System for monitoring operational load
The system addresses the inefficiencies of manual electrical installation monitoring by automating thermal load calculations and providing real-time alerts, ensuring timely adjustments and enhanced safety.
Patent Information
- Application Number
- PCT/SE2026/050311
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-06
- Filing Date
- 2026-05-06
- Publication Date
- 2026-11-12
AI Technical Summary
Existing methods for monitoring electrical installations in networks require extensive, knowledge-intensive, and costly manual processes that are often neglected, posing a risk of inadequate protection against personal injury and property damage due to outdated or omitted monitoring procedures.
A system comprising a memory and software that measures operational load by calculating thermal load based on current and operating time, using overload protection capacity to determine if the load exceeds a threshold, and providing alerts or signals for adjustments.
Enables continuous, automated monitoring of electrical installations, detecting changes and adjusting procedures accordingly, reducing the risk of damage by providing timely alerts and wear event notifications.
Smart Images

Figure SE2026050311_12112026_PF_FP_ABST
Abstract
Description
SYSTEM FOR MONITORING OPERATIONAL LOADTECHNICAL FIELD OF INVENTION
[0001] This invention relates to a monitoring system comprising a memory, software and one or more measuring units for the supervision of one or more electrical installation in an electrical network.BACKGROUND
[0002] Electrical installations and electrical equipment intended to be connected to an electrical network should be monitored or regularly checked to ensure adequate protection against personal injury and property damage caused by electricity. The procedures for ongoing monitoring should be adapted to the specific installation and equipment in terms of design, age, surrounding environment, and usage. As these factors change over time, periodic monitoring procedures should also be adjusted accordingly.
[0003] Using known methods, this involves extensive, knowledge-intensive, and cost-driving manual processes to monitor, verify, and adapt the procedures to such changes — tasks that are often neglected due to the significant effort required. There is a considerable risk that these procedures are not updated or, even worse, omitted entirely.
[0004] The present invention addresses some of the issues associated with known methods by replacingthem with a technical solution, as described below in the detailed description .SUMMARY OF INVENTION
[0005] In a first aspect of the invention, there is provided a system for measuring an operational load over time for an electrical network. The network comprises apower supply source configured to be a main power provider to the electrical network , an electrical installation being connected in series with an overload protection with a known capacity and a conductor connecting the electrical installation to the power source. The conductor is configured to carry a current to or from the power supply but not via the overload protection. The system comprises:a memory configured to store one or more properties of the electrical installation being derived as a function of the known overload protection capacity; and,a computer software function configured to communicate with a measuring unit and to receive from the measuring unit a measured current through the electrical installation or a physical quantity convertible to a current through the electrical installation.The computer software function is further configured to:measure an operating time associated with the measured current or physical quantity;calculate, a total thermal load over the operating time for the electrical installation based on the measured current or physical quantity, the operating time and the properties of the electrical installation;determine, by the software, that the total thermal load of the electrical instal- lation is above a threshold value; and,as a result of the determining, provide a signal.
[0006] In some embodiments, the electrical network comprises two or more overload protections, each with a respective known capacity; two or more electrical in- stallations, each connected downstream to a corresponding respective one of the two or more overload protections. The system comprises two or more measuring units configured to measure a current or a physical quantity convertible to a current through each of the respective two or more electrical installation. Further, the system is configured to determine that the total thermal load of at least one of the electrical installations is above a threshold value for an allowed thermal load, and, as a result of the determining, provide a signal.
[0007] In some embodiments, the electrical network comprises three overload protections; and three electrical installations, each connected downstream to a corresponding respective one of the three overload protections, the three electrical in- stallations forming respective phases in a three-phase network; and the conductor is a neutral conductor. The system further comprises three individual measuring units , each arranged at a respective one of the three phases downstream to a respective one of the three overload protections.
[0008] In some embodiments, the system is configured to measure, for each of the three phases, a respective current or physical quantity, as well as the operating time being the same for the three phases ;calculate, by the software, a neutral current in the neutral conductor by summing a respective complex representation of each one of the currents of the three phases,calculate a total thermal load over the operating time for the neutral conductor based on the neutral current, the operating time and the properties, determine that the total thermal load of the neutral conductor is above a threshold value for an allowed thermal load, and, as a result of the determining, provide a signal.
[0009] In some embodiments, the system is configured to determine that the total thermal load of the electrical installation is above a threshold value by identifying different intervals for the measured current in dependence of the current capacity of the load protection, and wherein the system is configured to calculate the thermal load by comparing the total thermal load to the different intervals.
[0010] In some embodiments, the different intervals are determined as a function of one or more predetermined percentages of the capacity of the overload protection.
[0011] In some embodiments, the time dependent temperature variation is calculated by using a thermal time constant T, wherein the thermal time constant T is or has been estimated by usin the cross-sectional area of the electrical installation in turn inferred by the capacity of the overload protection.5
[0012] A method for measuring an operational load over time for an electrical network comprising a power supply source configured to be a main power provider to the electrical network, wherein an electrical installation is connected in series with an overload protection with a known capacity, a conductor connecting the electrize cal installation to the power source. The conductor is configured to carry a current to or from the power supply but not via the overload protection. The method comprises:storing, into a memory, one or more properties of the electrical installation being derived as a function of the known overload protection capacity;15 providing a computer software function, configured to communicate with a measuring unit and to receive from the measuring unit a measured current through the electrical installation or a physical quantity convertible to a current through the electrical installation;causing the computer software function to:0 measure an operating time associated with the measured current or physical quantity;calculate, a total thermal load over the operating time for the electrical installation based on the measured current or physical quantity, the operating time and the properties of the electrical installation;5 determine that the total thermal load of the electrical installation is above a threshold value; and, as a result of the determining, provide a signal.
