By adopting a dual-zone intelligent control method in the raw coal bin, and building and adjusting coal supply strategies based on power generation plans and boiler coal-fired requirements, the problems of low efficiency and high cost of traditional raw coal bins are solved, and more efficient and economical coal transportation is achieved.

WO2025025352A1PCT designated stage expired Publication Date: 2025-02-06HUANENG POWER INT CO LTD RIZHAO POWER PLANT
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/125371
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-08-02
Filing Date
2023-10-19
Publication Date
2025-02-06

AI Technical Summary

Technical Problem

The traditional raw coal bin adopts mechanical control method, which has low efficiency, slow response speed and high economic cost, which limits its application scope and development.

Method used

The intelligent control method of dual-zone raw coal bin is adopted to determine the coal-fired formula group through the future power generation plan based on the generator set, and a coal supply rate strategy is constructed according to the coal-fired requirements of different time nodes of the boiler, and the optimal is determined through multiple adjustments and comprehensive value evaluation. Coal supply strategy, drives the dual-zone of the raw coal silo to supply coal.

Benefits of technology

It improves the economy and efficiency of coal transportation in the raw coal silo, reduces transportation costs, and achieves more efficient coal storage and transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023125371_06022025_PF_FP_ABST
    Figure CN2023125371_06022025_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of warehoused coal control. Disclosed are a two-zone raw coal bunker control method and system. The method comprises: on the basis of a future power generation plan of a power generator set, determining a corresponding coal formulation group from a preset coal formulation correspondence table; on the basis of coal requirements of a boiler at different time nodes, creating original coal supply rate strategies for different zones of a raw coal bunker; performing a plurality of adjustments on coal supply rates for the different zones in a first coal supply rate strategy, and generating virtual coal supply rate strategies for the adjustments; configuring an economy evaluation weight and an efficiency evaluation weight for coal formulations respectively used by the different zones of the raw coal bunker, on the basis of the economy evaluation weight and the efficiency evaluation weight, performing comprehensive value evaluation on the original coal supply rate strategies and the plurality of virtual coal supply rate strategies, and obtaining respective evaluated compressive values; and comparing the magnitudes of the evaluated comprehensive values and determining the coal supply rate strategy having the maximum evaluated comprehensive value as the current coal supply rate strategy.
Need to check novelty before this filing date? Find Prior Art

Description

A dual-partition raw coal bunker control method and system Technical Field

[0001] The present invention relates to the technical field of coal storage control, and in particular to a double-partition raw coal bunker control method and system. Background Art

[0002] In the coal industry, raw coal bunkers are one of the most important equipment for storing and transporting coal. Traditional raw coal bunkers are usually operated by mechanical control, but their low efficiency, slow response speed, and high economic cost have limited their application and development.

[0003] Therefore, developing an intelligent control method for a dual-partition raw coal bunker to achieve high-efficiency, high-economic, precise and energy-saving coal storage and transportation is of great significance to the development of the field of coal control technology. Summary of the Invention

[0004] The present invention provides a dual-zone raw coal bunker control method and system, which can effectively improve the economy and efficiency of coal transportation in the raw coal bunker.

[0005] The technical solution adopted by the present invention is: a dual-zone raw coal bunker control method, comprising: based on the future power generation plan of the generator set, determining a corresponding coal formula group in a preset coal formula corresponding table, and configuring the coal filling of the dual zones of the raw coal bunker based on the coal formula group;

[0006] Based on the coal burning requirements of the boiler at different time nodes, a raw coal supply rate strategy is established for different zones of the raw coal bunker;

[0007] Adjusting the coal supply rates of different zones in the first coal supply rate strategy multiple times, and generating a virtual coal supply rate strategy for each adjustment;

[0008] The economic evaluation weights and efficiency evaluation weights are configured for the coal formulas applied to different partitions of the raw coal bunker. Based on the economic evaluation weights and efficiency evaluation weights, the original coal supply rate strategy and several virtual coal supply rate strategies are comprehensively evaluated to obtain their respective comprehensive evaluation values.

