Preheating and melting system for steel with double melting furnace and method for preheating and melting steel using a double melting furnace

The double melting furnace system with integrated oxygen lance and mobile electrode systems addresses inefficiencies in steel preheating and melting by utilizing fumes for efficient heat transfer, resulting in reduced power-off times and faster steel production cycles.

WO2024246962A1PCT designated stage expired Publication Date: 2024-12-05THERMOMELT SRL
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/IT2024/050110
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-29
Filing Date
2024-05-29
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing steel preheating and melting processes using double melting furnaces face inefficiencies in reducing total power-off time and achieving shorter power-on cycles, leading to longer tap-to-tap times in steel production.

Method used

A preheating and melting system with a double melting furnace that employs two crucibles, oxygen lance systems with burners, and a mobile electrode system, where fumes from one crucible are used to preheat and melt scrap in the other, allowing for efficient heat transfer and reduced power-off times through a network of flues and extractor hoods.

Benefits of technology

This system significantly reduces total power-off time and achieves shorter power-on cycles, enabling faster ladle casting with a consistent tap-to-tap time of 42 minutes, enhancing the overall efficiency of steel production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IT2024050110_05122024_PF_FP_ABST
    Figure IT2024050110_05122024_PF_FP_ABST
Patent Text Reader

Abstract

A preheating and melting system for steel with a double melting furnace comprises a first and a second crucible for loading scrap (1), (2), a first and a second oxygen lance system equipped with a burner (3), (4), a mobile system of electrodes (5), a first and a second extractor hood system (6), (7), a first and a second flue (8), (9), a hot fume flue (12). When the first extractor hood system (6) is in operation, the second flue (9) is connected to the second extractor hood system (7), while when the second extractor hood system (7) is in operation, the first flue (8) is connected to the first extractor hood system (6). A method for preheating and melting steel involves a preheating and melting system for steel with a double melting furnace.
Need to check novelty before this filing date? Find Prior Art

Description

PREHEATING AND MELTING SYSTEM FOR STEEL WITH DOUBLE MELTING FURNACE AND METHOD FOR PREHEATING AND MELTING STEEL USING A DOUBLE MELTING FURNACE

[0001] The present invention relates to a preheating and melting system for steel with a double melting furnace and a method for preheating and melting steel using a double melting furnace.

[0002] In general, the present invention relates to the production of carbon steel, e.g., plain mild steel, medium carbon steel, or cast carbon steel or stainless steel, and the production of steel by other methods starting from scrap.

[0003] In particular, the present invention relates to electric furnace recharging, arc furnaces, scrap preheating, charging device arrangements, apparatus for preheating charges; arrangements for preheating charges, scrap preheating, recharging; discharging; handling of the charge, burners, exhaust gas extraction, fume collection, and related hoods for exhaust gases from an electric arc furnace, resistors, or systems using burners.

[0004] The state of the art is represented by patent CN 108168320 A concerning a symmetric double furnace-cavity device for scrap steel and a method of melting scrap steel, comprising two closed cavities of scrap steel, the closed cavities of scrap steel are equipped with burners, exhaust fume outlets, iron discharge outlets, the exhaust fume outlets are connected with high-temperature flues, the two closed cavities of scrap steel and the high-temperature flues are connected via combustion chambers, the exhaust fume outlets are connected with dust collectors via exhaust fume pipes, the exhaust fume pipes are equipped with fume cut-off valves, the dust collectors are connected with exhaust fume chimneys via induced draft fans; and the iron discharge outlets are equipped with iron discharge trolleys. The process comprises the following steps: the two closed cavities of scrap steel are alternately used as melting cavities for scrap steel; heat is supplied to one closed cavity of scrap steel through the burner to melt the scrap steel; the hot waste gas generated by the melting of the scrap steel is introduced into the combustion chambers and heated by high-temperature smoke; the high-temperature smoke is introduced into the other closed cavity of scrap steel to preheat the scrap steel; and the high-temperature smoke is converted to low-temperature smoke to pass through the exhaust fume pipes. The device and method solve the problem of high energy consumption in traditional methods of processing used steel, do not use electricity, and can reduce the costs of melting steel and iron.

