Device installation modular unit
By designing a detachable cross beam frame to connect with vertical pillars, the problem of inert or harmful gas deposition in the modular unit of the equipment installation is solved, and gas diffusion in the underlying area is realized, ensuring safety and stability.
Patent Information
- Application Number
- PCT/CN2024/080126
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-06-16
- Filing Date
- 2024-03-05
- Publication Date
- 2024-12-19
AI Technical Summary
The existing equipment installation modular units are installed in the chemical or pharmaceutical industry. In the chemical or pharmaceutical industry, the gas diffusion is blocked and there are hidden dangers.
A modular unit of equipment installation with a base structure that facilitates gas diffusion is designed. Through multiple vertical pillars and a detachable cross beam frame, the cross beam frame can be connected and disassembled with the vertical pillars and equipment to ensure that the bottom equipment area has sufficient Gas diffusion space.
It effectively prevents the hidden danger of hindering gas diffusion by the beam frame, ensures that the underlying area can fully diffuse inert or harmful gases, and meets the safety requirements of the chemical or pharmaceutical industry.
Smart Images

Figure CN2024080126_19122024_PF_FP_ABST
Abstract
Description
Equipment installation modular units
[0001] Citation of Related Applications
[0002] This application claims priority to a prior invention patent application filed in China with an application date of June 16, 2023, application number 202310713816.8, and invention name “A Modular Unit for Equipment Installation”. The entire contents of the prior application are incorporated herein by reference. Technical Field
[0003] The present disclosure relates to an equipment installation modular unit, and in particular to an underlying equipment installation support structure in the equipment installation modular unit. Background Art
[0004] Currently, to facilitate the rapid and easy installation of factory facilities, a common approach is to modularize the relevant facilities and transport the prefabricated modular units to the construction site for installation (e.g., the solution disclosed in patent document CN112166233A). In traditional modular design, for modular units with multi-layer equipment mounting frames, the equipment mounting frames on each layer, including the bottom layer, adopt the same standard design. Furthermore, to meet process requirements and save floor space, the bottom layer is also required to house the relevant equipment on the other layers. Furthermore, to ensure that the equipment piping on the bottom layer is hoisted and transported together with the modular units, maximize trial installation and inspection at the modular structure manufacturer, and ensure hoisting strength, a steel structure layer is typically added to the bottom layer of the modules, including grating or patterned plates. However, in industries such as the chemical and pharmaceutical industries, inert and harmful gases are generated during production. These gases often accumulate between the bottom layer equipment structures (e.g., the grating or patterned plates). In other words, the equipment mounting structure on the bottom layer in conventional technologies can hinder the diffusion of inert (or harmful) gases, causing these gases to stagnate near the bottom layer, creating a potential risk. Therefore, for such equipment installation modular units used in related industries such as the chemical or pharmaceutical industries that generate inert gases (or harmful gases), it is necessary to consider modules with a substructure that facilitates gas diffusion.
[0005] Summary of the Invention
[0006] The present disclosure provides an equipment installation modular unit, and more particularly, provides an equipment installation modular unit having an underlying structure that facilitates gas diffusion.
[0007] The present disclosure provides an equipment installation modular unit, comprising a plurality of vertical pillars and a multi-layer equipment installation frame connected between the plurality of vertical pillars for installing equipment. When various equipment are installed on the equipment installation frame on each layer, the equipment installation modular unit is transported as a whole to the required installation site for installation. In the multi-layer equipment installation frame, at least the beam frame of the installation equipment on the bottom layer is composed of a plurality of beams, and the beam frame is not only detachably connected to the plurality of vertical pillars, but also detachably connected to the various equipment installed on the beam frame.
[0008] In at least one embodiment, the plurality of beams of the beam frame include a frame beam and an equipment base beam connected to the equipment, and the equipment base beam is detachably connected to the frame beam.
[0009] In at least one embodiment, the connection between the beam frame and the plurality of vertical pillars, the connection between the beam frame and the various equipment, and the connection between the equipment base beam and the frame beam adopts a bolt connection structure.
[0010] In at least one embodiment, at least one of the various devices has an anchor bolt fixed to a concrete foundation at the installation site.