[0009] Compare the comprehensive evaluation values ​​of the original coal supply rate strategy and the virtual coal supply rate strategy, and determine the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy;

[0010] Based on the current coal supply rate strategy, the dual partitions of the raw coal bunker are driven to supply coal.

[0011] In some embodiments of the present application, based on the future power generation plan of the generator set, a method for determining a corresponding coal fuel formula group in a preset coal fuel formula correspondence table includes:

[0012] The first step is to construct a coal formula correspondence table, which includes several coal formula groups, each of which corresponds to a corresponding preset power generation planning interval;

[0013] In the second step, the future power generation plan determined by the power generation unit is substituted into the coal-fired formula corresponding table for comparative analysis, and the corresponding coal-fired formula group is determined according to the preset power generation planning interval to which the future power generation plan belongs.

[0014] In some embodiments of the present application, the preset power generation interval planning includes: power generation requirements for different time segments, and power generation power increase rate requirements for different time segments.

[0015] In some embodiments of the present application, a method for constructing a raw coal supply rate strategy for different zones of a raw coal bin based on the coal burning requirements of the boiler at different time points includes:

[0016] Scan and analyze the future power generation plan to determine the time node when the coal requirements change, and record the determined time node as the marked time node; according to the coal requirements corresponding to the marked time node and the efficiency performance of the coal formula corresponding to different partitions of the raw coal bin, the coal supply rate of different partitions of the raw coal bin is initially set, thereby forming the raw coal supply rate strategy.

[0017] In some embodiments of the present application, a method for adjusting the coal supply rates of different partitions in the first coal supply rate strategy multiple times and generating a virtual coal supply rate strategy for each adjustment includes:

[0018] Determine the coal supply rate interval of different sections of the raw coal bunker in the original coal supply rate strategy, divide the interval into multiple sub-intervals, adjust the multiple sub-intervals, and determine the average coal supply rate of each sub-interval;

[0019] According to the average coal supply rate of multiple sub-intervals, multiple virtual coal supply rate strategies are generated.

[0020] In some embodiments of the present application, the method of configuring the economic evaluation weights and efficiency evaluation weights for the coal recipes applied to different zones of the raw coal bin includes:

[0021] When allocating economic evaluation weights to the coal formula, the proportions of the various components in the coal formula are analyzed, and the cost of the unit supply of the coal formula is calculated based on the cost of each component. The economic evaluation weights are then allocated based on the cost of the unit supply of the coal formula.

[0022] When allocating efficiency evaluation weights for coal-fired formulas, the power generation corresponding to the unit supply of the coal-fired formula is analyzed, and the efficiency evaluation weights are allocated based on the power generation per unit supply of the coal-fired formula.

[0023] In some embodiments of the present application, the expression for calculating the economic evaluation weight is:

[0024]

[0025] Among them, J is the economic evaluation weight corresponding to the coal formula, k1 is the first economic conversion coefficient, k2 is the second economic conversion coefficient, k3 is the third economic conversion coefficient, and k n is the nth economic conversion coefficient, b1% is the first component ratio of the coal-fired formula, b2% is the second component ratio of the coal-fired formula, b3% is the third component ratio of the coal-fired formula, b n % is the ratio of the nth component in the coal formula.

[0026] In some embodiments of the present application, the expression for calculating the efficiency evaluation weight is:

[0027]

[0028] Among them, L is the efficiency evaluation weight corresponding to the coal-fired formula, M is the efficiency conversion coefficient, and a is the power generation corresponding to the unit supply of the coal-fired formula.

[0029] In some embodiments of the present application, a method for comprehensively evaluating the original coal supply rate strategy and the virtual coal supply rate strategy includes:

[0030] The original coal supply rate strategy and the virtual coal supply rate strategy are analyzed to determine the coal supply rates of different zones in different coal supply strategies. The initial economic evaluation value is obtained by multiplying the coal supply rate of different zones by the economic evaluation weight of the coal formula configuration applied in each zone. The initial efficiency evaluation value is obtained by multiplying the coal supply rate of different zones by the efficiency evaluation weight of the coal formula configuration applied in each zone.

