliminary compressed data;
[0038] S502: Based on the preliminary compressed data, adopt data reorganization technology to optimize the data structure and generate optimized processing data;
[0039] S503: Based on the optimized data, a data reconstruction algorithm is used to reconstruct the data format and generate reconstructed data;
[0040] S504: Based on the reconstructed data, a data stream processing framework is used to perform stream processing to generate streamlined split data.
[0041] As a further solution of the present invention, based on streamlined data splitting, data integrity verification technology is used to optimize data quality and generate quality verification data in the following steps:
[0042] S601: Based on the streamlined split data, a data integrity detection algorithm is used to perform a preliminary quality check to generate preliminary quality inspection data;
[0043] S602: Based on the preliminary quality inspection data, a data cleaning algorithm is used to eliminate inconsistent and erroneous data to generate cleaned data;
[0044] S603: Based on the cleaned data, integrity enhancement technology is used to optimize data accuracy and generate integrity assessment data;
[0045] S604: Based on the integrity assessment data, a comprehensive data quality assessment framework is adopted to optimize data quality and generate quality verification data.
[0046] As a further solution of the present invention, based on the quality verification data, network topology analysis technology is used to identify the interdependencies between components and generate a component association analysis report. Specifically, the steps are as follows:
[0047] S701: Based on the quality verification data, a graph theory algorithm is used to analyze the connectivity between components and generate a preliminary component relationship diagram;
[0048] S702: Based on the preliminary component relationship diagram, identify components and dependency paths using network flow analysis technology to generate a component dependency diagram;
[0049] S703: Based on the component dependency graph, a cluster analysis algorithm is used to distinguish groups of multiple types of components and generate component group analysis results;
[0050] S704: Based on the component group analysis results, network topology optimization technology is used, and multiple types of network parameters are considered simultaneously to further analyze the dependencies and interactions between components and generate a component association analysis report.
[0051] As a further solution of the present invention, based on the component association analysis report, a data fusion and integration algorithm is used to integrate the hierarchical data structure, optimized splitting plan, logical splitting path, updated splitting data, streamlined splitting data and quality verification data to complete the BIM model splitting. The specific steps of generating the split BIM model are as follows:
[0052] S801: Based on the component association analysis report, preliminarily integrate the data results of multiple stages using the association data integration technology to generate preliminary integrated data;
[0053] S802: Based on the preliminary integrated data, a dimensional analysis method is used to integrate the multi-faceted data, and a comprehensive multi-dimensional data view is created to generate a multi-dimensional fusion data set;
[0054] S803: Based on the multi-dimensional fusion data set, data processing technology is used to optimize and streamline the data to generate a refined data set;
[0055] S804: Based on the refined data set, a comprehensive data management strategy is adopted to perform final fusion and integration of the data, and to check the consistency and integrity of the information to generate a split BIM model.
[0056] A BIM model rapid splitting system, the BIM model rapid splitting system is used to execute the above-mentioned BIM model rapid splitting method, the system includes a preliminary classification module, a functional division module, a project stage association module, a data hierarchy construction module, a main area processing module, a secondary area processing module, a comprehensive data processing module, a multi-objective optimization module, a logical splitting path module, and a data fusion and integration module;
[0057] The preliminary classification module uses a decision tree classification algorithm to perform preliminary classification on the BIM model data based on the building element type and functional requirements to generate preliminary classification data;
[0058] The functional classification module uses the K-means clustering algorithm based on the preliminary classification data to perform functional classification on the data and generate functional classification data;
[0059] The project stage association module uses association rule learning algorithm based on function classification data to analyze the relationship between data and project stages and generate project stage association data;
[0060] The data hierarchy construction module is based on the project phase related data and adopts data merging technology to integrate the data and generate a hierarchical data structure;
[0061] The main area processing module is based on a hierarchical data structure and adopts a heuristic rule analysis algorithm to analyze the main area data and generate a main area processing plan;
[0062] The secondary area processing module uses a simplified processing algorithm based on the primary area processing plan to analyze the secondary area and generate a secondary area processing plan;
[0063] The comprehensive data processing module generates a comprehensive data processing solution based on the primary and secondary regional processing plans by using data fusion technology and balancing processing strategies;
[0064] The multi-objective optimization module is based on a comprehensive data processing solution and adopts multi-objective optimization technology to perform differentiated data processing and generate an optimized splitting plan;
[0065] The logic splitting path module uses a predicate logic splitting engine to perform logical reasoning based on the optimized splitting plan to generate a logic splitting path;
[0066] The data fusion and integration module is based on the logical splitting path and adopts the data fusion and integration algorithm to integrate the results of the preliminary classification module, the functional division module, the project stage association module, the data hierarchy construction module, the main area processing module, the secondary area processing module, the comprehensive data processing module, the multi-objective optimization module, and the logical splitting path module to complete the BIM model splitting and generate the split BIM model.