[0013] In some embodiments, a method for installing the system above onto an electrical network, wherein the electrical network comprises an electrical installa0 tion being connected in series with an overload protection with a known capacity, aconductor connectingthe electrical installation to the power source, the conductor being configured to carry a current to or from the power supply but not via the overload protection. The method comprises:connecting a measuring unit of the system to the electrical installation, so that a current passing through the overload protection is measured by the measuring unit;before or after the connecting, determining one or more properties relating to the electrical installation as a function of the known overload protection capacity; andstoring, into a memory of the system, the one or more properties.
[0014] Said computer software products can each individually be implemented by a non-transitory computer-readable medium encoding instructions that cause one or more hardware processors located in at least one of computer hardware de- vices in any one of the systems to perform the measuring of an operational load.DRAWINGS
[0015] Fig. 1 is an overview of an electrical network with one electrical installation.
[0016] Fig. 2 is an overview of an electrical network with two or more electrical installations.
[0017] Fig. 3 is an overview of an electrical network where the electrical network is a three-phase network.
[0018] Fig.4 is an overview of a system for an electrical network with a measuring unit.
[0019] Fig 5 is an overview of a system for measuring an operational load over time for an electrical network with two or more measuring units.
[0020] Fig 6 is an overview of a system for measuring an operational load over time for a three-phase network with three measuring units.
[0021] Fig. 7 is an overview of a method for measuring an operational load for an electrical network.
[0022] Fig 8. is another overview of a method for measuring an operational load for an electrical network.
[0023] Fig 9. is an overview of a computer device that can be used in the implementation of the system.DETAILED DESCRIPTION
[0024] The invention described herein is intended to provide a solution for the above- mentioned problems. The invention discloses a system 300 for measuring an oper- 5 ational load over time for an electrical network 100. The load level of an electrical network has a direct impact on the rate at which components of the installation wear out. By continuously monitoring and automatically determiningthe load level using specially developed algorithms, this information can serve as a valuable basis for determining howfrequently an installation should be inspected.w
[0025] Through the same monitoring process, any changes in the installation can be automatically detected, allowing procedures to be adjusted accordingly.
[0026] Figure 1 depicts the electrical network 100, which comprises a power supply is 106, an electrical installation 104 for carrying a current through the electrical installation 104, and an overload protection 102 connected in series with the power supply 106 and the electrical installation 104, for instance connected between the power supply 106 and the electrical installation 104. The electrical network 100 may be, for example, a power distribution network, an industrial electrical grid, an 0 electrical energy transmission system, or any type of infrastructure designed for distribution of electrical power. For instance, the electrical network 100 can be a distribution network for 110 or 230 V, 50 Hz AC current, such as a three-phase AC system; or a 12 V or 24 V DC distribution network. The power supply 106 may be a main power supply to or in the electrical network 100. The electrical installation 5 104 may be supplied with power from, e.g. mainly from, only from, or the like, the power supply 106. For instance, the power supply 106 may be a mains conduit in the electrical network 100. The electrical network 100 also comprises a first conductor 108, connecting the electrical installation 104 to the power supply 106. The first conductor 108 is arranged to carry a current between the power supply 106 0 and the electrical installation, i.e. not over the overload protection 102 associated with the electrical installation 104. In some embodiments, the first conductor 108may have, such as be connected to, a second overload protection (not shown). In some embodiments, the first conductor 108 may be a neutral conductor, a ground / earth conductor, a return path conductor, or a negative conductor, or a similar conductor suitable for the electrical network 100. Hence, the current is 5 configured to flow in series through the power supply 106, the overload protection 102, the electrical installation 104 and the conductor 108.
[0027] In some embodiments, the electrical installation 104 may comprise a power cable of any standardised physical dimension. The electrical installation 104 may w comprise a supply cable connected to the electrical network 100. The electrical installation 104 may be associated with a respective overload protection 102 of any kind. The overload protection 102 may be a fuse, for instance a 10 A, 16 A, 20 A, 35 A, 60 A, or any other dimensioned fuse. The overload protection 102 may also comprise another type of protection such as a circuit breaker, a thermal overload relay, 15 a solid-state protection or the like. In some embodiments, the overload protection 102 is connected either immediately upstream or immediately downstream to the electrical installation 104 and may be dimensioned to have a capacity scaled to match the physical capacity of the electrical installation 104. The overload protection 102 is connected in series to, or as a part of, the electrical installation 104, so 0 that any current passing through the electrical installation 104 also passes through the overload protection 102.
