Multi-stope interval-free parallel mining method

By staggering the arrangement of preliminary and subsequent mining areas, and utilizing the collection shafts and ore extraction roadways, the interleaved mining of ore is achieved, solving the problems of large preparation work and easy damage to the backfill body, and realizing efficient and safe parallel mining of multiple mining areas without intervals.

WO2026232692A1PCT designated stage Publication Date: 2026-11-12CHANGSHA INST OF MINING RES CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2025/108525
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-08
Filing Date
2025-07-15
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

In existing technologies, multi-mining methods suffer from problems such as large preparation work volume, long preparation time, and easy damage to backfill bodies leading to safety hazards, and cannot achieve parallel mining of multiple mining areas without intervals.

Method used

The method of staggered arrangement of the preliminary and follow-up mining areas is adopted. The preparation engineering of the preliminary mining area is only arranged at the bottom. The ore is mined and transported in a staggered manner through the collection shaft and the ore exit roadway. The follow-up mining area utilizes the engineering facilities of the preliminary mining area to avoid disturbance of the backfill body and ensure safety and high efficiency.

Benefits of technology

It enables efficient and safe parallel mining of multiple mining areas without intervals, shortens preparation time and mining preparation work, improves mining efficiency, and ensures the safety of the mining process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2025108525_12112026_PF_FP_ABST
    Figure CN2025108525_12112026_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed in the present invention is a multi-stope interval-free parallel mining method, comprising: dividing an ore body into leading stopes and following stopes, which are arranged alternately, along the strike of the ore body; performing development works in a leading stope, including an ore collection shaft which is excavated symmetrically from both sides in the width direction of the bottom, an ore draw drift which is excavated in the middle, and loading drifts which are arranged between both sides of the ore draw drift and the ore collection shaft; in the leading stope, starting mining at a specified distance above the roof of the ore draw drift, such that after broken ore is pushed into the ore collection shaft for quantitative drawing, a rock drilling and blasting operation platform for a following stope is formed at the top of the ore collection shaft; performing filling each time a leading stope is mined out, with a reserved width of the ore collection shaft unfilled; and after the leading stope is mined to a specified height above the following stope, performing mining in the following stope: constructing horizontal blasting holes in the following stope by means of the operation platform, loading explosives into the blasting holes, and then performing blasting to break ore downward, and after each blasting operation, transporting part of the ore by means of the ore draw drift and the loading drifts to ensure the space required for the next ore breaking, and finally transporting all the ore in one instance. Obviously, the mining method of the present invention is efficient and safe, with the development works arranged only at the bottom of the leading stopes, thereby greatly shortening the preparation time for the stopes and reducing the development work quantity.
Need to check novelty before this filing date? Find Prior Art

Description

A method for parallel mining without intervals in multiple mining areas Technical Field

[0001] This invention belongs to the field of mining and relates to a method for parallel mining of multiple mining areas without intervals. Background Technology

[0002] Setting up multiple mining areas is the most direct and effective measure to increase mine productivity.

[0003] In mining production practice, due to problems such as large mutual disturbances and easy damage and collapse of backfill, an intermittent and gradual approach is often adopted, keeping a certain distance between each mining site and mining in sequence.

[0004] The above mining methods are widely used in metal mines, but they have the following inherent drawbacks:

[0005] On the one hand, the preparatory works for each mining area are independent of each other. After the mining is completed, the drilling tunnels, ore access roads, and mining area connecting tunnels of the mining area are filled or sealed, and cannot be reused for subsequent mining. This results in a large amount of preparatory work being carried out for each mining area, which involves a large amount of excavation work, a long preparation time, and a large investment.

[0006] On the other hand, after the initial mining area is mined, the mining area is filled. However, during the subsequent mining process, the lateral constraints of the filling body are released. Under the continuous impact of blasting, it is very easy for it to become unstable and collapse, which can hinder the mining process and even cause safety accidents. Summary of the Invention

[0007] The purpose of this invention is to provide a method for parallel mining of multiple mining areas without intervals, which has high utilization rate in the preparation process and no disturbance from the backfill body.

[0008] The present invention provides a method for parallel mining with multiple mining areas without intervals, which divides the ore body into staggered leading mining areas and following mining areas. The preparation works for the leading mining areas include a sump pit symmetrically excavated on both sides in the bottom width direction, a ore extraction roadway excavated in the middle position, and shovel-loading roadways arranged on both sides of the ore extraction roadway between the ore extraction roadway and the sump pit. Mining in the leading mining areas begins at a specified distance above the roof of the ore extraction roadway. After the ore is pushed into the sump pit and released in a measured amount, the rock drilling and subsequent drilling for the following mining areas are formed on the top of the sump pit. Blasting operation platform; after each mining and backfilling of the preliminary mining area, a ore collection shaft width is reserved without filling as a subsequent ore receiving area; after the preliminary mining area is mined to the designated height of the advanced follow-up mining area, the follow-up mining area is mined: through the operation platform in the ore collection shaft, horizontal blasting holes are constructed for the follow-up mining area, explosives are loaded and blasted, and ore is dropped downwards. After each blast, part of the ore is transported out through the ore extraction roadway and shovel loading roadway at the bottom of the preliminary mining area to ensure the space required for the next ore dropping, and finally all the ore is transported out at once.

