Deep rock grouting and seepage simulation test system and test method

Through the deep rock formation grouting and seepage simulation test system, the problem of the inability to effectively simulate the overlying rock separation layer and slurry flow pattern in the existing technology has been solved, and technical support for goaf collapse prevention and surface subsidence control has been achieved, and overburden subsidence control has been provided. Methods for studying the evolution of rock separation layers and the laws of slurry seepage.

CN115097106BActive Publication Date: 2024-10-11GENERAL PROSPECTING INSTITUTE OF CHINA NATIONAL ADMINISTRATION OF COAL GEOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210750004.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-28
Publication Date
2024-10-11
Estimated Expiration
2042-06-28

AI Technical Summary

Technical Problem

The existing overburden separation layer grouting technology lacks in-depth experimental equipment and means, and cannot effectively simulate the damage of overburden and slurry flow patterns in actual projects, and cannot achieve in-depth research on goaf collapse prevention and surface subsidence control.

Method used

A deep rock formation grouting and seepage simulation test system is designed, including an equipment frame, a flexible loading device, an automatic laying device, a similar material preparation and conveying device, and a grouting device. Through the design of the test chamber and the automatic laying device, the overlying rock is realized Simulation of separation layers and study of slurry flow.

Benefits of technology

The system can simulate the overlying rock separation layer and the grouting process, provide experimental means to study the evolution of the overlying rock separation layer and the slurry seepage law, achieve technical support for goaf collapse prevention and surface subsidence control, and avoid the low efficiency of manual laying. and material accumulation issues.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115097106B_ABST
    Figure CN115097106B_ABST
Patent Text Reader

Abstract

The present invention discloses a deep rock stratum grouting and seepage simulation test system, which belongs to the technical field of overburden rock delamination grouting. It includes an equipment frame, a rock stratum flexible loading device, a test chamber, an automatic laying device, a similar material preparation and conveying device, a grouting device and an installation device. By improving the test chamber, a hollow isolation piece that can slide relatively along the bottom beam is designed in the test chamber to separate the test chambers, and the two test chambers can be used for control tests. Moreover, after the similar materials are completed, the angle of the test chamber can be adjusted by a second telescopic cylinder. The automation of similar material laying is achieved by adopting an automatic laying device. The present invention can simulate overburden rock delamination and grouting process, restore the overburden rock delamination and grouting evolution under actual geological conditions, and provide technical support for studying the evolution of overburden rock delamination and the law of slurry seepage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of overburden rock separation grouting, and in particular to a deep rock stratum grouting and seepage simulation test system and test method. Background Art

[0002] Coal has made a significant contribution to my country's national economy and social development, but it has also brought about deep-seated problems such as "mining subsidence, environmental pollution, and ecological imbalance". At present, the development task of coal mining enterprises has changed from "safe and efficient mining" to "green mining and clean utilization", and prevention and control of mining subsidence and environmental governance are one of its important contents.

[0003] Overburden delamination grouting is a green mining technology that effectively prevents and controls mining subsidence and protects the mining environment. It has the advantages of simple process, low cost, small impact on underground production, and high coal recovery rate. It is mainly used in ground subsidence control, mining subsidence prevention and control, and harmless treatment of solid waste. It can also be used for aquifer protection, rock burst disaster prevention and control, etc.

[0004] At present, there are many green mining stratum grouting projects being carried out, but the understanding and research on the development mechanism, characteristics and laws of stratum, diffusion and migration laws of slurry in stratum, design and optimization of stratum grouting parameters, and the mechanism and effect evaluation of stratum grouting in surface subsidence control, prevention and control of mining collapse, prevention and control of rock burst, and protection of aquifers are still not in-depth, and there is a lack of experimental equipment and means to carry out related research.

[0005] Application No. 202110574077.X discloses a two-dimensional visual grouting test box and its use method. This method cannot simulate the damage of overburden in actual engineering, cannot restore the slurry flow at the engineering site well, and cannot realize the study of the law of slurry seepage in overburden.

[0006] Application No. 202010953172.6 discloses a three-dimensional simulation experimental device and method for the flow law of overburden isolation grouting filling slurry. The device can realize the study of the flow law of slurry. Due to the limitations of the three-dimensional model, it is impossible to intuitively display the state of overburden movement and slurry flow.

[0007] Application No. 202010952461.4 discloses a fluid-solid coupling similarity simulation material and preparation method for reproducing fractures, but the preparation process of the similarity material is complicated, the relevant fractures are prepared based on 3D printing, and the fractures in the formation cannot be accurately restored, making it difficult to accurately simulate the changes in overburden delamination during coal mining.

[0008] Application No. 202010624595.3 discloses a visualization test system for simulating the grouting and seepage process of a rock mass containing fractures, which provides a visualization test system for simulating the grouting and seepage process of a rock mass containing fractures;

[0009] Application No. 201910020163.9 discloses a visual testing device and experimental method for ultrasonic-assisted pressure grouting, which only realizes the grouting seepage simulation for rock blocks, cannot conduct grouting research in complex formations, and the cost of the precision instruments used is too high.

[0010] In summary, the technology of controlling surface subsidence by filling the overburden layer needs to be further improved.