[0028] The system 300 may be configured to measure one or more of current, active power, and reactive power, and also a corresponding operation time for the meas- 5 ured current, active power and / or reactive power, and to store these measurement values in a memory 302. The system 300 may further be configured to read, by a computer software program 304, the measurement values from the memory 302 and to calculate a total operational load of the electrical installation 104 based on the measurement values. The memory 302 and a computer processor configured 0 to execute the software program 304 of the system 300 may be embedded in a hardware device, in turn communicatively coupled to one or more measuring units306 comprised in the system 300. Alternatively, any combination of the various parts of the system 300 may be provided as distinct individual parts communicatively coupled to each other. Communication between the parts may take place using wired or wireless communication protocols, that can be conventional as such. For instance, communication can take place over the open Internet. The system 300 may have a visual interface 308 presenting a visualization of the electrical network 100, along with measured data and / or any overload alert signal (see below) in association with the different parts of the system 300. In another embodiment, there may be no visual interface, and the system 300 may monitor the elec- trical network 100 providing a signal of any type when the operational load is over a predetermined threshold value or within an interval.
[0029] For data acquisition, each measuring unit 306 may individually comprise one or more of a variety of different sensors, including a current sensor, a voltage sen- sor, and a power meter for measuring active power, reactive power or both active and reactive power. The measuring unit 306 may be configured to send measured data continuously or intermittently, such as at predetermined time intervals, to the memory 302. The measured data may be stored and used by the software program 304 for calculations of the operational load of the electrical network 100 as de- scribed below. The measurement unit 306 may be a part of the system 300, or alternatively the measurement unit 306 may be a part of the electrical network, such as a fixed measurement unit for electricity consumption. In the latter case, the system 300 can comprise a suitable communications means, such as an internet cable connection, allowing the software 304 to communicate with the measurement unit 306 and reading measurement values therefrom.
[0030] For the functionality of the system 300, a measuring unit 306 may be located at the electrical installation 104 of the electrical network 100, such as connected in series, for instance immediately downstream or upstream, in relation to the over- load protection 102, so that any current passing through the overload protection 102 associated with the electrical installation 104 also passes through themeasurement unit 306 and the electrical installation 104. Since the overload protection 102 normally is specifically capacity-scaled for the electrical installation 104 which it serves, the system 300 may determine the approximate physical properties of the electrical installation 104 as a function of the current capacity of the 5 overload protection 102. The present inventors have discovered that such approximate estimation is good enough both for providing alerts regarding overload and to assess useful life of the components of the electrical installation 104. The determined physical properties may be stored in the memory 302 for each individual of one or more overload protection 102 capacity and may be used, such as adapted, w by the software 304 together with measured data during operation.
[0031] The memory 302 is configured to receive the measured data from the measuring unit 306 and to store the measured data in the memory 302. Further, in connection to, such as part of, the installation of the system 300 at the electrical net-75 work 100, the current capacity of the overload protection 102, or any other information correlating with the current capacity thereof, may be stored in the memory 302. The memory 302 may further comprise the software program 304. In another embodiment, the software program 304 may be installed outside the memory 302 on a separate piece of physical hardware device communicatively coupled to the 0 memory 302.
[0032] The current capacity information of each of the one or more overload protections 102 and corresponding physical properties of each of the one or more electrical installations 104 may be stored in the memory 302. As an example, where the 5 electrical installation 104 comprises a cable, a known maximum capacity of an overload protection102 may imply that the cable has certain parameters, for example has a certain cross-section area A, a time constant related to a temperature change, i.e. a specific time constant T, a specific current rating, or the like. These parameters may be automatically determined by the system 300, such as by the 0 software program 304, based on, such as a function of, the capacity of the overload protection 102. The automatic determining can be a determining based onapproximation of the parameter in question as a function of the capacity of the overload protection 102, for instance using tabulated values or a predetermined formula.5
[0033] The combination of the above-mentioned measured data and physical properties enables the system 300 to, in real-time or almost real-time, monitor operational load of the electrical installation 104 such as a current load, active or reactive power with respect to operation time or the like.w
[0034] The variation of the load level of the electrical installation 104, in terms of a power developed in the electrical installation 104, influences its thermal behaviour, and in particular an operating temperature of the electrical installation 104 overtime. Athermal load level of the electrical installation 104 may be evaluated by the system 300 using different approaches. The system 300 may determine a 15 thermal time constant, denoted by T, which is determined as a function of conductor cross-sectional area and possibly also material composition of a cable conducting the current that also passes through the overload protection 102. As mentioned above, the thermal time constant T may be determined as a function of the capacity of the overload protection 102, in turn implying a certain cross-sectional 0 area of a cable served by the overload protection 102. The thermal time constant T for an electrical installation 104 describes how fast the electrical installation 104 reacts to a certain current load, i.e. how fast the temperature changes as a result of a certain developed current through the electrical installation 104. By configuring the software function 304 to determine T based on a given current capacity of 5 an overload protection 102 serving a hypothetical cable, a cross-section of the hypothetical cable being calculated based on said current capacity, or by tabulating values for T in the memory 302 as a function of different overload protection 102 current capacities, the system 300 can determine T for an electrical installation 104. The electrical installation 104 comprises the hypothetical cable being con- 0 nected in series with the overload protections 102 serving the electrical installation 104 and having the given current capacity. The present inventors have discovered that the thermal load calculations are sufficiently precise for monitoring theelectrical installation 104 even in case the electrical installation 104 does not comprise a hypothetical cable of said type.
