Description
technical field
[0001] The invention belongs to the technical field of mining, and in particular relates to a safe and efficient shallow-hole room-and-pillar mining method. Background technique
[0002] Underground shallow-hole room-and-pillar mining method, personnel are exposed to the goaf for a long time. After drilling and blasting each time, the pumice needs to be cleaned. The area is large. Due to the blasting vibration and the long mining time of the stope, the rock joints and fissures are greatly damaged, and the roof of the stope There are problems such as cracking in the side walls. Therefore, during the mining process, mining must be stopped to deal with the roof side walls, which seriously affects the safety and mining efficiency of the mining process.
[0003] Therefore, it is an urgent problem to study a safe and efficient underground shallow-hole room-and-pillar mining method. Contents of the invention
[0004] The purpose of the present invention is to pro...
Examples
Embodiment 1
[0038] Such as figure 1 , this embodiment implements mining for the ore body with stable ore rocks and a gently inclined lower ore body with a thickness of less than 8-10m, including the following steps:
[0039] First, along the footwall of the ore body, the along-vein transport roadway 1 is arranged. During the construction process of the vein-along transport roadway 1, the vertical ore body direction is constructed at a distance of 30m. The construction of bottom-drawing roadway 3, along-vein transportation roadway 1 and vein-piercing ore-exiting roadway 2 in the later stope recovery process is completed, and air inlet and return passages and safety passages are formed. For ore body 6, a 25m×15m stope is arranged according to the occurrence of the ore body, and 4m of ore pillars 4 are reserved between the stopes. During the mining process, blasting mining is carried out with the bottom roadway 5 as the free face to the stope. Firstly, the bottom of the stope is completely ...