Method for correcting inclination of concrete slab caused by subsidence of ground
The method of installing a gutter and jack, followed by injecting expandable resin into voids, addresses the inefficiencies of existing methods by ensuring the sunken concrete slab is returned to its original height without affecting adjacent sections, effectively correcting tilt due to ground subsidence.
Patent Information
- Application Number
- PCT/JP2024/016356
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-31
- Filing Date
- 2024-04-25
- Publication Date
- 2024-12-05
AI Technical Summary
Concrete slabs in port areas, such as those used for RTG cranes, tilt due to ground subsidence, and existing methods like injecting expandable resin are inefficient when one side sinks, as they can cause the other side to rise unevenly.
A method involving installing a gutter and a jack to lift the concrete slab, followed by injecting expandable resin into the void created by drilling, allowing the slab to be returned to its original height without affecting the adjacent side.
Effectively corrects the inclination of concrete slabs by ensuring the sunken side is returned to its predetermined height while preventing the adjacent side from being lifted, maintaining structural integrity and operational safety.
Smart Images

Figure JP2024016356_05122024_PF_FP_ABST
Abstract
Description
Method for correcting tilt of concrete slab caused by ground subsidence
[0001] The present invention relates to a method for correcting the tilt of a concrete slab caused by subsidence of the ground.
[0002] In recent years, tilting of concrete slabs due to ground subsidence in port areas has become a problem. As a method for dealing with this problem, the research group of the present inventors has proposed in Patent Document 1 a method in which expansive resin is injected into the inside of the subsided ground or into gaps that have formed between the ground and the concrete slab through injection holes drilled into the concrete slab, causing it to expand and push up the concrete slab to a predetermined height.
[0003] RTG (Rubber Tired Gantry) cranes (tired transfer cranes), which are used as cargo handling machines in container terminals in port areas, are gantry cranes used to transport containers within a yard, unloading containers from trucks to the yard and loading containers from the yard onto trucks. Unlike rail-type transfer cranes, RTG cranes do not require rails. Instead, their travel lanes are constructed of elongated concrete slabs, e.g., 10 to 300 meters long, 1 to 3 meters wide, and 0.1 to 0.5 meters thick (some are constructed by pouring ready-mixed concrete on-site, while others are constructed by connecting multiple PC concrete slabs that have been brought in). The method using an expansive resin proposed by the present inventors' research group in Patent Document 1 is also effective when the elongated concrete slabs that make up the travel lanes of such RTG cranes tilt due to ground subsidence. However, if one of the longitudinal sides of a concrete slab sinks (if the concrete slab tilts parallel to the longitudinal direction), when an attempt is made to return the concrete slab on one side to a predetermined height by injecting and expanding expansive resin into the ground on the sunken side or into the void that has formed between the ground and the concrete slab, the concrete slab on the other side, which does not need to be pushed up by the expansion of the expansive resin, may be pushed up at the same time because the width of the concrete slab is short.
[0004] Japanese Patent Application Laid-Open No. 2006-144269
[0005] Therefore, an object of the present invention is to provide a method for correcting the inclination of a concrete slab by returning the sunken side to a predetermined height when one side of the concrete slab sinks due to subsidence of the ground.
[0006] The method of the present invention, which has been made in consideration of the above points, for correcting the tilt of a concrete slab caused by subsidence of the ground comprises, as set forth in claim 1, at least the following steps: (1) providing a gutter along the edge of the sunken concrete slab, in which jacks are installed to lift the concrete slab from the side; (2) installing jacks in the gutter and lifting the concrete slab from the side; (3) injecting expansive resin into the void below the concrete slab formed by lifting the concrete slab with the jacks, through injection holes drilled in the concrete slab, and causing it to expand; and (4) removing the jacks installed in the gutter.
[0007] According to the present invention, when one side of a concrete slab sinks due to subsidence of the ground, a method can be provided for correcting the inclination of the concrete slab by returning the sunken side to a predetermined height.