[0035] To reduce the impact of transient current variations that do not contribute significantly to the thermal load of the electrical installation 104, such as spikes or fast short variations, a moving window approach may be employed. In this context, the root mean square (RMS) value of the electrical current may be calculated over a defined time window, which is continuously shifted across the total operational period. The RMS current, IRMS, over the total operation time To, may be defined as:1 cT°IRMS= Hr I i2(t)dtJlo JoWhere:• i2(t) = the square value of the measured current.• To= operational time.In preferred embodiments, a moving window RMS calculation is applied such that the RMS current is recalculated continuously or periodically over overlapping or sequential subintervals of time within the total operational period. In the following operational load calculations, it is assumed that the current used is the RMS value calculated for the operation time To. The operation time Tocan be at least 1 minute, such as at least 10 minutes, such as at least 1 hour, such as at least 12 hours, such as at least 24 hours. Alternatively or in addition, the operation time Tocan be at the most 1 month, such as at the most 1 week, such as at the most 24 hours, such as at the most 12 hours, such as at the most 1 hour.
[0036] In some embodiments, the system 300 may calculate an estimation of a predicted time required for the installation 104 to reach a certain percentage of a maximum permissible temperature (i.e. the final temperature) under a continuous current load. This estimation of the predicted time can be used to determine opera- tional modes in which the likelihood and severity of thermal degradation,progressive material aging, or operational hazards affecting the electrical installation 104 is increased. Concretely, this can be done by estimatingthe thermal time constant T based on the above-mentioned hypothetical cable of the electrical installation 104. The thermal time constant T may be calculated by the software pro- 5 gram 304 or tabulated in the memory 302. For instance, the thermal time constant T can be determined to provide a predictive measure of the time required for the hypothetical cable to increase by a specified proportion of a certain temperature given a certain constant current load, wherein the proportion of the certain temperature increase reached at time t = T corresponds to approximately 63.2 % of the of w the total certain temperature increase. This thermal behaviour may be described by the following equation:T(t) = To+ AT(l - e~t / T)15 where T(t) is the temperature at time t, Tois the initial temperature, AT is the final temperature rise above To, and T is the thermal time constant.
[0037] Following the stipulated temperature equation above, a time until the installation 104 reaches a final steady-state temperature under the continuous current 20 may be approximated by multiplying the thermal time constant T with a multiple n. Whereas n = 1, corresponds to a time when the electrical installation 104 has reached 63.2 % of its final temperature, n = 5 corresponds to a time when the electrical installation 104 has reached 99.3 % of its final temperature. The present inventors have found that 5T is a suitable approximation for a time threshold for for 25 the present purposes.
[0038] As an example, the electrical installation 104 may comprise a hypothetical cable in the form of a cupper conductor connected in series with a corresponding overload protection 102 as a 16A fuse, so that all current passing through the over-jo load protection 102 also passes through the hypothetical cable. The system 300 may be configured to assume that the hypothetical cable connected to the 16Afuse has a cross-section area of 1.5mm and may thereby calculate or read a tabulated value from the memory 302 of the thermal time constant T to 42s. 5 T hence becomes 5*42s=21 Os. Assumed tabulated properties of a hypothetical cable corresponding to a known overload protection! 02 is presented in Table 1.Table 1 Physical properties of a hypothetical cable with respect to corresponding overload protection capacity.Cross-Section Current rating [A] Overload Thermal time 5 T [S] Area [mm2] protection [A] constant T [S]w 1.5 18.5 16 42 210 2.5 25 20 65 325 4 34 25 89 445 6 43 35 126 630 10 60 50 179 895 15 16 80 63 258 1290 25 101 80 396 1980 35 126 100 498 2490 50 153 125 690 3450 70 196 160 824 4120 0 95 238 200 1029 5145 120 276 250 1221 6105 150 319 250 1428 7140 185 364 315 1668 8340 240 430 315 2012 10060 5 300 497 400 2353 11765
[0039] In some embodiments, the software 304 is configured to define a threshold for a “very high” current load, that can be a value lower than the current capacity of the overload protection 102. For instance, the threshold for the “very high” current 0 load can be a value between 80% and 100%, such as 90% or thereabouts, of the current capacity of the overload protection 102. In these and other embodiments,the software 304 is configured to define a threshold for a “high” current load, that can be a value lower than the current capacity of the overload protection 102. For instance, the threshold for the “high” current load can be a value between 50% and 90%, such as 70% or thereabouts, of the current capacity of the overload protec- 5 tion 102. The threshold for the “very high” current load can be higher than the threshold for the “high” current load, such as at least 10% higher in terms of the current capacity of the overload protection 102. Then, the software 304 can be configured to detect instances when the measured current through the electrical installation 104, or the current determined based on a different measurement such w as active / reactive power, continuously is above each of the “high” and “very high” thresholds. For instance, the software 304 can be configured to detect if the current through the electrical installation 104 is continuously above the “very high” threshold for a duration of 5T. Correspondingly, the software 304 can be configured to detect instances when the current is continuously below the “high” or “very 15 high” threshold during a certain time duration. Herein, a current being continuously above the “high” threshold during a certain time duration is denoted a “high current load state”; a current being continuously above the “very high” threshold during a certain time duration is denoted a “very high current load state”; and a current being continuously below the “high” or (alternatively) the “very high” threshold 0 during a certain time duration is denoted a “rest state”. During the rest state, thermal energy dissipates through natural cooling mechanisms, allowingthe temperature of the hypothetical cable, and by approximation the electrical installation 104, to decrease toward ambient conditions.5
