Charge / discharge device, charge / discharge management system, and charge / discharge control method
The charge/discharge device and method address battery degradation at low temperatures by implementing temperature rise and pre-charging strategies, ensuring efficient operation and reducing degradation.
Patent Information
- Application Number
- PCT/JP2026/006369
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-09
- Filing Date
- 2026-02-20
- Publication Date
- 2026-11-12
AI Technical Summary
Rechargeable batteries, such as lithium-ion secondary batteries, experience degradation at low temperatures due to increased internal resistance, leading to reduced output voltage and power capacity, and existing temperature-raising technologies may not be effective under all conditions.
A charge/discharge device and method that includes a power conversion unit, circuit control unit, and charge/discharge control unit to manage charging and temperature control modes, allowing for temperature rise and pre-charging based on battery state and temperature, ensuring efficient charging and discharging at low temperatures.
The solution effectively raises the temperature of the battery at low temperatures, thereby suppressing degradation and enabling efficient charging and discharging, regardless of conditions.
Smart Images

Figure JP2026006369_12112026_PF_FP_ABST
Abstract
Description
Charge / discharge device, charge / discharge management system, and charge / discharge control method
[0001] The present invention relates to a charge / discharge device for charging and / or discharging a storage battery, a charge / discharge management system, and a charge / discharge control method.
[0002] Generally, rechargeable batteries such as lithium-ion secondary batteries experience degradation at low temperatures, where internal resistance increases, leading to a decrease in output voltage and a reduction in power capacity. Therefore, when charging or discharging a rechargeable battery at low temperatures, it is advisable to raise the battery's temperature beforehand.
[0003] As a technology related to raising the temperature of a storage battery, for example, Patent Document 1 describes an electric vehicle charging system that preheats the storage battery using thermal energy stored in a heat storage material prior to charging the storage battery.
[0004] Japanese Patent Publication No. 2012-209213
[0005] In the electric vehicle charging system described in Patent Document 1, thermal energy stored in a heat storage material is used for preliminary heating of the battery. Therefore, a situation may arise where, due to reasons such as a long time having passed since the heat was stored in the heat storage material, or inadequate insulation design of the heat storage material, insufficient thermal energy is stored in the heat storage material when attempting to raise the temperature of the battery. Consequently, the technology described in Patent Document 1 may not be able to sufficiently raise the temperature of the battery at low temperatures, depending on the conditions.
[0006] This invention has been made in view of the above background, and aims to provide a charge / discharge device and / or charge / discharge management system that can raise the temperature of a storage battery at low temperatures regardless of the conditions.
[0007] In one preferred embodiment, the charging and discharging device according to the present invention is a charging and discharging device connected to a storage battery and controlling the charging and discharging of power to the storage battery, comprising: a power conversion unit that receives power from an external source, performs power conversion, and supplies power to the storage battery; a circuit control unit that controls the power conversion unit in one of a plurality of control modes, including a first charging mode that charges the storage battery to a first target charge amount, a second charging mode that charges the storage battery to a second target charge amount less than the first target charge amount, a temperature rise mode that performs temperature rise control to raise the temperature of the storage battery, and a standby mode in which no power conversion is performed; and a charging and discharging control unit that selects a control mode for controlling the power conversion unit from the plurality of control modes based on charging plan information including time information for identifying the start timing of charging to the storage battery in the first charging mode, and state information including information on the charge state and temperature of the storage battery, and instructs the circuit control unit to control in the selected control mode.
[0008] Furthermore, from another perspective, the battery charge / discharge control method according to the present invention, in one preferred embodiment, is a charge / discharge control method in a charge / discharge device equipped with a power conversion unit that converts power supplied from an external source and supplies it to the battery to charge the battery, and acquires charge plan information including time information for specifying the timing of charging the battery, and state information including information on the charge state and temperature of the battery, determines the start time of control of the power conversion unit in a first charging mode to charge the battery to a first target charge amount based on the time information, and based on the information on the state of the battery, selects and performs one of the following preprocessing steps: a first preprocessing step in which the power conversion unit is controlled in a standby mode in which no power conversion is performed in the power conversion unit until the start time, a second preprocessing step in which the power conversion unit is controlled in a heating mode to raise the temperature of the battery before the start time, and a third preprocessing step in which the power conversion unit is controlled in a pre-charging mode to charge the battery to a second target charge amount less than the first target charge amount before the start time, and then controls the power conversion unit in a heating mode, and then performs the selected preprocessing step, and after the selected preprocessing step is performed, the battery is charged in the first charging mode.
[0009] From another perspective, in one preferred embodiment, the charge-discharge management system according to the present invention is a charge-discharge management system for managing the charging and discharging of a storage battery, comprising: a charge-discharge management device configured to acquire and present the status of the storage battery to a user, accept a request from the user to charge the storage battery, and send charging plan information including time information for determining the start time of charging along with the charging request; and a charge-discharge device configured to exchange information with the charge-discharge management device and to charge and discharge power to the storage battery, comprising: a power conversion unit that receives power from an external source, performs power conversion, and supplies power to the storage battery; and a unit that charges the storage battery to a first target charge amount. The charging and discharging device includes a circuit control unit that controls the power conversion unit in one of a plurality of control modes, including a first charging mode, a second charging mode that charges the battery to a second target charge amount less than a first target charge amount, a temperature-raising mode that performs temperature-raising control to raise the temperature of the battery, and a standby mode in which no power conversion is performed; and a charge / discharge control unit that, in response to a charging request, acquires charging plan information and status information including information on the charge state and temperature of the battery, selects a control mode for controlling the power conversion unit from among the plurality of control modes based on the charging plan information and status information, and instructs the circuit control unit to control in the selected control mode.
