Optical node system, controller, power supply control method, and program

The optical node system employs a controller to generate and select power supply schedules that maintain optimal voltage levels across nodes, addressing inefficiencies in existing systems and reducing power consumption through optimized voltage management.

WO2024236699A1PCT designated stage expired Publication Date: 2024-11-21NT T INC
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/018144
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

Existing optical node systems face challenges in efficiently controlling power supply to multiple nodes via optical fibers, leading to increased power consumption and difficulties in maintaining optimal voltage levels due to timer-based voltage measurement methods.

Method used

An optical node system with a controller that generates and selects power supply schedules to ensure voltage levels of power storage units remain within a predetermined range, reducing power consumption by optimizing voltage measurement and switching operations.

Benefits of technology

This approach allows for precise control of power supply to multiple optical nodes, reducing power consumption and improving communication quality by maintaining optimal voltage levels and minimizing switching costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023018144_21112024_PF_FP_ABST
    Figure JP2023018144_21112024_PF_FP_ABST
Patent Text Reader

Abstract

This optical node system is provided with a first node 1 and a plurality of second nodes 2. The first node 1 is provided with a controller 15 for controlling the supply of power, via an optical fiber 5, to the second nodes 2. The controller 15 is provided with: a calculation unit 151 that repeats a plurality of times, for each of power storage units 25A, 25B provided to each of the second nodes 2, processing to calculate voltages of each of the power storage units after a predetermined length of time for a case in which a power supply destination is switched to the relevant power storage unit, and that generates a plurality of power supply schedules in which the voltages of the power storage units calculated per the predetermined length of time are set; and a selection unit 152 for selecting, from the plurality of power supply schedules, a power supply schedule according to which the voltages of the power storage units set per the predetermined length of time all fall within a predetermined voltage range.
Need to check novelty before this filing date? Find Prior Art

Description

Optical node system, controller, power supply control method and program

[0001] The present disclosure relates to an optical node system, a controller, a power supply control method, and a program.

[0002] A remote node that operates with optical fiber power supply has been proposed. Non-Patent Document 1 proposes an optical node system in which a center side device equipped with a light source and a plurality of optical nodes are connected by optical fibers, and these optical nodes are driven by optical fiber power supply.

[0003] Tomohiro Kawano et. al., “Control using Power-over-Fiber for Remote-Operated Optical Fiber Switching Nodes“, IWCS2022, 4-2

[0004] In Non-Patent Document 1, each optical node periodically measures the voltage of a capacitor that serves as a driving power source, and determines whether the optical fiber power feed destination is the node itself or another node.

[0005] However, in the control method of Non-Patent Document 1, the optical node uses a timer to measure the voltage measurement timing, which causes constant power consumption due to the timer operation. Furthermore, Non-Patent Document 1 also causes power consumption due to periodic voltage measurements. Therefore, there is a problem that it takes time to charge the capacitor.

[0006] Furthermore, in Non-Patent Document 1, the power supply destination is switched after the measured voltage falls below or exceeds a threshold, making it difficult to appropriately control the voltages of the capacitors of all optical nodes.

[0007] The present disclosure has been made in consideration of the above circumstances, and an object of the present disclosure is to provide a technology for appropriately controlling power supply to a plurality of optical nodes while reducing the power consumption of the optical nodes.

[0008] In order to achieve the above object, one aspect of the present disclosure is an optical node system comprising a first node and a plurality of second nodes, wherein the first node comprises a controller that controls power supply to the second node via an optical fiber, and the controller comprises: a calculation unit that repeats a process of calculating, for each power storage unit provided in each second node, the voltage of each power storage unit after a predetermined time when the power supply destination is switched to the power storage unit, multiple times to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each of the predetermined time periods is set; and a selection unit that selects, from the plurality of power supply schedules, a power supply schedule in which the voltages of each power storage unit set for each of the predetermined time periods all fall within a predetermined voltage range.

[0009] One aspect of the present disclosure is a controller that controls an optical node system including a first node and a plurality of second nodes, wherein the first node supplies power to the plurality of second nodes via optical fiber, and the controller includes: a calculation unit that repeats a process of calculating, for each power storage unit included in each second node, the voltage of each power storage unit after a predetermined time when the power supply destination is switched to the power storage unit, multiple times to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each of the predetermined time periods is set; and a selection unit that selects, from the plurality of power supply schedules, a power supply schedule in which the voltages of each power storage unit set for each of the predetermined time periods all fall within a predetermined voltage range.

[0010] One aspect of the present disclosure is a power supply control method performed by an optical node system including a first node and a plurality of second nodes, in which the first node repeats a process of calculating, for each power storage unit included in each second node, the voltage of each power storage unit after a predetermined time when the power supply destination is switched to the power storage unit, multiple times, to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each predetermined time is set, and selects from the multiple power supply schedules a power supply schedule in which the voltages of each power storage unit set for each predetermined time are all within a predetermined voltage range.

[0011] One aspect of the present disclosure is a program for causing a computer to function as the controller.

[0012] According to the present disclosure, it is possible to provide a technique for appropriately controlling power supply to a plurality of optical nodes while reducing the power consumption of the optical nodes.