[0011] Therefore, in response to the above situation, a deep rock grouting and seepage simulation equipment system was developed. Summary of the invention

[0012] One of the purposes of the present invention is to provide a deep rock grouting and seepage simulation test system, which provides experimental means and methods for the movement characteristics and laws of the surrounding rock of the goaf (including the overlying rock up to the surface) under different geological mining conditions, the dynamic evolution characteristics and laws of the strata, the mechanism and effect evaluation of strata grouting to prevent and control goaf collapse geological disasters, and other related theories and technologies, thereby providing a guarantee for the study of spatial grouting management of overlying rock strata.

[0013] In order to achieve the above object, the present invention adopts the following technical solutions:

[0014] A deep rock grouting and seepage simulation test system, comprising an equipment frame, a flexible loading device, a test chamber, an automatic laying device, a similar material preparation and conveying device, a grouting device and an installation device;

[0015] The test chamber is located in the equipment frame, and the test chamber includes a bottom beam, a left baffle, a right baffle, a middle isolation column and a reaction beam;

[0016] The bottom beam is fixedly connected to the left baffle and the right baffle respectively, a second telescopic oil cylinder is arranged in a direction perpendicular to the bottom beam, a cylinder bracket is arranged on the top beam of the equipment frame, the bottom of the second telescopic oil cylinder is hinged to the cylinder bracket, a base is arranged on the left side of the bottom beam, and the top of the second telescopic oil cylinder is hinged to the base; the right bottom of the test bin is welded to the base of the equipment frame through a hinged base; the angle of the test bin can be adjusted within a certain range by adjusting the second telescopic oil cylinder;

[0017] The middle isolation column is arranged in the inner space of the test chamber, and the middle isolation column can slide left and right along the bottom beam. A plurality of first through holes are arranged on the bottom beam and the middle isolation column. When the middle isolation column slides to a suitable position, the middle isolation column and the bottom beam are fixed by bolts cooperating with the first through holes.

[0018] A first telescopic oil cylinder is arranged on the outer side of the left column of the equipment frame, and a steel wire rope is connected to the top of the first telescopic oil cylinder by a fixed pulley, and the other end of the steel wire rope is connected to the reaction beam; when the first telescopic oil cylinder is extended or retracted, the reaction beam can be lowered or raised;

[0019] A plurality of electric hoists are arranged at the left and right ends of the top beam of the equipment frame;

[0020] The automatic paving device comprises an integrated hopper, a sliding mechanism, a cylinder, a leveling and compacting mechanism and a main control console;

[0021] The integrated hopper comprises a hopper body, the cross-sectional area of ​​which decreases from top to bottom, the top of the hopper body is provided with a feed inlet, and the bottom of the hopper body is provided with a discharge outlet;

[0022] The sliding mechanism comprises a first sliding wheel, a second sliding wheel and a hollow right-angle reducer for driving and controlling the first sliding wheel and the second sliding wheel to slide;

[0023] The side of the hopper body is provided with a first connecting plate and a second connecting plate, on which the first sliding wheel and the second sliding wheel are installed, and the installation heights of the two first sliding wheels and the two second sliding wheels are the same, and the hollow right-angle reducer is installed on the outside of the first sliding wheel and the second sliding wheel located on one side of the first connecting plate, and is used to control and realize the rotation of the two first sliding wheels and the two second sliding wheels;

[0024] A support frame perpendicular to the second connecting plate is also installed on the second connecting plate;

[0025] One end of the cylinder is connected to an air pump station, and the other end is connected to a hinged plate, and the hinged plate is connected to a baffle, and the cylinder is supported by the support frame, and the shape and size of the baffle are adapted to the shape and size of the discharge port. The air pump station provides power to control the cylinder and make it pass through the support frame to advance or push out in the direction of the discharge port, and the discharge speed of the discharge port is controlled by controlling the advancement and push out of the cylinder in the direction of the discharge port;

[0026] The flattening and compacting mechanism comprises a flattening and compacting plate and a mounting structure, wherein the flattening and compacting plate comprises a plate 1 and a plate 2, wherein the plate 1 is mounted behind the discharge port through the mounting structure, and the plate 1 is mounted in a direction perpendicular to the sliding directions of the first sliding wheel and the second sliding wheel, and the plate 2 is connected to the bottom of the plate 1 and is perpendicular to the plate 1, and when similar materials are discharged from the discharge port, they are flattened and compacted by the plate 2; a plurality of circular holes are vertically arranged on the plate 1, and the mounting structure comprises fixing screws matching the circular holes, and the height of the flattening and compacting plate can be adjusted by adjusting the mounting position of the circular holes;

[0027] A pressure sensor is also provided at the bottom of the second board, and the pressure sensor is connected to the main control console via a data line;

[0028] The similar material preparation and conveying device is used to convey similar materials into the hopper body;

[0029] The installation device is used to install the automatic laying device, and the installation device includes an I-beam, and the I-beam is installed on the front and rear sides of the test chamber. The first sliding wheel and the second sliding wheel are respectively installed on the flange positions of the I-beam. When similar simulation materials need to be laid in the test chamber, the automatic laying device is placed on the I-beam through the electric hoist on the top of the equipment frame and installed together with the I-beam.

[0030] The above-mentioned grouting device is used for grouting into the test chamber, and includes casters, a grouting machine frame, a hoop, a grouting tank body, and a slurry outlet. The casters can realize the movement of the grouting equipment, the hoop can fix the grouting tank above the grouting machine frame, and the pressurizing device can increase the pressure, thereby increasing the slurry pressure in the grouting tank and pumping it out from the slurry outlet.