[0031] Based on the initial economic evaluation value and the initial efficiency evaluation value of the same coal supply strategy, a comprehensive evaluation value of the same coal supply strategy is determined.

[0032] In some embodiments of the present application, a dual-zone raw coal bunker control system is also disclosed, including:

[0033] A coal formula group determination module is used to determine the corresponding coal formula group in the preset coal formula corresponding table based on the future power generation plan of the generator set, and configure the coal filling of the dual partitions of the raw coal bunker based on the coal formula group;

[0034] A coal supply rate strategy generation module is used to construct an original coal supply rate strategy for different zones of the raw coal bunker based on the coal burning requirements of the boiler at different time nodes, adjust the coal supply rate for different zones in the first coal supply rate strategy multiple times, and generate a virtual coal supply rate strategy for each adjustment;

[0035] The strategy evaluation module is used to configure economic evaluation weights and efficiency evaluation weights for the coal formulas applied to different partitions of the raw coal bunker, and conduct a comprehensive value evaluation of the original coal supply rate strategy and several virtual coal supply rate strategies based on the economic evaluation weights and efficiency evaluation weights, obtain their respective comprehensive evaluation values, compare the comprehensive evaluation values ​​of the original coal supply rate strategy and the comprehensive evaluation values ​​of the virtual coal supply rate strategies, and determine the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy;

[0036] The driving module is used to drive the dual partitions of the raw coal bin to supply coal based on the current coal supply rate strategy.

[0037] The beneficial effects of the present invention are:

[0038] 1. Configure economic evaluation weights and efficiency evaluation weights, and provide calculation formulas for economic evaluation weights and efficiency evaluation weights. Through these evaluation standards, the economy and efficiency of raw coal storage and coal transportation can be effectively improved.

[0039] 2. By determining the comprehensive evaluation value of the coal supply strategy, selecting and applying the coal supply rate strategy with the largest comprehensive evaluation value, the coal supply efficiency of the double-partition raw coal bunker is greatly improved.

[0040] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] FIG1 is a schematic diagram of the steps of a dual-zone raw coal bunker control method according to an embodiment of the present application;

[0042] FIG2 is a schematic diagram of module connections of a dual-partition raw coal bin control system in an embodiment of the present application. DETAILED DESCRIPTION

[0043] The technical solution of the present invention is further described below with reference to the accompanying drawings and embodiments.

[0044] The following will be combined with the accompanying drawings and specific embodiments to clearly and completely describe the technical solutions of the present invention. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention and cannot be understood as limiting the scope of protection of the present invention. Those skilled in the art in this field can make some non-essential improvements and adjustments based on the content of the present invention described below. In the present invention, unless otherwise clearly specified and limited, the technical terms used in this application should have the common meanings understood by those skilled in the art of the present invention. Example

[0045] The purpose of the present invention is to provide a dual-zone raw coal bunker control method and system.

[0046] In an embodiment of the present application, a dual-zone raw coal bunker control method is disclosed, referring to FIG1 , including:

[0047] S1: Based on the future power generation plan of the generator set, the corresponding coal formula group is determined in the preset coal formula corresponding table, and the coal filling of the double partitions of the raw coal bin is configured based on the coal formula group.

[0048] It should be understood that the preset coal formula correspondence table refers to a coal ratio plan prepared in advance according to different load conditions and coal quality requirements during the power generation process.

[0049] S2: Based on the coal burning requirements of the boiler at different time nodes, a raw coal supply rate strategy is constructed for different partitions of the raw coal bunker.

[0050] It should be understood that the original coal supply rate strategy refers to the formulation of a reasonable coal supply plan and supply speed based on the current load conditions and coal inventory conditions during the power generation process to ensure the stable and economic operation of the power system. The coal supply rate strategy includes the arrangement of coal supply rates in different zones. For example, at different time nodes, the coal supply rates in different zones are different.

[0051] For example, there are partitions A and B, the coal supply rate of partition A at time node 01 is set to 1v, and the coal supply rate at time node 02 is set to 2v. The overall coal supply rate setting strategy of partitions AB is called the original coal supply rate strategy.