[0040] In some embodiments, the software 304 can be configured to interpret a detection of a very high current load state during a certain minimum time period without any interruption, such as a time period of at least 5 T, as an alert event. This can, for instance, mean that the electric installation 104 is at risk of permanent damage due to the elevated temperature potentially resulting from the prolonged 0 very high current load state. In some embodiments, the software 304 can be configured to interpret a detection of a very high current load state during a certainminimum time period without any interruption, such as a time period of at least 5 T, as a wear event. This can, for instance, mean that the electric installation 104 is at risk of increased wear damage due to the elevated temperature potentially resulting from the prolonged very high current load state. In some embodiments, the 5 software 304 can be configured to take into consideration a detected rest state during a prolonged time period when determining whether or not an alert event or a wear event is detected in various scenarios. In a first example, in case a rest event is detected, immediately following a detected very high current load state where the very high current load state is not sufficiently prolonged to result in an alert w event, and where rest event is detected to be at least as prolonged as the very high current load state, the software 304 can be configured to determine that the very high current load state is finished, and to restart the measurement of a time period for a subsequently detected very high current load state. For instance, if a very high current load state is detected for 3 T seconds and is then followed by a rest state 15 detected to be 4 T seconds, when a very high current load state is then again detected, a timer for that subsequent very high current load state is restarted from zero. In a second example, in case the rest state is instead detected to be of shorter time period than the preceding detected very high current load state, for instance a 3 T s very high current load state followed by a 2 T seconds rest state and 0 thereafter again a very high current load state, the software 304 can then instead be configured to interpret the subsequent very high current load state as a continuation of the preceding very high current load state. Hence, if the 3 T seconds very high current load state is followed by another 3 T seconds very high current load state after said 2 T seconds rest state, the result is a detected 3+3=6 T seconds very 5 high current load state, then resulting in a detected alert event. The corresponding can apply for detected high current voltage loads, a detected rest state and the detection of a wear event. Hence, for both the alert event and the wear event, a (very) high current load state can be considered to be a continuation of a previous (very) high current load state in case an intermediate rest state is shorter than the earlier 0 (very) high current load state.
[0041] Hence, the present inventors have discovered that the temperature developed in a hypothetical cable being served by the overload protection 102, calculated based on properties of the hypothetical cable derived from the current capacity of the overload protection 102, serves as a useful proxy for determining a to- 5 tai operational load forthe electrical installation 104 as a whole, the electrical installation 104 being served by the same overload protection 102. When determining the physical properties of the hypothetical cable, the software 304 can be configured to use assumed or calculated tabulated values for the following metrics for said hypothetical cable as a function of the known capacity of overload protection: w • A = cross-sectional area of the cable• Material of the installation. The assumed material of the hypothetical cable may further provide the following tabular values:• p= resistivity of the material [ ]• T= specific time constant [s]15 • c = specific heat capacity [J / (kg K)]]• C = p ■ A ■ c , C is the thermal capacitance per meterThe above assumed properties of the hypothetical cable may then be used to determine an electrical resistance, R, forthe hypothetical cable:0R=--AWWhere R = electrical resistance [ ]Knowing R, the software 304 may use the measured current / (t) through the elec- 5 trical installation 104 to calculate a power dissipation P(t) (heat loss) from said hypothetical cable:P(t) = / (t)2■ R (2)The power dissipation P(t) may be used together with the thermal capacitance per meter C' to determine a time dependent temperature variation T(t) of the hypothetical cable as a result of the temperature change rate — :dT(t)= P(t) (3)dtWhere:tT(t) = Too
[0042] Furthermore, the time dependent temperature variation T(t) in the hypothetical cable, and by approximation also the electrical installation 104, may be integrated over the corresponding measured operating time t0and arrive at a total ther- mal load over the operating time for the hypothetical cable, and again by approximation for the electrical installation 104:t0Thermal Load = Qthermai = J T(t)dt (5)o
[0043] When the thermal load of the electrical installation 104 is determined to be above a predetermined threshold, the system 300 may provide a signal, such as an externally communicated signal. This was exemplified above by the very high current load state having a detected uninterrupted length of at least a predetermined threshold time. Hence, the signal can be sent to indicate the detection of said alert event.
[0044] The detection of a wear event may be used internally by the system 300, as opposed to giving rise to an externally communicated signal. For instance, whencalculating a remaining useful life for various components in the electrical installation 104, or for the electrical installation 104 as a whole, an expected maximum useful life therefore can be discounted by a factor calculated as a function of a total detected time for detected wear events. For instance, in case the electrical in- 5 stallation 104 has an expected maximum useful life of 10 years, but it has been detected that detected wear events represent 50% of the total time during the first 5 years of these maximum 10 years, the total useful life can be discounted by 30%, yielding a remaining useful life of 2 years. The choice of discounting factor depending on the total time represented by detected wear events can vary depending on w the type of electrical installation 104 and can be tabulated or calculated by the software 304.
[0045] In addition to the above-described alert events and wear events, the software 304 may further be configured to measure shorter high-current events. To achieve 15 this, a very high current load detected to occur only during a shorter time period than what is required for it to constitute a detected alert event can still be determined to be an alert event in case an average or maximum current during said shorter measurement time surpasses the above-discussed RMS current, IRMS, or surpasses a predetermined fraction of the RMS current. The RMS current, IRMS, can 0 be measured across a historical time period represented by the The operation time Toas explained above.