[0013] Fig. 1 is a diagram showing the configuration of an optical node system according to this embodiment. Fig. 2 is an explanatory diagram for explaining power supply control according to this embodiment. Fig. 3 is an explanatory diagram for explaining a power supply schedule including an arrangement table. Fig. 4 is a diagram showing an example of a method for estimating a stored voltage during power supply. Fig. 5 is a diagram showing an example of a method for estimating a stored voltage during discharge. Fig. 6 is an example of a flowchart of a power supply control process. Fig. 7 is a diagram showing a hardware configuration.

[0014]

[0023] Embodiments of the present disclosure will be described with reference to the accompanying drawings. The embodiments described below are examples of the present disclosure, and the present disclosure is not limited to the following embodiments. Note that components with the same reference numerals in this specification and drawings indicate the same components.

[0015] FIG. 1 is a diagram showing an example of the configuration of an optical node system according to this embodiment.

[0016] The illustrated optical node system includes a center device 1 (first node) and multiple optical nodes 2 (child second nodes). The upstream center device 1 and the multiple downstream optical nodes 2 are connected via an optical fiber 5 (optical fiber transmission path). In the illustrated optical node system, the multiple optical nodes 2 are connected in series to one optical fiber 5.

[0017] In this embodiment, the direction from the optical node 2 to the center device 1 is referred to as the "upstream direction," and the direction from the center device 1 to the optical node 2 is referred to as the "downstream direction."

[0018] The center device 1 is installed in an environment where power is available (for example, in a communication building) and performs optical fiber power feeding. Specifically, the center device 1 outputs light for power feeding to the optical nodes 2 via optical fibers 5. That is, the center device 1 switches the optical switch 21 to the downstream light output from the optical fibers 5 to the target optical node 2 side, stores the downstream light in the power storage units 25A and 25B via the optical coupler 22A and the photoelectric conversion unit 23, and supplies drive power to all active elements provided in the optical node 2.

[0019] The illustrated center device 1 includes a light source 11 that outputs light, a modulator 12, an optical circulator 13, a light receiver 14, and a controller 15. Note that light will also be referred to as an optical signal in the following description.

[0020] The optical circulator 13 branches an optical signal in the downstream direction (hereinafter referred to as "downstream signal") and an optical signal in the upstream direction (hereinafter referred to as "upstream signal"). The downstream signal and the upstream signal are branched by passing through the optical circulator 13, and the center device 1 and the optical node 2 can be connected by a single optical fiber 5.

[0021] The light source 11 outputs light to the optical node 2 via the optical fiber 5. The light source 11 is, for example, a laser diode, and emits laser light. The light emitted from the light source 11 is incident on the optical fiber 5 via the modulator 12 and the optical circulator 13. In this embodiment, downstream signals and upstream signals are transmitted and received using the light source 11 for power supply.

[0022] The modulator 12 (intensity modulator) modulates the light output from the light source 11 under the control of the controller 15 to generate a downstream signal, superimposes it on the power supply light, and outputs it to the optical node 2. In the example shown in the figure, an external modulation method is used in which the light source 11 and the modulator 12 are separate, but a direct modulation method may also be used. For example, the light source 11 may be configured as an internally modulated laser with a modulation function.

[0023] The optical receiver (photoelectric converter) 14 receives an upstream signal output from the optical node 2 via the optical fiber 5, converts it into an electrical signal, and outputs it to the controller 15. The upstream signal may include, for example, detection information measured and detected by the device 30 of the optical node 2. The optical receiver 14 uses a light-receiving element such as a photodiode.

[0024] The controller 15 controls the optical node system. For example, the controller 15 controls power supply to the optical node 2 via the optical fiber 5. The controller 15 also sends a modulation signal to the modulator 12 and superimposes a control signal (downstream signal) to the optical node 2 onto the power supply light output by the light source 11. The control signal may be, for example, a switching instruction for switching the power supply destination power storage units 25A and 25B, an instruction to drive the device 30, etc. The controller 15 also receives an upstream signal output from the optical receiver 14, and may transmit detection information detected by the device 30, etc., included in the upstream signal, to another system (not shown).

[0025] The illustrated controller 15 includes a calculation unit 151 , a selection unit 152 , and a storage unit (database) 153 .

[0026] The calculation unit 151 repeats a process of calculating, for each of the power storage units 25A, 25B included in each optical node 2, a voltage of each power storage unit after a predetermined time (Δt) when the power supply destination is switched to the power storage unit, multiple times to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each predetermined time is set. The calculation unit 151 may calculate, for each of the plurality of power supply schedules, a switching cost incurred by switching the power storage unit 25A, 25B as the power supply destination. The calculation unit 151 may set the power storage state of each of the power storage units 25A, 25B using the calculated voltage, a first threshold value indicating the lower limit of a predetermined voltage range, and a second threshold value indicating the upper limit of the voltage range.

[0027] The selection unit 152 selects, from the plurality of power supply schedules, a power supply schedule in which the voltages of the power storage units 25A, 25B set for each predetermined time fall within a predetermined voltage range. The selection unit 152 may select, from the plurality of power supply schedules, a power supply schedule in which the voltages of the power storage units 25A, 25B set for each predetermined time fall within a predetermined voltage range and which has the smallest switching cost.

[0028] A power supply schedule is stored in storage unit 153. The power supply schedule includes a table in which the calculated voltages and power storage states of power storage units 25A and 25B are set for each predetermined time period. The power supply schedule will be described later.

[0029] The optical node 2 is connected to the center device 1 via an optical fiber 5 and is capable of storing power through optical power supply, so that the optical node 2 can be installed in a location without a power source.