[0010] According to the present invention, it is possible to raise the temperature of a storage battery at low temperatures regardless of the conditions and charge and / or discharge it, thereby suppressing the progression of degradation associated with charging and discharging of the storage battery at low temperatures. Other problems solved by the present invention and novel features will become clear from the description and drawings herein.
[0011] This is a schematic block diagram showing the configuration of one embodiment of a battery storage system. This is a schematic configuration diagram of the charge / discharge device. This is a schematic diagram showing the relationship between the state of the battery and the pre-processing performed. This is a flowchart showing the flow of the charging process performed by the charge / discharge device. This is a flowchart showing the flow of the pre-processing. This is a time chart showing an example of the time progression of the charging operation when the first pre-processing is performed. This is a time chart showing an example of the time progression of the charging operation when the second pre-processing is performed. This is a time chart showing an example of the time progression of the charging operation when the third pre-processing is performed. This is a time chart showing an example of the time progression of the charging operation when the battery is charged without pre-processing. This is a schematic diagram showing an example of the screen output of a terminal device when a charge request is made.
[0012] Hereinafter, representative embodiments of the present invention will be described with reference to the drawings. The embodiments and drawings described below are illustrative examples for explaining the present invention, and have been omitted or simplified as appropriate for clarity of explanation. Furthermore, in order to facilitate understanding of the invention, please note that the position, size, shape, and extent of each component shown in the drawings may not necessarily represent them precisely. In each drawing, parts having the same configuration and / or function are denoted by the same reference numerals. In addition, in the following description, unless particularly necessary, redundant explanations of parts having the same configuration and / or function will be omitted.
[0013] Figure 1 is a schematic block diagram showing the configuration of one embodiment of a battery storage system to which the present invention is applied. The battery storage system of this embodiment is composed of, for example, a vehicle 1 such as an automobile equipped with a battery storage system 11, housing equipment 2, and terminal equipment 3. Here, the battery storage system 11 is described as an on-board battery installed in the vehicle 1, but the battery storage system is not limited to on-board use and may be used for other purposes.
[0014] Vehicle 1 includes a charge / discharge device 10, a storage battery 11, a battery management system (BMS) 12, an integrated control device 13, a gateway (GW) 14, and a connector 15. Vehicle 1 is, for example, an electric vehicle that uses the power of a drive motor (not shown) driven by electricity supplied from the storage battery 11 as its driving source, and may be a pure electric vehicle that runs solely on the driving force of the motor, or a so-called hybrid electric vehicle (HEV) equipped with an internal combustion engine.
[0015] The storage battery 11 supplies power to the aforementioned motor for driving, for example. As the storage battery 11, for example, a lithium-ion secondary battery can be used, which is configured by connecting a plurality of lithium-ion battery cells in series and / or in parallel. Other batteries that can be charged and discharged, such as nickel-metal hydride secondary batteries, may also be used as the storage battery 11.
[0016] The BMS 12 monitors the state of the battery 11 and acquires state information related to the state of the battery 11. The acquired information may include, for example, information regarding the charge state of the battery 11 and the temperature of the battery 11. For the charge state, for example, State of Charge (SOC), which is an index representing the charge rate of the battery 11, may be used. The number of SOCs and temperatures monitored may be one or more, depending on the configuration of the battery 11. The state information of the battery 11 acquired by the BMS 12 is sent to the integrated control device 13 via an in-vehicle network (not shown) of the vehicle 1.
[0017] The integrated control device 13 controls various devices installed in the vehicle 1. Based on information such as the state of the vehicle 1 and the devices installed in the vehicle 1, and the driver's operations, acquired by various sensors (not shown), the integrated control device 13 generates drive commands to control inverters and motors (not shown), and / or controls devices such as brakes to control the vehicle's movement. The integrated control device 13 also exchanges information with the charge / discharge device 10 and the BMS 12 to manage the electrical energy stored in the battery 11.
[0018] GW14 is connected wirelessly or via a wired connection to a network 5 located outside the vehicle 1, such as the internet. GW14 can communicate and exchange information with, for example, home equipment 2 or terminal devices 3 via the network 5.
[0019] Connector 15 is a connection point on the vehicle 1 side for connecting the vehicle 1 to the residential equipment 2. Connector 15 is connected to connector 24 on the residential equipment side, enabling the exchange of power between the vehicle 1 and the residential equipment 2. GW 14 may be configured to communicate with the outside via connector 15.
[0020] The charge / discharge device 10 comprises a power conversion unit 100, a circuit control unit 110, and a charge / discharge control unit 120. The power conversion unit 100 includes a DC-DC conversion circuit 101 and an AC-DC conversion circuit 102 connected between the battery 11 and the connector 15. The charge / discharge device 10 charges the battery 11 by receiving power from an external source, such as a residential appliance 2, via the connector 15. Conversely, the charge / discharge device 10 can also supply power stored in the battery 11 to an external source via the connector 15. In this embodiment, the charge / discharge device 10 is configured to allow bidirectional power exchange with the outside, but it may also be configured to allow unidirectional power exchange, for example, to charge the battery 11 with power supplied from an external source.
[0021] The residential equipment 2 is, for example, equipment installed in a typical house, and is composed of, for example, a distribution board 21, a power load 22, and a home energy management system (HEMS) 23.
[0022] The distribution board 21 receives power from the power system 4 and supplies power to the power load 22. The distribution board 21 can also supply power to the vehicle 1 via the connector 24, or receive power from the vehicle 1 and supply power to the power load 22.
[0023] Specifically, the power load 22 refers to appliances such as electric lights, refrigerators, washing machines, televisions, and air conditioners, which consume electricity supplied via a distribution board.