[0031] The beneficial technical effects directly brought about by the above technical solution are:

[0032] By improving the test chamber, a hollow isolation piece that can slide relatively along the bottom beam is designed in the test chamber to separate the test chambers. The two test chambers can be used for control tests. Moreover, after similar materials are completed, the angle of the test chamber can be adjusted by the second telescopic cylinder to ensure that one test can simulate different inclination angles and comparative tests of different similar materials at the same time.

[0033] Moreover, the automatic laying device mentioned above avoids the technical problems of low laying efficiency and uneven laying caused by manual laying. The automatic laying device of the present invention can realize automatic laying of similar materials, save manpower, and has a simple structure and is easy to operate.

[0034] The most important thing is that the automatic laying device can avoid the accumulation of similar materials when laying similar materials layer by layer. Since similar materials will not accumulate in the test chamber, it also avoids the occurrence of uneven laying of similar materials in the later stage. The reasons are briefly analyzed as follows:

[0035] First, a baffle matching the shape and size of the discharge port is provided at one end of the cylinder. The extension length of the cylinder is adjustable. The air pump station is used to control the advancement or pushout of the cylinder. Combined with the baffle, the size of the discharge port can be adjusted, thereby achieving the effect of adjusting the discharge speed of similar materials.

[0036] Secondly, combined with the design of the leveling and compacting plate behind the discharge port, in the leveling and compacting plate, plate one is installed in a direction perpendicular to the sliding direction of the first sliding wheel and the second sliding wheel, and plate two is connected to the bottom of plate one and is perpendicular to plate one. After the similar material is discharged from the discharge port, it is leveled and compacted by plate two, and because plate two is compacted along with the movement of the first pulley and the second pulley, it is laid and compacted at the same time, which can better ensure the flatness of the similar material.

[0037] Finally, the automatic laying device mentioned above, by providing the first sliding wheel and the second sliding wheel, can not only drive the entire device to slide, but also facilitate installation. In actual use, the first sliding wheel and the second sliding wheel can be quickly installed by setting them on the flange position of the I-beam.

[0038] As a preferred solution of the present invention, a roller is provided at the bottom of the middle isolation column, and a slide rail cooperating with the roller is provided on the bottom beam, and the middle isolation column can slide left and right in the test chamber through the cooperation of the roller and the slide rail.

[0039] As another preferred embodiment of the present invention, the effective length of the test chamber is divided into 1000mm, 1500mm, 2000mm, 2500mm, 3000mm, 3500mm, 4000mm, 4500mm and 5000mm, and the intermediate isolation column is a hollow square pipe with a size of 400mm×1500mm×500mm.

[0040] Preferably, a plurality of second through holes are provided on both sides of the left baffle plate, the right baffle plate and the middle isolation column.

[0041] Preferably, the bottom of the second telescopic oil cylinder is fixed on the hydraulic cylinder welding seat, and the hydraulic steel welding seat is fixed on the equipment frame base.

[0042] Preferably, the rock formation flexible loading device comprises a flexible airbag, and the flexible airbag is composed of a plurality of independently loaded airbag bodies, each of which is connected to an independent constant pressure control pump.

[0043] Preferably, the lengths of the first and second plates are the same, and the width of the second plate is 10 to 20 cm.

[0044] Preferably, the support frame includes four support rods arranged in a frame shape, one end of each support rod is connected to the second connecting plate, and the other end is connected to a square frame, the cylinder is installed on the square frame, and the protruding end of the cylinder passes through the support frame and is pushed toward the bottom of the discharge port.

[0045] Preferably, the similar material preparation and conveying device includes a feeding hose, through which similar materials are conveyed to the integrated hopper, one end of the feeding hose is connected to the slurry preparation and conveying device, and the other end is located above the integrated hopper, and the feeding hose located near the integrated hopper is fixed thereto by a fixing part, and the fixing part includes a slender steel bar, and the slender steel bar is provided with holes, and the slender steel bar is installed on the right column of the equipment frame, and a plurality of clips are fixedly provided on the slender steel bar, and a fixing rod is erected toward the test bin through each clip, and an iron plate with a hollow upper part is installed at the other end of the fixing rod, and the iron plate is fixed to the end of the fixing rod by bolts, and the feeding hose located near the integrated hopper is fixed to the fixing rod through the iron plate, and the discharge port end of the feeding hose is placed directly above the integrated hopper, and when the integrated hopper slides, the feeding hose moves with the integrated hopper under the action of the fixing part.

[0046] Another object of the present invention is to provide a deep rock grouting and seepage simulation test method, which uses the above-mentioned deep rock grouting and seepage simulation test system and includes the following steps in sequence:

[0047] The first step is to calculate the required size and angle of the model according to the geological conditions to be simulated, and equip similar materials according to the actual strata;

[0048] Step 2: After determining the size of the model, move the position of the middle isolation column and adjust it to the position required by the experiment, and then fix it;

[0049] Step 3: Install I-beam baffles on both sides of the test chamber from the bottom to the top, and lay similar materials through the automatic laying device. Use materials with different proportions for each layer according to requirements, and evenly spread mica powder between simulated rock layers. After laying, install the first baffles in front and behind the test chamber;

[0050] Step 4: After the model is laid, place the rock formation flexible loading device on the top of the test chamber model, adjust the first telescopic cylinder, lower the reaction beam, and fix the reaction beam to the left and right baffles and the middle isolation column of the test chamber with bolts;

[0051] Step 5: pressurizing the flexible loading device using the loading mechanism;

[0052] Step 6: Operate the second telescopic oil cylinder to adjust the angle of the test chamber, and adjust the inclination of the test chamber to be consistent with the required coal seam inclination;

[0053] Step 7: After the similar materials solidify, gradually remove the first baffles at the front and back until the model meets the excavation requirements;

[0054] Step 8: Use the model excavation device to excavate the model from the back side of the test chamber, monitor the deformation and damage of the overlying rock strata, and determine the position of the separation space;

[0055] Step 9: Arrange grouting holes and grouting pipes on the top of the model, and connect the grouting pipes to the grouting holes; inject the slurry prepared by the grouting device into the abscission space, and monitor the flow state of the slurry.