[0067] Compared with the prior art, the advantages and positive effects of the present invention are:
[0068] In the present invention, by applying an integrated decision tree classification algorithm and K-means clustering, the efficiency of processing large and structurally complex BIM models is improved, and the challenge of large amounts of data can be effectively met. Through efficient data stratification and classification, the processing flow of the entire model is optimized. In terms of multi-disciplinary integrated processing, such as architecture, structure, electrical, piping, etc., deeper data association and analysis are achieved, thereby improving the fluency and efficiency of cross-disciplinary cooperation. It also includes data optimization algorithms and logical splitting technologies, which not only speed up the identification and classification of different components in the model, but also improve the degree of automation. This solution has achieved significant improvements in processing efficiency, data fusion depth and automation, effectively overcoming the limitations of existing technologies and providing a more advanced and comprehensive solution for BIM model processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] FIG1 is a schematic diagram of the workflow of the present invention;
[0070] FIG2 is a flow chart of the refinement of S1 of the present invention;
[0071] FIG3 is a flow chart of the refinement of S2 of the present invention;
[0072] FIG4 is a flow chart of the refinement of S3 of the present invention;
[0073] FIG5 is a flow chart of the refinement of S4 of the present invention;
[0074] FIG6 is a flow chart of the refinement of S5 of the present invention;
[0075] FIG7 is a flow chart of the refinement of S6 of the present invention;
[0076] FIG8 is a flow chart of the refinement of S7 of the present invention;
[0077] FIG9 is a flow chart of the refinement of S8 of the present invention;
[0078] FIG10 is a system flow chart of the present invention. DETAILED DESCRIPTION
[0079] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0080] In the description of the present invention, it should be understood that the terms "length," "width," "up," "down," "front," "back," "left," "right," "vertical," "horizontal," "top," "bottom," "inside," "outside," and the like, indicating positions or relationships, are based on the positions or relationships shown in the accompanying drawings and are intended only to facilitate the description of the present invention and simplify the description. They do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limiting the present invention. Furthermore, in the description of the present invention, "plurality" means two or more, unless otherwise expressly and specifically defined. Example 1
[0081] Referring to FIG1 , the present invention provides a technical solution: a method for quickly splitting a BIM model, comprising the following steps:
[0082] S1: Based on the building element types and functional requirements, an integrated decision tree classification algorithm and K-means clustering are used to hierarchically process the BIM model data and classify them by type, function, and project stage to generate a hierarchical data structure;
[0083] S2: Based on the hierarchical data structure, a data optimization algorithm based on heuristic rules is used to implement differentiated processing for primary and secondary areas, optimize the splitting process, and generate an optimized splitting plan;
[0084] S3: Based on the optimized split plan, a splitting engine based on predicate logic is used to perform logical reasoning, select a splitting path, and generate a logical splitting path.
[0085] S4: Based on the logical split path, an incremental change detection algorithm is used to update the changed parts of the model and generate updated split data;
[0086] S5: Based on the updated split data, data compression and optimization algorithms are used to perform data streamlining processing to generate streamlined split data;
[0087] S6: Based on streamlined data splitting, data integrity verification technology is used to optimize data quality and generate quality verification data;
[0088] S7: Based on the quality verification data, network topology analysis technology is used to identify the interdependencies between components and generate a component association analysis report;
[0089] S8: Based on the component association analysis report, data fusion and integration algorithms are used to integrate the results of hierarchical data structure, optimized splitting plan, logical splitting path, updated splitting data, streamlined splitting data and quality verification data to complete the BIM model splitting and generate the split BIM model.
[0090] The hierarchical data structure includes data layering for multiple functions such as structure, electrical, and piping. The logical splitting path specifically refers to the splitting method and sequential path derived based on the logical formula. The updated split data specifically refers to the modification and update information of the changed part of the model. The streamlined split data specifically refers to the optimized data set. The quality verification data specifically refers to the tested data set. The component association analysis report specifically refers to a report that displays the dependency relationship between components and the network connection strength.