[0024] The HEMS 23 manages the power consumed within the residential equipment 2. The HEMS 23 can function as a charge / discharge management device that requests the vehicle 1 to charge the battery 11 or to supply power from the battery 11, depending on the power consumption status by the power load 22. Charge / discharge requests from the HEMS 23 are received by the GW 14 via the network 5 or connectors 24, 15 and sent to the integrated control unit 13 and further to the charge / discharge device 10. The HEMS 23 may also function as a terminal device that displays the status of the battery 11 to the user and / or accepts input from the user for charging or discharging the battery 11.
[0025] The residential equipment 2 may also include a solar power generation system and a battery storage system, which are not shown. In such cases, the power supplied from these systems may be supplied to the vehicle 1 to charge the battery 11.
[0026] The terminal device 3 may be a mobile terminal operated by the user, such as a smartphone or tablet, or it may be a general-purpose computer such as a PC (personal computer). The terminal device 3, like the HEMS 23, has the function of a charge / discharge management device and can be used, for example, to display the status of the battery 11 to the user or to receive input from the user for charging or discharging the battery 11. Charge / discharge requests from the terminal device 3 requesting charging of the battery 11 or supplying power from the battery 11 are sent to the GW 14 via the network 5, and from the GW 14 to the charge / discharge device 10 via the integrated control device 13.
[0027] In the present embodiment, a charge-discharge management system is formed including the charge-discharge device 10 mounted on the vehicle 1, the terminal device 3, and / or the HEMS 23. In the present embodiment, the charge-discharge device 10 exchanges information with the terminal device 3 and / or the HEMS 23 via the integrated control device 13 and the GW 14, but the charge-discharge device 10, the terminal device 3, and the HEMS 23 may be configured to be capable of information exchange without going through the integrated control device 13 or the GW 24. In addition, in the present specification, the case where the vehicle 1 is connected to the residential facility 2 to perform charging and discharging of the storage battery 11 is described as an example, but the vehicle 1 may be connected to facilities other than the residential facility 2, such as a charging station or other power loads, to perform charging and discharging of the storage battery 11.
[0028] FIG. 2 is a schematic configuration diagram of the charge-discharge device 10.
[0029] When charging the storage battery 11, the AC-DC conversion circuit 102 is connected to the connector 15, converts AC power supplied via the connector 15 into DC power of voltage Vout, and outputs the DC power. The DC-DC conversion circuit 101 converts the DC power of voltage Vout output from the AC-DC conversion circuit 102 into DC power of voltage Vin to charge the storage battery 11. When power is supplied from the connector 15, the DC-DC conversion circuit 101 converts the DC power of voltage Vin obtained by discharging the storage battery 11 into DC power of voltage Vout. The AC-DC conversion circuit 102 converts the DC power of voltage Vout output from the DC-DC conversion circuit 101 into AC power and outputs the AC power to the connector 15.
[0030] The DC-DC conversion circuit 101 includes, for example, four switching elements (Q 1H , Q 1L , Q 2H , Q 2L ) on the primary side bridge circuit, and similarly four switching elements (Q 3H , Q 3L , Q 4H , Q 4L ) on the secondary side bridge circuit via an inductance L kgIt can be configured using a dual active bridge (DAB) circuit connected via a transformer Tr. By making the DC-DC conversion circuit 101 a DAB circuit, bidirectional power exchange from the primary side to the secondary side and from the secondary side to the primary side can be efficiently implemented. The DC-DC conversion circuit 101 further connects the midpoint n, which is approximately the midpoint potential of the battery 11, to the switching element Q of the primary side bridge circuit. 1H Q 1L It is equipped with a switch S that connects to the midpoint.
[0031] The AC-DC conversion circuit 102 may be a bidirectional inverter circuit capable of converting power from AC to DC, as well as from DC to AC, and may be configured using, for example, switching elements (not shown).
[0032] The circuit control unit 110 controls the on / off operation of the switching elements in the DC-DC conversion circuit 101 and the AC-DC conversion circuit 102 based on information obtained from voltage sensors and current sensors (not shown), and controls the charging and discharging of the storage battery 11 by the power conversion unit 100. At this time, the switch S of the DC-DC conversion circuit 101 is kept in the off state. In this specification, the control mode in which the storage battery 11 is charged by power supplied from an external source is called the "charging mode," and the control mode in which power is supplied to the outside from the connector 15 by discharging the storage battery is called the "discharging mode." Hereafter, these two control modes are collectively referred to as the "power exchange mode." The charging mode also includes the "main charging mode," which is a first charging mode in which the storage battery 11 is fully charged or charged to an arbitrary amount, and the "preliminary charging mode," which is a second charging mode in which preliminary charging is performed in the pre-processing described later.
[0033] The circuit control unit 110 also controls the switch S and each switching element of the DC-DC conversion circuit 101 to control the battery cell B on the side with a higher potential than the midpoint n. H Battery cell B discharges from the low-potential side. L The operation to charge the low-potential battery cell B L Battery cell B discharges from the high-potential side. HThe charging operation and the operation of the battery 11 are repeated alternately, and the heat generated by the internal resistance of the battery 11 can be used to raise the temperature of the battery 11. For such temperature rise control by the DC-DC conversion circuit 101, for example, the technology described in Japanese Patent Application Publication No. 2024-121204 can be applied. In this specification, the control mode that raises the temperature of the battery 11 in this way is called the "temperature rise mode". The repetition frequency of charging and discharging in the temperature rise mode is preferably 1 kHz or higher from the viewpoint of suppressing the degradation of the battery 11.
[0034] The control modes of the power conversion unit 100 by the circuit control unit 110 include the power exchange mode and the heating mode described above, as well as a "standby mode" in which the unit remains stationary without performing power exchange or heating operations. The charge / discharge control unit 120 selects which control mode—power exchange mode, heating mode, or standby mode—to operate the power conversion unit 100 in, and commands the circuit control unit 110 to operate the power conversion unit 100 in the selected control mode.