[0056] Compared with the prior art, the present invention brings the following beneficial technical effects:

[0057] The present invention proposes a deep rock grouting and seepage simulation test system, which can simulate the overburden stratum delamination and grouting process, restore the overburden stratum delamination and grouting evolution under actual geological conditions, and provide technical support for studying the evolution of overburden stratum delamination and slurry seepage law.

[0058] On the conventional similar material simulation experimental device, by reasonably setting the position of the middle partition, it is possible to carry out synchronous comparative tests in the test chamber, eliminating the influence of factors such as time on the test; and the angle of the designed test chamber can be adjusted as needed, effectively realizing the research on the relevant theory of grouting of overburden separation of near-horizontal coal seams;

[0059] The test system of the present invention adopts a flexible loading device, which eliminates the defect of unbalanced upper force loading in most current devices.

[0060] The automatic paving device adopted in the present invention realizes the automation of paving of similar materials. The paving equipment moves at a uniform speed during the paving process, ensuring the uniform paving of similar materials. The automatic paving device is equipped with a leveling and compacting device, which effectively ensures the smooth paving of the entire model. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] The present invention will be further described below in conjunction with the accompanying drawings:

[0062] Figure 1 It is a schematic diagram of the installation of the automatic laying device of the present invention on a two-dimensional similar simulation test bench;

[0063] Figure 2 It is a structural schematic diagram of the automatic laying device of the present invention;

[0064] Figure 3It is a side view of the automatic laying device of the present invention;

[0065] Figure 4 A top view of the automatic laying device of the present invention;

[0066] Figure 5 It is a structural schematic diagram of the grouting device of the present invention;

[0067] In the figure:

[0068] 1. Equipment frame base, 2. Articulated base, 3. Test chamber bottom beam, 4. First baffle, 5. Middle isolation column, 6. Equipment frame column, 7. Rock formation flexible loading device, 8. Automatic laying device, 9. First electric hoist, 10. Second electric hoist, 11. Third electric hoist, 12. Cylinder bracket, 13. Reaction beam, 14. Second telescopic cylinder, 15. First telescopic cylinder, 16. Hydraulic cylinder welding seat, 17. First sliding wheel, 18. Second sliding wheel, 19. Cylinder, 20. Leveling and compacting mechanism, 21. Discharge port, 22. Integrated hopper, 23. Baffle, 24. Hollow right-angle reducer, 25. Support rod, 26. Air pump station, 27. Casters, 28. Grouting machine frame, 29. Hoop, 30. Sealing device, 31. Slurry inlet pressure port, 32. Grouting tank, 33. Slurry outlet. DETAILED DESCRIPTION

[0069] The present invention proposes a deep rock grouting and seepage simulation test system. In order to make the advantages and technical solutions of the present invention clearer and more specific, the present invention is described in detail below in conjunction with specific embodiments.

[0070] The two-dimensional similarity simulation test bench described in the present invention includes an equipment frame and a test chamber located in the equipment frame, wherein the equipment frame includes an equipment frame base 1, equipment frame columns 6 located on both sides of the base, which are respectively a left column and a right column, and a top beam, and the equipment frame base is fixedly connected to the left column and the right column by bolts; the top beam is fixedly connected to the left column and the right column by bolts.

[0071] The present invention is a deep rock grouting and seepage simulation test system, which includes an equipment frame, a rock stratum flexible loading device, a test chamber, an automatic laying device 8, a similar material preparation and transportation device, a grouting device and an installation device.

[0072] The test chamber is a rectangular parallelepiped structure located in the equipment frame. The specific structure of the test chamber includes a test chamber bottom beam 3, a left baffle, a right baffle, a middle isolation column 5 and a reaction beam 13. As a major innovation of the present invention, the internal space of the test chamber is divided into two by the middle isolation column, so that synchronous comparative tests can be carried out in the test chamber.

[0073] The interior of the test chamber is divided by an intermediate isolation column, specifically: the intermediate isolation column is a hollow square pipe with a size of 400mm×1500mm×500mm, four rollers are installed at the bottom of the intermediate isolation column, and a slide rail matching the rollers is installed on the bottom beam of the test chamber. In this design, the intermediate isolation column can slide left and right along the bottom beam, and a plurality of first through holes are provided on the bottom beam and the intermediate isolation column. The first through holes are used to fix the intermediate isolation column to the bottom beam. When the intermediate isolation column slides to a suitable position, the intermediate isolation column and the bottom beam are fixed by bolts matching the first through holes. The effective length of the test chamber can be set to: 1000mm, 1500mm, 2000mm, 2500mm, 3000mm, 3500mm, 4000mm, 4500mm and 5000mm respectively.