[0009] When the above method is implemented, the width of the preceding mining area is smaller than the width of the following mining area.

[0010] When the above method is implemented, the shovel-loading roadway is parallel and inclined to connect the ore extraction roadway and the ore collection shaft, with an inclination angle of 40-60°.

[0011] When the above method is implemented, the height of the reserved pillar at the bottom of the preliminary mining area shall not exceed 8m, and the width and height of the ore extraction roadway shall not exceed half of the width and height of the reserved pillar.

[0012] When implementing the above method, the preliminary mining area is mined from bottom to top using roadway excavation, and the mining area is 3-6m ahead of the preliminary mining area.

[0013] When implementing the above method, during the initial mining, the mining height shall not exceed 5m each time. After the ore falls, it shall be pushed into the ore collection shaft and released in the specified amount.

[0014] When the above method is implemented, the backfill height after each mining operation in the preliminary mining area is less than the mining height.

[0015] When implementing the above method, a portion of the ore is released after each blast in the mining area to reserve space for receiving ore from subsequent blasts. After all blasts are completed, all the ore is released at once and then the goaf is filled.

[0016] This invention arranges the preliminary and subsequent mining areas alternately, with each mining cycle proceeding sequentially, starting with the preliminary mining area and ending with the subsequent mining area. This alternating process eliminates the need to wait for the preliminary mining area to finish mining and filling before returning to the subsequent mining area. It allows for simultaneous mining of multiple adjacent preliminary mining areas and adjacent subsequent mining areas, enabling parallel mining of multiple mining areas without gaps and significantly improving mining efficiency. Preparation works are only required at the bottom of the preliminary mining area, and the subsequent mining area utilizes these preparation works to extract ore, greatly reducing preparation time and the amount of preparation work. After filling, the preliminary mining area has ore isolation supports on both sides. During subsequent mining, horizontal drilling and blasting cause ore to fall downwards without disturbing the filling material of the preliminary mining area, thus ensuring the safety of the entire mining process. In summary, this invention is a highly efficient and safe mining method. Attached Figure Description

[0017] Figures 1 to 5 are schematic diagrams of the mining process according to an embodiment of the present invention.

[0018] Figure 6 is a schematic diagram of AA in Figure 1.

[0019] Figure 7 is a schematic diagram of BB in Figure 1.

[0020] Figure 8 is a schematic diagram of CC in Figure 1.

[0021] Number in the diagram:

[0022] 1-Preliminary mining area;

[0023] 2-Follow the mining site;

[0024] 3-Collection of mine shafts;

[0025] 4- Mining roadway;

[0026] 5-Shovel loading roadway;

[0027] 6-Horizontal borehole;

[0028] 7-Filling body. Detailed Implementation

[0029] The present invention discloses a multi-mine parallel mining method with no intervals. The general idea is as follows: Along the strike of the ore body, staggered leading and trailing mines are established. The leading and trailing mines are mined sequentially, with each mining cycle starting with the leading mine and followed by the trailing mine, alternating between the two. There is no need to wait for the leading mine to finish mining before returning to the trailing mine. Regarding preparatory work, it is only arranged at the bottom of the leading mine; no preparatory work is arranged for the trailing mine. The ore from the trailing mine is transported out from the preparatory work arranged in the leading mine.

[0030] The specific process of implementing the above approach is as follows:

[0031] 1. When dividing the mining areas, the width of the preceding mining area shall be smaller than the width of the following mining area.

[0032] II. Regarding the preliminary mining area

[0033] (1) The mining preparation project includes the ore collection shafts that are symmetrically excavated on both sides of the bottom width direction of the mining area, the ore extraction roadways excavated in the middle position, and the shovel-loading roadways arranged on both sides of the ore extraction roadways and the ore collection shafts respectively.

[0034] (1.1) The height of the reserved pillar at the bottom of the mining area shall not exceed 8m, and the width and height of the mining roadway shall not exceed half of the width and height of the reserved pillar.

[0035] (1.2) Several shovel-loaded roadways are parallel and inclined to connect the ore extraction roadway and the ore collection shaft, with an inclination angle of 40-60°.

[0036] (2) Starting from 3-5m above the top of the mining roadway, mining is carried out by roadway excavation. The ore is pushed into the collection shaft and released in a specified amount so that the top of the ore in the collection shaft is near the bottom of the ore body of the following mining area, so that the top of the ore forms a drilling and blasting operation platform for the following mining area.

[0037] (3) Each time the backfilling is completed, the width of the collection well is left unfilled as the receiving area for subsequent ore. At the same time, the ore in the collection well serves as the isolation support between the first mining area and the following mining area.