[0035] The circuit control unit 110 and the charge / discharge control unit 120 can be configured as hardware using, for example, a so-called microcontroller unit (MCU) equipped with a central processing unit (CPU), memory, and peripheral circuits such as input / output circuits, analog-to-digital conversion circuits, and digital-to-analog conversion circuits (not shown). In this case, the functions of the circuit control unit 110 and the charge / discharge control unit 120 are realized by executing a program stored in memory using the CPU. The circuit control unit 110 and the charge / discharge control unit 120 may be configured in whole or in part using, for example, a field-programmable gate array (FPGA), an application-specific integrated circuit (ASIC), or discrete electronic components instead of an MCU.
[0036] The storage battery 11 generally tends to have increased internal resistance and reduced capacity at low temperatures. In particular, this tendency is prominent when the storage battery 11 is a lithium ion battery. For this reason, when the storage battery 11 is charged and discharged at a rated current or a current close to the rated current at low temperatures, the voltage of the storage battery 11 increases due to the increased internal resistance, which raises concerns such as exceeding the safety-set upper limit voltage, or causing partial abnormal heat generation inside the storage battery 11 that accelerates the deterioration of the storage battery 11. Therefore, it is desirable that the charging and discharging of the storage battery 11 at the rated current or a current close to the rated current be performed when the temperature of the storage battery 11 is higher than a certain level of temperature.
[0037] In the present embodiment, in view of the above points, when charging and discharging of the storage battery 11 is performed in the power interchange mode while the temperature of the storage battery 11 is lower than a preset temperature (hereinafter referred to as the main chargeable threshold), as a pretreatment, a process of operating the power conversion unit 100 in the temperature raising mode to raise the temperature of the storage battery 11 is carried out. Note that the main chargeable threshold may be determined experimentally or empirically in consideration of, for example, the progress of deterioration of the storage battery 11.
[0038] The temperature rise of the storage battery 11 in the temperature raising mode is performed using the electrical energy stored in the storage battery 11. For this reason, the higher the SOC of the storage battery 11 is, the longer the temperature raising mode can be continued and a sufficient temperature raising effect can be obtained, but when the SOC is low, a situation where a sufficient temperature raising effect cannot be expected may occur. In the present embodiment, when the SOC is lower than the lower limit SOC at which temperature rise in the temperature raising mode is possible (hereinafter referred to as the temperature-raise-possible threshold), preliminary charging of the storage battery 11 is performed in the pretreatment. Hereinafter, the control mode for performing preliminary charging is referred to as the preliminary charging mode. When the SOC is lower than the temperature-raise-possible threshold, in the present embodiment, the storage battery 11 is charged in the preliminary charging mode to bring the SOC to a state equal to or higher than the temperature-raise-possible threshold, and the temperature rise of the storage battery 11 by the temperature raising mode is carried out.
[0039] FIG. 3 is a schematic diagram showing the relationship between the state of the storage battery and the preprocessing to be performed. As shown in FIG. 3, in the present embodiment, three types of preprocessing are selectively performed according to the temperature and SOC of the storage battery 11. The storage battery temperature on the horizontal axis and the storage battery SOC on the vertical axis respectively represent the temperature and SOC of the storage battery 11 expected at the time when main charging is started. Note that the storage battery SOC hardly changes while the control mode is the standby mode. Therefore, the current SOC of the storage battery 11 can be used as the storage battery SOC.
[0040] When it is predicted that the temperature of the storage battery 11 will be equal to or higher than the main charge enable threshold at the start of charging and discharging, it is not necessary to raise the temperature of the storage battery 11 in advance. In this case, in the present embodiment, the first preprocessing for operating the power conversion unit 100 in the standby mode is performed.
[0041] When it is predicted that the temperature of the storage battery 11 will be lower than the main charge enable threshold at the start of charging and discharging, different preprocessing is performed according to the SOC of the storage battery 11. When the temperature of the storage battery 11 is lower than the main charge enable threshold at the start of charging and discharging, and the SOC of the storage battery 11 is equal to or higher than the temperature rise enable threshold, the second preprocessing for raising the temperature of the storage battery 11 in the temperature rise mode prior to charging and discharging of the storage battery 11 is performed. On the other hand, when the temperature of the storage battery 11 is lower than the main charge enable threshold and the SOC of the storage battery 11 is lower than the temperature rise enable threshold, the third preprocessing is performed, in which the storage battery 11 is pre-charged in the pre-charge mode, and then the temperature of the storage battery 11 is raised in the temperature rise mode.
[0042] FIG. 4 is a flowchart showing the flow of a charging process executed by the charging and discharging device 10 in the present embodiment.
[0043] The charging process is triggered, for example, by the connection between the connector 15 and the connector 24 by the user (hereinafter sometimes referred to as plug-in), a charging request from the user using the terminal device 3, or a charging request from the HEMS 23. The charge and discharge control unit 120 starts the charging process upon recognizing the occurrence of any of the events (step S100).
[0044] The charge / discharge control unit 120 acquires charge plan information based on a charge request. The charge plan information includes time information to specify the timing of the charge. Electricity rates may be lower during off-peak hours, such as late at night, when electricity supply and demand are low, depending on the contract. In such cases, it is assumed that the user would like to plug in the vehicle 1 in the evening after use, and start the actual charging during off-peak hours when electricity rates are lower. In this embodiment, for example, by setting time information that specifies the desired start time of charging in the charge plan information when plugging in, it is possible to start charging at any desired time. The time information may specify an absolute time, such as midnight, or it may specify a relative time from a specific event, such as four hours after plugging in. Furthermore, the time information does not need to directly indicate the start timing of charging; for example, it may indicate the end timing of charging. For example, if the charge plan information does not include time information indicating the start time of charging, but does include time information indicating the end time of charging, it is possible to estimate the time required for charging and determine the start time of charging based on that. Alternatively, instead of the charging completion time, time information indicating the time when the battery 11 begins to discharge, such as the vehicle 1 start time, may be used. By using such information, it becomes possible to charge the battery 11 before using the power stored in it. The charging plan information may be set using, for example, a terminal device 3 or a HEMS 23.