[0074] A plurality of second through holes are arranged on both sides of the left baffle plate, the right baffle plate and the middle isolation column for fixing the left baffle plate and the right baffle plate.

[0075] The bottom beam of the test bin is fixedly connected to the left baffle and the right baffle respectively, a second telescopic cylinder 14 is arranged in a direction perpendicular to the bottom beam, a cylinder bracket 12 is arranged on the top beam of the equipment frame, the bottom of the second telescopic cylinder is hinged to the cylinder bracket, a base is arranged on the left side of the bottom beam, and the top of the second telescopic cylinder is hinged to the base; the right bottom of the test bin is welded to the base of the equipment frame through a hinged base; the angle of the test bin can be adjusted within a certain range by adjusting the second telescopic cylinder.

[0076] A first telescopic oil cylinder 15 is arranged on the outer side of the left column of the equipment frame. The top of the first telescopic oil cylinder is connected to a steel wire rope by a fixed pulley. The other end of the steel wire rope is connected to the reaction beam 13. Specifically, two lifting ears are arranged on the reaction beam 13, which are connected to the steel wire rope through the lifting ears. When the first telescopic oil cylinder is extended or retracted, the reaction beam can be lowered or raised. During the laying process of similar materials, the first telescopic oil cylinder is retracted and the reaction beam is raised. After the laying is completed, the first telescopic oil cylinder is extended, and the reaction beam is lowered. After the lowering, it is connected and fixed to the left baffle, the right baffle and the middle isolation column of the test chamber through bolts.

[0077] A plurality of electric hoists are arranged at the left and right ends of the top beam of the equipment frame, such as the first electric hoist 9, the second electric hoist 10 and the third electric hoist 11 arranged from left to right. The design of the electric hoist also facilitates the later installation of the automatic laying device.

[0078] The above-mentioned rock formation flexible loading device 7 includes a flexible airbag, which is composed of a number of independently loaded airbag bodies, each of which is connected to an independent constant pressure control pump. The rock formation flexible loading device also includes an independent constant pressure control pump, a pressure sensor, a gas source, a precision pressure regulating valve group, a gas pipeline, a pipeline connector and a collection controller used in conjunction with the flexible airbag. The flexible loading airbag is installed in the grouting and seepage simulation test chamber, and the pipeline and corresponding valve parts are connected. The gas is injected into the airbag at the designed pressure through the constant pressure pump to achieve flexible loading. The pressure can achieve gradient loading control and design a flexible loading method. The specific loading method and how to load can be achieved by those skilled in the art with reference to the existing technology.

[0079] The first telescopic oil cylinder and the second telescopic oil cylinder are both connected to the air pump station.

[0080] Preferably, a plurality of second through holes are provided on both sides of the left baffle plate, the right baffle plate and the middle isolation column.

[0081] Preferably, the bottom of the second telescopic oil cylinder is fixed on the hydraulic cylinder welding seat 16, and the hydraulic steel welding seat is fixed on the equipment frame base 1.

[0082] Combination Figure 2 , Figure 3 and Figure 4 As shown, the automatic paving device 8 comprises an integrated hopper 22, a sliding mechanism, a cylinder 19, a leveling and compacting mechanism 20 and a main control console. The integrated hopper is used to hold similar simulation materials, the sliding mechanism is used to ensure the sliding of the automatic paving device, the cylinder 19 controls the discharge speed of the integrated hopper 22, and the leveling and compacting mechanism ensures the flatness of the paving of similar simulation materials.

[0083] The integrated hopper 22 for containing similar simulation materials is funnel-shaped as a whole, i.e., wide at the top and narrow at the bottom, so that it is convenient to control the discharge speed of the discharge port. Specifically, the integrated hopper includes a hopper body, and the cross-sectional area of ​​the hopper body decreases from top to bottom. A feed port is arranged at the top of the hopper body, i.e., the top is open-shaped, and similar materials can enter the hopper body from any position of the top thereof. A discharge port 21 is arranged at the bottom of the hopper body, and the shape of the discharge port is circular or square.

[0084] like Figure 3 As shown, the sliding mechanism includes a first sliding wheel 17, a second sliding wheel 18 and a hollow right-angle reducer 24 for driving and controlling the first sliding wheel and the second sliding wheel to slide, wherein the first sliding wheel and the second sliding wheel are provided in two groups, each group includes a first sliding wheel and a second sliding wheel, and the structure of the first sliding wheel and the second sliding wheel can be realized by referring to the existing technology, and no detailed description is given here.

[0085] A first connecting plate and a second connecting plate are provided on the side of the hopper body, and the main functions of the first connecting plate and the second connecting plate are to install the first sliding wheel, the second sliding wheel and the support frame, and the first sliding wheel and the second sliding wheel are installed on the first connecting plate and the second connecting plate. The specific installation method is to fix the connection by bolts, fix the first sliding wheel to the first connecting plate by bolts, and fix the second sliding wheel to the first connecting plate by bolts. The installation heights of the first sliding wheel and the second sliding wheel are the same. In order to ensure translation, the installation heights of the two are the same, and the installation heights of the first sliding wheel and the second sliding wheel located on the second connecting plate are also the same. The directions of the wheels of the first sliding wheel and the second sliding wheel are their sliding directions, and the directions of the wheels are parallel to the side directions of the hopper body. The hollow right-angle reducer is installed on the outer sides of the first sliding wheel and the second sliding wheel located on one side of the first connecting plate, and is used to control and realize the rotation of the two first sliding wheels and the two second sliding wheels.