[0091] Through the integrated decision tree classification algorithm, K-means clustering and heuristic rule data optimization algorithm, BIM model data can be quickly and accurately layered and optimized, thereby saving more time. Secondly, the flexibility and customizability of the method make it suitable for various projects and scenarios. The splitting rules can be customized according to specific needs, which increases applicability. The method ensures the consistency and accuracy of the splitting results through logical reasoning and data integrity verification technology, improves the quality of model data, and data compression and optimization algorithms and data streamlining processing reduce the volume of split data and improve the efficiency of subsequent analysis and application. Through quality verification data and component association analysis reports, potential design and construction problems can be discovered, which increases the project team's understanding and mastery of the model. The automated process helps reduce the cost of project splitting and maintenance.
[0092] Refer to Figure 2. Based on the building element types and functional requirements, an integrated decision tree classification algorithm and K-means clustering are used to hierarchically process the BIM model data and classify it by type, function, and project stage. The specific steps for generating the hierarchical data structure are as follows:
[0093] S101: Based on the building element types and functional requirements, a decision tree classification algorithm is used to preliminarily classify the BIM model data and generate preliminary classification data;
[0094] S102: Based on the preliminary classification data, the K-means clustering method is used to functionally divide the data and generate functional classification data;
[0095] S103: Based on the functional classification data, an association rule learning algorithm is used to analyze the relationship between the data and the project phases to generate project phase association data;
[0096] S104: Based on the project phase related data, data merging technology is used to integrate the data and generate a hierarchical data structure.
[0097] In step S101, a decision tree classification algorithm is used to preliminarily classify the BIM model data according to the building element type and functional requirements to form preliminary classification data. This step helps to divide the model elements into different categories according to their type. In step S102, the K-means clustering method is used to functionally divide the data based on the preliminary classification data to generate functional classification data, which helps to aggregate elements with similar functions and better understand the functional layout in the model. In step S103, an association rule learning algorithm is used to analyze the relationship between the functional classification data and the project stage to generate project stage association data. This step helps to determine the evolution and correlation of different functional elements in different project stages. In step S104, data merging technology is used to integrate the preliminary classification data, functional classification data and project stage association data to generate a complete hierarchical data structure. This hierarchical data structure contains detailed information on the building element type, functional classification and project stage, providing a basis for subsequent splitting and analysis.
[0098] Refer to Figure 3. Based on the hierarchical data structure, a data optimization algorithm based on heuristic rules is used to implement differentiated processing for primary and secondary areas and optimize the splitting process. The specific steps for generating an optimized splitting plan are as follows:
[0099] S201: Based on the hierarchical data structure, a heuristic rule analysis algorithm is used to analyze the main area data and generate a main area processing plan;
[0100] S202: Based on the primary area treatment plan, a simplified treatment algorithm is used to analyze the secondary area and generate a secondary area treatment plan;
[0101] S203: Based on the primary area processing plan and the secondary area processing plan, data fusion technology is used to balance the processing strategies and generate a comprehensive data processing solution;
[0102] S204: Based on the comprehensive data processing solution, multi-objective optimization technology is used to perform differentiated data processing and generate an optimized splitting plan.
[0103] In step S201, a heuristic rule analysis algorithm is used to perform a detailed analysis of the main area data based on a hierarchical data structure. This step aims to determine the characteristics and requirements of the main area and generate a processing plan for the main area to ensure that the data in these areas meet specific optimization requirements. In step S202, based on the processing plan for the main area, a simplified processing algorithm is used to analyze the secondary area. The secondary area may require different processing strategies, so a processing plan for the secondary area is generated to ensure that the data in the secondary area can also be properly optimized. In step S203, based on the main area processing plan and the secondary area processing plan, data fusion technology is used to balance the processing strategies and generate a comprehensive data processing plan. This plan takes into account the needs of the main and secondary areas to ensure that the data of the entire model is properly optimized and processed during the splitting process. In step S204, a multi-objective optimization technology is used to consider differentiated data processing requirements to generate a final optimized splitting plan. This plan optimizes various aspects of the comprehensive data processing plan to meet multiple optimization goals, such as reducing data redundancy and improving data quality.