[0008] 1 is a schematic cross-sectional view (schematic cross-sectional view in the width direction of the concrete slab) showing the state in which a gutter is provided along the right edge of the sunken concrete slab in order to install a jack to lift the concrete slab from the right side, in step (1). 2 is a schematic cross-sectional view showing the state in which the right side of the concrete slab is lifted from the right side to its original height with the jack installed in the gutter, in step (2). 3 is a schematic cross-sectional view showing the state in which expansive resin is injected through an injection hole drilled in the concrete slab into a void below the concrete slab formed by lifting the right side of the concrete slab with the jack, in step (3). 4 is a schematic cross-sectional view showing the state in which the jack installed in the gutter has been removed, in step (4).
[0009] The method of the present invention for correcting the tilt of a concrete slab caused by ground subsidence includes at least the following steps: (1) providing a gutter along the edge of the sunken concrete slab in which jacks are installed to lift the concrete slab from the side; (2) installing jacks in the gutter and lifting the concrete slab from the side; (3) injecting an expansive resin into a void below the concrete slab formed by lifting the concrete slab with the jacks through injection holes drilled in the concrete slab, causing the resin to expand; and (4) removing the jacks installed in the gutter.
[0010] The method of the present invention will be described below with reference to the drawings, but the method of the present invention should not be construed as being limited to the following description.
[0011] 1 is a schematic cross-sectional view (schematic cross-sectional view in the width direction of the concrete slab) showing a state in which the right side of the length of a narrow concrete slab (e.g., 250 m long, 1.25 m wide, and 0.3 m thick concrete slab constructed by pouring ready-mixed concrete in situ) constituting a travel lane for an RTG crane at a container terminal in a port area has sunk (i.e., the concrete slab tilts parallel to the length), and a gutter has been provided along the right side of the sunk concrete slab in step (1) for installing a jack to lift the concrete slab from the right side. The scale and size of the gutter provided for installing the jack can be determined appropriately depending on the settlement condition of the concrete slab (e.g., the center of the length is more likely to sink than the ends, so the sunk concrete slab tends to have a twisted shape (the degree of settlement is not uniform)), the size, performance, and number of jacks to be used, etc.
[0012] 2 is a schematic cross-sectional view showing the state in which the right side of the concrete slab has been lifted from the right side by a jack installed in the gutter to the original height (target height) as a predetermined height in step (2). The lateral lifting of the concrete slab with the jack can be achieved by using, for example, an L-shaped metal (e.g., steel) angle member as a member for lifting the concrete slab from the side with the jack, fixing one outer surface of the angle member to the side of the concrete slab, and applying pressure to a hydraulic jack installed on a reaction plate to lift the other outer surface from below (the hydraulic jack can be manual or electric, and a steel pipe pile pressed into the ground can also be used instead of the reaction plate). One method for securing one outer surface of an L-shaped angle member to the side of a concrete slab includes drilling a hole in the side of the concrete slab to insert a bolt used to secure one outer surface of the L-shaped angle member, injecting a Chemical Anchor® into the bolt insertion hole, inserting the bolt, and tightening the L-shaped angle member with a nut through the bolt through-hole. The bolt should be, for example, 150-300 mm in length and 10-30 mm in diameter, with at least 50 mm inserted into the insertion hole. The number of bolts used may be, for example, two to four per jack. To prevent deformation of the L-shaped angle member when lifted from below with a jack, steel plates or other reinforcement may be attached to the inner surface as corner reinforcement to prevent the L-shape from deforming and preventing the concrete slab from lifting. The degree of lift of the concrete slab can be confirmed, for example, using a laser level.
[0013] 3 is a schematic cross-sectional view showing the state in which expansive resin is injected through an injection hole drilled into the concrete slab into the gap below the concrete slab, formed by lifting the right side of the concrete slab with a jack in step (3). The injection hole for the expansive resin should be located, for example, 200 to 500 mm away from the edge of the concrete slab and have a diameter of 10 to 50 mm. If the injection hole is located too close to the edge of the concrete slab, the expansive resin injected into the gap below the concrete slab is likely to leak out the side (resulting in poor construction efficiency). The injection of expansive resin through the injection hole can be performed using a known injection gun. The expansive resin injected into the gap below the concrete slab first flows toward the lower slope (the right side of the concrete slab) and expands within a short period of time (e.g., 2 to 10 seconds; an appropriate time can be selected depending on the size of the gap by adjusting the composition and components of the expansive resin). The resin then expands into the remaining gap through continuous or intermittent injections of a specified amount, filling the gap. This prevents the concrete slab on the left side, which does not need to be pushed up by the expansion of the expansive resin, from being pushed up. It is desirable to inject the expansive resin through the injection hole so that the side of the expanded resin filling the gap overflows into the gutter, ensuring sufficient and solid filling of the gap below the concrete slab with the expanded resin.