[0030] In the optical node system of this embodiment, a plurality of optical nodes 2 are connected in series to a center device 1 via optical fibers 5. This allows a single light source 11 in the center device 1 to drive a plurality of optical nodes 2.

[0031] The illustrated optical node 2 includes an optical switch 21, optical couplers 22A and 22B, an opto-electrical conversion unit 23, an optical circulator 24, a light receiving unit 27, an upstream communication unit 28, a microcontroller 29, power storage units 25A and 25B, a boost circuit 26, a device 30, and load switches 31A, 31B, 31C, and 31D.

[0032] The optical switch 21 switches the light output from the center device 1 to its own node or another downstream node. In other words, the optical switch 21 can switch the optical power supply direction used for power storage between its own node and another downstream node. The optical switch 21 of this embodiment is arranged in front of the optical coupler 22A, and switches whether to guide downstream light output from the center device 1 or the upstream optical node 2 to its own optical coupler 22A or to the optical node 2 installed downstream. The optical switch 21 can be, for example, a 1x2 optical switch. This allows one light source 11 of the center device 1 to supply power to and drive multiple optical nodes 2.

[0033] The optical coupler 22A (first optical coupler) branches the light output from the center device 1 via the optical switch 21 into two. The optical coupler 22A is a multiplexer / demultiplexer that can multiplex / demultiplex downstream light and upstream light. The optical coupler 22A is a branching ratio coupler that branches a larger optical power of the downstream light output from the center device 1 to the photoelectric conversion unit 23 with a branching ratio of, for example, 90:10 or 99:1. The light branched by the optical coupler 22A and having a smaller optical power is guided to the optical circulator 24.

[0034] The photoelectric conversion unit 23 converts the light output from the optical coupler 22A into electricity and stores the electricity in the storage units 25A and 25B. The photoelectric conversion unit 23 uses a photoelectric conversion element capable of receiving the wavelength of the laser light emitted by the light source 11. The photoelectric conversion element can be an easily available element suitable for the long wavelength band of 1300 nm to 1600 nm used for communications, such as an element made of indium gallium arsenide, with an open circuit voltage of 5 V or less and a conversion efficiency of approximately 30%. The wavelength of the light emitted by the light source 11 is set to a wavelength that corresponds to the photoelectric conversion element of the photoelectric conversion unit 23 used.

[0035] The optical circulator 24 separates the other light branched from the optical coupler 22A into a downstream signal and an upstream signal.

[0036] The optical coupler 22B (second optical coupler) branches the light separated by the optical circulator 24. The light branched by the optical coupler 22B is guided to a light receiving unit 27 that receives the light as a downstream signal and an upstream communication unit 28 that generates an upstream signal.

[0037] The light receiving unit 27 receives one of the lights branched from the optical coupler 22B as a downstream signal. A light receiving element such as a photodiode is used for the light receiving unit 27. The downstream signal includes a control signal transmitted by the center device 1.

[0038] The upstream communication unit 28 modulates the other light branched by the optical coupler 22B to generate modulated light and outputs the modulated light to the center device 1. Specifically, the upstream communication unit 28 includes a reflective optical switch (not shown) that performs modulation synchronized with a signal from a microcomputer 29 (described later). The generated modulated light is output to the center device 1 via the optical fiber 5 as an upstream signal to the center device 1. For example, the upstream communication unit 28 may generate modulated light using an optical switch that controls ON / OFF to attenuate or not attenuate the other light. The upstream communication unit 28 preferably operates at a low voltage and with low power consumption of several μW or less. For example, an electrostatically driven MEMS optical switch that requires little drive power and is generally available may be used.

[0039] The optical node 2 of this embodiment includes multiple power storage units 25A, 25B depending on the application. Here, the following description will be given using an example in which the optical node 2 includes two power storage units 25A, 25B. The power storage units 25A, 25B can be, for example, electric double layer capacitors.

[0040] The power storage unit 25A (first power storage unit) stores the electric energy converted by the photoelectric conversion unit 23. The electric energy stored in the power storage unit 25A serves as a power source for active elements such as the microcomputer 29, the optical switch 21, and the upstream communication unit 28. The power storage unit 25A can also be said to be a power storage unit for the microcomputer 29.

[0041] The power storage unit 25B (second power storage unit) stores the electric energy converted by the photoelectric conversion unit 23. The power storage unit 25B can also be said to be a power storage unit for the device 30 driven by the optical node 2.

[0042] In addition, in supplying voltage to each active element, the supply voltage can be adjusted appropriately by a boost circuit 26 (DC / DC converter or the like).

[0043] When two power storage units 25A and 25B are present, for example, by providing a load switch 31A, when the load switch 31A is OFF, only power storage unit 25A can store power, and when the load switch 31A is ON, only power storage unit 25B can store power. However, in the illustrated configuration, when the load switch 31A is ON, power storage unit 25A and power storage unit 25B are connected in parallel, so strictly speaking, when the voltage of power storage unit 25B is the same as or higher than that of power storage unit 25A, current also flows to power storage unit 25A.

[0044] The microcontroller 29 (hereinafter referred to as "microcomputer") controls active elements such as the optical switch 21, the upstream communication unit 28, the load switches 31A, 31B, 31C, and 31D, and the device 30. The microcomputer 29 may be, for example, a microprocessor.

[0045] The microcomputer 29 mainly has the following functions.