[0005] Additionally, the state of the art is represented by patent CN 112094977 A concerning an efficient melting process and plant with an electric converter with double furnace bodies, mainly comprising a melting furnace, an oxygen lance system, an electrode system, a movable fume hood system, a guide rail for the oxygen lance oscillation trolleys, a lifting trolley rail for the oxygen lance, a flue, a carbon gas storage cabinet, and a diffusing chimney. In one of the melting furnaces, a metallic material with any scrap ratio is added. By adopting preheating and melting of electrodes, the oxygen lance system is then used to supply oxygen to achieve efficient melting, the electrode moves to the other melting furnace filled with the metallic material to heat and melt, and the oxygen lance system is then used to supply oxygen to achieve efficient melting, so that the two melting furnaces produce steel circularly using the electrode and the oxygen lance system. The system is suitable for a melting process with a casting amount of 30-400t, the melting requirements for any scrap ratio, steel type, and process can be met, and the larger the scrap ratio, the more obvious the advantages, averaging an increase of 40% or more.

[0006] Additionally, the state of the art is represented by patent CN 109136464 A concerning a double-station electric arc furnace, related to the field of steel in electric arc furnaces, comprising a combustion gas duct, an electrode unit, and two furnace body units, where each of the furnace body units has a melting chamber with an upward opening; the combustion gas duct is arranged between the two furnace body units and communicates with the two melting chambers; the electrode unit comprises an electrode displacement device and two furnace body units, the electrode displacement device comprises an electrode lifting mechanism and an electrode rotation mechanism, the electrode rotation mechanism guides the electrodes to move alternately between the two furnace body units, the electrode lifting mechanism guides the electrodes to lift and fall, and the lowered electrodes are inserted into the melting chambers of the lower positioned furnace body units.

[0007] The purpose of the present invention is to improve the efficiency of the preheating used in the prior art by reducing the total power-off time required during the cycle of preheating and melting steel using a double melting furnace.

[0008] A further purpose is to employ a power-on time immediately after starting a cycle of preheating and melting steel using a double melting furnace that is shorter than that of the prior art.

[0009] A further purpose is to perform the first ladle casting after a tap-to-tap time shorter than that of the prior art.

[0010] The above and other purposes and advantages of the invention, as will result from the following description, are achieved with a preheating and melting system for steel with a double melting furnace as described in claim 1.

[0011] Additionally, the above and other purposes and advantages of the invention, as will result from the following description, are achieved with a preheating and melting process for steel using a double melting furnace as described in claim 4.

[0012] Preferred embodiments and non-trivial variants of the present invention are the subject of the dependent claims. It is understood that all attached claims are an integral part of this description. It will be immediately obvious that numerous variations and modifications (for example, related to shape, dimensions, arrangements, and parts with equivalent functionalities) can be made without departing from the scope of protection of the invention as it appears from the attached claims.

[0013] The present invention will be better described by some preferred embodiments, provided by way of example and not limitation, with reference to the attached drawings, in which:

[0014] shows a plan view of an embodiment of the preheating and melting system for steel with a double melting furnace, according to the present invention;

[0015] shows a sectional view along line II-II of the previous figure;

[0016] shows a sectional view along line III-III of;

[0017] shows a partial sectional view in regard IV of the previous figure;

[0018] shows a front view of a relevant apparatus of an embodiment of the preheating and melting system for steel with a double melting furnace, according to the present invention;

[0019] shows a side view of another relevant apparatus of an embodiment of the preheating and melting system for steel with a double melting furnace, according to the present invention;

[0020] shows a plan view of the previous figure;

[0021] Figures fromtoshow the main phases of an embodiment of the preheating and melting process for steel with a double melting furnace, according to the present invention; and

[0022] Figures fromtoshow views of a variant of an embodiment of the preheating and melting system for steel with a double melting furnace, according to the present invention.