[0045] The charging plan information is sent to the vehicle 1 from the terminal device 3 or HEMS 23 along with or following the charging request. Alternatively, the charging plan information may be pre-set by the user using the terminal device 3 or an on-board terminal device (not shown) mounted on the vehicle 1, and held by the charge / discharge control unit 120 or the integrated control unit 13 (step S110).
[0046] Next, the charge / discharge control unit 120 acquires SOC information as information regarding the charge state of the battery 11. The SOC information may be the SOC value for the entire battery 11, or multiple SOC values acquired for each of the multiple groups of battery cells that make up the battery 11. If the SOC value cannot be obtained directly, information that allows for estimation of the SOC, such as the voltage or integrated current value of the battery 11, may be used (step S120).
[0047] The charge / discharge control unit 120 then acquires information regarding the temperature of the storage battery 11. The temperature information may be the temperature values of one or more locations within the storage battery 11, or information such as sensor values that can estimate the temperature (step S130).
[0048] The processes from steps S110 to S130 do not necessarily have to be performed in this order; they may be executed in any order.
[0049] After acquiring various information in steps S110 to S130, the charge / discharge control unit 120 decides which of the three pre-processing steps described above to perform based on the acquired information, and then performs the decided pre-processing step. Details of the pre-processing performed in this step will be described later. The pre-processing continues until the charging start time determined by the process described later is reached (step S140).
[0050] When the pre-processing is completed and the charging start time arrives, the charge / discharge device 10 starts charging the battery 11 in this charging mode, and terminates the charging process when the State of Charge (SOC) reaches a target value (hereinafter referred to as the first target charge amount). Here, the first target charge amount may be the charge amount that results in a full charge, or a charge amount less than a preset full charge. Also, if the charging plan information includes a target charge amount, the target charge amount specified in the charging plan information may be used as the first target charge amount (step S150).
[0051] Figure 5 is a flowchart showing the pre-processing steps performed in step S140.
[0052] The charge / discharge control unit 120 first obtains the time to start charging the battery 11 based on the charge plan information obtained in step S110. If the charge plan information includes the start time of charging, that time can be obtained as the start time. If the time information does not include the start time but includes the end time, the time required for charging when charging is performed at the charge threshold current described later, based on the SOC information obtained in step S120, can be calculated and the time obtained by subtracting that time from the end time can be obtained as the start time of charging (step S200).
[0053] The charge / discharge control unit 120 then obtains the state of the battery 11 at the charging start time based on the SOC information obtained in step S120 and the temperature information obtained in step S130. Specifically, estimated values of the charge amount SOC_i and temperature T_i of the battery 11 at the charging start time are obtained. If no charging or discharging occurs in the battery 11 before the charging start time, the SOC will change almost completely. Therefore, the SOC obtained from the acquired SOC information can be considered as the SOC_i at the charging start time.
[0054] The temperature of the battery 11 at the start of charging can be calculated based on the current ambient temperature and past history of the location of the vehicle 1. In particular, during winter, the ambient temperature is low, so even if the temperature of the battery 11 is sufficiently high when plugged in, it is expected that the temperature of the battery 11 will drop by the time charging starts. The current ambient temperature can be obtained, for example, by using the measurement results of an ambient temperature sensor if the vehicle 1 is equipped with one that measures the ambient temperature. Alternatively, a forecast value of the temperature in the area where the vehicle 1 is located, provided by a weather forecast obtainable via the network 5, may be used as the ambient temperature. Furthermore, a more accurate battery temperature can be obtained by using previously acquired heat transfer characteristics and thermal models of the battery 11 (step S210).
[0055] After acquiring the state of the storage battery, the charge / discharge control unit 120 compares the acquired temperature T_i of the storage battery 11 with the rechargeable threshold T_th to determine the temperature of the storage battery 11 (step S220).
[0056] If the temperature determination shows that the battery temperature T_i is equal to or greater than the charging threshold T_th, then further heating of the battery 11 is not required. In this case, the first pre-processing is performed. Specifically, the charge / discharge control unit 120 issues a command to the circuit control unit 110 to control the power conversion unit 100 in standby mode. Control in standby mode continues until the charging start time (step S230).
[0057] If the temperature determination in step S220 shows that the battery temperature T_i is lower than the rechargeable threshold T_th, it is determined that the battery 11 needs to be heated. In this case, the charge / discharge control unit 120 calculates the heating parameters used to heat the battery 11. The heating parameters calculated here include, for example, the high-potential battery cell B H and battery cell B on the low-potential side L The parameters may include the current amplitude, effective value, frequency, charge / discharge power, time required to raise the temperature of the battery 11, start time of temperature rise, and end time of temperature rise. Furthermore, from these parameters, for example, the amount of power required to raise the temperature of the battery 11 from the battery temperature T_i to the chargeable threshold T_th is obtained, and the temperature rise threshold SOC_th is calculated (step S240).
[0058] After obtaining the temperature rise parameters, the charge / discharge control unit 120 compares the SOC value SOC_i obtained in step S210 with the temperature rise threshold SOC_th to determine whether the remaining charge in the storage battery 11 is sufficient to raise the temperature of the storage battery 11 (step S250).