[0052] S3: The coal supply rate of different partitions in the first coal supply rate strategy is adjusted multiple times, and a virtual coal supply rate strategy is generated for each adjustment.

[0053] It should be understood that the virtual coal supply rate strategy is to adjust the coal supply rate set by the original coal supply rate strategy up and down within the divided sub-intervals.

[0054] For example, the interval of coal supply rate of 1v is selected as 0.8v-1.2v, which is divided into four sub-intervals of 0.8v-0.9v, 0.9v-1.0v, 1.0v-1.1v, and 1.1v-1.2v. According to the average coal supply rate of the four sub-intervals, the selected virtual coal supply rate is 0.85v, 0.95v, 1.05v, and 1.15v.

[0055] S4: Configure economic evaluation weights and efficiency evaluation weights for the coal formulas applied to different partitions of the raw coal bin, and conduct comprehensive value evaluation of the original coal supply rate strategy and several virtual coal supply rate strategies based on the economic evaluation weights and efficiency evaluation weights to obtain their respective comprehensive evaluation values.

[0056] It should be understood that the economic evaluation weight refers to the weight used in the comprehensive evaluation of economic performance indicators such as thermal efficiency and cost based on different load conditions and coal quality requirements; the efficiency evaluation weight refers to the weight used in the comprehensive evaluation of efficiency performance indicators such as thermal efficiency and cost based on different load conditions and coal quality requirements.

[0057] S5: Compare the comprehensive evaluation value of the original coal supply rate strategy and the comprehensive evaluation value of the virtual coal supply rate strategy, and determine the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy.

[0058] S6: Based on the current coal supply rate strategy, drive the dual partitions of the raw coal bin to supply coal.

[0059] The method for driving the dual-zone coal supply of the raw coal bin based on the current coal supply rate strategy is as follows: according to the current coal supply rate strategy, the coal supply rate of each zone is determined, and the two zones of the raw coal bin are controlled to supply coal according to the set coal supply rate.

[0060] In some embodiments of the present application, based on the future power generation plan of the generator set, a method for determining a corresponding coal fuel formula group in a preset coal fuel formula correspondence table includes:

[0061] The first step is to construct a coal formula corresponding table, which includes several coal formula groups, and each coal formula group corresponds to a corresponding preset power generation planning interval.

[0062] In the second step, the future power generation plan determined by the power generation unit is substituted into the coal-fired formula corresponding table for comparative analysis, and the corresponding coal-fired formula group is determined according to the preset power generation planning interval to which the future power generation plan belongs.

[0063] In some embodiments of the present application, the preset power generation interval planning includes: power generation requirements for different time segments, and power generation power increase rate requirements for different time segments.

[0064] In some embodiments of the present application, a method for constructing a raw coal supply rate strategy for different zones of a raw coal bin based on the coal burning requirements of the boiler at different time points includes:

[0065] Scan and analyze the future power generation plan to determine the time nodes when the coal requirements change, and record the determined time nodes as marked time nodes.

[0066] According to the coal requirements corresponding to the marked time nodes and the efficiency performance of the coal formula corresponding to different partitions of the raw coal bin, the coal supply rates of different partitions of the raw coal bin are initially set, thereby forming the raw coal supply rate strategy.

[0067] In some embodiments of the present application, a method for adjusting the coal supply rates of different partitions in the first coal supply rate strategy multiple times and generating a virtual coal supply rate strategy for each adjustment includes:

[0068] Determine the coal supply rate interval of different partitions of the raw coal bunker in the original coal supply rate strategy, divide the interval into multiple sub-intervals, adjust the multiple sub-intervals, and determine the average coal supply rate of each sub-interval.

[0069] According to the average coal supply rate of multiple sub-intervals, multiple virtual coal supply rate strategies are generated.