[0104] Refer to Figure 4. Based on the optimized split plan, a splitting engine based on predicate logic is used to perform logical reasoning and select a splitting path. The specific steps for generating a logical splitting path are as follows:
[0105] S301: Based on the optimized splitting plan, a predicate logic algorithm is used to perform preliminary logical reasoning and generate preliminary logical reasoning results;
[0106] S302: Based on the preliminary logical reasoning results, logic optimization technology is used to further optimize the logical structure of the split path and generate a logic optimization path result;
[0107] S303: Based on the logical optimization path result, a weighted sorting algorithm is used to sort the path options and generate a weighted sorting splitting result;
[0108] S304: Based on the weighted sorting splitting results, a path decision analysis method is used to select a suitable splitting path, and the efficiency of logical reasoning is optimized to generate a logical splitting path.
[0109] In step S301, a predicate logic algorithm is used to perform preliminary logical reasoning based on the optimized splitting plan. This step aims to extract logical relationships and conditions from the optimized splitting plan and generate preliminary logical reasoning results, for example, to determine which elements need to be split in what order. In step S302, based on the preliminary logical reasoning results, logical optimization technology is used to further optimize the logical structure of the splitting path, which includes rearranging and organizing logical relationships to ensure the rationality and efficiency of the splitting path, and generating logical optimization path results. In step S303, based on the logical optimization path results, a weighted sorting algorithm is used to sort different path options. This step will consider various factors, such as the complexity of the splitting path, data correlation, etc., to generate a weighted sorted splitting result list. In step S304, based on the weighted sorting splitting results, a path decision analysis method is used to select the most appropriate splitting path and further optimize the logical reasoning efficiency. This step will ensure that the selected splitting path is optimal to meet specific splitting goals and requirements.
[0110] Refer to Figure 5. Based on the logical split path, the incremental change detection algorithm is used to update the changed parts of the model. The specific steps to generate the updated split data are as follows:
[0111] S401: Based on the logical split path, incremental change detection technology is used to identify and update the changed parts in the model and generate preliminary update data;
[0112] S402: Based on the preliminary updated data, a data synchronization protocol is used to maintain data consistency and generate synchronized updated data;
[0113] S403: Based on the synchronously updated data, the difference query technology in the database is used to process the data differences and generate differential update data;
[0114] S404: Based on the differentially updated data, a data merging algorithm is used to integrate the data and generate updated split data.
[0115] In step S401, based on the logical split path, incremental change detection technology is used to identify and update the changed parts in the BIM model. This step aims to determine the model changes that need to be made under the guidance of the split path and generate preliminary update data. In step S402, based on the preliminary update data, a data synchronization protocol is used to ensure data consistency. This may include synchronizing the updated data with the original model data to ensure that the updated data is consistent with other parts of the model. In step S403, based on the synchronized update data, the difference query technology in the database is used to process the data differences. This step helps to determine the data changes in the model and generate differentiated update data. These data reflect the changes caused by the split path. In step S404, based on the differentiated update data, a data merging algorithm is used to integrate the data. This step integrates the new update data with the original model data to generate the final updated split data.
[0116] Referring to FIG6 , based on the updated split data, data compression and optimization algorithms are used to perform data streamlining processing. The specific steps for generating streamlined split data are as follows:
[0117] S501: Based on the updated split data, compression coding technology is used to reduce the data volume and generate preliminary compressed data;
[0118] S502: Based on the preliminary compressed data, data reorganization technology is used to optimize the data structure and generate optimized processing data;
[0119] S503: Based on the optimized processed data, a data reconstruction algorithm is used to reconstruct the data format and generate reconstructed data;
[0120] S504: Based on the reconstructed data, a data stream processing framework is used to perform stream processing to generate streamlined split data.
[0121] In step S501, based on the updated split data, compression encoding technology is used to reduce the data volume. This step aims to compress the data into a smaller size through a compression algorithm to generate preliminary compressed data, which helps to reduce data transmission and storage costs. In step S502, based on the preliminary compressed data, data reorganization technology is used to optimize the data structure, which includes reorganizing the data to improve data access efficiency and readability, and generating optimized processed data. In step S503, based on the optimized processed data, a data reconstruction algorithm is used to reconstruct the data format. This step helps to restore the data to its original format to ensure the integrity and correctness of the data and generate reconstructed data. In step S504, based on the reconstructed data, a data stream processing framework is used for stream processing. This step processes the data in a stream manner to ensure the continuity and real-time nature of the data in the process, and finally generates streamlined split data.
[0122] Please refer to Figure 7. The steps for optimizing data quality and generating quality verification data based on streamlined data splitting and data integrity verification technology are as follows:
[0123] S601: Based on the streamlined split data, a data integrity detection algorithm is used to perform preliminary quality checks and generate preliminary quality inspection data;
[0124] S602: Based on the preliminary quality inspection data, a data cleaning algorithm is used to eliminate inconsistent and erroneous data to generate cleaned data;
[0125] S603: Based on the cleaned data, integrity enhancement technology is used to optimize data accuracy and generate integrity assessment data;
[0126] S604: Based on the integrity assessment data, a comprehensive data quality assessment framework is used to optimize data quality and generate quality verification data.