[0046] (1) Downstream Signal Analysis Function The microcomputer 29 analyzes the downstream signal received by the light receiving unit 27. The light output from the light source 11 of the center device 1 is intensity-modulated to the output laser light under the control of the controller 15, and becomes a downstream signal such as a TTL (Time to Live) or CMOS signal. The downstream signal includes various control signals such as switching instructions for various switches (optical switch 21, load switch 31A, etc.) for switching the power supply destination, and driving instructions for the device 30.

[0047] (2) Upstream Signal Generation Function The microcomputer 29, in cooperation with the downstream signal analysis function, generates an upstream signal by modulating the optical switch provided in the upstream communication unit 28.

[0048] (3) Operation Control Function The microcomputer 29, in cooperation with the downstream signal analysis function, switches the switch 21 and the load switches 31A, 31B, 31C, and 31D in accordance with a control signal from the center device 1, and also drives the device 30. The microcomputer 29 may measure the voltage of the power storage units 25A and 31 using an AD converter (not shown) or the like provided in the microcomputer 29, generate an upstream signal including the measured voltage using the upstream communication unit 28, and transmit the upstream signal to the center device 1.

[0049] In this way, by linking the above three functions together, the microcontroller 29 can communicate with the center device 1, accept execution instructions from the center device 1, and select and supply power to the desired storage unit from among the multiple storage units 25A, 25B of the multiple optical nodes 2.

[0050] The load switches 31A, 31B, 31C, and 31D are driven according to instructions from the microcomputer 29. The load switch 31A is provided between the photoelectric conversion unit 23 and the power storage units 25A and 25B, and controls the supply of electrical energy converted by the photoelectric conversion unit 23 to the power storage units 25A and 25B. Specifically, the load switch 31A performs ON / OFF control so that power is supplied to the power storage unit 25B (device 30) only when necessary. This makes it possible to reduce unnecessary consumption of the minute amount of power supplied to the optical node 2.

[0051] The load switch 31B is provided between the power storage unit 25B and the boost circuit 26, the load switch 31C is provided between the boost circuit 26 and the device 30, and the load switch 31D is provided between the boost circuit 26 and the optical switch 21.

[0052] The device 30 is a device that is driven using the power stored in the power storage unit 25 B. Each unit of the optical node 2 is connected via a power storage distribution line and / or a signal line.

[0053] 1 shows two optical nodes 2 connected in series, three or more optical nodes 2 may be connected to the center device 1. Also, although the illustrated optical node 2 includes two power storage units 25A and 25B, it may include only one power storage unit. In this case, the device 30 is driven using the power stored in the power storage unit 25A. Also, the optical node 2 may include three or more power storage units.

[0054] Furthermore, among the multiple optical nodes 2 connected in series, the optical node 2 located farthest from the center device 1 may not be equipped with an optical switch 21, and the optical fiber 5 may be directly connected to the optical coupler 22A.

[0055] 2 is an explanatory diagram for explaining power supply control of this embodiment. The optical node system shown in FIG. 2 includes four optical nodes 2A, 2B, 2C, and 2D, and each of the optical nodes 2A, 2B, 2C, and 2D includes two power storage units. Here, only the optical switch 21 and the two power storage units of each optical node are shown, and the rest is omitted.

[0056] The illustrated optical node system includes, in order of proximity to the center device 1, optical node 2A, optical node 2B, optical node 2C, and optical node 2D. In FIG. 2, the first power storage unit of optical node 2A is labeled "A1" and the second power storage unit is labeled "A2". The first power storage unit of optical node 2B is labeled "B1" and the second power storage unit is labeled "B2". The first power storage unit of optical node 2C is labeled "C1" and the second power storage unit is labeled "C2". The first power storage unit of optical node 2D is labeled "D1" and the second power storage unit is labeled "D2".

[0057] 2 (arrangement tables) are examples of power storage information stored in the storage unit 153 of the center device 1. The illustrated tables 200 and 210 have, for each power storage unit, a power supply destination, a storage voltage (V), and a power storage state.

[0058] The power supply destination (power supply destination array) is set to indicate whether or not the power storage unit is currently supplying power. Here, "0" is set to a power storage unit that is not supplying power, and "1" is set to a power storage unit that is currently supplying power. In FIG. 2, power storage unit D1 of optical node 2D is currently supplying power, so "1" (power supplying) is set to the power supply destination of the seventh element (n=7) in the array of table 200, and "0" is set to the other power storage units. "1" (power supplying) cannot be set to multiple power storage units at the same time.

[0059] The storage voltage (storage voltage array) is set with the storage voltage (voltage value) of each storage unit. The storage voltage indicates the amount of stored electricity in the storage unit. In this embodiment, the controller 15 calculates (estimates) the storage voltage. The calculation of the storage voltage will be described later.

[0060] The power storage state (power storage state array) indicates the power storage state of each power storage unit. The controller 15 sets the power storage state of each power storage unit using the calculated power storage voltage and a first threshold and a second threshold. The second threshold is greater than the first threshold. Specifically, the controller 15 classifies the power storage state of each power storage unit into levels based on the calculated power storage voltage, and sets the level of the power storage state to the power storage state.

[0061] In the illustrated example, a first threshold (lower limit voltage) and a second threshold (upper limit voltage) are set. The controller 15 sets the storage state by comparing the calculated storage voltage of each power storage unit with the first threshold and the second threshold. Here, the storage state of a storage voltage less than the first threshold is set to "0," the storage state of a storage voltage equal to or greater than the first threshold and equal to or less than the second threshold is set to "1," and the storage state of a storage voltage greater than the second threshold is set to "2."