[0070] In some embodiments of the present application, the method of configuring the economic evaluation weights and efficiency evaluation weights for the coal recipes applied to different zones of the raw coal bin includes:

[0071] When allocating economic evaluation weights for coal formulas, the proportions of the various components in the coal formula are analyzed, and combined with the costs of the various components, the cost of the unit supply of the coal formula is calculated, and the economic evaluation weights are allocated based on the cost of the unit supply of the coal formula.

[0072] When allocating efficiency evaluation weights for coal-fired formulas, the power generation corresponding to the unit supply of the coal-fired formula is analyzed, and the efficiency evaluation weights are allocated based on the power generation per unit supply of the coal-fired formula.

[0073] In some embodiments of the present application, the expression for calculating the economic evaluation weight is:

[0074]

[0075] Among them, J is the economic evaluation weight corresponding to the coal formula, k1 is the first economic conversion coefficient, k2 is the second economic conversion coefficient, k3 is the third economic conversion coefficient, and k nis the nth economic conversion coefficient, b1% is the first component ratio of the coal-fired formula, b2% is the second component ratio of the coal-fired formula, b3% is the third component ratio of the coal-fired formula, b n % is the ratio of the nth component in the coal formula.

[0076] In some embodiments of the present application, the expression for calculating the efficiency evaluation weight is:

[0077]

[0078] Among them, L is the efficiency evaluation weight corresponding to the coal-fired formula, M is the efficiency conversion coefficient, and a is the power generation corresponding to the unit supply of the coal-fired formula.

[0079] In some embodiments of the present application, a method for comprehensively evaluating the original coal supply rate strategy and the virtual coal supply rate strategy includes:

[0080] The original coal supply rate strategy and the virtual coal supply rate strategy are analyzed, and the coal supply rates of different partitions in different coal supply strategies are determined respectively.

[0081] Calculate the product of the economic evaluation weight of the coal supply rate in different zones and the coal formula configuration applied in the zone to obtain the initial economic evaluation value; calculate the product of the coal supply rate in different zones and the efficiency evaluation weight of the coal formula configuration applied in the zone to obtain the initial efficiency evaluation value.

[0082] Based on the initial economic evaluation value and the initial efficiency evaluation value of the same coal supply strategy, a comprehensive evaluation value of the same coal supply strategy is determined.

[0083] In some embodiments of the present application, a method for determining the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy includes:

[0084] The comprehensive evaluation values ​​of all virtual coal supply rate strategies are compared, and a virtual coal supply rate strategy with the largest comprehensive evaluation value is obtained.

[0085] The comprehensive evaluation value of the virtual coal supply rate strategy with the largest comprehensive evaluation value is compared with the comprehensive evaluation value of the original coal supply rate strategy to obtain the coal supply rate strategy with the largest comprehensive evaluation value; the coal supply rate strategy with the largest comprehensive evaluation value is determined as the current coal supply rate strategy.

[0086] In some embodiments of the present application, a method for driving the dual-zone coal supply of a raw coal bin based on a current coal supply rate strategy includes:

[0087] According to the current coal supply rate strategy, the coal supply rate of each partition is determined.

[0088] Control the two partitions of the raw coal bunker and supply coal according to the set coal supply rate.

[0089] In some embodiments of the present application, a dual-partition raw coal bunker control system is also disclosed, including: a coal formula group determination module, a coal supply rate strategy generation module, a strategy evaluation module, and a driving module.

[0090] The coal formula group determination module is used to determine the corresponding coal formula group in the preset coal formula corresponding table based on the future power generation plan of the generator set, and configure the coal filling of the double partitions of the raw coal bin based on the coal formula group.

[0091] The coal supply rate strategy generation module is used to construct an original coal supply rate strategy for different partitions of the raw coal bin based on the coal burning requirements of the boiler at different time nodes, adjust the coal supply rates of different partitions in the first coal supply rate strategy multiple times, and generate a virtual coal supply rate strategy for each adjustment.

[0092] The strategy evaluation module is used to configure economic evaluation weights and efficiency evaluation weights for the coal formulas applied to different partitions of the raw coal bin, and to conduct a comprehensive value evaluation of the original coal supply rate strategy and several virtual coal supply rate strategies based on the economic evaluation weights and efficiency evaluation weights to obtain their respective comprehensive evaluation values, compare the comprehensive evaluation values ​​of the original coal supply rate strategy and the comprehensive evaluation values ​​of the virtual coal supply rate strategy, and determine the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy.