[0046] In another embodiment in Fig 2., the electrical network 100 comprises two or more overload protections 102 and two or more corresponding respective electri- 5 cal installations 104, each connected in series to, such as immediately upstream or downstream of, a corresponding respective one of the two or more overload protections 102 in the general way discussed above. The two or more overload protections 102 may each have a corresponding known current capacity. In this embodiment, the system 300 comprises two or more measuring units 306, each being 0 configured to measure a respective current through a respective one of the two or more electrical installations 104, or a physical quantity convertible to a current through the electrical installation 104, seen in Fig. 5. The thermal load for each ofthe two or more electrical installations 104 may be calculated by the system 300 in the way described above, based on the current capacity of the overload protection 102 and the measured current therethrough. In case the current through at least one of the electrical installations 104 is determined to be above a corresponding 5 threshold value, such as during a sufficiently prolonged time period, the system 300 may be configured to provide a signal.
[0047] In some embodiments, the electrical network may be a three-phase network 200, see Fig. 3. The three phase network 200 may comprise three overload protec-w tions 102 and three electrical installations 104 each individually connected to a corresponding respective one of the three overload protections 102. The three electrical installations 104 are each connected to a respective phase 204 of the three-phase network. Further, the conductor 108 may be a neutral conductor 208, connected to all three of the electrical installations 104. In this embodiment, the 15 system 300 comprises three individual measuring units 306, each arranged at a respective one of the three phases 204 in series with, such as immediately upstream or downstream of, a respective one of the three overload protections 102 as generally described above, and configured to directly or indirectly measure a current through the electrical installation 104 in question. The system 300, shown in Fig. 6 0 may be arranged to provide a signal when the thermal load of at least one of the three individual phases 204 is above a threshold value for an allowed thermal load, in the general way discussed above.
[0048] For the three-phase network 200 (see Fig 6.), a thermal load of the neutral 5 conductor 208 may be calculated. Under ideal conditions with equal load through the three phases, there is no current through the neutral conductor 208 (due to the currents through the phase conductors cancelling), hence there is no thermal load in the neutral conductor 208 due to such current. During various load cases during use of the network 200 the resulting current through the conductor 208 can vary as 0 a function of the respective load in each phase, for instance leading to a phase shift in one or more of the three phase conductors 204. A phase shift in a phase conductor 204 will generate a rest current going back to the power supply 106through the neutral conductor 208. A current in the neutral conductor 208 may be calculated summarising the complex representation of the measured currents through each one of the three phases 204. The thermal load of the neutral conductor 208 may be calculated accordingly, usingthe same physical properties and op- 5 erating time as for any or all of the three individual phases 204, but usingthe calculated current through the neutral conductor 208 as the measured current. The system 300 may be configured to provide a signal if the thermal load of the neutral conductor 208, calculated as described above, is above a threshold value, in the general way discussed above.w
[0049] The measured current may be divided in two or more intervals. In some embodiments, the intervals may be determined using different percentual intervals of the current capacity of the capacity of the overload protection 102. Knowing certain physical dimensions of the electrical installation 104, the capacity of the over-75 load protection 102 may be used to calculate a corresponding thermal threshold.This maximum thermal threshold may be the basis forthe different intervals, whereas the intervals (defined in terms of the measured current) corresponds to predefined percent of a certain instantaneous thermal load. The intervals may be the aforementioned threshold values used to determine whether or not to trigger a 0 signal, to which the measured current is compared.
[0050] In some embodiments, when the measured current is detected to be in a certain predefined interval for a certain predetermined amount of time, such as an uninterrupted amount of time as described above, the signal may trigger a predeter- 5 mined action correspondingto the reached interval. Such an action could be an immediate shut down of the electrical installation 104 or the entire electrical network 100; or the sending of a warning signal to a communicatively connected device, such as the interface 308, a computer, a smartphone, a watch or the like.
[0051] In a concrete example, three different intervals for the electrical installation 104 are applied. The three different intervals can generally be non-overlapping and / or directly adjacent to one another.1. Low load - corresponding to 0-70% (e.g. including or excluding 70%) of the 5 current capacity of the overload protection 102.2. High load - corresponding to 70%-90% (e.g. including or excluding 70% and 90%) of the current capacity of the overload protection 102.3. Very high load - corresponding to 90% (e.g. including or excluding 90%) of current capacity of the overload protection 102.w
[0052] In the case of the embodiment wherein the electrical network 100 is a three- phase network 200, the threshold and intervals for the neutral conductor 208 may have its own defined thresholds and intervals, that may be the same as or different from the ones for the individual electrical installations 104. The threshold or inter- 75 vals may be determined as a function of devices connected to three-phase network 200. A signal provided from such a threshold may carry information that a device is malfunctioning and may need to be replaced.The invention also relates to a method 500. The method can be performed by the sys- 0 tern 300, for measuring an operational load overtime for the one or several electrical installations 104 in the electrical network 100. The method 500 comprises the following steps:Step 5025 The system 300 measures, e.g. by the measuring unit 306, a measured current or physical quantity correspondingto a current, as well as an operating time associated with the measured current or physical quantity.Step 5040 The memory 302 receives the measured current or physical quantity, as well as the operating time.Step 506The system 300 calculates a total thermal load.5 Step 508The system determines that the total thermal load of the electrical installation 104 is above a threshold value.Step 510w As a result of the determining, the system provides a signal.
[0053] The measuring unit 306 associated with the electrical installation 104 can be connected in series with, such as immediately upstream or downstream to, the at least one overload protection 102, so that a current passing through the overload 15 protection 102 is measured by the measuring unit 306.