[0086] The hollow right-angle reducer is connected to the first sliding wheel and the second sliding wheel through a hinge shaft to control the rotation of the sliding wheels.

[0087] The support frame includes four support rods arranged in a frame shape, one end of each support rod 25 is connected to the second connecting plate, and the other end is connected to a square frame. The cylinder is installed on the square frame, and the extended end of the cylinder passes through the support frame and is pushed below the discharge port.

[0088] One end of the cylinder is connected to an air pump station 26, and the other end is connected to a hinged plate, and the hinged plate is connected to a baffle 23. The cylinder is supported by a support frame. The shape and size of the baffle are adapted to the shape and size of the discharge port 21. Preferably, both are round or square. The air pump station provides power to control the cylinder 19 and make it pass through the support frame to advance or push out in the direction of the discharge port. The discharge speed of the discharge port is controlled by controlling the advancement and push out of the cylinder in the direction of the discharge port.

[0089] The flattening and compacting mechanism 20 includes a flattening and compacting plate and a mounting structure, wherein the flattening and compacting plate includes a plate 1 and a plate 2, wherein the plate 1 is mounted behind the discharge port through the mounting structure, and the plate 1 is mounted in a direction perpendicular to the sliding directions of the first sliding wheel and the second sliding wheel, and the plate 2 is connected to the bottom of the plate 1 and is perpendicular to the plate 1. When similar materials are discharged from the discharge port, they are flattened and compacted by the plate 2; a plurality of circular holes are vertically arranged on the plate 1, and the mounting structure includes fixing screws matching the circular holes, and the height of the flattening and compacting plate is adjusted by adjusting the mounting position of the circular holes;

[0090] The above-mentioned leveling and compacting plate and the installation mechanism cooperate with each other, and the leveling and compacting plate can be installed at an appropriate height through the installation mechanism according to the laying requirements of similar simulation materials. The specific height adjustment is achieved through multiple circular holes arranged vertically on the first plate. If the installation mechanism is installed on the circular holes at different heights, the height adjustment of the leveling and compacting plate is completed. When laying similar materials from bottom to top, the height of the leveling and compacting plate is adjusted so that the second plate is just compacted on the similar simulation material.

[0091] Preferably, a pressure sensor is also provided at the bottom of the second plate, and the pressure sensor is connected to the main control console via a data line. The pressure sensor transmits data to the main control console, so that the main control console can adjust the discharge speed of the discharge port.

[0092] A similar material preparation and conveying device and an installation device are used in conjunction with this automatic laying device. The similar material preparation device, for example, uses a stirring mechanism to prepare and stir similar simulation materials; the similar material conveying device, for example, uses an automatic feeding mechanism to convey the similar simulation materials into the hopper body of the automatic laying device.

[0093] The above-mentioned automatic feeding mechanism preferably includes a conveyor and a feeding hose. The conveyor is located below the discharge port of the stirring mechanism. The similar simulation material discharged from the discharge port of the stirring mechanism enters the conveyor and is transported to the feeding hose by the conveyor belt of the conveyor. That is, by connecting one end of the feeding hose to the discharge end of the conveyor, the similar simulation material can be transported into the feeding hose, and the other end of the feeding hose is located above the integrated hopper.

[0094] When the integrated hopper is moved during laying, in order to facilitate the feeding hose to move with the integrated hopper, the feeding hose located near the integrated hopper is fixed by a fixing piece.

[0095] Specifically, the fixing part includes a slender steel bar, which is provided with holes. The slender steel bar is installed on the right column of the equipment frame, and a plurality of buckles are fixed on the slender steel bar. A fixing rod is set to the test bin through each buckle, and a hollow iron plate is installed on the other end of the fixing rod. The iron plate is fixed to the end of the fixing rod by bolts. The feeding hose near the integrated hopper passes through the iron plate and is fixed to the fixing rod. The discharge port end of the feeding hose is placed directly above the integrated hopper. When the integrated hopper slides, the feeding hose moves with the integrated hopper under the action of the fixing part. This design can realize laying while feeding, avoiding the accumulation of similar simulated materials.

[0096] like Figure 5As shown, the grouting device includes casters 27, a grouting frame 28, a hoop 29, a sealing device 30, a slurry inlet pressure port 31, a grouting tank 32, and a slurry outlet 33. The casters 27 are installed below the grouting frame 28, the grouting tank 32 is located on the grouting frame 28, the slurry inlet pressure port 31 and the slurry outlet 33 are respectively connected to the grouting tank 32, the sealing device 30 seals the grouting tank 32, and the hoop 29 can further fix the grouting tank 32.

[0097] Preferably, in order to realize full automation of the automatic laying system, the automatic laying device, the stirring mechanism and the automatic feeding mechanism are all connected to the main control system, and the main control system controls the laying of the automatic laying device, the stirring time of the stirring mechanism, and further controls the feeding speed of the automatic feeding mechanism.

[0098] In order to facilitate the quick and convenient installation of the automatic laying device, the present invention has a targeted installation device, which specifically includes an I-beam. The structure of the I-beam is the same as that of the prior art, including a web and flange plates on both sides. The I-beam is installed on the front and rear sides of the test chamber, and the first sliding wheel and the second sliding wheel are respectively installed on the flange positions of the I-beam. When similar simulation materials need to be laid in the test chamber, the automatic laying device is placed on the I-beam where a layer of similar material is to be laid through the electric hoist on the top of the equipment frame, and is installed together with the I-beam.

