Method and apparatus for determining movement authority distance of virtual-track train, and device
By determining the location of obstacles near the track intersection and side collision risk of virtual track trains, and calculating the movement authorized distance with the braking distance, the driving safety problem of virtual track trains near the track intersection is solved, and the risk of side collision is reduced.
Patent Information
- Application Number
- PCT/CN2023/122838
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-25
- Filing Date
- 2023-09-28
- Publication Date
- 2024-11-28
AI Technical Summary
The prior art lacks mature solutions to determine the authorized distance of virtual track trains near track intersections, resulting in poor driving safety and especially side collision risks.
By determining the current train location, whether there is an obstacle train, the distance between the obstacle and the track intersection and the risk of side collision, combined with the conventional braking distance and emergency braking distance, the current movement authorized distance is calculated to reduce the side Collision risk.
It realizes the timely identification of the side collision risks at rail intersections, and controls the train to travel according to the mobile authorized distance, which improves driving safety and reduces the risk of side collisions near rail intersections.
Smart Images

Figure CN2023122838_28112024_PF_FP_ABST
Abstract
Description
Method, device and equipment for determining authorized distance of virtual track train movement Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a method, device and equipment for determining an authorized movement distance of a virtual track train. Background Art
[0002] The Virtual Rail Train is a green urban rail transit system, offering a novel solution to modern urban transportation challenges. Tailor-made to address urban ills, it can serve as a supplement to high-volume transportation in first-tier cities, as well as the primary source of passenger transport in second- and third-tier cities. It can also handle specialized routes, such as between new districts and from city centers to tourist destinations. It can be fully integrated with existing public transportation systems to create a three-dimensional transportation network encompassing underground, surface, and aerial transportation.
[0003] The key factor in the operation of virtual rail trains is to determine the authorized movement distance, and then control the operation of the virtual rail train based on the authorized movement distance to ensure driving safety.
[0004] Summary of the Invention
[0005] The present invention provides a method, device and equipment for determining the authorized movement distance of a virtual track train, so as to improve the driving safety of the train when it travels near a track intersection.
[0006] According to one aspect of the present invention, a method for determining an authorized movement distance of a virtual track train is provided, comprising:
[0007] determining, based on a current train position of a current train on a main track, whether there is a track intersection within a preset distance ahead of the current train on the main track;
[0008] If the track intersection exists, determining whether there is a first obstacle train in the auxiliary track; wherein the auxiliary track refers to a track extending from the track intersection;
[0009] If the first obstacle train exists, determining a first obstacle position of the first obstacle train on the auxiliary track, and determining a first track distance between the first obstacle train and the track intersection based on the first obstacle position;
[0010] determining, based on the first track distance, whether the first obstacle train poses a side collision risk to the current train;
[0011] If the side collision risk exists, the second track distance between the current train and the first obstacle train is determined, and the current authorized movement distance of the current train is determined based on the conventional braking distance, emergency braking distance and the second track distance corresponding to the current train.
[0012] According to another aspect of the present invention, there is provided a device for determining an authorized movement distance of a virtual track train, comprising:
[0013] a track intersection determination module, configured to determine, based on a current train position of a current train on a main track, whether there is a track intersection within a preset distance ahead of the current train on the main track;
[0014] A first obstacle train determination module is configured to determine whether a first obstacle train exists in an auxiliary track if the track intersection exists; wherein the auxiliary track refers to a track extending from the track intersection;
[0015] a first track distance determining module, configured to determine a first obstacle position of the first obstacle train on the auxiliary track if the first obstacle train exists, and determine a first track distance between the first obstacle train and the track intersection based on the first obstacle position;
[0016] a side collision risk determination module, configured to determine, based on the first track distance, whether the first obstacle train poses a side collision risk to the current train;
[0017] The first movement authorization distance determination module is used to determine the second track distance between the current train and the first obstacle train if there is the risk of the side collision, and determine the current movement authorization distance of the current train based on the conventional braking distance, emergency braking distance and the second track distance corresponding to the current train.
[0018] According to another aspect of the present invention, an electronic device is provided, comprising:
[0019] at least one processor; and
[0020] a memory communicatively connected to the at least one processor; wherein,
[0021] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for determining the authorized movement distance of a virtual track train according to any embodiment of the present invention.
[0022] The technical solution of the embodiment of the present invention determines whether there is a first obstacle train in the auxiliary track when the current train is about to reach the track intersection. If so, it further determines whether the first obstacle train poses a side collision risk to the current train. If so, it determines the current authorized movement distance of the current train based on the conventional braking distance, emergency braking distance and second track distance corresponding to the current train, thereby achieving the effect of determining the corresponding authorized movement distance based on whether the train has a side collision risk at the track intersection, thereby improving the driving safety of the train when it travels near the track intersection.