[0127] In step S601, based on the streamlined split data, a data integrity detection algorithm is used to perform a preliminary quality check. This step aims to identify potential problems and inconsistencies in the data and generate preliminary quality inspection data, which includes possible problems or errors. In step S602, based on the preliminary quality inspection data, a data cleaning algorithm is used to eliminate inconsistent and erroneous data. This step helps to ensure the consistency and accuracy of the data and generates cleaned data, in which the detected problems have been eliminated. In step S603, based on the cleaned data, integrity enhancement technology is used to further optimize data accuracy. This may include filling missing data, correcting erroneous data, and generating integrity assessment data to ensure the integrity and accuracy of the data. In step S604, based on the integrity assessment data, a comprehensive data quality assessment framework is used to comprehensively consider various data quality factors to further optimize data quality. This step helps to ensure that the data meets quality standards in all aspects and ultimately generates quality verification data to prove the high quality and credibility of the data.
[0128] Refer to Figure 8. Based on the quality verification data, network topology analysis technology is used to identify the interdependencies between components and generate a component association analysis report. The specific steps are:
[0129] S701: Based on the quality verification data, use graph theory algorithms to analyze the connectivity between components and generate a preliminary component relationship diagram;
[0130] S702: Based on the preliminary component relationship diagram, network flow analysis technology is used to identify components and dependency paths, and a component dependency diagram is generated;
[0131] S703: Based on the component dependency graph, a cluster analysis algorithm is used to distinguish groups of multiple types of components and generate component group analysis results;
[0132] S704: Based on the component group analysis results, network topology optimization technology is used, and multiple types of network parameters are considered at the same time to further analyze the dependencies and interactions between components and generate a component association analysis report.
[0133] In step S701, based on the quality verification data, a graph theory algorithm is used to analyze the connectivity between components. This step aims to generate a preliminary component relationship diagram, which contains the basic connection relationships between components to identify potential connections between components. In step S702, based on the preliminary component relationship diagram, network flow analysis technology is used to identify components and dependency paths, which helps to determine the dependencies between components and generate a component dependency graph, which contains information about dependency paths. In step S703, based on the component dependency graph, a cluster analysis algorithm is used to distinguish groups of multiple types of components. This step helps to divide components into different categories or groups and generate component group analysis results to better understand the relationships between components. In step S704, based on the component group analysis results, network topology optimization technology is used, while considering multiple types of network parameters, to further analyze the dependencies and interactions between components. This step helps to gain an in-depth understanding of the relationships between different component groups and generate a component association analysis report, providing detailed dependency and interaction information.
[0134] Refer to Figure 9. Based on the component association analysis report, the data fusion and integration algorithm is used to integrate the hierarchical data structure, optimized splitting plan, logical splitting path, updated splitting data, streamlined splitting data, and quality verification data to complete the BIM model splitting. The specific steps for generating the split BIM model are as follows:
[0135] S801: Based on the component association analysis report, use the associated data integration technology to preliminarily integrate the data results of multiple stages to generate preliminary integrated data;
[0136] S802: Based on the preliminary integrated data, dimensional analysis is used to integrate multiple aspects of data, and a comprehensive multidimensional data view is created to generate a multidimensional fusion data set;
[0137] S803: Based on the multi-dimensional fusion data set, data processing technology is used to optimize and streamline the data to generate a refined data set;
[0138] S804: Based on the refined data set, adopt a comprehensive data management strategy to carry out the final fusion and integration of data, and proofread the information consistency and integrity to generate a split BIM model.
[0139] In step S801, based on the component association analysis report, the associated data integration technology is used to preliminarily integrate the data results of multiple stages. This step aims to integrate the data from different stages to generate preliminary integrated data, which contains information from multiple data sources. In step S802, based on the preliminary integrated data, the dimensional analysis method is used to integrate various data and create a comprehensive multidimensional data view. This helps to integrate information from different data dimensions and angles to generate a multidimensional fused data set and provide a more comprehensive data view. In step S803, based on the multidimensional fused data set, data processing technology is used to optimize and streamline the data. This step may include data cleaning, deduplication, screening and other operations to generate a refined data set to ensure the quality and accuracy of the data. In step S804, based on the refined data set, a comprehensive data management strategy is used to perform the final fusion and integration of the data. This may involve the fusion of different data types, and the proofreading of information consistency and integrity to generate the final split BIM model, which contains the data results of all stages.