[0011] In at least one embodiment, at least one of the equipment foundation beams is fixed by welding to an embedded plate in a groove of a concrete foundation at the installation site or is connected and fixed to the equipment concrete foundation at the installation site by chemical anchor bolts.
[0012] In at least one embodiment, the installation frame includes an equipment installation plane frame located at the middle layer, an equipment installation plane frame located at the top layer, and the beam frame located at the bottom layer. The equipment installation modular unit is hoisted and transported as a whole to the required installation site for installation.
[0013] In at least one embodiment, the beam frame includes multiple outer frame beams, multiple inner frame beams and multiple equipment installation beams. After at least part of the equipment is installed on the concrete foundation at the desired installation site, the outer frame beams are disassembled and one or more of the multiple inner frame beams and the multiple equipment installation beams are removed.
[0014] In at least one embodiment, when at least one of the equipment foundation beams is welded and fixed to the embedded plate in the concrete foundation groove at the installation site, the height of the equipment from the ground plane of the foundation is 200 mm to 400 mm. When the chemical anchor bolts are used, the height of the equipment from the ground plane of the foundation is greater than 400 mm.
[0015] In at least one embodiment, the height of the equipment foundation beam is determined based on the height of the equipment from the ground level of the foundation as dictated by industry requirements.
[0016] In at least one embodiment, the frame beam includes: a plurality of outer frame beams, which form the outer frame of the beam frame and are detachably connected to the plurality of vertical pillars; at least one first inner frame beam, which connects the outer frame beams opposite to each other within the outer frame; and at least one second inner frame beam, which connects the outer frame beams and the first inner frame beams opposite to each other within the outer frame, at least one equipment foundation beam is provided in the outer frame, the at least one equipment foundation beam is detachably connected to at least one of the outer frame beams, the first inner frame beams and the second inner frame beams, and the equipment is detachably mounted on the at least one equipment foundation beam.
[0017] In at least one embodiment, in the multi-layer equipment installation frame, a diagonal bracing beam is provided between adjacent equipment installation frames, the diagonal bracing beam is connected to the adjacent equipment installation frames and is inclined relative to the adjacent equipment installation frames.
[0018] In at least one embodiment, in the multi-layer equipment installation frame, at least one equipment installation frame other than the beam frame is not only detachably connected to multiple vertical pillars, but also detachably connected to various equipment installed on the at least one equipment installation frame.
[0019] By using the equipment installation modular unit provided by the present invention, after the equipment installation modular unit arrives at the installation site, at least part of the structure of the bottom beam frame where various equipment are installed can be disassembled, thereby preventing the hidden dangers caused by the beam frame hindering the diffusion of gas retained in the bottom layer. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] FIG1 is a schematic side view of an equipment installation modular unit showing an embodiment of the present disclosure;
[0021] FIG2 is a schematic top view showing various equipment mounted on a bottom beam frame in an equipment mounting modular unit according to an embodiment of the present disclosure;
[0022] 3 is a schematic longitudinal sectional view showing a state of the first device of an embodiment of the present disclosure when installed on site;
[0023] 4 is a schematic longitudinal sectional view showing a state of the second device of the embodiment of the present disclosure when installed on site;
[0024] 5 is a schematic longitudinal sectional view showing a state of a third device according to an embodiment of the present disclosure when installed on site;
[0025] 6 is a partial perspective view showing a state in which various devices on the bottom floor of the equipment installation modular unit according to an embodiment of the present disclosure are connected to the beam frame;
[0026] 7 is a partial perspective view showing a state in which various equipment on the bottom floor of the equipment installation modular unit according to an embodiment of the present disclosure is detached from the beam frame and fixed on a concrete foundation. DETAILED DESCRIPTION
[0027] The following detailed description of the technical solutions and effects of the present disclosure is given through specific implementation methods. The following implementation methods are only used to illustrate the content of the present disclosure, and the present disclosure is not limited to the following implementation methods or examples. Any changes made to the present disclosure based on the concepts of the present disclosure are within the scope of protection claimed by the present disclosure.
