Method for determining wear

The digital twin simulation for rail vehicles and routes optimizes maintenance planning by predicting wear and tear, reducing costs and downtime through precise scheduling and location selection.

WO2026234104A1PCT designated stage Publication Date: 2026-11-12SIEMENS MOBILITY GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/EP2026/063118
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-09
Filing Date
2026-05-06
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing methods for determining rail vehicle wear result in unnecessary maintenance and higher costs due to overplanning, leading to longer downtime.

Method used

A digital twin is created for both the rail vehicle and the route, simulating wear based on these models to optimize maintenance planning, including deployment, timing, and location, using machine learning and physical models, and incorporating sensor data for continuous updates.

Benefits of technology

This approach reduces maintenance costs and downtime by optimizing maintenance schedules and locations, ensuring operational safety and precision in wear prediction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2026063118_12112026_PF_FP_ABST
    Figure EP2026063118_12112026_PF_FP_ABST
Patent Text Reader

Abstract

The invention relates to a method for determining the wear of a rail vehicle. For a rail vehicle, a digital twin is generated (S1) by means of which wear of the rail vehicle is replicated. For a route, a digital twin is created by means of which important route elements for wear are replicated (S2). For a rail vehicle under consideration, which is scheduled for use on the route, expected wear is determined (S3) by simulation, wherein the simulation is based on the twin of the rail vehicle and on the twin of the route.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] 202504897

[0002] 1

[0003] Description

[0004] Methods for determining wear

[0005] The invention relates to a method for determining the wear of a rail vehicle.

[0006] Introduction and State of the Art

[0007] Rail vehicles, especially locomotives, use components that wear out during operation.

[0008] The wear and tear depends on many factors – for example, the task or use of the rail vehicle, the quality or characteristics of the track, the braking and acceleration requirements of a train pulled by the rail vehicle, environmental influences, etc.

[0009] It is known to estimate the wear and tear of the rail vehicle or its associated components using empirical data collected from the operational use of a large number of rail vehicles.

[0010] To address wear and tear in a timely manner, maintenance work is often planned and carried out earlier than necessary for safety reasons. Considering the life cycle of a rail vehicle, this results in higher maintenance costs and longer downtime than actually required.

[0011] Task

[0012] The object of the invention described below is to provide a method for determining the wear of a rail vehicle that is optimized with regard to costs and downtime.

[0013] This problem is solved by the features of claim 1.

[0014] Advantageous further developments are specified in the dependent patent claims. 202504897

[0015] 2

[0016] Description of the invention

[0017] The invention relates to a method for determining the wear of a rail vehicle.

[0018] A digital twin is created for a rail vehicle, which is used to simulate the wear and tear of the rail vehicle, or to simulate the wear and tear of a relevant component of the rail vehicle.

[0019] A digital twin is created for a route, which is used to recreate route elements that are important for wear and tear.

[0020] For a rail vehicle under consideration, which is planned for use on the track, expected wear is determined by simulation, whereby this simulation is based on the twin of the rail vehicle and on the twin of the track.

[0021] In a beneficial further training course, simulation is used to check, with a view to wear and tear, whether the planned use of the rail vehicle on the route is possible.

[0022] In a beneficial further training, simulation is used to determine, with a view to wear and tear, when maintenance needs to be carried out on the rail vehicle.

[0023] In a beneficial further training, simulation is used to determine, with a view to wear and tear, on which sections of a rail network the rail vehicle can (still) be used.

[0024] Within the framework of fleet management, this makes it possible to vary the deployment planning of rail vehicles - for example, deployment plans of two corresponding rail vehicles can be exchanged.

[0025] This makes it possible to meet the maintenance needs of a first rail vehicle while simultaneously ensuring operational requirements are met by a second rail vehicle. 202504897

[0026] 3

[0027] In a beneficial further training course, simulation is used to determine, with a view to wear and tear, which workshop should be visited at which time in order to carry out maintenance work on the rail vehicle in an optimized manner.

[0028] In a beneficial further training program, the choice of workshop takes into account the capacities and resources available there.

[0029] For example, when planning maintenance, consideration is given to whether a suitable parking space, a suitable hall parking space, qualified personnel, spare parts, machines, etc. are available at that time.