[0023] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present invention, nor is it intended to limit the scope of the present invention. Other features of the present invention will become readily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] FIG1 is a flow chart of a method for determining an authorized distance for moving a virtual track train provided in a first embodiment of the present invention;
[0026] FIG2A is a flowchart of a method for determining an authorized movement distance of a virtual track train provided in a second embodiment of the present invention;
[0027] FIG2B is a schematic diagram of a current mobile authorization distance provided by Embodiment 2 of the present invention;
[0028] FIG2C is a schematic diagram of another current authorized moving distance provided by the second embodiment of the present invention;
[0029] FIG2D is a schematic diagram of another current authorized moving distance provided by the second embodiment of the present invention;
[0030] FIG3 is a schematic structural diagram of a device for determining an authorized distance for moving a virtual track train provided in a third embodiment of the present invention;
[0031] FIG4 is a schematic structural diagram of an electronic device for implementing a method for determining an authorized movement distance of a virtual track train according to an embodiment of the present invention. DETAILED DESCRIPTION
[0032] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts should fall within the scope of protection of the present invention.
[0033] It should be noted that the terms "first", "second", "third", etc. in the description and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0034] Compared to trams, virtual rail trains offer the advantages of lower costs and greater operational flexibility. Virtual rail trains require no dedicated track and can be put into operation with simple road modifications. Compared to modern tram lines, which cost approximately 150 million to 200 million yuan per kilometer, the overall investment for virtual rail trains is only one-fifth of that of trams.
[0035] Compared to BRT systems or superbuses, virtual rail trains offer advantages in safety and comfort. They utilize a multi-axis steering system for trajectory-following control, keeping the train's turning radius to within 15 meters, eliminating the turning challenges faced by overly long buses. Their low-floor design reduces noise levels, and their rubber tires ensure a comfortable and stable ride. Furthermore, virtual rail trains support intelligent driving, effectively reducing driver workload and the likelihood of traffic accidents, further enhancing safety.
[0036] A key factor in virtual rail train operation is determining the authorized movement distance, which is then used to control the virtual rail train's movement to ensure safe operation. However, there is currently no mature solution for planning the authorized movement distance of virtual rail trains near track intersections. This leads to the risk of side collisions near track intersections, resulting in poor driving safety.
[0037] Example 1
[0038] Figure 1 is a flow chart of a method for determining a virtual track train movement authorization distance provided by a first embodiment of the present invention. This embodiment is applicable to determining a virtual track train movement authorization distance when there is a risk of side collision at a track intersection. The method can be executed by a virtual track train movement authorization distance determination device, which can be implemented in the form of hardware and / or software. As shown in Figure 1, the method includes:
[0039] S101. Determine, based on a current train position of a current train on a main track, whether there is a track intersection within a preset distance in front of the current train on the main track.
[0040] The current train represents a virtual train traveling on the main track. The main track represents the virtual track on which the current train is traveling at the current moment. The front of the current train represents the direction in which the current train is traveling on the main track.
[0041] The current train position indicates the location of the current train on the main track, which can be represented by the current front position of the current train on the main track and the current rear position of the current train on the main track. The current train position can be obtained by a positioning device onboard the current train, such as a GPS (Global Positioning System). A track intersection is a line connection area that allows a train to transfer from one track to another. In other words, a track intersection allows the current train to transfer from the main track to another track.
[0042] In one embodiment, a controller of the current train (hereinafter referred to as the controller) determines the current train position on the main track using the current train's positioning device. The controller retrieves electronic map data from an electronic map server or the current train's local terminal and determines the intersection locations of all track intersections on the main track based on the electronic map data. Furthermore, based on the current train's head position and the intersection locations of each track intersection, the controller determines whether there is a track intersection within a preset distance ahead of the current train on the main track. The preset distance can be set and adjusted based on actual business needs, for example, the preset distance can be set to 100 meters or 200 meters, etc.
[0043] Optionally, the controller determines the intersection distance between the front of the current train and each track intersection based on the current front position and the intersection position of each track intersection in the main track. If the intersection distance between any track intersection and the front of the current train is less than or equal to a preset distance, the track intersection is regarded as a track intersection within the preset distance in front of the current train in the main track.
[0044] S102: If there is a track intersection, determine whether there is a first obstacle train on the auxiliary track.
[0045] Among them, the auxiliary track refers to the virtual track extending from the track intersection, that is, another virtual track transferred from the main track through the track intersection is called the auxiliary track.
[0046] In one embodiment, if the controller determines that a track intersection exists within a preset distance ahead of the current train on the main track, the controller controls the current train to periodically transmit a broadcast message via wireless broadcast to determine whether there is an obstacle on the auxiliary track. If any other train receives this broadcast message, it generates a response message based on the other train's train information, the track information of the track it is currently on, its position on that track, and its travel direction, and sends it to the current train.