[0028] The modular equipment installation unit 10 provided in embodiments of the present disclosure is applicable to industries such as the chemical and pharmaceutical industries. As shown in FIG1 , the modular equipment installation unit 10 is a rectangular parallelepiped frame structure comprising: a plurality of (four in this embodiment) vertical pillars 11; a plurality of planar equipment installation frames 12 located in the middle layer; a planar equipment installation frame 13 located in the top layer; a crossbeam frame 14 located in the bottom layer for installing equipment; diagonal bracing beams 15 connecting the vertical pillars 11, the planar equipment installation frames 12, 13, and the crossbeam frame 14; and a plurality of lifting lugs 16 provided on the frame structure.
[0029] Among them, the length of multiple vertical pillars 11 can be used to limit the height of the equipment installation modular unit 10, and the equipment installation plane frame 12, 13 and the beam frame 14 are used to form a multi-layer equipment installation frame of the equipment installation modular unit 10 between the multiple vertical pillars 11.
[0030] The equipment installation plane frames 12 and 13 can be configured, for example, as follows: a polygonal frame (a rectangular frame in this embodiment) is formed by a plurality of outer frame crossbeams (four in this embodiment), with panels disposed within the frame. The panels within the frame can be fixed to the outer frame crossbeams or removably attached to the outer frame crossbeams. In this configuration, the outer frame crossbeams constituting the polygonal frame of each equipment installation plane frame are joined and secured to the plurality of vertical struts 11, and the panels disposed within the frame of each equipment installation plane frame can also be arranged parallel to one another.
[0031] 1, 2, and 6, the equipment installation beam frame 14 located on the bottom floor can be configured as follows: a polygonal frame (a rectangular frame in this embodiment) is formed by a plurality of outer frame beams (four outer frame beams 14a in this embodiment), and inner frame beams or equipment installation beams are disposed within the frame to engage with the outer frame beams. In this configuration, the outer frame beams of the beam frame 14 are engaged and fixed to the plurality of vertical pillars 11, and the plane of the frame formed by the outer frame beams of the beam frame 14 can also be configured to be parallel to the plates of the equipment installation plane frames 12 and 13.
[0032] In addition, by using multiple diagonal bracing beams 15 to connect respectively with each vertical pillar 11, the equipment installation plane frame 12, 13 and the crossbeam frame 14 as shown in Figure 1, the equipment installation modular unit 10 can be prevented from being deformed by external force, and the structural stability of the equipment installation modular unit 10 can be improved.
[0033] As shown in FIG1 , in the frame structure of the equipment installation modular unit 10, at the junction of at least one of the layers of equipment installation frames (equipment installation plane frames 12 and 13 and beam frame 14) and at least one vertical support 11, a lifting lug 16 is provided for lifting the equipment installation modular unit 10 during movement, transportation, installation, and removal of the equipment installation modular unit 10. This allows the equipment installation modular unit 10 to be moved, transported, installed, and removed by simply hooking the lifting lug 16 using a crane or the like, simplifying operation.
[0034] The equipment installation modular unit 10 can be manufactured and assembled in advance in a modular equipment manufacturing plant, and after the required related equipment is also installed on the equipment installation frames of each layer (equipment installation plane frames 12, 13 and beam frames 14), it is hoisted and transported as a whole to the construction and installation site of a chemical plant or pharmaceutical factory for installation and fixation. Of course, the transportation method of the equipment installation modular unit 10 disclosed in the present invention is not limited to hoisting transportation, and the equipment installation modular unit 10 disclosed in the present invention can be transported by any appropriate vehicle or tool. Among them, in the equipment installation frames of each layer (equipment installation plane frames 12, 13 and beam frames 14) of this embodiment, the connections between the multiple beams of the beam frame 14 on the bottom layer and the vertical pillars 11 and the connections with the equipment installed on the bottom layer can all be detachable connections.