[0030] For example, when choosing a workshop, its geographical location in relation to the planned route as well as its current or future capacity utilization are taken into account.

[0031] In this way, not only the timing but also the location of maintenance is chosen in such a way as to reduce operating costs and minimize downtime.

[0032] In an advantageous further training course, the simulation is carried out for a large number of rail vehicles in conjunction with a route network in order to realize a maintenance-based or wear-optimized deployment planning of a fleet of rail vehicles.

[0033] For example, a rail vehicle with a heavily worn pantograph is preferably used on routes with a lightly used overhead line in order to optimize the timing of upcoming pantograph maintenance or to postpone it.

[0034] For example, a rail vehicle requiring maintenance will preferably be used on a route where a workshop with the appropriate resources or capacities is available at a predetermined time for this purpose.

[0035] For example, deployment plans for the rail vehicle fleet are optimized in such a way that suitable times and suitable workshops are determined for the maintenance of rail vehicles that need servicing.

[0036] In a beneficial advanced training course, a pantograph, a wheelset, a braking system, an air conditioning system and / or a sanding system are modeled as components in the digital twin of the rail vehicle for wear simulation. 202504897

[0037] 4

[0038] In a beneficial further training course, the following relevant route elements are replicated in the digital twin of the route:

[0039] - the condition of the rails (material, age, quality or wear and tear, etc.),

[0040] - a track characteristic (bridges, curve radii, gradients, banked curves, high-speed sections, low-speed sections, etc.)

[0041] - the condition of the overhead line (material, age, quality or wear and tear, etc.) used by the rail vehicle for energy extraction,

[0042] - Weather conditions along the route (humidity, frost, dust, sand, temperatures, average temperatures, etc.), and / or

[0043] - Workshops and their resources (see above)

[0044] In an advantageous further training, both twins use the principle of machine learning and / or the application of physical models to model respective wear and tear.

[0045] In a beneficial advanced training approach, the digital twin of the route is based on a digitized route model designed as a discrete model. In this discrete model, individual route segments are assigned specific properties. This makes it possible to determine the contribution of each route segment to wear and tear individually.

[0046] This enables:

[0047] - a more precise prediction of wear and tear,

[0048] - a targeted update of the model based on new measurements, as well as

[0049] - an identification of particularly wear-intensive track sections.

[0050] The discrete model thus forms the basis for a differentiated, distance-dependent wear simulation and therefore a basis for optimized maintenance planning.

[0051] In an advantageous further training, a model used by the track twin and / or the rail vehicle twin is trained with measured values ​​obtained during maintenance work carried out on the components or on the rail vehicle and / or during track work carried out.

[0052] This determines current wear and tear, which, based on the route traveled, also reflects the operating profile of the rail vehicle. 202504897

[0053] 5

[0054] Sensors on the rail vehicle or along the track are preferably used for this purpose. The measured values ​​are preferably recorded during operation in order to continuously adjust the twins.

[0055] The sensors can be attached to individual vehicles or to the vehicles of an entire fleet.

[0056] In addition or as an alternative, the deployment of the rail vehicles collecting data is planned in such a way that measuring points along the track are regularly visited. This makes it possible to improve the track twin in a timely and continuous manner.

[0057] In a beneficial training program, feedback is provided to the track operator if a potential deterioration of the track is detected via the digital twin. This enables the track operator to carry out repairs on the track in a timely manner.

[0058] Observed deviations along the track are preferably detected via measurement data and communicated to the track operator, so that the operator can improve the track situation if necessary by re-grinding or renewing the rail.

[0059] Advantages:

[0060] The present invention dynamically implements optimized wear detection and, consequently, optimized maintenance of a rail vehicle.

[0061] This results in savings in maintenance costs and expenses while maintaining or improving the operational safety of the rail vehicle.

[0062] The present invention makes it possible to determine an optimized or dynamically selectable maintenance time and / or maintenance location for a rail vehicle and to ensure a plannable scope of maintenance.

[0063] The present invention makes it possible to optimize the maintenance timing with regard to the position of a maintenance facility (workshop) or the order status of the rail vehicle. 202504897

[0064] 6

[0065] Maintenance can be scheduled into the operational sequence of the rail vehicle without having to make an unnecessary trip and incur unnecessary travel costs.