[0059] If the charge level determination shows that SOC_i is greater than or equal to SOC_th, a second pre-processing step is selected. In the second pre-processing step, the charge / discharge control unit 120 instructs the circuit control unit 110 to control the power conversion unit 100 in standby mode. Subsequently, when the temperature rise start time acquired in step S240 is reached, the charge / discharge control unit 120 instructs the circuit control unit 110 to control the power conversion circuit in temperature rise mode. The control of the power conversion circuit by the circuit control unit 110 is performed using the charge / discharge current amplitude, effective value, frequency, charging power, etc., calculated in step S240. Control in temperature rise mode continues until either the temperature rise end time or the charging start time arrives (step S260).
[0060] If it is determined in step S250 that SOC_i is lower than SOC_th, a third preprocessing step is selected, and the charge / discharge control unit 120 calculates pre-charge parameters to be used for pre-charging the battery 11. The pre-charge parameters calculated here may include, for example, a target value of SOC (hereinafter referred to as the second target charge amount), charging current, pre-charge time, pre-charge start time, and pre-charge end time. The second target charge amount can be determined, for example, based on the main charge threshold T_th, the current temperature of the battery 11, and the current SOC. The second target charge amount should be greater than or equal to the temperature rise threshold SOC_th, and for example, the temperature rise threshold SOC_th calculated in step S240 may be used (step S270).
[0061] Next, the charge / discharge control unit 120 performs a third pre-processing step. In the third pre-processing step, the charge / discharge control unit 120 first instructs the circuit control unit 110 to control the power conversion unit 100 in pre-charge mode. The circuit control unit 110 controls the power conversion unit 100 so that pre-charging is performed with the charging current calculated in step S270, thereby performing pre-charging of the storage battery 11. If the pre-charge start time has been acquired in step S270, control is performed in standby mode until the pre-charge start time arrives, and then control in pre-charge mode is started in accordance with the pre-charge start time. After pre-charging is completed, the control mode is changed to standby mode. Furthermore, when the temperature rise start time arrives, control in temperature rise mode is started, and control in temperature rise mode continues until either the temperature rise end time or the charging start time arrives, thereby raising the temperature of the storage battery 11 (step S280).
[0062] Figure 6 is a time chart showing an example of the time progression of the charging operation when the first pre-processing is performed in step S140. In the figure, (a) shows the transition of the control mode, (b) shows the transition of the battery charging current, (c) shows the transition of the battery SOC, and (d) shows the transition of the battery temperature. Note that the charging threshold in the time chart of the battery charging current (b) is the limit value of the charging current at which the battery 11 can be safely charged by constant current control in the charging mode, and for example, the rated charging current value can be used. The limiting charging threshold is the limit value of the charging current at which the battery 11 can be safely charged when the temperature of the battery 11 is lower than the charging threshold. The limiting charging threshold may be set to a value obtained experimentally or empirically.
[0063] The charging process described above begins at time t0 when the user plugs in the device. In step S220, it is determined that the temperature of the battery 11 at the charging start time t1 is above the rechargeable threshold, and the first pre-processing is selected. At this time, standby mode is selected as the control mode, and control is performed in standby mode until time t1 arrives. During this time, the temperature of the battery 11 gradually decreases, but remains above the rechargeable threshold until time t1.
[0064] When charging starts at time t1, the control mode switches to the main charging mode, and charging begins at the main charging threshold current using constant current control. Once charging starts, the State of Charge (SOC) of the battery 11 begins to rise, and at time t2, when the SOC of the battery 11 approaches the first target charge amount, the charging of the battery 11 is switched from constant current control to constant voltage control. Subsequently, when the battery SOC reaches the first target charge amount at time t3 through charging with constant voltage control, the control mode switches to standby mode, and the charging process ends.
[0065] Figure 7 is a time chart showing an example of the time progression of the charging operation when the second pre-processing is performed in step S140. Similar to Figure 6, in the figure, (a) shows the transition of the control mode, (b) shows the transition of the battery charging current, (c) shows the transition of the battery SOC, and (d) shows the transition of the battery temperature. In the example shown in Figure 7, when the charging process starts, in step S220 of Figure 5, it is determined that the temperature of the battery 11 at the charging start time t2 is lower than the threshold for charging. However, in step S240, it is determined that the battery SOC at time t2 is above the threshold for temperature rise, and the second pre-processing is selected.
[0066] In this example as well, the control mode is set to standby mode at time t1 when the user plugs in the device. Eventually, at time t1, before the charging start time t2, the control mode switches to the heating mode, and the heating of the battery 11 begins. Once the control mode switches to the heating mode, the temperature of the battery 11 begins to rise, and by the time of the charging start time t2, it reaches the charging threshold. Meanwhile, the State of Charge (SOC) of the battery 11 gradually decreases as power is consumed to heat the battery 11.
[0067] At time t2, the control mode switches to the main charging mode, and charging is first performed at the main charging threshold current using current control. Then, at time t3, it switches to charging using constant voltage control, and charging continues. At time t4, when the battery SOC reaches the first target charge level, the control mode switches from the main charging mode to the standby mode, and the charging process ends.
[0068] Figure 8 is a time chart showing an example of the time progression of the charging operation when the third pre-processing is performed in step S140. Similar to Figures 6 and 7, in the figure, (a) shows the transition of the control mode, (b) shows the transition of the battery charging current, (c) shows the transition of the battery SOC, and (d) shows the transition of the battery temperature. In the example shown in Figure 8, when the charging process starts, in step S220 it is determined that the temperature of the battery 11 at the charging start time t3 is lower than the threshold for charging, and in step S240 it is determined that the battery SOC at time t3 is lower than the threshold for temperature rise, and the third pre-processing is selected.
[0069] In this example, when the device is plugged in and the charging process begins, the control mode is first set to pre-charging mode. This pre-charges the battery 11 so that the State of Temperature (SOC) rises above the threshold temperature. During this time, the temperature of the battery 11 temporarily rises due to the charging current. At time t1, when the battery SOC rises above the threshold temperature, the control mode switches to standby mode.