[0140] Please refer to FIG10 , which shows a BIM model rapid splitting system. The BIM model rapid splitting system is used to execute the above-mentioned BIM model rapid splitting method. The system includes a preliminary classification module, a functional division module, a project stage association module, a data hierarchy construction module, a primary area processing module, a secondary area processing module, a comprehensive data processing module, a multi-objective optimization module, a logical splitting path module, and a data fusion and integration module.
[0141] The preliminary classification module uses a decision tree classification algorithm to preliminarily classify BIM model data based on building element types and functional requirements, and generates preliminary classification data;
[0142] The functional classification module uses the K-means clustering algorithm based on the preliminary classification data to perform functional classification on the data and generate functional classification data;
[0143] The project phase association module uses association rule learning algorithms based on functional classification data to analyze the relationship between data and project phases and generate project phase association data;
[0144] The data hierarchy building module is based on the project phase related data and uses data merging technology to integrate data and generate a hierarchical data structure;
[0145] The main area processing module is based on a hierarchical data structure and adopts a heuristic rule analysis algorithm to analyze the main area data and generate a main area processing plan;
[0146] The secondary area processing module uses a simplified processing algorithm based on the primary area processing plan to analyze the secondary area and generate a secondary area processing plan;
[0147] The comprehensive data processing module uses data fusion technology and balanced processing strategies to generate a comprehensive data processing solution based on the primary and secondary regional processing plans;
[0148] The multi-objective optimization module is based on a comprehensive data processing solution and uses multi-objective optimization technology to perform differentiated data processing and generate an optimized splitting plan;
[0149] The logical splitting path module uses a predicate logic splitting engine to perform logical reasoning and generate a logical splitting path based on the optimized splitting plan;
[0150] The data fusion and integration module is based on the logical splitting path and adopts data fusion and integration algorithm to integrate the results of the preliminary classification module, functional division module, project stage association module, data hierarchy construction module, main area processing module, secondary area processing module, comprehensive data processing module, multi-objective optimization module, and logical splitting path module to complete the BIM model splitting and generate the split BIM model.
[0151] The system improves data quality through algorithms such as quality verification and data cleaning, reduces errors and problems in the project, and reduces subsequent repair costs. The system can process data from a variety of different sources and formats, providing users with a comprehensive data view, and can better understand and analyze BIM model data. The multi-objective optimization module and the logical split path module provide intelligent decision support, helping users generate optimal split plans and paths, improving project planning and management effects. The data fusion and integration module ensures the consistency and integrity of the data results generated by each module, avoids data dispersion and inconsistency problems, and improves the credibility of BIM model data. In summary, the BIM model rapid splitting system provides comprehensive support for construction and engineering projects, and provides a solid foundation for the successful implementation and management of projects by improving work efficiency, data quality and decision-making level. It is of great significance to improving productivity and quality in the fields of construction and engineering.
[0152] The above are merely preferred embodiments of the present invention and do not limit the present invention in any other form. Any technician familiar with the profession can use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of protection of the technical solution of the present invention.
Claims
1. A BIM model rapid splitting method, characterized in that: The following steps are involved: Based on the building element types and functional requirements, the integrated decision tree classification algorithm and K-means clustering are used to hierarchically process the BIM model data, and classify them by type, function and project stage to generate a hierarchical data structure; Based on the hierarchical data structure, a data optimization algorithm based on heuristic rules is used to implement differentiated processing on the primary area and the secondary area, and the splitting process is optimized to generate an optimized splitting plan; Based on the optimized splitting plan, a splitting engine based on predicate logic is used to perform logical reasoning and select a splitting path to generate a logical splitting path; Based on the logical splitting path, an incremental change detection algorithm is used to update the changed parts in the model to generate updated splitting data; Based on the updated split data, a data compression and optimization algorithm is used to perform data streamlining processing to generate streamlined split data; Based on the streamlined split data, data integrity verification technology is used to optimize data quality and generate quality verification data; Based on the quality verification data, using network topology analysis technology, identifying the interdependence between components, and generating a component association analysis report; Based on the component association analysis report, a data fusion and integration algorithm is used to integrate the hierarchical data structure, the optimized splitting plan, the logical splitting path, the updated splitting data, the streamlined splitting data and the quality verification data, so as to complete the BIM model splitting and generate the split BIM model; The hierarchical data structure includes data hierarchies of multiple functions such as structure, electricity, and pipelines. The logical splitting path specifically refers to the splitting method and sequential path derived based on logical formulas. The updated split data specifically refers to the modification and update information of the changed part of the model. The streamlined split data specifically refers to the data set that has been optimized. The quality verification data specifically refers to the data set that has been tested. The component association analysis report specifically refers to a report that displays the dependencies between components and the strength of network connections.