[0062] That is, the power storage state is an arrangement in which, for the operating voltage range of the optical node (above a first threshold and below a second threshold), a state in which the voltage of the power storage unit is below the lower limit of the operating voltage range is "0," a state in which it is within the operating voltage range is "1," and a state in which it is above the upper limit of the operating voltage range is "2." When the power storage state is "1," it can be said that the storage voltage of the power storage unit is within an appropriate operating voltage range. Therefore, the controller 15 selects a power supply schedule in which the power storage states of all power storage units are "1."

[0063] Table 210 shows the state after Δt seconds when the power storage unit of the power supply destination is switched from the state of table 200 to A1 of optical node 2A.

[0064] At the power supply destination, "1" is set to the power storage unit A1 (the first element in the array) of the optical node 2A, and "0" is set to the other power storage units.

[0065] The storage voltage is updated to the voltage of each power storage unit calculated by a voltage estimation method described later. At this time, controller 15 calculates the storage voltage for power storage unit A1 using the voltage estimation method during charging, and calculates the storage voltage for the other power storage units using the voltage estimation method during discharging.

[0066] The state of charge is set to a state of charge corresponding to the calculated stored voltage. The controller 15 determines the state of the stored voltage of each power storage unit and sets the determination result.

[0067] Next, a description will be given of the switching cost incurred when switching the power storage unit to which power is supplied.

[0068] 2, the power supply destination is switched from the power storage unit D1 of the optical node 2D to the power storage unit A1 of the optical node 2A. In order to actually switch the power supply destination, it is necessary to operate the three optical switches 21 shown in the figure. If the cost of operating one optical switch 21 is, for example, "1," in the example of FIG. 2, the controller 15 calculates the switching cost as "3."

[0069] Furthermore, for example, if the cost is set to "0" when the first power storage units A1, B1, C1, and D1 are used before the switching and remain the first power storage units A1, B1, C1, and D1 after the switching, the cost is set to "0.5" when the second power storage units A2, B2, C2, and D2 are used before the switching and remain the first power storage units A1, B1, C1, and D1 after the switching, and the cost is set to "1" when the second power storage units A2, B2, C2, and D2 are used before the switching and remain the second power storage units A2, B2, C2, and D2 after the switching, then it is possible to calculate the corresponding switching costs. This switching cost includes, for example, the cost of operating the load switch 31A.

[0070] The switching cost is linked to the energy consumption of the entire optical node 2 that occurs when switching the power supply destination. Therefore, a lower switching cost means a smaller number of operations of the optical switch 21, the load switch 31A, etc., and means that electrical energy is not consumed in the switching operation. The switching cost is used when selecting an optimal power supply schedule, which will be described later.

[0071] 3 is a diagram illustrating a comprehensive array calculation for an estimation period of T (NΔt) seconds according to this embodiment. Here, a method will be described in which the controller 15 generates and calculates an estimated table every predetermined time (Δt seconds) to generate a plurality of patterns of power supply schedules for the estimation period of T seconds.

[0072] In the initial state, as shown in table 200 in Fig. 2, the power supply destination is the power storage unit D1 of optical node 2D. At this time, the controller 15 generates a table of all patterns after Δt seconds in which "1" is set to any of the n power storage units in the array of power supply destinations. Fig. 3 illustrates a table 211 in which the power storage unit A1 of optical node 2A is "1" and a table 212 in which the power storage unit A2 of optical node 2A is "1". Similarly, the controller 15 also generates a table in which the power storage units B1, B2, C1, C2, D1, and D2 are each "1". As a result, eight patterns of tables after Δt seconds are generated.

[0073] The controller 15 sets the storage voltage of each storage unit after Δt seconds, calculated using the voltage estimation method described below, as the storage voltage of each table, and sets the storage state of each storage unit, determined using the calculated storage voltage, as the storage state.

[0074] The controller 15 also sets the calculated switching cost in each table. For example, in the case of table 211, switching is from the power storage unit D1 of optical node 2D to the power storage unit A1 of optical node A. As shown in FIG. 2, three optical switches 21 are operated, so the switching cost is, for example, "3." In the case of table 212, switching is from the power storage unit D1 of optical node 2D to the power storage unit A2 of optical node A. In this case, as shown in FIG. 2, three optical switches 21 are operated, and switching is also from the first power storage unit D1 to the second power storage unit A2, so the switching cost is, for example, "3.5."

[0075] Next, the controller 15 generates a table for 2Δt seconds later in the same manner as the generation of the table for Δt seconds later. Specifically, for each pattern in the table for Δt seconds later, the controller 15 sets the pattern as the initial state, calculates the storage voltage for Δt seconds later when "1" is set for each of the n elements of the power supply destination, and sets a storage voltage array, and determines the voltage state based on the storage voltage to set a storage state array. The controller 15 also calculates the switching cost.

[0076] 3 shows tables 221 and 222 for 2Δt seconds later when the table for Δt seconds later is table 211. Table 221 is a table for when the power supply destination is power storage unit A1 of optical node 2A, and table 222 is a table for when the power supply destination is power storage unit A2 of optical node 2A. The controller 15 also generates tables for other patterns for 2Δt seconds later when the table for Δt seconds later is table 211. Similarly, the controller 15 also generates tables for all patterns for 2Δt seconds later when the table for Δt seconds later is other than table 211.