[0035] FIG2 is a schematic top view showing various equipment mounted on the bottom beam frame 14 of the equipment mounting modular unit 10 according to an embodiment of the present disclosure. As shown in Figure 2, the above-mentioned multiple beams of the beam frame 14 include four outer frame beams 14a connected to the vertical pillars 11, two first inner frame beams 14b connecting two outer frame beams 14a opposite to each other, a second inner frame beam 14c connected between one outer frame beam 14a of the two outer frame beams 14a not connected by the first inner frame beams 14b and the first inner frame beam 14b opposite to it, two first equipment installation beams 14d connected between the other outer frame beam 14a of the two outer frame beams 14a not connected by the first inner frame beam 14b and the first inner frame beam 14b opposite to it, two second equipment installation beams 14e connected between the two first inner frame beams 14b, and a third equipment installation beam 14f connected between the outer frame beam 14a and the second inner frame beam 14c.
[0036] The outer frame crossbeam 14a, the first inner frame crossbeam 14b, and the second inner frame crossbeam 14c serve as frame beams of the crossbeam frame 14, and the first equipment mounting beam 14d, the second equipment mounting beam 14e, and the third equipment mounting beam 14f serve as equipment foundation beams for mounting equipment of the crossbeam frame 14. In the embodiment shown in FIG2 , two first equipment mounting beams 14d are used to mount the first equipment 21, two second equipment mounting beams 14e are used to mount the second equipment 22, and one third equipment mounting beam 14f is used to mount the third equipment 23.
[0037] Furthermore, the number and layout of the outer frame crossbeams 14a, first inner frame crossbeams 14b, second inner frame crossbeams 14c, first equipment mounting beams 14d, second equipment mounting beams 14e, and third equipment mounting beams 14f of the crossbeam frame 14 are not limited to those shown in FIG2 , and may be modified depending on the specific equipment to be installed. Thus, the crossbeam frame 14 of the bottom layer of the equipment mounting modular unit 10 disclosed herein has excellent versatility.
[0038] The first device 21 can be a horizontal device having a saddle 21a with anchor bolts for securing to the concrete foundation at the installation site. During assembly and transportation of the modular device installation unit 10, the two first device mounting beams 14d are connected to the sides of the saddle 21a using fasteners (e.g., bolted fasteners). In other words, by fastening the saddle 21a to the two first device mounting beams 14d using fasteners (e.g., bolted fasteners), the first device 21 is mounted and secured to the crossbeam frame 14.
[0039] Specifically, the first device 21 is, for example, roughly cylindrical in shape, and is mounted and fixed on the two first device mounting beams 14d in a horizontal manner with the help of two saddles 21a below it. The saddle 21a is made of, for example, channel steel, that is, C-shaped steel. In this embodiment, as shown in FIG3 , when viewed from the side in the horizontal direction, the saddle 21a is roughly trapezoidal in shape, wider at the top and narrower at the bottom. In addition, the two first device mounting beams 14d are also made of, for example, channel steel. At the installation site, as shown in FIG2 , at two locations spaced a certain distance apart from each other in the longitudinal direction of the first device 21, the channel steel serving as the saddle 21a and the channel steel serving as the first device mounting beam 14d are connected back to back, in other words, they are connected so that the openings of the channel steels face opposite sides.
[0040] The second device 22 can be a mounting base without a saddle or the like, and a predetermined device can be mounted on the second device. The predetermined device, for example, needs to be at a certain height (e.g., 200 mm to 400 mm) from the ground plane G of the foundation according to industrial requirements. An equipment foundation beam needs to be provided on the second device 22. Specifically, as shown in FIG2 , a second device mounting beam 14 e serving as the equipment foundation beam is fixed below the second device 22. Therefore, before the equipment mounting modular unit 10 is hoisted and transported, the two second device mounting beams 14 e are first fixedly connected to the second device 22 by fasteners (e.g., bolted fasteners) or welding. In other words, the second device 22 is fixedly connected to the two second device mounting beams 14 e by fasteners (e.g., bolted fasteners) or welding. Then, the two second equipment mounting beams 14e are respectively connected to the two first inner frame beams 14b by fasteners (such as bolted fasteners), so that the second equipment 22 with the equipment base beam is installed and fixed on the beam frame 14.
[0041] However, the present invention is not limited thereto. Alternatively, the two second device mounting beams 14e may be connected to the two first inner frame cross beams 14b respectively by fasteners (such as bolted fasteners), and then the second device 22 may be fixedly connected to the two second device mounting beams 14e by fasteners (such as bolted fasteners) or welding.