[0047] The controller receives the response message sent by the other train and parses the response message to obtain the train information of the other train and the track information of the track it is on, and then determines whether it is the auxiliary track based on the track information. If so, the other train is regarded as the first obstacle train based on the train information.
[0048] S103: If there is a first obstacle train, determine a first obstacle position of the first obstacle train on the auxiliary track, and determine a first track distance between the first obstacle train and the track intersection based on the first obstacle position.
[0049] Among them, the first obstacle position represents the train position of the first obstacle train in the auxiliary track, which can be represented by the first obstacle front position of the front of the first obstacle train in the auxiliary track and the first obstacle rear position of the rear of the first obstacle train in the auxiliary track.
[0050] In one embodiment, if the controller determines that there is a first obstacle train in the auxiliary track, it continues to parse the response message to obtain the train position of the first obstacle train on the track as the first obstacle position, and parses to obtain the travel direction of the first obstacle train.
[0051] The controller determines an intersection position of a track intersection in the main track. If the traveling direction of the first obstacle train is opposite to that of the current train, the position difference between the intersection position and the position of the front of the first obstacle train is used as the first track distance between the first obstacle train and the track intersection. If the traveling direction of the first obstacle train is the same as that of the current train, the position difference between the intersection position and the position of the rear of the first obstacle train is used as the first track distance between the first obstacle train and the track intersection.
[0052] S104: Determine whether the first obstacle train poses a side collision risk to the current train based on the first track distance.
[0053] Among them, the side collision risk refers to the risk that when the first obstacle train is close to the track intersection, due to the train width of the first obstacle train and the current train, the first obstacle train traveling on the auxiliary track may have a side collision with the current train traveling on the main track.
[0054] In one embodiment, the controller obtains a preset side collision risk distance and compares the first track distance with the side collision risk distance to determine whether the first obstacle train poses a side collision risk to the current train.
[0055] Among them, the side collision risk distance is obtained based on the train width combined with empirical values, and is used to characterize the distance between a train traveling on the auxiliary track and the track intersection at which there may be a side collision risk for a train traveling on the main track. It can be understood that when the first track distance is less than or equal to the side collision risk distance, it means that the first obstacle train poses a side collision risk to the current train; when the first track distance is greater than the side collision risk distance, it means that the first obstacle train does not pose a side collision risk to the current train.
[0056] S105. If there is a side collision risk, determine the second track distance between the current train and the first obstacle train, and determine the current authorized movement distance of the current train based on the regular braking distance, emergency braking distance and the second track distance corresponding to the current train.
[0057] The conventional braking distance represents the distance traveled from the time the train begins braking with conventional braking force until it comes to a complete stop. The emergency braking distance represents the distance traveled from the time the train begins braking with emergency braking force until it comes to a complete stop. It is understood that the emergency braking force is greater than the conventional braking force, and accordingly, the conventional braking distance is longer than the emergency braking distance.
[0058] The current authorized movement distance indicates the distance the current train is authorized to move forward, which means that the current train can travel safely within the current authorized movement distance.
[0059] In one embodiment, if the controller determines that the first obstacle train poses a risk of side collision to the current train, the controller determines a second track distance between the current train and the first obstacle train based on a position difference between the current train position and the first obstacle position of the first obstacle train.
[0060] Optionally, if the traveling direction of the first obstacle train is opposite to that of the current train, the position difference between the current front position and the front position of the first obstacle is used as the second track distance; if the traveling direction of the first obstacle train is the same as that of the current train, the position difference between the current front position and the rear position of the first obstacle is used as the second track distance.
[0061] The controller determines the distance difference based on the second track distance and the emergency braking distance, and determines the numerical value between the distance difference and the conventional braking distance. If the distance difference is greater than the conventional braking distance, the conventional braking distance is used as the current authorized movement distance of the current train. If the distance difference is less than the conventional braking distance, the distance difference is used as the current authorized movement distance of the current train.
[0062] The technical solution of the embodiment of the present invention determines the first track distance between the first obstacle train and the track intersection, and determines whether the first obstacle train poses a side collision risk to the current train based on the first track distance. If there is a side collision risk, the current movement authorization distance of the current train is determined based on the conventional braking distance, emergency braking distance and second track distance corresponding to the current train, thereby achieving the effect of timely identifying the side collision risk of the current train at the track intersection and determining the current movement authorization distance when the side collision risk exists, thereby controlling the current train's travel based on the current movement authorization distance, which can reduce the risk of side collision of the train at the track intersection and improve the travel safety when the train travels near the track intersection.