[0077] This makes it possible to acquire the storage voltage and storage state of each power storage unit 2Δt seconds after the initial state for all switching patterns.

[0078] The controller 15 repeats the same calculation N times. As a result, the power supply schedule after the estimated period T seconds, represented as NΔt, is calculated as N A pattern can be generated. The power supply schedule of each pattern may include all corresponding tables for Δt seconds later, 2Δ seconds later, ..., NΔt seconds later. That is, the power supply schedule may include trajectories of the power supply destination array, the storage voltage array, and the storage state array. Furthermore, the power supply schedule need not be in a table format, but may include the power supply destination for each Δt, and the storage voltage and storage state of each power storage unit extracted from the corresponding table. Note that the power supply schedule may not include the storage state.

[0079] Therefore, by selecting any one of the power supply schedules, it is possible to grasp the stored voltage and the stored state when the power supply destination is switched according to the selected power supply schedule.

[0080] Furthermore, by accumulating each switching cost calculated every Δt seconds according to the selected power supply schedule, it is possible to derive the total switching cost of the power supply schedule.

[0081] Furthermore, the controller 15 can determine that a power supply schedule in which there is a power storage unit whose power storage state has become "2" or "0" is an inappropriate power supply schedule and can eliminate the power supply schedule. Furthermore, the controller 15 can eliminate a power supply schedule in which the total switching cost is relatively high from the viewpoint of the amount of power consumption.

[0082] Next, an example of a method for estimating the stored voltage of the power storage unit will be described.

[0083] In this embodiment, the photoelectric conversion unit 23 of the optical node 2 is a photodiode, and the power storage units 25A and 25B are capacitors. The microcomputer 29 of the optical node 2 may be able to measure the voltages of the power storage units 25A and 25B in the initial state in response to an instruction from the controller 15.

[0084] FIG. 4 shows a circuit diagram of the optical node 2 when the power storage units 25A and 25B are being charged by optical power feeding.

[0085] The output current of the photodiode 23 is I PD and the output voltage is V PD Let's say.

[0086] The current consumption of the microcomputer 29 is I LIC and the applied voltage is V LIC Let's say.

[0087] The input current of capacitors 25A and 25B is I CAP and the voltage across both ends is V CAP Let's say.

[0088] The microcomputer 29 assumes that there is no particular operation and calculates the power consumption I LIC can be considered as a constant.

[0089] Output current I of photodiode 23 PD and the voltage across the capacitor V CAP Regarding the electrical characteristics, the following formula holds:

[0090]

[0091] where J0 is the saturation reverse current of the photodiode 23, η is the photon-electron conversion rate of the photodiode 23, P0 is the intensity of the power supply light incident on the photodiode 23, and T is the temperature of the photodiode 23. k, e, λ, h, and c are the Boltzmann constant, the elementary charge, the wavelength of the power supply light, Planck's constant, and the speed of light, respectively. Also, C is the capacitance of the capacitors 25A and 25B.

[0092] Furthermore, the following formula is established from Kirchhoff's law:

[0093]

[0094] From the above, the voltage V across the capacitors 25A and 25B during charging CAP The following equation (1) holds true.

[0095]

[0096] Therefore, during power supply, the voltage calculated by equation (1) becomes equal to the voltage V across the capacitors 25A and 25B as time dt passes. CAPIn this way, the controller 15 can calculate the stored voltage after Δt seconds during power supply using equation (1). Note that dt may be smaller than Δt or may be the same as Δt.

[0097] FIG. 5 shows a circuit diagram when the optical power supply is stopped and the capacitors 25A and 25B are discharging.

[0098] The microcomputer 29 assumes that there is no particular operation and consumes power I LIC can be considered as a constant.

[0099] The following equations hold for the capacitors 25A and 25B based on their electrical characteristics.

[0100]

[0101] where V H is the voltage of the capacitors 25A and 25B at the time when the optical power supply is stopped.

[0102] Furthermore, the following formula is established from Kirchhoff's law:

[0103]

[0104] From the above, the voltage across the capacitor during discharge, V CAP The following equation (2) holds true.

[0105]

[0106] That is, the stored voltage of the capacitors 25A and 25B during discharge is V H As time t passes, the stored voltage decreases by the amount of power consumption from [Delta]t. This allows the controller 15 to calculate the stored voltage after Δt seconds during discharge using equation (2).

[0107] As a result, controller 15 can estimate the stored voltage of each of power storage units 25A and 25B.

[0108] FIG. 6 is a diagram illustrating an example of a flowchart of the power supply control process of the optical node system of this embodiment.

[0109] The controller 15 stamps a start time t0 at which power supply starts from an initial state (for example, the state of table 200 in FIG. 2 ) to a predetermined power storage unit as a power supply destination, and sets an estimated time t1 (S11). The initial value of t1 is 0. In the case of a cold start state in which no power is stored in the power storage units of all optical nodes 2, the initial state may be such that "1" is set for the first element of the power supply destination (power storage unit A1 of node 2A in FIG. 2 ).

[0110] The controller 15 calculates, for each power storage unit included in each optical node 2, the storage voltage of each power storage unit Δt seconds later (a predetermined time later) when the power supply destination is switched from the initial power supply destination to the power storage unit (S12). Specifically, the controller 15 calculates the storage voltage for a power storage unit currently supplying power using the above-described formula (1), and for other power storage units using the above-described formula (2). Note that, for the storage voltage of each power storage unit immediately before the power supply destination is switched, the controller 15 may use a value calculated in the previous estimation period T, or may acquire a storage voltage measured by each optical node 2. Furthermore, the controller 15 calculates, for each power storage unit included in the optical node 2, a switching cost when the power supply destination is switched from the initial power supply destination to the power storage unit (S12). Then, the controller 15 updates t1 to t1 + Δt.