[0042] In addition, the predetermined equipment installed in the second equipment 22 can also be appropriately changed according to actual needs.
[0043] The third device 23 can be a mounting base without a saddle, etc., and can be mounted on the third device 23. The predetermined device, for example, needs to be at a higher height (e.g., greater than 400 mm) from the ground plane G of the foundation according to industrial requirements. Similarly, as shown in FIG2 , a third device mounting beam 14 f serving as a device foundation beam is fixed below the third device 23. Therefore, before the device mounting modular unit 10 is hoisted and transported, the third device mounting beam 14 f must first be fixedly connected to the third device 23 by fasteners (e.g., bolted fasteners) or welding. In other words, the third device 23 is fixedly connected to the third device mounting beam 14 f by fasteners (e.g., bolted fasteners) or welding. Then, the third device mounting beam 14 f is connected to the outer frame crossbeam 14 a and the second inner frame crossbeam 14 c respectively by fasteners (e.g., bolted fasteners). In this way, the third device 23 with the device foundation beam is mounted and fixed to the crossbeam frame 14.
[0044] However, the present invention is not limited thereto, and the third device mounting beam 14f may be connected to the outer frame beam 14a and the second inner frame beam 14c respectively by fasteners (such as bolted fasteners), and then the third device 23 may be fixedly connected to the third device mounting beam 14f by fasteners (such as bolted fasteners) or welding.
[0045] In addition, the equipment installed in the third equipment 23 can also be appropriately changed according to actual needs.
[0046] The outer frame crossbeam 14a, the first inner frame crossbeam 14b, the second inner frame crossbeam 14c, the second equipment mounting beam 14e, and the third equipment mounting beam 14f can all be made of H-shaped steel, each with end plates provided at both ends, each with bolt connection holes. The first equipment mounting beam 14d is made of channel steel, with end plates provided at both ends, each with bolt connection holes. However, this is not limiting. The outer frame crossbeam 14a, the first inner frame crossbeam 14b, the second inner frame crossbeam 14c, the first equipment mounting beam 14d, the second equipment mounting beam 14e, and the third equipment mounting beam 14f can also be made of any other steel material known in the art, as needed.
[0047] After the required equipment and pipelines are installed on the equipment installation frames on the other floors, and the first equipment 21, second equipment 22, third equipment 23 and their pipelines are installed and fixed on the crossbeam frame 14, the assembly and production of the equipment installation modular unit 10 is completed. The equipment installation modular unit 10 can then be transported to the installation site for on-site construction and installation.
[0048] The following describes a method for installing the various devices on the bottom layer after the device installation modular unit 10 is transported to the installation site.
[0049] FIG3 is a longitudinal cross-sectional view of the first device 21 of the embodiment of the present disclosure during on-site installation, i.e., a cross-sectional view taken along line AA in FIG2 . Before installation, the anchor bolts B of the first device 21 are inserted into the anchor bolt receptacles reserved on-site, while the saddle 21a is directly placed on the precast concrete foundation C on-site. The connections between the two first device mounting beams 14d and the outer frame beam 14a and the first inner frame beam 14b are then removed. The connections between the two first device mounting beams 14d connected to the saddle 21a are then removed, and the outer frame beam 14a, the first device mounting beam 14d, and the first inner frame beam 14b are gradually removed. Finally, the first device 21 is fixed to the concrete foundation C by grouting the gaps between the anchor bolts B and the anchor bolt receptacles. In this way, when the first device 21 is a large device such as a horizontal device, by using the anchor bolts B and grouting the gaps between the anchor bolts B and the anchor bolt insertion holes, the installation strength of the first device 21 can be ensured, and the first device 21 can be stably fixed to the concrete foundation C.