2. The BIM model rapid splitting method according to claim 1 is characterized in that: Based on the building element types and functional requirements, the integrated decision tree classification algorithm and K-means clustering are used to hierarchically process the BIM model data, and classify the types, functions and project stages. The steps of generating a hierarchical data structure are specifically as follows: Based on the building element types and functional requirements, the decision tree classification algorithm is used to preliminarily classify the BIM model data and generate preliminary classification data; Based on the preliminary classification data, the K-means clustering method is used to functionally divide the data to generate functional classification data; Based on the functional classification data, an association rule learning algorithm is used to analyze the relationship between the data and the project phase, and generate project phase association data; Based on the project phase related data, data merging technology is used to integrate the data and generate a hierarchical data structure.
3. The BIM model rapid splitting method according to claim 2 is characterized in that: Based on the hierarchical data structure, a data optimization algorithm based on heuristic rules is used to implement differentiated processing for primary and secondary areas, and to optimize the splitting process. The specific steps for generating an optimized splitting plan are as follows: Based on the hierarchical data structure, a heuristic rule analysis algorithm is used to analyze the main area data and generate a main area processing plan; Based on the main area treatment plan, a simplified treatment algorithm is used to analyze the secondary area and generate a secondary area treatment plan; Based on the primary area processing plan and the secondary area processing plan, a data fusion technique is used to balance the processing strategies and generate a comprehensive data processing plan; Based on the comprehensive data processing solution, multi-objective optimization technology is used to perform differentiated data processing and generate an optimized splitting plan.
4. The BIM model rapid splitting method according to claim 3 is characterized in that: Based on the optimized split plan, a split engine based on predicate logic is used to perform logical reasoning and select a split path. The specific steps for generating a logical split path are as follows: Based on the optimized splitting plan, a predicate logic algorithm is used to perform preliminary logical reasoning and generate preliminary logical reasoning results; Based on the preliminary logical reasoning results, a logic optimization technique is used to further optimize the logical structure of the split path and generate a logic optimized path result; Based on the logic optimization path result, a weighted sorting algorithm is used to sort the path options to generate a weighted sorting splitting result; Based on the weighted sorting splitting results, a path decision analysis method is used to select a suitable splitting path, optimize the efficiency of logical reasoning, and generate a logical splitting path.
5. The BIM model rapid splitting method according to claim 4 is characterized in that: Based on the logical split path, an incremental change detection algorithm is used to update the changed parts of the model. The steps to generate the updated split data are as follows: Based on the logic splitting path, using incremental change detection technology, identifying and updating the changed parts in the model, and generating preliminary update data; Based on the preliminary update data, a data synchronization protocol is adopted to maintain data consistency and generate synchronous update data; Based on the synchronously updated data, a difference query technology in the database is used to process data differences and generate differentially updated data; Based on the differentiated updated data, a data merging algorithm is used to integrate the data to generate updated split data.
6. The BIM model rapid splitting method according to claim 5 is characterized in that: Based on the updated split data, data compression and optimization algorithms are used to perform data streamlining. The specific steps for generating streamlined split data are as follows: Based on the updated split data, using compression coding technology to reduce the data volume and generate preliminary compressed data; Based on the preliminary compressed data, adopting data reorganization technology, optimizing the data structure, and generating optimized processing data; Based on the optimized processed data, a data reconstruction algorithm is used to reconstruct the data format and generate reconstructed data; Based on the reconstructed data, a data stream processing framework is used to perform stream processing to generate streamlined split data.
7. The BIM model rapid splitting method according to claim 6 is characterized in that: Based on streamlined data splitting, data integrity verification technology is used to optimize data quality and generate quality verification data in the following steps: Based on the streamlined split data, a data integrity detection algorithm is used to perform a preliminary quality check to generate preliminary quality inspection data; Based on the preliminary quality inspection data, a data cleaning algorithm is used to remove inconsistent and erroneous data to generate cleaned data; Based on the cleaned data, integrity enhancement technology is used to optimize data accuracy and generate integrity assessment data; Based on the integrity assessment data, a comprehensive data quality assessment framework is adopted to optimize data quality and generate quality verification data.