[0054] The invention also relates to a method for installing 600 the system 300 in relation to the electrical network 100 in turn comprising the one or more electrical installations 104 each connected in series to an overload protection 102 with a 0 known capacity as described above. The method 600 comprises the following steps:Step 602Connectingthe measuring unit 306 to the electrical installation 104.5Step 604Determining one or more properties relating to the electrical installation 104 as a function of the known overload protection capacity. This determination can take place as discussed above, using a hypothetical cable as a proxy for the whole elec- 0 trical installation 104.Step 606Storing into the memory (302) properties calculated in step 604, such as the abovedescribed time period of 5 T seconds and threshold values for the measured current.5Steps 602 and 604 can be performed in any order, or in parallel.
[0055] When determinin the thermal load of an electrical installation 104 being served by a corresponding overload protection 102, and specifically by measuring w a current and an operational time as described above, assumed physical properties corresponding of a hypothetical cable corresponding to the current capacity of the overload protection 102 may be determined and used. The use of an overload protection 102 having a certain current capacity to serve a hypothetical cable of a certain material can be interpreted to imply that that the hypothetical cable has a 15 certain cross-section area and thereby a thermal time constant T for the hypothetical cable, useful for determining a resulting temperature when the hypothetical cable is, for instance, loaded with a constant current at capacity of the hypothetical cable. A measured current through the electrical installation 104 may then be used to calculate a resulting time dependent temperature variation T(t) of the 0 hypothetical cable using the determined thermal time constant T and the measured current. The thermal load of the hypothetical cable may then be calculated by integrating the temperature variation T(t) overthe operational time. Furthermore, having the assumed physical properties corresponding to the installed overload protection 102 of an hypothetical cable, time thresholds may by estimated using 5 the thermal time constant T to evaluate the load of the electrical installation 104 using the hypothetical cable as a proxy for the electrical installation 104. The present inventors have discovered that said thermal load calculations are sufficiently precise for monitoring the electrical installation 104 even in case the electrical installation 104 is not, or even if it does not comprise, a hypothetical cable of said 0 type.
[0056] The essential elements of a computer, in general, are a processor for performing instructions and one or more memory devices for storing instructions and data. As used herein, a “computer” can include a server computer, a client computer, a personal computer, embedded programmable circuitry, or a special purpose logic circuitry. Such computers can be connected to one or more other computers through a network, such as the internet, or via any suitable peer-to-peer connection for digital communications, such as a Bluetooth® connection.
[0057] Each computer can include various software modules, which can be distributed between an applications layer and an operating system. These can include executable and / or interpretable software programs or libraries, includingvarious programs that operate, for instance, a sensor program, a interface programs, API, orthe like. The number of software modules used can vary from one implementation to another and from one such computer to another. Each of said programs can be implemented in embedded firmware and / or as software modules that are distributed on one or more data processing apparatus connected by one or more computer networks or other suitable communication networks.
[0058] Fig. 9 illustrates an example of such a computer, being a data processing apparatus 700 that can include hardware or firmware devices including one or more hardware processors, CPU(s) 702, a non-transitory computer readable medium (memory) 302, a communication interface 704, and one or more user interface devices 308. The processor 702 is capable of processing instructions for execution within the data processing apparatus 700, such as instructions stored on the non- transitory computer readable medium 302. In some implementations, the processor 702 is a single or multi-core processor, or two or more central processing units (CPUs). The data processing apparatus 700 uses its communication interface 704 to communicate with one or more other hardware. Thus, in various implementa- tions, the processes described can be run in parallel, concurrently, or serially, on a single or multi-core computing machine, and / or on a computer cluster / cloud, etc.
[0059] The data processing apparatus 700 includes various software modules, which can be distributed between an applications layer and an operating system. These can include executable and / or interpretable software programs or libraries, includ- 5 ing various programs that operate, for instance, a sensor program, a interface programs, API, or the like.
[0060] Examples of user interface devices 308 include a display, a touchscreen display, a speaker, a microphone, a tactile feedback device, a keyboard, and a mouse. w Moreover, the user interface device(s) need not be local device(s), but can be remote from the data processing apparatus 700, e.g., user interface device(s) 308 accessible via one or more communication network(s). The user interface device 308 can also be in the form of a standalone device having a screen, such as a conventional smartphone being connected to the system 700 via a configuration or setup opera-75 tion. The data processing apparatus 700 can store instructions that implement operations as described in this document, for example, on the non-transitory computer readable medium 302, which can include one or more additional devices 708, for example, one or more of a floppy disk device, a hard disk device, an optical disk device, a tape device, and a solid state memory device (e.g., a RAM drive, a Flash 0 memory or an EEPROM). Moreover, the instructions that implement the operations described in this document can be downloaded to the non-transitory computer readable medium 302 from one or more computers (e.g., from the cloud), and in some implementations, the RAM drive is a volatile memory device to which the instructions are downloaded each time the computer is turned on.5
[0061] It is realized that the described computer hardware can be physical hardware or physical hardware configured to emulate different computer hardware thus providing virtual hardware, or any combination thereof.0
[0062] Any feature disclosed for one example and / or embodiment may be combined with one or more features disclosed for one or more other examples and / orl ' lembodiments without departing from the scope herein. Specifically, everything that has been described in relation to the system is applicable to each of the methods, and vice versa. The examples herein are provided to illustrate how to carry out the embodiments herein, while the scope of protection is defined by the appended independent claims.