[0093] The driving module is used to drive the dual partitions of the raw coal bin to supply coal based on the current coal supply rate strategy.

[0094] The beneficial effects of the present invention are:

[0095] 1. Configure economic evaluation weights and efficiency evaluation weights, and provide calculation formulas for economic evaluation weights and efficiency evaluation weights. Through these evaluation standards, the economy and efficiency of raw coal storage and coal transportation can be effectively improved.

[0096] 2. By determining the comprehensive evaluation value of the coal supply strategy, selecting and applying the coal supply rate strategy with the largest comprehensive evaluation value, the coal supply efficiency of the double-partition raw coal bunker is greatly improved.

[0097] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit the same. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solutions of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.

Claims

1. A dual-zone raw coal bunker control method, characterized in that: include: Based on the future power generation plan of the generator set, the corresponding coal formula group is determined in the preset coal formula corresponding table, and the coal filling of the double partitions of the raw coal bunker is configured based on the coal formula group; Based on the coal burning requirements of the boiler at different time nodes, the raw coal supply rate strategy is constructed for different partitions of the raw coal bunker; The coal supply rate of different partitions in the first coal supply rate strategy is adjusted multiple times, and a virtual coal supply rate strategy is generated for each adjustment; The economic evaluation weights and efficiency evaluation weights are configured for the coal formulas applied to different partitions of the raw coal bunker, and the original coal supply rate strategy and several virtual coal supply rate strategies are comprehensively evaluated based on the economic evaluation weights and efficiency evaluation weights to obtain their respective comprehensive evaluation values; Compare the comprehensive evaluation values ​​of the original coal supply rate strategy and the comprehensive evaluation values ​​of the virtual coal supply rate strategy, and determine the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy; Based on the current coal supply rate strategy, the dual partitions of the raw coal bunker are driven to supply coal.

2. A dual-zone raw coal bunker control method according to claim 1, characterized in that: Based on the future power generation plan of the generator set, the method for determining the corresponding coal formula group in the preset coal formula corresponding table includes: The first step is to construct a coal formula corresponding table, wherein the coal formula corresponding table includes a plurality of coal formula groups, and each coal formula group corresponds to a corresponding preset power generation planning interval; In the second step, the future power generation plan determined by the power generation unit is substituted into the coal-fired formula corresponding table for comparative analysis, and the corresponding coal-fired formula group is determined according to the preset power generation planning interval to which the future power generation plan belongs.

3. A dual-zone raw coal bunker control method according to claim 2, characterized in that: The preset power generation interval planning includes: power generation requirements for different time periods, and power generation power increase rate requirements for different time periods.

4. A dual-zone raw coal bunker control method according to claim 1, characterized in that: Based on the coal burning requirements of the boiler at different time nodes, the methods for constructing the raw coal supply rate strategy for different partitions of the raw coal bunker include: Scan and analyze future power generation plans to determine the time nodes when coal requirements change, and record the determined time nodes as marked time nodes; According to the coal requirements corresponding to the marked time nodes and the efficiency performance of the coal formulas corresponding to different partitions of the raw coal bin, the coal supply rates of different partitions of the raw coal bin are initially set, thereby forming the raw coal supply rate strategy.

5. A dual-zone raw coal bunker control method according to claim 1, characterized in that: The method of adjusting the coal supply rates of different partitions in the first coal supply rate strategy for multiple times and generating a virtual coal supply rate strategy for each adjustment includes: Determine the interval of coal supply rate of different partitions of the raw coal bunker in the original coal supply rate strategy, divide the interval into multiple sub-intervals, adjust the multiple sub-intervals, and determine the average coal supply rate of each sub-interval; According to the average coal supply rate of multiple sub-intervals, multiple virtual coal supply rate strategies are generated.