[0070] While the control mode is set to standby mode, the temperature of the battery 11 gradually decreases until it falls below the chargeable threshold. Then, as in the case of the second pre-processing, at time t2, before the charging start time t3, the control mode switches from standby mode to heating mode, and the heating of the battery 11 begins. While control is performed in heating mode, the battery SOC gradually decreases, and the battery temperature gradually increases. At time t3, when the battery temperature is above the chargeable threshold, the control mode switches to the charging mode, and charging of the battery 11 by constant current control begins. Subsequently, at time t4, when the battery SOC approaches the first target charge amount, the charging switches from constant current control to constant voltage control, and at time t5, when the battery SOC reaches the first target charge amount, the control mode switches to standby mode, and the charging process ends.
[0071] In the pre-charging mode, the charging current of the battery 11 may be appropriately determined according to the temperature of the battery 11. For example, as shown in Figure 8, if the battery temperature is above the main charge threshold, charging is possible at the main charge threshold current. On the other hand, if the battery temperature is below the main charge threshold, pre-charging can be performed with a charging current of a limiting charge threshold smaller than the main charge threshold. In this case, when the battery temperature rises above the main charge threshold due to heat generated by pre-charging, the charging current may be switched to the main charge threshold and pre-charging can be performed. By doing so, degradation of the battery 11 due to pre-charging can be suppressed.
[0072] Figure 9 is a time chart showing an example of the time progression of the charging operation when the storage battery 11 is charged without the pre-treatment described in this embodiment, as a comparative example.
[0073] If pre-processing is not performed as in this embodiment, the charge / discharge management system is controlled in standby mode until the charging start time t1, at which time t1, charging of the battery is expected to begin. Now, considering the case where the battery temperature is lower than the main chargeable threshold, for safety reasons, charging with the charging current of the main chargeable threshold is not possible at the start of charging, and charging of the battery is started with the limited charging threshold current. Charging is performed in this state, and when the battery temperature reaches the main chargeable threshold, at time t2, it becomes possible to start charging the battery with the main charging threshold current. Thus, in the comparative example, the charging current is limited at low temperatures, so the time required for charging (from time t1 to t4) is longer compared to this embodiment, and charging cannot be performed efficiently. In contrast, in this embodiment, as described above, pre-processing is performed in advance according to the situation, and even if the temperature of the battery 11 is low, the temperature of the battery 11 is raised by the charging start time, allowing for efficient charging.
[0074] Figure 10 is a schematic diagram showing an example of the screen output of the terminal device 3 when a charging request is made to the charge / discharge device 10 in this embodiment.
[0075] The user can input the charging start time and charging end time using the terminal device 3 and instruct the charge / discharge device 10 to begin charging. The input charging start time and charging end time are displayed on the screen of the terminal device 3 as the scheduled charging start time 1001 and the scheduled charging end time 1002, respectively. The terminal device 3 may be configured to present information to the user, such as the ambient temperature 1003, the battery temperature 1004, and the battery SOC 1005, when a charging request is made. The user can send a charge / discharge request to the charge / discharge device 10 by clicking, for example, the "Charge" button 1006. The information entered by the user is sent to the charge / discharge device 10 as charging plan information. Although not shown in the figure, the target charge amount at the time of charging completion may be included as user input information.
[0076] When the charge / discharge device 10 receives a charge request, it starts the charging process described above. The charge / discharge device 10 may be configured to send a charging schedule to the terminal device 3, which includes the details of pre-processing performed before the main charge, such as raising the temperature of the storage battery 11 and pre-charging, according to the determination results in steps S220 and S250 shown in Figure 5. In this case, the terminal device 3 may be configured to notify the user by displaying the contents on the information display unit 1007. By displaying the charging schedule in this way, it is possible to improve the user's understanding of the charging process, even for users who are not familiar with the characteristics of the storage battery 11. Although the user interface of the terminal device 3 has been described as an example here, the HEMS 23 and other in-vehicle terminal devices (not shown) may have similar user interface functions.
[0077] According to this embodiment, charging of the battery is performed by carrying out pre-processing according to the contents of the charging plan information, the battery's SOC information, and the battery's temperature information. Therefore, even if the battery temperature is low, the battery can be sufficiently heated in advance regardless of the conditions, and charging can be performed efficiently.
[0078] In the embodiments described above, the charging process was explained, but a similar pre-processing may also be performed when discharging the battery. If the battery is used when its temperature is low, problems may arise such as not being able to obtain the desired output or accelerating degradation if a large current is output. In such cases, by specifying the battery discharge start time in advance, for example, the start time of use of the vehicle 1, and instructing the charge / discharge device 10, it is possible to raise the temperature of the battery by the discharge start time, in the same way as during charging.
[0079] The present invention has been described above with reference to representative embodiments, but the present invention is not limited thereto and can be implemented in various ways without departing from the spirit of the invention as described in the claims. For example, in the above-described embodiment, charging and discharging are performed between the high-potential battery cell and the low-potential battery cell in the heating mode, but the battery may be configured to heat up by charging and discharging between some battery cells connected in parallel within the battery and some other battery cells. Alternatively, if a second battery, such as a lead-acid battery that supplies power to auxiliary equipment, is connected to the charging and discharging device, it is also possible to heat up the battery by charging and discharging between the battery and the second battery.
[0080] The embodiments described above are explained in detail for the purpose of clearly illustrating the present invention, and are not necessarily limited to those comprising all the configurations described.