[0063] Example 2
[0064] FIG2A is a flowchart of a method for determining a virtual track train movement authorization distance provided by Example 2 of the present invention. This embodiment further optimizes and expands the above-mentioned Example 1 and can be combined with the above-mentioned optional implementations. As shown in FIG2 , the method includes:
[0065] S201. Determine, based on a current train position of a current train on a main track, whether there is a track intersection within a preset distance in front of the current train on the main track.
[0066] S202: If there is a track intersection, determine whether there is a first obstacle train on the auxiliary track.
[0067] Among them, the auxiliary track refers to the track extending from the track intersection.
[0068] S203: If there is a first obstacle train, determine a first obstacle position of the first obstacle train on the auxiliary track, and determine a first track distance between the first obstacle train and the track intersection according to the first obstacle position.
[0069] S204: Numerically compare the first track distance with the side collision risk distance, and determine whether the first obstacle train poses a side collision risk to the current train based on the comparison result.
[0070] Among them, the side collision risk distance is determined according to the width of the train.
[0071] In one embodiment, the first track distance is numerically compared with the side collision risk distance. If the first track distance is less than the side collision risk distance, it means that the first obstacle train poses a side collision risk to the current train. If the first track distance is greater than the side collision risk distance, it means that the first obstacle train does not pose a side collision risk to the current train.
[0072] By numerically comparing the first track distance with the side collision risk distance, and determining whether the first obstacle train poses a side collision risk to the current train based on the numerical comparison results, the effect of timely discovering the side collision risk of the current train at the track intersection is achieved, laying a data foundation for subsequent triggering and determining the corresponding current movement authorization distance.
[0073] S205: If there is a side collision risk, execute S206; if there is no side collision risk, execute S208.
[0074] S206. Determine the second track distance between the current train and the first obstacle train, determine the maximum authorized movement distance corresponding to the current train based on the sum of the safety redundancy distance and the conventional braking distance, and determine the minimum protection distance corresponding to the current train based on the sum of the safety redundancy distance and the emergency braking distance.
[0075] The safety margin distance represents a protective distance set for redundancy purposes and can be set and adjusted based on actual business needs. The maximum authorized movement distance represents the maximum authorized movement distance granted to the current train. The minimum protective distance represents the movement distance required to take into account the train's emergency braking under the most unfavorable conditions.
[0076] In one embodiment, the sum of the safety margin distance and the normal braking distance is used as the maximum authorized movement distance corresponding to the current train, and the sum of the safety margin distance and the emergency braking distance is used as the minimum protection distance corresponding to the current train.
[0077] S207: Determine a first distance difference according to the second track distance and the minimum protection distance, and determine a current authorized movement distance of the current train according to the first distance difference and the maximum authorized movement distance.
[0078] In one embodiment, a first distance difference is obtained by subtracting the minimum protection distance from the second track distance. The first distance difference is numerically compared with the maximum authorized movement distance, and the current authorized movement distance of the current train is determined from the first distance difference and the maximum authorized movement distance based on the numerical value of the two.
[0079] By determining the maximum authorized movement distance corresponding to the current train based on the sum of the safety redundancy distance and the conventional braking distance; determining the minimum protection distance corresponding to the current train based on the sum of the safety redundancy distance and the emergency braking distance; determining the first distance difference based on the second track distance and the minimum protection distance, and determining the current authorized movement distance of the current train based on the first distance difference and the maximum authorized movement distance, a feasible method for calculating the authorized movement distance of a train when there is a risk of side collision at a track intersection is provided, thereby reducing the risk of side collision of the train at the track intersection.
[0080] Optionally, determining a current authorized movement distance of the current train according to the first distance difference and the maximum authorized movement distance includes:
[0081] When the first distance difference is less than the maximum authorized mobile distance, the first distance difference is used as the current authorized mobile distance; when the maximum authorized mobile distance is less than the first distance difference, the maximum authorized mobile distance is used as the current authorized mobile distance.
[0082] In one embodiment, the current authorized movement distance of the current train is determined using the following formula: MIN(TRAIN_DANGER_DIST-MIN_INTERVAL_L,MAX_MA_L)
[0083] Among them, "TRAIN_DANGER_DIST" represents the second track distance, "MIN_INTERVAL_L" represents the minimum protection distance, "TRAIN_DANGER_DIST-MIN_INTERVAL_L" represents the first distance difference, and "MAX_MA_L" represents the maximum movement authorization distance.
[0084] By using the first distance difference as the current movement authorization distance when the first distance difference is less than the maximum movement authorization distance, and using the maximum movement authorization distance as the current movement authorization distance when the maximum movement authorization distance is less than the first distance difference, the current movement authorization distance is made the smallest within the comparison group, ensuring that the current train travels based on the current movement authorization distance, and reducing the risk of side collision of the train at the track intersection.
[0085] S208. Determine whether there is a second obstacle train ahead of the current train on the main track. If there is a second obstacle train, execute S209; if there is no second obstacle train, execute S210.