[0038] However, the ore well will also be filled during the final filling.

[0039] III. Regarding Following the Mining Site

[0040] After the advance stope has been mined to a depth of 3-6m in the preceding stope, the following stope will then be mined:

[0041] (1) Install rock drilling equipment on the working platform formed on the top of the ore in the mining shaft, load explosives into the horizontal blasting hole of the following mining area, and blast downwards to drop the ore;

[0042] However, it is important to note that during the first blasting operation in the mining area, all the ore in the ore collection shaft should be released so that the horizontal blast holes drilled by the rock drilling equipment are as close as possible to the bottom of the mining area, thereby ensuring the blasting effect.

[0043] (2) After each blast, some of the blasted ore is transported out through the ore extraction roadway and shovel loading roadway at the bottom of the prior mining area to ensure the space required for the next blast.

[0044] (3) All the ore was transported out at once in the last instance;

[0045] (4) Filling the goaf.

[0046] As can be seen from the general concept and specific implementation process of this invention, this invention has the following advantages:

[0047] The ore body is divided into staggered advance and follow-up mining areas. The advance mining areas are mined ahead of the follow-up mining areas, and backfilling is used to reserve ore collection shafts after mining. Drilling and blasting operation platforms are cleverly constructed to control ore extraction. Horizontal drilling and blasting operations are carried out on these platforms in the follow-up mining areas. The blasted ore is transported out through the loading roadways and ore extraction roadways at the bottom of the advance mining areas. Only preparatory works are arranged at the bottom of the advance mining areas. The follow-up mining areas utilize the preparatory works arranged in the advance mining areas to extract ore, eliminating the need for any preparatory works. This greatly shortens the preparation time and amount of preparatory work for the entire ore body mining area.

[0048] The follow-up stop always closely follows the mining of the preceding stop. During the mining of the follow-up stop, the backfill body of the preceding stop is always separated from the backfill body by the ore pile in the ore collection shaft. Moreover, the mining of the follow-up stop is carried out by horizontal hole blasting followed by downward ore falling (not the lateral caving of existing technology), which avoids damage to the backfill body by the mining of the follow-up stop and ensures the safety of the entire mining process.

[0049] The preliminary mining area and the following mining area are mined one after the other in a step-by-step manner. In each mining cycle, the preliminary mining area comes first and the following mining area comes later, and they are carried out alternately. There is no need to wait for the preliminary mining area to finish mining before returning to the following mining area. Therefore, while arranging personnel to mine multiple adjacent preliminary mining areas, personnel can be arranged to mine adjacent following mining areas at the same time, realizing parallel mining of multiple mining areas without intervals, which greatly improves mining efficiency.

Claims

1. A method for parallel mining of multiple mining areas without intervals, characterized in that, The method describes the division of the ore body into staggered advance and follow-up mining areas; The preparatory works for the preliminary mining area include a ore collection shaft that is symmetrically excavated on both sides in the bottom width direction, an ore extraction roadway that is excavated in the middle position, and shovel-loading roadways arranged on both sides of the ore extraction roadway and the ore collection shaft respectively. Mining begins at a designated distance above the roof of the ore extraction roadway in the pilot mining area. After the ore is pushed into the collection shaft and released in a measured amount, a drilling and blasting operation platform is formed at the top of the collection shaft to follow the mining area. After each mining and backfilling operation in the initial mining area, a ore collection shaft width is reserved without filling as a subsequent ore receiving area; After the preliminary stope is mined to the designated height of the advanced follow-up stope, the follow-up stope will be mined: The working platform inside the mine shaft is used to load explosives into the horizontal blasting holes of the following mining area, and then blasts them to drop the ore downwards. After each blast, a portion of the ore is transported out through the ore extraction roadway and shovel loading roadway at the bottom of the preceding mining area to ensure the space required for the next ore drop. Finally, all the ore is transported out at once.

2. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, The width of the preceding stope is smaller than the width of the following stope.

3. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, The shovel-loaded roadway is parallel and inclined between the ore extraction roadway and the ore collection shaft, with an inclination angle of 40-60°.

4. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, The height of the reserved pillars at the bottom of the preliminary mining area shall not exceed 8m, and the width and height of the ore extraction roadway shall not exceed half the width and height of the reserved pillars.

5. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, The preliminary mining area is mined from bottom to top using roadway excavation, and is 3-6 meters ahead of the mining area.

6. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, During the initial mining phase, the mining height shall not exceed 5m each time. After the ore falls, it shall be pushed into the ore collection shaft and released in the specified amount.

7. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, The backfill height after each extraction in the initial mining area is less than the extraction height.

8. The method for parallel mining without intervals in multiple mining areas as described in claim 1, characterized in that, After each blast in the mining area, a portion of the ore is released to reserve space for receiving ore from subsequent blasts. After all blasts are completed, all the ore is released at once and then the goaf is filled.