8. The BIM model rapid splitting method according to claim 7 is characterized in that: Based on the quality verification data, network topology analysis technology is used to identify the interdependencies between components. The steps to generate a component association analysis report are as follows: Based on the quality verification data, a graph theory algorithm is used to analyze the connectivity between components and generate a preliminary component relationship diagram; Based on the preliminary component relationship diagram, using network flow analysis technology to identify components and dependency paths, and generate a component dependency diagram; Based on the component dependency graph, a cluster analysis algorithm is used to distinguish groups of multiple types of components and generate component group analysis results; Based on the component group analysis results, network topology optimization technology is adopted, and multiple types of network parameters are considered at the same time to further analyze the dependencies and interactions between components and generate a component association analysis report.
9. The BIM model rapid splitting method according to claim 8, characterized in that: Based on the component association analysis report, the data fusion and integration algorithm is used to integrate the hierarchical data structure, optimized splitting plan, logical splitting path, updated splitting data, streamlined splitting data and quality verification data to complete the BIM model splitting. The specific steps for generating the split BIM model are as follows: Based on the component association analysis report, the data results of multiple stages are preliminarily integrated using association data integration technology to generate preliminary integrated data; Based on the preliminary integrated data, a dimensional analysis method is used to integrate various data, and a comprehensive multidimensional data view is created to generate a multidimensional fusion data set; Based on the multi-dimensional fusion data set, data processing technology is used to optimize and streamline the data to generate a refined data set; Based on the refined data set, a comprehensive data management strategy is adopted to carry out the final fusion and integration of the data, and the consistency and integrity of the information are checked to generate a split BIM model.
10. A BIM model rapid splitting system, characterized in that: According to the BIM model rapid splitting method according to any one of claims 1 to 9, the system includes a preliminary classification module, a functional division module, a project stage association module, a data hierarchy construction module, a main area processing module, a secondary area processing module, a comprehensive data processing module, a multi-objective optimization module, a logical splitting path module, and a data fusion integration module; The preliminary classification module uses a decision tree classification algorithm to perform preliminary classification of BIM model data based on building element types and functional requirements to generate preliminary classification data; The functional classification module uses K-means clustering algorithm based on preliminary classification data to perform functional classification on the data and generate functional classification data; The project phase association module uses association rule learning algorithm based on function classification data to analyze the relationship between data and project phases and generate project phase association data; The data level construction module is based on the project phase related data and adopts data merging technology to integrate data and generate a hierarchical data structure; The main area processing module analyzes the main area data based on the hierarchical data structure and adopts a heuristic rule analysis algorithm to generate a main area processing plan; The secondary area processing module uses a simplified processing algorithm based on the primary area processing plan to analyze the secondary area and generate a secondary area processing plan; The comprehensive data processing module generates a comprehensive data processing plan based on the main area processing plan and the secondary area processing plan by using data fusion technology and balancing processing strategies; The multi-objective optimization module is based on a comprehensive data processing solution and adopts multi-objective optimization technology to perform differentiated data processing and generate an optimized splitting plan; The logic splitting path module uses a predicate logic splitting engine to perform logical reasoning and generate a logic splitting path based on an optimized splitting plan; The data fusion and integration module is based on the logical splitting path and adopts the data fusion and integration algorithm to integrate the results of the preliminary classification module, the functional division module, the project stage association module, the data hierarchy construction module, the main area processing module, the secondary area processing module, the comprehensive data processing module, the multi-objective optimization module, and the logical splitting path module to complete the BIM model splitting and generate the split BIM model.
Citation Information
Patent Citations
BIM-based three-dimensional building model splitting processing method and device
CN108427794A
BIM-based building design method and system
CN111723426A
Quick splitting method and system based on BIM model
CN112001022A
Fabricated concrete structure splitting and deepening forward design method based on BIM
CN114707228A
Three-dimensional building model splitting processing method based on BIM
CN115510545A
Cited By
Engineering payment checking method and system based on BIM (Building Information Modeling) calculation quantity result
CN119359266A
Dynamic printing data minimization splitting method based on topological entropy mapping
CN119668533A
Pipeline construction data analysis method based on BIM
CN119939837A
Cross-platform low-code development system and method supporting code export
CN120215920A
Building design method, building construction method, building system and device
CN120509099A