[0086] In one embodiment, the controller controls the current train to periodically transmit broadcast messages via wireless broadcasting to determine whether there are obstacles on the main track. If any other train receives the broadcast message, it generates a reply message based on the other train's train information, the track information of the track it is currently on, its position on the track, and its travel direction, and sends the reply message to the current train.
[0087] The controller receives the response message sent by the other train and parses the response message to obtain the train information of the other train and the track information of the track it is on, and then determines whether it is the main track based on the track information. If so, the other train is regarded as the second obstacle train based on the train information.
[0088] S209: Determine the third track distance between the current train and the second obstacle train, and determine the current authorized movement distance of the current train based on the conventional braking distance, emergency braking distance, and the third track distance corresponding to the current train.
[0089] In one embodiment, the controller determines a third track distance between the current train and the second obstacle train based on a position difference between the current train position and the second obstacle position of the second obstacle train.
[0090] Optionally, if the traveling direction of the second obstacle train is opposite to that of the current train, the position difference between the current train head position and the second obstacle train head position is used as the third track distance; if the traveling direction of the first obstacle train is the same as that of the current train, the position difference between the current train head position and the second obstacle train tail position is used as the third track distance.
[0091] The sum of the safety margin distance and the conventional braking distance is used as the maximum authorized movement distance for the current train. The sum of the safety margin distance and the emergency braking distance is used as the minimum protection distance for the current train.
[0092] Subtract the minimum protection distance from the third track distance to obtain the second distance difference. Compare the second distance difference with the maximum authorized movement distance. If the second distance difference is less than the maximum authorized movement distance, use the second distance difference as the current authorized movement distance. If the maximum authorized movement distance is less than the second distance difference, use the maximum authorized movement distance as the current authorized movement distance.
[0093] For the related term concepts and specific methods in S209, please refer to the related descriptions of Example 1 and Example 2, and will not be repeated here.
[0094] If there is a second obstacle train on the main track, the third track distance between the current train and the second obstacle train is determined, and the current authorized movement distance of the current train is determined based on the conventional braking distance, emergency braking distance and third track distance corresponding to the current train. This allows the current authorized movement distance of the current train to be determined accordingly regardless of whether there is a second obstacle train on the main track or a first obstacle train on the auxiliary track. This expands the applicable scenarios of the solution, reduces the risk of head-on and rear-end collisions between trains, and further improves the driving safety of trains.
[0095] S210. Determine the maximum authorized movement distance corresponding to the current train according to the sum of the safety redundancy distance and the conventional braking distance, and use the maximum authorized movement distance as the current authorized movement distance.
[0096] In one embodiment, if there is no second obstacle train in front of the current train on the main track, the safety redundancy distance and the conventional braking distance are summed, and the sum result is used as the maximum movement authorization distance, and then the maximum movement authorization distance is used as the current movement authorization distance.
[0097] If there is no second obstacle train in front of the current train on the main track, the maximum movement authorization distance corresponding to the current train is determined according to the sum of the safety redundancy distance and the conventional braking distance, and the maximum movement authorization distance is used as the current movement authorization distance. As a result, if there is no second obstacle train in front of the current train on the main track, the movement authorization distance is set to the maximum, thereby improving the train's travel efficiency.
[0098] Figure 2B is a schematic diagram of a current movement authorization distance provided in Example 2 of the present invention. As shown in Figure 2B, 200 represents the current train, 201 represents the main track, 202 represents the track intersection, 207 represents the auxiliary track, and 203 represents the first obstacle train. The current train 200 and the first obstacle train 203 are traveling in the same direction.
[0099] 204 represents the side collision risk distance. As shown in FIG2B , the first track distance between the rear position of the first obstacle train 203 and the intersection position of the track intersection 202 is less than the side collision risk distance 204, that is, the first obstacle train 203 poses a side collision risk to the current train 200.
[0100] 205 represents the current authorized movement distance of the current train. 206 represents the minimum safe interval, which is used to control the distance between the current train and the obstacle train after braking. In this scenario, the track intersection 202 is set as a dangerous point.
[0101] FIG2C is a schematic diagram of another current authorized movement distance provided by Example 2 of the present invention. As shown in FIG2C , 200 represents the current train, 201 represents the main track, 202 represents the track intersection, 207 represents the auxiliary track, 203 represents the first obstacle train, and 208 represents the second obstacle train. The current train 200, the first obstacle train 203, and the second obstacle train 208 are traveling in the same direction.
[0102] 204 represents the side collision risk distance. As shown in FIG2C , the first track distance between the rear position of the first obstacle train 203 and the intersection position of the track intersection 202 is greater than the side collision risk distance 204, that is, the first obstacle train 203 does not pose a side collision risk to the current train 200.