[0111] The controller 15 determines the state of charge based on the charge voltage calculated in S12 (S13). As a result, the controller 15 creates a table of all patterns after Δt seconds (see FIGS. 2 and 3) and stores it in the storage unit 153.

[0112] The controller 15 adds the current switching cost calculated in S13 to the previous switching cost calculated in S14 for each pattern (S14).

[0113] The controller 15 determines whether the estimated time t1 is equal to the estimated period T (S15). If t1 is not equal to T (S15: NO), the controller 15 returns to S12 and repeats the subsequent processes.

[0114] If the estimated time t1 = the estimated period T (S15: YES), the controller 15 selects a power supply schedule in which the power storage states of all the power storage units calculated every Δt seconds in the estimated period T are within the operating voltage range (power storage state: "1") and which has the smallest total switching cost (S16). That is, the controller 15 confirms that the voltage state is within the operating voltage range in all time periods in the selected power supply schedule.

[0115] The controller 15 determines whether or not there is a change in the power supply destination at the current time t2 (S17). That is, the controller 15 determines whether or not it is time to change the power storage unit of the power supply destination at the current time t2 in order to switch the power supply destination in accordance with the power supply schedule selected in S16. Specifically, the controller 15 determines whether or not the current time t2 is the switching timing every Δt, and whether or not there is a change from the current power supply destination to another power supply destination in the selected power supply schedule.

[0116] If it is determined that it is time to switch the power supply destination (S17: YES), the controller 15 generates a control signal for switching to the changed power supply destination in the power supply schedule (S18). Specifically, the controller 15 controls the modulator 12 to modulate the light output from the light source 11 to generate a control signal (downstream signal) for switching the power supply destination, and transmits it to the corresponding optical node. The microcomputer 29 of the optical node 2 operates the optical switch 21, the load switch 31A, etc. in accordance with the control signal to switch the power storage unit of the power supply destination. If it is not time to switch the power supply destination (S17: NO), proceed to S19.

[0117] The controller 15 determines whether the current time t2 - the start time t0 = T (S19), and if t2 - t0 = T is not true (S19: NO), the process returns to S17. On the other hand, if t2 - t0 = T (S19: YES), the estimation period T has elapsed, so the controller 15 updates the start time t0 to t0 + T (S20), returns to S12, and repeats the subsequent processes.

[0118] In the power supply control process of the present embodiment described in Fig. 6, the power storage state is determined based on the storage voltage in S13, but the process of S13 does not have to be performed. That is, although the table shown in Fig. 3 of the present embodiment and the power supply schedule including the table include the power storage state in addition to the storage voltage, the table and the power supply schedule do not have to include the power storage state. In this case, the controller 15 may determine in S16 whether the storage voltage of each power storage unit is within the operating voltage range (not less than the first threshold value and not more than the second threshold value), and select a power supply schedule in which all storage voltages fall within the operating voltage range.

[0119] The optical node system of the present embodiment described above includes a center device 1 and a plurality of optical nodes 2, and the center device 1 includes a controller 15 that controls power supply via optical fibers to the optical nodes 2. The controller 15 includes a calculation unit 151 that repeats a process of calculating, for each power storage unit included in each optical node 2, the voltage of each power storage unit after a predetermined time when the power supply destination is switched to the power storage unit, a plurality of times to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each predetermined time (Δt) is set, and a selection unit 152 that selects, from the plurality of power supply schedules, a power supply schedule in which the voltages of each power storage unit set for each predetermined time fall within a predetermined voltage range.

[0120] In this way, the controller 15 of this embodiment calculates and estimates the voltage of each power storage unit. This eliminates the need for the controller 15 to perform communication processing to inquire about the voltage of each optical node 2, and eliminates the need for each optical node 2 to measure the voltage of its power storage unit and transmit the measured voltage to the controller 15. This makes it possible to reduce the power consumption of the optical nodes 2.

[0121] Furthermore, the controller 15 of this embodiment generates a plurality of power supply schedules in which the voltage of each power storage unit calculated for each predetermined time is set, and selects a power supply schedule in which the voltages of each power storage unit set for each predetermined time fall within a predetermined voltage range. As a result, in this embodiment, an optimal power supply schedule indicating which power storage unit of which optical node 2 should be supplied with power can be constructed, and power supply to a plurality of optical nodes can be appropriately controlled without directly inquiring about the voltage of each power storage unit to the optical node 2.

[0122] Specifically, in this embodiment, the storage voltage of each power storage unit is calculated every predetermined time (Δt), a power supply schedule for the entire estimated period T is generated, and a power supply schedule is selected in which the storage voltages of all power storage units fall within a predetermined voltage range in all time periods. This makes it possible to eliminate power supply schedules in which any power storage unit falls below the lower limit voltage. It also makes it possible to avoid the risk of multiple power storage units falling below the lower limit voltage at approximately the same time, causing power storage units that are not supplied with power to fall significantly below the lower limit voltage.