[0023] Referring to figures fromto, it can be noted that a preheating and melting system for steel with a double melting furnace comprises a first and a second crucible for loading scrap (1), (2), a first and a second oxygen lance system equipped with a burner (3), (4), a mobile system of electrodes (5), a first and a second system of extractor hood (6), (7), a first and a second flue (8), (9) provided with a first and a second flue gas cut-off valve (10), (11), a section of flue for hot fumes (12) connected with the first and the second crucible for loading scrap (1), (2). The first and the second crucible for loading scrap (1), (2) is equipped with a nozzle for the tapping of iron (13), (14) provided with iron unloading trolleys.

[0024] Advantageously, when the first extractor hood system (6) is in operation, the second flue (9) is connected to the second extractor hood system (7), while when the second extractor hood system (7) is in operation, the first flue (8) is connected to the first extractor hood system (6).

[0025] The first and the second oxygen lance system equipped with a burner (3), (4) is housed in the respective first and second extractor hood system (6), (7).

[0026] The section of flue for hot fumes (12) consists of a series of sections of flue (15), (16), (17) mutually connected to allow adjustment of alignment with respect to the first and second crucibles for loading scrap (1), (2).

[0027] A preheating and melting process for steel using a preheating and melting system for steel with a double melting furnace comprises the following steps:. The first crucible for loading scrap (1) is loaded with a first load of scrap. The first extractor hood system (6) closes. The second crucible for loading scrap (2) is loaded with a second load of scrap. The second extractor hood system (7) closes.. The mobile system of electrodes (5) lowers and activates inside the second crucible for loading scrap (2). The first oxygen lance system equipped with a burner (3) is inserted into the first crucible for loading scrap (1). The fumes generated inside the second crucible for loading scrap (2) transfer into the first crucible for loading scrap (1) through the section of the flue for hot fumes (12). The first load of scrap of the first crucible for loading scrap (1) is heated by means of the first oxygen lance system equipped with a burner (3) and by means of the fumes coming from the second crucible for loading scrap (2).. The mobile system of electrodes (5) active in the second crucible for loading scrap (2) is deactivated and lifted, while the first load of scrap of the first crucible for loading scrap (1) continues to be heated by means of the fumes coming from the second crucible for loading scrap (2) and by means of the first oxygen lance system equipped with a burner (3).. The mobile system of electrodes (5) moves from the second crucible for loading scrap (2) to the first crucible for loading scrap (1), allowing the second crucible for loading scrap (2) to start casting liquid steel into ladle through the respective tapping system.. The mobile system of electrodes (5) lowers and activates inside the first crucible for loading scrap (1). Simultaneously, the second crucible for loading scrap (2) is loaded with a third load of scrap, the first load of scrap of the first crucible for loading scrap (1) having already been heated by the first oxygen lance system equipped with a burner (3) and by the fumes coming from the second crucible for loading scrap (2) during phases a), b), c), d).. In the second crucible for loading scrap (2) the second extraction hood system (7) closes and the second oxygen lance system equipped with a burner (4) is inserted. Simultaneously, following the activation of the mobile system of electrodes (5) in the first crucible for loading scrap (1), the production of fumes begins, the fumes migrating into the second crucible for loading scrap (2) through the section of the flue for hot fumes (12). The load of scrap of the second crucible for loading scrap (2) is heated by both means of the second oxygen lance system equipped with a burner (4) and by means of the fumes.. The mobile system of electrodes (5) active in the first crucible for loading scrap (1) is deactivated and lifted, while the load of scrap in the second crucible for loading scrap (2) continues to be heated by the fumes coming from the first crucible for loading scrap (1) and by the second oxygen lance system equipped with a burner (4).. Once the melting cycle in the first crucible for loading scrap (1) is finished, the casting of liquid steel can start through the respective tapping system. The mobile electrode system (5) moves from the first crucible for loading scrap (1) to the second crucible for loading scrap (2).. The mobile system of electrodes (5) lowers and activates inside the second crucible for loading scrap (2). Simultaneously, the first crucible for loading scrap (1) is loaded with a fourth load of scrap, the third load of scrap of the second crucible for loading scrap (2) having already been heated by the second oxygen lance system equipped with a burner (4) and by the fumes coming from the first crucible for loading scrap (1) during phases e), f), g), h) of the process.. In the first crucible for loading scrap (1), the first extractor hood system (6) closes and the first oxygen lance system equipped with a burner (3) is inserted. Simultaneously, following the activation of the mobile system of electrodes (5) in the second crucible for loading scrap (2), the production of fumes begins, which migrate towards the first crucible for loading scrap (1) through the section of the flue for hot fumes (12). The fourth load of scrap of the first crucible for loading scrap (1) is heated both by the first oxygen lance system equipped with a burner (3) and by the fumes.The cycle restarts from phase c)..Examples