6. A dual-zone raw coal bunker control method according to claim 1, characterized in that: The method of configuring the economic evaluation weight and efficiency evaluation weight for the coal formula applied to different partitions of the raw coal bunker includes: When allocating economic evaluation weights for coal formula, the proportion of each component in the coal formula is analyzed, and the cost of the unit supply of the coal formula is calculated in combination with the cost of each component, and the economic evaluation weights are allocated according to the cost of the unit supply of the coal formula; When allocating efficiency evaluation weights for coal-fired formulas, the power generation corresponding to the unit supply of the coal-fired formula is analyzed, and the efficiency evaluation weights are allocated according to the power generation per unit supply of the coal-fired formula.

7. A dual-zone raw coal bunker control method according to claim 6, characterized in that: The expression for calculating the economic evaluation weight is: ; Among them, J is the economic evaluation weight corresponding to the coal formula, k1 is the first economic conversion coefficient, k2 is the second economic conversion coefficient, k3 is the third economic conversion coefficient, k n is the nth economic conversion coefficient, b1% is the first component ratio of the coal-fired formula, b2% is the second component ratio of the coal-fired formula, b3% is the third component ratio of the coal-fired formula, b n % is the proportion of the nth component in the coal formula.

8. A dual-zone raw coal bunker control method according to claim 6, characterized in that: The expression for calculating the efficiency evaluation weight is: ; Among them, L is the efficiency evaluation weight corresponding to the coal-fired formula, M is the efficiency conversion coefficient, and a is the power generation corresponding to the unit supply of the coal-fired formula.

9. A dual-zone raw coal bunker control method according to claim 1, characterized in that: The method for comprehensively evaluating the original coal supply rate strategy and the virtual coal supply rate strategy includes: The original coal supply rate strategy and the virtual coal supply rate strategy are analyzed to determine the coal supply rates of different zones in different coal supply strategies. Calculate the product of the economic evaluation weight of the coal supply rate in different zones and the coal formula configuration applied in the zones to obtain an initial economic evaluation value; calculate the product of the efficiency evaluation weight of the coal supply rate in different zones and the coal formula configuration applied in the zones to obtain an initial efficiency evaluation value; Based on the initial economic evaluation value and the initial efficiency evaluation value of the same coal supply strategy, a comprehensive evaluation value of the same coal supply strategy is determined.

10. A dual-zone raw coal bunker control system, characterized in that: include: A coal formula group determination module is used to determine the corresponding coal formula group in the preset coal formula corresponding table based on the future power generation plan of the generator set, and configure the coal filling of the double partitions of the raw coal bunker based on the coal formula group; A coal supply rate strategy generation module is used to construct an original coal supply rate strategy for different partitions of the raw coal bunker based on the coal burning requirements of the boiler at different time nodes, adjust the coal supply rates of different partitions in the first coal supply rate strategy multiple times, and generate a virtual coal supply rate strategy for each adjustment; The strategy evaluation module is used to configure the economic evaluation weights and efficiency evaluation weights for the coal formulas applied to different partitions of the raw coal bunker, and to conduct a comprehensive value evaluation on the original coal supply rate strategy and several virtual coal supply rate strategies based on the economic evaluation weights and efficiency evaluation weights, to obtain their respective comprehensive evaluation values, to compare the comprehensive evaluation values ​​of the original coal supply rate strategy and the comprehensive evaluation values ​​of the virtual coal supply rate strategy, and to determine the coal supply rate strategy with the largest comprehensive evaluation value as the current coal supply rate strategy; The driving module is used to drive the dual partitions of the raw coal bunker to supply coal based on the current coal supply rate strategy.

Citation Information

Patent Citations

  • Separated bunker coal feeding thermal power generating unit coal feeding amount optimized distribution control method

    CN105785759A

  • Generator set control method and device

    CN110230825A

  • Coal dispatching system and method for cluster type coal plant

    CN111506028A

  • BIM (Building Information Modeling)-based fire coal conveying system and method for thermal power plant

    CN115310885A

  • Method and device for evaluating carrying capacity of power distribution network

    CN115471084A