[0081] 1...Vehicle, 2...Residential equipment, 3...Terminal device, 4...Power system, 5...Network, 10...Charge / discharge management system, 11...Storage battery, 12...BMS, 13...Integrated control device, 14...GW, 15, 24...Connector, 21...Distribution board, 22...Power load, 23...HEMS, 100...Power converter, 101...DC-DC converter circuit, 102...AC-DC converter circuit, 110...Circuit control unit, 120...Charge / discharge control unit
Claims
1. A charge / discharge device connected to a storage battery and controlling the charging and discharging of power to the storage battery, comprising: a power conversion unit that receives power from an external source, performs power conversion, and supplies power to the storage battery; a circuit control unit that controls the power conversion unit in one of a plurality of control modes, including a first charging mode for charging the storage battery to a first target charge amount, a second charging mode for charging the storage battery to a second target charge amount less than the first target charge amount, a temperature rise mode for performing temperature rise control to raise the temperature of the storage battery, and a standby mode in which no power conversion is performed; and a charge / discharge control unit that selects a control mode for controlling the power conversion unit from the plurality of control modes based on charging plan information including time information for specifying the start timing of charging to the storage battery in the first charging mode, and state information including information on the charge state and temperature of the storage battery, and instructs the circuit control unit to control in the selected control mode.
2. The charge / discharge device according to claim 1, wherein, when the selected control mode is the temperature-raising mode, the circuit control unit controls the power conversion unit to raise the temperature of the storage battery using the power stored in the storage battery.
3. The charge-discharge device according to claim 2, wherein the circuit control unit controls the power conversion unit so that mutual charging and discharging occurs between a portion of the battery cells of the storage battery and other portions of the battery cells.
4. The charge / discharge control unit is configured to estimate the temperature of the storage battery at the start of control in the first charging mode based on the time information and the state information, and if the estimated temperature of the storage battery is lower than a preset threshold, to instruct the circuit control unit to perform control in the temperature rise mode prior to performing the first charging mode, as described in claim 2.
5. The charge / discharge control unit is configured to, if the estimated temperature of the storage battery is lower than a preset threshold, further estimate, based on the charge state of the storage battery, whether the amount of charge of the storage battery is sufficient to raise the temperature of the storage battery to the preset threshold, and if the amount of charge of the storage battery is estimated to be less than the amount of charge sufficient to raise the temperature of the storage battery to the preset threshold, instruct the circuit control unit to perform control in the second charge mode before performing control in the temperature-raising mode, as described in claim 4.
6. The charge / discharge control unit is configured to determine a target charge amount in the second charge mode based on the charge state and temperature of the storage battery obtained based on the state information and the estimated temperature of the storage battery, according to claim 5.
7. The charge / discharge control unit is configured to determine the timing of execution of control of the power conversion unit in the temperature rise mode based on the time information and the state information, according to claim 5.
8. The charge / discharge control unit is configured in the heating mode to cause the circuit control unit to start control in the first charge mode after the temperature of the storage battery has risen above the threshold value.
9. The charge / discharge device according to claim 8, wherein the charge / discharge device is mounted on a vehicle and controls the charging and discharging of the battery provided in the vehicle.
10. The charge / discharge device according to claim 9, wherein the charge / discharge control unit is configured to notify a terminal device operated by the user of the vehicle that control in the heating mode, or control in the second charge mode and the heating mode, will be performed before control in the first charge mode is performed.
11. A method for controlling the charging and discharging of a battery in a charge / discharge device equipped with a power conversion unit that converts power supplied from an external source and supplies it to a battery to charge the battery, comprising: acquiring charging plan information including time information for specifying the timing of charging the battery, and state information including information on the charge state and temperature of the battery; determining the start time of control of the power conversion unit in a first charging mode for charging the battery to a first target charge amount based on the time information; selecting one of the following preprocessing steps based on the time information and the state information: a first preprocessing step in which the power conversion unit is controlled in a standby mode in which no power conversion is performed in the power conversion unit until the start time; a second preprocessing step in which the power conversion unit is controlled in a heating mode for raising the temperature of the battery before the start time; and a third preprocessing step in which the power conversion unit is controlled in a second charging mode for charging the battery to a second target charge amount less than the first target charge amount before the start time, and then controls the power conversion unit in the heating mode; and performing the selected preprocessing step. A charge / discharge control method comprising performing the selected preprocessing described above, followed by charging the storage battery using the first charge mode.
12. The charge / discharge control method according to claim 11, wherein the execution of the preprocessing includes a process for estimating the temperature of the storage battery at the start time, and the first preprocessing is selected when the temperature of the storage battery estimated by the estimation process is equal to or greater than a preset threshold.
13. The charge-discharge control method according to claim 12, wherein the execution of the preprocessing further includes a process to determine whether the charge amount of the storage battery is sufficient to raise the temperature of the storage battery to the threshold or higher, if the temperature of the storage battery estimated by the estimation process is lower than the threshold, and the second preprocessing is selected if the determination result in the determination process is positive, and the third preprocessing is selected if the determination result in the determination process is negative.
14. A charge and discharge management system for managing the charging and discharging of a storage battery, comprising: a charge and discharge management device configured to acquire and present the status of the storage battery to a user, accept a request from the user to charge the storage battery, and send charging plan information including time information for determining the start time of charging along with the charging request; and a charge and discharge device configured to exchange information with the charge and discharge management device and to charge and discharge power to the storage battery, comprising: a power conversion unit that receives power from an external source, performs power conversion, and supplies power to the storage battery; A charge and discharge management system comprising: a circuit control unit that controls the power conversion unit in one of a plurality of control modes, including a first charging mode for charging the battery to a first target charge amount, a second charging mode for charging the battery to a second target charge amount less than the first target charge amount, a temperature-raising mode for performing temperature-raising control to raise the temperature of the battery, and a standby mode in which no power conversion is performed; and a charge and discharge control unit that, in response to a charging request, acquires the charging plan information and state information including information on the charge state and temperature of the battery, selects a control mode for controlling the power conversion unit from the plurality of control modes based on the charging plan information and the state information, and instructs the circuit control unit to control in the selected control mode.