[0028] The present invention relates to an electric arc furnace with scrap preheating using two crucibles for loading scrap and a first and a second oxygen lance system equipped with a burner, i.e., an oxy-methane burner on a first and a second extractor hood system or vault.

[0029] The scrap preheating occurs through the passage of fumes from the ebt or tapping spout to the other ebt or tapping spout and exits through the fume duct placed above the door. The outlet fume duct is on the same axis as the ebt or tapping spout.

[0030] Regarding the spout furnace, spout furnace, the heat in the form of smoke must enter the tapping spout and reach the other spout of the second crucible through the duct.

[0031] Regarding the EBT furnace, Eccentric Bottom Tapping, bottom-tapping furnace, the process is the same as that of the spout furnace, with the difference that the casting is underneath the furnace.

[0032] Figures fromtorefer to a first configuration of a preheating and melting system for steel with a double melting furnace.

[0033] Figures fromtorefer to a second configuration of a preheating and melting system for steel with a double melting furnace.

[0034] In both types of furnace, the smoke enters from the spout or EBT and exits above the slag door placed on the tilting axis of the furnace., the first crucible for loading scrap (1) is loaded with 33 tons of scrap and the second crucible for loading scrap (2) is loaded with 33 tons of scrap. Subsequently, the first and the second extractor hood systems (6), (7) are closed., the mobile system of electrodes (5) is lowered and activated inside the second crucible for loading scrap (2). Simultaneously, the first oxygen lance system equipped with a burner (3) is inserted into the first crucible for loading scrap (1). The fumes generated inside the second crucible for loading scrap (2) transfer to the first crucible for loading scrap (1) through the section of the flue for hot fumes (12). In this way, while the mobile system of electrodes (5) is activated in the second crucible for loading scrap (2), the scrap in the first crucible for loading scrap (1) is heated by the first oxygen lance system equipped with a burner (3) and by the fumes coming from the second crucible for loading scrap (2)., the mobile system of electrodes (5) active in the second crucible for loading scrap (2) is deactivated and raised after forty minutes, while the scrap in the first crucible for loading scrap (1) continues to be heated by the fumes coming from the second crucible for loading scrap (2) and by the first oxygen lance system equipped with a burner (3)., the mobile system of electrodes (5) moves from the second crucible for loading scrap (2) to the first crucible for loading scrap (1), allowing the second crucible for loading scrap (2) to start casting 30 tons of liquid steel into the ladle through the respective bottom tapping system, EBT, Eccentric Bottom Tapping.The total power-off time for the phases a), b), c), d) of the second crucible for loading scrap (2) is 12 minutes. The power-on time for the phases a), b), c), d) of the second crucible for loading scrap (2) is 40 minutes. Thus, after a tap-to-tap time of 52 minutes, the first ladle casting is performed., the mobile system of electrodes (5) is lowered and activated inside the first crucible for loading scrap (1). Simultaneously, the second crucible for loading scrap (2) is loaded with another 33 tons of scrap, the scrap in the first crucible for loading scrap (1) having already been heated by the first oxygen lance system equipped with a burner (3) and by the fumes coming from the second crucible for loading scrap (2) during the phases a), b), c), d) of the cycle., in the second crucible for loading scrap (2), the second extractor hood system (7) closes and the second oxygen lance system equipped with a burner (4) is inserted. Simultaneously, following the activation of the mobile system of electrodes (5) in the first crucible for loading scrap (1), the production of fumes begins, the fumes migrating towards the second crucible for loading scrap (2) through the section of the flue for hot fumes (12). The scrap in the second crucible for loading scrap (2) is heated by both the second oxygen lance system equipped with a burner (4) and by the fumes., the mobile system of electrodes (5) active in the first crucible for loading scrap (1) is deactivated after 30 minutes, while the scrap in the second crucible for loading scrap (2) continues to be heated by the fumes coming from the first crucible for loading scrap (1) and by the second oxygen lance system equipped with a burner (4). The first crucible for loading scrap (1) has finished working and is ready to pour 30 tons of liquid steel., the mobile system of electrodes (5) moves from the first crucible for loading scrap (1) to the second crucible for loading scrap (2), allowing the first crucible for loading scrap (1) to start casting 30 tons of liquid steel into the ladle through the respective bottom tapping system, EBT, Eccentric Bottom Tapping.The total power-off time for the phases e), f), g), h) of the first crucible for loading scrap (1) is 12 minutes. The power-on time is 30 minutes, so after a tap-to-tap time of 42 minutes, the second ladle casting is performed., the mobile system of electrodes (5) is lowered and activated inside the second crucible for loading scrap (2). Simultaneously, the first crucible for loading scrap (1) is loaded with another 33 tons of scrap, the scrap in the second crucible for loading scrap (2) having already been heated by the second oxygen lance system equipped with a burner (4) and by the fumes coming from the first crucible for loading scrap (1) during the phases e), f), g), h) of the cycle., the first extractor hood system (6) closes and the first oxygen lance system equipped with a burner (3) is inserted into the first crucible for loading scrap (1). Simultaneously, following the activation of the mobile system of electrodes (5) in the second crucible for loading scrap (2), the production of fumes begins, which migrate towards the first crucible for loading scrap (1) through the section of the flue for hot fumes (12). The scrap in the first crucible for loading scrap (1) is heated by both the first oxygen lance system equipped with a burner (3) and the fumes.The cycle restarts; the tap-to-tap time will always be 42 minutes (30 minutes of power-on and 12 minutes of power-off).