[0050] Figure 4 is a schematic longitudinal cross-sectional view of the second device 22 during on-site installation, according to an embodiment of the present disclosure, taken along line BB in Figure 2. Prior to installation, the connections between the second device mounting beam 14e and the two first inner frame crossbeams 14b are removed. The second device mounting beam 14e is then placed within a pre-cut groove W in the on-site concrete foundation and secured to the embedded plate P within the groove by welding. In this manner, the second device 22 is secured to the concrete foundation C via the second device mounting beam 14e, which has a predetermined height. This ensures that the installation height of the second device 22 meets industrial requirements by utilizing the second device mounting beam 14e positioned between the concrete foundation C and the second device 22. The structure of the second device mounting beam 14e positioned between the concrete foundation C and the second device 22 can be appropriately modified based on the actual installation. In other words, the height of the second device mounting beam 14e can be determined based on the industrial requirements for the height of the second device 22 from the ground level of the foundation. Therefore, the crossbeam frame 14 of the bottom layer of the equipment installation modular unit 10 of the present disclosure has excellent versatility.
[0051] Figure 5 is a schematic longitudinal cross-sectional view of the third device 23 during on-site installation according to an embodiment of the present disclosure, taken along line CC in Figure 2. Prior to installation, the connections between the third device mounting beam 14f and the outer frame crossbeam 14a and the second inner frame crossbeam 14c are first disassembled. The third device mounting beam 14f is then lowered onto the on-site concrete foundation C and secured to the concrete foundation C using chemical anchors H, followed by grouting. In this manner, the third device 23 is secured to the concrete foundation via the third device mounting beam 14f, which has a predetermined height. This ensures that the installation height of the third device 23 meets industry standards by utilizing the third device mounting beam 14f, located between the concrete foundation C and the third device 23. The structure of the third device mounting beam 14f, located between the concrete foundation C and the third device 23, can be appropriately modified based on the actual installation. In other words, the height of the third device mounting beam 14f can be determined based on the industry-specified height of the third device 23 from the ground level. Therefore, the bottom beam frame 14 of the equipment installation modular unit 10 of the present disclosure has excellent versatility. In addition, compared with the anchor bolts B, the chemical anchor bolts H are easier to operate, which can improve workability and reduce costs while meeting the strength requirements of the third equipment 23.
[0052] FIG6 is a partial perspective view showing a state in which various equipment on the bottom floor of the equipment installation modular unit 10 and the beam frame 14 are connected according to an embodiment of the present disclosure.
[0053] FIG7 is a partial perspective view showing a state in which various equipment on the bottom floor of the equipment installation modular unit 10 according to an embodiment of the present disclosure is detached from the beam frame 14 and fixed on a concrete foundation.
[0054] Figures 6 and 7 illustrate the bottom beam frame before and after removal. Specifically, in the embodiment shown in Figure 7, at least the outer frame beam 14a, first inner frame beam 14b, second inner frame beam 14c, and first equipment mounting beam 14d of the beam frame 14 are removed during on-site installation, thereby creating ample space between the various equipment mounted on the beam frame 14.
[0055] By adopting the equipment installation modular unit disclosed in the present invention, since the support and installation method of the underlying equipment is retained, it is ensured that the underlying equipment, pipelines, etc. can be hoisted and transported together with the modular unit, thereby meeting the module factory's needs for maximum trial installation, acceptance, and inspection. At the same time, the present invention adopts a technical solution in which the beam frame supporting the underlying equipment can be removed from the underlying equipment or the equipment foundation beam of the underlying equipment. Therefore, the area where the underlying equipment is located can have space for gases such as inert gases or harmful gases to fully diffuse, solving the problem in the prior art that inert gases are easily deposited in the underlying frame and cause hidden dangers.
[0056] As other embodiments of the present disclosure, the following changes may be made.
[0057] In addition to the connection method using fasteners (such as bolted fasteners), the detachable connections between the beams that constitute the beam frame, between the beams and the vertical pillars, and between the beams and the underlying equipment or the equipment foundation beams of the underlying equipment can also use other detachable connection methods such as snap-fitting and snap-fitting.
[0058] Except for the bottom layer, the equipment installation frames of other layers can also adopt the same connection structure as that of the bottom layer.
[0059] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any appropriate manner without contradiction.