[0099] The deep rock grouting and seepage simulation test method is further explained below.

[0100] The deep rock grouting and seepage simulation test method adopts the deep rock grouting and seepage simulation test system mentioned above, and comprises the following steps in sequence:

[0101] The first step is to calculate the required size and angle of the model according to the geological conditions to be simulated, and equip similar materials according to the actual strata;

[0102] Step 2: According to the experimental requirements in step 1, after determining the size of the model, move the position of the middle isolation column and adjust it to the position required by the experiment, and then use bolts to fix the middle isolation column to the bottom beam of the test chamber;

[0103] The third step is to set up the front and rear I-beam baffles from the bottom of the test chamber upwards, and lay similar materials through the automatic laying device. According to the requirements, different proportions of materials are used for each layer, and mica powder is evenly spread between the simulated rock layers. After laying, the first baffle 4 is installed in front and behind the test chamber;

[0104] Step 4: After the model is laid, place the rock formation flexible loading device on the top of the test chamber model, adjust the first telescopic cylinder, lower the reaction beam, and fix the reaction beam to the left and right baffles and the middle isolation column of the test chamber with bolts;

[0105] Step 5: pressurizing the flexible loading device using the loading mechanism;

[0106] Step 6: Operate the second telescopic oil cylinder to adjust the angle of the test chamber, and adjust the inclination of the test chamber to be consistent with the required coal seam inclination;

[0107] Step 7: After the similar materials solidify, gradually remove the first baffles at the front and back until the model meets the excavation requirements;

[0108] Step 8: Use the model excavation device to excavate the model from the back side of the test chamber, monitor the deformation and damage of the overlying rock strata, and determine the position of the separation space;

[0109] Step 9: Arrange grouting holes and grouting pipes on the top of the model, and connect the grouting pipes to the grouting holes; inject the slurry prepared by the grouting device into the abscission space, and monitor the flow state of the slurry.

[0110] In summary, the present invention can restore the overburden stratum separation and grouting evolution under actual geological conditions, and provide technical support for studying the evolution of overburden stratum separation and slurry seepage law.

[0111] Parts not described in the present invention can be implemented by referring to the existing technology.

[0112] It should be noted that any equivalent method or obvious variation method made by those skilled in the art under the guidance of this specification should be within the protection scope of the present invention.

Claims

1. A deep rock grouting and seepage simulation test system, characterized in that: It includes equipment frame, rock formation flexible loading device, test chamber, automatic laying device, similar material preparation and conveying device, grouting device and installation device; The test chamber is located in the equipment frame, and the test chamber includes a bottom beam, a left baffle, a right baffle, a middle isolation column and a reaction beam; The bottom beam is fixedly connected to the left baffle and the right baffle respectively, a second telescopic oil cylinder is arranged in a direction perpendicular to the bottom beam, a cylinder bracket is arranged on the top beam of the equipment frame, the bottom of the second telescopic oil cylinder is hinged to the cylinder bracket, a base is arranged on the left side of the bottom beam, and the top of the second telescopic oil cylinder is hinged to the base; the right bottom of the test bin is welded to the base of the equipment frame through a hinged base; the angle of the test bin can be adjusted within a certain range by adjusting the second telescopic oil cylinder; The middle isolation column is arranged in the inner space of the test chamber, and the middle isolation column can slide left and right along the bottom beam. A plurality of first through holes are arranged on the bottom beam and the middle isolation column. When the middle isolation column slides to a suitable position, the middle isolation column and the bottom beam are fixed by bolts cooperating with the first through holes. A first telescopic oil cylinder is arranged on the outer side of the left column of the equipment frame, and a steel wire rope is connected to the top of the first telescopic oil cylinder by a fixed pulley, and the other end of the steel wire rope is connected to the reaction beam; when the first telescopic oil cylinder is extended or retracted, the reaction beam can be lowered or raised; A plurality of electric hoists are arranged at the left and right ends of the top beam of the equipment frame; The automatic paving device comprises an integrated hopper, a sliding mechanism, a cylinder, a leveling and compacting mechanism and a main control console; The integrated hopper comprises a hopper body, the cross-sectional area of ​​which decreases from top to bottom, the top of the hopper body is provided with a feed inlet, and the bottom of the hopper body is provided with a discharge outlet; The sliding mechanism comprises a first sliding wheel, a second sliding wheel and a hollow right-angle reducer for driving and controlling the first sliding wheel and the second sliding wheel to slide; The side of the hopper body is provided with a first connecting plate and a second connecting plate, on which the first sliding wheel and the second sliding wheel are installed, and the installation heights of the two first sliding wheels and the two second sliding wheels are the same, and the hollow right-angle reducer is installed on the outside of the first sliding wheel and the second sliding wheel located on one side of the first connecting plate, and is used to control and realize the rotation of the two first sliding wheels and the two second sliding wheels; A support frame perpendicular to the second connecting plate is also installed on the second connecting plate; One end of the cylinder is connected to an air pump station, and the other end is connected to a hinged plate, and the hinged plate is connected to a baffle, and the cylinder is supported by the support frame, and the shape and size of the baffle are adapted to the shape and size of the discharge port. The air pump station provides power to control the cylinder and make it pass through the support frame to advance or push out in the direction of the discharge port, and the discharge speed of the discharge port is controlled by controlling the advancement and push out of the cylinder in the direction of the discharge port; The flattening and compacting mechanism comprises a flattening and compacting plate and a mounting structure, wherein the flattening and compacting plate comprises a plate 1 and a plate 2, wherein the plate 1 is mounted behind the discharge port through the mounting structure, and the plate 1 is mounted in a direction perpendicular to the sliding directions of the first sliding wheel and the second sliding wheel, and the plate 2 is connected to the bottom of the plate 1 and is perpendicular to the plate 1, and when similar materials are discharged from the discharge port, they are flattened and compacted by the plate 2; a plurality of circular holes are vertically arranged on the plate 1, and the mounting structure comprises fixing screws matching the circular holes, and the height of the flattening and compacting plate can be adjusted by adjusting the mounting position of the circular holes; A pressure sensor is also provided at the bottom of the second board, and the pressure sensor is connected to the main control console via a data line; The similar material preparation and conveying device is used to convey similar materials into the hopper body; The installation device is used to install the automatic laying device, and the installation device includes an I-beam, and the I-beam is installed on the front and rear sides of the test chamber. The first sliding wheel and the second sliding wheel are respectively installed on the flange positions of the I-beam. When similar simulation materials need to be laid in the test chamber, the automatic laying device is placed on the I-beam through the electric hoist on the top of the equipment frame and installed together with the I-beam.