[0103] 205 represents the current authorized movement distance of the current train. 206 represents the minimum safe interval, which is used to control the distance between the current train and the obstacle train after braking. In this scenario, the rear position 209 of the second obstacle train 208 is set as the danger point.
[0104] FIG2D is a schematic diagram of another current authorized movement distance provided by Example 2 of the present invention. As shown in FIG2D , 200 represents the current train, 201 represents the main track, 202 represents the track intersection, 207 represents the auxiliary track, 203 represents the first obstacle train, and 208 represents the second obstacle train. The current train 200 and the first obstacle train 203 are traveling in the same direction, while the current train 200 and the second obstacle train 208 are traveling in opposite directions.
[0105] 204 represents the side collision risk distance. As shown in FIG2C , the first track distance between the rear position of the first obstacle train 203 and the intersection position of the track intersection 202 is greater than the side collision risk distance 204, that is, the first obstacle train 203 does not pose a side collision risk to the current train 200.
[0106] 205 represents the current authorized movement distance of the current train. 206 represents the minimum safe interval, which is used to control the distance between the current train and the obstacle train after braking. 210 represents the authorized movement distance of the second obstacle train 208. In this scenario, the end point 211 of the authorized movement distance of the second obstacle train 208 is set as the danger point.
[0107] The concepts or determination methods of the above-mentioned entities can be referred to the relevant description of the embodiments of the present disclosure, and will not be repeated here.
[0108] Example 3
[0109] FIG3 is a schematic diagram of the structure of a device for determining a virtual track train movement authorization distance provided by a third embodiment of the present invention. As shown in FIG3 , the device includes:
[0110] a track intersection determination module 31 for determining, based on a current train position of the current train on the main track, whether there is a track intersection within a preset distance ahead of the current train on the main track;
[0111] A first obstacle train determination module 32 is configured to determine whether a first obstacle train exists on an auxiliary track if a track intersection exists; wherein the auxiliary track refers to a track extending from the track intersection;
[0112] a first track distance determining module 33 for determining a first obstacle position of the first obstacle train on the auxiliary track if there is a first obstacle train, and determining a first track distance between the first obstacle train and the track intersection based on the first obstacle position;
[0113] a side collision risk determination module 34 for determining, based on the first track distance, whether the first obstacle train poses a side collision risk to the current train;
[0114] The first movement authorization distance determination module 35 is used to determine the second track distance between the current train and the first obstacle train if there is a risk of side collision, and determine the current movement authorization distance of the current train based on the regular braking distance, emergency braking distance and second track distance corresponding to the current train.
[0115] Optionally, the side collision risk determination module 34 is specifically configured to:
[0116] The first track distance is numerically compared with the side collision risk distance, and whether the first obstacle train poses a side collision risk to the current train is determined based on the numerical comparison result; wherein the side collision risk distance is determined based on the train width.
[0117] Optionally, the first authorized movement distance determination module 35 is specifically configured to:
[0118] Determine the maximum authorized movement distance corresponding to the current train based on the sum of the safety redundancy distance and the conventional braking distance;
[0119] Determine the minimum protection distance corresponding to the current train based on the sum of the safety redundancy distance and the emergency braking distance;
[0120] A first distance difference is determined according to the second track distance and the minimum protection distance, and a current authorized movement distance of the current train is determined according to the first distance difference and the maximum authorized movement distance.
[0121] Optionally, the first authorized movement distance determining module 35 is further configured to:
[0122] If the first distance difference is less than the maximum authorized movement distance, the first distance difference is used as the current authorized movement distance;
[0123] When the maximum authorized movement distance is less than the first distance difference, the maximum authorized movement distance is used as the current authorized movement distance.
[0124] Optionally, the device further includes a second mobile authorization distance determination module, specifically configured to:
[0125] If there is no side collision risk, determining whether there is a second obstacle train ahead of the current train on the main track;
[0126] If there is a second obstacle train, the third track distance between the current train and the second obstacle train is determined, and the current movement authorization distance of the current train is determined based on the regular braking distance, emergency braking distance and third track distance corresponding to the current train.
[0127] Optionally, the device further includes a third mobile authorization distance determination module, specifically configured to:
[0128] If there is no second obstacle train, the maximum authorized movement distance corresponding to the current train is determined based on the sum of the safety redundancy distance and the conventional braking distance, and the maximum authorized movement distance is used as the current authorized movement distance.
[0129] The device for determining the authorized movement distance of a virtual track train provided in an embodiment of the present invention can execute the method for determining the authorized movement distance of a virtual track train provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0130] Example 4
[0131] FIG4 shows a block diagram of an electronic device 40 that can be used to implement an embodiment of the present invention. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0132] As shown in Figure 4, the electronic device 40 includes at least one processor 41, and a memory connected to the at least one processor 41, such as a read-only memory (ROM) 42, a random access memory (RAM) 43, etc., wherein the memory stores a computer program that can be executed by the at least one processor, and the processor 41 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 42 or the computer program loaded from the storage unit 48 to the random access memory (RAM) 43. Various programs and data required for the operation of the electronic device 40 can also be stored in the RAM 43. The processor 41, ROM 42 and RAM 43 are connected to each other via a bus 44. An input / output (I / O) interface 45 is also connected to the bus 44.