[0014] FIG. 4 is a schematic cross-sectional view showing the state after step (3) is completed and the jack installed in the gutter is removed in step (4). (When the hydraulic jack is removed, the reaction plate is also removed, and the L-shaped angle member, one of the outer surfaces of which is fixed to the side of the concrete slab, is also removed by releasing the nuts. The bolts inserted into the concrete slab from its side are cut off and left in place.) It is confirmed, for example, using a laser level, that the concrete slab remains at its original height even after loosening the jack. If this is confirmed, the injection holes drilled into the concrete slab are blocked with, for example, non-shrinking mortar. If the concrete slab drops from its original height due to loosening the jack, pressure is applied to the jack again to raise the concrete slab to its original height. Expanding resin is injected through the injection holes into the voids below the concrete slab, which are formed by the lifting of the concrete slab, and the expanded resin fills the voids. The gutter can be returned to its original state by backfilling and compacting it using a prescribed method, and then pouring ready-mixed concrete or installing a PC concrete slab, etc. If the expanded resin that filled the gap below the concrete slab in step (3) overflows into the gutter on the sides to the extent that it could interfere with backfilling and compaction of the gutter, backfilling and compaction of the gutter can be carried out after cutting or cutting off the excessive overflowing part of the expanded resin (it is recommended to cut or cut off any overflow exceeding 10 mm).
[0015] If the concrete slab subsidence covers a wide area, the lifting of the concrete slab using jacks in step (2) can be performed, for example, by lining up jacks in the gutter, for example, every 1 to 3 meters, and first applying pressure to the jack installed at the extreme edge of the area where the concrete slab needs to be lifted, followed by the jack next to it, and then the jack next to it, and so on. Alternatively, first applying pressure to the jack installed in the area with the greatest degree of subsidence, followed by the jacks on either side of it, and then the jacks next to it, and so on. The status of all installed jacks should be constantly checked, and if any jacks have not been able to lift the concrete slab to its original height, additional pressure should be applied to further lift the concrete slab. Even if a jack is able to lift the concrete slab to its original height, if it does not function as a support for the lifted concrete slab, the concrete slab may fall back to its original height. Therefore, sufficient pressure should be applied to enable the jacks to function as a support. By limiting the spacing between jacks to 3m, it is possible to prevent the load of the concrete slab on each jack from becoming too large, making it easier for multiple jacks to work together to lift the concrete slab.
[0016] Furthermore, in step (3), the expansive resin can be injected by providing injection holes in the concrete slab at intervals of, for example, 0.5 to 1.5 m, and injecting the expansive resin in order from the positions where the concrete slab has been raised to its original height, or by injecting the expansive resin after the concrete slab has been raised to its original height at all positions. By setting the upper limit of the interval between the injection holes for the expansive resin to 1.5 m, it becomes easy to prevent voids from remaining below the concrete slab after the expansive resin injected through the injection holes expands.
[0017] It is not necessary to have enough jacks to install in all areas where the concrete slab needs to be lifted; for example, 5 to 30 jacks can be installed in some of the areas where the concrete slab needs to be lifted, and the jacks that were installed can be removed in order from the areas where the tilt of the concrete slab has been corrected by lifting the concrete slab with the jacks and injecting expansive resin, and the removed jacks can be installed in areas where installation is required but where no jacks have yet been installed, and the concrete slab can then be lifted with the jacks and the expansive resin can be injected.