[0123] In other words, by selecting a power supply schedule that switches the power supply destination at the appropriate time, it is possible to avoid the risk of the voltage of the power storage unit falling outside the operating voltage range, thereby improving the communication quality of the optical node system and providing stable services to users.

[0124] In this embodiment, the controller 15 calculates the total switching cost incurred by switching the power storage unit to be supplied with power for each of the plurality of power supply schedules, and selects the power supply schedule with the lowest switching cost, thereby reducing the power consumption of the optical node 2.

[0125] The controller 15 described above can be, for example, a general-purpose computer system as shown in Fig. 7. The computer system shown in the figure includes a CPU (Central Processing Unit, processor) 901, a memory 902, a storage 903 (HDD: Hard Disk Drive, SSD: Solid State Drive), a communication device 904, an input device 905, and an output device 906. The memory 902 and the storage 903 are storage devices. In this computer system, the CPU 901 executes a predetermined program loaded on the memory 902, thereby realizing the functions of the controller 15.

[0126] The controller 15 may be implemented in one computer or in multiple computers. The controller 15 may also be a virtual machine implemented in a computer. The program for the controller 15 may be stored in a computer-readable recording medium such as a HDD, SSD, USB (Universal Serial Bus) memory, CD (Compact Disc), or DVD (Digital Versatile Disc), or may be distributed via a network. The computer-readable recording medium may be, for example, a non-transitory recording medium.

[0127] The present disclosure is not limited to the above-described embodiment, and various modifications are possible within the scope of the gist thereof. For example, in the above-described embodiment, the controller 15 is arranged inside the center device 1, but this is not limiting. The controller 15 may be arranged independently outside the center device 1. In this case, the controller 15 is connected to the modulator 12 and the photodetector 14 of the center device 1.

[0128] Furthermore, in the power supply schedule up to the estimated cycle T in this embodiment, the state immediately thereafter, T+Δt seconds later, is not calculated, and therefore, there is a possibility that multiple power storage units will fall outside the operating voltage range after T+Δt seconds. Therefore, when the estimated cycle T is set, a margin time t3 may be provided to generate a power supply schedule up to T+t3, thereby reliably avoiding a situation in which multiple power storage units fall outside the operating voltage range after T+Δt seconds.

[0129] 1: Center device (first node) 11: Light source 12: Modulator 13: Optical circulator 14: Photoreceiver 15: Controller 151: Calculation unit 152: Selection unit 153: Storage unit 2, 2A, 2B, 2C, 2D: Optical node (second node) 21: Optical switch 22A, 22B: Optical coupler 23: Photoelectric conversion unit 24: Optical circulator 25A, 25B: Power storage unit 26: Boost circuit 27: Photoreceiver 28: Upstream communication unit 29: Microcomputer 29 30: Device 30 31A, 31B, 31C, 31D: Load switch

Claims

1. An optical node system comprising a first node and a plurality of second nodes, wherein the first node comprises: a controller that controls power supply to the second node via an optical fiber, and the controller comprises: a calculation unit that generates a plurality of power supply schedules in which the voltage of each power storage unit calculated for each predetermined time when the power supply destination is switched to the power storage unit, by repeating a plurality of times for each power storage unit comprised in each second node, and the voltage of each power storage unit calculated for each predetermined time is set; and a selection unit that selects from the plurality of power supply schedules a power supply schedule in which the voltages of each power storage unit set for each predetermined time are all within a predetermined voltage range.

2. The optical node system according to claim 1, wherein the calculation unit calculates a switching cost incurred by switching the power storage unit to which power is supplied for each of the plurality of power supply schedules, and the selection unit selects from the plurality of power supply schedules a power supply schedule in which all of the voltages of the power storage units set for each of the specified times fall within a specified voltage range and which has the smallest switching cost.

3. The optical node system according to claim 1, wherein each second node comprises a plurality of said power storage units.

4. The optical node system of claim 1, wherein the power supply schedule includes a table in which the calculated voltage and power storage state of each power storage unit are set for each of the specified time periods, and the calculation unit sets the power storage state of each power storage unit using the calculated voltage, a first threshold value indicating a lower limit of the voltage range, and a second threshold value indicating an upper limit of the voltage range.

5. A controller for controlling an optical node system including a first node and a plurality of second nodes, wherein the first node supplies power to the plurality of second nodes via optical fiber, the controller comprising: a calculation unit that repeats a process of calculating, for each power storage unit included in each second node, a voltage of each power storage unit after a predetermined time when the power supply destination is switched to the power storage unit, multiple times to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each of the predetermined times is set; and a selection unit that selects, from the plurality of power supply schedules, a power supply schedule in which the voltages of each power storage unit set for each of the predetermined times all fall within a predetermined voltage range.

6. A power supply control method performed by an optical node system having a first node and a plurality of second nodes, wherein the first node: for each power storage unit included in each second node, repeats a process of calculating the voltage of each power storage unit after a predetermined time when the power supply destination is switched to the power storage unit a plurality of times, to generate a plurality of power supply schedules in which the voltage of each power storage unit calculated for each predetermined time is set; and selects from the plurality of power supply schedules a power supply schedule in which the voltages of each power storage unit set for each predetermined time are all within a predetermined voltage range.

7. A program for causing a computer to function as the controller according to claim 5.

Citation Information

Patent Citations

  • Power reception device, and optical power feed / information transmission system and method

    JP2010011339A

  • Optical fiber path switching apparatus and method

    JP2023031767A

  • Monitoring control device and optical power feeding system

    WO2022130525A1