[0133] Multiple components in the electronic device 40 are connected to the I / O interface 45, including an input unit 46, such as a keyboard, a mouse, etc.; an output unit 47, such as various types of displays, speakers, etc.; a storage unit 48, such as a magnetic disk, an optical disk, etc.; and a communication unit 49, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 49 allows the electronic device 40 to exchange information / data with other devices via a computer network such as the Internet and / or various telecommunication networks.
[0134] The processor 41 can be any general-purpose and / or specialized processing component with processing and computing capabilities. Some examples of the processor 41 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various specialized artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 41 executes the various methods and processes described above, such as the method for determining the authorized distance for virtual track train movement.
[0135] In some embodiments, the method for determining the authorized distance for virtual rail train movement may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 48. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 40 via the ROM 42 and / or the communication unit 49. When the computer program is loaded into the RAM 43 and executed by the processor 41, one or more steps of the method for determining the authorized distance for virtual rail train movement described above may be performed. Alternatively, in other embodiments, the processor 41 may be configured to execute the method for determining the authorized distance for virtual rail train movement in any other appropriate manner (e.g., by means of firmware).
[0136] Various embodiments of the systems and techniques described above can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), system-on-chip systems (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments can include being implemented in one or more computer programs that are executable and / or interpreted on a programmable system that includes at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0137] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, such that when the computer program is executed by the processor, the functions / operations specified in the flowcharts and / or block diagrams are implemented. The computer program may be executed entirely on the machine, partially on the machine, as a stand-alone software package, partially on the machine and partially on a remote machine, or entirely on a remote machine or server.
[0138] In the context of the present invention, computer-readable storage media can be tangible media that can contain or store a computer program for use with an instruction execution system, device or equipment or used in combination with an instruction execution system, device or equipment. Computer-readable storage media can include but are not limited to electronic, magnetic, optical, electromagnetic, infrared or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, computer-readable storage media can be machine-readable signal media. More specific examples of machine-readable storage media can include electrical connections based on one or more lines, portable computer disks, hard disks, random access memories (RAM), read-only memories (ROM), erasable programmable read-only memories (EPROM or flash memory), optical fibers, portable compact disk read-only memories (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.
[0139] To provide interaction with a user, the systems and techniques described herein can be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0140] The systems and techniques described herein can be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system can be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0141] A computing system may include clients and servers. The clients and servers are typically remote from each other and typically interact via a communication network. This client-server relationship arises through computer programs running on the respective computers, creating a client-server relationship. The server may be a cloud server, also known as a cloud computing server or cloud host. This server is a hosting product within the cloud computing service ecosystem that addresses the management difficulties and limited scalability of traditional physical hosting and VPS services.
[0142] It should be understood that the various forms of the processes shown above can be used to reorder, add, or delete steps. For example, the steps described in the present invention can be performed in parallel, sequentially, or in a different order, as long as the desired results of the technical solution of the present invention can be achieved. This is not limited herein.
[0143] The above specific embodiments do not limit the scope of protection of the present invention. Those skilled in the art will appreciate that various modifications, combinations, sub-combinations, and substitutions may be made based on design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention are intended to be included within the scope of protection of the present invention.
Claims
1. A method for determining a virtual track train movement authorization distance, comprising: Determining, according to a current train position of a current train in a main track, whether there is a track intersection within a preset distance in front of the current train in the main track; If the track intersection exists, determining whether there is a first obstacle train in the auxiliary track; wherein the auxiliary track refers to a track extending from the track intersection; If the first obstacle train exists, determining a first obstacle position of the first obstacle train in the auxiliary track, and determining a first track distance between the first obstacle train and the track intersection according to the first obstacle position; determining, according to the first track distance, whether the first obstacle train poses a risk of side collision to the current train; If the side collision risk exists, the second track distance between the current train and the first obstacle train is determined, and the current movement authorization distance of the current train is determined according to the conventional braking distance, emergency braking distance and the second track distance corresponding to the current train.
2. The method according to claim 1, characterized in that Determining whether the first obstacle train has a side collision risk with the current train according to the first track distance includes: A numerical comparison is performed between the first track distance and the side collision risk distance, and based on the numerical comparison result, it is determined whether the first obstacle train poses a side collision risk to the current train; wherein the side collision risk distance is determined based on the train width.