[0018] The expandable resin may be any expandable resin that has been known to be useful for ground improvement. Among these, non-fluorocarbon expandable resins that are environmentally friendly and do not cause global warming are desirable. Examples of non-fluorocarbon expandable resins include commercially available resins composed of polyol and isocyanate that react to form urethane foam without generating fluorocarbon gas (specifically, a combination of Nippon Paftem Co., Ltd.'s Non-fluorocarbon Polyol FF5020-UC and Nippon Paftem Co., Ltd.'s Isocyanate NP-90 is an example). In addition to those composed of polyol and isocyanate, non-fluorocarbon expandable resins may also include those that foam with carbon dioxide gas by reacting with water and isocyanate, those that foam using liquefied carbon dioxide gas, and hydrocarbon-based resins with foaming properties.
[0019] The expandable resin may contain a third component that can improve the strength of the expanded resin when added to the expandable resin, such as steel slag, metal powder such as iron powder, soil, sand, gravel, or other granular or powdery solid substances (not reactive with the expandable resin) that are stronger than the expanded resin. Adding such a third component to the expandable resin also has the advantage of suppressing the occurrence of scorch (burning) caused by the reaction heat generated when the expandable resin expands. The third component is added in a weight ratio of 0.1 to 50.0 parts by weight of the expandable resin to give the expanded resin a desired strength (for example, 130 to 1400 kN / m 2 ) to the expanding resin.
[0020] In the above explanation, the right side of the concrete slab is raised from the right side to its original height using a jack installed in the gutter in step (2). However, the height to which the concrete slab is raised by the jack may be set lower than its original height (for example, 1 to 10 mm lower than its original height), and the concrete slab may be returned to its original height by the expansion of an expansive resin injected into the void below the concrete slab. This makes it easier to remove the jack in step (4) (after the concrete slab is returned to its original height, a gap is created between the jack and the L-shaped angle member, allowing the jack to be easily removed).
[0021] Furthermore, in the above explanation, in step (2), the right side of the concrete slab is lifted from the right side to its original height using a jack installed in the gutter, and then in step (3), expansive resin is injected into the gap below the concrete slab to expand it. However, if pressure is applied to the jack to lift the concrete slab in step (2) and at the same time expansive resin is injected into the gap below the concrete slab in step (3) to expand it, so that the expanded resin not only fills the gap but also pushes up the concrete slab, the concrete slab can be returned to its original height even if the load on the concrete slab exceeds the allowable load of the jack.
[0022] The above explanation has been given as an example of correcting the inclination of a long, narrow concrete slab that constitutes a travel lane for an RTG crane at a container terminal in a port area, but the present invention can also be applied to correcting the inclination of a long, narrow concrete slab that constitutes a travel lane for an AGV (Automated Guided Vehicle) or a travel lane for trucks at a container terminal in a port area.
[0023] Furthermore, the concrete slabs whose tilt can be corrected by applying the present invention are not limited to long and narrow concrete slabs (for example, concrete slabs whose length is three times or more its width), and the present invention can be applied to correcting the tilt of concrete slabs of various lengths and widths (for example, concrete slabs whose length is 10 to 500 m and whose width is 1 to 10 m, and whose thickness may be, for example, 0.1 to 0.5 m).
[0024] The present invention has industrial applicability in that it provides a method for correcting the inclination of a concrete slab by returning the sunken side to a predetermined height when one side of the concrete slab sinks due to ground subsidence.
Claims
1. A method for correcting the inclination of a concrete slab caused by subsidence of the ground, comprising at least the steps of: (1) providing a gutter along the edge of the sunken concrete slab in which a jack for lifting the concrete slab from the side is installed; (2) installing a jack in the gutter and lifting the concrete slab from the side; (3) injecting an expansive resin into a void below the concrete slab formed by lifting the concrete slab with the jack through an injection hole drilled in the concrete slab, thereby allowing the resin to expand; and (4) removing the jack installed in the gutter.
Citation Information
Patent Citations
Correcting method and correcting device for building having uneven settlement
JP2000008398A
Inclination correcting method and inclination correcting member for building
JP2002295027A
Uneven settlement correction construction method by steel plate footing system
JP2007327309A
Jig for hydraulic jack used for repair construction of uneven settlement of building, and method for repairing unevenly settled building by using the same
JP2014025212A
Durable block press-in foundation construction method for foundation repair
JP2022078187A