2. A deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The bottom of the middle isolation column is provided with a roller, and the bottom beam is provided with a slide rail matched with the roller, and the middle isolation column can slide left and right in the test chamber through the cooperation of the roller and the slide rail.

3. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The effective length of the test chamber is divided into 1000mm, 1500mm, 2000mm, 2500mm, 3000mm, 3500mm, 4000mm, 4500mm and 5000mm, and the middle isolation column is a hollow square pipe with a size of 400mm×1500mm×500mm.

4. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: A plurality of second through holes are arranged on both sides of the left baffle plate, the right baffle plate and the middle isolation column.

5. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The bottom of the second telescopic oil cylinder is fixed on the hydraulic cylinder welding seat, and the hydraulic cylinder welding seat is fixed on the equipment frame base.

6. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The rock formation flexible loading device comprises a flexible airbag, which is composed of a plurality of independently loaded airbag bodies, each of which is connected to an independent constant pressure control pump.

7. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The lengths of the first and second boards are the same, and the width of the second board is 10 to 20 cm.

8. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The support frame includes four support rods arranged in a frame shape, one end of each support rod is connected to the second connecting plate, and the other end is connected to a square frame. The cylinder is installed on the square frame, and the protruding end of the cylinder passes through the support frame and is pushed toward the bottom of the discharge port.

9. The deep rock grouting and seepage simulation test system according to claim 1, characterized in that: The similar material preparation and conveying device comprises a feeding hose, through which similar materials are conveyed to the integrated hopper, one end of the feeding hose is connected to the similar material preparation and conveying device, and the other end is located above the integrated hopper. The feeding hose located near the integrated hopper is fixed thereto by a fixing part, and the fixing part comprises a slender steel bar, on which holes are provided, and the slender steel bar is installed on the right column of the equipment frame, and a plurality of clips are fixedly provided on the slender steel bar, and a fixing rod is erected toward the test bin through each clip, and an iron plate with a hollow upper part is installed at the other end of the fixing rod, and the iron plate is fixed to the end of the fixing rod by bolts, and the feeding hose located near the integrated hopper is fixed to the fixing rod through the iron plate, and the discharge port end of the feeding hose is placed directly above the integrated hopper, and when the integrated hopper slides, the feeding hose moves with the integrated hopper under the action of the fixing part.

10. A deep rock grouting and seepage simulation test method, characterized in that: The method adopts the deep rock grouting and seepage simulation test system as claimed in claim 1, and the method comprises the following steps in sequence: The first step is to calculate the required size and angle of the model according to the geological conditions to be simulated, and equip similar materials according to the actual strata; Step 2: After determining the size of the model, move the position of the middle isolation column and adjust it to the position required by the experiment, and then fix it; Step 3: Install I-beam baffles on both sides of the test chamber from the bottom to the top, and lay similar materials through the automatic laying device. Use materials with different proportions for each layer according to requirements, and evenly spread mica powder between simulated rock layers. After laying, install the first baffles in front and behind the test chamber; Step 4: After the model is laid, place the rock formation flexible loading device on the top of the test chamber model, adjust the first telescopic cylinder, lower the reaction beam, and fix the reaction beam to the left and right baffles and the middle isolation column of the test chamber with bolts; Step 5: pressurizing the flexible loading device using the loading mechanism; Step 6: Operate the second telescopic oil cylinder to adjust the angle of the test chamber, and adjust the inclination of the test chamber to be consistent with the required coal seam inclination; Step 7: After the similar materials solidify, gradually remove the first baffles at the front and back until the model meets the excavation requirements; Step 8: Use the model excavation device to excavate the model from the back side of the test chamber, monitor the deformation and damage of the overlying rock strata, and determine the position of the separation space; Step 9: Arrange grouting holes and grouting pipes on the top of the model, and connect the grouting pipes to the grouting holes; inject the slurry prepared by the grouting device into the abscission space, and monitor the flow state of the slurry.