3. The method according to claim 1, characterized in that The determining, according to the conventional braking distance, the emergency braking distance and the second track distance corresponding to the current train, the current authorized movement distance of the current train comprises: Determine the maximum authorized movement distance corresponding to the current train according to the sum of the safety redundancy distance and the conventional braking distance; Determining a minimum protection distance corresponding to the current train according to a sum of a safety redundancy distance and the emergency braking distance; A first distance difference is determined according to the second track distance and the minimum protection distance, and a current authorized movement distance of the current train is determined according to the first distance difference and the maximum authorized movement distance.
4. The method according to claim 3, characterized in that The determining, according to the first distance difference and the maximum authorized movement distance, the current authorized movement distance of the current train includes: When the first distance difference is less than the maximum mobile authorized distance, using the first distance difference as the current mobile authorized distance; When the maximum authorized mobile distance is smaller than the first distance difference, the maximum authorized mobile distance is used as the current authorized mobile distance.
5. The method according to claim 1, after determining whether the first obstacle train has a side collision risk with the current train according to the first track distance, further comprises: If the side collision risk does not exist, determining whether there is a second obstacle train ahead of the current train in the main track; If the second obstacle train exists, the third track distance between the current train and the second obstacle train is determined, and the current movement authorization distance of the current train is determined according to the conventional braking distance, emergency braking distance and the third track distance corresponding to the current train.
6. The method according to claim 5, after determining whether there is a second obstacle train ahead of the current train in the main track, further comprising: If the second obstacle train does not exist, the maximum movement authorization distance corresponding to the current train is determined according to the sum of the safety redundancy distance and the conventional braking distance, and the maximum movement authorization distance is used as the current movement authorization distance.
7. A device for determining a virtual track train movement authorization distance, comprising: A track intersection determination module, used to determine whether there is a track intersection within a preset distance in front of the current train in the main track according to the current train position of the current train in the main track; The first obstacle train determination module is used to determine the auxiliary track if the track intersection exists. whether there is a first obstacle train; wherein the auxiliary track represents a track extending from the track intersection; a first track distance determination module, configured to determine a first obstacle position of the first obstacle train in the auxiliary track if the first obstacle train exists, and determine a first track distance between the first obstacle train and the track intersection according to the first obstacle position; a side collision risk determination module, configured to determine whether the first obstacle train has a side collision risk with the current train according to the first track distance; The first movement authorization distance determination module is used to determine the second track distance between the current train and the first obstacle train if there is the risk of side collision, and determine the current movement authorization distance of the current train according to the conventional braking distance, emergency braking distance and the second track distance corresponding to the current train.
8. The device according to claim 7, characterized in that The side collision risk determination module is specifically used to: A numerical comparison is performed between the first track distance and the side collision risk distance, and based on the numerical comparison result, it is determined whether the first obstacle train poses a side collision risk to the current train; wherein the side collision risk distance is determined based on the train width.
9. The device according to claim 7, characterized in that The first mobile authorization distance determination module is specifically used to: Determine the maximum authorized movement distance corresponding to the current train according to the sum of the safety redundancy distance and the conventional braking distance; Determining a minimum protection distance corresponding to the current train according to a sum of a safety redundancy distance and the emergency braking distance; A first distance difference is determined according to the second track distance and the minimum protection distance, and a current authorized movement distance of the current train is determined according to the first distance difference and the maximum authorized movement distance.
10. The device according to claim 9, characterized in that The first mobile authorization distance determination module is further specifically used for: When the first distance difference is less than the maximum mobile authorized distance, using the first distance difference as the current mobile authorized distance; When the maximum authorized mobile distance is smaller than the first distance difference, the maximum authorized mobile distance is used as the current authorized mobile distance.
11. The device according to claim 7, further comprising a second mobile authorization distance determination module, specifically configured to: If the side collision risk does not exist, determining whether there is a second obstacle train ahead of the current train in the main track; If the second obstacle train exists, the third track distance between the current train and the second obstacle train is determined, and the current movement authorization distance of the current train is determined according to the conventional braking distance, emergency braking distance and the third track distance corresponding to the current train.
12. The device according to claim 11, further comprising a third mobile authorization distance determination module, specifically configured to: If the second obstacle train does not exist, the maximum movement authorization distance corresponding to the current train is determined according to the sum of the safety redundancy distance and the conventional braking distance, and the maximum movement authorization distance is used as the current movement authorization distance.
13. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for determining the authorized movement distance of a virtual rail train according to any one of claims 1 to 6.
Citation Information
Patent Citations
Speed controlling method for running of combined train
CN101480962A
Determining method and device of train moving authority, and trains
CN109318941A
Method and device for determining moving authority based on vehicle-vehicle communication
CN110843861A
Train lateral turnout invasion protection method and device
CN113942550A
Train protection method and device, electronic equipment and storage medium
CN114715230A