Claims
CLAIMS1. A system (300) for measuring an operational load over time for an electrical network (100) comprising a power supply source (106) configured to be a main power 5 provider to the electrical network (100), an electrical installation (104) being connected in series with an overload protection (102) with a known capacity, a conductor (108) connecting the electrical installation (104) to the power supply source (106), the conductor (108) being configured to carry a current to or from the power supply source (106) but not via the overload protection (102), characterised in that, w the system (300) comprising:a memory (302), the memory (302) being configured to store one or more properties of the electrical installation (104) being derived as a function of the known overload protection capacity; and- a computer software function (304), configured to communicate with a measur- 15 ing unit (306) and to receive from the measuring unit (306) a measured current through the electrical installation (104) or a physical quantity convertible to a current through the electrical installation (104),the computer software function (304) further being configured to:- measure an operating time associated with the measured current or physical 0 quantity;- calculate, a total thermal load over the operating time for the electrical installation (104) based on the measured current or physical quantity, the operating time and the properties of the electrical installation (104);determine, by the software (304), that the total thermal load of the electrical in- 5 stallation (104) is above a threshold value; and,- as a result of the determining, provide a signal.
2. The system (300) of claim 1 , wherein the electrical network (100) comprises: two or more overload protections (102), each with a respective known capacity;0 two or more electrical installations (104), each connected downstream to a corresponding respective one of the two or more overload protections (102), the system (300) comprising:- two or more measuring units (306) being configured to measure a current through each of the respective two or more electrical installation (104) or a physical quantity convertible to a current through the electrical installation (104) wherein5 the system (300) is configured to:- determine that the total thermal load of at least one of the electrical installations (104) is above a threshold value for an allowed thermal load, and, - as a result of the determining, provide a signal.w 3. The system (300) of claim 2, wherein the electrical network (100) comprises:- three overload protections (102);- three electrical installations (104), each connected downstream to a corresponding respective one of the three overload protections (102), the three electrical installations (104) forming respective phases (204) in a three-phase net- 75 work (200); and where,- the conductor (108) is a neutral conductor (208),wherein the system (300) comprises:- three individual measuring units (306), each arranged at a respective one of the three phases (204) downstream to a respective one of the three overload protec- 0 tions (102).
4. The system (300) of claim 3, wherein the system (300) is configured to:- measure, for each of the three phases (204), a respective current or physical quantity, as well as the operatingtime beingthesameforthe three phases 5 (204);- calculate, by the computer software function (304), a neutral current in the neutral conductor (208) by summing a respective complex representation of each one of the currents of the three phases (204);calculate a total thermal load over the operating time for the neutral conductor (208) based on the neutral current, the operating time and the properties of the electrical installation (104);- determine that the total thermal load of the neutral conductor (208) is above a 5 threshold value for an allowed thermal load; and,- as a result of the determining, provide a signal.
5. The system (300) of any preceding claim, wherein the system is configured to: determine that the total thermal load of the electrical installation (104) is above a w threshold value by identifying different intervals for the measured current in dependence of the current capacity of the overload protection (102); and - calculate the thermal load by comparing the total thermal load to the different intervals.15 6. The system (300) of claim 5, wherein the different intervals are determined as a function of one or more predetermined percentages of the capacity of the overload protection (102).
7. The system (300) of any preceding claim, wherein a time dependent temperature 0 variation is calculated by using a thermal time constant T, wherein the thermal time constant T is or has been estimated by using the cross-sectional area of a hypothetical cable as a proxy for the electrical installation (104) in turn inferred by the capacity of the overload protection (102).5 8. A method for measuring an operational load over time for an electrical network (100) comprising a power supply source (106) configured to be a main power provider to the electrical network (100), wherein an electrical installation (104) is connected in series with an overload protection (102) with a known capacity, a conductor (108) connecting the electrical installation (104) to the power supply source (106), the con- 0 ductor (108) being configured to carry a current to or from the power supply source (106) but not via the overload protection (102), characterised in that,the method comprising:- storing, into a memory (302), one or more properties of the electrical installation (104) being derived as a function of the known overload protection capacity; 5 - providing a computer software function (304), configured to communicate with a measuring unit (306) and to receive from the measuring unit (306) a measured current through the electrical installation (104) or a physical quantity convertible to a current through the electrical installation (104);- causing the computer software function (304) to:w - measure an operating time associated with the measured current or physical quantity;- calculate, a total thermal load over the operating time for the electrical installation (104) based on the measured current or physical quantity, the operating time and the properties of the electrical installation (104);15 - determine that the total thermal load of the electrical installation (104) is above a threshold value; and,- as a result of the determining, provide a signal.
9. A method for installing (600) a system (300) according to claim 1 onto an electri- 0 cal network (100), wherein the electrical network (100) comprises an electrical installation (104) being connected in series with an overload protection (102) with a known capacity, a conductor (108) connecting the electrical installation (104) to the power supply source (106), the conductor being configured to carry a current to or from the power supply source (106) but not via the overload protection (102), characterised in 5 that,the method (600) comprising:- connecting (602) a measuring unit (306) of the system (300) to the electrical installation (104), so that a current passing through the overload protection (102) is measured by the measuring unit (306);- before or after the connecting (602), determining one or more properties relating to the electrical installation (104) as a function of the known overload protection capacity; and- storing (604), into a memory (302) of the system (300), the one or more proper- ties.