[0066] The present invention makes it possible to reduce maintenance costs for a rail vehicle fleet, or to optimize the planning of maintenance costs for a rail vehicle fleet.

[0067] The present invention makes it possible to identify trackside maintenance work in a timely manner and to communicate this information to a track operator.

[0068] The present invention allows inspection intervals on the track and / or on the rail vehicle to be dynamically adjusted.

[0069] The present invention enables a targeted forecast of maintenance actions required at a given time. This is done on an individual basis for a specific rail vehicle or vehicle fleet.

[0070] Character description:

[0071] The invention is explained in more detail below with the aid of a drawing. The single figure FIG shows an example of a method according to the invention for determining the wear of a rail vehicle.

[0072] In a first step S1, a digital twin is created for a rail vehicle, with which wear of the rail vehicle is simulated, or with which wear of a wear-relevant component of the rail vehicle is simulated.

[0073] In a second step S2, a digital twin is created for a route, which is used to replicate route elements that are important for wear and tear.

[0074] In a third step S3, for a rail vehicle under consideration that is planned for use on the track, an expected wear is determined by simulation, whereby this simulation is based on the twin of the rail vehicle and on the twin of the track.

Claims

202504897 7 Patent claims 1. Method for determining the wear of a railway vehicle, - where a digital twin is created for a rail vehicle, which is used to simulate the wear and tear of the rail vehicle, - where a digital twin is created for a route, with which route elements important for wear and tear are replicated, - where the expected wear and tear for a rail vehicle intended for use on the route is determined by simulation, - where the simulation is based on the twin of the rail vehicle and the twin of the track.

2. Method according to claim 1, wherein a pantograph, a wheelset, a braking system, an air conditioning system and / or a sanding system is replicated in the digital twin of the rail vehicle for wear simulation.

3. Method according to claim 1, wherein the following are replicated as relevant route elements in the digital twin of the route: - a rail condition, - a route characteristic, - an overhead line condition in which the overhead line is used by the rail vehicle to draw energy, - Weather conditions along the route, and / or - Workshops and the resources available there.

4. Method according to any of the preceding claims, wherein both twins use the principle of machine learning and / or the principle of physical models.

5. Method according to claim 1, wherein the digital twin of the route is based on a digitized route model designed as a discrete model, wherein in the discrete model individual route sections are provided with specific properties.

6. A method according to any of the preceding claims, wherein a model used by the track twin and / or the rail vehicle twin is trained with measured values. 202504897 8 7. Method according to claim 6, wherein the measured values ​​are obtained during maintenance work carried out on the rail vehicle and / or during track work carried out.

8. Method according to claim 6 or 7, wherein sensors on the rail vehicle and / or on the track and / or on rail vehicles of a fleet are used for determining measured values.

9. Method according to one of claims 6 to 8, wherein the measured values ​​are recorded during ongoing operational operation.

10. Method according to one of claims 6 to 9, wherein the deployment planning of the measurement-collecting rail vehicles is carried out in such a way that trackside measuring points are regularly visited.

11. Method according to one of the preceding claims, wherein feedback is provided to a track operator when track deterioration is detected via the digital twin of the track.

12. Method according to claim 1, wherein, based on the simulation with regard to wear, it is checked whether the planned use of the rail vehicle on the route is possible.

13. Method according to claim 1, wherein, based on simulation with regard to wear, it is determined at what time maintenance is to be carried out on the rail vehicle.

14. Method according to claim 1, wherein, based on simulation with regard to wear, it is determined on which sections of a rail network the rail vehicle can be used.

15. The method of claim 1, wherein, based on simulation with regard to wear, it is determined which workshop should be visited at which time in order to carry out maintenance work on the rail vehicle. 202504897 16. Method according to claim 15, - where the choice of workshop takes into account the capacities and resources available there, - namely, in particular, whether a suitable parking space, a suitable indoor parking space, qualified personnel, spare parts and / or machinery are available there at a given time, - where the geographical location of the workshop is taken into account in relation to the planned journey route, and / or - where the workshop's current and / or future workload is taken into account when choosing it.

17. Method according to claim 1, wherein the simulation is carried out for a plurality of rail vehicles in conjunction with a track network used by them.