Claims

Preheating and melting system for steel with double melting furnace, comprising a first and a second crucible for loading scrap (1), (2), a first and a second oxygen lance system equipped with a burner (3), (4), a mobile system of electrodes (5), a first and a second system of extractor hood (6), (7), a first and a second flue (8), (9) provided with a first and a second flue gas cut-off valve (10), (11), a section of flue for hot fumes (12) connected to said first and said second crucible for loading scrap (1), (2), said first and said second crucible for loading scrap (1), (2) equipped with a nozzle for the tapping of iron (13), (14) provided with iron unloading trolleys, characterized in that, when said first extractor hood system (6) is in operation, said second flue (9) is connected to said second extractor hood system (7), while, when said second extractor hood system (7) is in operation, said first flue (8) is connected to said first extractor hood system (6).System according to the previous claim, characterized in that said first and second oxygen lance system equipped with a burner (3), (4) is housed in the respective first and second extractor hood system (6), (7).System according to one of the previous claims, characterized in that said section of flue for hot fumes (12) consists of a series of sections of flue (15), (16), (17) mutually connected so as to allowing adjustment of alignment with respect to said first and second crucibles for loading scrap (1), (2).Preheating and melting process for steel by means of a double melting furnace preheating and melting system for steel, the double melting furnace of the type comprising a first and a second crucible for loading scrap (1), (2), a first and a second oxygen lance system equipped with a burner (3), (4), a mobile system of electrodes (5), a first and a second extractor hood system (6), (7), a first and a second flue (8), (9) provided with a first and a second flue gas cut –off valve (10), (11), a section of flue for hot fumes (12) connected with said first and said second crucible for loading scrap (1), (2), said first and said second crucible for loading scrap (1), (2) equipped with a nozzle for the tapping of iron (13), (14) provided with iron unloading trolleys, said first and said second oxygen lance system equipped with a burner (3), (4), said preheating and melting process comprising the following steps:The first crucible for loading scrap (1) is loaded with a first load of scrap. The first extractor hood system (6) closes. The second crucible for loading scrap (2) is loaded with a second load of scrap. The second extractor hood system (7) closes.The mobile system of electrodes (5) lowers and activates inside the second crucible for loading scrap (2). The first oxygen lance system equipped with a burner (3) is inserted into the first crucible for loading scrap (1). The fumes generated inside the second crucible for loading scrap (2) migrate into the first crucible for loading scrap (1) through the section of the flue for hot fumes (12). The first load of scrap of the first crucible for loading scrap (1) is heated by means of the first oxygen lance system equipped with a burner (3) and by means of the fumes coming from the second crucible for a load of scrap (2).The mobile system of electrodes (5) active in the second crucible for loading scrap (2) is deactivated and lifted, while the first load of scrap of the first crucible for loading scrap (1) continues to be heated by means of the fumes coming from the second crucible for loading scrap (2) and by means of the first oxygen