[0060] LIST OF REFERENCE NUMERALS 10 Equipment installation modular unit 11 Vertical support 12 Equipment installation plane frame at the middle layer 13 Equipment installation plane frame at the top layer 14 Beam frame 14a Outer frame cross beam 14b 1st inner frame cross beam 14c 2nd inner frame cross beam 14d 1st equipment installation beam 14e 2nd equipment installation beam 14f 3rd equipment installation beam 15 Diagonal support beam 16 Lifting lug 21 1st equipment 21a Saddle 22 2nd equipment 23 3rd equipment B Ground anchor H Chemical anchor G Ground plane
Claims
1. A modular equipment installation unit, comprising a plurality of vertical pillars (11) and a multi-layer equipment installation frame connected between the plurality of vertical pillars (11) for installing equipment, wherein the modular equipment installation unit (10) is transported as a whole to a desired installation site for installation, with various equipment installed on the equipment installation frames at each layer. In the multi-layer equipment installation frame, at least the beam frame (14) of the installation equipment on the bottom layer is composed of multiple beams, and the beam frame (14) is not only detachably connected to multiple vertical pillars (11), but also detachably connected to various equipment installed on the beam frame.
2. The equipment installation modular unit according to claim 1, characterized in that: The multiple cross beams of the cross beam frame (14) include a frame beam and an equipment base beam connected to the equipment, and the equipment base beam is detachably connected to the frame beam.
3. The equipment installation modular unit according to claim 2, characterized in that: The connection between the crossbeam frame and the plurality of vertical pillars (11), the connection between the crossbeam frame and the various equipment, and the connection between the equipment foundation beam and the frame beam adopt a bolt connection structure.
4. The equipment installation modular unit according to claim 1, characterized in that: At least one of the various devices has a ground anchor bolt, which is fixed to a concrete foundation at the installation site.
5. The equipment installation modular unit according to claim 2, characterized in that: At least one of the equipment foundation beams is fixed by welding to the embedded plate in the groove of the concrete foundation at the installation site or connected and fixed to the concrete foundation at the installation site by chemical anchor bolts.
6. The equipment installation modular unit according to claim 1, characterized in that: The installation frame comprises an equipment installation plane frame (12) located at the middle layer, an equipment installation plane frame (13) located at the top layer, and the beam frame (14) located at the bottom layer. The equipment installation modular unit (10) is hoisted and transported as a whole to the required installation site for installation. Pack.
7. The equipment installation modular unit according to claim 1, characterized in that: The beam frame (14) comprises a plurality of outer frame beams (14a), a plurality of inner frame beams and a plurality of equipment installation beams. After at least part of the equipment is installed on a concrete foundation (C) at the desired installation site, the outer frame beams (14a) are disassembled, and one or more of the plurality of inner frame beams and the plurality of equipment installation beams are removed.
8. The equipment installation modular unit according to claim 5, characterized in that: When at least one of the equipment foundation beams is welded and fixed to the embedded plate in the concrete foundation groove at the installation site, the height of the equipment from the ground plane of the foundation is 200 mm to 400 mm, When the chemical anchor is used, the height of the device from the ground level of the foundation is greater than 400 mm.
9. The equipment installation modular unit according to claim 5, characterized in that: The height of the equipment foundation beam is determined according to the height of the equipment from the ground level of the foundation as specified by industrial requirements.
10. The equipment installation modular unit according to claim 2, characterized in that: The frame beam comprises: A plurality of outer frame cross beams (14a), which form an outer frame of the cross beam frame and are detachably connected to the plurality of vertical pillars; at least one first inner frame cross beam (14b) connecting the outer frame cross beams opposite to each other in the outer frame; and at least one second inner frame beam (14c) connecting the outer frame beam and the first inner frame beam facing each other in the outer frame, At least one equipment foundation beam (14d, 14e, 14f) is provided in the outer frame. The at least one equipment foundation beam and the outer frame beam, the first inner frame beam and the At least one of the second inner frame cross beams is detachably connected, The equipment is detachably mounted on the at least one equipment foundation beam.
Citation Information
Patent Citations
Construction method of factory building facilities and factory building configuration module
CN112166233A
Support frame for arranging module units in a service vehicle
CN102469877A
Modularization tower device and construction transport method thereof
CN105545059A
Modularized building and construction method thereof
CN110005051A
Subrack assembly, associated rack and assembly method
CN111801991A