lance system equipped with a burner (3).The mobile system of electrodes (5) moves from the second crucible for loading scrap (2) to the first crucible for loading scrap (1), allowing the second crucible for loading scrap (2) to start casting liquid steel into ladle through the respective tapping system.The mobile system of electrodes (5) lowers and activates inside the first crucible for loading scrap (1). Simultaneously, the second crucible for loading scrap(2) is loaded with a third load of scrap, the first load of scrap of the first crucible for loading scrap (1) having already been heated by the first oxygen lance system equipped of burner (3) and by the fumes coming from the second crucible for loading scrap (2) during phases a), b), c), d).In the second crucible for loading scrap (2) the second extraction hood system (7) closes and the second oxygen lance system equipped with burner (4) is inserted. Simultaneously, following the activation of the mobile system of electrodes (5) in the first crucible for loading scrap (1), the production of fumes begins, the fumes migrating into the second crucible for loading scrap (2) through the section of the flue for hot fumes (12). The load of scrap of the second crucible for loading scrap (2) is heated by both means of the second oxygen lance system equipped with a burner (4) and means of the fumes.The mobile system of electrodes (5) active in the first crucible for loading scrap (1) is deactivated and lifted, while the load of scrap in the second crucible for loading scrap (2) continues to be heated by the fumes coming from the first crucible for loading scrap (1) and by the second oxygen lance system equipped with a burner (4).Once the melting cycle in the first crucible for loading scrap (1) is finished, the casting of liquid steel can start through the respective tapping system. The mobile electrode system (5) moves from the first crucible for loading scrap (1) to the second crucible for loading scrap (2).The mobile system of electrodes (5) lowers and activates inside the second crucible for loading scrap (2). Simultaneously, the first crucible for loading scrap (1) is loaded with a fourth load of scrap, the third load of scrap of the second crucible for loading scrap (2) having already been heated by means of the second oxygen lance system equipped of burner (4) and by means of the fumes coming from the first crucible for loading scrap (1) during phases e), f) g), h) of the process.In the first crucible for loading scrap (1), the first extractor hood system (6) closes and the first oxygen lance system(3) equipped with a burner is inserted.Simultaneously, following the activation of the mobile system of electrodes (5) in the second crucible for loading scrap (2), the production of fumes begins, which move towards the first crucible for loading scrap (1) through the section of the flue for hot fumes (12). The fourth load of scrap of the first crucible for loading scrap (1) is heated both by the first oxygen lance system equipped with a burner (3) and by the fumes.The cycle restarts from phase c).

Citation Information

Patent Citations

  • Symmetric double-furnace-cavity waste steel preheating and melting device and waste steel melting method

    CN108168320A

  • Double-station electric arc furnace

    CN109136464A

  • Electricity-converter efficient smelting process and system with double furnace bodies

    CN112094977A

  • Operating a melting unit with two furnaces arranged side by side

    DE4406260A1

  • Smelting plant with two melting furnaces arranged in juxtaposed relationship

    US5264020A